Tugas Modul Lab. Penganggaran
Jawab:
Tabel 1
PT POLITEK
FORECAST PENJUALAN TAHUN 2018
Tahun/n X Y XY X2
2011/1 0 235.000 - 0
2012/2 1 240.000 240.000 1
2013/3 2 275.000 550.000 4
2014/4 3 280.000 840.000 9
2015/5 4 250.000 1.000.000 16
2016/6 5 275.000 1.375.000 25
2017/7 6 300.000 1.800.000 36
2018/8 7 299.286 2.095.002 49
∑ 28 2.154.286 7.900.002 140
Perhitungan:
b = (n.∑XY - ∑X.∑Y)/(n.∑X²-(∑X)²)
b = (7x5805000 - 21x1855000)/(7x91-(21)²)
b = 8571,428571
a = (∑Y - b.∑X)/n
a = (1855000 - 8571,428571x21)/7 Y = a + bX
a = 239285,7143
Y = 239285,7143 + 8571,428571X
Perhitungan:
Rencana penjualan 299.286 → Anggaran produksi untuk tiap triwulan: 298.736/4 =
(+) Persediaan akhir 1.800 = 74.684 meter
Total produk tersedia 301.086
(-) Persediaan awal 2.350
Total produksi 298.736
Teraso
Rencana penjualan 59.857 → Produksi tiap triwulan: 59.457/4 = 14.864 meter
(+) Persediaan akhir 600
Total produk tersedia 60.457
(-) Persediaan awal 1.000
Total produksi 59.457
Polos
Rencana penjualan 149.643 → Produksi tiap triwulan: 149.343/4 = 37.336 meter
(+) Persediaan akhir 450
Total produk tersedia 150.093
(-) Persediaan awal 750
Total produksi 149.343
Warna
Rencana penjualan 89.786 → Produksi tiap triwulan: 89.936/4 = 22.484 meter
(+) Persediaan akhir 750
Total produk tersedia 90.536
(-) Persediaan awal 600
Total produksi 89.936
TABEL 4.1
PT POLITEK
ANGGARAN KEBUTUHAN BAHAN BAKU TAHUN 2018
PERIOD PRODUKS MILL SEMEN PC PASIR TERASO SEMEN CP
E JENIS I SP JUMLAH SP JUMLAH SP JUMLAH SP JUMLAH SP JUMLAH
TRIWULAN I
3, 52.02 1 148.6
Teraso 14.864 29.729 29.729 7.432
2 5 5 0 43 2 1
298.68 1 373.3
Polos 37.336 - - 8 - -
6 0 58 - -
112.42 1 224.8
Warna 22.484 - - 5 - 67.452
0 0 40 - 3
463.13 746.8
Sub Total 74.684 29.729 29.729 74.884
1 40
TRIWULAN II
3, 52.02 1 148.6
Teraso 14.864 29.729 29.729 7.432
2 5 5 0 43 2 1
298.68 1 373.3
Polos 37.336 - - 8 - -
6 0 58 - -
112.42 1 224.8
Warna 22.484 - - 5 - 67.452
0 0 40 - 3
463.13 746.8
Sub Total 74.684 29.729 29.729 74.884
1 40
TRIWULAN III
3, 52.02 1 148.6
Teraso 14.864 29.729 29.729 7.432
2 5 5 0 43 2 1
298.68 1 373.3
Polos 37.336 - - 8 - -
6 0 58 - -
112.42 1 224.8
Warna 22.484 - - 5 - 67.452
0 0 40 - 3
463.13 746.8
Sub Total 74.684 29.729 29.729 74.884
1 40
TRIWULAN IV
3, 52.02 1 148.6
Teraso 14.864 29.729 29.729 7.432
2 5 5 0 43 2 1
298.68 1 373.3
Polos 37.336 - - 8 - -
6 0 58 - -
112.42 1 224.8
Warna 22.484 - - 5 - 67.452
0 0 40 - 3
463.13 746.8
Sub Total 74.684 29.729 29.729 74.884
1 40
1.852.52 2.987.3
TOTAL 298.736 118.914 118.914 299.536
3 60
Tabel 4.2
PT POLITEK
ANGGARAN KEBUTUHAN BAHAN PENOLONG (VERP)
PERIODE PRODUKSI SP JUMLAH
TRIWULAN I 22.484 0,0625 1.405,25
TRIWULAN II 22.484 0,0625 1.405,25
TRIWULAN III 22.484 0,0625 1.405,25
TRIWULAN IV 22.484 0,0625 1.405,25
TOTAL 5.621
Tabel 4.3
PT POLITEK
ANGGARAN PEMBELIAN BAHAN TAHUN 2018
PEMBELIAN
PERIODE KEBUTUHA PERSEDIAA PERSEDIAA
JUMLAH HARGA/K
JENIS N N AKHIR N AWAL KG RP
G
TRIWULAN I
5.00
Mill 29.729 46.320 76.049 71.049 Rp 150 Rp 10.657.296
0
3.98
Semen PC 463.131 650.756 1.113.886 1.109.905 Rp 250 Rp 277.476.330
1
15.00
Pasir 746.840 764.340 1.511.180 1.496.180 Rp 10 Rp 14.961.800
0
3.00
Teraso 29.729 43.420 73.149 70.149 Rp 200 Rp 14.029.728
0
90
Semen CP 74.884 105.918 180.802 179.902 Rp 500 Rp 89.950.800
0
1
Verp 1.405 4.231 5.636 5.626 Rp 3.000 Rp 16.877.963
0
27.89
Sub Total 1.345.717 1.614.984 2.960.701 2.932.810 Rp 4.110 Rp 423.953.917
1
TRIWULAN II
46.32
Mill 29.729 52.116 81.844 35.524 Rp 150 Rp 5.328.648
0
650.75
Semen PC 463.131 742.577 1.205.708 554.953 Rp 250 Rp 138.738.165
6
764.34
Pasir 746.840 915.208 1.662.048 897.708 Rp 10 Rp 8.977.080
0
43.42
Teraso 29.729 48.766 78.494 35.074 Rp 200 Rp 7.014.864
0
105.91
Semen CP 74.884 120.984 195.868 89.951 Rp 500 Rp 44.975.400
8
4.23
Verp 1.405 2.825 4.231 - Rp 3.000 Rp -
1
1.614.98
Sub Total 1.345.717 1.882.477 3.228.194 1.613.210 Rp 4.110 Rp 205.034.157
4
TRIWULAN III
52.11
Mill 29.729 34.229 63.957 11.841 Rp 150 Rp 1.776.216
6
742.57
Semen PC 463.131 464.431 927.562 184.984 Rp 250 Rp 46.246.055
7
915.20
Pasir 746.840 766.840 1.513.680 598.472 Rp 10 Rp 5.984.720
8
48.76
Teraso 29.729 30.729 60.457 11.691 Rp 200 Rp 2.338.288
6
120.98
Semen CP 74.884 76.084 150.968 29.984 Rp 500 Rp 14.991.800
4
2.82
Verp 1.405 1.420 2.825 - Rp 3.000 Rp -
5
1.882.47
Sub Total 1.345.717 1.373.732 2.719.449 836.973 Rp 4.110 Rp 71.337.079
7
TRIWULAN IV
34.22
Mill 29.729 4.500 34.229 - Rp 150 Rp -
9
464.43
Semen PC 463.131 1.300 464.431 - Rp 250 Rp -
1
766.84
Pasir 746.840 20.000 766.840 - Rp 10 Rp -
0
30.72
Teraso 29.729 1.000 30.729 - Rp 200 Rp -
9
76.08
Semen CP 74.884 1.200 76.084 - Rp 500 Rp -
4
1.42
Verp 1.405 15 1.420 - Rp 3.000 Rp -
0
1.373.73
Sub Total 1.345.717 28.015 1.373.732 - Rp 4.110 Rp -
2
4.899.08
TOTAL 5.382.869 4.899.208 10.282.077 5.382.993 16.440 700.325.153
4
Perhitungan:
Mill Semen PC
Kebutuhan material 118.914 Kebutuhan material 1.852.523
(+) Persediaan akhir 4.500 (+) Persediaan akhir 1.300
Total tersedia 123.414 Total tersedia 1.853.823
(-) Persediaan awal 5.000 (-) Persediaan awal 3.981
Pembelian material 118.414 Pembelian material 1.849.842
Pembelian material (PT Apit) Pembelian material (Supplier PT Apit)
Pembayaran I (60%) 71.049 Pembayaran I (60%) 1.109.905
Pembayaran II (30%) 35.524 Pembayaran II (30%) 554.953
Pembayaran III (10%) 11.841 Pembayaran III (10%) 184.984
118.414 1.849.842