As Built Drawing
DESA PENGLATAN KEC.
BULELENG KAB. BULELENG
SKEMA JARINGAN PIPANISASI RESERVOAR
DESA PENGLATAN (Existing)
BRONCAPTERING SI N
GA A M
BA RA RA
JA
PAMSIMAS MENYETUJUI :
BRONCAPTERING
(Existing) PUTU SUNANTO, ST
DIPERIKSA :
RESERVOAR d : 2"
DIBUAT OLEH :
KETUA SATLAK
(KOMANG MERTAYASA)
JUDUL GAMBAR :
PIPA DISTRIBUSI
JARINGAN PIPA
DESA PENGLATAN
BA RA RA
GA A M JA
SI N
Sirtu PEKERJAAN :
DPMU
KABUPATEN BULELENG
Tanah Urug 0.40
0. 0.60
MENYETUJUI :
SENIOR FASILITATOR
KABUPATEN BULELENG
PUTU SUNANTO, ST
DIPERIKSA :
0.10 0.09
0. 0.10 0.10 0.05 0.10
TFM WSS
DIBUAT OLEH :
KETUA SATLAK
JUDUL GAMBAR :
GALIAN PIPA
Kayu 8/12 Atap seng gelombang
+ 2.70
BA RA RA
GA A M JA
SI N
PEKERJAAN :
+1
Dinding keramik 20 X 25 SISTEM PENYEDIAAN AIR MINUM
+ 0.75 DESA PENGLATAN
KECAMATAN BULELENG
Lantai keramik
MENGETAHUI :
+ 0.25 Rabat beton (tb 6 cm)
Sloof 15/20
DPMU
0.00 KABUPATEN BULELENG
- 0.20
Pas. batu kali (camp 1 : 4)
DIPERIKSA :
TFM WSS
KETUA SATLAK
(KOMANG MERTAYASA)
JUDUL GAMBAR :
DENAH KM/WC BARU TAMPAK DEPAN
SKALA 1: 50 SKALA 1: 50
PEKERJAAN :
MENGETAHUI :
DPMU
KABUPATEN BULELENG
MENYETUJUI :
SENIOR FASILITATOR
KABUPATEN BULELENG
PUTU SUNANTO, ST
DIPERIKSA :
TFM WSS
KETUA SATLAK
(KOMANG MERTAYASA)
JUDUL GAMBAR :