REHABILITASI RUMAH SAKIT UMUM ANUTAPURA

KOTA PALU
SULAWESI TENGAH

KONTRAK NO. : HK.02.03-Sj/Satgas.PB/SPMK.S/026


TANGGAL 30 NOVEMBER 2018
PT. BUKIT ASAM, Tbk

dengan

PT. ADHI KARYA (Persero), Tbk


DEPARTEMEN GEDUNG

LAPORAN MINGGUAN
MINGGU KE : 21 (DUA PULUH SATU)
Periode Tanggal 22 April 2019 - 28 April 2019

Konsultan Manajemen Konstruksi

PT. INDRA KARYA ( Persero )


LAPORAN KEMAJUAN PEKERJAA
REHABILITASI RUMAH SAKIT ANUTA
KOTA PALU - SULAWESI TENGA
MINGGU KE -
PERIODE : 22 April 2019 S/D

PROYEK : REHABILITASI RUMAH SAKIT ANUTAPURA, PALU - SULAWESI TENGAH


LOKASI KEGIATAN : KOTA PALU, SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

MATA ESTIMASI NILAI BOBOT


URAIAN PEKERJAAN
PEMBAYARAN PEKERJAAN (EX.PPN)
(%)

1 2 3 4

I PERSYARATAN UMUM 170,440,000.00 1.1316

II REHAB. GEDUNG 14,891,927,416.77 98.8684


1 GEDUNG PERAWATAN GARUDA 359,742,491.02 2.3884
2 GEDUNG PERAWATAN GELATIK 256,962,485.60 1.7060
3 GEDUNG PERAWATAN KAKATUA 145,954,573.60 0.9690
4 GEDUNG PERAWATAN KASUARI 218,565,601.74 1.4511
5 GEDUNG PERAWATAN RAJAWALI 86,901,766.20 0.5769
6 GEDUNG CT SCAN 25,913,190.30 0.1720
7 GEDUNG PERAWATAN NURI 116,058,730.95 0.7705
8 GEDUNG UNIT TRANSFUSI DARAH 32,295,695.20 0.2144
9 GEDUNG PERAWATAN PIPIT 79,150,472.40 0.5255
10 GEDUNG INSTALASI GIZI 157,076,693.20 1.0428
11 GEDUNG PERAWATAN WALET 43,595,614.40 0.2894
12 GEDUNG PERAWATAN RUSUNAWA 31,568,351.92 0.2096
13 GEDUNG PERAWATAN MERAK 30,117,956.10 0.2000
14 GEDUNG ICU 8,519,843.75 0.0566
15 GEDUNG BEDAH SENTRAL 119,128,144.04 0.7909
16 GEDUNG JENAZAH 56,300,956.35 0.3738
17 GEDUNG SANITASI 13,102,621.00 0.0870
18 GEDUNG PERAWATAN KUTILANG 127,419,381.50 0.8459
19 GEDUNG PERAWATAN CENDRAWASIH 154,480,958.25 1.0256
20 GEDUNG CCSD 30,789,327.01 0.2044
21 GEDUNG HEMODEALISA 25,718,472.70 0.1707
22 GEDUNG INTERMEDIET 29,346,434.80 0.1948
23 GEDUNG BELIBIS 48,204,551.20 0.3200
24 GEDUNG MALEO 56,729,515.20 0.3766
25 GEDUNG IGD 167,888,081.65 1.1146
26 GEDUNG ARSIP 11,846,314.10 0.0786
27 GEDUNG ADMINISTRASI 154,974,841.92 1.0289
28 GEDUNG GENSET 12,066,304.80 0.0801
29 GEDUNG WORKSHOP 28,223,042.20 0.1874
30 GEDUNG RADIOLOGI 3,146,836.80 0.0209
31 GEDUNG INSTALASI KEBIDANAN 414,158.38 0.0027
32 GEDUNG OBAT 191,175,711.65 1.2692
33 GEDUNG CAMAR 101,859,258.23 0.6762
34 GEDUNG UPS 4,640,889.50 0.0308
35 GEDUNG APOTIK 13,420,244.80 0.0891
36 GEDUNG ENDOSCOPY 37,236,812.75 0.2472
37 GEDUND ATM CENTER 20,104,112.20 0.1335
38 GEDUNG OB / KEBERSIHAN 21,904,587.30 0.1454
39 SELASAR ANTAR BANGUNAN 11,869,382,392.08 78.8016

TOTAL 15,062,367,416.77 100.0000


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutapura Palu
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader
ORAN KEMAJUAN PEKERJAAN
ITASI RUMAH SAKIT ANUTAPURA
A PALU - SULAWESI TENGAH
21
28 April 2019

KONTRAKTOR PELAKSANA : PT. ADHI KARYA ( PERSERO ) TBK


KONSULTAN SUPERVISI : PT. INDRA KARYA ( PERSERO )
JANGKA WAKTU PELAKSANAA : 275 HARI KALENDER
WAKTU TERPAKAI : 150 HARI KALENDER
WAKTU TERSISA : 125 HARI KALENDER

PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
(%) (%) (%) (%)
5 6 7 8

0.0875 0.0219 0.1094 9.66

2.3884 - 2.3884 100.00


0.1495 0.0777 0.2272 13.32

0.0845 - 0.0845 40.31

0.3738 - 0.3738 100.00


0.0801 - 0.0801 100.00
0.1874 - 0.1874 100.00

0.0308 - 0.0308 100.00

0.2473
3.5230 3.7703
0.0996
3.3818 3.4814
(0.1412) (0.1477) (0.2889)

Palu, 28 April 2019


Diajukan Oleh,
PT. ADHI KARYA (PERSERO) Tbk
Sakit Umum Anutapura Palu Departemen Gedung

M. Ardany Afianto, ST. MT


Project Manager
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH S
KOTA PALU - SU
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

ESTIMASI NILAI PEKERJAAN


No. (EX.PPN)
URAIAN PEKERJAAN
ITEM BOBOT
JUMLAH HARGA
(%)

A. PERSYARATAN UMUM 170,440,000.00 1.1316

TOTAL 170,440,000.00 1.1316


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (P
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sak
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryan


NIP. 197305142001121003 Team Leader
REKAPITULASI
AN PROGRESS MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
SD 28 April 2019

Waktu Terpakai : 150


Waktu Tersisa : 125

PROGRESS PROGRESS PRESENTASI


S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%)

0.0875 0.0219 0.1094 9.66

- -
0.0301
0.8589 0.8890 0.8890
0.0219
0.0875 0.1094
(0.7714) (0.0082) (0.7796)

Palu, 28 April 2019


periksa Oleh, Diajukan Oleh,
INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
habilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


am Leader Project Manager
LAPORAN MINGGU K
REHABILITASI RUMAH SAKIT UMUM
KOTA PALU
SULAWESI TENGAH
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

A. PERSYARATAN UMUM
A.1 Fasilitas Konstruksi dan Pengendalian Sementara 1.1316
1 Kantor lapangan / direksi keet Bln 6.00 0.2788
2 Gudang bahan dan workshop Bln 6.00 0.1195
3 Barak pekerja Bln 6.00 0.1195
4 Fasilitas Air dan listrik untuk Kerja Bln 6.00 0.0996
5 Keamanan ,Keselamatan dan Kesehatan Kerja Bln 6.00 0.0996
6 Pelaporan dan Dokumentasi Ls 1.00 0.0199
7 Shop Drawings & As Built Drawings Ls 1.00 0.0266

A.2 Mobilisasi dan Demobilisasi


1 Mobilisasi & Demobilisasi Ls 1.00 0.3681

1.1316

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutap
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader
LAPORAN MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021

PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

0.0875 0.0219 0.1094


- - - - - -
- - - - - -
- - - - - -
4.00 0.0664 1.00 0.0166 5.00 0.0830 83.33
0.27 0.0045 0.07 0.0012 0.34 0.0056 5.67
0.04 0.0008 0.01 0.0002 0.05 0.0010 5.00
0.04 0.0011 0.01 0.0003 0.05 0.0013 5.00

0.04 0.0147 0.01 0.0037 0.05 0.0184 5.00

0.0875 0.0219 0.1094

Palu, 28 April 2019


Diajukan Oleh,
DRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
litasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

M. Ardany Afianto, ST. MT


Project Manager
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH
KOTA PALU - S
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

ESTIMASI NILAI PEKERJAAN


No. (EX.PPN)
URAIAN PEKERJAAN
ITEM BOBOT
JUMLAH HARGA
(%)

1 GEDUNG PERAWATAN GARUDA


LANTAI 1

II. PEKERJAAN BONGKARAN DAN STRUKTUR


A. PEKERJAAN BONGKARAN LANTAI 31,915,659.05 0.2119
B. PEKERJAAN TANAH 21,152,798.00 0.1404
C. PEKERJAAN BETON 93,244,721.35 0.6191

III. PEKERJAAN ARSITEKTUR


A. PEKERJAAN PENYELESAIAN 111,712,088.20 0.7417
B. PEKERJAAN PLAFON 13,949.60 0.0001
C. PEKERJAAN PASANGAN 1,661,891.30 0.0110
D PEKERJAAN PINTU DAN JENDELA 11,143,083.85 0.0740
E. PEKERJAAN PENGECATAN 56,546,664.30 0.3754

III. PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING


A. PEKERJAAN MEKANIKAL PLUMBING 19,844,130.00 0.1317
B. PEKERJAAN ELEKTRIKAL 322,340.00 0.0021

LANTAI 2

I. PEKERJAAN BONGKARAN
A. PEKERJAAN BONGKARAN LANTAI 52,470.00 0.0003

II. PEKERJAAN PENYELESAIAN


A. PEKERJAAN PASANGAN 128,227.00 0.0009
B. PEKERJAAN LANGIT - LANGIT PLAFON 1,420,740.77 0.0094
C. PEKERJAAN PENYELESAIAN 369,048.00 0.0025
D. PEKERJAAN PENGECATAN 6,557,432.70 0.0435
E. PEKERJAAN PINTU & JENDELA 2,457,056.90 0.0163
F. PEKERJAAN MEKANIKAL PLUMBING 72,000.00 0.0005
G. PEKERJAAN MEKANIKAL ELEKTRIKAL 1,128,190.00 0.0075

TOTAL 359,742,491.02 2.3884


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (P
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sa
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryan


NIP. 197305142001121003 Team Leader
REKAPITULASI
AN PROGRESS MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
SD 28 April 2019

Waktu Terpakai : 150


Waktu Tersisa : 125

PROGRESS PROGRESS PRESENTASI


S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%)

0.2119 - 0.2119 100.00


0.1404 - 0.1404 100.00
0.6191 - 0.6191 100.00

0.7417 - 0.7417 100.00


0.0001 - 0.0001 100.00
0.0110 - 0.0110 100.00
0.0740 - 0.0740 100.00
0.3754 - 0.3754 100.00

0.1317 - 0.1317 100.00


0.0021 - 0.0021 100.00

0.0003 - 0.0003 100.00

0.0009 - 0.0009 100.00


0.0094 - 0.0094 100.00
0.0025 - 0.0025 100.00
0.0435 - 0.0435 100.00
0.0163 - 0.0163 100.00
0.0005 - 0.0005 100.00
0.0075 - 0.0075 100.00

-
2.3884 2.3884 2.3884
-
2.3884 2.3884
- - - -

Palu, 28 April 2019


periksa Oleh, Diajukan Oleh,
INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
habilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


am Leader Project Manager
LAPORAN MINGGU
REHABILITASI RUMAH SAKIT UM
KOTA PALU
SULAWESI TENGA
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

1 GEDUNG PERAWATAN GARUDA

I PEKERJAAN PERSIAPAN
Lantai 1
II. PEKERJAAN BONGKARAN DAN STRUKTUR
A. PEKERJAAN BONGKARAN LANTAI 0.2119
A.1 Bongkaran
1 Bongkaran Granite Tile / Keramik M² 291.27 0.0521
2 Bongkaran Lantai Beton tanpa tulangan M³ 43.37 0.0638
3 Bongkaran Plint M¹ 175.58 0.0145
4 Bongkaran Pintu Akses Masuk Material M³ 0.34 0.0016
5 Pembersihan lokasi Bongkaran Granite/Keramik M² 291.27 0.0324
6 Pembersihan lokasi Bongkaran Lantai Beton tanpa tulangan M² 291.27 0.0324
7 Pembersihan Bongkaran Plint M² 17.56 0.0020
8 Pembersihan Bongkaran Pintu Akses Masuk Material M² 2.25 0.0003
9 Cipping dinding ( Tali Air ) dan Pembersihan Lokasi M¹ 175.58 0.0128
B. PEKERJAAN TANAH 0.1404
B1. Galian Tanah Biasa sedalam ≤ 1 m
1 Galian Tanah Biasa M³ 8.60 0.0044
2 Pemadatan tanah M² 286.50 0.1360
C. PEKERJAAN BETON 0.6191
C.1 Struktur Lantai
1 Urugan Pasir M³ 8.60 0.0134
2 Beton K 175 M³ 14.75 0.1345
3 Beton K 225 M³ 28.65 0.2748
4 Besi Polos Uk. dia 10 mm Kg 1,910.47 0.1963
III. PEKERJAAN ARSITEKTUR
A. PEKERJAAN PENYELESAIAN 0.7417
A.1 Pemasangan Lantai Granite Tile / Keramik
1 Pasang Lantai 600 x 600 mm M² 291.27 0.5947
2 Pasang Lantai 400 x 400 mm M² 5.82 0.0070
GD. Garuda 94
No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

A.2 Pemasangan Plint


1 Pasang Plint Lantai 100 x 600 mm M¹ 175.58 0.0547
2 Pemasangan Tali Air M¹ 175.58 0.0852
B. PEKERJAAN PLAFON 0.0001
B.1 Finishing Dinding Retak Rambut
1 Cat List Plafon M² 0.56 0.0001
C. PEKERJAAN PASANGAN 0.0110
C.1 Finishing Dinding Retak Rambut
1 Plesteran Dinding 1:4 M² 6.34 0.0031
2 Acian Dinding M² 6.34 0.0018

C.2 Dinding Bata Pintu Akses Material


1 Pasangan Bata 1 : 4 M² 2.25 0.0028
2 Plesteran Dinding 1 : 4 M² 4.50 0.0021
3 Acian Dinding M² 4.50 0.0012
D PEKERJAAN PINTU DAN JENDELA 0.0740
D.1 Bongkar dan Pasang Kembali Jemdela & Pintu

Bongkar Jendela dan Pintu (Kusen dan Daun Jendela Kaca,


1 Kusen
Pasangdan DaunKusen
kembali Pintu Kaca)
Pintu Aluminium dan Jendela (Kusen Unit 1.00 0.0020
2 Pintu dan Jendela Lama) M¹ 20.30 0.0022
3 Bongkar Daun Pintu Kayu Unit 13.00 0.0051
4 Pemotongan Daun Pintu Kayu M¹ 14.88 0.0027
5 Pasang Kembali Daun Pintu Kayu Unit 13.00 0.0112
6 Pasang Kembali Daun Pintu Kaca ( Daun Pintu Kaca Lama ) M² 3.96 0.0006
7 Pasang Kembali Daun Jendela Kaca ( Daun Jendela Kaca Lama ) M² 4.35 0.0006
8 Bongkar Kusen dan Pintu ( Kusen dan daun Pintu ) Unit 4.00 0.0029
9 Pasang Kembali Kusen dan Pintu ( Kusen dan Daun Pintu ) Unit 4.00 0.0051

D.2 Pergantian Kaca Pecah


1 Uk. 0.190 x 0.785 ( Kaca Bening ) M² 0.15 0.0003
2 Uk. 1.085 x 0.605 ( Kaca Reyband ) M² 1.31 0.0024

D.3 Bongkaran Dinding


1 Bongkar Dinding
Pemasangan Partisi
Kembali ( Rangka
Dinding Alumunium
Partisi ( Rangka&Alumunium
Daun Kaca&
) M² 10.12 0.0019
2 Daun Kaca ) M² 10.12 0.0027

D.4 Engsel Pintu


1 Engsel Pintu Tanam Kaca Tempered Bh 4.00 0.0329
2 Engsel Pintu Kamar Mandi Kamar Perawatan 1 Psg 1.00 0.0014
E. PEKERJAAN PENGECATAN 0.3754
E.1 Pengecatan

GD. Garuda 94
No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

1 Cat Dinding Dalam M² 466.02 0.1297


2 Cat Dinding Luar M² 725.19 0.2457
III. PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING
A. PEKERJAAN MEKANIKAL PLUMBING 0.1317
A.1 Kloset Lantai 1
1 Bongkar Closet Duduk Unit 6.00 0.0084
2 Pemasangan Closet Baru Unit 6.00 0.1170
3 Bongkar dan Pasang Baru Assesoris & Kran Wastafel Gantung Unit 3.00 0.0059
4 Kran Kamar Mandi 1/2'' ( Kran Plastik ) Bh 2.00 0.0005
B. PEKERJAAN ELEKTRIKAL 0.0021
B.1 Sistem Penerangan Selasar Lantai 1
1 Bohlam Lampu Flourescant Ceiling Bh 2.00 0.0021

Lantai 2
I. PEKERJAAN BONGKARAN
A. PEKERJAAN BONGKARAN LANTAI 0.0003
A.1 Bongkaran
1 Bongkaran Granite Tile / Keramik M² 1.20 0.0002
2 Pembersihan lokasi Bongkaran Granite/Keramik M² 1.20 0.0001
II. PEKERJAAN PENYELESAIAN
A. PEKERJAAN PASANGAN 0.0009
A.1 Finishing Dinding Retak Rambut Lantai 2
1 Plesteran Dinding 1:4 M² 1.10 0.0005
2 Acian Dinding M² 1.10 0.0003
B. PEKERJAAN LANGIT - LANGIT PLAFON 0.0094
1 Bongkar List Plafon M¹ 28.32 0.0023
2 List Plafon M¹ 28.32 0.0065
3 Cat List Plafon M² 3.96 0.0007
C. PEKERJAAN PENYELESAIAN 0.0025
B.1 Pemasangan Lantai Granite Tile / Keramik
1 Pasang Lantai 600 x 600 mm M² 1.20 0.0025
D. PEKERJAAN PENGECATAN 0.0435
C.1 Pengecatan Lantai 2
1 Cat Dinding Dalam M² 156.39 0.0435
E. PEKERJAAN PINTU & JENDELA 0.0163
D.1 PINTU
1 Daun Jendela Kaca Ryband 5 mm M² 8.99 0.0163
F. PEKERJAAN MEKANIKAL PLUMBING 0.0005
F.1 Assesoris Kamar Mandi
1 Kran 1/2'' Kamar Mandi Bh 2.00 0.0005
G. PEKERJAAN MEKANIKAL ELEKTRIKAL 0.0075
G.1 Sistem Penerangan Selasar ( Koridor )

GD. Garuda 94
No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

1 Bohlam Lampu Flourescant Ceiling Bh 7.00 0.0075

2.3884

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutapu
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader

GD. Garuda 94
LAPORAN MINGGU KE - 21
LITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021

PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

0.2119 - 0.2119

291.27 0.0521 - 291.27 0.0521 100.00


43.37 0.0638 - 43.37 0.0638 100.00
175.58 0.0145 - 175.58 0.0145 100.00
0.34 0.0016 - 0.34 0.0016 100.00
291.27 0.0324 - 291.27 0.0324 100.00
291.27 0.0324 - 291.27 0.0324 100.00
17.56 0.0020 - 17.56 0.0020 100.00
2.25 0.0003 - 2.25 0.0003 100.00
175.58 0.0128 - 175.58 0.0128 100.00
0.1404 - 0.1404

8.60 0.0044 - 8.60 0.0044 100.00


286.50 0.1360 - 286.50 0.1360 100.00
0.6191 - 0.6191

8.60 0.0134 - 8.60 0.0134 100.00


14.75 0.1345 - 14.75 0.1345 100.00
28.65 0.2748 - 28.65 0.2748 100.00
1,910.47 0.1963 - 1,910.47 0.1963 100.00

0.7417 - 0.7417

291.27 0.5947 - 291.27 0.5947 100.00


5.82 0.0070 - 5.82 0.0070 100.00
GD. Garuda 94
PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

175.58 0.0547 - 175.58 0.0547 100.00


175.58 0.0852 - 175.58 0.0852 100.00
0.0001 - 0.0001

0.56 0.0001 - 0.56 0.0001 100.00


0.0110 - 0.0110

6.34 0.0031 - 6.34 0.0031 100.00


6.34 0.0018 - 6.34 0.0018 100.00

2.25 0.0028 - 2.25 0.0028 100.00


4.50 0.0021 - 4.50 0.0021 100.00
4.50 0.0012 - 4.50 0.0012 100.00
0.0740 - 0.0740

1.00 0.0020 - 1.00 0.0020 100.00


20.30 0.0022 - 20.30 0.0022 100.00
13.00 0.0051 - 13.00 0.0051 100.00
14.88 0.0027 - 14.88 0.0027 100.00
13.00 0.0112 - 13.00 0.0112 100.00
3.96 0.0006 - 3.96 0.0006 100.00
4.35 0.0006 - 4.35 0.0006 100.00
4.00 0.0029 - 4.00 0.0029 100.00
4.00 0.0051 - 4.00 0.0051 100.00

0.15 0.0003 - 0.15 0.0003 100.00


1.31 0.0024 - 1.31 0.0024 100.00

10.12 0.0019 - 10.12 0.0019 100.00


10.12 0.0027 - 10.12 0.0027 100.00

4.00 0.0329 - 4.00 0.0329 100.00


1.00 0.0014 - 1.00 0.0014 100.00
0.3754 - 0.3754

GD. Garuda 94
PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

466.02 0.1297 - 466.02 0.1297 100.00


725.19 0.2457 - 725.19 0.2457 100.00

0.1317 - 0.1317

6.00 0.0084 - 6.00 0.0084 100.00


6.00 0.1170 - 6.00 0.1170 100.00
3.00 0.0059 - 3.00 0.0059 100.00
2.00 0.0005 - 2.00 0.0005 100.00
0.0021 - 0.0021

2.00 0.0021 - 2.00 0.0021 100.00

0.0003 - 0.0003

1.20 0.0002 - 1.20 0.0002 100.00


1.20 0.0001 - 1.20 0.0001 100.00

0.0009 - 0.0009

1.10 0.0005 - 1.10 0.0005 100.00


1.10 0.0003 - 1.10 0.0003 100.00
0.0094 - 0.0094
28.32 0.0023 - 28.32 0.0023 100.00
28.32 0.0065 - 28.32 0.0065 100.00
3.96 0.0007 - 3.96 0.0007 100.00
0.0025 - 0.0025

1.20 0.0025 - 1.20 0.0025 100.00


0.0435 - 0.0435

156.39 0.0435 - 156.39 0.0435 100.00


0.0163 - 0.0163

8.99 0.0163 - 8.99 0.0163 100.00


0.0005 - 0.0005

2.00 0.0005 - 2.00 0.0005 100.00


0.0075 - 0.0075

GD. Garuda 94
PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

7.00 0.0075 - 7.00 0.0075 100.00

2.3884 - 2.3884

Palu, 28 April 2019


Diajukan Oleh,
PT. ADHI KARYA (PERSERO) Tbk
Rumah Sakit Umum Anutapura Palu Departemen Gedung

M. Ardany Afianto, ST. MT


Project Manager

GD. Garuda 94
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH
KOTA PALU - S
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

KONTRAK
No.
URAIAN PEKERJAAN
ITEM
JUMLAH HARGA

2 GEDUNG PERAWATAN GELATIK


Lantai 1
I. PEKERJAAN BONGKARAN DAN STRUKTUR
A. PEKERJAAN BONGKARAN LANTAI 22,125,579.20
B. PEKERJAAN TANAH 19,945,114.60
C. PEKERJAAN BETON 84,974,761.30

II. PEKERJAAN ARSITEKTUR


A. PEKERJAAN PENYELESAIAN 81,372,008.60
B. PEKERJAAN PLAFON 299,172.00
C. PEKERJAAN PASANGAN 2,715,976.70
D. PEKERJAAN PINTU DAN JENDELA 10,167,189.80
E. PEKERJAAN PENGECATAN 35,161,603.40

III. PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING


B. PEKERJAAN ELEKTRIKAL 201,080.00

TOTAL 256,962,485.60
Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh,
Koordinator Rehabilitasi Rekonstruksi
Bangunan Gedung Wilayah Sulawesi Tengah
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT


NIP. 197305142001121003
REKAPITULASI
LAPORAN PROGRESS MINGGU KE - 21
REHABILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
2 April 2019 SD 28 April 2019

Waktu Terpakai :
Waktu Tersisa :

PROGRESS PROGRESS PRESENTAS


KONTRAK
S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%) (%)

0.1469 0.1452 - 0.1452


0.1324 0.0024 0.0044 0.0068
0.5642 - 0.0733 0.0733

0.5402 - - -
0.0020 - - -
0.0180 0.0019 - 0.0019
0.0675 - - -
0.2334 - - -

0.0013 - - -

1.7060
0.0777
0.8634 0.9410 0.9410
0.0777
0.1495 0.2272
(0.7139) - (0.7139) (0.7139)

Palu, 28 April 2019


Diperiksa Oleh, Diajukan Oleh,
PT. INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
Rehabilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

Ir. Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


Team Leader Project Manager
21 1 22-Apr-19 sd 24-Apr-19
2 25-Apr-19 sd 1-May-19
3 2-May-19 sd 8-May-19
4 9-May-19 sd 15-May-19
5 16-May-19 sd 22-May-19

150 30-Nov-18 sd 28-Apr-19###


125 22-Apr-19 sd 28-Apr-19

PRESENTASI
PROGRESS
PEKERJAAN
(%)

1
3
4
98.86 6
5.15 15
12.99 21

28
- 30
- 34
10.27 43
- 54
- 72

77
- 79
PERSERO) Tbk
1 2 3 4 5 6 7 89 10 11 12 13
LAPORAN MINGGU
REHABILITASI RUMAH SAKIT UMU
KOTA PALU
SULAWESI TENGAH
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No.
URAIAN PEKERJAAN SAT VOLUME
ITEM

1 1 GEDUNG PERAWATAN GELATIK


2
3 Lantai 1
4 I. PEKERJAAN BONGKARAN DAN STRUKTUR
5
6 A. PEKERJAAN BONGKARAN LANTAI
7 A.1 Bongkaran R. Dokter, R. Nurse, Kls IA, IB, IIA, IIB, IIIA, IIIB, Selasar
8 1 Bongkaran Granite Tile / Keramik M² 264.59
9 2 Bongkaran Lantai Beton tanpa tulangan M³ 26.46
10 3 Pembersihan lokasi Bongkaran Granite/Keramik M² 264.59
11 4 Pembersihan lokasi Bongkaran Lantai Beton tanpa tulangan M² 264.59
12 5 Bongkaran Dinding Bata M² 0.31
13 6 Pembersihan Bongkaran Bata M² 2.04
14
15 B. PEKERJAAN TANAH
16 B1. Galian Tanah Biasa sedalam ≤ 1 m
17 Bongkaran R. Dokter, R. Nurse, Kls IA, IB, IIA, IIB, IIIA, IIIB, Selasar
18 1 Galian Tanah Biasa M³ 13.22
19 2 Pemadatan tanah M² 264.59
20
21 C. PEKERJAAN BETON
22 C.1 Struktur Lantai
23 1 Urugan Pasir M³ 7.94
24 2 Beton K 175 M³ 13.22
25 3 Beton K 225 M³ 26.46
26 4 Besi Polos Uk. dia 10 mm Kg 1,726.40
27
28 II. PEKERJAAN ARSITEKTUR
29
30 A. PEKERJAAN PENYELESAIAN
31 A.1 Pemasangan Lantai Granite Tile / Keramik
32 1 Pasang Lantai 600 x 600 mm M² 264.59
33
34 B. PEKERJAAN PLAFON
35 B.1 Finishing Plafon R. Kls IIIA
36 1 List Plafon M¹ 6.00
37 2 Cat List Plafon M² 0.60
38
39 B.2 Finishing Plafon R. Kls IIIB
40 1 List Plafon M¹ 6.00
41 2 Cat List Plafon M² 0.60
42
43 C. PEKERJAAN PASANGAN
44 C.1 Finishing Dinding Retak Rambut
45 1 Plesteran Dinding 1 : 2 M² 6.51
46 2 Acian Dinding M² 6.51
47
48 C.2 Finishing Dinding Retak Kasar
49 1 Pasangan Bata 1 : 4 M² 2.04
50 2 Plesteran Dinding 1 : 4 M² 4.08
51 3 Acian Dinding M² 4.08
52 4 Kolom Praktis M¹ 10.00
53
54 D. PEKERJAAN PINTU DAN JENDELA
55 D.1 Bongkar dan Pasang Kembali Jendela & Pintu
56 1 Bongkar Daun Pintu Kayu Unit 8.00
57 2 Pasang Kembali Daun Pintu Kayu Unit 8.00
58 3 Bongkar Kusen dan Pintu ( Kusen dan Daun Pintu ) KM Kls IA Unit 1.00
59
60 D.2 Kusen dan Pintu Kamar Mandi Kls IA
61 1 Kusen Alumunium M¹ 4.80
62 2 Pintu Alumunium M² 1.40
63 3 Engsel Pintu Psg 1.00
64 4 Kunci Pintu Bh 1.00
65
66 D.3 Pemasangan Pintu Baru
67 1 Pergantian / Pasang Pintu Baru ( 2 Daun ) Kls IIIA M² 3.78
68
69 D.4 Engsel Pintu
70 1 Engsel Pintu Ruangan Psg 9.00
71
72 E. PEKERJAAN PENGECATAN
73 E.1 Pengecatan
74 1 Cat Dinding Dalam M² 542.50
75 2 Cat Dinding Luar M² 243.28
76
77 III. PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING
78
79 B. PEKERJAAN ELEKTRIKAL
80 B.1 Sistem Penerangan Selasar Lantai 1
81 1 Bohlam Lampu Ruangan Bh 2.00
82

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anut
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader
16 17 18 19 20 21 22 23 24
LAPORAN MINGGU KE - 21 1
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
22 April 2019 S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021 DIGANTI TIAP MIN

PROGRESS PRESENTASI
BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
% BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

1
2
3
4
5
0.1469 0.1452 - 0.1452 6
7
0.0473 264.59 0.0473 - 264.59 0.0473 100.00 8
0.0389 26.46 0.0389 - 26.46 0.0389 100.00 9
0.0295 264.59 0.0295 - 264.59 0.0295 100.00 10
0.0295 264.59 0.0295 - 264.59 0.0295 100.00 11
0.0015 - - - - - - 12
0.0002 - - - - - - 13
14
0.1324 0.0024 0.0044 0.0068 15
16
17
0.0068 4.68 0.00 8.54 0.004 13.22 0.01 100.00 18
0.1256 - - - - - - - 19
20
0.5642 - 0.0733 0.0733 21
22
0.0123 - - 7.94 0.01 7.94 0.01 100.00 23
0.1206 - - 6.68 0.06 6.68 0.06 50.53 24
0.2538 - - - - - - - 25
0.1774 - - - - - - - 26
27
28
29
0.5402 - - - 30
31
0.5402 - - - - - - - 32
33
0.0020 - - - 34
35
0.0009 - - - - - - - 36
0.0001 - - - - - - - 37
38
39
0.0009 - - - - - - - 40
0.0001 - - - - - - - 41
42
0.0180 0.0019 - 0.0019 43
44
0.0032 - - - - - - - 45
0.0018 - - - - - - - 46
47
48
0.0026 0.68 0.00 - - 0.68 0.00 33.33 49
0.0019 1.36 0.00 - - 1.36 0.00 33.33 50
0.0011 1.36 0.00 - - 1.36 0.00 33.33 51
0.0074 - - - - - - - 52
53
0.0675 - - - 54
55
0.0032 - - - - - - - 56
0.0069 - - - - - - - 57
0.0007 - - - - - - - 58
59
60
0.0028 - - - - - - - 61
0.0013 - - - - - - - 62
0.0014 - - - - - - - 63
0.0023 - - - - - - - 64
65
66
0.0366 - - - - - - - 67
68
69
0.0123 - - - - - - - 70
71
0.2334 - - - 72
73
0.1510 - - - - - - - 74
0.0824 - - - - - - - 75
76
77
78
0.0013 - - - 79
80
0.0013 - - - - - - - 81
82

1.7060 0.1495 0.0777 0.2272

Palu, 28 April 2019


Diajukan Oleh,
DRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
litasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

ok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


Project Manager
2 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
4
2

DIGANTI TIAP MINGGU

21 22 23 24 25
22-Apr-19 29-Apr-19 6-May-19 13-May-19 20-May-19
SD MG LALU SD SD SD SD SD SD MG INI BULAN INI
SISA 28-Apr-19 5-May-19 12-May-19 19-May-19 26-May-19

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 264.59 264.59 -
- 26.46 26.46 -
- 264.59 264.59 -
- 264.59 264.59 -
(0.31) - - -
(2.04) - - -
- - - -
- - - -
- - - -
- - - -
(8.56) - 4.66 4.66 4.66
(264.59) - - -
- - - -
- - - -
- - - -
- - 7.94 7.94 7.94
(6.54) - 6.68 6.68 6.68
(26.46) - - -
(1,726.40) - - -
- - - -
-
- - - -
- - - -
- - - -
(264.59) - - -
- - - -
- - - -
- - - -
(6.00) - - -
(0.60) - - -
- - - -
- - - -
(6.00) - - -
(0.60) - - -
- - - -
- - - -
- - - -
(6.51) - - -
(6.51) - - -
- - - -
- - - -
(1.36) - 0.68 0.68 0.68
(2.72) - 1.36 1.36 1.36
(2.72) - 1.36 1.36 1.36
(10.00) - - -
- - - -
- - - -
- - - -
(8.00) - - -
(8.00) - - -
(1.00) - - -
- - - -
- - - -
(4.80) - - -
(1.40) - - -
(1.00) - - -
(1.00) - - -
- - - -
- - - -
(3.78) - - -
- - - -
- - - -
(9.00) - - -
- - - -
- - - -
- - - -
(542.50) - - -
(243.28) - - -
- - - -
- - - -
- - - -
- - - -
- - - -
(2.00) - - -
- - - -
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH
KOTA PALU - S
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

KONTRAK
No.
URAIAN PEKERJAAN
ITEM
JUMLAH HARGA

3 GEDUNG PERAWATAN KAKATUA

A. KAMAR PERAWATAN 01 224,675.00


B. RUANG PERAWATAN 02 1,674,605.20
C. RUANG PERAWATAN 3 7,728,025.60
D. RUANG PERAWATAN 4 6,464,145.60
E. RUANG PERAWATAN 06 723,728.00
F. RUANG PERAWATAN 07 723,728.00
G. RUANG PERAWATAN 08 2,617,989.80
H. KAMAR UTAMA 03 3,676,306.20
I. KAMAR UTAMA 01 6,045,207.20
J. KAMAR UTAMA 02 7,323,922.40
K. SELASAR RUANGAN 12,993,969.60
L. PENGECATAN GD. KAKATUA 95,758,271.00

TOTAL 145,954,573.60
Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi
Disetjui Oleh,
Koordinator Rehabilitasi Rekonstruksi
Bangunan Gedung Wilayah Sulawesi Tengah
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT


NIP. 197305142001121003
REKAPITULASI
LAPORAN PROGRESS MINGGU KE - 21
REHABILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
2 April 2019 SD 28 April 2019

Waktu Terpakai :
Waktu Tersisa :

PROGRESS PROGRESS PRESENTAS


KONTRAK
S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%) (%)

0.0015
0.0111
0.0513
0.0429
0.0048
0.0048
0.0174
0.0244
0.0401
0.0486
0.0863
0.6357

0.9690 - - - - -
Palu, 28 April 2019
Diperiksa Oleh, Diajukan Oleh,
PT. INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
Rehabilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

Ir. Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


Team Leader Project Manager
21 1 22-Apr-19 sd 24-Apr-19
2 25-Apr-19 sd 1-May-19
3 2-May-19 sd 8-May-19
4 9-May-19 sd 15-May-19
5 16-May-19 sd 22-May-19

150 30-Nov-18 sd 28-Apr-19###


125 22-Apr-19 sd 28-Apr-19

PRESENTASI
PROGRESS
PEKERJAAN
(%)

- 4
- 12
- 20
- 33
- 46
- 52
- 58
- 75
- 83
- 100
- 117
- 130
100
PERSERO) Tbk
1 2 3 4 5 6 7 89 10 11 12 13
LAPORAN MINGGU
REHABILITASI RUMAH SAKIT UMU
KOTA PALU
SULAWESI TENGAH
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No.
URAIAN PEKERJAAN SAT VOLUME
ITEM

1 3 GEDUNG PERAWATAN KAKATUA


2
3 Lantai 1
4 A. KAMAR PERAWATAN 01
5 A.1 Finishing Dinding Retak Rambut
6 1 Plesteran Dinding 1 : 2 M² 1.50
7 2 Acian Dinding M² 1.50
8
9 A.2 Langit-langit / Plafon
10 1 Cat Plafon M² 2.00
11
12 B. RUANG PERAWATAN 02
13 B.1 Finishing Dinding Retak Kasar
14 1 Pembongkaran Dinding Bata M³ 0.36
15 2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 26.00
16 3 Pasangan Bata 1:4 M² 2.40
17 4 Plesteran Dinding 1:4 M² 4.80
18 5 Acian Dinding M² 4.80
19
20 C. RUANG PERAWATAN 3
21 C.1 Pemasangan Lantai Granite Tile / Keramik
22 1 Bongkaran Granite Tile / Keramik M² 4.48
23 2 Pembersihan lokasi Bongkaran Granite/Keramik M² 4.48
24 3 Pasang Lantai 400 x 400 mm M² 4.48
25
26 C.2 Finishing Dinding Retak Kasar
27 1 Pembongkaran Dinding Bata M³ 2.16
28 2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 14.40
29 3 Pasangan Bata 1:4 M² 14.40
30 4 Plesteran Dinding 1:4 M² 20.16
31 5 Acian Dinding M² 20.16
32
33 D. RUANG PERAWATAN 4
34 D.1 Pemasangan Lantai Granite Tile / Keramik
35 1 Bongkaran Granite Tile / Keramik M² 3.84
36 2 Pembersihan lokasi Bongkaran Granite/Keramik M² 3.84
37 3 Pasang Lantai 400 x 400 mm M² 3.84
38
39 D.2 Finishing Dinding Retak Kasar
40 1 Pembongkaran Dinding Bata M³ 1.80
41 2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 12.00
42 3 Pasangan Bata 1:4 M² 12.00
43 4 Plesteran Dinding 1:4 M² 16.80
44 5 Acian Dinding M² 16.80
45
46 E. RUANG PERAWATAN 06
47 E.1 Pemasangan Lantai Granite Tile / Keramik
48 1 Bongkaran Granite Tile / Keramik M² 3.20
49 2 Pembersihan lokasi Bongkaran Granite/Keramik M² 3.20
50 3 Pasang Lantai 400 x 400 mm M² 3.20
51
52 F. RUANG PERAWATAN 07
53 F.1 Pemasangan Lantai Granite Tile / Keramik
54 1 Bongkaran Granite Tile / Keramik M² 3.20
55 2 Pembersihan lokasi Bongkaran Granite/Keramik M² 3.20
56 3 Pasang Lantai 400 x 400 mm M² 3.20
57
58 G. RUANG PERAWATAN 08
59 G.1 Pemasangan Lantai Granite Tile / Keramik
60 1 Bongkaran Granite Tile / Keramik M² 1.60
61 2 Pembersihan lokasi Bongkaran Granite/Keramik M² 1.60
62 3 Pasang Lantai 400 x 400 mm M² 1.60
63
64 G.2 Finishing Dinding Retak Rambut
65 1 Plesteran Dinding 1 : 2 M² 2.90
66 2 Acian Dinding M² 2.90
67
68 G.3 Finishing Dinding Retak Kasar
69 1 Pembongkaran Dinding Bata M³ 0.54
70 2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 3.60
71 3 Pasangan Bata 1:4 M² 3.60
72 4 Plesteran Dinding 1:4 M² 7.20
73 5 Acian Dinding M² 7.20
74
75 H. KAMAR UTAMA 03
76 H.1 Finishing Dinding Retak Kasar
77 1 Pembongkaran Dinding Bata M³ 1.04
78 2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 6.90
79 3 Pasangan Bata 1:4 M² 6.90
80 4 Plesteran Dinding 1:4 M² 13.80
81 5 Acian Dinding M² 13.80
82
83 I. KAMAR UTAMA 01
84 I.1 Finishing Dinding Retak Kasar
85 1 Pembongkaran Dinding Bata M² 0.81
86 2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 5.40
87 3 Pasangan Bata 1:4 M² 5.40
88 4 Plesteran Dinding 1:4 M² 10.80
89 5 Acian Dinding M² 10.80
90
91 I.2 Langit-langit / Plafon
92 1 Bongkaran Plafon M² 20.00
93 2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 20.00
94 3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 20.00
95 4 Cat Plafon M² 20.00
96 5 Bongkaran List Plafon M¹ 18.00
97 6 List Gypsum M¹ 18.00
98 7 Cat List Plafon M² 1.80
99
100 J. KAMAR UTAMA 02
101 J.1 Finishing Dinding Retak Kasar
102 1 Pembongkaran Dinding Bata M³ 1.17
103 3 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 7.80
104 2 Pasangan Bata 1:4 M² 7.80
105 3 Plesteran Dinding 1:4 M² 15.60
106 4 Acian Dinding M² 15.60
107
108 J.2 Langit-langit / Plafon
109 1 Bongkaran Plafon M² 20.00
110 2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 20.00
111 3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 20.00
112 4 Cat Plafon M² 20.00
113 5 Bongkaran List Plafon M¹ 18.00
114 6 List Gypsum M¹ 18.00
115 7 Cat List Plafon M² 1.80
116
117 K. SELASAR RUANGAN
118 K.1 Pemasangan Lantai Granite Tile / Keramik
119 1 Bongkaran Granite Tile / Keramik M² 20.00
120 2 Pembersihan lokasi Bongkaran Granite/Keramik M² 20.00
121 3 Galian Tanah Biasa M³ 3.60
122 4 Pemadatan tanah M² 20.00
123 5 Urugan Pasir M³ 0.60
124 6 Beton K 175 M³ 1.00
125 7 Beton K 225 M³ 2.00
126 8 Besi Polos Uk. dia 10 mm Kg 152.27
127 9 Pasang Lantai 400 x 400 mm M² 20.00
128
129
130 L. PENGECATAN GD. KAKATUA
131 L.1 Pengecatan
132 1 Cat Dinding Dalam M² 388.00
133 2 Cat Dinding Luar M² 1,557.70
134

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anut
Rehabilitasi Rumah Sakit Umum Anutapura Palu
Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT
NIP. 197305142001121003 Team Leader
16 17 18 19 20 21 22 23 24
LAPORAN MINGGU KE - 21 1
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
22 April 2019 S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-001 DIGANTI TIAP MIN

PROGRESS PRESENTASI
BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
% BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

1
2
3
0.0015 4
5
0.0007 - - Err:502 Err:502 Err:502 Err:502 Err:502 6
0.0004 - - Err:502 Err:502 Err:502 Err:502 Err:502 7
8
9
0.0003 - - Err:502 Err:502 Err:502 Err:502 Err:502 10
11
0.0111 12
13
0.0017 - - Err:502 Err:502 Err:502 Err:502 Err:502 14
0.0029 - - Err:502 Err:502 Err:502 Err:502 Err:502 15
0.0030 - - Err:502 Err:502 Err:502 Err:502 Err:502 16
0.0022 - - Err:502 Err:502 Err:502 Err:502 Err:502 17
0.0013 - - Err:502 Err:502 Err:502 Err:502 Err:502 18
19
0.0513 20
21
0.0008 - - Err:502 Err:502 Err:502 Err:502 Err:502 22
0.0005 - - Err:502 Err:502 Err:502 Err:502 Err:502 23
0.0054 - - Err:502 Err:502 Err:502 Err:502 Err:502 24
25
26
0.0101 - - Err:502 Err:502 Err:502 Err:502 Err:502 27
0.0016 - - Err:502 Err:502 Err:502 Err:502 Err:502 28
0.0180 - - Err:502 Err:502 Err:502 Err:502 Err:502 29
0.0092 - - Err:502 Err:502 Err:502 Err:502 Err:502 30
0.0056 - - Err:502 Err:502 Err:502 Err:502 Err:502 31
32
0.0429 33
34
0.0007 - - Err:502 Err:502 Err:502 Err:502 Err:502 35
0.0004 - - Err:502 Err:502 Err:502 Err:502 Err:502 36
0.0047 - - Err:502 Err:502 Err:502 Err:502 Err:502 37
38
39
0.0084 - - Err:502 Err:502 Err:502 Err:502 Err:502 40
0.0013 - - Err:502 Err:502 Err:502 Err:502 Err:502 41
0.0150 - - Err:502 Err:502 Err:502 Err:502 Err:502 42
0.0077 - - Err:502 Err:502 Err:502 Err:502 Err:502 43
0.0047 - - Err:502 Err:502 Err:502 Err:502 Err:502 44
45
0.0048 46
47
0.0006 - - Err:502 Err:502 Err:502 Err:502 Err:502 48
0.0004 - - Err:502 Err:502 Err:502 Err:502 Err:502 49
0.0039 - - Err:502 Err:502 Err:502 Err:502 Err:502 50
51
0.0048 52
53
0.0006 - - Err:502 Err:502 Err:502 Err:502 Err:502 54
0.0004 - - Err:502 Err:502 Err:502 Err:502 Err:502 55
0.0039 - - Err:502 Err:502 Err:502 Err:502 Err:502 56
57
0.0174 58
59
0.0003 - - Err:502 Err:502 Err:502 Err:502 Err:502 60
0.0002 - - Err:502 Err:502 Err:502 Err:502 Err:502 61
0.0019 - - Err:502 Err:502 Err:502 Err:502 Err:502 62
63
64
0.0014 - - Err:502 Err:502 Err:502 Err:502 Err:502 65
0.0008 - - Err:502 Err:502 Err:502 Err:502 Err:502 66
67
68
0.0025 - - Err:502 Err:502 Err:502 Err:502 Err:502 69
0.0004 - - Err:502 Err:502 Err:502 Err:502 Err:502 70
0.0045 - - Err:502 Err:502 Err:502 Err:502 Err:502 71
0.0033 - - Err:502 Err:502 Err:502 Err:502 Err:502 72
0.0020 - - Err:502 Err:502 Err:502 Err:502 Err:502 73
74
0.0244 75
76
0.0048 - - Err:502 Err:502 Err:502 Err:502 Err:502 77
0.0008 - - Err:502 Err:502 Err:502 Err:502 Err:502 78
0.0086 - - Err:502 Err:502 Err:502 Err:502 Err:502 79
0.0063 - - Err:502 Err:502 Err:502 Err:502 Err:502 80
0.0038 - - Err:502 Err:502 Err:502 Err:502 Err:502 81
82
0.0401 83
84
0.0038 - - Err:502 Err:502 Err:502 Err:502 Err:502 85
0.0006 - - Err:502 Err:502 Err:502 Err:502 Err:502 86
0.0068 - - Err:502 Err:502 Err:502 Err:502 Err:502 87
0.0049 - - Err:502 Err:502 Err:502 Err:502 Err:502 88
0.0030 - - Err:502 Err:502 Err:502 Err:502 Err:502 89
90
91
0.0034 - - Err:502 Err:502 Err:502 Err:502 Err:502 92
0.0022 - - Err:502 Err:502 Err:502 Err:502 Err:502 93
0.0077 - - Err:502 Err:502 Err:502 Err:502 Err:502 94
0.0033 - - Err:502 Err:502 Err:502 Err:502 Err:502 95
0.0015 - - Err:502 Err:502 Err:502 Err:502 Err:502 96
0.0027 - - Err:502 Err:502 Err:502 Err:502 Err:502 97
0.0003 - - Err:502 Err:502 Err:502 Err:502 Err:502 98
99
0.0486 100
101
0.0055 - - Err:502 Err:502 Err:502 Err:502 Err:502 102
0.0009 - - Err:502 Err:502 Err:502 Err:502 Err:502 103
0.0098 - - Err:502 Err:502 Err:502 Err:502 Err:502 104
0.0071 - - Err:502 Err:502 Err:502 Err:502 Err:502 105
0.0043 - - Err:502 Err:502 Err:502 Err:502 Err:502 106
107
108
0.0034 - - Err:502 Err:502 Err:502 Err:502 Err:502 109
0.0022 - - Err:502 Err:502 Err:502 Err:502 Err:502 110
0.0077 - - Err:502 Err:502 Err:502 Err:502 Err:502 111
0.0033 - - Err:502 Err:502 Err:502 Err:502 Err:502 112
0.0015 - - Err:502 Err:502 Err:502 Err:502 Err:502 113
0.0027 - - Err:502 Err:502 Err:502 Err:502 Err:502 114
0.0003 - - Err:502 Err:502 Err:502 Err:502 Err:502 115
116
0.0863 117
118
0.0036 - - Err:502 Err:502 Err:502 Err:502 Err:502 119
0.0022 - - Err:502 Err:502 Err:502 Err:502 Err:502 120
0.0019 - - Err:502 Err:502 Err:502 Err:502 Err:502 121
0.0095 - - Err:502 Err:502 Err:502 Err:502 Err:502 122
0.0009 - - Err:502 Err:502 Err:502 Err:502 Err:502 123
0.0091 - - Err:502 Err:502 Err:502 Err:502 Err:502 124
0.0192 - - Err:502 Err:502 Err:502 Err:502 Err:502 125
0.0156 - - Err:502 Err:502 Err:502 Err:502 Err:502 126
0.0242 - - Err:502 Err:502 Err:502 Err:502 Err:502 127
128
129
0.6357 130
131
0.1080 - - Err:502 Err:502 Err:502 Err:502 Err:502 132
0.5277 - - Err:502 Err:502 Err:502 Err:502 Err:502 133
134

0.9690 - Err:502 Err:502

Palu, 28 April 2019


Diajukan Oleh,
DRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
litasi Rumah Sakit Umum Anutapura Palu Departemen Gedung
ok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT
Project Manager
2 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
24
22

DIGANTI TIAP MINGGU

1 2 3 4 5
22-Apr-19 29-Apr-19 6-May-19 13-May-19 20-May-19
SD MG LALU SD SD SD SD SD SD MG INI BULAN INI
SISA 28-Apr-19 5-May-19 12-May-19 19-May-19 26-May-19

- - - -
- - - -
- - - -
- - - -
- - - -
(1.50) - - -
(1.50) - - -
- - - -
- - - -
(2.00) - - -
- - - -
- - - -
- - - -
(0.36) - - -
(26.00) - - -
(2.40) - - -
(4.80) - - -
(4.80) - - -
- - - -
- - - -
- - - -
(4.48) - - -
(4.48) - - -
(4.48) - - -
- - - -
- - - -
(2.16) - - -
(14.40) - - -
(14.40) - - -
(20.16) - - -
(20.16) - - -
- - - -
- - - -
- - - -
(3.84) - - -
(3.84) - - -
(3.84) - - -
- - - -
- - - -
(1.80) - - -
(12.00) - - -
(12.00) - - -
(16.80) - - -
(16.80) - - -
- - - -
- - - -
- - - -
(3.20) - - -
(3.20) - - -
(3.20) - - -
- - - -
- - - -
- - - -
(3.20) - - -
(3.20) - - -
(3.20) - - -
- - - -
- - - -
- - - -
(1.60) - - -
(1.60) - - -
(1.60) - - -
- - - -
- - - -
(2.90) - - -
(2.90) - - -
- - - -
- - - -
(0.54) - - -
(3.60) - - -
(3.60) - - -
(7.20) - - -
(7.20) - - -
- - - -
- - - -
- - - -
(1.04) - - -
(6.90) - - -
(6.90) - - -
(13.80) - - -
(13.80) - - -
- - - -
- - - -
- - - -
(0.81) - - -
(5.40) - - -
(5.40) - - -
(10.80) - - -
(10.80) - - -
- - - -
- - - -
(20.00) - - -
(20.00) - - -
(20.00) - - -
(20.00) - - -
(18.00) - - -
(18.00) - - -
(1.80) - - -
- - - -
- - - -
- - - -
(1.17) - - -
(7.80) - - -
(7.80) - - -
(15.60) - - -
(15.60) - - -
- - - -
- - - -
(20.00) - - -
(20.00) - - -
(20.00) - - -
(20.00) - - -
(18.00) - - -
(18.00) - - -
(1.80) - - -
- - - -
- - - -
- - - -
(20.00) - - -
(20.00) - - -
(3.60) - - -
(20.00) - - -
(0.60) - - -
(1.00) - - -
(2.00) - - -
(152.27) - - -
(20.00) - - -
- - - -
- - - -
- - - -
- - - -
(388.00) - - -
(1,557.70) - - -
- - - -
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH
KOTA PALU - S
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

ESTIMASI NILAI PEKERJAAN


No. (EX.PPN)
URAIAN PEKERJAAN
ITEM BOBOT
JUMLAH HARGA
(%)

12 GEDUNG PERAWATAN RUSUNAWA


BANGUNAN LUAR

A. SALURAN KELILING BANGUNAN


A.1 PERBAIKAN SALURAN 1,000,983.60 0.0066
A.2 RABAT BETON 11,724,365.00 0.0778
A.3 PERBAIKAN PAVING BLOCK KELILING BANGUNAN 14,660,292.24 0.0973

II RUANGAN PERAWATAN
A. KAMAR NO 41 538,147.20 0.0036
B. KAMAR NO 42 538,147.20 0.0036
C. SELASAR DEPAN KAMAR 42 987,228.00 0.0066
D. KAMAR NO 44 538,147.20 0.0036
E. KAMAR NO 49 1,042,894.28 0.0069
F. SELASAR DEPAN KAMAR 49 538,147.20 0.0036

TOTAL 31,568,351.92 0.2096


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (P
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sa
Rehabilitasi Rumah Sakit Umum Anutapura Palu
Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryan
NIP. 197305142001121003 Team Leader
REKAPITULASI
AN PROGRESS MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
SD 28 April 2019

Waktu Terpakai : 150


Waktu Tersisa : 125

PROGRESS PROGRESS PRESENTASI


S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%)

0.0066 - 0.0066 100.00


0.0778 - 0.0778 100.00
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

-
0.2111 0.2111 0.2111
-
0.0845 0.0845
(0.1266) - (0.1266) (0.1266)

Palu, 28 April 2019


periksa Oleh, Diajukan Oleh,
INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
habilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung
Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT
am Leader Project Manager
LAPORAN MINGGU
REHABILITASI RUMAH SAKIT UM
KOTA PALU
SULAWESI TENGA
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

12 GEDUNG PERAWATAN RUSUNAWA


I BANGUNAN LUAR
Lantai 1
A. SALURAN KELILING BANGUNAN
A.1 PERBAIKAN SALURAN 0.0066
1 Pembongkaran Dinding Bata M³ 0.27 0.0013
2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 1.80 0.0002
3 Galian Tanah Biasa M³ 0.54 0.0003
4 Pasangan Bata 1:4 M² 1.80 0.0023
5 Plesteran 1 : 4 M² 3.60 0.0016
6 Acian M² 3.60 0.0010
A.2 RABAT BETON 0.0778
1 Bongkaran Lantai Beton tanpa tulangan M³ 5.75 0.0085
2 Pembersihan lokasi Bongkaran Lantai Beton tanpa tulangan M² 57.50 0.0064
3 Urugan Pasir M³ 2.88 0.0045
4 Bekisting Rabat Beton M² 5.75 0.0061
5 Beton K 175 M³ 5.75 0.0524
A.3 PERBAIKAN PAVING BLOCK KELILING BANGUNAN 0.0973
1 Bongkaran Paving Block M² 19.80 0.0093
2 Urugan Pasir M³ 0.79 0.0012
3 Pasang Paving Block natural tebal 8 cm M² 19.80 0.0868

Lantai 3
II RUANGAN PERAWATAN
A. KAMAR NO 41 0.0036
A.1 Langit-langit / Plafon
1 Bongkaran Plafon M² 2.88 0.0005
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 2.88 0.0003
3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 2.88 0.0011
4 Cat Plafon M² 2.88 0.0005
5 Bongkaran List Plafon M¹ 4.80 0.0004
GD. Garuda 94
No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

6 List Gypsum M¹ 4.80 0.0007


7 Cat List Plafon M² 0.48 0.0001
B. KAMAR NO 42 0.0036
B.1 Langit-langit / Plafon
1 Bongkaran Plafon M² 2.88 0.0005
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 2.88 0.0003
3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 2.88 0.0011
4 Cat Plafon M² 2.88 0.0005
5 Bongkaran List Plafon M¹ 4.80 0.0004
6 List Gypsum M¹ 4.80 0.0007
7 Cat List Plafon M² 0.48 0.0001
C. SELASAR DEPAN KAMAR 42 0.0066
C.1 Langit-langit / Plafon
1 Bongkaran Plafon M² 5.76 0.0010
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 5.76 0.0006
3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 5.76 0.0022
4 Cat Plafon M² 5.76 0.0010
5 Bongkaran List Plafon M¹ 7.20 0.0006
6 List Gypsum M¹ 7.20 0.0011
7 Cat List Plafon M² 0.72 0.0001
D. KAMAR NO 44 0.0036
D.1 Langit-langit / Plafon
1 Bongkaran Plafon M² 2.88 0.0005
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 2.88 0.0003
3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 2.88 0.0011
4 Cat Plafon M² 2.88 0.0005
5 Bongkaran List Plafon M¹ 4.80 0.0004
6 List Gypsum M¹ 4.80 0.0007
7 Cat List Plafon M² 0.48 0.0001
E. KAMAR NO 49 0.0069
E.1 Langit-langit / Plafon
1 Bongkaran Plafon M² 6.24 0.0010
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 6.24 0.0007
3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 6.24 0.0024
4 Cat Plafon M² 6.24 0.0010
5 Bongkaran List Plafon M¹ 7.10 0.0006
6 List Gypsum M¹ 7.10 0.0011
7 Cat List Plafon M² 0.71 0.0001
F. SELASAR DEPAN KAMAR 49 0.0036
F.1 Langit-langit / Plafon
1 Bongkaran Plafon M² 2.88 0.0005
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 2.88 0.0003

GD. Garuda 94
No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

3 Gypsum board t= 9 mm (Diluar Rangka Hollow) M² 2.88 0.0011


4 Cat Plafon M² 2.88 0.0005
5 Bongkaran List Plafon M¹ 4.80 0.0004
6 List Gypsum M¹ 4.80 0.0007
7 Cat List Plafon M² 0.48 0.0001

0.2096

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutapu
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader

GD. Garuda 94
LAPORAN MINGGU KE - 21
LITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021

PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

0.0066 - 0.0066
0.27 0.0013 - 0.27 0.0013 100.00
1.80 0.0002 - 1.80 0.0002 100.00
0.54 0.0003 - 0.54 0.0003 100.00
1.80 0.0023 - 1.80 0.0023 100.00
3.60 0.0016 - 3.60 0.0016 100.00
3.60 0.0010 - 3.60 0.0010 100.00
0.0778 - 0.0778
5.75 0.0085 - - 5.75 0.0085 100.00
57.50 0.0064 - - 57.50 0.0064 100.00
2.88 0.0045 - - 2.88 0.0045 100.00
5.75 0.0061 - - 5.75 0.0061 100.00
5.75 0.0524 - - 5.75 0.0524 100.00
- - -
- - - - - - -
- - - - - - -
- - - - - - -

- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
GD. Garuda 94
PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -

GD. Garuda 94
PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

0.0845 - 0.0845

Palu, 28 April 2019


Diajukan Oleh,
PT. ADHI KARYA (PERSERO) Tbk
Rumah Sakit Umum Anutapura Palu Departemen Gedung

M. Ardany Afianto, ST. MT


Project Manager

GD. Garuda 94
REK
LAPORAN PROGRESS
REHABILITASI RUMAH
KOTA PALU -
PERIODE : Monday, April 22, 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

ESTIMASI NILAI PEKERJAAN


No. (EX.PPN)
URAIAN PEKERJAAN
ITEM BOBOT
JUMLAH HARGA
(%)

16 GEDUNG JENAZAH

A. PEMBONGKARAN DAN PEMASANGAN PLAFON BARU 20,314,542.10 0.1349


B. PEKERJAAN PASANGAN 1,472,467.10 0.0098
C. PEKERJAAN PINTU DAN JENDELA 4,532,707.15 0.0301
D. PEKERJAAN PENYELESAIAN 10,896,636.40 0.0723
E. PEKERJAAN PELINDUNG PANAS 695,790.40 0.0046
F. PENGECATAN 18,073,213.20 0.1200
G PEKERJAAN ELEKTRIKAL 315,600.00 0.0021

TOTAL 56,300,956.35 0.3738


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah S
Rehabilitasi Rumah Sakit Umum Anutapura Palu
Aksa H. Mardani, ST.MT Ir. Totok Dwi Kurya
NIP. 197305142001121003 Team Leader
REKAPITULASI
AN PROGRESS MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
SD Sunday, April 28, 2019

Waktu Terpakai : 150


Waktu Tersisa : 125

PROGRESS PROGRESS PRESENTASI


S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%)

0.1349 - 0.1349 100.00


0.0098 - 0.0098 100.00
0.0301 - 0.0301 100.00
0.0723 - 0.0723 100.00
0.0046 - 0.0046 100.00
0.1200 - 0.1200 100.00
0.0021 - 0.0021 100.00

- -
-
0.3738 0.3738 0.3738
-
0.3738 0.3738
- - - -

Palu, 28 April 2019


periksa Oleh, Diajukan Oleh,
INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
habilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung
Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT
am Leader Project Manager
LAPORAN MINGGU K
REHABILITASI RUMAH SAKIT UMUM
KOTA PALU
SULAWESI TENGAH
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

16 GEDUNG JENAZAH

A. PEMBONGKARAN DAN PEMASANGAN PLAFON BARU 0.1349


A.1 Langit-langit / Plafon
1 Bongkaran Plafon M² 110.88 0.0186
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 110.88 0.0123
3 Triplek t = 5 mm tanpa rangka hollow 40 x 40 mm M² 82.13 0.0377
4 Kalsium silikat board t = 3 mm (diluar Rangka hollow) M² 28.75 0.0111
5 Cat Plafon M² 133.65 0.0221
6 Bongkaran List Plafon M¹ 128.58 0.0104
7 List Kayu M¹ 128.58 0.0170
8 Cat List Plafon M² 15.42 0.0026
9 Rangka Plafon ( Rangka Kayu ) M² 4.20 0.0031
B. PEKERJAAN PASANGAN 0.0098
B.1 Finishing Dinding Retak Kasar ( R. Administrasi )
1 Pasangan Bata 1 : 4 M² 3.55 0.0044
2 Plesteran Dinding 1 : 4 M² 3.55 0.0016
3 Acian Dinding M² 3.55 0.0010

B.2 Finishing Dinding Retak Rambut


1 Plesteran Dinding 1 : 2 M² 3.21 0.0016
2 Acian Dinding M² 3.21 0.0009

B.3 Finishing Profil Teras Depan


1 Plesteran Dinding 1 : 2 M² 0.27 0.0001
2 Acian Dinding M² 0.37 0.0001
C. PEKERJAAN PINTU DAN JENDELA 0.0301
C.1 Bongkar Kusen dan Pintu
1 Bongkar Kusen dan Pintu Unit 1.00 0.0007

C.2 Pergantian Kaca Pecah


1 Uk. 0.625 x 1.420 M² 0.89 0.0015
2 Uk. 0.80 x 0.703 M² 1.12 0.0019

C.3 Pengecatan Pintu dan Jendela


1 Pengecatan Daun Pintu M² 35.20 0.0140
2 Pengecatan Kusen Jendela M² 7.65 0.0030
3 Pengecatan Kusen Jendela M² 22.38 0.0089
D. PEKERJAAN PENYELESAIAN 0.0723
D.1 Lantai Keramik Turun dan Pecah Ruang Administrasi
1 Bongkaran Keramik M² 17.03 0.0030
2 Pembersihan lokasi Bongkaran Granite/Keramik M² 17.03 0.0019
3 Pembongkaran Beton Tanpa Tulangan M³ 1.70 0.0025
4 Pembersihan lokasi pekerjaan Bongkaran M² 17.03 0.0019
5 Galian Tanah Biasa M³ 0.51 0.0003
6 Pemadatan tanah M² 17.03 0.0081
7 Urugan Pasir M³ 0.51 0.0008
8 Beton K 175 M³ 0.85 0.0078
9 Beton K 225 M³ 1.70 0.0163
10 Besi Polos Uk. dia 10 mm Kg 109.75 0.0113
11 Pasang Lantai 300 x 300 mm M² 17.03 0.0185
E. PEKERJAAN PELINDUNG PANAS 0.0046
E.1 Penutup Atap ,Talang Datar
1 Penutup Atap (Genteng Metal) M² 0.64 0.0010
2 Nok atap metal M¹ 1.20 0.0006
3 Lisplank kalsium silikat M¹ 6.00 0.0028
4 Pengecatan Lisplank M² 1.20 0.0002
F. PENGECATAN 0.1200
E.1 Pengecatan
1 Cat Dinding Dalam M² 247.14 0.0688
2 Cat Dinding Luar M² 151.10 0.0512
G PEKERJAAN ELEKTRIKAL 0.0021
G.1 Sistem Penerangan Selasar Lantai 1
1 Bohlam Lampu Ruang ( LED 12 W ) Bh 3.00 0.0021

0.3738

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutapu
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader
LAPORAN MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021

PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

0.1349 - 0.1349

110.88 0.0186 - 110.88 0.0186 100.00


110.88 0.0123 - 110.88 0.0123 100.00
82.13 0.0377 - 82.13 0.0377 100.00
28.75 0.0111 - 28.75 0.0111 100.00
133.65 0.0221 - 133.65 0.0221 100.00
128.58 0.0104 - 128.58 0.0104 100.00
128.58 0.0170 - 128.58 0.0170 100.00
15.42 0.0026 - 15.42 0.0026 100.00
4.20 0.0031 - 4.20 0.0031 100.00
0.0098 - 0.0098

3.55 0.0044 - - 3.55 0.0044 100.00


3.55 0.0016 - - 3.55 0.0016 100.00
3.55 0.0010 - - 3.55 0.0010 100.00

3.21 0.0016 - - 3.21 0.0016 100.00


3.21 0.0009 - - 3.21 0.0009 100.00

0.27 0.0001 - - 0.27 0.0001 100.00


0.37 0.0001 - - 0.37 0.0001 100.00
0.0301 - 0.0301
1.00 0.0007 - - 1.00 0.0007 100.00

0.89 0.0015 - - 0.89 0.0015 100.00


1.12 0.0019 - - 1.12 0.0019 100.00

35.20 0.0140 - - 35.20 0.0140 100.00


7.65 0.0030 - - 7.65 0.0030 100.00
22.38 0.0089 - - 22.38 0.0089 100.00
0.0723 - 0.0723

17.03 0.0030 - 17.03 0.0030 100.00


17.03 0.0019 - 17.03 0.0019 100.00
1.70 0.0025 - 1.70 0.0025 100.00
17.03 0.0019 - 17.03 0.0019 100.00
0.51 0.0003 - 0.51 0.0003 100.00
17.03 0.0081 - 17.03 0.0081 100.00
0.51 0.0008 - 0.51 0.0008 100.00
0.85 0.0078 - 0.85 0.0078 100.00
1.70 0.0163 - 1.70 0.0163 100.00
109.75 0.0113 - 109.75 0.0113 100.00
17.03 0.0185 - 17.03 0.0185 100.00
0.0046 - 0.0046

0.64 0.0010 - - 0.64 0.0010 100.00


1.20 0.0006 - - 1.20 0.0006 100.00
6.00 0.0028 - - 6.00 0.0028 100.00
1.20 0.0002 - - 1.20 0.0002 100.00
0.1200 - 0.1200

247.14 0.0688 - - 247.14 0.0688 100.00


151.10 0.0512 - - 151.10 0.0512 100.00
0.0021 - 0.0021

3.00 0.0021 - - 3.00 0.0021 100.00

0.3738 - 0.3738

Palu, 28 April 2019


Diajukan Oleh,
DRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
litasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

M. Ardany Afianto, ST. MT


Project Manager
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH
KOTA PALU - S
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

ESTIMASI NILAI PEKERJAAN


No. (EX.PPN)
URAIAN PEKERJAAN
ITEM BOBOT
JUMLAH HARGA
(%)

27 GEDUNG GENSET

A. PINTU BELAKANG 1,367,393.40 0.0091


B. PENGECATAN 10,698,911.40 0.0710

TOTAL 12,066,304.80 0.0801


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (P
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sa
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryan


NIP. 197305142001121003 Team Leader
REKAPITULASI
AN PROGRESS MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
SD 28 April 2019

Waktu Terpakai : 150


Waktu Tersisa : 125

PROGRESS PROGRESS PRESENTASI


S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%)

0.0091 - 0.0091 100.00


0.0426 0.0128 0.0554 78.00

-
0.0801 0.0801 0.0801
0.0128
0.0517 0.0645
(0.0284) 0.0128 (0.0156) (0.0156)

Palu, 28 April 2019


periksa Oleh, Diajukan Oleh,
INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
habilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


am Leader Project Manager
LAPORAN MINGGU
REHABILITASI RUMAH SAKIT UM
KOTA PALU
SULAWESI TENGA
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

27 GEDUNG GENSET

A. PINTU BELAKANG 0.0091


A.1 Finishing Dinding Retak Kasar
1 Pembongkaran Dinding Bata M³ 0.12 0.0006
2 Pembersihan lokasi pekerjaan Bongkaran Batu Bata M² 0.80 0.0001
3 Pasangan Bata 1:4 M² 0.80 0.0010
4 Plesteran Dinding 1:4 M² 1.60 0.0007
5 Acian Dinding M² 1.60 0.0004
6 Balok Praktis M¹ 2.00 0.0017
A.2 Langit-langit / Plafon
1 Bongkaran Plafon M² 3.00 0.0005
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 3.00 0.0003
3 Plafon Triplek t = 5 mm tanpa rangka hollow 40 x 40 mm M² 3.00 0.0014
4 Cat Plafon M² 3.00 0.0005
A.3 Langit-langit / Plafon
1 Bongkaran Plafon M² 2.00 0.0003
2 Pembersihan lokasi pekerjaan Bongkaran Plafon M² 2.00 0.0002
3 Plafon Triplek t = 5 mm tanpa rangka hollow 40 x 40 mm M² 2.00 0.0009
4 Cat Plafon M² 2.00 0.0003
B. PENGECATAN 0.0710
1 Cat Dinding Bagian Luar M² 135.31 0.0458
2 Cat Plafon M² 152.31 0.0252

0.0801

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)

GD. Garuda 94
No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutapu
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader

GD. Garuda 94
LAPORAN MINGGU KE - 21
LITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021

PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

0.0091 - 0.0091

0.12 0.0006 - 0.12 0.0006 100.00


0.80 0.0001 - 0.80 0.0001 100.00
0.80 0.0010 - 0.80 0.0010 100.00
1.60 0.0007 - 1.60 0.0007 100.00
1.60 0.0004 - 1.60 0.0004 100.00
2.00 0.0017 - 2.00 0.0017 100.00

3.00 0.0005 - - 3.00 0.0005 100.00


3.00 0.0003 - - 3.00 0.0003 100.00
3.00 0.0014 - - 3.00 0.0014 100.00
3.00 0.0005 - - 3.00 0.0005 100.00

2.00 0.0003 - - 2.00 0.0003 100.00


2.00 0.0002 - - 2.00 0.0002 100.00
2.00 0.0009 - - 2.00 0.0009 100.00
2.00 0.0003 - - 2.00 0.0003 100.00
0.0426 0.0128 0.0554
81.19 0.0275 24.36 0.0083 105.54 0.0358 78.00
91.39 0.0151 27.42 0.0045 118.80 0.0196 78.00

0.0517 0.0128 0.0645

Palu, 28 April 2019


Diajukan Oleh,
PT. ADHI KARYA (PERSERO) Tbk

GD. Garuda 94
PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

Rumah Sakit Umum Anutapura Palu Departemen Gedung

M. Ardany Afianto, ST. MT


Project Manager

GD. Garuda 94
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH
KOTA PALU - S
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

ESTIMASI NILAI PEKERJAAN


No. (EX.PPN)
URAIAN PEKERJAAN
ITEM BOBOT
JUMLAH HARGA
(%)

33 GEDUNG UPS

A GEDUNG BAGIAN DALAM 29,142.50 0.0002


B PENGECATAN 4,611,747.00 0.0306

TOTAL 4,640,889.50 0.0308


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (P
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sa
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryan


NIP. 197305142001121003 Team Leader
REKAPITULASI
AN PROGRESS MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
SD 28 April 2019

Waktu Terpakai : 150


Waktu Tersisa : 125

PROGRESS PROGRESS PRESENTASI


S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%)

0.0002 - 0.0002 100.00


0.0306 - 0.0306 100.00

-
0.0308 0.0308 0.0308
-
0.0308 0.0308
- - - -

Palu, 28 April 2019


periksa Oleh, Diajukan Oleh,
INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
habilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


am Leader Project Manager
LAPORAN MINGGU
REHABILITASI RUMAH SAKIT UM
KOTA PALU
SULAWESI TENGA
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No. BOBOT
URAIAN PEKERJAAN SAT VOLUME
ITEM %

33 GEDUNG UPS

A GEDUNG BAGIAN DALAM 0.0002


A.1 Finishing Dinding Retak Rambut
1 Plesteran Dinding 1 : 2 M² 0.25 0.0001
2 Acian Dinding M² 0.25 0.0001

B PENGECATAN 0.0306
1 Cat Dinding Dalam M² 43.89 0.0122
2 Cat Dinding Luar M² 54.31 0.0184

0.0308

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutapu
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader

GD. Garuda 94
LAPORAN MINGGU KE - 21
LITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021

PROGRESS PRESENTASI
S/D MINGGU LALU MINGGU INI S/D MINGGU INI PROGRESS
BOBOT BOBOT BOBOT PEKERJAAN
VOLUME VOLUME VOLUME
(%) (%) (%) (%)

0.0002 - 0.0002

0.25 0.0001 - - 0.25 0.0001 100.00


0.25 0.0001 - - 0.25 0.0001 100.00

0.0306 - 0.0306
43.89 0.0122 - - 43.89 0.0122 100.00
54.31 0.0184 - - 54.31 0.0184 100.00

0.0308 - 0.0308

Palu, 28 April 2019


Diajukan Oleh,
PT. ADHI KARYA (PERSERO) Tbk
Rumah Sakit Umum Anutapura Palu Departemen Gedung

M. Ardany Afianto, ST. MT


Project Manager

GD. Garuda 94
REKA
LAPORAN PROGRESS M
REHABILITASI RUMAH
KOTA PALU - S
PERIODE : 22 April 2019

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

ESTIMASI NILAI PEKERJAAN


No. (EX.PPN)
URAIAN PEKERJAAN
ITEM BOBOT
JUMLAH HARGA
(%)

28 GEDUNG WORKSHOP

Lantai 2

A. RUANG ALAT & BAHAN 91,337.40 0.0006

B. FINISHING DINDING 52,456.50 0.0003

C. PENGECATAN 28,079,248.30 0.1864

TOTAL 28,223,042.20 0.1874


Rencana Progress Minggu Ini
Kumulatif Rencana Progress s/d Minggu Ini
Realisasi Progress Minggu ini
Kumulatif Realisasi Progress s/d Minggu Ini
Deviasi

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (P
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sa
Rehabilitasi Rumah Sakit Umum Anutapura Palu

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryan


NIP. 197305142001121003 Team Leader
REKAPITULASI
AN PROGRESS MINGGU KE - 21
ILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU - SULAWESI TENGAH
SD 28 April 2019

Waktu Terpakai : 150


Waktu Tersisa : 125

PROGRESS PROGRESS PRESENTASI


S/D MINGGU LALU MINGGU INI S/D MINGGU INI RENCANA S/D DEVIASI PROGRESS
BOBOT BOBOT BOBOT MINGGU INI (%) PEKERJAAN
(%) (%) (%) (%) (%)

0.0006 - 0.0006 100.00

0.0003 - 0.0003 100.00

0.1083 0.0408 0.1491 80.00

0.0839
0.0675 0.1514 0.1514
0.0408
0.1093 0.1501
0.0418 (0.0431) (0.0013) (0.0013)

Palu, 28 April 2019


periksa Oleh, Diajukan Oleh,
INDRA KARYA (PERSERO) PT. ADHI KARYA (PERSERO) Tbk
habilitasi Rumah Sakit Umum Anutapura Palu Departemen Gedung

Totok Dwi Kuryanto, MT M. Ardany Afianto, ST. MT


am Leader Project Manager
REHABILITASI RU

S
PERIODE : 22 April 201

PROYEK : REHABILITASI RUMAH SAKIT UMUM ANUTAPURA


LOKASI KEGIATAN : KOTA PALU - SULAWESI TENGAH
NO. KONTRAK : HK.02.03-Sj/Satgas.PB/SPMK.S/026
TGL. KONTRAK : 30 NOVEMBER 2018
NILAI KONTRAK ( EX. PPN ) : Rp 15,062,367,416.77

No. HARGA SATUAN


URAIAN PEKERJAAN SAT VOLUME
ITEM Rp

28 GEDUNG WORKSHOP

Lantai 2

A. RUANG ALAT & BAHAN


A.1 Pemasangan Kaca Jendela (Kaca Pecah)
1 Kaca Jendela tebal 5 mm M² 0.36 253,715.00

B. FINISHING DINDING
B.1 Finishing Dinding Retak Rambut
1 Plesteran Dinding 1 : 2 M² 0.45 74,750.00
2 Acian Dinding M² 0.45 41,820.00

C. PENGECATAN
1 Cat Dinding Dalam M² 278.89 41,930.00
2 Cat Dinding Luar M² 303.73 51,030.00
3 Cat Plafon M² 35.57 24,910.00

Disetjui Oleh, Diperiksa Oleh,


Koordinator Rehabilitasi Rekonstruksi PT. INDRA KARYA (PERSERO)
Bangunan Gedung Wilayah Sulawesi Tengah Rehabilitasi Rumah Sakit Umum Anutapura
Rehabilitasi Rumah Sakit Umum Anutapura Palu

GD. Garuda 94
No. HARGA SATUAN
URAIAN PEKERJAAN SAT VOLUME
ITEM Rp

Aksa H. Mardani, ST.MT Ir. Totok Dwi Kuryanto, MT


NIP. 197305142001121003 Team Leader

GD. Garuda 94
LAPORAN MINGGU KE - 21
HABILITASI RUMAH SAKIT UMUM ANUTAPURA
KOTA PALU
SULAWESI TENGAH
22 April 2019 S/D 28 April 2019

NO. LAPORAN : AK-RSAP-LM-021

PROGRESS
JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
Rp % BOBOT BOBOT BOBOT
VOLUME VOLUME VOLUME
(%) (%) (%)

91,337.40 0.0006 0.0006 - 0.0006

91,337.40 0.0006 0.36 0.0006 - - 0.36 0.0006

52,456.50 0.0003 0.0003 - 0.0003

33,637.50 0.0002 0.45 0.0002 - - 0.45 0.0002


18,819.00 0.0001 0.45 0.0001 - - 0.45 0.0001

28,079,248.30 0.1864 0.1083 0.0408 0.1491


11,693,857.70 0.0776 167.33 0.0466 55.79 0.0155 223.12 0.0621
15,499,341.90 0.1029 182.24 0.0617 60.76 0.0206 243.00 0.0823
886,048.70 0.0059 - - 28.46 0.0047 28.46 0.0047

28,223,042.20 0.1874 0.1093 0.0408 0.1501

Palu, 28 April 2019


Diajukan Oleh,
PT. ADHI KARYA (PERSERO) Tbk
um Anutapura Palu Departemen Gedung

GD. Garuda 94
PROGRESS
JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI
Rp % BOBOT BOBOT BOBOT
VOLUME VOLUME VOLUME
(%) (%) (%)

M. Ardany Afianto, ST. MT


Project Manager

GD. Garuda 94
NO. LAPORAN : AK-RSAP-LM-021

PRESENTASI
PROGRESS
PEKERJAAN
(%)

100.00

100.00
100.00

80.00
80.00
80.00

GD. Garuda 94