Anda di halaman 1dari 47

REKAPITULASI AKHIR

Harga
Deskripsi Pekerjaan Vol
( Rp )

PRELIMINARIES 1 271,850,000

BILL NO.2 -CLUSTER


Demolition 1 312,817,500
PEKERJAAN INTERIOR
PEKERJAAN DINDING 1 941,202,427
PEKERJAAN FINISHING 1 733,686,561
PEKERJAAN LANTAI 1 1,399,366,151
PEKERJAAN PLAFOND 1 915,417,564
PEKERJAAN PINTU 1 684,175,000
PEKERJAAN ELEKTRIKAL 1 677,612,990
PEKERJAAN FIRE SERVICES 1 140,047,680
PEKERJAAN PLUMBING 1 559,335,898
PEKERJAAN GAS MEDIK 1 374,557,290
PEKERJAAN HVAC 1 1,304,305,219
PEKERJAAN FURNITURE 1 2,339,741,486
MISCELANEOUS 1 131,215,000
SIGNAGE 1 52,450,000

TOTAL 10,837,780,765
PPN 10% 1,083,778,077
GRAND TOTAL 11,921,558,842

Terbilang : # Sebelas Milyar Empat Ratus Delapan Puluh Delapan Juta Dua Ratus Lima Puluh Dua Ribu Dua Ratus Tiga Puluh Lima
Rupiah
PRELIMINARIES
Kode Deskripsi Unit Rupiah

CATATAN HARGA

UMUM

Kontrak ini bersifat lump Sum (kecuali dimana dicantumkan "Provisonal" atau
"Provisioanal Sum" dan oleh karena itu Kontraktor wajib menghitung kembali volume
(jumlah satuan) pekerjaan yang diajukan oleh Quantity Surveyor dan jika menurut
perhitungan Kontraktor volume (jumlah satuan) pekerjaan yang tercantum tersebut
tidak benar atau ada pekerjaan yang belum dicantumkan, Kontraktor dapat merubah
atau menambahkannya pada lampiran khusus yang dibuat untuk itu, semua resiko
baik mengenai salah hitung terhadap harga maupun jumlah satuan yang diajukan
dan biaya-biaya lain yang tidak terduga adalah tetap menjadi tanggung jawab
Kontraktor.

Dalam mengajukan harga pekerjaan ini Kontraktor harus sudah mempertimbangkan


untuk memasukan semua biaya pengeluaran pekerjaan dan tidak ada tuntutan di
kemudian hari terhadap Pemberi Tugas bila Daftar Uraian Pekerjaan ini dipandang
tidak lengkap oleh Kontraktor dan semua hal-hal yang tidak tercantum disini
dianggap sudah dimasukan didalam penawaran pekerjaan yang ditawarkan.

Jumlah harga yang ditawarkan Kontraktor adalah Lump Sum (jumlah tetap). Semua
resiko baik mengenai ekskalasi harga, salah hitung terhadap harga maupun jumlah
satuan yang diajukan menjadi tanggung jawab Kontraktor.

Kontraktor wajib jika dikehendaki membuat perhitungan-perhitungan (kalkulasi) yang


terperinci beserta gambar-gambar dan harus diserahkan kepada Pemberi Tugas
dalam rangkap tiga untuk diperiksa dan disetujui. Kontraktor wajib menyerahkan
kepada Pemberi Tugas hasil perhitungan (kalkulasi) dan gambar-gambar terakhir
yang telah disetujui.

PRELIMINARIES

Kontraktor dianggap sudah memasukan harga untuk semua preliminaries ini


termasuk biaya preliminaries untuk semua nilai provisional yang termasuk dalam
total nilai kontrak yang disepakati. Tidak ada penyesuaian apapun terhadap nilai
preliminaries ini walaupun terjadi pengurangan atau penambahan terhadap nilai
provisional dikemudian hari.

Jika menurut Kontraktor terdapat item pekerjaan Preliminaries yang belum termasuk
dalam item pekerjaan preliminaries yang disediakan ini, tetapi harus ada sehubungan
dengan lingkup pekerjaan yang menjadi tanggung jawabnya, maka kontraktor dapat
mengajukan penambahan item preliminaries dalam lembar terpisah dan nilainya
harus sudah termasuk dalam jumlah nilai rekapitulasi akhir yang ditawarkan.

Kontraktor wajib membaca dan memahami seluruh isi pekerjaan Preliminaries ini,
jika Kontraktor menganggap tedapat item pekerjaan yang sudah termasuk dalam
penawaran, maka Kontraktor wajib untuk menulis "Termasuk" dalam kolom harga.
Jika ada item dalam pekerjaan preliminaries tidak diberikan harga, maka dianggap
sudah termasuk.

Total nilai preliminaries ini lump sum dan tidak akan ada penyesuaian apapun
sehubungan dengan total nilai kontrak akhir atau adanya perubahan nilai kontrak.

Ke Penjumlahan Rp. -

1 FASILITAS KONTRAKTOR

1.1
Biaya Manajemen Lapangan dan Pengadaan Peralatan di Lapangan Ls 10,000,000

Kontraktor harus sudah memperhitungkan biaya manajemen dan persiapan


lapangan.

Kontraktor harus menyerahkan struktur organisasi lapangan secara detail yang


menunjukkan daftar semua staf pengawas lapangan untuk persetujuan Proyek
Manajer. Daftar tersebut harus sudah termasuk semua detail yang berkaitan dengan
masing-masing personil termasuk tugas, posisi, kewajiban, kualifikasi, pengalaman,
umur dan lamanya bekerja pada perusahaan Kontraktor tersebut. Diagram struktur
organisasi juga harus menunjukkan bahwa ada staf pengawas yang bertanggung
jawab di lapangan selama Masa Pemeliharaan. Penetapan struktur organisasi dan
adanya persetujuan Proyek Manajer tidak membatasi tanggung jawab dan kewajiban
Kontraktor untuk mencukupi jumlah staf yang terlibat di lapangan bila dipandang
perlu ada penambahan tanpa ada tambahan biaya dari Pemberi Tugas.

Semua instruksi yang diberikan kepada Construction Manager Kontraktor dianggap


sebagai instruksi yang diberikan kepada Kontraktor

Semua staf pengawas lapangan senior harus disetujui oleh Proyek Manajer yang
tetap memiliki hak dan kewenangan mutlak untuk mencabut persetujuannya bila
dianggap perlu tanpa memberikan alasan apapun.

Staf pengawas lapangan senior tidak boleh diganti tanpa ada persetujuan terlebih
dahulu dari Proyek Manajer.

1.2 Kantor Lapangan (Direksi Keet) dan Akomodasi Lain Kontraktor Ls 7,500,000

Kontraktor harus menyediakan, membuat, memelihara, membongkar dan


membersihkan di akhir penyelesaian pekerjaan kantor sementara dan akomodasi
yang lain termasuk fasilitas toilet yang memadai untuk digunakan staf lapangan
kontraktor dan sub-kontraktornya.
Kontraktor harus menyediakan, menjaga tetap bersih dan memelihara sepanjang
masa konstruksi, toilet yang sesuai dan memadai untuk dipakai pekerjanya.
Kontraktor harus dapat memastikan pekerjanya tidak mengotori proyek.

1.3 Peralatan Milik Kontraktor Ls include

Kontraktor harus menyediakan semua peralatan yang dibutuhkan untuk


melaksanakan dan menyelesaikan Pekerjaan.

1.4 Gudang Kontraktor Sementara dan Los Kerja Ls 7,500,000

Kontraktor harus menyediakan, membuat, memelihara dan membersihkan di akhir


penyelesaian pekerjaan semua tempat gudang sementara yang diperlukan untuk
menyimpan bahan bangunan dan peralatan.

1.5 Pakaian dan Topi Pelindung Ls 15,000,000

Kontraktor harus menyediakan dan memelihara dalam keadaan baik, bersih dan
layak semua pakaian pelindung seperti helm, sepatu dan pakaian pelindung untuk
staf Pemberi Tugas di lokasi, Pimpinan Proyek dan stafnya, staf konsultan lapangan,
serta tamu pengunjung.

Ke Penjumlahan Rp. 40,000,000

FASILITAS KONTRAKTOR (Lanjutan)

1.6 Telepon Ls incl

Kontraktor harus menyediakan saluran telepon untuk digunakan oleh dirinya sendiri.

Kontraktor harus membayar semua tagihan telepon yang dipergunakan oleh dirinya
sendiri.

1.7 Air Bersih Ls by Owner

1.8 Penerangan dan Daya Listrik Ls By Owner


2 PEKERJAAN PENUNJANG

2.1 Setting out Pekerjaan, Pengukuran dan Bouwplank Ls 2,000,000

Kontraktor bertanggung jawab terhadap keakuratan pekerjaan termasuk penentuan


level dan penentuan titik-titik patok. Kesalahan pada setting out atau penentuan level
harus diperbaiki atas biaya Kontraktor dan harus sampai bisa diterima oleh Pemberi
Tugas. Semua konsekuensi kerugian akibat kesalahan setting out dan penentuan
level menjadi tanggung jawab Kontraktor.

Kontraktor harus menyediakan semua alat-alat survey dan tim surveyor yang
dibutuhkan Pemberi Tugas untuk keperluan pengecekan ukuran dan level.

Ke Penjumlahan Rp. 2,000,000

PEKERJAAN PENUNJANG (Lanjutan)

2.2 Perancah dan Steger Ls 10,000,000

Kontraktor harus menyediakan semua perancah sementara yang diperlukan, steger,


penyokong, papan landasan, tempat pijakan berjalan, tempat masuk, tangga, jaring
keselamatan dan sejenisnya, untuk melaksanakan pekerjaan yang tepat dan aman
pada ketinggian manapun, dan harus mengubah, menggeser atau memindahkannya
untuk menyesuaikan peruntukannya setiap saat sesuai dengan kebutuhan, dan
memindahkannya dari lokasi pekerjaan pada saat penyelesaian pekerjaan.

Desain dan konstruksi perancah, steger, penyokong, papan landasan, tempat pijakan
berjalan, tempat masuk, tangga, jaring keselamatan dan sejenisnya harus memenuhi
persyaratan dari otoritas terkait.

Penggunaan kayu atau bambu dalam pembangunan perancah, steger, penyokong,


papan landasan, tempat pijakan berjalan, tempat masuk, tangga, jaring keselamatan
dan sejenisnya tidak diperbolehkan.

3 PEKERJAAN ADMINISTRASI KONTRAKTOR

3.1 Keselamatan, Kesehatan dan Kesejahteraan Pekerja (K3) Ls 45,000,000

Kontraktor harus menyampaikan rencana manual program Keselamatan dan


Kesehatan Kerja sesuai dengan Kontrak. Kontraktor harus menunjuk petugas khusus
Keselamatan dan Keselamatan Kerja untuk berkoordinasi dalam melaksanakan
program tersebut dengan Manajer Proyek.
Kontraktor harus menyediakan biaya berkaitan dengan pemenuhan atas semua
peraturan mengenai keselamatan kerja, kesehatan dan kesejahteraan pekerja dan
orang orang yang dipekerjakan di lapangan.

Kontraktor harus menyediakan dan memelihara dalam keadaan baik, bersih dan
layak semua alat pelindung diri seperti helem, sepatu dan pakaian pelindung untuk
staf Pemberi Tugas di lokasi, Pimpinan Proyek dan stafnya, staf konsultan lapangan,
serta tamu pengunjung.

3.2 Foto Kemajuan Kerja Ls 3,600,000

Kontraktor harus menyerahkan sebanyak 2 (dua) set photo-photo berwarna


menunjukkan kemajuan pekerjaan setiap 2 (dua) minggu hingga masa Serah Terima
Pertama serta setiap tahap pengajuan pembayaran (penagihan) prestasi pekerjaan.
Format pengajuan photo kemajuan kerja tersebut ditentukan oleh Pemberi Tugas,
Kontraktor wajib dan diharapkan berkoordinasi dengan tim Pemberi Tugas. Photo-
photo tidak diberikan kepada pihak lain tanpa ijin dari Pemberi Tugas.

3.3 Gambar Kerja (Shop Drawing) Ls 3,000,000

Kontraktor diharuskan atas biaya sendiri mempersiapkan detail shop drawing dari
masing-masing bagian pekerjaan jika diperlukan untuk acuan fabrikasi atau
pelaksanaan agar sebelumnya disetujui oleh Pemberi Tugas.

Persetujuan shop drawing oleh Pemberi Tugas tidak membebaskan Kontraktor dari
tugas tanggung jawab dan kewajiban sesuai Kontrak.

3.4 As-built Drawings Ls 8,250,000

Sepanjang masa konstruksi Kontraktor harus menyediakan satu set gambar as-built
terbaru dari berbagai bagian pekerjaan yang sudah selesai dilaksanakan sesuai
Kontrak. Kontraktor harus menyerahkan 3 (tiga) copy dalam bentuk file/data (CD), 3
(tiga) set hard copy ukuran A3 sebagai syarat awal diterbitkannya Berita Acara Serah
Terima Pertama oleh Pemberi Tugas.

Ke Penjumlahan Rp. 69,850,000

4 PEKERJAAN LAIN-LAIN

4.1 Pengiriman Material ke dan Pengeluaran Material dari Lapangan Ls 50,000,000


Kontraktor harus patuh terhadap peraturan dari pengelola atau polisi setempat dalam
hal penggunaan kendaraan untuk mengantar material ke atau memindahkan material
sisa dan berlebih dari lapangan dan harus sudah menyediakan biaya untuk
keperluan tersebut.

Ke Penjumlahan Rp. 50,000,000

PEKERJAAN LAIN-LAIN (Lanjutan)

4.2 Perlindungan dan Proteksi Pekerjaan Ls 65,000,000

Kontraktor harus menyediakan perlindungan terhadap pekerjaan, material dan bahan


terhadap kerusakan dan kehilangan, semua penerangan yang diperlukan pengawas,
pagar pengaman, dan semua pencegahan terhadap kecelakaan.

Kontraktor adalah penanggung jawab tunggal pengamanan terhadap kerusakan atau


kehilangan material-material, bahan, peralatan termasuk bahan yang dibeli langsung
oleh Pemberi Tugas baik yang sudah dipasang ataupun belum.

Kontraktor harus melindungi secara penuh dan memadai semua permukaan yang
bersebelahan dan jalur semua material dan peralatan yang beresiko merusak dan
harus bertanggung jawab untuk memperbaikinya kembali semua kerusakan pada
permukaan yang sudah selesai dikerjakan, material dan peralatan yang terjadi
sebelum diterbitkannya Berita acara Penyelesaian pertama.

Perlindungan harus segera dilakukan segera setelah permukaan yang sudah selesai
dikerjakan dan / atau material dan peralatan yang baru tiba di lokasi dengan
perlindungan yang dibutuhkan dan harus tetap terjaga dengan baik selama masa
kontruksi berlangsung. Termasuk hoarding partition pembatas.

Jika material yang dipasok sudah termasuk proteksi penutup atau pelindung,
Kontraktor harus memperbaiki, mengganti, atau apapun untuk tetap menajga
proteksi penutup atau pelindung tetap berfungsi efektif.

4.3 Perlindungan Kebakaran Ls include

Kontraktor harus selalu menjaga lokasi dari bahaya kebakaran. Kontraktor harus
menyiapkan semua tindakan pencegahan termasuk peralatan khusus yang
diperlukan untuk menjamin keamanan dan keselamatan pekerjaan dan selalu
menyediakan semua alat pemadam kebakaran sesuai dengan yang diinginkan oleh
Pemberi Tugas.

4.4 Pembuangan Sampah / Kebersihan Ls 30,000,000


Semua sampah proyek, kemasan material, material berlebih dan sebagainya harus
dikeluarkan dari proyek atau daerah sekitar proyek yang disetujui oleh Pemberi
Tugas secepat mungkin setidaknya sekali sehari selama masa konstruksi agar jalan
akses tidak terhambat dan memudahkan pengawasan lapangan.

Kontrakator harus menyediakan dan memelihara selama diperlukan untuk


pelaksanaan konstruksi semua tempat penampungan sampah sementara.

Tidak diperkenankan membakar sampah di lokasi kerja.

Kontraktor, setelah menyelesaikan seluruh pekerjaan harus meninggalkan proyek


dan area sekitarnya dalam kondisi bersih dan rapi, seperti ditetapkan oleh Pemberi
Tugas.

Ke Penjumlahan Rp. 95,000,000

5 ASURANSI

5.1 Asuransi Tenaga Kerja Ls 15,000,000

Kontraktor harus mengasuransikan pekerjanya, termasuk pekerja dari sub-


Kontraktornya (jika ada) dengan Jaminan Sosial Tenaga Kerja (JAMSOSTEK) /
BPJS Ketenagakerjaan, dan harus terus berkelanjutan selama waktu penyelesaian
pekerjaan dan jika diperlukan, polis asuransi tersebut diberikan kepada Pemberi
Tugas untuk disimpan selama masa kontrak pekerjaan termasuk bukti semua premi
yang sudah dibayarkan.

Ke Penjumlahan Rp. 15,000,000

PENJUMLAHAN

Halaman 1 / 1 -

Halaman 1 / 2 40,000,000

Halaman 1 / 3 2,000,000

Halaman 1 / 4 69,850,000

Halaman 1 / 5 50,000,000

Halaman 1 / 6 95,000,000

Halaman 1 / 7 15,000,000
PRELIMINARIES Rp. 271,850,000
1

2
3

4
5

7
8

10

11
12

13
14
BILL NO.2 -CLUSTER

No Item Total Unit TOTAL

A Demolition
Ceiling 2250 m2 25,000 56,250,000
Partisi gypsum 962.5 m2 25,000 24,062,500
Dinding Bata 875 m2 30,000 26,250,000
Closet 18 unit 450,000 8,100,000
Wastafel 45 unit 250,000 11,250,000
Urinal 5 unit 250,000 1,250,000
Lantai Keramik/Granit 2459 m2 45,000 110,655,000
Furniture 1 ls 35,000,000 35,000,000
MEP 1 ls 40,000,000 40,000,000

B PEKERJAAN INTERIOR

PEKERJAAN DINDING
Supply Install Partisi 2 sisi Gypsum 9mm ex Jayaboard/setara. Rangka
1 metal stud tebal c/w rockwool density 80kg/m3 794.905 m2 210,000 166,930,050
Supply Install Partisi 2 sisi Triplek 9mm ex Palem/setara+Gypsum 9mm
ex Jayaboard/setara, rangka metal stud tebal c/w rockwool density
80kg/m3 124.425 m2 298,500 37,140,863
Supply Install Partisi 2 sisi Triplek 9mm ex Palem/setara, rangka metal
stud tebal c/w rockwool density 80kg/m3 196.715 m2 310,000 60,981,650
Supply Install Partisi Kaca tempered ex Asahi t=12mm c/w u alumunium
2cm, sealant clear 256.62 m2 976,320 250,543,238
Supply Install Partisi 1 sisi Triplek 9mm ex Palem/setara, rangka metal
stud tebal c/w rockwool density 80kg/m3 577.15 m2 195,264 112,696,618

Supply Install Dinding bata ringan c/w kolom praktis, plaster, aci 205.74 m2 384,400 79,086,456
Sandwich Panel 95.49 m2 337,400 32,218,326
Curtain ex Regency backlining PVC c/w rail track ex sharp point silent
PC track white 51.6 m2 867,600 44,768,160
Partisi pembatas HPL ex Taco 2sisi t=1.7m + Kaca Clear Sanblast up to
Plafond 22.365 m2 1,470,582 32,889,566
Partisi cubicle Toilet ex Matriks 10 set 7,500,000 75,000,000
Sandblast Sticker 256.62 m2 125,000 32,077,500
Cover kolom bulat dengan HPL ex Taco c/m rangka hollow 2x4 t 0.7
galvanis, penutup tripleks 9mm ex palem 5 set 3,374,000 16,870,000

PEKERJAAN FINISHING
HPL ex taco press triplek 3mm 676.485 m2 287,500 194,489,438
HPL ex Lamitak press triplek 3mm c/w steel gold list 55.3 m2 1,550,000 85,715,000
Kaca Back printed digital printing 97.62 m2 1,307,184 127,607,302
Cat ex Indaco Belazo AGE 1788.51 m2 55,000 98,368,050
Keramik Homogeneous Tile dinding toilet ex IKAD/VALENTINO/setara
uk 60x60 494.16 m2 352,560 174,221,050
Digital Printing 28.5 m2 381,262 10,865,967
Cermin t=5mm c/w sealant, 3M tape 59.91 m2 708,058 42,419,755

PEKERJAAN LANTAI
Keramik Homogeneous Tile ex Niro Polished Cut size 200x1200 879.35 m2 435,000 382,517,250

Vinyl ex Forbo Eternal Colour Termasuk Plint 10cm, cove formers,


welding rod, waste 5% Type eternal colour refer to drawings
Pemasangan dengan semen, campuran polimer,adhesive F-Ball F-44 941.931 m2 805,000 758,254,455
Keramik Homogeneous Tile ex Niro/IKAD/Valentino Gress 60X60,
Polished 234.53 m2 352,560 82,685,897

Keramik Homogeneous Tile ex IKAD/Valentino Gress 60X60, texture 79.05 m2 352,560 27,869,868
Waterproofing 95.1375 m2 201,315 19,152,620
Screeding 664.713 m2 75,000 49,853,475
Plint Stainless Steel t=10cm 267.43 m' 210,000 56,160,300
Karpet Mushola 0 m2 146,906 -
Inlay Stainless gold t 2cm 140.27 m' 163,059 22,872,286

PEKERJAAN PLAFOND

Plafond PVC ex Shunda Plafond, Rangka akustik 60x120 cm, Type AC-
074 c/w Maintee Crosstee wall angle 1817.98 m2 340,000 618,113,200
Supply Install rangka hollow 4x4 galvanis t 0.7mm penutup rangka
Triplek 9mm Finishing HPL ex Taco press 3mm c/w shadowline 230.79 m2 576,600 133,073,514
Supply install Plafond Sandwich Panel 26.21 m2 575,000 15,070,750
Supply Install Cornice Sandwich Panel 20.77 m' 97,937 2,034,154
Supply Install rangka hollow 4x4 galvanis t 0.7mm penutup rangka
Gypsum 12mm ex Jayaboard/setara 187.42 m2 178,155 33,389,810
Supply Install Pelmet cove triplek 9mm Finishing cat Belazo AGE 380.99 m' 256,158 97,593,636
Edging Stainless Gold @ pelmet 58.7 m' 275,000 16,142,500

PEKERJAAN PINTU
Supply Install Pintu kayu single uk. 800x2500mm, dengan 100x50mm
kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco
( refer to door schedule & detail )
1 5 unit 4,700,000 23,500,000
Supply Install Pintu kayu single uk. 900x2500mm, dengan 100x50mm
kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco
( refer to door schedule & detail )
1 11 unit 5,500,000 60,500,000
Supply Install Pintu kayu single uk. 1000x2500mm, dengan 100x50mm
kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco
2 ( refer to door schedule & detail ) 45 unit 5,500,000 247,500,000
Supply Install Pintu kayu Double uk. 1200x2500mm, dengan 100x50mm
kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco
3 ( refer to door schedule & detail ) 10 unit 9,200,000 92,000,000
Supply Install Pintu kayu Double uk. 1600x2500mm, dengan 100x50mm
kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco
( refer to door schedule & detail )
7 unit 9,200,000 64,400,000
Supply Install kamuflase pintu besi shaft eksisting uk. 600x800mm, fin.
HPL ex Taco ( refer to door schedule & detail ) 5 unit 2,850,000 14,250,000
Supply Install Pintu Sliding Single uk. 1000x2500mm, dengan
100x50mm t=2600mm, fin. Kaca Pattern Back sticker custom ( refer to
door schedule & detail ) 2 unit 10,500,000 21,000,000
Supply Install Pintu Sliding Single Hermetich uk. 1600x2500mm, dengan
100x50mm kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL
ex Taco ( refer to door schedule & detail ) 1 unit 161,025,000 161,025,000
-
PEKERJAAN ELEKTRIKAL -
Modifikasi panel existing Distribution Box c/w tambahan mcb, mccb,
scun, vinyl, busbar, ect 2 unit 11,400,000 22,800,000
Supply Install Panel Distribusi listrik c/w box, mccb, mcb, scunn, vinyl,
busbar, ect 1 unit 9,500,000 9,500,000
Supply Install Lampu TL VICTORY LITE IBT 2x36w, incl. Lampu TL Led
ex luxon 4000K 120 bh 644,100 77,292,000
Supply Install Lampu TL VICTORY LITE IBT 2x18w, incl. Lampu TL Led
ex luxon 4000K 91 bh 483,075 43,959,825
Supply install LED Downlight NNP73231 Luga Refresh 15W, 1500LM,
4000K 109 bh 563,588 61,431,038
Supply install LED Downlight NNP72435031 Luga Refresh 10W,
1500LM, 4000K 84 bh 456,238 38,323,950
Supply Install Hidden lamp on ceiling & furniture NNP91020 LED Strip
Light 4.8W 400W/mtr, 4000K, PS 40W 451.13 m 118,085 53,271,686
Supply Install Pendant lamp on ceiling, Customed, c/w perkuatan
struktur dan lampu LED strip 4000K 7.2w 2 bh 5,904,250 11,808,500
Supply Install Wall mounted lamp on ceiling, Customed, c/w light bulb
e27 ex panasonic/phillips 7w 6 bh 1,610,250 9,661,500
Supply Install E-lighter 1 x 10W emergency light 220V, c/w battery
backup 2hour 7 bh 644,100 4,508,700
Supply Install Exit lamp 10W, c/w battery backup 2hour 7 bh 697,775 4,884,425
Supply Install Switches 1 gang ex Boss; c/w wires 14 bh 156,545 2,191,627
Supply Install Switches 2 gang ex Boss; c/w wires 14 bh 172,506 2,415,083
Supply Install Switches 3 gang ex Boss; c/w wires 50 bh 230,234 11,511,720
Supply Install 6 Grid swicthes ex Boss; c/w wires 9 bh 460,993 4,148,939
Supply Install Cables NYM 3x2,5mm2 for Lighting Groups; c/w trunking,
Conduit, T-doos, etc 433 ttk 225,435 97,613,355
Supply Install Cables NYM 3x2,5mm2 for Strip Light Groups; c/w
trunking, Conduit, T-doos, etc 69 ttk 225,435 15,555,015
Supply Install Socket outlet 1 gang wall mounted ex Panasonic/setara
160 bh 91,248 14,599,600
Supply Install Socket outlet 2 gang floor mounted ex Legrand 11 bh 483,075 5,313,825

Supply Install Socket outlet 2 gang TV wall ex Panasonic/Setara


12 bh 489,250 5,871,000
Supply Install Socket outlet 1 gang on ceiling(TV) 10 bh 91,248 912,475
Supply Install Socket outlet 1 gang for booking system 5 bh 91,248 456,238
Supply Install Cables NYM 3x2.5mm2 for Socket Groups; c/w trunking,
Conduit, T-doos, etc 198 ttk 354,255 70,142,490
Data: UTP Cat6. c/w RJ45, faceplate, modular, pacthpanel, conduit,
trunking, etc.ex Belden 69 ttk 855,000 58,995,000
Data WAP: UTP Cat6. c/w RJ45, faceplate, modular, pacthpanel,
conduit, trunking, etc.ex Belden 4 ttk 855,000 3,420,000
Voice: UTP Cat6. c/w RJ45, faceplate, modular, conduit, trunking, etc.ex
Belden 55 ttk 855,000 47,025,000

PEKERJAAN FIRE SERVICES


Bongkar Pasang Relokasi Sprinkler head 280 ttk 303,744 85,048,320
Bongkar Pasang Hydrant Sprinkler dan perapihan kembali 1 ttk 7,593,600 7,593,600
Bongkar dan Pasang Celiing Speaker 15 unit 189,840 2,847,600
Bongkar dan Pasang Smoke Detector 80 unit 189,840 15,187,200
Supply Install Wiring c/w GI conduit, support cables FRC 2c x 1.5 sqmm
95 ttk 309,168 29,370,960

PEKERJAAN PLUMBING
Cold water pipe for Wespax c/w fitting, flexible joint, gate valve, elbow,
support, etc 58 ttk 705,120 40,896,960
Waste water pipe for PVC c/w fitting, elbow, support, P-trap, Y-trap,
clean out, etc 79 ttk 813,600 64,274,400
Vent pipe for UPVC c/w fitting, elbow, support, etc 17 ttk 379,680 6,454,560
Coring waste water pipe 19 ttk 488,160 9,275,040
Grouting ex Coring 8 ttk 162,720 1,301,760
Closet ex Toto CW822NJ+Ecowasher 15 bh 9,144,864 137,172,960
Washtafel LW538RCB 16 bh 3,145,920 50,334,720
Lavatory Faucet TEN40ANV900/TN78-9V911 16 bh 7,213,920 115,422,720
Urinal UW58HJM 7 bh 11,032,416 77,226,912
Floor Drain TX1DBV1 21 bh 495,754 10,410,826
Tissue Holder TX703AG 18 bh 711,629 12,809,318
Keran Wudhu TX133L 1 bh 607,488 607,488
Janitor SK322E 2 bh 9,489,830 18,979,661
Faucet T23BQ13N 3 bh 517,450 1,552,349
Shower set TX432SJN 1 bh 3,124,224 3,124,224
Divider Urinal Custom tempered Glass t=10mm Frosted 7 bh 1,356,000 9,492,000

PEKERJAAN GAS MEDIK


Supply Install Pipa Tembaga 3/4" ( Line Utama dipakai kembali) 216 ttk 217,808 47,046,528
Supply Install Pipa Tembaga 5/8" 445.8 ttk 175,264 78,132,691
Supply Install Pipa Tembaga 1/2" 125.7 ttk 151,872 19,090,310
Supply Install Pipa Tembaga3/8" 119.2 ttk 135,600 16,163,520
Supply Install wall outlet oxygen ex komatsu 43.8 ttk 2,150,000 94,170,000
Supply Install wall outlet suction/vacuum ex komatsu 40 ttk 2,150,000 86,000,000
Supply Install material fitting 3 ttk 5,315,520 15,946,560
Supply install support pipa 3 ttk 3,471,360 10,414,080
Supply Install box valve 2 gas 1 unit 7,593,600 7,593,600

PEKERJAAN HVAC

Supply Install Indoor AHU Unit ex Smart Air ( Precision) , Capacity:6HP,


60.000BTU/h Hotgas Technology + Inverter (Indoor) Supply Air Flow
970Cfm. Return Air Flow:776Cfm Fresh air 776Cfm Room Pressure -3
s/d -10 Pa Temp 21-24oC RH 45%-60%, Supply Install Outdoor Unit ex
York Capacity 8Hp/80.000BTU/h 3Hp+3Hp c/w support+ dudukan 1 Set 193,736,800 193,736,800
Supply Install Exhaust Unit ex Smart Air (Precision) Capacity:388Cfm
Built in Hepa Filter c/w support + dudukan 3 Set 24,408,000 73,224,000
PENGADAAN DAN PEMASANGAN AKSESORIS
Supply Install Thermostat ex Elitec/Setara 3 Set 2,169,600 6,508,800
Supply Install RH Display ex Elitec/ Setara 3 Set 2,169,600 6,508,800
Supply Install Magnehelic Pre Medium (Dwyer/Setara) 3 set 1,084,800 3,254,400
Supply Install Magnehelic Hepa ( Dwyer/Setara) 3 set 1,084,800 3,254,400
Supply Install Magnehelic Tekanan Ruang 3 set 2,169,600 6,508,800
Supply Install Filter Drier 1/2" 6 bh 488,160 2,928,960
Supply Install Sight Gas 1/2" &3/8" 6 bh 379,680 2,278,080
Supply Install Selang PU 1/2" 3 bh 379,680 1,139,040
PEKERJAAN PIPA TEMBAGA
Pipa Tembaga lengkap isolasi K-Flex dan material bantu
Pipa liquid uk 3/8"+3/8" 35 m 162,720 5,695,200
Pipa gas uk 5/8"+5/8" 35 m 282,048 9,871,680
Pipa Hot Gas uk 3/8"+3/8" 35 m 162,720 5,695,200
Hand Valve dia 3/8" 2 bh 379,680 759,360
PRE FILTER DAN MEDIUM HOUSING BOX
Pre filter Eff, 25-35%@1bh/Indoor AHU ex Kowa/Setara 1 set 542,400 542,400

Medium Filter Eff. 95%@2bh/Indoor AHU ex Kowa Setara 24"x24"x12" 1 set 2,712,000 2,712,000
HEPA FILTER+HOUSING BOX+PERFORATED GRILL 304
Hepa Filter Eff99.99% ex Kowa/Setara 24"x24"x6" 1 set 6,508,800 6,508,800
PEMASANGAN PIPA DRAIN AC C/W ISOLASI TEBAL 1/2"
Dia 1" 15 m 27,120 406,800
PERALATAN DAN PEKERJAAN DUCTING
Ducting Supply BJLS 60 +PE Insulation 13mm
Plenume Return 4 m2 265,000 1,060,000
Ducting Supply/Return Bjls 60 43 m2 265,000 11,395,000
Ducting Supply/Return BJLS60 tanpa isolasi 30 m2 216,960 6,508,800
Hanger & Support 1 lot 1,084,800 1,084,800
Rubber Mounting 4 bh 48,816 195,264
PEKERJAAN VOLUME DAMPER, GRILL DAN DIFFUSER
Return Air Grill (RAG) uk 500x500 white 1 bh 759,360 759,360
Return Air Grill (RAG) uk 900x300 white bh
Exhaust Air Grill (EAG) uk 350x350 white 1 bh 531,552 531,552
Fresh Air Louvre (FAL) 250x250 white 1 bh 379,680 379,680
Exhaust Air Louvre (EAL) 350x350 white 1 bh 531,552 531,552
Volume Damper (VD) 200x150mm 1 bh 379,680 379,680
Volume Damper (VD) 200x200mm bh
Volume Damper (VD) 300x300mm 1 bh 650,880 650,880
Volume Damper (VD) 350x300mm 1 bh 705,120 705,120
Volume Damper (VD) 550x300mm 1 bh 1,200,000 1,200,000
PEKERJAAN LISTRIK
Panel Starter Up AHU 1 bh 6,508,800 6,508,800
Panel AC 1 bh 7,593,600 7,593,600
Supply Install NYY 4x2.5mm2 dari Panel AC ke Startup 15 m 27,120 406,800
Supply Install NYY 4x2.5mm2 dari Panel AC ke AHU 35 m 27,120 949,200
Supply Install NYYHY 3x1.5mm2 dari Start up Panel AC ke AHU 35 m 37,968 1,328,880
Supply Install NYYHY 16x1.5mm2 dari Outdoor ke AHU 35 m 135,600 4,746,000
Supply Install NYYHY 5x1.5mm2 dari AHU ke RH Control 15 m 32,544 488,160
Supply Install NYYHY 5x1.5mm2 dari AHU ke Thermostat Control 15 m 32,544 488,160
Material bantu 2 lot 1,084,800 2,169,600
Kabel Ladder 200x100 70 m 162,720 11,390,400
Bobokan Dinding Jalur Ducting dan pipa 5 ls 1,627,200 8,136,000
Isi Freon 5 ls 1,757,376 8,786,880
Testing Commisioning 5 ls 2,712,000 13,560,000

BONGKAR PASANG FCU DAN AHU


Supply Install Ducting PU 1960.8 m2 325,440 638,122,752
Supply Install Duct dia 8" 530.4 mtr 146,448 77,676,019

FCU 2.1 (Kemo)


Bongkar dIffuser 250x250mm (4), Return 100x1125mm(2bh) dan flexible
duct 12m c/w demolish ducting existing 1 ls 5,966,400 5,966,400
Supply Install Diffuser 250x250 white 4 bh 379,680 1,518,720
Supply Install Return Grill uk 100x1125mm 2 bh 930,216 1,860,432
FCU 2.2 (RUANG TUNGGU DAN R TINDAKAN)

Bongkar dIffuser 200x200mm (8), Return 100x300mm(6bh) dan flexible


duct 18m VD350x150mm (2bh) c/w demolish ducting existing 1 lot 5,966,400 5,966,400
Supply Install Diffuser 200x200 white 12 bh 303,744 3,644,928
Supply Install Return Grill uk 100x300mm 3 bh 303,744 911,232
Supply Install Volume Damper uk350x100mm 4 bh 433,920 1,735,680
FCU 2.3 (RUANG TUNGGU)
Bongkar dIffuser 200x200mm (9), Return 100x500mm(6bh) dan flexible
duct 28m VD500x100mm (1bh),200x800(1bh) c/w demolish ducting
existing 1 lot 5,966,400 5,966,400
Supply Install Diffuser 200x200 white 9 bh 303,744 2,733,696
Supply Install Return Grill uk 100x500mm 6 bh 455,616 2,733,696
Supply Install Volume Damper uk500x100mm 1 bh 520,704 520,704
Supply Install Volume Damper uk200x800mm 1 bh 244,080 244,080
FCU 2.4 (RUANG PERIKSA)
Bongkar dIffuser 200x200mm (7), Return 100x500mm(7bh) dan flexible
duct 28m VD500x100mm (1bh),350X150(2bh) c/w demolish ducting
existing 1 lot 5,966,400 5,966,400
Supply Install Diffuser 200x200 white 7 bh 303,744 2,126,208
Supply Install Return Grill uk 100x300mm 7 bh 303,744 2,126,208
Supply Install Volume Damper uk350x150mm 2 bh 433,920 867,840
FCU 2.5 (CARDIO)
Bongkar Diffuser 200 x 200 mm (9), Return 350 x 100 mm (9 bh) dan
Flexible Duct 36 mtr dan Volume Dumper 550 x 150 mm (1 bh), 200 x 80
mm (1 bh) C/W demolish ducting existing 1 lot 5,966,400 5,966,400
Supply Install Diffuser uk. 200 mm x 200 mm 9 bh 303,744 2,733,696
Supply Install Return Grille uk. 350 x 100 mm 9 bh 341,712 3,075,408
Supply Install Volume Damper uk. 550 x 150 mm 1 bh 607,488 607,488
Supply Install Volume Damper uk. 200 x 80 mm 1 bh 244,080 244,080
FCU 2.6 (NEUROSCIENCE)
Bongkar Diffuser 200 x 200 mm (8), Return 400 x 100 mm (8 bh) dan
Flexible Duct 32 mtr C/W demolish ducting existing 1 lot 5,424,000 5,424,000
Supply Install Diffuser uk. 200 mm x 200 mm 8 bh 303,744 2,429,952
Supply Install Return Grille uk. 400 x 100 mm 8 bh 379,680 3,037,440
FCU 2.7 (NEUROSCIENCE/DOCTOR LOUNGE)
Bongkar Diffuser 200 x 200 mm (4), Return 100 x 1275 mm (1 bh) dan
Flexible Duct 10 mtr c/w demolish ducting existing 1 lot 3,796,800 3,796,800
Supply Install Diffuser uk. 200 mm x 200 mm 4 bh 303,744 1,214,976
Supply Install Return Grille uk. 100 x 1275 mm 1 bh 1,044,120 1,044,120
FCU 2.10 (RUANG PERIKSA/RUANG TUNGGU)
Bongkar Diffuser 200 x 200 mm (30 bh), Flexible Duct 60 mtr c/w
demolish ducting existing 1 lot 4,339,200 4,339,200
Supply Install Diffuser uk. 200 mm x 200 mm 30 bh 303,744 9,112,320

AHU 2.A
Bongkar Diffuser 250 x 250 mm (48 bh), Return 2000 x 1000 mm (3 bh)
Flexible Duct 96 mtr, Volume Damper 600 x 400 mm ( 1 bh) c/w
demolish ducting existing 1 lot 6,508,800 6,508,800
Supply Install Diffuser uk. 250 mm x 250 mm 48 bh 379,680 18,224,640
Supply Install AG uk. 2000 x 1000 mm 3 bh 2,603,520 7,810,560
Supply Install Volume Damper 600 x 400 mm 1 bh 867,840 867,840

AHU 2.B
Bongkar Diffuser 200 x 200 mm (36 bh), Grille 750 x 100 mm (4 bh)
Grille 1000 x 50 mm (18 bh), Flexible Duct 108 mtr, EAG 1300 x 750 ( 3
bh) 1500 x 500 mm (1 bh) dan Volume Dummper 300 x 200 mm (1 bh)
c/w demolish ducting existing 1 lot 9,220,800 9,220,800
Supply Install Diffuser uk. 200 mm x 200 mm 36 bh 303,744 10,934,784
Supply Install Grille uk. 750 x 100 mm 4 bh 645,456 2,581,824
Supply Install Grille uk. 1000 x 50 mm 18 bh 797,328 14,351,904
Supply Install AG uk. 1300 x 750 mm 3 bh 1,556,688 4,670,064
Supply Install AG uk. 1500 x 500 mm 1 bh 1,518,720 1,518,720
Supply Install Volume Damper 300 x 200 mm 1 bh 433,920 433,920

PEKERJAAN FURNITURE

Meja Nurse Station uk 6600+1200+1200 x 650x800mm, finishing bh


duco+HPL c/w accesories hardware ex huben softclosing, Counter Top
ex Terazzo TMAC, details w/ list stainless gold 2 48,500,000 97,000,000
Meja Kasir uk 2350 x 650x800mm, finishing HPL c/w accesories
hardware ex huben softclosing, Counter Top ex HPL, details w/ list bh
stainless gold + Front architrave 1 13,116,149 13,116,149
Meja Medical Record uk 2350 x 650x800mm, finishing HPL c/w
accesories hardware ex huben softclosing, Counter Top ex HPL, details bh
w/ list stainless gold + Front architrave 1 12,106,049 12,106,049
Credenza uk 3000x400x900mm finishing HPL c/w accesories hardware bh
ex huben softclosing, Counter Top ex HPL 2 9,090,900 18,181,800
Kursi Staff ex Stramm/Setara 34 bh 1,262,625 42,929,250
Sofa Set 2500x1200x450 upholstery ex Regency, Busa Medium, kaki bh
stainless rangka kaki besi 9 15,151,500 136,363,500
Kursi Puff dia 50cm upholstery ex Regency, Busa Medium , Plint bh
Stainless 23 1,767,675 40,656,525
Top Meja @kolom uk 4000x2600x40mm ex Terazzo TMAC c/w bh
backsplash t:10cm 1 23,030,280 23,030,280
Meja Charging 2700x2000x900 top meja ex terazzo TMAC body Fin. bh
HPL c/w accesories hardware ex huben softclosing, 1 15,545,439 15,545,439
Kursi Tunggu (Custom ) 12 bh 3,535,350 42,424,200
Sofa Bench uk 2500x450 kain upholstery ex Regency, Busa Medium, bh
kaki besi stainless 22 6,565,650 144,444,300
Sofa 2 Seater 15 bh 6,565,650 98,484,750
Coffee Table 10 bh 3,030,300 30,303,000
Puff abu-abu 8 bh 1,767,675 14,141,400
Meja Nurse Station uk 2950 x 650x900mm, finishing duco+HPL c/w
accesories hardware ex huben softclosing, Counter Top ex HPL, details bh
w/ list stainless gold 3 17,500,000 52,500,000
Meja Lavatory ex HPL AICA/setara uk 1200x800x400 top solid surface bh
ex Triem 16 6,666,660 106,666,560
Cermin 1200x1800 c/w sides LED strip lamp w/ acrylic cover 16 bh 3,272,724 52,363,584
Meja Pantry 4420x800x850mm Top Solid surface ex Triem, c/w
aksesoris rak, finishing HPL c/w accesories hardware ex huben bh
softclosing 2 24,505,026 49,010,052
Locker ganti uk 404x404x2400 (3 tingkat) 19 bh 2,626,260 49,898,940
Kursi Pasien 80 bh 3,535,350 282,828,000
Ambalan L Meja Kerja Dokter 1400x600 38 bh 2,121,210 80,605,980
Kursi Dokter 38 bh 1,515,150 57,575,700
Credenza uk 1500x800x900mm finishing HPL c/w accesories hardware
ex huben softclosing, Counter Top ex Solid Surface+ Sink+Keran ex bh
Toto 32 9,727,200 311,270,400
Hanging Cabinet uk 1500x800x900mm finishing HPL c/w accesories bh
hardware ex huben softclosing 32 4,536,000 145,152,000
Credenza uk 1200x800x900mm finishing HPL c/w accesories hardware bh
ex huben softclosing, Counter Top exSolid Surface 1 8,750,000 8,750,000
Credenza uk 3300x800x900mm finishing HPL c/w accesories hardware bh
ex huben softclosing, Counter Top ex HPL 1 10,500,000 10,500,000
bh
Meja Meeting 2000x1000x750mm Fin HPL ex Taco. Kaki besi cat duco 1 9,500,000 9,500,000
Meja Kerja Workstation uk 600x1400x750mm Fin. HPL ex Taco c/w bh
mobile drawer 7 4,545,450 31,818,150

Credenza uk 1800x800x900mm finishing HPL c/w accesories hardware bh


ex huben softclosing, Counter Top ex Solid Surface+ Sink 2 8,737,365 17,474,730
Hanging Cabinet uk 1800x800x900mm finishing HPL c/w accesories bh
hardware ex huben softclosing 2 5,454,540 10,909,080
Meja Kerja Workstation uk 2560x2360x750mm Fin. HPL ex Taco 1 bh 7,575,750 7,575,750
Sofa One Seater 1 bh 4,545,450 4,545,450
Mobile Drawer 400x400x850mm fin HPL ex Taco 1 bh 909,090 909,090
Meja Makan ex Informa 2 bh 3,030,300 6,060,600
Kursi makan ex informa 8 bh 1,515,150 12,121,200
Kursi Bar ex Informa 7 bh 1,111,110 7,777,770
Full Height Pantry uk 2500x2800x600mm Top meja solid surface+sink bh
c/w accesories hardware ex huben softclosing 1 21,414,120 21,414,120
Meja Bar 2500x600x1100mm top Solid surface, Body fin HPL c/w bh
accesories hardware ex huben softclosing 1 13,888,875 13,888,875
Full Height Pantry uk 5200x2800x600mm Top meja solid surface+sink bh
c/w accesories hardware ex huben softclosing 1 55,151,460 55,151,460
Meja Bar 5200+2000x600x1100mm top Solid surface, Body fin HPL c/w bh
accesories hardware ex huben softclosing 1 37,090,872 37,090,872
Credenza TV uk 3800x400x400mm fin HPL ex Taco c/w accesories bh
hardware ex huben softclosing, 1 9,595,950 9,595,950
Credenza TV uk 1800x800x400mm dua sisi fin HPL ex Taco c/w bh
accesories hardware ex huben softclosing, 1 8,181,810 8,181,810

Meja Nurse Station uk diameter 4400 x 650x800mm, finishing duco+HPL bh


c/w accesories hardware ex huben softclosing, Counter Top ex Terazzo
TMAC, details w/ list stainless gold 1 22,666,644 22,666,644

Meja Information Station uk elips diameter 4000 x 650x800mm, finishing bh


duco+HPL c/w accesories hardware ex huben softclosing, Counter Top
ex Terazzo TMAC, details w/ list stainless gold 1 23,000,000 23,000,000

Meja Nurse Station uk diameter 3050+6400+2400 x 650x800mm, bh


finishing duco+HPL c/w accesories hardware ex huben softclosing,
Counter Top ex Terazzo TMAC, details w/ list stainless gold 1 61,000,000 61,000,000
Dining Table 3 bh 3,535,350 10,606,050
Dining Chair 3 bh 3,030,300 9,090,900
Divider Partition c/w build in lamp feature uk 1200x1800 4 bh 4,363,632 17,454,528
Reupholstery Oscar Kasur Rehab Medik 5 bh 1,212,120 6,060,600

MISCELANEOUS
Braket TV 10 bh 508,500 5,085,000
Supply Install Smart TV UHD 43" ex LG/Setara 11 bh 6,215,000 68,365,000
Grill Wudhu stainless steel hollow 304 700x1700mm 0 bh 4,034,100 -
Painting Artwork c/w frame 3 bh 6,215,000 18,645,000
Planter c/w Tanaman hidup dan media tanam 16 bh 1,695,000 27,120,000
Mural wallpaint area tunggu cardio/neuro 24 m2 500,000 12,000,000

SIGNAGE
Nurse Station L=2500mm Acrylic Duco Paint ( Text TBA) 7 bh 1,500,000 10,500,000
Charging Station 1 bh 550,000 550,000
Cashier 2 bh 550,000 1,100,000
Record 1 bh 550,000 550,000
Lab 1 bh 550,000 550,000
Doctor's Lounge 1 bh 550,000 550,000
Musholla 0 bh 550,000 -
Toilet 10 bh 550,000 5,500,000
Directory sign @ corridor Mezzanin 2 bh 1,450,000 2,900,000
Room ID 55 bh 550,000 30,250,000

10,565,930,765
BILL NO.2 -CLUSTER

No Item

1 Biaya Manajemen Lapangan dan Pengadaan Peralatan di Lapangan


2 Kantor Lapangan (Direksi Keet) dan Akomodasi Lain Kontraktor
3 Gudang Kontraktor Sementara dan Los Kerja
4 Pakaian dan Topi Pelindung
5 Setting out Pekerjaan, Pengukuran dan Bouwplank
6 Perancah dan Steger
7 Keselamatan, Kesehatan dan Kesejahteraan Pekerja (K3)
8 Foto Kemajuan Kerja
9 Gambar Kerja (Shop Drawing)
10 As-built Drawings
11 Pengiriman Material ke dan Pengeluaran Material dari Lapangan
12 Perlindungan dan Proteksi Pekerjaan
13 Pembuangan Sampah / Kebersihan
14 Asuransi Tenaga Kerja

A Demolition
Ceiling
Partisi gypsum
Dinding Bata
Closet
Wastafel
Urinal
Lantai Keramik/Granit
Furniture
MEP

B PEKERJAAN INTERIOR
PEKERJAAN DINDING
Supply Install Partisi 2 sisi Gypsum 9mm ex Jayaboard/setara. Rangka metal
1 stud tebal c/w rockwool density 80kg/m3

Supply Install Partisi 2 sisi Triplek 9mm ex Palem/setara+Gypsum 9mm ex


Jayaboard/setara, rangka metal stud tebal c/w rockwool density 80kg/m3
Supply Install Partisi 2 sisi Triplek 9mm ex Palem/setara, rangka metal stud
tebal c/w rockwool density 80kg/m3
Supply Install Partisi Kaca tempered ex Asahi t=12mm c/w u alumunium 2cm,
sealant clear
Supply Install Partisi 1 sisi Triplek 9mm ex Palem/setara, rangka metal stud
tebal c/w rockwool density 80kg/m3
Supply Install Dinding bata ringan c/w kolom praktis, plaster, aci
Sandwich Panel
Curtain ex Regency backlining PVC c/w rail track ex sharp point silent PC
track white
Partisi pembatas HPL ex Taco 2sisi t=1.7m + Kaca Clear Sanblast up to
Plafond
Partisi cubicle Toilet ex Matriks
Sandblast Sticker
Cover kolom bulat dengan HPL ex Taco c/m rangka hollow 2x4 t 0.7 galvanis,
penutup tripleks 9mm ex palem

PEKERJAAN FINISHING
HPL ex taco press triplek 3mm
HPL ex Lamitak press triplek 3mm c/w steel gold list
Kaca Back printed digital printing
Cat ex Indaco Belazo AGE
Keramik Homogeneous Tile dinding toilet ex IKAD/VALENTINO/setara uk
60x60
Digital Printing
Cermin t=5mm c/w sealant, 3M tape

PEKERJAAN LANTAI
Keramik Homogeneous Tile ex Niro Polished Cut size 200x1200
Vinyl ex Forbo Eternal Colour Termasuk Plint 10cm, cove formers, welding
rod, waste 5% Type eternal colour refer to drawings Pemasangan dengan
semen, campuran polimer,adhesive F-Ball F-44

Keramik Homogeneous Tile ex Niro/IKAD/Valentino Gress 60X60, Polished


Keramik Homogeneous Tile ex IKAD/Valentino Gress 60X60, texture
Waterproofing
Screeding
Plint Stainless Steel t=10cm
Karpet Mushola
Inlay Stainless gold t 2cm

PEKERJAAN PLAFOND
Plafond PVC ex Shunda Plafond, Rangka akustik 60x120 cm, Type AC-074
c/w Maintee Crosstee wall angle
Supply Install rangka hollow 4x4 galvanis t 0.7mm penutup rangka Triplek
9mm Finishing HPL ex Taco press 3mm c/w shadowline
Supply install Plafond Sandwich Panel
Supply Install Cornice Sandwich Panel
Supply Install rangka hollow 4x4 galvanis t 0.7mm penutup rangka Gypsum
12mm ex Jayaboard/setara
Supply Install Pelmet cove triplek 9mm Finishing cat Belazo AGE
Edging Stainless Gold @ pelmet

PEKERJAAN PINTU
Supply Install Pintu kayu single uk. 800x2500mm, dengan 100x50mm kusen
kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco ( refer to door
1 schedule & detail )
Supply Install Pintu kayu single uk. 900x2500mm, dengan 100x50mm kusen
kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco ( refer to door
1 schedule & detail )
Supply Install Pintu kayu single uk. 1000x2500mm, dengan 100x50mm kusen
kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco ( refer to door
2 schedule & detail )
Supply Install Pintu kayu Double uk. 1200x2500mm, dengan 100x50mm
kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco ( refer to
3 door schedule & detail )
Supply Install Pintu kayu Double uk. 1600x2500mm, dengan 100x50mm
kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex Taco ( refer to
door schedule & detail )
Supply Install kamuflase pintu besi shaft eksisting uk. 600x800mm, fin. HPL
ex Taco ( refer to door schedule & detail )
Supply Install Pintu Sliding Single uk. 1000x2500mm, dengan 100x50mm
t=2600mm, fin. Kaca Pattern Back sticker custom ( refer to door schedule &
detail )
Supply Install Pintu Sliding Single Hermetich uk. 1600x2500mm, dengan
100x50mm kusen kayu kamper solid fin. Cat Duco, t=2600mm, fin. HPL ex
Taco ( refer to door schedule & detail )

PEKERJAAN ELEKTRIKAL
Modifikasi panel existing Distribution Box c/w tambahan mcb, mccb, scun,
vinyl, busbar, ect
Supply Install Panel Distribusi listrik c/w box, mccb, mcb, scunn, vinyl, busbar,
ect
Supply Install Lampu TL VICTORY LITE IBT 2x36w, incl. Lampu TL Led ex
luxon 4000K
Supply Install Lampu TL VICTORY LITE IBT 2x18w, incl. Lampu TL Led ex
luxon 4000K
Supply install LED Downlight NNP73231 Luga Refresh 15W, 1500LM, 4000K

Supply install LED Downlight NNP72435031 Luga Refresh 10W, 1500LM,


4000K
Supply Install Hidden lamp on ceiling & furniture NNP91020 LED Strip Light
4.8W 400W/mtr, 4000K, PS 40W
Supply Install Pendant lamp on ceiling, Customed, c/w perkuatan struktur dan
lampu LED strip 4000K 7.2w
Supply Install Wall mounted lamp on ceiling, Customed, c/w light bulb e27 ex
panasonic/phillips 7w
Supply Install E-lighter 1 x 10W emergency light 220V, c/w battery backup
2hour
Supply Install Exit lamp 10W, c/w battery backup 2hour
Supply Install Switches 1 gang ex Boss; c/w wires
Supply Install Switches 2 gang ex Boss; c/w wires
Supply Install Switches 3 gang ex Boss; c/w wires
Supply Install 6 Grid swicthes ex Boss; c/w wires
Supply Install Cables NYM 3x2,5mm2 for Lighting Groups; c/w trunking,
Conduit, T-doos, etc
Supply Install Cables NYM 3x2,5mm2 for Strip Light Groups; c/w trunking,
Conduit, T-doos, etc
Supply Install Socket outlet 1 gang wall mounted ex Panasonic/setara
Supply Install Socket outlet 2 gang floor mounted ex Legrand
Supply Install Socket outlet 2 gang TV wall ex Panasonic/Setara
Supply Install Socket outlet 1 gang on ceiling(TV)
Supply Install Socket outlet 1 gang for booking system
Supply Install Cables NYM 3x2.5mm2 for Socket Groups; c/w trunking,
Conduit, T-doos, etc
Data: UTP Cat6. c/w RJ45, faceplate, modular, pacthpanel, conduit, trunking,
etc.ex Belden
Data WAP: UTP Cat6. c/w RJ45, faceplate, modular, pacthpanel, conduit,
trunking, etc.ex Belden
Voice: UTP Cat6. c/w RJ45, faceplate, modular, conduit, trunking, etc.ex
Belden

PEKERJAAN FIRE SERVICES


Bongkar Pasang Relokasi Sprinkler head
Bongkar Pasang Hydrant Sprinkler dan perapihan kembali
Bongkar dan Pasang Celiing Speaker
Bongkar dan Pasang Smoke Detector
Supply Install Wiring c/w GI conduit, support cables FRC 2c x 1.5 sqmm

PEKERJAAN PLUMBING
Cold water pipe for Wespax c/w fitting, flexible joint, gate valve, elbow,
support, etc
Waste water pipe for PVC c/w fitting, elbow, support, P-trap, Y-trap, clean out,
etc
Vent pipe for UPVC c/w fitting, elbow, support, etc
Coring waste water pipe
Grouting ex Coring
Closet ex Toto CW822NJ+Ecowasher
Washtafel LW538RCB
Lavatory Faucet TEN40ANV900/TN78-9V911
Urinal UW58HJM
Floor Drain TX1DBV1
Tissue Holder TX703AG
Keran Wudhu TX133L
Janitor SK322E
Faucet T23BQ13N
Shower set TX432SJN
Divider Urinal Custom tempered Glass t=10mm Frosted

PEKERJAAN GAS MEDIK


Supply Install Pipa Tembaga 3/4" ( Line Utama dipakai kembali)
Supply Install Pipa Tembaga 5/8"
Supply Install Pipa Tembaga 1/2"
Supply Install Pipa Tembaga3/8"
Supply Install wall outlet oxygen ex komatsu
Supply Install wall outlet suction/vacuum ex komatsu
Supply Install material fitting
Supply install support pipa
Supply Install box valve 2 gas

PEKERJAAN HVAC
Supply Install Indoor AHU Unit ex Smart Air ( Precision) , Capacity:6HP,
60.000BTU/h Hotgas Technology + Inverter (Indoor) Supply Air Flow 970Cfm.
Return Air Flow:776Cfm Fresh air 776Cfm Room Pressure -3 s/d -10 Pa Temp
21-24oC RH 45%-60%, Supply Install Outdoor Unit ex York Capacity
8Hp/80.000BTU/h 3Hp+3Hp c/w support+ dudukan
Supply Install Exhaust Unit ex Smart Air (Precision) Capacity:388Cfm Built in
Hepa Filter c/w support + dudukan
PENGADAAN DAN PEMASANGAN AKSESORIS
Supply Install Thermostat ex Elitec/Setara
Supply Install RH Display ex Elitec/ Setara
Supply Install Magnehelic Pre Medium (Dwyer/Setara)
Supply Install Magnehelic Hepa ( Dwyer/Setara)
Supply Install Magnehelic Tekanan Ruang
Supply Install Filter Drier 1/2"
Supply Install Sight Gas 1/2" &3/8"
Supply Install Selang PU 1/2"
PEKERJAAN PIPA TEMBAGA
Pipa Tembaga lengkap isolasi K-Flex dan material bantu
Pipa liquid uk 3/8"+3/8"
Pipa gas uk 5/8"+5/8"
Pipa Hot Gas uk 3/8"+3/8"
Hand Valve dia 3/8"
PRE FILTER DAN MEDIUM HOUSING BOX
Pre filter Eff, 25-35%@1bh/Indoor AHU ex Kowa/Setara
Medium Filter Eff. 95%@2bh/Indoor AHU ex Kowa Setara 24"x24"x12"
HEPA FILTER+HOUSING BOX+PERFORATED GRILL 304
Hepa Filter Eff99.99% ex Kowa/Setara 24"x24"x6"
PEMASANGAN PIPA DRAIN AC C/W ISOLASI TEBAL 1/2"
Dia 1"
PERALATAN DAN PEKERJAAN DUCTING
Ducting Supply BJLS 60 +PE Insulation 13mm
Plenume Return
Ducting Supply/Return Bjls 60
Ducting Supply/Return BJLS60 tanpa isolasi
Hanger & Support
Rubber Mounting
PEKERJAAN VOLUME DAMPER, GRILL DAN DIFFUSER
Return Air Grill (RAG) uk 500x500 white
Return Air Grill (RAG) uk 900x300 white
Exhaust Air Grill (EAG) uk 350x350 white
Fresh Air Louvre (FAL) 250x250 white
Exhaust Air Louvre (EAL) 350x350 white
Volume Damper (VD) 200x150mm
Volume Damper (VD) 200x200mm
Volume Damper (VD) 300x300mm
Volume Damper (VD) 350x300mm
Volume Damper (VD) 550x300mm
PEKERJAAN LISTRIK
Panel Starter Up AHU
Panel AC
Supply Install NYY 4x2.5mm2 dari Panel AC ke Startup
Supply Install NYY 4x2.5mm2 dari Panel AC ke AHU
Supply Install NYYHY 3x1.5mm2 dari Start up Panel AC ke AHU
Supply Install NYYHY 16x1.5mm2 dari Outdoor ke AHU
Supply Install NYYHY 5x1.5mm2 dari AHU ke RH Control
Supply Install NYYHY 5x1.5mm2 dari AHU ke Thermostat Control
Material bantu
Kabel Ladder 200x100
Bobokan Dinding Jalur Ducting dan pipa
Isi Freon
Testing Commisioning

BONGKAR PASANG FCU DAN AHU


Supply Install Ducting PU
Supply Install Duct dia 8"

FCU 2.1 (Kemo)


Bongkar dIffuser 250x250mm (4), Return 100x1125mm(2bh) dan flexible duct
12m c/w demolish ducting existing
Supply Install Diffuser 250x250 white
Supply Install Return Grill uk 100x1125mm
FCU 2.2 (RUANG TUNGGU DAN R TINDAKAN)
Bongkar dIffuser 200x200mm (8), Return 100x300mm(6bh) dan flexible duct
18m VD350x150mm (2bh) c/w demolish ducting existing
Supply Install Diffuser 200x200 white
Supply Install Return Grill uk 100x300mm
Supply Install Volume Damper uk350x100mm
FCU 2.3 (RUANG TUNGGU)

Bongkar dIffuser 200x200mm (9), Return 100x500mm(6bh) dan flexible duct


28m VD500x100mm (1bh),200x800(1bh) c/w demolish ducting existing
Supply Install Diffuser 200x200 white
Supply Install Return Grill uk 100x500mm
Supply Install Volume Damper uk500x100mm
Supply Install Volume Damper uk200x800mm
FCU 2.4 (RUANG PERIKSA)

Bongkar dIffuser 200x200mm (7), Return 100x500mm(7bh) dan flexible duct


28m VD500x100mm (1bh),350X150(2bh) c/w demolish ducting existing
Supply Install Diffuser 200x200 white
Supply Install Return Grill uk 100x300mm
Supply Install Volume Damper uk350x150mm
FCU 2.5 (CARDIO)
Bongkar Diffuser 200 x 200 mm (9), Return 350 x 100 mm (9 bh) dan
Flexible Duct 36 mtr dan Volume Dumper 550 x 150 mm (1 bh), 200 x 80 mm
(1 bh) C/W demolish ducting existing
Supply Install Diffuser uk. 200 mm x 200 mm
Supply Install Return Grille uk. 350 x 100 mm
Supply Install Volume Damper uk. 550 x 150 mm
Supply Install Volume Damper uk. 200 x 80 mm
FCU 2.6 (NEUROSCIENCE)
Bongkar Diffuser 200 x 200 mm (8), Return 400 x 100 mm (8 bh) dan Flexible
Duct 32 mtr C/W demolish ducting existing
Supply Install Diffuser uk. 200 mm x 200 mm
Supply Install Return Grille uk. 400 x 100 mm
FCU 2.7 (NEUROSCIENCE/DOCTOR LOUNGE)
Bongkar Diffuser 200 x 200 mm (4), Return 100 x 1275 mm (1 bh) dan
Flexible Duct 10 mtr c/w demolish ducting existing
Supply Install Diffuser uk. 200 mm x 200 mm
Supply Install Return Grille uk. 100 x 1275 mm
FCU 2.10 (RUANG PERIKSA/RUANG TUNGGU)
Bongkar Diffuser 200 x 200 mm (30 bh), Flexible Duct 60 mtr c/w demolish
ducting existing
Supply Install Diffuser uk. 200 mm x 200 mm

AHU 2.A
Bongkar Diffuser 250 x 250 mm (48 bh), Return 2000 x 1000 mm (3 bh)
Flexible Duct 96 mtr, Volume Damper 600 x 400 mm ( 1 bh) c/w demolish
ducting existing
Supply Install Diffuser uk. 250 mm x 250 mm
Supply Install AG uk. 2000 x 1000 mm
Supply Install Volume Damper 600 x 400 mm

AHU 2.B
Bongkar Diffuser 200 x 200 mm (36 bh), Grille 750 x 100 mm (4 bh) Grille
1000 x 50 mm (18 bh), Flexible Duct 108 mtr, EAG 1300 x 750 ( 3 bh) 1500
x 500 mm (1 bh) dan Volume Dummper 300 x 200 mm (1 bh) c/w demolish
ducting existing
Supply Install Diffuser uk. 200 mm x 200 mm
Supply Install Grille uk. 750 x 100 mm
Supply Install Grille uk. 1000 x 50 mm
Supply Install AG uk. 1300 x 750 mm
Supply Install AG uk. 1500 x 500 mm
Supply Install Volume Damper 300 x 200 mm

PEKERJAAN FURNITURE
Meja Nurse Station uk 6600+1200+1200 x 650x800mm, finishing duco+HPL
c/w accesories hardware ex huben softclosing, Counter Top ex Terazzo
TMAC, details w/ list stainless gold
Meja Kasir uk 2350 x 650x800mm, finishing HPL c/w accesories hardware ex
huben softclosing, Counter Top ex HPL, details w/ list stainless gold + Front
architrave
Meja Medical Record uk 2350 x 650x800mm, finishing HPL c/w accesories
hardware ex huben softclosing, Counter Top ex HPL, details w/ list stainless
gold + Front architrave
Credenza uk 3000x400x900mm finishing HPL c/w accesories hardware ex
huben softclosing, Counter Top ex HPL
Kursi Staff ex Stramm/Setara
Sofa Set 2500x1200x450 upholstery ex Regency, Busa Medium, kaki
stainless rangka kaki besi

Kursi Puff dia 50cm upholstery ex Regency, Busa Medium , Plint Stainless
Top Meja @kolom uk 4000x2600x40mm ex Terazzo TMAC c/w backsplash
t:10cm
Meja Charging 2700x2000x900 top meja ex terazzo TMAC body Fin. HPL c/w
accesories hardware ex huben softclosing,
Kursi Tunggu (Custom )
Sofa Bench uk 2500x450 kain upholstery ex Regency, Busa Medium, kaki
besi stainless
Sofa 2 Seater
Coffee Table
Puff abu-abu
Meja Nurse Station uk 2950 x 650x900mm, finishing duco+HPL c/w
accesories hardware ex huben softclosing, Counter Top ex HPL, details w/ list
stainless gold
Meja Lavatory ex HPL AICA/setara uk 1200x800x400 top solid surface ex
Triem
Cermin 1200x1800 c/w sides LED strip lamp w/ acrylic cover

Meja Pantry 4420x800x850mm Top Solid surface ex Triem, c/w aksesoris rak,
finishing HPL c/w accesories hardware ex huben softclosing
Locker ganti uk 404x404x2400 (3 tingkat)
Kursi Pasien
Ambalan L Meja Kerja Dokter 1400x600
Kursi Dokter
Credenza uk 1500x800x900mm finishing HPL c/w accesories hardware ex
huben softclosing, Counter Top ex Solid Surface+ Sink+Keran ex Toto
Hanging Cabinet uk 1500x800x900mm finishing HPL c/w accesories
hardware ex huben softclosing
Credenza uk 1200x800x900mm finishing HPL c/w accesories hardware ex
huben softclosing, Counter Top exSolid Surface
Credenza uk 3300x800x900mm finishing HPL c/w accesories hardware ex
huben softclosing, Counter Top ex HPL
Meja Meeting 2000x1000x750mm Fin HPL ex Taco. Kaki besi cat duco
Meja Kerja Workstation uk 600x1400x750mm Fin. HPL ex Taco c/w mobile
drawer

Credenza uk 1800x800x900mm finishing HPL c/w accesories hardware ex


huben softclosing, Counter Top ex Solid Surface+ Sink
Hanging Cabinet uk 1800x800x900mm finishing HPL c/w accesories hardware
ex huben softclosing
Meja Kerja Workstation uk 2560x2360x750mm Fin. HPL ex Taco
Sofa One Seater
Mobile Drawer 400x400x850mm fin HPL ex Taco
Meja Makan ex Informa
Kursi makan ex informa
Kursi Bar ex Informa
Full Height Pantry uk 2500x2800x600mm Top meja solid surface+sink c/w
accesories hardware ex huben softclosing
Meja Bar 2500x600x1100mm top Solid surface, Body fin HPL c/w accesories
hardware ex huben softclosing
Full Height Pantry uk 5200x2800x600mm Top meja solid surface+sink c/w
accesories hardware ex huben softclosing
Meja Bar 5200+2000x600x1100mm top Solid surface, Body fin HPL c/w
accesories hardware ex huben softclosing
Credenza TV uk 3800x400x400mm fin HPL ex Taco c/w accesories hardware
ex huben softclosing,
Credenza TV uk 1800x800x400mm dua sisi fin HPL ex Taco c/w accesories
hardware ex huben softclosing,

Meja Nurse Station uk diameter 4400 x 650x800mm, finishing duco+HPL c/w


accesories hardware ex huben softclosing, Counter Top ex Terazzo TMAC,
details w/ list stainless gold

Meja Information Station uk elips diameter 4000 x 650x800mm, finishing


duco+HPL c/w accesories hardware ex huben softclosing, Counter Top ex
Terazzo TMAC, details w/ list stainless gold

Meja Nurse Station uk diameter 3050+6400+2400 x 650x800mm, finishing


duco+HPL c/w accesories hardware ex huben softclosing, Counter Top ex
Terazzo TMAC, details w/ list stainless gold
Dining Table
Dining Chair
Divider Partition c/w build in lamp feature uk 1200x1800
Reupholstery Oscar Kasur Rehab Medik

MISCELANEOUS
Braket TV
Supply Install Smart TV UHD 43" ex LG/Setara
Grill Wudhu stainless steel hollow 304 700x1700mm
Painting Artwork c/w frame
Planter c/w Tanaman hidup dan media tanam
Mural wallpaint area tunggu cardio/neuro

SIGNAGE
Nurse Station L=2500mm Acrylic Duco Paint ( Text TBA)
Charging Station
Cashier
Record
Lab
Doctor's Lounge
Musholla
Toilet
Directory sign @ corridor Mezzanin
Room ID
ER

Total Unit TOTAL

1 2 3
Ls 1 10,000,000 10,000,000 0.094

Ls 1 7,500,000 7,500,000 0.070 0.01


Ls 1 7,500,000 7,500,000 0.070

Ls 1 15,000,000 15,000,000 0.140 0.03 0.03


Ls 1 2,000,000 2,000,000 0.019

Ls 1 10,000,000 10,000,000 0.094

Ls 1 45,000,000 45,000,000 0.421

Ls 1 3,600,000 3,600,000 0.034

Ls 1 3,000,000 3,000,000 0.028

Ls 1 8,250,000 8,250,000 0.077

Ls 1 50,000,000 50,000,000 0.468

Ls 1 65,000,000 65,000,000 0.609

Ls 1 30,000,000 30,000,000 0.281

Ls 1 15,000,000 15,000,000 0.140

2250 m2 12,000 27,000,000 0.253


962.5 m2 12,000 11,550,000 0.108
875 m2 22,600 19,775,000 0.185
18 unit 56,500 1,017,000 0.010
45 unit 33,900 1,525,500 0.014
5 unit 56,500 282,500 0.003
2459 m2 17,200 42,294,800 0.396
1 ls 35,000,000 35,000,000 0.328
1 ls 40,000,000 40,000,000 0.375
1.563
794.905 m2 210,000 166,930,050

0.348
124.425 m2 298,500 37,140,863
0.571
196.715 m2 310,000 60,981,650
2.347
256.62 m2 976,320 250,543,238
1.056
577.15 m2 195,264 112,696,618
205.74 m2 384,400 79,086,456 0.741
95.49 m2 337,400 32,218,326 0.302
0.419
51.6 m2 867,600 44,768,160
0.308
22.365 m2 1,470,582 32,889,566
10 set 7,500,000 75,000,000 0.702
256.62 m2 125,000 32,077,500 0.300
0.158
5 set 3,374,000 16,870,000

676.485 m2 287,500 194,489,438 1.822


55.3 m2 1,550,000 85,715,000 0.803
97.62 m2 1,307,184 127,607,302 1.195
1788.51 m2 55,000 98,368,050 0.921
1.632
494.16 m2 352,560 174,221,050
28.5 m2 381,262 10,865,967 0.102
59.91 m2 708,058 42,419,755 0.397

879.35 m2 435,000 382,517,250 3.583

7.102
941.931 m2 805,000 758,254,455
0.774
234.53 m2 352,560 82,685,897
79.05 m2 352,560 27,869,868 0.261
95.1375 m2 201,315 19,152,620 0.179
664.713 m2 75,000 49,853,475 0.467
267.43 m' 210,000 56,160,300 0.526
0 m2 146,906 - -
140.27 m' 163,059 22,872,286 0.214

5.789
1817.98 m2 340,000 618,113,200
1.246
230.79 m2 576,600 133,073,514
26.21 m2 575,000 15,070,750 0.141
20.77 m' 97,937 2,034,154 0.019
0.313
187.42 m2 178,155 33,389,810
380.99 m' 256,158 97,593,636 0.914
58.7 m' 275,000 16,142,500 0.151

0.220
5 unit 4,700,000 23,500,000

0.567
11 unit 5,500,000 60,500,000

2.318
45 unit 5,500,000 247,500,000

0.862
10 unit 9,200,000 92,000,000

0.603
7 unit 9,200,000 64,400,000
0.133
5 unit 2,850,000 14,250,000

0.197
2 unit 10,500,000 21,000,000

1.508
1 unit 161,025,000 161,025,000
-
-
0.214
2 unit 11,400,000 22,800,000
0.089
1 unit 9,500,000 9,500,000
0.724
120 bh 644,100 77,292,000
0.412
91 bh 483,075 43,959,825
0.575
109 bh 563,588 61,431,038
0.359
84 bh 456,238 38,323,950
0.499
451.13 m 118,085 53,271,686
0.111
2 bh 5,904,250 11,808,500
0.090
6 bh 1,610,250 9,661,500
0.042
7 bh 644,100 4,508,700
7 bh 697,775 4,884,425 0.046
14 bh 156,545 2,191,627 0.021
14 bh 172,506 2,415,083 0.023
50 bh 230,234 11,511,720 0.108
9 bh 460,993 4,148,939 0.039
0.914
433 ttk 225,435 97,613,355
0.146
69 ttk 225,435 15,555,015
160 bh 91,248 14,599,600 0.137
11 bh 483,075 5,313,825 0.050
12 bh 489,250 5,871,000 0.055
10 bh 91,248 912,475 0.009
5 bh 91,248 456,238 0.004
0.657
198 ttk 354,255 70,142,490
0.553
69 ttk 855,000 58,995,000
0.032
4 ttk 855,000 3,420,000
0.440
55 ttk 855,000 47,025,000

280 ttk 303,744 85,048,320 0.797


1 ttk 7,593,600 7,593,600 0.071
15 unit 189,840 2,847,600 0.027
80 unit 189,840 15,187,200 0.142
95 ttk 309,168 29,370,960 0.275

0.383
58 ttk 705,120 40,896,960
0.602
79 ttk 813,600 64,274,400
17 ttk 379,680 6,454,560 0.060
19 ttk 488,160 9,275,040 0.087
8 ttk 162,720 1,301,760 0.012
15 bh 9,144,864 137,172,960 1.285
16 bh 3,145,920 50,334,720 0.471
16 bh 7,213,920 115,422,720 1.081
7 bh 11,032,416 77,226,912 0.723
21 bh 495,754 10,410,826 0.098
18 bh 711,629 12,809,318 0.120
1 bh 607,488 607,488 0.006
2 bh 9,489,830 18,979,661 0.178
3 bh 517,450 1,552,349 0.015
1 bh 3,124,224 3,124,224 0.029
7 bh 1,356,000 9,492,000 0.089

216 ttk 217,808 47,046,528 0.441


445.8 ttk 175,264 78,132,691 0.732
125.7 ttk 151,872 19,090,310 0.179
119.2 ttk 135,600 16,163,520 0.151
43.8 ttk 2,150,000 94,170,000 0.882
40 ttk 2,150,000 86,000,000 0.805
3 ttk 5,315,520 15,946,560 0.149
3 ttk 3,471,360 10,414,080 0.098
1 unit 7,593,600 7,593,600 0.071

1.815

1 Set 193,736,800 193,736,800


0.686
3 Set 24,408,000 73,224,000
3 Set 2,169,600 6,508,800 0.061
3 Set 2,169,600 6,508,800 0.061
3 set 1,084,800 3,254,400 0.030
3 set 1,084,800 3,254,400 0.030
3 set 2,169,600 6,508,800 0.061
6 bh 488,160 2,928,960 0.027
6 bh 379,680 2,278,080 0.021
3 bh 379,680 1,139,040 0.011

35 m 162,720 5,695,200 0.053


35 m 282,048 9,871,680 0.092
35 m 162,720 5,695,200 0.053
2 bh 379,680 759,360 0.007

1 set 542,400 542,400 0.005


1 set 2,712,000 2,712,000 0.025

1 set 6,508,800 6,508,800 0.061

15 m 27,120 406,800 0.004

4 m2 298,320 1,193,280 0.011


43 m2 298,320 12,827,760 0.120
30 m2 216,960 6,508,800 0.061
1 lot 1,084,800 1,084,800 0.010
4 bh 48,816 195,264 0.002

1 bh 759,360 759,360 0.007


bh
1 bh 531,552 531,552 0.005
1 bh 379,680 379,680 0.004
1 bh 531,552 531,552 0.005
1 bh 379,680 379,680 0.004
bh
1 bh 650,880 650,880 0.006
1 bh 705,120 705,120 0.007
1 bh 1,200,000 1,200,000 0.011

1 bh 6,508,800 6,508,800 0.061


1 bh 7,593,600 7,593,600 0.071
15 m 27,120 406,800 0.004
35 m 27,120 949,200 0.009
35 m 37,968 1,328,880 0.012
35 m 135,600 4,746,000 0.044
15 m 32,544 488,160 0.005
15 m 32,544 488,160 0.005
2 lot 1,084,800 2,169,600 0.020
70 m 162,720 11,390,400 0.107
5 ls 1,627,200 8,136,000 0.076
5 ls 1,757,376 8,786,880 0.082
5 ls 2,712,000 13,560,000 0.127

1960.8 m2 325,440 638,122,752 5.977


530.4 mtr 146,448 77,676,019 0.728

0.056
1 ls 5,966,400 5,966,400
4 bh 379,680 1,518,720 0.014
2 bh 930,216 1,860,432 0.017

0.056
1 lot 5,966,400 5,966,400
12 bh 303,744 3,644,928 0.034
3 bh 303,744 911,232 0.009
4 bh 433,920 1,735,680 0.016

0.056
1 lot 5,966,400 5,966,400
9 bh 303,744 2,733,696 0.026
6 bh 455,616 2,733,696 0.026
1 bh 520,704 520,704 0.005
1 bh 244,080 244,080 0.002

0.056
1 lot 5,966,400 5,966,400
7 bh 303,744 2,126,208 0.020
7 bh 303,744 2,126,208 0.020
2 bh 433,920 867,840 0.008
0.056
1 lot 5,966,400 5,966,400
9 bh 303,744 2,733,696 0.026
9 bh 341,712 3,075,408 0.029
1 bh 607,488 607,488 0.006
1 bh 244,080 244,080 0.002

0.051
1 lot 5,424,000 5,424,000
8 bh 303,744 2,429,952 0.023
8 bh 379,680 3,037,440 0.028

0.036
1 lot 3,796,800 3,796,800
4 bh 303,744 1,214,976 0.011
1 bh 1,044,120 1,044,120 0.010

0.041
1 lot 4,339,200 4,339,200
30 bh 303,744 9,112,320 0.085

0.061
1 lot 6,508,800 6,508,800
48 bh 379,680 18,224,640 0.171
3 bh 2,603,520 7,810,560 0.073
1 bh 867,840 867,840 0.008

0.086
1 lot 9,220,800 9,220,800
36 bh 303,744 10,934,784 0.102
4 bh 645,456 2,581,824 0.024
18 bh 797,328 14,351,904 0.134
3 bh 1,556,688 4,670,064 0.044
1 bh 1,518,720 1,518,720 0.014
1 bh 433,920 433,920 0.004
bh 0.868
2 46,363,590 92,727,180

bh 0.123
1 13,116,149 13,116,149

bh 0.113
1 12,106,049 12,106,049
bh 0.170
2 9,090,900 18,181,800
34 bh 1,262,625 42,929,250 0.402
bh 1.277
9 15,151,500 136,363,500
bh 0.381
23 1,767,675 40,656,525
bh 0.216
1 23,030,280 23,030,280
bh 0.146
1 15,545,439 15,545,439
12 bh 3,535,350 42,424,200 0.397
bh 1.353
22 6,565,650 144,444,300
15 bh 6,565,650 98,484,750 0.922
10 bh 3,030,300 30,303,000 0.284
8 bh 1,767,675 14,141,400 0.132

bh 0.335
3 11,919,180 35,757,540
bh 0.999
16 6,666,660 106,666,560
16 bh 3,272,724 52,363,584 0.490

bh 0.459
2 24,505,026 49,010,052
19 bh 2,626,260 49,898,940 0.467
80 bh 3,535,350 282,828,000 2.649
38 bh 2,121,210 80,605,980 0.755
38 bh 1,515,150 57,575,700 0.539
bh 2.915
32 9,727,200 311,270,400
bh 1.360
32 4,536,000 145,152,000
bh 0.062
1 6,666,660 6,666,660
bh 0.094
1 9,999,990 9,999,990
1 bh 7,575,750 7,575,750 0.071
bh 0.298
7 4,545,450 31,818,150

bh 0.164
2 8,737,365 17,474,730
bh 0.102
2 5,454,540 10,909,080
1 bh 7,575,750 7,575,750 0.071
1 bh 4,545,450 4,545,450 0.043
1 bh 909,090 909,090 0.009
2 bh 3,030,300 6,060,600 0.057
8 bh 1,515,150 12,121,200 0.114
7 bh 1,111,110 7,777,770 0.073
bh 0.201
1 21,414,120 21,414,120
bh 0.130
1 13,888,875 13,888,875
bh 0.517
1 55,151,460 55,151,460
bh 0.347
1 37,090,872 37,090,872
bh 0.090
1 9,595,950 9,595,950
bh 0.077
1 8,181,810 8,181,810

bh 0.212
1 22,666,644 22,666,644

bh 0.193

1 20,606,040 20,606,040

bh 0.569

1 60,787,818 60,787,818
3 bh 3,535,350 10,606,050 0.099
3 bh 3,030,300 9,090,900 0.085
4 bh 4,363,632 17,454,528 0.163
5 bh 1,212,120 6,060,600 0.057

10 bh 508,500 5,085,000 0.048


11 bh 6,215,000 68,365,000 0.640
0 bh 4,034,100 - -
3 bh 6,215,000 18,645,000 0.175
16 bh 1,695,000 27,120,000 0.254
24 m2 500,000 12,000,000 0.112

7 bh 1,500,000 10,500,000 0.098


1 bh 550,000 550,000 0.005
2 bh 550,000 1,100,000 0.010
1 bh 550,000 550,000 0.005
1 bh 550,000 550,000 0.005
1 bh 550,000 550,000 0.005
0 bh 550,000 -
10 bh 550,000 5,500,000 0.052
2 bh 1,450,000 2,900,000 0.027
55 bh 550,000 30,250,000 0.283

10,676,845,083
10,676,845,083 100.000
1,067,684,508
11,744,529,592
4 5 6 7 8 9 10 11 12 13 14 15
0.01 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01
0.03 0.03 0.03
0.00 0.00 0.00 0.00
0.01 0.01 0.01 0.01 0.01
16 17 18 19 20 21 22 23 24 25 26 27 28 29

0.01 0.01
30

Anda mungkin juga menyukai