RANCANGAN ANGGARAN BIAYA

PEMBANGUNAN PAPAN PANJAT BOULDER


RHINO WALL CLIMBING
NO JENIS PENGELUARAN VOLUME HARGA SATUAN (Rp)
A. PEMBANGUNAN WALL BOULDER
1 Pembelian Multiplek 12 300,000
2 Pembelian Besi 12 175,000
3 Pembelian Cat Besi 10 150,000
4 Pembelian Cat Kayu 15 75,000
5 Pembelian Cakar Ayam 4 185,000
6 Pembelian Besi Coran 4 185,000
7 Pembelian Baud 300 3,000
8 Pembelian Kuas Besar 4 25,000
9 Pembelian Ampelas 10 5,000
10 Pembelian Thiner 20 40,000
11 Pembelian Baut Tanem 200 10,000
12 Ongkos Pekerja 6 650,000
13 Konsumsi Pekerja 6 200,000
JUMLAH
B. KEBUTUHAN PERALATAN
Pembelian Matras 6 1,250,000
Pembelian Point 8 650,000
JUMLAH
TOTAL A + B
=
ER

JUMLAH (Rp)

3,600,000
2,100,000
1,500,000
1,125,000
740,000
740,000
900,000
100,000
50,000
800,000
2,000,000
3,900,000
1,200,000
18,755,000

7,500,000
5,200,000
12,700,000
31,455,00
RANCANGAN ANGGARAN BIAYA
PEMBANGUNAN PAPAN PANJAT BOULDER
RHINO CLIMBING

NO JENIS PENGELUARAN VOLUME HARGA SATUAN (Rp) JUMLAH (Rp)


A. KEBUTUHAN WALL BOULDER
1 Pembelian Multiplek 12 250,000 3,000,000
2 Pembelian Besi 12 125,000 1,500,000
3 Pembelian Cat Besi 10 100,000 1,000,000
4 Pembelian Cat Kayu 15 50,000 750,000
5 Pembelian Cakar Ayam 4 185,000 740,000
6 Pembelian Besi Coran 4 185,000 740,000
7 Pembelian Baud 300 2,000 600,000
8 Pembelian Kuas Besar 4 20,000 80,000
9 Pembelian Ampelas 10 5,000 50,000
10 Pembelian Thiner 15 40,000 600,000
11 Pembelian Baut Tanem 200 5,000 1,000,000
12 Ongkos Pekerja 6 500,000 3,000,000
13 Konsumsi Pekerja 6 200,000 1,200,000
JUMLAH 14,260,000
B. KEBUTUHAN PERALATAN
Pembelian Matras 6 1,000,000 6,000,000
Pembelian Point 8 450,000 3,600,000
JUMLAH 9,600,000
TOTAL A + B 23,860,000

TERBILANG : DUAPULUH TIGA JUTA DELAPARATUS ENAMPULUH RIBU RUPIAH