PROGRAM : PROGRAM PENGEMBANGAN DESTINASI PARIWISATA
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA PARIWISATA PEKERJAAN : LANJUTAN PEMBANGUNAN PLAT LANTAI BETON DI SIRING LAUT INSTANSI : DINAS KEBUDAYAAN DAN PARIWISATA PROP / KAB / KODYA : KABUPATEN KOTABARU ITEM PEMBAYARAN NO. : 3.5 JENIS PEKERJAAN : PEKERJAAN PEMASANGAN KONSTRUKSI PENUTUP PELAT LANTAI BETON (6,4 X 10)M SATUAN PEMBAYARAN : UNIT
PERKIRAAN HARGA JUMLAH
NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA (Rp.) (Rp.)
A. URAIAN PEKERJAAN :
1. Pasang Baja profil WF 200.100.6 kg 1.280,0000 36.250,28 46.400.358,40
2. Pasang UNP 100.50.5 kg 708,1200 32.323,28 22.888.761,03 3. Pasang Siku 100.100.5 kg 495,2800 32.323,28 16.009.074,12 4. Pasang Siku 70.700.6 kg 709,4560 32.323,28 22.931.944,94 5. Pasang Pelat plendes + stifner , t =12 mm kg 250,8333 32.323,28 8.107.756,07 6. Pasang Pelat plendes + stifner , t =10 mm kg 250,8333 32.323,28 8.107.756,07 7. Pasang Plat bordes penutup t = 6 mm kg 3.191,3194 32.323,28 103.153.911,97 8. Cat zincromate m2 235,0000 56.700,00 13.324.500,00 9. Angkur M19 - L 30 cm bh 116,0000 56.000,00 6.496.000,00 10. Bobok beton unit 10,0000 1.000.000,00 10.000.000,00
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN 257.420.062,59
E. OVERHEAD & PROFIT 10 % x D 0,00 F. HARGA SATUAN PEKERJAAN ( D + E ) 257.420.062,59 Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan. 2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang 3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator. 4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.