Anda di halaman 1dari 56

REKAPITULASI

HARGA PERKIRAAN SENDIRI (HPS)

SATUAN KERJA : DINAS KESEHATAN KAB. SIGI


PEKERJAAN : PEMBANGUNAN RUMAH GENSET KINOVARO
LOKASI : DESA PORAME KEC. KINOVARO KAB. SIGI
TAHUN ANGGARAN : 2017

NO. URAIAN PEKERJAAN JUMLAH HARGA


1 2 3
I. PEKERJAAN PERSIAPAN Rp 775,000.00
II. PEKERJAAN TANAH Rp 2,644,369.13
III. PEKERJAAN PONDASI Rp 10,771,217.40
IV. PEKERJAAN BETON Rp 37,445,315.58
V. PEKERJAAN DINDING DAN PLESTERAN Rp 16,095,384.00
VII. PEKERJAAN PINTU/KUSEN/VENTILASI Rp 5,682,871.81
VIII. PEKERJAAN PENGECATAN Rp 3,634,844.35
IX. PEKERJAAN PENGGANTUNG Rp 828,091.00
X. PEKERJAAN INSTALASI LISTRIK Rp 2,441,089.00
XI PEKERJAAN LAIN-LAIN Rp 1,500,000.00

A. BIAYA KONSTRUKSI Rp 81,818,182.28


B. PPN 10% Rp 8,181,818.23
C. TOTAL KESELURUHAN Rp 90,000,000.51
D. DIBULATKAN Rp 90,000,000.00

TERBILANG : Sembilan Puluh Juta Rupiah

Sigi Biromaru, 04 Juli 2017


PENGGUNA ANGGARAN
DINAS KESEHATAN

dr. SOFYAN MAILILI, M.Kes


Nip. 19650906 199703 1 002
DAFTAR KUANTITAS DAN HARGA

SATUAN KERJA : DINAS KESEHATAN KAB. SIGI


PEKERJAAN : PEMBANGUNAN RUMAH GENSET KINOVARO
LOKASI : DESA PORAME KEC. KINOVARO KAB. SIGI
TAHUN ANGGARAN : 2017

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6=4x5

I. PEKERJAAN PERSIAPAN
1. Pek. Pengukuran dan Pemasangan Bouwplank Ls 1.000 Rp 525,000.00 Rp 525,000.00
2. Pek. Pembuatan Papan Nama Proyek Ls 1.000 Rp 250,000.00 Rp 250,000.00
Rp 775,000.00
II. PEKERJAAN TANAH
1. Pek. Galian Sedalam < 1 meter M3 13.920 Rp 33,440.00 Rp 465,484.80
2. Pek. Galian Sedalam > 1 meter M3 3.072 Rp 69,795.00 Rp 214,410.24
3. Pek. Urugan Kembali M3 5.664 Rp 20,295.00 Rp 114,950.88
4. Pek. Urugan Tasirtu Bawah Lantai M3 8.725 Rp 113,300.00 Rp 988,569.69
5. Pek. Urugan Pasir Bawah Pondasi Batu Kali M3 1.160 Rp 194,260.00 Rp 225,341.60
6. Pek. Urugan Pasir Bawah Lantai M3 3.272 Rp 194,260.00 Rp 635,611.92
Rp 2,644,369.13
III. PEKERJAAN PONDASI
1. Pek. Pondasi Poer Plat M3 0.782 Rp 4,016,985.50 Rp 3,142,889.46
2. Pek. Pondasi Batu kali 1 Pc : 4 Psr M3 8.628 Rp 736,895.50 Rp 6,357,565.93
3. Pek. Batu Kosong (Aanstamping) M3 3.480 Rp 365,161.50 Rp 1,270,762.02
Rp 10,771,217.40
IV. PEKERJAAN BETON
1. Pek. Cor Lantai Kerja Pondasi Poer Plat M3 0.280 Rp 958,468.50 Rp 268,371.18
2. Pek. Cor Lantai Kerja Bertulang Tebal 10 cm M3 1.759 Rp 3,759,082.18 Rp 6,612,225.55
3. Pasang Lantai Beton Tumbuk 1:3:5 tebal 5 cm Teras M3 0.948 Rp 958,468.50 Rp 908,474.78
4. Pek. Sloof 15/20 M3 0.645 Rp 3,680,304.83 Rp 2,373,796.62
5. Pek. Kolom 20/20 M3 0.387 Rp 4,229,330.60 Rp 1,637,850.57
6. Pek. Kolom 15/15 M3 0.096 Rp 5,043,716.33 Rp 486,617.75
7. Pek. Ring Balok 15/20 M3 0.645 Rp 4,658,539.23 Rp 3,004,757.81
8. Pek. Ring Balok 15/15 M3 0.196 Rp 4,163,560.17 Rp 815,016.90
9. Pek. Kolom ornamen M3 0.479 Rp 3,759,082.18 Rp 1,801,502.54
10. Pek. Plat Beton Bertulang M3 5.197 Rp 3,759,082.18 Rp 19,536,701.88
Rp 37,445,315.58
V. PEKERJAAN DINDING DAN PLESTERAN
1. Pek. Pasangan Dinding 1/2 Bata 1 Pc : 5 Psr M2 36.504 Rp 118,981.28 Rp 4,343,233.15
2. Pek. Plesteran Dinding Biasa 1 Pc : 5 Psr M2 73.007 Rp 43,061.70 Rp 3,143,805.53
3. Pek. Plesteran Kolom Beton 1 Pc : 3 Psr M2 23.400 Rp 44,833.58 Rp 1,049,105.77
4. Pek. Plesteran Kaki Pondasi M2 8.708 Rp 44,833.58 Rp 390,410.81
5. Pek. Plesteran Plat dan kolom ornamen M2 50.238 Rp 44,833.58 Rp 2,252,362.84
6. Pek. Acian M2 155.353 Rp 31,647.00 Rp 4,916,465.89
Rp 16,095,384.00
VII. PEKERJAAN PINTU/KUSEN/VENTILASI
1. Pek. Pasang Kusen Pintu/Jendela/Ventilasi Kayu Klas II M3 0.239 Rp 4,521,944.83 Rp 1,082,650.81
2. Pek. Pasang Pintu Panel M2 5.280 Rp 493,625.00 Rp 2,606,340.00
3. Pek. Terali Besi Ls 1.000 Rp 1,200,000.00 Rp 1,200,000.00
4. Pek. Pasang Bingkai Jendela Jungkit Kaca Bening 5 mm M2 1.800 Rp 441,045.00 Rp 793,881.00
Rp 5,682,871.81
IX. PEKERJAAN PENGECATAN
1. Pek. Cat Tembok dan Kolom M2 155.353 Rp 19,236.25 Rp 2,988,414.92
2. Pek. Cat Kayu (Kusen/Pintu/Listplank/Jendela) M2 13.563 Rp 47,663.00 Rp 646,429.44
Rp 3,634,844.35
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6=4x5
X. PEKERJAAN PENGGANTUNG
1. Pek. Pas Engsel Pintu Bh 9.000 Rp 31,306.00 Rp 281,754.00
2. Pek. Pas Engsel Jendela Bh 4.000 Rp 28,006.00 Rp 112,024.00
3. Pek. Pas. Kunci Pintu 2 Slaag Bh 1.000 Rp 288,695.00 Rp 288,695.00
4. Pek. Pas. Grendel Bh 1.000 Rp 25,806.00 Rp 25,806.00
5. Pek. Pas. Kait Angin Bh 4.000 Rp 29,953.00 Rp 119,812.00
Rp 828,091.00
XI. PEKERJAAN INSTALASI LISTRIK
1. Pek. Pemasangan Box Panel + MCB Bh 1.000 Rp 350,000.00 Rp 350,000.00
2. Pek. Pemasangan Mata Lampu & Stop Kontak Ttk 3.000 Rp 177,045.00 Rp 531,135.00
3. Pek. Pemasangan Saklar Ganda Bh 1.000 Rp 48,411.00 Rp 48,411.00
4. Pek. Pemasangan Stop Kontak Bh 3.000 Rp 44,011.00 Rp 132,033.00
5. Pek. Pas. Lampu TL. 2 x 20 Watt Philips + Kap Tanam Bh 2.000 Rp 210,111.00 Rp 420,222.00
6. Pek. Pas. Lampu 15 Watt + Down Light Ǿ4" Bh 8.000 Rp 119,911.00 Rp 959,288.00
Rp 2,441,089.00
XIII. PEKERJAAN LAIN-LAIN
1. Pek. Laporan, Asbuilt Drawing, Dokumentasi & Administrasi Ls 1.000 Rp 1,000,000.00 Rp 1,000,000.00
2. Pek. Pembersihan Akhir Ls 1.000 Rp 500,000.00 Rp 500,000.00
Rp 1,500,000.00
ANALISA SATUAN PEKERJAAN

SATUAN KERJA : DINAS KESEHATAN KAB. SIGI


PEKERJAAN : PEMBANGUNAN RUMAH GENSET KINOVARO
LOKASI : DESA PORAME KEC. KINOVARO KAB. SIGI
T.A : 2017

2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 OH 0.400 65,000.00 26,000.00
Tukang Kayu L 02 OH 0.200 90,000.00 18,000.00
Kepala Tukang L 03 OH 0.020 125,000.00 2,500.00
Mandor L 04 OH 0.020 110,000.00 2,200.00
JUMLAH TENAGA KERJA 48,700.00
B. BAHAN
Dolken kayu φ Batang 1.250 24,000.00 30,000.00
8-10/400 cm
Semen portland Kg 5.000 1,360.00 6,800.00
Pasir beton m3 0.005 130,000.00 650.00
Koral beton m3 0.009 250,000.00 2,250.00
Kayu 5/7 m3 0.072 1,600,000.00 115,200.00
Paku biasa 2” – 5” Kg 0.060 16,500.00 990.00
Residu Liter 0.400 17,000.00 6,800.00
JUMLAH HARGA BAHAN 162,690.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 211,390.00
E. OVERHEAD DAN PROFIT 10% 21,139.00
F. HARGA SATUAN PEKERJAAN (D+E) 232,529.00

2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 OH 0.200 65,000.00 13,000.00
Tukang Kayu L 02 OH 0.400 90,000.00 36,000.00
Kepala Tukang L 03 OH 0.020 125,000.00 2,500.00
Mandor L 04 OH 0.020 110,000.00 2,200.00
JUMLAH TENAGA KERJA 53,700.00
B. BAHAN
Dolken kayu φ 8-10/400 cm Batang 1.250 24,000.00 30,000.00
Semen portland Kg 2.500 1,360.00 3,400.00
Seng gelombang Lbr 1.200 58,000.00 69,600.00
Pasir beton m3 0.005 130,000.00 650.00
Koral beton m3 0.009 250,000.00 2,250.00
Kayu 5/7 m3 0.072 1,600,000.00 115,200.00
Paku biasa 2” – 5” Kg 0.060 16,500.00 990.00
Meni besi Liter 0.450 35,000.00 15,750.00
JUMLAH HARGA BAHAN 237,840.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 291,540.00
E. OVERHEAD DAN PROFIT 10% 29,154.00
F. HARGA SATUAN PEKERJAAN (D+E) 320,694.00
2.2.1.3 Pengukuran dan pemasangan 1 m1 Bouwplank
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 OH 0.100 65,000.00 6,500.00
Tukang Kayu L 02 OH 0.100 90,000.00 9,000.00
Kepala Tukang L 03 OH 0.010 125,000.00 1,250.00
Mandor L 04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 17,300.00
B. BAHAN
Kayu balok 5/7 m3 0.012 1,600,000.00 19,200.00
Paku 2”-3” Kg 0.020 16,500.00 330.00
Kayu papan 3/20 m3 0.007 1,600,000.00 11,200.00
JUMLAH HARGA BAHAN 30,730.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 48,030.00
E. OVERHEAD DAN PROFIT 10% 4,803.00
F. HARGA SATUAN PEKERJAAN (D+E) 52,833.00

2.2.1.7 Pembersihan 1 m2 lapangan dan perataan


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.100 65,000.00 6,500.00
Mandor L 04 O/H 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 12,000.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 12,000.00
E. OVERHEAD DAN PROFIT 10% 1,200.00
F. HARGA SATUAN PEKERJAAN (D+E) 13,200.00

2.3.1 HARGA SATUAN PEKERJAAN TANAH


2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.400 65,000.00 26,000.00
Mandor L 04 O/H 0.040 110,000.00 4,400.00
JUMLAH TENAGA KERJA 30,400.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 30,400.00
E. OVERHEAD DAN PROFIT 10% 3,040.00
F. HARGA SATUAN PEKERJAAN (D+E) 33,440.00
Penggalian 1 m3 tanah biasa sedalam 2 m
2.3.1.2
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.900 65,000.00 58,500.00
Mandor L 04 O/H 0.045 110,000.00 4,950.00
JUMLAH TENAGA KERJA 63,450.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 63,450.00
E. OVERHEAD DAN PROFIT 10% 6,345.00
F. HARGA SATUAN PEKERJAAN (D+E) 69,795.00
2.3.1.3 Menggali 1 m3 tanah biasa sedalam 3 m
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.050 65,000.00 68,250.00
Mandor L 04 O/H 0.067 110,000.00 7,370.00
JUMLAH TENAGA KERJA 75,620.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 75,620.00
E. OVERHEAD DAN PROFIT 10% 7,562.00
F. HARGA SATUAN PEKERJAAN (D+E) 83,182.00

2.3.1.4 Menggali 1 m3 tanah keras sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.000 65,000.00 65,000.00
Mandor L 04 O/H 0.032 110,000.00 3,520.00
JUMLAH TENAGA KERJA 68,520.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 68,520.00
E. OVERHEAD DAN PROFIT 10% 6,852.00
F. HARGA SATUAN PEKERJAAN (D+E) 75,372.00
Menggali 1 m3 tanah cadas sedalam 1 m
2.3.1.5
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.500 65,000.00 97,500.00
Mandor L 04 O/H 0.060 110,000.00 6,600.00
JUMLAH TENAGA KERJA 104,100.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 104,100.00
E. OVERHEAD DAN PROFIT 10% 10,410.00
F. HARGA SATUAN PEKERJAAN (D+E) 114,510.00

2.3.1.6 Menggali 1 m3 tanah lumpur sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.200 65,000.00 78,000.00
Mandor L 04 O/H 0.045 110,000.00 4,950.00
JUMLAH TENAGA KERJA 82,950.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 82,950.00
E. OVERHEAD DAN PROFIT 10% 8,295.00
F. HARGA SATUAN PEKERJAAN (D+E) 91,245.00
Pengurugan kembali 1 m3 galian tanah
2.3.1.7
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.250 65,000.00 16,250.00
Mandor L 04 O/H 0.020 110,000.00 2,200.00
JUMLAH TENAGA KERJA 18,450.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 18,450.00
E. OVERHEAD DAN PROFIT 10% 1,845.00
F. HARGA SATUAN PEKERJAAN (D+E) 20,295.00

2.3.1.8 Pemadatan tanah 1 m3 tanah (per 20 cm)


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.500 65,000.00 32,500.00
Mandor L 04 O/H 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 38,000.00
B. BAHAN

JUMLAH HARGA BAHAN


C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 38,000.00
E. OVERHEAD DAN PROFIT 10% 3,800.00
F. HARGA SATUAN PEKERJAAN (D+E) 41,800.00

2.3.1.9 Pengurugan 1 m3 dengan pasir urug


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Mandor L 04 O/H 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 20,600.00
B. BAHAN
Pasir Urug m3 1.200 130,000.00 156,000.00
JUMLAH HARGA BAHAN 156,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 176,600.00
E. OVERHEAD DAN PROFIT 10% 17,660.00
F. HARGA SATUAN PEKERJAAN (D+E) 194,260.00

2.3.1.10 Pengurugan 1 m3 sirtu padat


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.250 65,000.00 16,250.00
Mandor L 04 O/H 0.025 110,000.00 2,750.00
JUMLAH TENAGA KERJA 19,000.00
B. BAHAN
Sirtu Padat m3 1.200 70,000.00 84,000.00
JUMLAH HARGA BAHAN 84,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 103,000.00
E. OVERHEAD DAN PROFIT 10% 10,300.00
F. HARGA SATUAN PEKERJAAN (D+E) 113,300.00
3.2.1 HARGA SATUAN PEKERJAAN PONDASI
3.2.1.1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.500 65,000.00 97,500.00
Tukang Batu L 02 O/H 0.750 90,000.00 67,500.00
Kepala Tukang L 03 O/H 0.075 125,000.00 9,375.00
Mandor L 04 O/H 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 182,625.00
B. BAHAN
Batu Belah m3 1.200 165,000.00 198,000.00
Semen Portland kg 202.000 1,360.00 274,720.00
Pasir Pasang m3 0.485 130,000.00 63,050.00
JUMLAH HARGA BAHAN 535,770.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 718,395.00
E. OVERHEAD DAN PROFIT 10% 71,839.50
F. HARGA SATUAN PEKERJAAN (D+E) 790,234.50
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
3.2.1.1
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.500 65,000.00 97,500.00
Tukang Batu L 02 O/H 0.750 90,000.00 67,500.00
Kepala Tukang L 03 O/H 0.075 125,000.00 9,375.00
Mandor L 04 O/H 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 182,625.00
B. BAHAN
Batu Belah m3 1.200 165,000.00 198,000.00
Semen Portland kg 163.000 1,360.00 221,680.00
Pasir Pasang m3 0.520 130,000.00 67,600.00
JUMLAH HARGA BAHAN 487,280.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 669,905.00
E. OVERHEAD DAN PROFIT 10% 66,990.50
F. HARGA SATUAN PEKERJAAN (D+E) 736,895.50

3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.500 65,000.00 97,500.00
Tukang Batu L 02 O/H 0.750 90,000.00 67,500.00
Kepala Tukang L 03 O/H 0.075 125,000.00 9,375.00
Mandor L 04 O/H 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 182,625.00
B. BAHAN
Batu Belah m3 1.200 165,000.00 198,000.00
Semen Portland kg 136.000 1,360.00 184,960.00
Pasir Pasang m3 0.544 130,000.00 70,720.00
JUMLAH HARGA BAHAN 453,680.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 636,305.00
E. OVERHEAD DAN PROFIT 10% 63,630.50
F. HARGA SATUAN PEKERJAAN (D+E) 699,935.50
3.2.1.4 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.500 65,000.00 97,500.00
Tukang Batu L 02 O/H 0.750 90,000.00 67,500.00
Kepala Tukang L 03 O/H 0.075 125,000.00 9,375.00
Mandor L 04 O/H 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 182,625.00
B. BAHAN
Batu Belah m3 1.200 165,000.00 198,000.00
Semen Portland kg 117.000 1,360.00 159,120.00
Pasir Pasang m3 0.561 130,000.00 72,930.00
JUMLAH HARGA BAHAN 430,050.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 612,675.00
E. OVERHEAD DAN PROFIT 10% 61,267.50
F. HARGA SATUAN PEKERJAAN (D+E) 673,942.50

3.2.1.5 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.500 65,000.00 97,500.00
Tukang Batu L 02 O/H 0.750 90,000.00 67,500.00
Kepala Tukang L 03 O/H 0.075 125,000.00 9,375.00
Mandor L 04 O/H 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 182,625.00
B. BAHAN
Batu Belah m3 1.200 165,000.00 198,000.00
Semen Portland kg 91.000 1,360.00 123,760.00
Pasir Pasang m3 0.584 130,000.00 75,920.00
JUMLAH HARGA BAHAN 397,680.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 580,305.00
E. OVERHEAD DAN PROFIT 10% 58,030.50
F. HARGA SATUAN PEKERJAAN (D+E) 638,335.50

3.2.1.2 Pemasangan 1 m3 batu kosong (anstamping)


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.780 65,000.00 50,700.00
Tukang Batu L 02 O/H 0.390 90,000.00 35,100.00
Kepala Tukang L 03 O/H 0.039 125,000.00 4,875.00
Mandor L 04 O/H 0.039 110,000.00 4,290.00
JUMLAH TENAGA KERJA 94,965.00
B. BAHAN
Batu Belah m3 1.200 165,000.00 198,000.00
Pasir Pasang m3 0.300 130,000.00 39,000.00
JUMLAH HARGA BAHAN 237,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 331,965.00
E. OVERHEAD DAN PROFIT 10% 33,196.50
F. HARGA SATUAN PEKERJAAN (D+E) 365,161.50
4.1.1 HARGA SATUAN PEKERJAAN BETON
4.1.1.1 Membuat 1 m3 beton tumbuk 1 Pc : 3 Psr : 5 Krl
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.650 65,000.00 107,250.00
Tukang Batu L 02 O/H 0.250 90,000.00 22,500.00
Kepala Tukang L 03 O/H 0.025 125,000.00 3,125.00
Mandor L 04 O/H 0.080 110,000.00 8,800.00
JUMLAH TENAGA KERJA 141,675.00
B. BAHAN
Semen Portland Kg 218.000 1,360.00 296,480.00
Pasir Beton M3 0.520 130,000.00 67,600.00
Koral Beton M3 0.870 250,000.00 217,500.00
JUMLAH HARGA BAHAN 581,580.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 723,255.00
E. OVERHEAD DAN PROFIT 10% 72,325.50
F. HARGA SATUAN PEKERJAAN (D+E) 795,580.50

4.1.1.2 Membuat 1 m3 beton tumbuk 1 Pc : 3 Psr : 6 Krl


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.650 65,000.00 107,250.00
Tukang Batu L 02 O/H 0.250 90,000.00 22,500.00
Kepala Tukang L 03 O/H 0.025 125,000.00 3,125.00
Mandor L 04 O/H 0.080 110,000.00 8,800.00
JUMLAH TENAGA KERJA 141,675.00
B. BAHAN
Semen Portland Kg 197.000 1,360.00 267,920.00
Pasir Beton M3 0.470 130,000.00 61,100.00
Kerikil (Maks 30 mm) M3 0.940 250,000.00 235,000.00
JUMLAH HARGA BAHAN 564,020.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 705,695.00
E. OVERHEAD DAN PROFIT 10% 70,569.50
F. HARGA SATUAN PEKERJAAN (D+E) 776,264.50

4.1.1.3 Membuat 1 m3 beton tumbuk 1 Pc : 2 Psr : 3 Krl


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.650 65,000.00 107,250.00
Tukang Batu L 02 O/H 0.250 90,000.00 22,500.00
Kepala Tukang L 03 O/H 0.025 125,000.00 3,125.00
Mandor L 04 O/H 0.080 110,000.00 8,800.00
JUMLAH TENAGA KERJA 141,675.00
B. BAHAN
Semen Portland Kg 336.000 1,360.00 456,960.00
Pasir Beton M3 0.540 130,000.00 70,200.00
Kerikil (Maks 30 mm) M3 0.810 250,000.00 202,500.00
JUMLAH HARGA BAHAN 729,660.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 871,335.00
E. OVERHEAD DAN PROFIT 10% 87,133.50
F. HARGA SATUAN PEKERJAAN (D+E) 958,468.50
4.1.1.4 Membuat 1 m3 beton bertulang 1 Pc : 2 Psr : 4 Krl
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.650 65,000.00 107,250.00
Tukang Batu L 02 O/H 0.250 90,000.00 22,500.00
Kepala Tukang L 03 O/H 0.025 125,000.00 3,125.00
Mandor L 04 O/H 0.080 110,000.00 8,800.00
JUMLAH TENAGA KERJA 141,675.00
B. BAHAN
Semen Portland Kg 291.000 1,360.00 395,760.00
Pasir Beton M3 0.470 130,000.00 61,100.00
Kerikil M3 0.930 250,000.00 232,500.00
JUMLAH HARGA BAHAN 689,360.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 831,035.00
E. OVERHEAD DAN PROFIT 10% 83,103.50
F. HARGA SATUAN PEKERJAAN (D+E) 914,138.50

4.1.1.13 Pembesian 1 kg dengan besi polos atau besi ulir


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.007 65,000.00 455.00
Tukang Besi L 02 O/H 0.007 90,000.00 630.00
Kepala Tukang L 03 O/H 0.001 125,000.00 87.50
Mandor L 04 O/H 0.000 110,000.00 44.00
JUMLAH TENAGA KERJA 1,216.50
B. BAHAN
Besi Beton (Polos/Ulir) Kg 1.050 10,500.00 11,025.00
Kawat Beton Kg 0.015 27,300.00 409.50
JUMLAH HARGA BAHAN 11,434.50
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 12,651.00
E. OVERHEAD DAN PROFIT 10% 1,265.10
F. HARGA SATUAN PEKERJAAN (D+E) 13,916.10

4.1.1.14 Pemasangan 1 m2 bekisting untuk pondasi


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.520 65,000.00 33,800.00
Tukang Kayu L 02 O/H 0.260 90,000.00 23,400.00
Kepala Tukang L 03 O/H 0.026 125,000.00 3,250.00
Mandor L 04 O/H 0.026 110,000.00 2,860.00
JUMLAH TENAGA KERJA 63,310.00
B. BAHAN
Kayu kelas III m3 0.040 1,350,000.00 54,000.00
Paku 5 cm – 10 cm Kg 0.300 16,500.00 4,950.00
Minyak bekisting Liter 0.100 15,000.00 1,500.00
JUMLAH HARGA BAHAN 60,450.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 123,760.00
E. OVERHEAD DAN PROFIT 10% 12,376.00
F. HARGA SATUAN PEKERJAAN (D+E) 136,136.00
4.1.1.15 Pemasangan 1 m2 bekisting untuk sloof
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.520 65,000.00 33,800.00
Tukang Kayu L 02 O/H 0.260 90,000.00 23,400.00
Kepala Tukang L 03 O/H 0.026 125,000.00 3,250.00
Mandor L 04 O/H 0.026 110,000.00 2,860.00
JUMLAH TENAGA KERJA 63,310.00
B. BAHAN
Kayu kelas III m3 0.045 1,350,000.00 60,750.00
Paku 5 cm – 10 cm Kg 0.300 16,500.00 4,950.00
Minyak bekisting Liter 0.100 15,000.00 1,500.00
JUMLAH HARGA BAHAN 67,200.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 130,510.00
E. OVERHEAD DAN PROFIT 10% 13,051.00
F. HARGA SATUAN PEKERJAAN (D+E) 143,561.00

4.1.1.16 Pemasangan 1 m2 bekisting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.660 65,000.00 42,900.00
Tukang Kayu L 02 O/H 0.330 90,000.00 29,700.00
Kepala Tukang L 03 O/H 0.033 125,000.00 4,125.00
Mandor L 04 O/H 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 80,355.00
B. BAHAN
Kayu kelas III m3 0.040 1,350,000.00 54,000.00
Paku 5 cm – 10 cm Kg 0.400 16,500.00 6,600.00
Minyak bekisting Liter 0.200 15,000.00 3,000.00
Balok kayu kelas II m3 0.015 1,600,000.00 24,000.00
Plywood tebal 9 mm Lbr 0.350 122,000.00 42,700.00
Dolken kayu φ 8-10cm –panj 4 m Batang 2.000 24,000.00 48,000.00
JUMLAH HARGA BAHAN 178,300.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 258,655.00
E. OVERHEAD DAN PROFIT 10% 25,865.50
F. HARGA SATUAN PEKERJAAN (D+E) 284,520.50

4.1.1.17 Pemasangan 1 m2 bekisting untuk balok


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.660 65,000.00 42,900.00
Tukang Kayu L 02 O/H 0.330 90,000.00 29,700.00
Kepala Tukang L 03 O/H 0.033 125,000.00 4,125.00
Mandor L 04 O/H 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 80,355.00
B. BAHAN
Kayu kelas III m3 0.040 1,350,000.00 54,000.00
Paku 5 cm – 10 cm Kg 0.400 16,500.00 6,600.00
Minyak bekisting Liter -
Balok kayu kelas III m3 0.018 1,350,000.00 24,300.00
Tripleks 4 mm Lbr 0.350 85,000.00 29,750.00
Dolken kayu φ 8-10cm –panj 4 m Batang 2.000 24,000.00 48,000.00
JUMLAH HARGA BAHAN 162,650.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 243,005.00
E. OVERHEAD DAN PROFIT 10% 24,300.50
F. HARGA SATUAN PEKERJAAN (D+E) 267,305.50
4.1.1.18 Pemasangan 1 m2 bekisting untuk lantai
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.660 65,000.00 42,900.00
Tukang Kayu L 02 O/H 0.330 90,000.00 29,700.00
Kepala Tukang L 03 O/H 0.033 125,000.00 4,125.00
Mandor L 04 O/H 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 80,355.00
B. BAHAN
Kayu kelas III m3 0.040 1,350,000.00 54,000.00
Paku 5 cm – 10 cm Kg 0.400 16,500.00 6,600.00
Minyak bekisting Liter 0.200 - -
Balok kayu kelas II m3 0.015 1,350,000.00 20,250.00
Plywood tebal 9 mm Lbr 0.350 85,000.00 29,750.00
Dolken kayu φ 8-10cm –panj 4 m Batang 6.000 24,000.00 144,000.00
JUMLAH HARGA BAHAN 254,600.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 334,955.00
E. OVERHEAD DAN PROFIT 10% 33,495.50
F. HARGA SATUAN PEKERJAAN (D+E) 368,450.50

4.1.1.19 Pemasangan 1 m2 bekisting untuk tangga


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.660 65,000.00 42,900.00
Tukang Kayu L 02 O/H 0.330 90,000.00 29,700.00
Kepala Tukang L 03 O/H 0.033 125,000.00 4,125.00
Mandor L 04 O/H 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 80,355.00
B. BAHAN
Kayu kelas III m3 0.030 1,350,000.00 40,500.00
Paku 5 cm – 10 cm Kg 0.400 16,500.00 6,600.00
Minyak bekisting Liter 0.150 - -
Balok kayu kelas II m3 0.015 1,350,000.00 20,250.00
Plywood tebal 9 mm Lbr 0.350 85,000.00 29,750.00
Dolken kayu φ 8-10cm –panj 4 m Batang 2.000 24,000.00 48,000.00
JUMLAH HARGA BAHAN 145,100.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 225,455.00
E. OVERHEAD DAN PROFIT 10% 22,545.50
F. HARGA SATUAN PEKERJAAN (D+E) 248,000.50

4.1.1.20 Membuat 1 m3 Tapak Poer Plat 120 x 120


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 958,468.50 958,468.50
Besi Beton Polos Kg 200.000 13,916.10 2,783,220.00
Bekesting m2 1.040 136,136.00 141,581.44
B JUMLAH 3,883,269.94

C HARGA SATUAN PEKERJAAN 3,883,269.94

4.1.1.21 Membuat 1 m3 Tapak Poer Plat 100 x 100


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 958,468.50 958,468.50
Besi Beton Polos Kg 160.000 13,916.10 2,226,576.00
Bekesting m2 1.000 136,136.00 136,136.00
B JUMLAH 3,321,180.50

C HARGA SATUAN PEKERJAAN 3,321,180.50


4.1.1.22 Membuat 1 m3 Tapak Poer Plat 80 x 80
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 958,468.50 958,468.50
Besi Beton Polos Kg 210.000 13,916.10 2,922,381.00
Bekesting m2 1.000 136,136.00 136,136.00
B JUMLAH 4,016,985.50

C HARGA SATUAN PEKERJAAN 4,016,985.50

4.1.1.23 Membuat 1 m3 Kolom Struktur dan Kolom Struktur Pedestal 30 x 30


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 958,468.50 958,468.50
Besi Beton Polos Kg 170.000 13,916.10 2,365,737.00
Bekesting m2 6.335 284,520.50 1,802,437.37
B JUMLAH 5,126,642.87

C HARGA SATUAN PEKERJAAN 5,126,642.87

4.1.1.24 Membuat 1 m3 Kolom Struktur dan Kolom Struktur Pedestal 40 x 40


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 958,468.50 958,468.50
Besi Beton Polos Kg 120.000 13,916.10 1,669,932.00
Bekesting m2 4.815 284,520.50 1,369,966.21
B JUMLAH 3,998,366.71

C HARGA SATUAN PEKERJAAN 3,998,366.71

4.1.1.25 Membuat 1 m3 Kolom Struktur 20 x 20


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 4 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 136.000 13,916.10 1,892,589.60
Bekesting m2 5.000 284,520.50 1,422,602.50
B JUMLAH 4,229,330.60

C HARGA SATUAN PEKERJAAN 4,229,330.60

4.1.1.26 Membuat 1 m3 Kolom Struktur 25 x 25


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 4 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 69.784 13,916.10 971,125.58
Bekesting m2 6.720 284,520.50 1,911,977.76
B JUMLAH 3,797,241.84

C HARGA SATUAN PEKERJAAN 3,797,241.84

4.1.1.27 Membuat 1 m3 Kolom Struktur 15 x 40


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 4 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 120.000 13,916.10 1,669,932.00
Bekesting m2 8.665 284,520.50 2,465,370.13
B JUMLAH 5,049,440.63

C HARGA SATUAN PEKERJAAN 5,049,440.63


4.1.1.28 Membuat 1 m3 Kolom Struktur 15 x 15
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 4 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 140.000 13,916.10 1,948,254.00
Bekesting m2 7.667 284,520.50 2,181,323.83
B JUMLAH 5,043,716.33

C HARGA SATUAN PEKERJAAN 5,043,716.33

4.1.1.29 Membuat 1 m3 Sloof 20 x 30


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 180.000 13,916.10 2,504,898.00
Bekesting Sloof m2 3.915 143,561.00 562,041.32
B JUMLAH 3,981,077.82

C HARGA SATUAN PEKERJAAN 3,981,077.82

4.1.1.30 Membuat 1 m3 Sloof 15 x 20


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 4 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 130.000 13,916.10 1,809,093.00
Bekesting Sloof m2 6.667 143,561.00 957,073.33
B JUMLAH 3,680,304.83

C HARGA SATUAN PEKERJAAN 3,680,304.83

4.1.1.31 Membuat 1 m3 Ring Balok 20 x 30


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 200.000 13,916.10 2,783,220.00
Bekesting Ring Balok m2 3.915 267,305.50 1,046,501.03
B JUMLAH 4,743,859.53

C HARGA SATUAN PEKERJAAN 4,743,859.53

4.1.1.32 Membuat 1 m3 Ring Balok 15 x 30


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 160.000 13,916.10 2,226,576.00
Bekesting Ring Balok m3 4.665 267,305.50 1,246,980.16
B JUMLAH 4,387,694.66

C HARGA SATUAN PEKERJAAN 4,387,694.66

4.1.1.33 Membuat 1 m3 Ring Balok 15 x 20


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 4 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 109.000 13,916.10 1,516,854.90
Bekesting Ring Balok m3 8.333 267,305.50 2,227,545.83
B JUMLAH 4,658,539.23

C HARGA SATUAN PEKERJAAN 4,658,539.23


4.1.1.34 Membuat 1 m3 Ring Balok 15 x 15
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 4 Krl m3 1.000 914,138.50 914,138.50
Besi Beton Polos Kg 139.593 13,916.10 1,942,594.79
Bekesting Ring Balok m3 4.889 267,305.50 1,306,826.89
B JUMLAH 4,163,560.17

C HARGA SATUAN PEKERJAAN 4,163,560.17

4.1.1.35 Membuat 1 m3 Pelat Lantai / Dinding & Sunscreen


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA + BAHAN+PERALATAN
Beton 1 Pc : 2 Psr : 3 Krl m3 1.000 958,468.50 958,468.50
Besi Beton Polos Kg 101.000 13,916.10 1,405,526.10
Bekesting Pelat Lantai m3 4.165 334,955.00 1,395,087.58
B JUMLAH 3,759,082.18

C HARGA SATUAN PEKERJAAN 3,759,082.18

. 4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


4.2.1.1 Memasang 1 m1 Rangka Kusen Pintu Dan Jendela Aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.043 65,000.00 2,795.00
tukang Khusus Aluminium L 03 O/H 0.043 90,000.00 3,870.00
Kepala Tukang L 03 O/H 0.004 125,000.00 537.50
Mandor L 04 O/H 0.002 110,000.00 231.00
JUMLAH TENAGA KERJA 7,433.50
B. BAHAN
Profil Aluminium 4/10 m 1.100 15,000.00 16,500.00
Sekrup Fixer Buah 2.000 1,500.00 3,000.00
Sealant Tube 0.060 35,000.00 2,100.00
JUMLAH HARGA BAHAN 21,600.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 29,033.50
E. OVERHEAD DAN PROFIT 10% 2,903.35
F. HARGA SATUAN PEKERJAAN (D+E) 31,936.85

4.2.1.2 Memasang 1 m1 Rangka Daun Pintu Dan Jendela Aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.043 65,000.00 2,795.00
tukang Khusus Aluminium L 03 O/H 0.043 90,000.00 3,870.00
Kepala Tukang L 03 O/H 0.004 125,000.00 537.50
Mandor L 04 O/H 0.002 110,000.00 231.00
JUMLAH TENAGA KERJA 7,433.50
B. BAHAN
Profil Aluminium 3/8 m 1.100 15,000.00 16,500.00
Sekrup Fixer Buah 2.000 1,500.00 3,000.00
Sealant Tube 0.060 35,000.00 2,100.00
JUMLAH HARGA BAHAN 21,600.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 29,033.50
E. OVERHEAD DAN PROFIT 10% 2,903.35
F. HARGA SATUAN PEKERJAAN (D+E) 31,936.85
4.2.1.3 Pemasangan 1 m pintu alluminium strip lebar 8 cm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.085 65,000.00 5,525.00
tukang Khusus Aluminium L 03 O/H 0.085 90,000.00 7,650.00
Kepala Tukang L 03 O/H 0.009 125,000.00 1,062.50
Mandor L 04 O/H 0.004 110,000.00 462.00
JUMLAH TENAGA KERJA 14,699.50
B. BAHAN
Profil Aluminium m 1.100 15,000.00 16,500.00
Aluminium Strip m 1.100 17,000.00 18,700.00
JUMLAH HARGA BAHAN 35,200.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 49,899.50
E. OVERHEAD DAN PROFIT 10% 4,989.95
F. HARGA SATUAN PEKERJAAN (D+E) 54,889.45
Pemasangan 1 m2 pintu kaca rangka alluminium
4.2.1.3
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.085 65,000.00 5,525.00
tukang Khusus Aluminium L 03 O/H 0.085 90,000.00 7,650.00
Kepala Tukang L 03 O/H 0.009 125,000.00 1,125.00
Mandor L 04 O/H 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 14,850.00
B. BAHAN
Profil Aluminium m 4.400 15,000.00 66,000.00
Profil Kaca m 4.500 - -
Sealant Tube 0.270 - -
JUMLAH HARGA BAHAN 66,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 80,850.00
E. OVERHEAD DAN PROFIT 10% 8,085.00
F. HARGA SATUAN PEKERJAAN (D+E) 88,935.00
Pemasangan 1 m terali besi strip (2 x 3) mm
4.2.1.5
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.670 65,000.00 108,550.00
Tukang Las L 03 O/H 1.670 90,000.00 150,300.00
Kepala Tukang L 03 O/H 0.167 125,000.00 20,875.00
Mandor L 04 O/H 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 288,855.00
B. BAHAN
Besi Strip Kg 6.177 25,000.00 154,425.00
Pengelasan cm 27.080 100.00 2,708.00
JUMLAH HARGA BAHAN 157,133.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 166,263.00
E. OVERHEAD DAN PROFIT 10% 16,626.30
F. HARGA SATUAN PEKERJAAN (D+E) 182,889.30
4.2.1.5 Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang L 03 O/H 0.200 90,000.00 18,000.00
Kepala Tukang L 03 O/H 0.020 125,000.00 2,500.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 33,610.00
B. BAHAN
Seng Plat m 1.050 20,000.00 21,000.00
Paku 1 cm - 2.5 cm kg 0.015 16,500.00 247.50
Papan Kayu Klas II m3 0.019 1,600,000.00 30,400.00
JUMLAH HARGA BAHAN 51,647.50
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 85,257.50
E. OVERHEAD DAN PROFIT 10% 8,525.75
F. HARGA SATUAN PEKERJAAN (D+E) 93,783.25

4.2.1.7 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.150 65,000.00 9,750.00
Tukang L 03 O/H 0.300 90,000.00 27,000.00
Kepala Tukang L 03 O/H 0.030 125,000.00 3,750.00
Mandor L 04 O/H 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 41,380.00
B. BAHAN
Seng Plat m 1.050 35,000.00 36,750.00
Paku 1 cm - 2.5 cm kg 0.010 16,500.00 165.00
Besi Strip kg 0.500 25,000.00 12,500.00
JUMLAH HARGA BAHAN 49,415.00
C. PERALATAN
- JUMLAH PERALATAN
D. JUMLAH (A+B+C) 90,795.00
E. OVERHEAD DAN PROFIT 10% 9,079.50
F. HARGA SATUAN PEKERJAAN (D+E) 99,874.50

4.2.1.6 Pemasangan 1 m2 rangka besi hollow 20.40.0.25mm, modul 60 x 60 cm, plafond


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.350 65,000.00 22,750.00
Tukang Besi L 03 O/H 0.350 90,000.00 31,500.00
Kepala Tukang L 03 O/H 0.035 125,000.00 4,375.00
Mandor L 04 O/H 0.018 110,000.00 1,980.00
JUMLAH TENAGA KERJA 60,605.00
B. BAHAN
Rangka Metal Hollow 40.40.2 m1 4.000 17,000.00 68,000.00
Assesories (Perkuatan, Las Dll) Ls 1.000 17,000.00 17,000.00
(100% x Rangka)
JUMLAH HARGA BAHAN 85,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 145,605.00
E. OVERHEAD DAN PROFIT 10% 14,560.50
F. HARGA SATUAN PEKERJAAN (D+E) 160,165.50
4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
4.4.1.1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.600 65,000.00 39,000.00
Tukang Batu L 03 O/H 0.200 90,000.00 18,000.00
Kepala Tukang L 03 O/H 0.020 125,000.00 2,500.00
Mandor L 04 O/H 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 62,800.00
B. BAHAN
Bata Merah Bh 140.000 825.00 115,500.00
Semen Portland Kg 43.500 1,360.00 59,160.00
Pasir Pasang m3 0.080 130,000.00 10,400.00
JUMLAH HARGA BAHAN 185,060.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 187,560.00
E. OVERHEAD DAN PROFIT 10% 18,756.00
F. HARGA SATUAN PEKERJAAN (D+E) 206,316.00

4.4.1.2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.600 65,000.00 39,000.00
Tukang Batu L 03 O/H 0.200 90,000.00 18,000.00
Kepala Tukang L 03 O/H 0.020 125,000.00 2,500.00
Mandor L 04 O/H 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 62,800.00
B. BAHAN
Bata Merah Bh 140.000 825.00 115,500.00
Semen Portland Kg 32.950 1,360.00 44,812.00
Pasir Pasang m3 0.091 130,000.00 11,830.00
JUMLAH HARGA BAHAN 172,142.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 174,642.00
E. OVERHEAD DAN PROFIT 10% 17,464.20
F. HARGA SATUAN PEKERJAAN (D+E) 192,106.20

4.4.1.3 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.600 65,000.00 39,000.00
Tukang Batu L 03 O/H 0.200 90,000.00 18,000.00
Kepala Tukang L 03 O/H 0.020 125,000.00 2,500.00
Mandor L 04 O/H 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 62,800.00
B. BAHAN
Bata Merah Bh 140.000 825.00 115,500.00
Semen Portland Kg 26.550 1,360.00 36,108.00
Pasir Pasang m3 0.093 130,000.00 12,090.00
JUMLAH HARGA BAHAN 163,698.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 166,198.00
E. OVERHEAD DAN PROFIT 10% 16,619.80
F. HARGA SATUAN PEKERJAAN (D+E) 182,817.80
4.4.1.4 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.600 65,000.00 39,000.00
Tukang Batu L 03 O/H 0.200 90,000.00 18,000.00
Kepala Tukang L 03 O/H 0.020 125,000.00 2,500.00
Mandor L 04 O/H 0.030 110,000.00 3,300.00
JUMLAH TENAGA KERJA 62,800.00
B. BAHAN
Bata Merah Bh 140.000 825.00 115,500.00
Semen Portland Kg 22.200 1,360.00 30,192.00
Pasir Pasang m3 0.102 130,000.00 13,260.00
JUMLAH HARGA BAHAN 158,952.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 161,452.00
E. OVERHEAD DAN PROFIT 10% 16,145.20
F. HARGA SATUAN PEKERJAAN (D+E) 177,597.20

4.4.1.5 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 31,400.00
B. BAHAN
Bata Merah Bh 70.000 825.00 57,750.00
Semen Portland Kg 18.950 1,360.00 25,772.00
Pasir Pasang m3 0.038 130,000.00 4,940.00
JUMLAH HARGA BAHAN 88,462.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 89,712.00
E. OVERHEAD DAN PROFIT 10% 8,971.20
F. HARGA SATUAN PEKERJAAN (D+E) 98,683.20

4.4.1.1 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 31,400.00
B. BAHAN
Bata Merah Bh 70.000 825.00 57,750.00
Semen Portland Kg 14.370 1,360.00 19,543.20
Pasir Pasang m3 0.040 130,000.00 5,200.00
JUMLAH HARGA BAHAN 82,493.20
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 113,893.20
E. OVERHEAD DAN PROFIT 10% 11,389.32
F. HARGA SATUAN PEKERJAAN (D+E) 125,282.52
4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 31,400.00
B. BAHAN
Bata Merah Bh 70.000 825.00 57,750.00
Semen Portland Kg 11.500 1,360.00 15,640.00
Pasir Pasang m3 0.043 130,000.00 5,590.00
JUMLAH HARGA BAHAN 78,980.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 110,380.00
E. OVERHEAD DAN PROFIT 10% 11,038.00
F. HARGA SATUAN PEKERJAAN (D+E) 121,418.00

4.4.1.2 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 5PP
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 31,400.00
B. BAHAN
Bata Merah Bh 70.000 825.00 57,750.00
Semen Portland Kg 9.680 1,360.00 13,164.80
Pasir Pasang m3 0.045 130,000.00 5,850.00
JUMLAH HARGA BAHAN 76,764.80
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 108,164.80
E. OVERHEAD DAN PROFIT 10% 10,816.48
F. HARGA SATUAN PEKERJAAN (D+E) 118,981.28

4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


4.4.2.1 Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm.
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 36,525.00
B. BAHAN
Semen Portland (PC) Kg 15.504 1,360.00 21,085.44
Pasir Pasang (PP) m3 0.016 130,000.00 2,080.00
JUMLAH HARGA BAHAN 23,165.44
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 24,815.44
E. OVERHEAD DAN PROFIT 10% 2,481.54
F. HARGA SATUAN PEKERJAAN (D+E) 27,296.98
4.4.2.1 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 36,525.00
B. BAHAN
Semen Portland (PC) Kg 10.224 1,360.00 13,904.64
Pasir Pasang (PP) m3 0.020 130,000.00 2,600.00
JUMLAH HARGA BAHAN 16,504.64
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 53,029.64
E. OVERHEAD DAN PROFIT 10% 5,302.96
F. HARGA SATUAN PEKERJAAN (D+E) 58,332.60

4.4.2.2 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang Batu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 29,475.00
B. BAHAN
Semen Portland (PC) Kg 6.480 1,360.00 8,812.80
Pasir Pasang (PP) m3 0.019 130,000.00 2,470.00
JUMLAH HARGA BAHAN 11,282.80
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 40,757.80
E. OVERHEAD DAN PROFIT 10% 4,075.78
F. HARGA SATUAN PEKERJAAN (D+E) 44,833.58

4.4.2.3 Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 36,525.00
B. BAHAN
Semen Portland (PC) Kg 6.240 1,360.00 8,486.40
Pasir Pasang (PP) m3 0.024 130,000.00 3,120.00
JUMLAH HARGA BAHAN 11,606.40
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 48,131.40
E. OVERHEAD DAN PROFIT 10% 4,813.14
F. HARGA SATUAN PEKERJAAN (D+E) 52,944.54
4.4.2.4 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang Batu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 29,475.00
B. BAHAN
Semen Portland (PC) Kg 5.200 1,360.00 7,072.00
Pasir Pasang (PP) m3 0.020 130,000.00 2,600.00
JUMLAH HARGA BAHAN 9,672.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 39,147.00
E. OVERHEAD DAN PROFIT 10% 3,914.70
F. HARGA SATUAN PEKERJAAN (D+E) 43,061.70

4.4.2.5 Pemasangan 1 m2 plesteran ciprat 1SP : 2PP


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 31,400.00
B. BAHAN
Semen Portland (PC) Kg 4.320 1,360.00 5,875.20
Pasir Pasang (PP) m3 0.006 130,000.00 780.00
JUMLAH HARGA BAHAN 6,655.20
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 38,055.20
E. OVERHEAD DAN PROFIT 10% 3,805.52
F. HARGA SATUAN PEKERJAAN (D+E) 41,860.72
Pemasangan 1 m2 finishing siar Pasangan batu kali, campuran 1SP : 2PP.
4.4.2.11
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.300 65,000.00 19,500.00
Tukang Batu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 36,525.00
B. BAHAN
Semen Portland (PC) Kg 6.340 1,360.00 8,622.40
Pasir Pasang (PP) m3 0.012 130,000.00 1,560.00
JUMLAH HARGA BAHAN 10,182.40
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 46,707.40
E. OVERHEAD DAN PROFIT 10% 4,670.74
F. HARGA SATUAN PEKERJAAN (D+E) 51,378.14
4.4.2.6 Pemasangan 1 m2 acian.
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang Batu L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 24,350.00
B. BAHAN
Semen Portland (PC) Kg 3.250 1,360.00 4,420.00
JUMLAH HARGA BAHAN 4,420.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 28,770.00
E. OVERHEAD DAN PROFIT 10% 2,877.00
F. HARGA SATUAN PEKERJAAN (D+E) 31,647.00

4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


4.4.3.1 Pemasangan 1m2 lantai keramik ukuran 40cm x 40cm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.250 65,000.00 16,250.00
Tukang Batu L 03 O/H 0.225 90,000.00 20,250.00
Kepala Tukang L 03 O/H 0.013 125,000.00 1,625.00
Mandor L 04 O/H 0.013 110,000.00 1,430.00
JUMLAH TENAGA KERJA 39,555.00
B. BAHAN
Keramik 40x40 Bh 6.250 13,500.00 84,375.00
Semen Portland (PC) Kg 8.000 1,360.00 10,880.00
Pasir Pasang m3 0.022 130,000.00 2,795.00
Semen Warna Kg 0.013 27,500.00 357.50
JUMLAH HARGA BAHAN 98,407.50
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 137,962.50
E. OVERHEAD DAN PROFIT 10% 13,796.25
F. HARGA SATUAN PEKERJAAN (D+E) 151,758.75

4.4.3.3 Pemasangan 1m2 lantai keramik ukuran 60cm x 60cm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.240 65,000.00 15,600.00
Tukang Batu L 03 O/H 0.120 90,000.00 10,800.00
Kepala Tukang L 03 O/H 0.012 125,000.00 1,500.00
Mandor L 04 O/H 0.012 110,000.00 1,320.00
JUMLAH TENAGA KERJA 29,220.00
B. BAHAN
Keramik 60x60 Bh 3.100 48,240.00 149,544.00
Semen Portland (PC) Kg 9.600 1,360.00 13,056.00
Pasir Pasang m3 0.045 130,000.00 5,850.00
Semen Warna Kg 1.500 27,500.00 41,250.00
JUMLAH HARGA BAHAN 209,700.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 238,920.00
E. OVERHEAD DAN PROFIT 10% 23,892.00
F. HARGA SATUAN PEKERJAAN (D+E) 262,812.00
4.4.3.4 Pemasangan 1m2 lantai keramik ukuran 20cm x 20cm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.250 65,000.00 16,250.00
Tukang Batu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.012 125,000.00 1,500.00
Mandor L 04 O/H 0.013 110,000.00 1,375.00
JUMLAH TENAGA KERJA 32,625.00
B. BAHAN
Keramik 20x20 Bh 25.000 3,150.00 78,750.00
Semen Portland (PC) Kg 8.000 1,360.00 10,880.00
Pasir Pasang m3 0.045 130,000.00 5,850.00
Semen Warna Kg 0.013 27,500.00 357.50
JUMLAH HARGA BAHAN 95,837.50
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 128,462.50
E. OVERHEAD DAN PROFIT 10% 12,846.25
F. HARGA SATUAN PEKERJAAN (D+E) 141,308.75

4.4.3.6 Pemasangan 1m2 lantai keramik mozaik ukuran 30cm x 30cm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.700 65,000.00 45,500.00
Tukang Batu L 03 O/H 0.350 90,000.00 31,500.00
Kepala Tukang L 03 O/H 0.035 125,000.00 4,375.00
Mandor L 04 O/H 0.035 110,000.00 3,850.00
JUMLAH TENAGA KERJA 85,225.00
B. BAHAN
Keramik 30x30 Bh 11.870 3,250.00 38,577.50
Semen Portland (PC) Kg 14.150 1,360.00 19,244.00
Pasir Pasang m3 0.039 130,000.00 5,070.00
Semen Warna Kg 2.000 27,500.00 55,000.00
JUMLAH HARGA BAHAN 117,891.50
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 203,116.50
E. OVERHEAD DAN PROFIT 10% 20,311.65
F. HARGA SATUAN PEKERJAAN (D+E) 223,428.15

4.4.3.9 Pemasangan 1 m1 plint keramik ukuran 10cm x 40cm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.090 65,000.00 5,850.00
Tukang Batu L 03 O/H 0.090 90,000.00 8,100.00
Kepala Tukang L 03 O/H 0.009 125,000.00 1,125.00
Mandor L 04 O/H 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 15,625.00
B. BAHAN
Plint Bh 2.650 2,450.00 6,492.50
Semen Portland (PC) Kg 1.240 1,360.00 1,686.40
Semen Warna Kg 0.100 27,500.00 2,750.00
Pasir Pasang m3 0.003 130,000.00 390.00
JUMLAH HARGA BAHAN 11,318.90
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 26,943.90
E. OVERHEAD DAN PROFIT 10% 2,694.39
F. HARGA SATUAN PEKERJAAN (D+E) 29,638.29
4.4.3.10 Pemasangan 1 m1 plint keramik ukuran 10cm x 20cm
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.090 65,000.00 5,850.00
Tukang Batu L 03 O/H 0.090 90,000.00 8,100.00
Kepala Tukang L 03 O/H 0.009 125,000.00 1,125.00
Mandor L 04 O/H 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 15,625.00
B. BAHAN
Plint Bh 2.650 2,000.00 5,300.00
Semen Portland (PC) Kg 1.140 1,360.00 1,550.40
Semen Warna Kg 0.100 27,500.00 2,750.00
Pasir Pasang m3 0.003 130,000.00 390.00
JUMLAH HARGA BAHAN 9,990.40
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 25,615.40
E. OVERHEAD DAN PROFIT 10% 2,561.54
F. HARGA SATUAN PEKERJAAN (D+E) 28,176.94

4.4.3.11 Pemasangan 1 m2 dinding porslen 20cm x 25cm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.250 65,000.00 16,250.00
Tukang Batu L 03 O/H 0.525 90,000.00 47,250.00
Kepala Tukang L 03 O/H 0.033 125,000.00 4,125.00
Mandor L 04 O/H 0.013 110,000.00 1,430.00
JUMLAH TENAGA KERJA 69,055.00
B. BAHAN
Porselin Bh 20.000 3,000.00 60,000.00
Semen Portland (PC) Kg 8.000 1,360.00 10,880.00
Semen Warna Kg 0.125 27,500.00 3,437.50
Pasir Pasang m3 0.018 130,000.00 2,340.00
JUMLAH HARGA BAHAN 76,657.50
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 145,712.50
E. OVERHEAD DAN PROFIT 10% 14,571.25
F. HARGA SATUAN PEKERJAAN (D+E) 160,283.75

4.4.3.6 Pemasangan 1 m2 dinding keramik 20cm x 25cm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.900 65,000.00 58,500.00
Tukang Batu L 03 O/H 0.450 90,000.00 40,500.00
Kepala Tukang L 03 O/H 0.045 125,000.00 5,625.00
Mandor L 04 O/H 0.045 110,000.00 4,950.00
JUMLAH TENAGA KERJA 109,575.00
B. BAHAN
Keramik 20cm x 25cm Bh 20.000 3,000.00 60,000.00
Semen Portland (PC) Kg 9.300 1,360.00 12,648.00
Semen Warna Kg 1.940 27,500.00 53,350.00
JUMLAH HARGA BAHAN 125,998.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 235,573.00
E. OVERHEAD DAN PROFIT 10% 23,557.30
F. HARGA SATUAN PEKERJAAN (D+E) 259,130.30
4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
4.5.1.1 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.100 65,000.00 6,500.00
Tukang Kayu L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 17,300.00
B. BAHAN
Tripleks 4 mm Lembar 0.375 85,000.00 31,875.00
Paku Tripleks Kg 0.030 15,200.00 456.00
JUMLAH HARGA BAHAN 32,331.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 49,631.00
E. OVERHEAD DAN PROFIT 10% 4,963.10
F. HARGA SATUAN PEKERJAAN (D+E) 54,594.10

4.5.1.1 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.100 65,000.00 6,500.00
Tukang Kayu L 03 O/H 0.050 90,000.00 4,500.00
Kepala Tukang L 03 O/H 0.005 125,000.00 625.00
Mandor L 04 O/H 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 12,175.00
B. BAHAN
Gypsum Board Lembar 0.364 57,000.00 20,748.00
Paku Sekrup Kg 0.110 25,000.00 2,750.00
JUMLAH HARGA BAHAN 23,498.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 35,673.00
E. OVERHEAD DAN PROFIT 10% 3,567.30
F. HARGA SATUAN PEKERJAAN (D+E) 39,240.30

4.5.1.4 Pemasangan 1 m’ list langit-langit kayu profil


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.050 65,000.00 3,250.00
Tukang Kayu L 03 O/H 0.005 90,000.00 450.00
Kepala Tukang L 03 O/H 0.005 125,000.00 625.00
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 4,655.00
B. BAHAN
List Kayu Profil m 1.050 11,580.00 12,159.00
Paku Kg 0.010 16,500.00 165.00
JUMLAH HARGA BAHAN 12,324.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 16,979.00
E. OVERHEAD DAN PROFIT 10% 1,697.90
F. HARGA SATUAN PEKERJAAN (D+E) 18,676.90
4.5.1.2 Pemasangan 1 m’ list langit-langit kayu profil
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.050 65,000.00 3,250.00
Tukang Kayu L 03 O/H 0.005 90,000.00 450.00
Kepala Tukang L 03 O/H 0.005 125,000.00 625.00
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 4,655.00
B. BAHAN
List Kayu Profil m 1.050 11,580.00 12,159.00
Paku Kg 0.010 16,500.00 165.00
JUMLAH HARGA BAHAN 12,324.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 16,979.00
E. OVERHEAD DAN PROFIT 10% 1,697.90
F. HARGA SATUAN PEKERJAAN (D+E) 18,676.90

4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


4.5.2.2 1 m2 Pek. Pasang Rangka Kuda-kuda Baja Ringan
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang Konstruksi L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 23,360.00
B. BAHAN
Smartruss C.75.75 M' 2.100 18,500.00 38,850.00
Smartruss C.75.65 M' 1.200 15,200.00 18,240.00
Reng U T S 40 M' 6.200 13,500.00 83,700.00
Screw Kg 0.110 700.00 77.00
Strap Bracing M' 0.700 12,000.00 8,400.00
JUMLAH HARGA BAHAN 149,267.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 172,627.00
E. OVERHEAD DAN PROFIT 10% 17,262.70
F. HARGA SATUAN PEKERJAAN (D+E) 189,889.70

4.2.1.7 Pemasangan dan Perakitan 1 m2 Konstruksi Atap Genteng Metal


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang Konstruksi L 03 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 23,360.00
B. BAHAN
Genteng Metal m1 1.020 58,000.00 59,160.00
Paku Skrup Kg 0.200 21,000.00 4,200.00
JUMLAH HARGA BAHAN 63,360.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 86,720.00
E. OVERHEAD DAN PROFIT 10% 8,672.00
F. HARGA SATUAN PEKERJAAN (D+E) 95,392.00
4.2.1.7 Pemasangan dan Perakitan 1 m2 Konstruksi Nok Genteng Metal
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.250 65,000.00 16,250.00
Tukang Konstruksi L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.013 110,000.00 1,430.00
JUMLAH TENAGA KERJA 33,055.00
B. BAHAN
Nok Genteng Metal m1 1.020 35,000.00 35,700.00
Paku Skrup Kg 0.050 21,000.00 1,050.00
JUMLAH HARGA BAHAN 36,750.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 69,805.00
E. OVERHEAD DAN PROFIT 10% 6,980.50
F. HARGA SATUAN PEKERJAAN (D+E) 76,785.50

4.5.2.7 Pemasangan 1 m2 alumunium foil/sisalation


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.150 65,000.00 9,750.00
Tukang Kayu L 03 O/H 0.050 90,000.00 4,500.00
Kepala Tukang L 03 O/H 0.005 125,000.00 625.00
Mandor L 04 O/H 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 15,755.00
B. BAHAN
Alumunium Foil m2 1.020 110,000.00 112,200.00
JUMLAH HARGA BAHAN 112,200.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 113,080.00
E. OVERHEAD DAN PROFIT 10% 11,308.00
F. HARGA SATUAN PEKERJAAN (D+E) 124,388.00

4.6.1 HARGA SATUAN PEKERJAAN KAYU


4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 7.000 65,000.00 455,000.00
Tukang Kayu L 03 O/H 21.000 90,000.00 1,890,000.00
Kepala Tukang L 03 O/H 2.100 125,000.00 262,500.00
Mandor L 04 O/H 0.350 110,000.00 38,500.00
JUMLAH TENAGA KERJA 2,646,000.00
B. BAHAN
Balok Kayu m3 1.100 1,600,000.00 1,760,000.00
Paku 10 cm Kg 1.250 Err:501 Err:501
Lem Kayu Kg 1.000 13,500.00 13,500.00
JUMLAH HARGA BAHAN 1,794,125.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 4,440,125.00
E. OVERHEAD DAN PROFIT 10% 444,012.50
F. HARGA SATUAN PEKERJAAN (D+E) 4,884,137.50
4.6.1.2 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 6.000 65,000.00 390,000.00
Tukang Kayu L 03 O/H 16.764 90,000.00 1,508,733.94
Kepala Tukang L 03 O/H 1.800 125,000.00 225,000.00
Mandor L 04 O/H 0.300 110,000.00 33,000.00
- JUMLAH TENAGA KERJA 2,156,733.94
B. BAHAN
Balok Kayu m3 1.200 1,600,000.00 1,920,000.00
Paku 10 cm Kg 1.250 16,500.00 20,625.00
Lem Kayu Kg 1.000 13,500.00 13,500.00
- JUMLAH HARGA BAHAN 1,954,125.00
C. PERALATAN
- JUMLAH PERALATAN
D. JUMLAH (A+B+C) 4,110,858.94
E. OVERHEAD DAN PROFIT 10% 411,085.89
F. HARGA SATUAN PEKERJAAN (D+E) 4,521,944.83

4.6.1.2 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.000 65,000.00 65,000.00
Tukang Kayu L 03 O/H 3.000 90,000.00 270,000.00
Kepala Tukang L 03 O/H 0.300 125,000.00 37,500.00
Mandor L 04 O/H 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 378,000.00
B. BAHAN
Papan Kayu m3 0.040 1,600,000.00 64,000.00
Lem Kayu Kg 0.500 13,500.00 6,750.00
JUMLAH HARGA BAHAN 70,750.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 448,750.00
E. OVERHEAD DAN PROFIT 10% 44,875.00
F. HARGA SATUAN PEKERJAAN (D+E) 493,625.00

4.6.1.3 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.800 65,000.00 52,000.00
Tukang Kayu L 03 O/H 2.400 90,000.00 216,000.00
Kepala Tukang L 03 O/H 0.240 125,000.00 30,000.00
Mandor L 04 O/H 0.040 110,000.00 4,400.00
JUMLAH TENAGA KERJA 302,400.00
B. BAHAN
Papan Kayu m3 0.024 1,600,000.00 38,400.00
Kaca Bening 5 mm m2 1.100 51,000.00 56,100.00
Lem Kayu Kg 0.300 13,500.00 4,050.00
JUMLAH HARGA BAHAN 98,550.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 400,950.00
E. OVERHEAD DAN PROFIT 10% 40,095.00
F. HARGA SATUAN PEKERJAAN (D+E) 441,045.00
4.6.1.5 Pembuatan dan pemasangan 1 m2 Pintu Panel KM/WC Lapis Aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 1.000 65,000.00 65,000.00
Tukang Kayu L 03 O/H 3.000 90,000.00 270,000.00
Kepala Tukang L 03 O/H 0.300 125,000.00 37,500.00
Mandor L 04 O/H 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 378,000.00
B. BAHAN
Papan Kayu m3 0.064 1,600,000.00 102,400.00
Lem Kayu Kg 0.500 13,500.00 6,750.00
Aluminium m2 1.100 110,000.00 121,000.00
JUMLAH HARGA BAHAN 608,150.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 986,150.00
E. OVERHEAD DAN PROFIT 10% 98,615.00
F. HARGA SATUAN PEKERJAAN (D+E) 1,084,765.00

4.6.1.8 Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.670 65,000.00 43,550.00
Tukang Kayu L 03 O/H 2.000 90,000.00 180,000.00
Kepala Tukang L 03 O/H 0.200 125,000.00 25,000.00
Mandor L 04 O/H 0.335 110,000.00 36,850.00
JUMLAH TENAGA KERJA 285,400.00
B. BAHAN
Papan Kayu m3 0.060 1,600,000.00 96,000.00
Paku 1 cm-2.5 cm kg 0.150 16,500.00 2,475.00
JUMLAH HARGA BAHAN 98,475.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 383,875.00
E. OVERHEAD DAN PROFIT 10% 38,387.50
F. HARGA SATUAN PEKERJAAN (D+E) 422,262.50

4.6.1.13 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang Kayu L 03 O/H 0.300 90,000.00 27,000.00
Kepala Tukang L 03 O/H 0.030 125,000.00 3,750.00
Mandor L 04 O/H 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 44,850.00
B. BAHAN
Kaso-Kaso 5 x 7 m3 0.016 1,600,000.00 26,080.00
Paku 7-10 cm kg 0.250 16,500.00 4,125.00
JUMLAH HARGA BAHAN 30,205.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 75,055.00
E. OVERHEAD DAN PROFIT 10% 7,505.50
F. HARGA SATUAN PEKERJAAN (D+E) 82,560.50
4.6.1.4 Pemasangan 1 m1 Pemasangan Calsiplank L 20 x 2 Susun
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.200 65,000.00 13,000.00
Tukang Kayu L 03 O/H 0.400 90,000.00 36,000.00
Kepala Tukang L 03 O/H 0.040 125,000.00 5,000.00
Mandor L 04 O/H 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 55,100.00
B. BAHAN
Calsiplank 20 /2 m1 2.200 27,000.00 59,400.00
Screw kg 0.200 25,000.00 5,000.00
JUMLAH HARGA BAHAN 64,400.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 119,500.00
E. OVERHEAD DAN PROFIT 10% 11,950.00
F. HARGA SATUAN PEKERJAAN (D+E) 131,450.00

4.6.1.15 Pemasangan 1 m1 Lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.100 65,000.00 6,500.00
Tukang Kayu L 03 O/H 0.200 90,000.00 18,000.00
Kepala Tukang L 03 O/H 0.020 125,000.00 2,500.00
Mandor L 04 O/H 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 27,550.00
B. BAHAN
Papan Kayu m3 0.011 1,600,000.00 17,600.00
Paku 5-7 cm kg 0.050 16,500.00 825.00
JUMLAH HARGA BAHAN 18,425.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 45,975.00
E. OVERHEAD DAN PROFIT 10% 4,597.50
F. HARGA SATUAN PEKERJAAN (D+E) 50,572.50

4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


4.6.2.6 Pemasangan 1 Bh Engsel Pintu 4"
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.015 65,000.00 975.00
Tukang Aluminium L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 16,460.00
B. BAHAN
Engsel Pintu 4" bh 1.000 12,000.00 12,000.00
JUMLAH HARGA BAHAN 12,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 28,460.00
E. OVERHEAD DAN PROFIT 10% 2,846.00
F. HARGA SATUAN PEKERJAAN (D+E) 31,306.00
4.6.2.7 Pemasangan 1 Bh Engsel Jendela 3"
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.015 65,000.00 975.00
Tukang Aluminium L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 16,460.00
B. BAHAN
Engsel Jendela 3" bh 1.000 9,000.00 9,000.00
JUMLAH HARGA BAHAN 9,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 25,460.00
E. OVERHEAD DAN PROFIT 10% 2,546.00
F. HARGA SATUAN PEKERJAAN (D+E) 28,006.00

4.6.2.11 Pemasangan 1 Pasang Grendel Jendela stainless Steel


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.015 65,000.00 975.00
Tukang Aluminium L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 16,460.00
B. BAHAN
Grendel Jendela SS Psg 1.000 7,000.00 7,000.00
JUMLAH HARGA BAHAN 7,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 23,460.00
E. OVERHEAD DAN PROFIT 10% 2,346.00
F. HARGA SATUAN PEKERJAAN (D+E) 25,806.00

4.6.2.12 Pemasangan 1 buah Kunci Pintu 2 Slaag


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.010 65,000.00 650.00
Tukang Kayu L 03 O/H 0.500 90,000.00 45,000.00
Kepala Tukang L 03 O/H 0.050 125,000.00 6,250.00
Mandor L 04 O/H 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 52,450.00
B. BAHAN
Kunci Tanam Biasa Bh 1.000 210,000.00 210,000.00
JUMLAH HARGA BAHAN 210,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 262,450.00
E. OVERHEAD DAN PROFIT 10% 26,245.00
F. HARGA SATUAN PEKERJAAN (D+E) 288,695.00
4.6.2.13 Pemasangan 1 buah Kunci Pintu Biasa
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.005 65,000.00 325.00
Tukang Kayu L 03 O/H 0.500 90,000.00 45,000.00
Kepala Tukang L 03 O/H 0.050 125,000.00 6,250.00
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 51,905.00
B. BAHAN
Kunci Tanam Biasa Bh 1.000 135,000.00 135,000.00
JUMLAH HARGA BAHAN 135,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 186,905.00
E. OVERHEAD DAN PROFIT 10% 18,690.50
F. HARGA SATUAN PEKERJAAN (D+E) 205,595.50

4.6.2.15 Pemasangan 1 buah kait angin


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.015 65,000.00 975.00
Tukang Kayu L 03 O/H 0.150 90,000.00 13,500.00
Kepala Tukang L 03 O/H 0.015 125,000.00 1,875.00
Mandor L 04 O/H 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 17,230.00
B. BAHAN
Kait Angin Bh 1.000 10,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 27,230.00
E. OVERHEAD DAN PROFIT 10% 2,723.00
F. HARGA SATUAN PEKERJAAN (D+E) 29,953.00

4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


4.7.1.1 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.070 65,000.00 4,550.00
Tukang Cat L 02 O/H 0.009 90,000.00 810.00
Kepala Tukang L 03 O/H 0.006 125,000.00 750.00
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 6,440.00
B. BAHAN
Cat Meni kg 0.200 35,000.00 7,000.00
Plamur kg 0.150 22,000.00 3,300.00
Cat Dasar kg 0.170 58,000.00 9,860.00
Cat Penutup kg 0.260 58,000.00 15,080.00
Kuas Bh 0.010 11,000.00 110.00
Pengencer kg 0.030 18,000.00 540.00
Ampelas Lbr 0.200 5,000.00 1,000.00
JUMLAH HARGA BAHAN 36,890.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 43,330.00
E. OVERHEAD DAN PROFIT 10% 4,333.00
F. HARGA SATUAN PEKERJAAN (D+E) 47,663.00
4.7.1.2 Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.070 65,000.00 4,550.00
Tukang Cat L 02 O/H 0.105 90,000.00 9,450.00
Kepala Tukang L 03 O/H 0.004 125,000.00 500.00
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 14,830.00
B. BAHAN
Cat Meni kg 0.200 35,000.00 7,000.00
Plamur kg 0.150 22,000.00 3,300.00
Cat Dasar kg 0.170 58,000.00 9,860.00
Cat Penutup kg 0.350 58,000.00 20,300.00
Kuas Bh 0.010 11,000.00 110.00
Pengencer kg 0.030 18,000.00 540.00
Ampelas Lbr 0.200 5,000.00 1,000.00
JUMLAH HARGA BAHAN 42,110.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 56,940.00
E. OVERHEAD DAN PROFIT 10% 5,694.00
F. HARGA SATUAN PEKERJAAN (D+E) 62,634.00

4.7.1.3 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat Penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.020 65,000.00 1,300.00
Tukang Cat L 02 O/H 0.063 90,000.00 5,670.00
Kepala Tukang L 03 O/H 0.006 125,000.00 787.50
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 8,087.50
B. BAHAN
Plamur kg 0.100 22,000.00 2,200.00
Cat dasar Kg 0.100 20,000.00 2,000.00
Cat Penutup kg 0.260 20,000.00 5,200.00
JUMLAH HARGA BAHAN 9,400.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 17,487.50
E. OVERHEAD DAN PROFIT 10% 1,748.75
F. HARGA SATUAN PEKERJAAN (D+E) 19,236.25

4.7.1.5 Pengecatan 1 M2 Permukaan Plafond


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.028 65,000.00 1,820.00
Tukang Cat L 02 O/H 0.042 90,000.00 3,780.00
Kepala Tukang L 03 O/H 0.004 125,000.00 525.00
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 6,455.00
B. BAHAN
Cat Tembok Kg 0.470 20,000.00 9,400.00
Plamir Kg 0.100 22,000.00 2,200.00
Kuas Roll Bh 0.010 30,000.00 300.00
Amplas Lbr 0.500 5,000.00 2,500.00
JUMLAH HARGA BAHAN 14,400.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 20,855.00
E. OVERHEAD DAN PROFIT 10% 2,085.50
F. HARGA SATUAN PEKERJAAN (D+E) 22,940.50
4.7.1.10 Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.028 65,000.00 1,820.00
Tukang Cat L 02 O/H 0.042 90,000.00 3,780.00
Kepala Tukang L 03 O/H 0.004 125,000.00 525.00
Mandor L 04 O/H 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 6,455.00
B. BAHAN
Cat dasar Kg 0.120 - -
Cat Penutup kg 0.180 - -
JUMLAH HARGA BAHAN -
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 6,455.00
E. OVERHEAD DAN PROFIT 10% 645.50
F. HARGA SATUAN PEKERJAAN (D+E) 7,100.50

6.1.1 HARGA SATUAN PEKERJAAN LISTRIK


6.1.1.1 Pemasangan 1 Titik Instalasi Lampu
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.500 65,000.00 32,500.00
Tukang Listrik L 02 O/H 0.050 90,000.00 4,500.00
Kepala Tukang L 03 O/H 0.050 125,000.00 6,250.00
Mandor L 04 O/H 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 48,750.00
B. BAHAN
Kabel Listrik NYM 2 x 2,5 m 10.500 10,000.00 105,000.00
Isolasi Listrik bh 0.250 12,000.00 3,000.00
T Dos bh 3.000 1,400.00 4,200.00
JUMLAH HARGA BAHAN 112,200.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 160,950.00
E. OVERHEAD DAN PROFIT 10% 16,095.00
F. HARGA SATUAN PEKERJAAN (D+E) 177,045.00
6.1.1.3 Pemasangan 1 Bh Lampu Tanam Downlight 15 W
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.010 65,000.00 650.00
Tukang Listrik L 02 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 11,010.00
B. BAHAN
Kap Downlight Bh 1.000 60,000.00 60,000.00
Lampu SL 15 W bh 1.000 38,000.00 38,000.00
JUMLAH HARGA BAHAN 98,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 109,010.00
E. OVERHEAD DAN PROFIT 10% 10,901.00
F. HARGA SATUAN PEKERJAAN (D+E) 119,911.00

6.1.1.4 Pemasangan 1 Buah Lampu TL. 2x20 Watt Philips + Kap Lampu 2x20 Watt Tanam
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.010 65,000.00 650.00
Tukang Listrik L 02 O/H 0.100 90,000.00 9,000.00
Kepala Tukang Listrik L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 11,010.00
B. BAHAN
Kap Lampu TL. 2 X 20 Watt Tanam Bh 1.000 110,000.00 110,000.00
Lampu TL. 20 Watt Philips bh 2.000 35,000.00 70,000.00
JUMLAH HARGA BAHAN 180,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 191,010.00
E. OVERHEAD DAN PROFIT 10% 19,101.00
F. HARGA SATUAN PEKERJAAN (D+E) 210,111.00

6.1.1.6 Pemasangan 1 Bh Saklar Tunggal


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.010 65,000.00 650.00
Tukang Listrik L 02 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 11,010.00
B. BAHAN
Saklar Tunggal Bh 1.000 27,000.00 27,000.00
JUMLAH HARGA BAHAN 27,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 38,010.00
E. OVERHEAD DAN PROFIT 10% 3,801.00
F. HARGA SATUAN PEKERJAAN (D+E) 41,811.00
6.1.1.7 Pemasangan 1 Bh Saklar Ganda
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.010 65,000.00 650.00
Tukang Listrik L 02 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 11,010.00
B. BAHAN
Saklar Ganda Bh 1.000 33,000.00 33,000.00
JUMLAH HARGA BAHAN 33,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 44,010.00
E. OVERHEAD DAN PROFIT 10% 4,401.00
F. HARGA SATUAN PEKERJAAN (D+E) 48,411.00

6.1.1.8 Pemasangan 1 Bh Stop Kontak


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.010 65,000.00 650.00
Tukang Listrik L 02 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 11,010.00
B. BAHAN
Stop Kontak Bh 1.000 29,000.00 29,000.00
JUMLAH HARGA BAHAN 29,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 40,010.00
E. OVERHEAD DAN PROFIT 10% 4,001.00
F. HARGA SATUAN PEKERJAAN (D+E) 44,011.00

6.1.1.9 Pemasangan 1 Bh Stop Kontak AC


No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6 7
A. TENAGA
Pekerja L 01 O/H 0.010 65,000.00 650.00
Tukang Listrik L 02 O/H 0.100 90,000.00 9,000.00
Kepala Tukang L 03 O/H 0.010 125,000.00 1,250.00
Mandor L 04 O/H 0.001 110,000.00 110.00
JUMLAH TENAGA KERJA 11,010.00
B. BAHAN
Stop Kontak AC Bh 1.000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C. PERALATAN
JUMLAH PERALATAN
D. JUMLAH (A+B+C) 76,010.00
E. OVERHEAD DAN PROFIT 10% 7,601.00
F. HARGA SATUAN PEKERJAAN (D+E) 83,611.00
DAFTAR HARGA SATUAN BAHAN

SATUAN KERJA : DINAS KESEHATAN KAB. SIGI


PEKERJAAN : PEMBANGUNAN RUMAH GENSET KINOVARO
LOKASI : DESA PORAME KEC. KINOVARO KAB. SIGI
TAHUN ANGGARAN : 2017

No. URAIAN BAHAN SATUAN HARGA SATUAN

1 2 3 4
I. TANAH DAN PASIR
Tanah Urug M3 Rp 80,000.00
Tasirtu M3 Rp 70,000.00
Pasir Beton M3 Rp 130,000.00
Pasir Pasang M3 Rp 130,000.00
Pasir Urug M3 Rp 130,000.00

II. BATUAN
Batu Kerikil M3 Rp 150,000.00
Koral Beton M3 Rp 250,000.00
Batu Kali M3 Rp 165,000.00
Batu Belah 15/20 cm M3 Rp 165,000.00
Bata Merah Bh Rp 825.00
Profil Beton M1 Rp 60,500.00
Profil Beton Besar M2 Rp 180,000.00

III. KAWAT DAN BESI


Kawat Beton Kg Rp 27,300.00
Kawat Diameter 4 mm Kg Rp 27,300.00
Besi Beton (Polos/ulir) Kg Rp 10,500.00
Besi Strip Kg Rp 25,000.00
Aluminium Motif Kulit Jeruk M2 Rp 110,000.00
Cawat/Baut/Beugel Kg Rp 15,000.00

IV. KAYU
Balok Kayu Kelas II M3 Rp 1,600,000.00
Balok Kayu Kelas III M3 Rp 1,350,000.00
Dolken Kayu btg Rp 24,000.00
Kaso 5 / 7 Kelas II M3 Rp 1,600,000.00
Kaso 5 / 7 Kelas III M3 Rp 1,350,000.00
Kayu Kelas II M3 Rp 1,600,000.00
Kayu Kelas III M3 Rp 1,350,000.00
Kayu Terentang M3 Rp 1,100,000.00
Papan Kayu Kelas II M3 Rp 1,600,000.00
Papan Kayu Kelas III M3 Rp 1,350,000.00
Plywood 9 mm Lbr Rp 122,000.00
Calsiplank L 20 M1 Rp 27,000.00
No. URAIAN BAHAN SATUAN HARGA SATUAN

1 2 3 4
V. PENUTUP ATAP
Nok Genteng Metal Lbr Rp 35,000.00
Genteng Metal Lbr Rp 58,000.00
Talang Jurai Aluminium M Rp 35,000.00
Seng Plat BJLS 0.20 M Rp 20,000.00
Seng Gelombang BJLS 0.20 Lbr Rp 57,300.00
Seng Gelombang BJLS 0.18 Lbr Rp 58,800.00

VI. PENUTUP PLAFOND


Tripleks 122x244x3 Lbr Rp 57,000.00
Tripleks 122x244x4 Lbr Rp 85,000.00
Tripleks 122x244x9 Lbr Rp 152,000.00
List Profil Kayu M Rp 11,580.00
Kompon Gypsum Kg Rp 7,500.00
Lem Kayu Kg Rp 13,500.00

VII. PAKU
Paku skrup Kg Rp 21,000.00
Paku 5 cm – 12 cm Kg Rp 16,500.00
Paku Biasa ½" - 1" Kg Rp 16,500.00
Paku Tripleks Kg Rp 15,200.00
Paku Screw Kg Rp 25,000.00
Paku Seng Kg Rp 25,000.00

VIII. KERAMIK DAN SANITASI


Tegel Anti Slip Tangga M Rp 20,000.00
Keramik 20/20 cm Bh Rp 3,150.00
Keramik 30/30 cm Mozaik Bh Rp 3,250.00
Keramik 20/25 cm Bh Rp 3,000.00
Keramik 40/40 cm Bh Rp 13,500.00
Keramik 60/60 cm Bh Rp 48,240.00
Kuku Tegel keramik Panjang 10 cm Bh Rp 800.00
Plint Keramik 10/40 cm Bh Rp 2,450.00
Plint keramik 10/20 cm Bh Rp 2,000.00
Wastafel Set Rp 500,000.00
Kloset Jongkok Bh Rp 200,000.00
Kloset Duduk Monoblock Bh Rp 2,000,000.00
Bak KM/WC Fiberglass Bh Rp 1,000,000.00
Kran Air Bh Rp 35,000.00
Floor Drain Bh Rp 30,000.00
Water Drain + Assesories Set Rp 85,000.00
Bak Cuci Piring 1 Lubang Bh Rp 285,000.00
Elbow Ø 3/4 Inchi Bh Rp 15,000.00
Elbow Ø 2.5 Inchi Bh Rp 15,000.00
Elbow Ø 4 Inchi Bh Rp 29,000.00
Pipa PVC Ø 1/2" M Rp 7,000.00
Pipa PVC Ø 3/4" M Rp 8,500.00
Pipa PVC Ø 2.5" M Rp 19,500.00
Pipa PVC Ø 4" M Rp 27,000.00
Tee Ø 3/4 Inchi Bh Rp 8,000.00
Seal Tape Bh Rp 9,000.00
Pipa Penghawaan Bh Rp 20,000.00
No. URAIAN BAHAN SATUAN HARGA SATUAN

1 2 3 4
IX. KUNCI-KUNCI
Kunci Tanam Biasa 2 Slaag Bh Rp 210,000.00
Kunci Tanam Biasa Bh Rp 135,000.00
Kunci Tanam Kamar Mandi Bh Rp 75,000.00
Engsel Pintu Biasa (Kupu-Kupu) Bh Rp 12,000.00
Engsel Jendela Bh Rp 9,000.00
Grendel Jendela Bh Rp 7,000.00
Kait Angin Jendela Bh Rp 10,000.00
Grendel Pintu Bh Rp 7,000.00

X. INSTALASI LISTRIK
Lampu SL 18 W Bh Rp 60,000.00
Lampu SL 12 W (Philips) Bh Rp 38,000.00
Kap Lampu TL. 2 X 20 Watt Tanam Bh Rp 110,000.00
Lampu TL. 20 Watt Philips Bh Rp 35,000.00
Saklar Tunggal Tanam (Ex. Panasonic) Bh Rp 27,000.00
Saklar Double Tanam (Ex. Panasonic) Bh Rp 33,000.00
Saklar Three Tanam (Ex. Panasonic) Bh Rp 33,000.00
Stop Kontak Tanam 1 lubang (Ex. Panasonic) Bh Rp 29,000.00
Stop Kontak AC Bh Rp 65,000.00
Pemasangan Box Panel Bh Rp 350,000.00
MCB Bh Rp 87,000.00
Instalasi Titik Lampu Ttk Rp 90,000.00
Penyambungan Listrik 1300 Watt Ls Rp 3,500,000.00
NYM 2x2.5 mm M Rp 10,000.00
Isolasi Listrik Bh Rp 12,000.00
T Dos Bh Rp 1,400.00
Downlight Bh Rp 60,000.00

XI. CAT
Cat Tembok Kg Rp 20,000.00
Cat Dasar Kg Rp 20,000.00
Cat Kayu glotek Kg Rp 58,000.00
Cat Penutup kg Rp 20,000.00
Cat Meni Kg Rp 35,000.00
Dempul Kg Rp 15,000.00
Plamir Kg Rp 22,000.00
Minyak Cat Kg Rp 18,000.00
Minyak bekisting Ltr Rp 15,000.00
Meni Besi Ltr Rp 28,000.00
Residu Ltr Rp 17,000.00
Kuas Roll Bh Rp 30,000.00
Kuas Tangan Bh Rp 11,000.00
Amplas Lbr Rp 5,000.00
Minyak Tanah Ltr Rp 12,000.00

XII. SEMEN
Portland Cement Kg Rp 1,360.00
Semen warna Kg Rp 27,500.00

XV. KACA
Kaca Ryband 5 mm M2 Rp 81,000.00
Kaca Bening 5 mm M2 Rp 51,000.00
Glass Block 20 x 20 Bh Rp 30,000.00
No. URAIAN BAHAN SATUAN HARGA SATUAN

1 2 3 4
Sealant Tube Rp 35,000.00
No. URAIAN BAHAN SATUAN HARGA SATUAN

1 2 3 4
XVI. BAHAN MATERIAL METAL
Smartruss C 75.75 M Rp 18,500.00
Smartruss C 75.65 M Rp 15,200.00
Reng U T S 40 M Rp 13,500.00
Screw Diver Bh Rp 700.00
Strap Bracing M Rp 12,000.00
Starter Box Bh Rp 120,000.00
Skrup Fixer Bh Rp 1,500.00
Dinabolt Bh Rp 5,000.00
Profil Aluminium 4/10 M Rp 15,000.00
Aluminium Strip M Rp 17,000.00
Besi Hollow 2 x 4 Galvalum M Rp 17,000.00

XVII. LAIN-LAIN
Air Kerja Ltr Rp 200.00
Peralatan Bantu Pemasangan Instalasi Pipa Ls Rp 250,000.00
Teralis Jendela Besi Hollow 2 x 2 M2 Rp 295,000.00
Lapisan Ijuk M3 Rp 100,000.00
DAFTAR HARGA SATUAN UPAH

SATUAN KERJA : DINAS KESEHATAN KAB. SIGI


PEKERJAAN : PEMBANGUNAN RUMAH GENSET KINOVARO
LOKASI : DESA PORAME KEC. KINOVARO KAB. SIGI
TAHUN ANGGARAN : 2017

No. URAIAN TENAGA KERJA SATUAN HARGA SATUAN

1 2 3 4

1. Pekerja Org/Hr Rp 65,000.00


2. Tukang Gali Org/Hr Rp 90,000.00
3. Tukang Batu Org/Hr Rp 90,000.00
4. Tukang Besi Org/Hr Rp 90,000.00
5. Tukang Besi Konstruksi Org/Hr Rp 90,000.00
6. Tukang Kayu Org/Hr Rp 90,000.00
7. Tukang Plumbing Org/Hr Rp 90,000.00
8. Tukang Cat Org/Hr Rp 90,000.00
9. Kepala Tukang Org/Hr Rp 125,000.00
10. Mandor Org/Hr Rp 110,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : DINAS KESEHATAN


PEKERJAAN : REHABILITASI BERAT RUMAH DINAS DOKTER PKM BALUASE
LOKASI : PKM BALUASE KEC. DOLO SELATAN
TAHUN ANGGARAN : 2013

I. PEKERJAAN TANAH

1. 1 M3 Pekerjaan Galian Tanah sedalam 1 meter

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Tenaga Kerja Pekerja Org/Hr 0.750 Rp 65,000.00 Rp 48,750.00
Mandor Org/Hr 0.025 Rp 110,000.00 Rp 2,750.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 51,500.00

2. 1 M3 Pek. Urugan Kembali

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Tenaga Kerja Pekerja Org/Hr 0.250 Rp 65,000.00 Rp 16,250.00
Mandor Org/Hr 0.008 Rp 110,000.00 Rp 916.67

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 17,166.67

3. 1 M3 Pek. Urugan Tasirti bawah Lantai

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Tasirtu m3 1.200 Rp 70,000.00 Rp 84,000.00
Tenaga Kerja Pekerja Org/Hr 0.250 Rp 65,000.00 Rp 16,250.00
Mandor Org/Hr 0.025 Rp 110,000.00 Rp 2,750.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 103,000.00

4. 1 M3 Pek. Urugan Pasir

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Pasir Urug m3 1.200 Rp 130,000.00 Rp 156,000.00
Tenaga Kerja Pekerja Org/Hr 0.300 Rp 65,000.00 Rp 19,500.00
Mandor Org/Hr 0.010 Rp 110,000.00 Rp 1,100.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 176,600.00

II. PEKERJAAN PONDASI

1. 1 M3 Pek. Pondasi Batu Belah Campuran 1 PC : 4 PP

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Batu Belah m3 1.200 Rp 165,000.00 Rp 198,000.00
Portland Semen Kg 163.000 Rp 1,360.00 Rp 221,680.00
Pasir Pasang m3 0.520 Rp 130,000.00 Rp 67,600.00

Tenaga Kerja Pekerja Org/Hr 1.500 Rp 65,000.00 Rp 97,500.00


Tukang Batu Org/Hr 0.750 Rp 90,000.00 Rp 67,500.00
Kepala tukang Org/Hr 0.075 Rp 125,000.00 Rp 9,375.00
Mandor Org/Hr 0.075 Rp 110,000.00 Rp 8,250.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 669,905.00

2. 1 M3 Pek. Batu Kosong (Aanstamping)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Batu Belah m3 1.200 Rp 165,000.00 Rp 198,000.00
Pasir Pasang m3 0.432 Rp 130,000.00 Rp 56,160.00

Tenaga Kerja Pekerja Org/Hr 0.780 Rp 65,000.00 Rp 50,700.00


Tukang Batu Org/Hr 0.390 Rp 90,000.00 Rp 35,100.00
Kepala tukang Org/Hr 0.039 Rp 125,000.00 Rp 4,875.00
Mandor Org/Hr 0.039 Rp 110,000.00 Rp 4,290.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 349,125.00


III. PEKERJAAN BETON

1. 1 M3 Pek. Beton Mutu f’c = 14,5 MPa (K-175), slump (12 ± 2) cm, w/c = 0,66

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Portland Cement Kg 326.000 Rp 1,360.00 Rp 443,360.00
Pasir beton Kg 760.000 Err:509 Err:509
Koral Beton Kg 1,029.000 Err:509 Err:509
Air Ltr 215.000 Rp 200.00 Rp 43,000.00

Tenaga Kerja Pekerja Org/Hr 1.650 Rp 65,000.00 Rp 107,250.00


Tukang Batu Org/Hr 0.275 Rp 90,000.00 Rp 24,750.00
Kepala tukang Org/Hr 0.028 Rp 125,000.00 Rp 3,500.00
Mandor Org/Hr 0.083 Rp 110,000.00 Rp 9,130.00

JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

2. 1 M3 Pek. Beton Mutu ’fc = 19,3 MPa (K-225), slump (12 ± 2) cm, w/c = 0,58

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Portland Cement Kg 371.000 Rp 1,360.00 Rp 504,560.00
Pasir beton Kg 698.000 Err:509 Err:509
Koral Beton Kg 1,047.000 Err:509 Err:509
Air Ltr 215.000 Rp 200.00 Rp 43,000.00

Tenaga Kerja Pekerja Org/Hr 1.650 Rp 65,000.00 Rp 107,250.00


Tukang Batu Org/Hr 0.275 Rp 90,000.00 Rp 24,750.00
Kepala tukang Org/Hr 0.028 Rp 125,000.00 Rp 3,500.00
Mandor Org/Hr 0.083 Rp 110,000.00 Rp 9,130.00

JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

3. 1 M3 Pek. Beton Tumbuk 1 Pc : 3 Ps : 5 Kr

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Portland Cement Kg 218.000 Rp 1,360.00 Rp 296,480.00
Pasir beton Kg 0.520 Err:509 Err:509
Koral Beton Kg 0.870 Err:509 Err:509

Tenaga Kerja Pekerja Org/Hr 1.650 Rp 65,000.00 Rp 107,250.00


Tukang Batu Org/Hr 0.250 Rp 90,000.00 Rp 22,500.00
Kepala tukang Org/Hr 0.025 Rp 125,000.00 Rp 3,125.00
Mandor Org/Hr 0.080 Rp 110,000.00 Rp 8,800.00

JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

4. 1 Kg Pembesian Dengan Besi Polos/Ulir

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Besi Beton (Polos/Ulir) Kg 1.050 Rp 10,500.00 Rp 11,025.00
Kawat Beton Kg 0.015 Rp 27,300.00 Rp 409.50

Tenaga Kerja Pekerja Org/Hr 0.007 Rp 65,000.00 Rp 455.00


Tukang Besi Org/Hr 0.007 Rp 90,000.00 Rp 630.00
Kepala tukang Org/Hr 0.001 Rp 125,000.00 Rp 87.50
Mandor Org/Hr 0.000 Rp 110,000.00 Rp 44.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 12,651.00

5. 1 M2 Pek. Bekesting Sloof

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kayu kelas III m3 0.045 Rp 1,350,000.00 Rp 60,750.00
Paku 5 cm – 12 cm Kg 0.300 Rp 16,500.00 Rp 4,950.00
Minyak bekisting Ltr 0.100 Rp 15,000.00 Rp 1,500.00

Tenaga Kerja Pekerja Org/Hr 0.520 Rp 65,000.00 Rp 33,800.00


Tukang Kayu Org/Hr 0.260 Rp 90,000.00 Rp 23,400.00
Kepala tukang Org/Hr 0.026 Rp 125,000.00 Rp 3,250.00
Mandor Org/Hr 0.026 Rp 110,000.00 Rp 2,860.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 130,510.00


6. 1 M2 Pek. Bekesting Kolom

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kayu kelas III m3 0.040 Rp 1,350,000.00 Rp 54,000.00
Paku 5 cm – 12 cm kg 0.400 Rp 16,500.00 Rp 6,600.00
Minyak bekisting Ltr 0.200 Rp 15,000.00 Rp 3,000.00
Balok Kayu kelas II m3 0.015 Rp 1,600,000.00 Rp 24,000.00
Plywood 10 mm Lbr 0.350 Rp 122,000.00 Rp 42,700.00
Dolken kayu Btg 2.000 Rp 24,000.00 Rp 48,000.00

Tenaga Kerja Pekerja Org/Hr 0.660 Rp 65,000.00 Rp 42,900.00


Tukang Kayu Org/Hr 0.330 Rp 90,000.00 Rp 29,700.00
Kepala tukang Org/Hr 0.033 Rp 125,000.00 Rp 4,125.00
Mandor Org/Hr 0.033 Rp 110,000.00 Rp 3,630.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 258,655.00

7. 1 M2 Pek. Bekesting Balok

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kayu kelas III m3 0.040 Rp 1,350,000.00 Rp 54,000.00
Paku 5 cm – 12 cm kg 0.400 Rp 16,500.00 Rp 6,600.00
Minyak bekisting Ltr 0.200 Rp 15,000.00 Rp 3,000.00
Balok Kayu kelas II m3 0.018 Rp 1,600,000.00 Rp 28,800.00
Plywood 10 mm Lbr 0.350 Rp 122,000.00 Rp 42,700.00
Dolken kayu Btg 2.000 Rp 24,000.00 Rp 48,000.00

Tenaga Kerja Pekerja Org/Hr 0.660 Rp 65,000.00 Rp 42,900.00


Tukang Kayu Org/Hr 0.330 Rp 90,000.00 Rp 29,700.00
Kepala tukang Org/Hr 0.033 Rp 125,000.00 Rp 4,125.00
Mandor Org/Hr 0.033 Rp 110,000.00 Rp 3,630.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 263,455.00

8. 1 M2 Pek. Bekesting Plat Meja Beton

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kayu kelas III m3 0.040 Rp 1,350,000.00 Rp 54,000.00
Paku 5 cm – 12 cm kg 0.400 Rp 16,500.00 Rp 6,600.00
Minyak bekisting Ltr 0.200 Rp 15,000.00 Rp 3,000.00
Balok Kayu kelas II m3 0.015 Rp 1,600,000.00 Rp 24,000.00
Plywood 10 mm Lbr 0.350 Rp 122,000.00 Rp 42,700.00
Dolken kayu Btg 6.000 Rp 24,000.00 Rp 144,000.00
Tenaga Kerja Pekerja Org/Hr 0.660 Rp 65,000.00 Rp 42,900.00
Tukang Kayu Org/Hr 0.330 Rp 90,000.00 Rp 29,700.00
Kepala tukang Org/Hr 0.033 Rp 125,000.00 Rp 4,125.00
Mandor Org/Hr 0.033 Rp 110,000.00 Rp 3,630.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 354,655.00

9. 1 M3 Pek. Sloof 15/20,(K-175)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan + Beton K-175 M3 1.000 Err:509 Err:509
Tenaga Kerja Besi Beton (Polos/Ulir) Kg 115.000 Rp 12,651.00 Rp 1,454,865.00
Bekisting M2 10.000 Rp 130,510.00 Rp 1,305,100.00
JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

10. 1 M3 Pek. Kolom 15/15,(K-175)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan + Beton K-175 M3 1.000 Err:509 Err:509
Tenaga Kerja Besi Beton (Polos/Ulir) Kg 115.000 Rp 12,651.00 Rp 1,454,865.00
Bekisting M2 13.330 Rp 258,655.00 Rp 3,447,871.15
JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

11. 1 M3 Pek. Kolom 25/25,(K-175)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan + Beton K-175 M3 1.000 Err:509 Err:509
Tenaga Kerja Besi Beton (Polos/Ulir) Kg 120.000 Rp 12,651.00 Rp 1,518,120.00
Bekisting M2 13.330 Rp 258,655.00 Rp 3,447,871.15

JUMLAH HARGA PER SATUAN PEKERJAAN Err:509


12. 1 M3 Pek. Ring Balok 15/20,(K-175)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan + Beton K-175 M3 1.000 Err:509 Err:509
Tenaga Kerja Besi Beton (Polos/Ulir) Kg 110.000 Rp 12,651.00 Rp 1,391,610.00
Bekisting M2 10.000 Rp 263,455.00 Rp 2,634,550.00
JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

13. 1 M3 Pek.Ring Balok 15/15,(K-175)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan + Beton K-175 M3 1.000 Err:509 Err:509
Tenaga Kerja Besi Beton (Polos/Ulir) Kg 110.000 Rp 12,651.00 Rp 1,391,610.00
Bekisting M2 10.000 Rp 263,455.00 Rp 2,634,550.00
JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

14. 1 M3 Pek. Beton Plat Meja, t = 8 cm (K-175)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan + Beton K-175 M3 1.000 Err:509 Err:509
Tenaga Kerja Besi Beton (Polos/Ulir) Kg 110.000 Rp 12,651.00 Rp 1,391,610.00
Bekisting M2 8.330 Rp 354,655.00 Rp 2,954,276.15
JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

IV. PEKERJAAN DINDING DAN PLESTERAN


1. 1 M2 Pek. Pasangan Dinding 1/2 Bata Merah (5X11X22)Cm Tebal 1/2 Bata, Camp. 1 PC : 5 PP

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Bata merah Buah 70.000 Rp 825.00 Rp 57,750.00
Portland Cement kg 9.680 Rp 1,360.00 Rp 13,164.80
Pasir Pasang m3 0.045 Rp 130,000.00 Rp 5,850.00
Tenaga Kerja Pekerja Org/Hr 0.300 Rp 65,000.00 Rp 19,500.00
Tukang Batu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
Mandor Org/Hr 0.015 Rp 110,000.00 Rp 1,650.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 108,164.80

2. 1 M2 Pek. Pasangan Dinding Transram 1/2 Bata Merah (5X11X22)Cm Tebal 1/2 Bata, Camp. 1 PC : 3 PP
HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Bata merah Buah 70.000 Rp 825.00 Rp 57,750.00
Portland Cement kg 14.370 Rp 1,360.00 Rp 19,543.20
Pasir Pasang m3 0.040 Rp 130,000.00 Rp 5,200.00
Tenaga Kerja Pekerja Org/Hr 0.300 Rp 65,000.00 Rp 19,500.00
Tukang Batu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
Mandor Org/Hr 0.015 Rp 110,000.00 Rp 1,650.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 113,893.20

3. 1 M2 Pek. Plesteran 1 PC : 3 PP Tebal 15 mm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Portland Cement Kg 7.776 Rp 1,360.00 Rp 10,575.36
Pasir Pasang m3 0.023 Rp 130,000.00 Rp 2,990.00
Tenaga Kerja Pekerja Org/Hr 0.300 Rp 65,000.00 Rp 19,500.00
Tukang Batu Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.015 Rp 110,000.00 Rp 1,650.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 50,090.36

4. 1 M2 Pek. Plesteran 1 PC : 5 PP Tebal 15 mm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Portland Cement Kg 5.184 Rp 1,360.00 Rp 7,050.24
Pasir Pasang m3 0.026 Rp 130,000.00 Rp 3,380.00
Tenaga Kerja Pekerja Org/Hr 0.300 Rp 65,000.00 Rp 19,500.00
Tukang Batu Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.015 Rp 110,000.00 Rp 1,650.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 46,955.24
5. 1 M2 Pek. Acian Semen

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Portland Cement Kg 3.250 Rp 1,360.00 Rp 4,420.00
Tenaga Kerja Pekerja Org/Hr 0.200 Rp 65,000.00 Rp 13,000.00
Tukang Batu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
Mandor Org/Hr 0.010 Rp 110,000.00 Rp 1,100.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 28,770.00

V. PEKERJAAN LANTAI

1. 1 M2 Pek. Pasang Keramik Lantai 20 x 20 cm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Keramik 20 x 20 cm Buah 26.500 Rp 3,150.00 Rp 83,475.00
Portland Cement kg 10.400 Rp 1,360.00 Rp 14,144.00
Pasir Pasang m3 0.045 Rp 130,000.00 Rp 5,850.00
Semen warna kg 1.620 Rp 27,500.00 Rp 44,550.00

Tenaga Kerja Pekerja Org/Hr 0.700 Rp 65,000.00 Rp 45,500.00


Tukang Batu Org/Hr 0.350 Rp 90,000.00 Rp 31,500.00
Kepala tukang Org/Hr 0.035 Rp 125,000.00 Rp 4,375.00
Mandor Org/Hr 0.035 Rp 110,000.00 Rp 3,850.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 233,244.00

2. 1 M2 Pek. Pasang Lantai Keramik 40 x 40 cm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Keramik 40 x 40 cm Buah 6.630 Rp 13,500.00 Rp 89,505.00
Portland Cement kg 9.800 Rp 1,360.00 Rp 13,328.00
Pasir Pasang m3 0.045 Rp 130,000.00 Rp 5,850.00
Semen warna kg 1.300 Rp 27,500.00 Rp 35,750.00

Tenaga Kerja Pekerja Org/Hr 0.700 Rp 65,000.00 Rp 45,500.00


Tukang Batu Org/Hr 0.350 Rp 90,000.00 Rp 31,500.00
Kepala tukang Org/Hr 0.035 Rp 125,000.00 Rp 4,375.00
Mandor Org/Hr 0.035 Rp 110,000.00 Rp 3,850.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 229,658.00

3. 1 M2 Pek. Pasang Dinding Porselin 20 x 25 cm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Keramik Porselin 20 x 25 cm Buah 21.000 Rp 3,000.00 Rp 63,000.00
Portland Cement kg 9.300 Rp 1,360.00 Rp 12,648.00
Pasir Pasang m3 0.018 Rp 130,000.00 Rp 2,340.00
Semen warna kg 1.940 Rp 27,500.00 Rp 53,350.00

Tenaga Kerja Pekerja Org/Hr 0.900 Rp 65,000.00 Rp 58,500.00


Tukang Batu Org/Hr 0.450 Rp 90,000.00 Rp 40,500.00
Kepala tukang Org/Hr 0.045 Rp 125,000.00 Rp 5,625.00
Mandor Org/Hr 0.045 Rp 110,000.00 Rp 4,950.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 240,913.00

4. 1 M1 Pek. Plint Keramik 10 x 20 cm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Plint Keramik 10 x 20 cm Buah 5.300 Rp 2,000.00 Rp 10,600.00
Portland Cement kg 1.140 Rp 1,360.00 Rp 1,550.40
Pasir Pasang m3 0.003 Rp 130,000.00 Rp 390.00
Semen warna kg 0.025 Rp 27,500.00 Rp 687.50

Tenaga Kerja Pekerja Org/Hr 0.090 Rp 65,000.00 Rp 5,850.00


Tukang Batu Org/Hr 0.090 Rp 90,000.00 Rp 8,100.00
Kepala tukang Org/Hr 0.009 Rp 125,000.00 Rp 1,125.00
Mandor Org/Hr 0.005 Rp 110,000.00 Rp 550.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 28,852.90


5. 1 M1 Pek. Plint Keramik 10 x 40 cm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Plint Keramik 10 x 40 cm Buah 2.650 Rp 2,450.00 Rp 6,492.50
Portland Cement kg 1.140 Rp 1,360.00 Rp 1,550.40
Pasir Pasang m3 0.003 Rp 130,000.00 Rp 390.00
Semen warna kg 0.100 Rp 27,500.00 Rp 2,750.00
Tenaga Kerja Pekerja Org/Hr 0.090 Rp 65,000.00 Rp 5,850.00
Tukang Batu Org/Hr 0.090 Rp 90,000.00 Rp 8,100.00
Kepala tukang Org/Hr 0.009 Rp 125,000.00 Rp 1,125.00
Mandor Org/Hr 0.005 Rp 110,000.00 Rp 550.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 26,807.90

6. 1 M1 Pek. Pasang Tegel Kuku Keramik 10 cm


HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Plint Kuku 10 cm Buah 10.600 Rp 800.00 Rp 8,480.00
Portland Cement kg 0.570 Rp 1,360.00 Rp 775.20
Semen warna kg 0.013 Rp 27,500.00 Rp 357.50
Tenaga Kerja Pekerja Org/Hr 0.090 Rp 65,000.00 Rp 5,850.00
Tukang Batu Org/Hr 0.090 Rp 90,000.00 Rp 8,100.00
Kepala tukang Org/Hr 0.009 Rp 125,000.00 Rp 1,125.00
Mandor Org/Hr 0.005 Rp 110,000.00 Rp 550.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 25,237.70

VI. PEKERJAAN PINTU/KUSEN/VENTILASI


1. 1 M2 Pek. Pasang Kusen Pintu/Ventilasi/Jendela
HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Balok Kayu m3 1.100 Rp 1,600,000.00 Rp 1,760,000.00
Paku 5 -7 cm kg 1.250 Rp 16,500.00 Rp 20,625.00
Lem Kayu Kg 1.000 Rp 13,500.00 Rp 13,500.00
Tenaga Kerja Pekerja Org/Hr 6.000 Rp 65,000.00 Rp 390,000.00
Tukang Kayu Org/Hr 18.000 Rp 90,000.00 Rp 1,620,000.00
Kepala tukang Org/Hr 1.800 Rp 125,000.00 Rp 225,000.00
Mandor Org/Hr 0.300 Rp 110,000.00 Rp 33,000.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 4,062,125.00

2. 1 M2 Pek. Pasang Papan Jalusi Kusen Atap


HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Papan Kayu m3 0.060 Rp 1,600,000.00 Rp 96,000.00
Paku 1 - 2.5 cm kg 0.150 Rp 16,500.00 Rp 2,475.00
Tenaga Kerja Pekerja Org/Hr 0.670 Rp 65,000.00 Rp 43,550.00
Tukang Kayu Org/Hr 2.000 Rp 90,000.00 Rp 180,000.00
Kepala tukang Org/Hr 0.200 Rp 125,000.00 Rp 25,000.00
Mandor Org/Hr 0.335 Rp 110,000.00 Rp 36,850.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 383,875.00

3. 1 M2 Pek. Pasang Pintu Panel


HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Papan Kayu m3 0.040 Rp 1,600,000.00 Rp 64,000.00
Lem Kayu kg 0.500 Rp 13,500.00 Rp 6,750.00
Tenaga Kerja Pekerja Org/Hr 1.000 Rp 65,000.00 Rp 65,000.00
Tukang Kayu Org/Hr 3.000 Rp 90,000.00 Rp 270,000.00
Kepala tukang Org/Hr 0.300 Rp 125,000.00 Rp 37,500.00
Mandor Org/Hr 0.050 Rp 110,000.00 Rp 5,500.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 448,750.00

4. 1 M2 Pek. Pasang Pintu Panel KM/WC Lapis Aluminium

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Papan Kayu m3 0.040 Rp 1,600,000.00 Rp 64,000.00
Lem Kayu Kg 0.500 Rp 13,500.00 Rp 6,750.00
Aluminium m2 1.100 Rp 110,000.00 Rp 121,000.00
Tenaga Kerja Pekerja Org/Hr 1.000 Rp 65,000.00 Rp 65,000.00
Tukang Kayu Org/Hr 3.000 Rp 90,000.00 Rp 270,000.00
Kepala tukang Org/Hr 0.300 Rp 125,000.00 Rp 37,500.00
Mandor Org/Hr 0.050 Rp 110,000.00 Rp 5,500.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 569,750.00
5. 1 M2 Pek. Pasang Bingkai Jendela Jungkit Kaca Ryband 5 mm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Papan Kayu m3 0.024 Rp 1,600,000.00 Rp 38,400.00
Lem Kayu Kg 0.300 Rp 13,500.00 Rp 4,050.00
Tenaga Kerja Pekerja Org/Hr 0.800 Rp 65,000.00 Rp 52,000.00
Tukang Kayu Org/Hr 2.400 Rp 90,000.00 Rp 216,000.00
Kepala tukang Org/Hr 0.240 Rp 125,000.00 Rp 30,000.00
Mandor Org/Hr 0.040 Rp 110,000.00 Rp 4,400.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 344,850.00

6. 1 M2 Pek. Pasang Kaca Mati 5 mm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kaca Ryband 5 mm m2 1.100 Rp 81,000.00 Rp 89,100.00
Tenaga Kerja Pekerja Org/Hr 0.150 Rp 65,000.00 Rp 9,750.00
Tukang Kayu Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.00075 Rp 110,000.00 Rp 82.50
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 114,307.50

7. 1 M2 Pek. Pasang Jendela + Analisa Kaca 5 mm Rp 459,157.50

VII. PEKERJAAN ATAP


1. 1 M2 Pek. Pasang Rangka Kuda-Kuda Baja Ringan + Genteng Metal

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Smartruss C 75.75 M' 2.100 Rp 18,500.00 Rp 38,850.00
Smartruss C 75.65 M' 1.200 Rp 15,200.00 Rp 18,240.00
Reng U T S 40 M' 6.200 Rp 13,500.00 Rp 83,700.00
Screw Bremick Kg 0.110 Rp 700.00 Rp 77.00
Strap Bracing M' 0.700 Rp 12,000.00 Rp 8,400.00
Genteng Metal Lbr 1.020 Rp 58,000.00 Rp 59,160.00
Tenaga Kerja Pekerja Org/Hr 0.200 Rp 65,000.00 Rp 13,000.00
Tukang Konstruksi Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
Mandor Org/Hr 0.001 Rp 110,000.00 Rp 110.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 231,787.00

2. 1 M1 Pek. Pasang Talang Jurai Aluminium

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Talang Jurai Aluminium M' 1.000 Rp 35,000.00 Rp 35,000.00
Screw Bremick Kg 0.015 Rp 700.00 Rp 10.50
Tenaga Kerja Pekerja Org/Hr 0.200 Rp 65,000.00 Rp 13,000.00
Tukang Konstruksi Org/Hr 0.400 Rp 90,000.00 Rp 36,000.00
Kepala tukang Org/Hr 0.025 Rp 125,000.00 Rp 3,125.00
Mandor Org/Hr 0.010 Rp 110,000.00 Rp 1,100.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 88,235.50

3. 1 M1 Pek. Pasang Nok Genteng Metal

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Genteng Nok Metal M' 1.100 Rp 35,000.00 Rp 38,500.00
Paku Biasa ½" - 1" Kg 0.050 Rp 16,500.00 Rp 825.00
Tenaga Kerja Pekerja Org/Hr 0.250 Rp 65,000.00 Rp 16,250.00
Tukang Konstruksi Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.013 Rp 110,000.00 Rp 1,430.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 72,380.00

4. 1 M2 Pek. Pasang Rangka Plafond (60 x 120)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kayu Klas II M3 0.013 Rp 1,600,000.00 Rp 20,800.00
Paku Biasa 1" - 2.5" Kg 0.120 Rp 16,500.00 Rp 1,980.00
Tenaga Kerja Pekerja Org/Hr 0.170 Rp 65,000.00 Rp 11,050.00
Tukang Kayu Org/Hr 0.270 Rp 90,000.00 Rp 24,300.00
Kepala tukang Org/Hr 0.027 Rp 125,000.00 Rp 3,375.00
Mandor Org/Hr 0.0085 Rp 110,000.00 Rp 935.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 62,440.00
5. 1 M2 Pek. Penutup Plafond plywood 9 mm

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan plywood 9 mm Lbr 0.375 Rp 57,000.00 Rp 21,375.00
Paku Tripleks Kg 0.030 Rp 15,200.00 Rp 456.00
Tenaga Kerja Pekerja Org/Hr 0.100 Rp 65,000.00 Rp 6,500.00
Tukang Kayu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.0100 Rp 125,000.00 Rp 1,250.00
Mandor Org/Hr 0.0500 Rp 110,000.00 Rp 5,500.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 44,081.00

6. 1 M1 Pek. Pasang List Profil Kayu

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan List Profil m1 1.050 Rp 11,580.00 Rp 12,159.00
Paku Biasa 2"-5" Kg 0.010 Rp 16,500.00 Rp 165.00
Tenaga Kerja Pekerja Org/Hr 0.05 Rp 65,000.00 Rp 3,250.00
Tukang Kayu Org/Hr 0.05 Rp 90,000.00 Rp 4,500.00
Kepala tukang Org/Hr 0.005 Rp 125,000.00 Rp 625.00
Mandor Org/Hr 0.003 Rp 110,000.00 Rp 330.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 21,029.00

7. 1 M1 Pek. Pasang Listplank 2 x(3/30)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Papan Klas II m3 0.0145 Rp 1,600,000.00 Rp 23,200.00
Paku Biasa 2"-5" Kg 0.060 Rp 16,500.00 Rp 990.00
Tenaga Kerja Pekerja Org/Hr 0.15 Rp 65,000.00 Rp 9,750.00
Tukang Kayu Org/Hr 0.25 Rp 90,000.00 Rp 22,500.00
Kepala tukang Org/Hr 0.025 Rp 125,000.00 Rp 3,125.00
Mandor Org/Hr 0.075 Rp 110,000.00 Rp 8,250.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 67,815.00

VIII. PEKERJAAN PENGECATAN

1. 1 M2 Pek. Pengecatan Dinding Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Plamir Kg 0.100 Rp 22,000.00 Rp 2,200.00
Cat Dasar Kg 0.100 Rp 20,000.00 Rp 2,000.00
Cat Tembok Kg 0.260 Rp 20,000.00 Rp 5,200.00
Tenaga Kerja Pekerja Org/Hr 0.020 Rp 65,000.00 Rp 1,300.00
Tukang Cat Org/Hr 0.063 Rp 90,000.00 Rp 5,670.00
Kepala tukang Org/Hr 0.006 Rp 125,000.00 Rp 787.50
Mandor Org/Hr 0.003 Rp 110,000.00 Rp 275.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 17,432.50

2. 1 M2 Pek. Pengecatan Permukaan Kayu Baru ( 1 Plamir, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Cat Meni Kg 0.200 Rp 35,000.00 Rp 7,000.00
Plamir Kg 0.150 Rp 22,000.00 Rp 3,300.00
Cat Dasar Kg 0.170 Rp 20,000.00 Rp 3,400.00
Cat Kayu glotek Kg 0.350 Rp 58,000.00 Rp 20,300.00
Tenaga Kerja Pekerja Org/Hr 0.070 Rp 65,000.00 Rp 4,550.00
Tukang Cat Org/Hr 0.105 Rp 90,000.00 Rp 9,450.00
Kepala tukang Org/Hr 0.004 Rp 125,000.00 Rp 500.00
Mandor Org/Hr 0.003 Rp 110,000.00 Rp 275.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 48,775.00

3. 1 M2 Pek. Pengecatan Permukaan Plafond

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Cat Tembok Kg 0.470 Rp 20,000.00 Rp 9,400.00
Plamir Kg 0.100 Rp 22,000.00 Rp 2,200.00
Kuas Roll Bh 0.010 Rp 30,000.00 Rp 300.00
Amplas Lbr 0.500 Rp 5,000.00 Rp 2,500.00
Tenaga Kerja Pekerja Org/Hr 0.028 Rp 65,000.00 Rp 1,820.00
Tukang Cat Org/Hr 0.042 Rp 90,000.00 Rp 3,780.00
Kepala tukang Org/Hr 0.0042 Rp 125,000.00 Rp 525.00
Mandor Org/Hr 0.0025 Rp 110,000.00 Rp 275.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 20,800.00


4. 1 M2 Pek. Pelapisan Bidang Kayu Dengan Residu

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Residu Ltr 0.350 Rp 17,000.00 Rp 5,950.00
Minyak Tanah Kg 0.030 Rp 12,000.00 Rp 360.00
Kuas Bh 0.020 Rp 11,000.00 Rp 220.00
Tenaga Kerja Tukang Cat Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.0100 Rp 125,000.00 Rp 1,250.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 16,780.00

IX. PEKERJAAN PENGGANTUNG


1. 1 Bh Pek. Pasang Engsel Pintu Biasa (Kupu-kupu)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Engsel Pintu Biasa (Kupu-kupu) Bh 1.000 Rp 12,000.00 Rp 12,000.00
Tenaga Kerja Pekerja Org/Hr 0.015 Rp 65,000.00 Rp 975.00
Tukang Kayu Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.001 Rp 110,000.00 Rp 110.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 28,460.00

2. 1 Bh Pek. Pasang Engsel Jendela


HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Engsel Jendela Casement Bh 1.000 Rp 9,000.00 Rp 9,000.00

Tenaga Kerja Pekerja Org/Hr 0.010 Rp 65,000.00 Rp 650.00


Tukang Kayu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
Mandor Org/Hr 0.001 Rp 110,000.00 Rp 110.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 20,010.00

3. 1 Bh Pek. Pasang Kunci Tanam Biasa

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kunci Tanam Biasa Bh 1.000 Rp 210,000.00 Rp 210,000.00
Tenaga Kerja Pekerja Org/Hr 0.010 Rp 65,000.00 Rp 650.00
Tukang Kayu Org/Hr 0.500 Rp 90,000.00 Rp 45,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
Mandor Org/Hr 0.005 Rp 110,000.00 Rp 550.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 257,450.00

4. 1 Bh Pek. Pasang Kunci Tanam Kamar Mandi


HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kunci Tanam Kamar Mandi Bh 1.000 Rp 75,000.00 Rp 75,000.00

Tenaga Kerja Pekerja Org/Hr 0.005 Rp 65,000.00 Rp 325.00


Tukang Kayu Org/Hr 0.500 Rp 90,000.00 Rp 45,000.00
Kepala tukang Org/Hr 0.005 Rp 125,000.00 Rp 625.00
Mandor Org/Hr 0.003 Rp 110,000.00 Rp 330.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 121,280.00

5. 1 Bh Pasang Grendel Jendela


HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Grendel Jendela Bh 1.000 Rp 7,000.00 Rp 7,000.00
Tenaga Kerja Tukang Kayu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 17,250.00

6. 1 Bh Pek. Pasang Grendel Pintu


HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Grendel Pintu Bh 1.000 Rp 7,000.00 Rp 7,000.00
Tenaga Kerja Tukang Kayu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00
Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 17,250.00
7. 1 Bh Pek. Pasang Kait Angin

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kait Angin Bh 1.000 Rp 10,000.00 Rp 10,000.00

Tenaga Kerja Tukang Kayu Org/Hr 0.100 Rp 90,000.00 Rp 9,000.00


Kepala tukang Org/Hr 0.010 Rp 125,000.00 Rp 1,250.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 20,250.00

X. PEKERJAAN SANITASI, INSTALASI AIR BERSIH DAN AIR KOTOR

1. 1 Bh Pek. Pasang Kloset Jongkok

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kloset Jongkok Bh 1.000 Rp 200,000.00 Rp 200,000.00
PC Kg 6.000 Rp 1,360.00 Rp 8,160.00
Pasir Pasang M3 0.010 Rp 130,000.00 Rp 1,300.00

Tenaga Kerja Pekerja Org/Hr 1.000 Rp 65,000.00 Rp 65,000.00


Tukang Plumbing Org/Hr 1.500 Rp 90,000.00 Rp 135,000.00
Kepala tukang Org/Hr 0.150 Rp 125,000.00 Rp 18,750.00
Mandor Org/Hr 0.150 Rp 110,000.00 Rp 16,500.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 444,710.00

2. 1 Bh Pek. Pasang Kloset Duduk Monoblock (Lengkap)

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kloset Duduk Monoblock Set 1.000 Rp 2,000,000.00 Rp 2,000,000.00
Perlengkapan dari Bahan % 30.000 Rp 2,000,000.00 Rp 600,000.00

Tenaga Kerja Pekerja Org/Hr 0.250 Rp 65,000.00 Rp 16,250.00


Tukang Plumbing Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.013 Rp 110,000.00 Rp 1,430.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 2,633,055.00

3. 1 Bh Pek. Pasang Wastafel

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Wastafel Set 1.100 Rp 500,000.00 Rp 550,000.00
Perlengkapan % 12.000 Rp 550,000.00 Rp 66,000.00
Pasir Pasang m3 0.010 Rp 130,000.00 Rp 1,300.00
Semen Warna Kg 6.000 Rp 27,500.00 Rp 165,000.00
Tenaga Kerja Pekerja Org/Hr 0.250 Rp 65,000.00 Rp 16,250.00
Tukang Plumbing Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.013 Rp 110,000.00 Rp 1,430.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 815,355.00

4. 1 Bh Pek. Pasang Bak Cuci Stainless Steel

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Bak Cuci Piring Bh 1.000 Rp 285,000.00 Rp 285,000.00
Water Drain + Asesories bh 1.000 Rp 85,000.00 Rp 85,000.00
Tenaga Kerja Pekerja Org/Hr 0.030 Rp 65,000.00 Rp 1,950.00
Tukang Plumbing Org/Hr 0.300 Rp 90,000.00 Rp 27,000.00
Kepala tukang Org/Hr 0.030 Rp 125,000.00 Rp 3,750.00
Mandor Org/Hr 0.002 Rp 110,000.00 Rp 220.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 402,920.00

5. 1 M1 Pek. Pipa PVC Tipe AW Ø 4 Inchi

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Pipa PVC Ø 4" m1 1.200 Rp 27,000.00 Rp 32,400.00
Perlengkapan % 30.000 Rp 27,000.00 Rp 8,100.00
Tenaga Kerja Pekerja Org/Hr 0.081 Rp 65,000.00 Rp 5,265.00
Tukang Plumbing Org/Hr 0.135 Rp 90,000.00 Rp 12,150.00
Kepala tukang Org/Hr 0.014 Rp 125,000.00 Rp 1,750.00
Mandor Org/Hr 0.004 Rp 110,000.00 Rp 440.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 60,105.00
6. 1 M1 Pek. Pipa PVC Tipe AW Ø 2.5 Inchi

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Pipa PVC Ø 2.5" m1 1.200 Rp 19,500.00 Rp 23,400.00
Perlengkapan % 30.000 Rp 19,500.00 Rp 5,850.00
Tenaga Kerja Pekerja Org/Hr 0.081 Rp 65,000.00 Rp 5,265.00
Tukang Plumbing Org/Hr 0.135 Rp 90,000.00 Rp 12,150.00
Kepala tukang Org/Hr 0.014 Rp 125,000.00 Rp 1,750.00
Mandor Org/Hr 0.004 Rp 110,000.00 Rp 440.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 48,855.00

7. 1 M1 Pek. Pipa PVC Tipe AW Ø 3/4 Inchi

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Pipa PVC Ø 3/4" m1 1.200 Rp 8,500.00 Rp 10,200.00
Perlengkapan % 30.000 Rp 8,500.00 Rp 2,550.00
Tenaga Kerja Pekerja Org/Hr 0.036 Rp 65,000.00 Rp 2,340.00
Tukang Plumbing Org/Hr 0.060 Rp 90,000.00 Rp 5,400.00
Kepala tukang Org/Hr 0.006 Rp 125,000.00 Rp 750.00
Mandor Org/Hr 0.002 Rp 110,000.00 Rp 220.00
JUMLAH HARGA PER SATUAN PEKERJAAN Rp 21,460.00

8. 1 Bh Pek. Pasang Kran Air Ø ¾" atau ½"

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Kran Air (Ex. Toto) Bh 1.000 Rp 35,000.00 Rp 35,000.00
Seal Tape Roll 0.025 Rp 9,000.00 Rp 225.00

Tenaga Kerja Pekerja Org/Hr 0.015 Rp 65,000.00 Rp 975.00


Tukang Plumbing Org/Hr 0.150 Rp 90,000.00 Rp 13,500.00
Kepala tukang Org/Hr 0.015 Rp 125,000.00 Rp 1,875.00
Mandor Org/Hr 0.001 Rp 110,000.00 Rp 110.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 51,685.00

9. 1 M1 Pasangan Saluran Air Hujan Keliling

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan + Galian m3 0.090 Rp 51,500.00 Rp 4,635.00
Tenaga Kerja Pek. Urugan Pasir m3 0.015 Rp 176,600.00 Rp 2,649.00
Pas. 1/2 Bata 1:3 m2 0.800 Rp 113,893.20 Rp 91,114.56
Plesteran 1:3 m2 1.100 Rp 50,090.36 Rp 55,099.40
Acian m2 1.100 Rp 28,770.00 Rp 31,647.00

JUMLAH HARGA PER SATUAN PEKERJAAN Rp 185,144.96

10. 1 Bh Bak Kontrol Pasang Batu Bata Ukuran 30 x 30, t = 35

HARGA SATUAN
KEBUTUHAN SATUAN INDEKS JUMLAH HARGA
BAHAN/UPAH
1 2 3 4 5
Bahan Bata merah m3 0.145 Rp 785,000.00 Rp 113,825.00
Portland Cement Kg 44.000 Rp 1,360.00 Rp 59,840.00
Pasir Pasang m3 0.070 Rp 130,000.00 Rp 9,100.00
Batu Kerikil m3 0.070 Rp 150,000.00 Rp 10,500.00
Besi beton Polos Kg 1.600 Err:509 Err:509
Pasir beton m3 0.060 Rp 130,000.00 Rp 7,800.00

Tenaga Kerja Pekerja Org/Hr 3.200 Rp 65,000.00 Rp 208,000.00


Tukang Batu Org/Hr 1.015 Rp 90,000.00 Rp 91,350.00
Kepala tukang Org/Hr 0.002 Rp 125,000.00 Rp 187.50
Mandor Org/Hr 0.016 Rp 110,000.00 Rp 1,760.00

JUMLAH HARGA PER SATUAN PEKERJAAN Err:509

Err:509
Err:509
Err:509
Err:509

Err:509
Err:509