Anda di halaman 1dari 1

JADWAL WAKTU PELAKSANAAN

Nama Pekerjaan : REVITALISASI PASAR INPRES GEUDONG


Lokasi : GEUDONG, KAB. ACEH UTARA
Owner : PD. BINA USAHA
Pelaksana : PT.RAMA PERKASA MANDIRI

JUMLAH BOBOT MASA PELAKSANAAN


NO URAIAN KEGIATAN VOLUME SAT HARGA RENCANA BULAN KET (%)
(Rp.) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
mar Apr Mei Jun Juli Ags Sept Okt Nov Des-20 Jan Feb Mar Apr Jun Jul Ags Sep-21

100
A PEKERJAAN PERSIAPAN DAN UMUM 36,000,000.00 0.36 0.18 0.18
B PEKERJAAN RUKO BLOK-A (2 UNIT) 381,010,563.37 3.86 0.96 0.96 0.96 0.96
80
C PEKERJAAN RUKO BLOK-B (9 UNIT) 1,149,363,943.90 11.64 1.940 1.940 1.940 1.940 1.940 1.940
D PEKERJAAN RUKO BLOK-C (12 UNIT) 1,474,636,450.01 14.93 2.133 2.133 2.133 2.133 2.133 2.133 2.133
60
E PEKERJAAN RUKO BLOK-D (12 UNIT) 1,486,785,583.43 15.06 1.88 1.88 1.88 1.88 1.88 1.88 1.88 1.88
F PEKERJAAN RUKO BLOK-E (9 UNIT) 1,197,534,111.50 12.13 1.52 1.52 1.52 1.52 1.52 1.52 1.52 1.52
40
G PEKERJAAN RUKO BLOK-F (11] UNIT) 1,481,089,455.40 15.00 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67 1.67
H PEKERJAAN RUKO BLOK-G (14 UNIT) 1,900,094,055.11 19.24 2.75 2.75 2.75 2.75 2.75 2.75 2.75
20
I.. PEKERJAAN MUSHALLA DAN TEMPAT WUDHU 214,699,353.52 2.17 0.72 0.72 0.72
J. PEKERJAAN LANDSCAPE 553,433,047.06 5.60 1.40 1.40 1.40 1.40
0

TOTAL BOBOT 9,874,646,563.31 100.00


PROGRES RENCANA BULANAN (%) 0.18 1.15 2.90 2.90 5.04 5.59 9.14 11.89 9.95 9.95 9.95 7.81 7.81 7.02 3.79 2.13 1.40 1.40
PROGRES RENCANA KOMULATIF BULANAN (%) 0.00 0.18 1.33 4.23 7.14 12.18 17.77 26.90 38.79 48.74 58.68 68.63 76.44 84.26 91.28 95.07 97.20 98.60 100.00

REALISASI PROGRES BULANAN (%) 0 0.18 2.12 `

REALISASI PROGRES KOMULATIF BULANAN (%) 0 0.18 2.30

DIFFERENCES 0.00 1.16

Anda mungkin juga menyukai