1 2 3 4 5 6 7
0800 - 0900
0900 - 1000
1000 - 1100
SHIFT 1

1100 - 1200
1200 - 1300
1300 - 1400
1400 - 1500
1500 - 1600
1600 - 1700
1700 - 1800
1800 - 1900
SHIFT 2

1900 - 2000
2000 - 2100
2100 - 2200
2200 - 2300
2300 - 0000
0000 - 0100
0100 - 0200
0200 - 0300
SHIFT 3

0300 - 0400
0400 - 0500
0500 - 0600
0600 - 0700
0700 - 0800

Total Jam Kerja 24 24 24 24 24 23


Kerusakan Mesin 2 1 5 5 14 10
Mati Lampu / Spanning
Buruh Packing / Palet Habis 3 9 4
Wheel Loader
Forklift
Batu Habis
Kondisi Lancar (Jm) 22 20 10 19 10 9
Kondisi Lancar (%) 92% 83% 42% 79% 42% 39%
HM Mesin Jalan (Jm) S.1 8.90 5.29 4.17 4.73 1.67 1.96
HM Mesin Jalan (Jm) S.2 0.00 0.00 0.00 0.00 0.00 0.00
HM Mesin Jalan (Jm) S.3 11.41 11.75 3.71 11.74 7.03 5.75
HM Mesin Jalan (%) 85% 71% 33% 69% 36% 34%

Mesh 1250
Mesh 800
Mesh 400
1
Mesh 325
Mesh 200 77 6 48 11
Lain - Lain 2 70 44 2
Mesh 1250
Mesh 800
Mesh 400
2
Mesh 325
Mesh 200 18 47 24 40 20
Lain - Lain 66.00 30.00 92.00
Mesh 1250
Mesh 800
Mesh 400
3
Mesh 325
Mesh 200 40 30 40
Lain - Lain 80 42
Total Mesh 200 95.00 87.00 30.00 78.00 91.00 20.00
Total Lain Lain 148.00 100.00 0.00 178.00 2.00 0.00
Total 243.00 187.00 30.00 256.00 93.00 20.00

TANGGAL
3/1/2021 Shift 1 {08.00} Cek mesin dan ganti bucket 1 pcs. {08.50} Start produksi. Giling F23 Ju
3/2/2021 Shift 1 {08.00} Cek mesin, {08.35} Start produksi. Giling F8 paletan. {12.50} Silo penuh
3/3/2021 Shift 1 {08.00} Cek mesin dan perbaikan body grinding mill bucket. {10.00} Start prod
3/4/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih di bawah fider hopper sambil nunggu silo
3/5/2021 Shift
Shift 1
1 {08.00} Cek mesin
Tidak packing. dan Cek
{08.00} gantimesin
dingding
dan body bucket
perbaikan sambil
mesin nunggu
roller batumill
grinding daridan
ta
3/6/2021 penuh.
3/7/2021
3/8/2021 Shift 1 {08.00} Cek mesin dan ganti bucket 2 pcs. {09.25} Start produksi, Giling F23 ju
3/9/2021 Shift
Shift 1
1 {08.00}
{08.00} Cek
Cek mesin, {08.30}
mesin dan Start produksi,
pengelasan dindingGiling
bucket F23 jumbo.dan
elevator Shift 2 Mekanik Lp
penggantian
3/10/2021 produksi, {21.15} PLN padam kembali. {21.46} Lanjut start kembali. {23.13} PLN pada
3/11/2021 Shift 1 Libur packing. {08.00} Cek mesin dan penambalan dinding bucket elevator. {0
3/12/2021 Shift
Shift 1
1 {08.00} Cek mesin,
Tidak packing, {08.35}
Gudang Start{08.00}
penuh. produksi.
Cek Giling
mesinmesh 200 jumbo.
dan nguras {16.42}
di bawah Off
bucket
3/13/2021 jumbo. {00.00} Ganti giling F23 paletan. {05.50} Silo penuh.
3/14/2021
3/15/2021 Shift
Shift 1
1 {08.00}
{08.00} Cek
Cek mesin, {08.50}
mesin dan Start produksi,
bersih-bersih Giling
di bawah F23 jumbo.
hopper. {15.40}
{08.50} Start Bucket m
produksi
3/16/2021 {07.18} Silo penuh kembali.
3/17/2021 Shift 1 {08.00} Cek mesin dan ganti bucket 1 pcs. {09.20} Start produksi giling F23 Jum
Shift 1 {08.00} Cek mesin dan perbaikan dinding bucket elevator. {09.50} Start produ
3/18/2021 Lanjut produksi ganti giling F8 Polos.
3/19/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih area mesin sambil nunggu silo F0 kosong
3/20/2021 Shift 1 {08.00} Cek mesin dan ganti bucket 2 pcs. {09.00} Start produksi. Giling F8 pal
3/21/2021
3/22/2021 Shift 1 Tidak Produksi, Masih perbaikan Grinding mill. Shift 2 Tidak Produksi, Masih p
3/23/2021 Shift 1 Tidak Produksi, Masih perbaikan Grinding mill. Shift 2 Tidak Produksi, Masih p
3/24/2021 Shift 1 Tidak Produksi, Masih perbaikan Grinding mill. Shift 2 Tidak Produksi, Masih p
3/25/2021 Shift 1 Tidak Produksi, Masih perbaikan Grinding mill. Shift 2 Tidak Produksi, Masih p
3/26/2021 Shift 1 Tidak Produksi, Masih perbaikan Grinding mill. Shift 2 Mekanik Longshift. Shift
3/27/2021 Shift 1 {08.00} Cek mesin dan pengencangan baut body grinding mill. {09.25} Start pr
3/28/2021 Shift 1 {08.00} Cek mesin dan pengelasan body grindong mill dan perbaikan compaye
3/29/2021 Shift
Shift 1
1 {08.00}
{08.00} Cek
Cek mesin. {08.40}
mesin dan gantiStart produksi,
bucket Giling F23
1 pcs. {08.45} jumbo.
Start {13.00}
produksi. Off.F8
Giling (13.2
pal
3/30/2021 {05.30} Silo penuh.
Shift 1 Tidak packing. {08.00} Cek mesin, {08.45} Start produksi. Giling F23 jumbo. {1
3/31/2021 Giling F23 jumbo. {00.35} Off, Loader rusak sedang dalam perbaikan. {01.45} Lanjut
LAPORAN DOWNTIME PABRIK (Maret 2021 )
Mesin MTW (Mesin Lama)
Mati Lampu / Spanning Buruh Packing / Palet Habis / Silo Penuh Wheel Loader
8 9 10 11 12 13 14 15 16 17

JAM ISTIRAHAT

JAM ISTIRAHAT

JAM ISTIRAHAT

24 24 24 24 24 23 24 24 24
3 2 3 2 2 9 3 4 2
3 1
1 4

3
21 19 18 21 22 13 21 16 22
88% 79% 75% 88% 92% 57% 88% 67% 92%
8.35 7.50 6.49 4.13 8.57 1.36 6.85 6.03 7.22
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.90 8.67 9.01 0.00 10.80 9.31 11.79 8.45 12.12
80% 67% 65% 17% 81% 46% 78% 60% 81%

64 62 35 70 70 7 41
2.0 4 34

30 63 40 55 49 50 86 59
16.00 16.00

62 43 58 62 60 5 55
2 2 2 82
156.00 168.00 133.00 0.00 187.00 49.00 180.00 98.00 155.00
4.00 6.00 0.00 0.00 2.00 0.00 0.00 98.00 50.00
160.00 174.00 133.00 0.00 189.00 49.00 180.00 196.00 205.00

KETERANGAN
t produksi. Giling F23 Jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {19.50} Start produksi. Giling F8 paletan.
etan. {12.50} Silo penuh. {16.30} Ganti giling F23 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {19.15} Start prod
ucket. {10.00} Start produksi, Giling F23 paletan. {15.30} Silo penuh. Shift Mekanik Longshift. Shift 3 {19.00} Cek mesin dan ngur
pper sambil nunggu silo berkurang. {11.30} Start produksi giling F0 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin.
mbil nunggu
roller batumill
grinding daridan
tambang. {16.15}
jaw cruser, danStart produksi.bearing
penggantian Giling F23 jumbo.
roller Shift {16.00}
convayer. 2 Mekanik Longshift.
Start produksi.Shift 3 {19.00}
Giling Cek mesin.
F23 Jumbo. Shift 2{2
M

t produksi, Giling F23 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin dan pengelasan body dinding bucket. {20.30}
mbo.dan
ator Shift 2 Mekanik Longshift.
penggantian panbelt jaw Shift 3 {19.00}
cruser. CekStart
{10.15} mesin, {19.40}Giling
produksi, Start F23
produksi,
jumbo.Giling F23Off,
{12.00} jumbo. {04.50}
{13.00} OFF,
Lanjut Batu habis.
produksi. Shift 2 M
mbali. {23.13} PLN padam kembali. {00.15} Produksi kembali.
ding bucket elevator. {09.30} Start produksi, Giling F23 jumbo. {12.00} Off. {13.00} PLN Padam. {14.00} Hidup kembali. Lanjut pr
200 jumbo.
nguras {16.42}
di bawah Off, elevator.
bucket convayerPerbaikan
atas macet. Shift 2bucket
dingding Mekanik Longshift.
elevator. Shift Start
{16.30} 3 Produksi lancar
produksi, . Giling
Giling F23 mesh
jumbo.200 jumbo.
Shift 2 Mekanik

mbo. {15.40}
{08.50} Start Bucket macet
produksi gilingdan ubolt putus
F8 paletan. 1 danSilo
{16.00} ganti uboltShift
penuh. 1 pcs. {16.40} Lanjut
2 Mekanik produksi.
Longshift. Shift 3Giling F23Cek
{19.00} jumbo. Shift
mesin dan2 ganti
Mekanik
buc

t produksi giling F23 Jumbo. Shift 2 Mekanik Longhshift. Shift 3 {19.00} Cek mesin, {19.25} Start produksi. Giling F23 jumbo.
tor. {09.50} Start produksi giling F0 Jumbo. {16.40} Silo penuh. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin {19.30} Star

l nunggu silo F0 kosong. {09.30} Start produksi, Giling F8 paletan. {12.30} Off, batu kosong. {13.00} Lanjut produksi. Shift 2 Mek
t produksi. Giling F8 paletan. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {20.00} Start produksi, Giling mesh 200 Jumbo

Tidak Produksi, Masih perbaikan Grinding mill. Mekanik longshift. Shift 3 Tidak Produksi, Masih perbaikan Grinding mill.
Tidak Produksi, Masih perbaikan Grinding mill. Mekanik longshift. Shift 3 Tidak Produksi, Masih perbaikan Grinding mill.
Tidak Produksi, Masih perbaikan Grinding mill. Mekanik longshift. Shift 3 Tidak Produksi, Masih perbaikan Grinding mill.
Tidak Produksi, Masih perbaikan Grinding mill. Mekanik longshift. Shift 3 Tidak Produksi, Masih perbaikan Grinding mill.
Mekanik Longshift. Shift 3 {21.45} Selesai perbaikan mesin.{22.00} Start produksi Giling F8 jumbo. {00.00} Cek mesin ulang. {00
ng mill. {09.25} Start produksi, Giling F23 jumbo. {15.30} Off karena bucket macet. Shift 2 Mekanik Longshift. Shift 3 {19.00} La
dan perbaikan compayer. {10.00} Start produksi, Giling F23 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {19.40}
tmbo. {13.00}
produksi. Off.F8
Giling (13.20} Lanjut
paletan. produksi,
{10.25} Gantibucket
Off, rantai giling F8 paletan.
putus. ShiftLanjut
{13.00} 2 Mekanik Losnghift.
produksi, {15.00}Shift
Off,3ngosongin
{19.00} Cek mesin,
Silo. Shift{19.35}
2 MekaS
ksi. Giling F23 jumbo. {12.00} Off. {13.00} Lanjut produksi.{13.30} Off, silo penuh, Lanjut nguras di bawah bucket elevator. Shift
rbaikan. {01.45} Lanjut produksi kembali. {04.00} Off, batu A habis.
et 2021 )
)
Wheel Loader Forklift Batu Habis
18 19 20 21 22 23 24 25 26 27

24 24 23 24 24 24 24 24 23
3 3 10 24 24 24 24 15 15

20 21 13 0 0 0 0 9 8
83% 88% 57% 0% 0% 0% 0% 38% 35%
5.30 7.44 8.72 0.00 0.00 0.00 0.00 0.00 6.15
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.55 11.59 3.18 0.00 0.00 0.00 0.00 9.07 3.83
70% 79% 52% 0% 0% 0% 0% 38% 43%

9 30
67 82 64 60

32 28
86.00 54.00 72.00 24.00

30 50 14
15 14 1.00 1.00 56
30.00 82.00 37.00 0.00 0.00 0.00 0.00 0.00 44.00
168.00 136.00 150.00 1.00 1.00 0.00 0.00 80.00 60.00
198.00 218.00 187.00 1.00 1.00 0.00 0.00 80.00 104.00

N
ksi. Giling F8 paletan.
mesin. {19.15} Start produksi. Giling F23 jumbo. {05.00} Ganti giling F23 paletan.
9.00} Cek mesin dan nguras di terowongan. {22.20} Start produksi. Giling F23 paletan. {02.00} Off, silo penuh.
hift 3 {19.00} Cek mesin. {19.35} Start produksi, Giling F0 jumbo. {23.35} Off. {00.00} Lanjut produksi ganti giling F23 jumbo.
ft 3 {19.00}
iling Cek mesin.
F23 Jumbo. Shift 2{20.45}
MekanikStart produksiShift
Longshift. Giling F23 jumbo.
3 {19.00} {04.20}
Cek mesin Off,
dan convayer
ganti ubold 1atas
pcs.macet.
{21.00} Start produksi, Giling F23 p

dinding bucket. {20.30} Start produksi, Giling F23 Jumbo.


4.50} OFF,
Lanjut Batu habis.
produksi. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {19.40} Start produksi giling F23 jumbo. {20.15} PLN pada

Hidup kembali. Lanjut produksi. Shift 2 Mekanik Longshift. Shift 3 Libur produksi dan packing.
3g mesh
jumbo.200 jumbo.
Shift 2 Mekanik Lonsghift. Shift 3 Tidak packing, Gudang penuh. {19.00} Cek mesin dan ganti bucket 2 pcs. {20.00} Sta

3Cek
jumbo. Shift
mesin dan2 ganti
Mekanik longshift.
bucket Shift 3nunggu
1 pcs sambil {19.00} silo
Cekkosong.
mesin, {19.40}
{21.40}Start
Startproduksi.
produksi,Giling
GilingF23 jumbo. {01.20} Silo penuh. {02.3
F8 paletan.

si. Giling F23 jumbo.


0} Cek mesin {19.30} Start produksi, Giling F0 jumbo. {21.30} Off, {21.45} Lanjut produksi ganti F23 jumbo. {06.10} Off, batu ku

jut produksi. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {20.00} Start produksi. Giling mesh 200 Jumbo.
si, Giling mesh 200 Jumbo. {23.10} Off, selumbung AS grinding mill pecah.

kan Grinding mill.


kan Grinding mill.
kan Grinding mill.
kan Grinding mill.
00} Cek mesin ulang. {00.30} Lanjut produksi. {07.50} Silo penuh.
ngshift. Shift 3 {19.00} Lanjut perbaikan bucket yang anjlok, ganti bucket 1 pcs, dan ubold 2 pcs. {05.00} Start produksi, Giling F
9.00} Cek mesin, {19.40} Start produksi. Giling F23 jumbo.
.00} Cek
songin mesin,
Silo. Shift{19.35} StartLongshift.
2 Mekanik produksi,Shift
Giling F8 paletan.
3 Grup packing{21.45} Off, perbaikan
libur karena body dinding
Gudang penuh. bucket
{19.00} elevator.
Cek mesin, {22.45}
{19.40} Lanjut
Start p
produk
ah bucket elevator. Shift 2 Mekanik Lonsghift. Shift 3 {19.00} Cek mesin, {19.50} Start produksi
Batu Habis
28 29 30 31

24 24 24 24 668
3 5 5 2 224 33.5%
4 0.6%
4 4 30 4.5%
2 2 0.3%
0 0.0%
2 5 0.7%
21 19 15 14 60.3% 39.7%
88% 79% 63% 58%
6.75 9.03 3.63 3.35 134
0.00 0.00 0.00 0.00 0
11.03 8.36 9.52 6.47 207 340.63
74% 72% 55% 41% 51%

F1.5X
0 0
0 0
0 0
0 0
33 58 65 686 1029
28 76 535 535
0 0
0 0
0 0
0 0
30 24 695 1042.5
84.00 20.00 560 560
0 0
0 0
0 0
0 0
44 24 617 925.5
50 2 349 349
107.00 58.00 24.00 89.00 1998.00
0.00 162.00 96.00 2.00 1444.00
107.00 220.00 120.00 91.00 3442.00 4441

penuh. Total
anti giling F23 jumbo. Mesh 200
art produksi, Giling F23 paletan. {02.30} Off, silo Others
Average / HR
Above (Below) Ideal Average

jumbo. {20.15} PLN padam. {21.08} lanjut

bucket 2 pcs. {20.00} Start produksi, Giling F23

{01.20} Silo penuh. {02.30} Lanjut produksi.


mbo. {06.10} Off, batu kurang bagus. {06.25}

200 Jumbo.

0} Start produksi, Giling F23 jumbo.

elevator. {22.45}
esin, {19.40} Lanjut
Start produksi,
produksi. Giling{03.30} Silo penuh
F23 palet.
Nilai Rupiah
Rp 1,176,000,000
Rp 21,000,000
Rp 157,500,000
Rp 10,500,000
Rp -
Rp 26,250,000
Rp 1,391,250,000

Selisih HM
-340.63
Additional Notes:

3442 Percentage Ideal Ton/H Ideal X %


1998 58% 8 4.6
1444 42% 18 7.6
8.5 Ideal Average / HR 12.2
Above (Below) Ideal Average / HR -3.65
Kerusakan Mesin Mati Lampu / Spanning
1 2 3 4 5 6 7
0800 - 0900
0900 - 1000
1000 - 1100
SHIFT 1

1100 - 1200
1200 - 1300
1300 - 1400
1400 - 1500
1500 - 1600
1600 - 1700
1700 - 1800
1800 - 1900
SHIFT 2

1900 - 2000
2000 - 2100
2100 - 2200
2200 - 2300
2300 - 0000
0000 - 0100
0100 - 0200
0200 - 0300
SHIFT 3

0300 - 0400
0400 - 0500
0500 - 0600
0600 - 0700
0700 - 0800

Total Jam Kerja 24 24 24 24 24 23


Kerusakan Mesin 1 7 5 2 2 2
Mati Lampu / Spanning
Buruh Packing / Palet Habi
Wheel Loader
Forklift
Batu Habis 16 16 2 3
Kondisi Lancar (Jm) 7 17 3 20 22 18
Kondisi Lancar (%) 29% 71% 13% 83% 92% 78%
HM Mesin Jalan (Jm) S.1 5.89 4.06 2.31 5.80 6.95 7.82
HM Mesin Jalan (Jm) S.2 0.00 0.00 0.00 0.00 0.00 0.00
HM Mesin Jalan (Jm) S.3 0.00 11.94 0.00 11.81 12.25 7.99
HM Mesin Jalan (%) 25% 67% 10% 73% 80% 69%

1 Mesh 2000 (UF-2)


Mesh 1250
Mesh 1200 (UF-5) 14.00 13.00
Mesh 800
Mesh 600
Mesh 400 (UF-8) 12.00
Mesh 325
Mesh 200 8.00 12.00 34.00
Lain - Lain
2 Mesh 2000 (UF-2)
Mesh 1250
Mesh 1200 (UF-5)
Mesh 800
Mesh 600
Mesh 400 (UF-8)
Mesh 325
Mesh 200 40.00 23.00 31.00 31.00
Lain - Lain
3 Mesh 2000 (UF-2)
Mesh 1250
Mesh 1200 (UF-5)
Mesh 800
Mesh 600
Mesh 400 (UF-8)
Mesh 325
Mesh 200 33.00 48.00 40.00 35.00
Lain - Lain
Total Mesh 2000 0.00 0.00 0.00 0.00 0.00 0.00
Total Mesh 1250 0.00 0.00 0.00 0.00 0.00 0.00
Total Mesh 1200 14.00 0.00 0.00 13.00 0.00 0.00
Total Mesh 800 0.00 0.00 0.00 0.00 0.00 0.00
Total Mesh 600 0.00 0.00 0.00 0.00 0.00 0.00
Total Mesh 400 0.00 0.00 0.00 0.00 0.00 12.00
Total Mesh 325 0.00 0.00 0.00 0.00 0.00 0.00
Total Mesh 200 0.00 81.00 12.00 71.00 105.00 66.00
Total Lain Lain 0.00 0.00 0.00 0.00 0.00 0.00
Total 14.00 81.00 12.00 84.00 105.00 78.00

TANGGAL
3/1/2021 Shift 1 {08.00} Cek mesin. {08.48} Start produksi, Giling UF-5 Paletan. {13.10} Peng
3/2/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih di area mesin. {13.45} Start produksi. G
3/3/2021 Shift 1 {08.00} Cek mesin dan penggantian palu hummer 20 pcs dan panbelt C-137
3/4/2021 Shift 1 {08.00} Cek mesin, {08.50} Start produksi Giling UF-5 Paletan. {16.00} Off, b
3/5/2021 Shift
Shift 1
1 {08.00}
{08.00} Cek
Cek mesin
mesin dan
dan bersih-bersih.
bersih-bersih. {09.12}
{08.44} Start
Start produksi
produksi Giling F23 jumb
giling F23 jumb
3/6/2021 jumbo. {03.50} Batu habis.
3/7/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih. {08.30} Start produksi, Giling UF-8 pal
3/8/2021 Produksi
Shift lancar.
1 {08.00} Cek mesin dan penyemprotan filter udara compresor. {08.30} Start
3/9/2021 {21.00} Lanjut produksi kembali. {04.50} Off, karena batu habis.
3/10/2021 Shift 1 {08.00} Cek mesin dan penggantian oli compressor dan filter 1 pcs. {11.00}
3/11/2021 Shift 1 {08.00} Cek mesin, {09.30} Start produksi. Giling UF-5 Paletan. Shift 2 {16.0
3/12/2021 Shift 1 {08.30} Start produksi. Giling UF-8 paletan. Shift 2 Mekanik Longshift. Shift
3/13/2021 Shift 1 {08.00} Lanjut produksi, Giling UF-2 jumbo. {15.00} Off. Shift 2 Mekanik Lon
3/14/2021
3/15/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih di bawah hopper dan di area hummer
3/16/2021 Shift 1 {08.00} Cek mesin {08.45} Start produksi, Giling UF-2 jumbo. Shift 2 Mekani
3/17/2021 Shift
Shift 1
1 {08.00}
{08.00} Cek
Cek mesin
mesin {09.00} Start produksi,
dan bersih-bersih Giling
di area UF-8
mesin. jumbo.Start
{09.14} Produksi Lanca
produksi, G
3/18/2021 mesin1 perbaikan
Shift {08.00} Cekpipa yang
mesin mampet.
dan {20.00}diStart
bersih-bersih areaproduksi, Giling Start
mesin. {08.45} meshproduksi.
200 jumbG
3/19/2021 {20.00} Start produksi.
Shift 1 {08.00} Cek mesinGiling
danmesh 400 jumbo.
bersih-bersih di area mesin. {09.10} Start produksi. G
3/20/2021 jumbo.
3/21/2021
3/22/2021 Shift
Shift 1
1 {08.00}
{08.00} Cek
Cek mesin
mesin dan
dan dan penyemprotan
penyemprotan filterfilter
udaraudara compresor,
compresor. {08.45}
{08.25} StartS
3/23/2021 Off, penggantian palu hummer 20 pcs. {23.56} Lanjut produksi, {02.40} Off, scree
3/24/2021 Shift 1 {08.00} Cek mesin . {08.20} Start produksi, Giling F23 jumbo. Produksi lanca
3/25/2021 Shift 1 {08.00} Cek mesin . {08.20} Start produksi. Giling F23 jumbo. Produksi lanca
3/26/2021 Shift 1 {08.00} Cek mesin. {08.20} Start produksi. Giling mesh 200 jumbo. Shift 2 M
3/27/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih di area hummer cruser. {08.40} Start p
3/28/2021 Shift 1 {08.00 - 09. 00} Produksi lancar Giling mesh 200 jumbo. Shift 2 Mekanik Lo
3/29/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih di area mesin hummer cruser. {08.50}
3/30/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih area mesin XZM. {09.15} Start produks
3/31/2021 Shift 1 {08.00} Cek mesin dan bersih-bersih area mesin. {08.30} Start produksi. Gili
LAPORAN DOWNTIME PABRIK (Maret 2021 )
Mesin XZM (Mesin Baru)
Mati Lampu / Spanning Buruh Packing / Palet Habis / Silo Penuh Wheel Loader
8 9 10 11 12 13 14 15 16 17

JAM ISTIRAHAT

JAM ISTIRAHAT

JAM ISTIRAHAT

24 24 24 24 24 23 24 24 24
2 3 4 3 2 2 3 2 2
3 1
1

6
22 15 17 20 22 20 21 22 22
92% 63% 71% 83% 92% 87% 88% 92% 92%
7.19 4.80 3.89 4.55 8.34 4.51 6.03 6.93 8.40
0.00 0.00 0.00 4.73 0.00 0.00 0.00 0.00 0.00
12.17 7.10 7.79 0.00 9.08 9.04 9.32 6.57 8.68
81% 50% 49% 39% 73% 59% 64% 56% 71%

6.00 8.00

10.00

13.00 10.00 14.00 14.00 16.00

20.00 20.00 20.00

4.00 6.00

10.00

8.00 4.00 10.00 8.00 19.00

37.00

9.00

9.00 16.00 10.00 12.00

40.00

0.00 0.00 0.00 0.00 13.00 12.00 0.00 8.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
13.00 27.00 20.00 0.00 14.00 0.00 34.00 8.00 47.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
97.00 0.00 20.00 0.00 20.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
110.00 27.00 40.00 20.00 47.00 12.00 34.00 16.00 47.00

KETERANGAN
5 Paletan. {13.10} Pengambilan sample mesh 325. {13.35} Lanjut produksi, Giling UF-5 paletan. {16.00} Off, Batu grade A koson
13.45} Start produksi. Giling F23 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {19.20} Start produksi. Giling F23
pcs dan panbelt C-137 4 pcs. {13.20} Start produksi. Giling F23 Paletan. {16.00} Off karena Batu grade A Habis. Shift 2 Tidak pro
Paletan. {16.00} Off, batu A kosong. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin dan pemasangan selang angin baru.
oduksi
oduksi Giling F23 jumbo.
giling F23 jumbo. {09.33}
{09.30} Ganti
Ganti giling
giling UF-8
F23 jumbo. {15.04} Ganti
Polos. {11.50} Ganti kembali
giling F23 paletan.
giling Shift 2 Mekanik
F23 Jumbo. Longshift.
{13.16} Ganti giling Shift
UF-83jumb
{19

oduksi, Giling UF-8 paletan. {11.50} Off. {13.00} Lanjut produksi kembali. {16.00} Off. {16.30} Lanjut produksi ganti giling F23 ju
mpresor. {08.30} Start produksi, Giling UF-8 paletan. {13.00} Pindah giling UF-8 Jumbo. {15.00} Off Batu habis. Shift 2 Mekanik
abis.
an filter 1 pcs. {11.00} Start produksi, Giling mesh 200 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {20.15 - 21.3
5 Paletan. Shift 2 {16.00} Lanjut produksi. {17.00} Mati lampu dan tegangan arus listrik turun. {19.00 - 19.33} Pipa hopper jumb
ekanik Longshift. Shift 3 {19.00} Cek mesin. {19.30} Start produksi. Giling UF-2 Jumbo.
Off. Shift 2 Mekanik Longshift. Shift 3 Tidak packing Gudang penuh. {19.00} Cek mesin, {20.00} Start produksi Giling UF-2 Jumbo

er dan di area hummer cruser. {09.48} Start produksi. Giling UF-8 paletan. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {
jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin, {19.20} Start produksi. Giling UF-2 jumbo.
jumbo.Start
09.14} Produksi Lancar.
produksi, Shift
Giling F232 Mekanik Longshift.
jumbo. {11.00} Off, Shift 3 {19.00} Cek
Air compressor mesin. {19.30}
breakdown Startfilter
separator produksi,
rusak.Giling UF-8
{14.00} jumbo.
Selesai perbaiak
Giling Start
08.45} meshproduksi.
200 jumbo.
Giling UF-5 paletan. {12.00} ganti giling F23 jumbo. {13.00} Lanjut produksi ganti giling UF-5 paletan. {17
09.10} Start produksi. Giling UF-5 paletan. {11.50} Ganti giling F23 jumbo. {13.00} Lanjut produksi ganti giling UF-5 paletan. Shift

ra compresor,
mpresor. {08.45}
{08.25} StartStart produksi.
produksi, Giling
Giling UF-8UF-8 paletan.
jumbo. {11.50}Shift
Ganti2 Mekanik
giling F23Longshift. Shift 3 ganti
jumbo. {13.00} Produksi lancar
kembali ke. UF-8
Gilingjumbo.
mesh 200 ju
{16.00
uksi, {02.40} Off, screen hummer rontok, ganti screen 1 pcs. {06.23} Lanjut produksi.
3 jumbo. Produksi lancar. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {19.35} Start produksi giling UF-8 paletan. {23.40}
3 jumbo. Produksi lancar. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin . {19.25 - 23.30} Start produksi giling F23 paletan.
sh 200 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {19.55} Start produksi, Giling mesh 200 jumbo.
r cruser. {08.40} Start produksi. Giling UF-5 paletan. {15.00} Ganti giling F23 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Ce
bo. Shift 2 Mekanik Longshift. Shift 3 Produksi lancar Giling mesh 200 jumbo.
ummer cruser. {08.50} Start produksi Giling uf-5 paletan. {11.55} Ganti giling F23 jumbo. {13.00} Lanjut uf-5 paletan. 16.00 Lanj
M. {09.15} Start produksi. Giling F23 Jumbo. {11.00} Off batu habis. Shift 2 Mekanik Longshift. Shift 3 Grup packing libur karena g
.30} Start produksi. Giling UF-8 paletan. {16.15} OFF, bearing hummer hancur, ganti bearing 22315,CC. {17.50} Selesai perbaik
aret 2021 )
ru)
Wheel Loader Forklift Batu Habis
18 19 20 21 22 23 24 25 26 27

AHAT

AHAT

AHAT

24 24 23 24 24 24 24 24 23
6 3 2 1 8 2 2 2 2

18 21 21 23 16 22 22 22 21
75% 88% 91% 96% 67% 92% 92% 92% 91%
4.86 6.26 6.78 7.31 8.24 9.27 10.27 7.04 6.96
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.25 8.87 10.03 12.52 5.99 12.66 12.77 11.83 11.03
63% 63% 73% 83% 59% 91% 96% 79% 78%

12.00 12.00 10.00

16.00 19.00

24.00 40.00 40.00 21.00 21.00

10.00 12.00 13.00

33.00 30.00 14.00 6.00 31.00 29.00 20.00

8.00

48.00 23.00 30.00 14.00 40.00 45.00 42.00 30.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 12.00 12.00 0.00 0.00 0.00 0.00 0.00 10.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 18.00 12.00 16.00 19.00 13.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
105.00 0.00 23.00 60.00 28.00 86.00 116.00 92.00 71.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
105.00 30.00 47.00 76.00 47.00 99.00 116.00 92.00 81.00

NGAN
00} Off, Batu grade A kosong. Shift 2 Tidak produksi. Mekanik longshift. Shift 3 Tidak produksi Karena batu grade A kosong.
0} Start produksi. Giling F23 jumbo.
de A Habis. Shift 2 Tidak produksi Mekanik longshift. Shift 3 Tidak produksi karena Batu Grade A habis.
asangan selang angin baru. {19.50} Start produksi Giling F23 jumbo. Produksi lancar.
ekanik Longshift.
3.16} Ganti giling Shift
UF-83jumbo.
{19.00}{14.55}
Cek mesin
Gantidan Penyemprotan
giling F23 jumbo. filter
Shift 2udara compresor.
Mekanik {19.20}
Longshift. Shift Start produksi
3 {19.00} Giling F23
Cek mesin. jumbo.
{19.25} Star

produksi ganti giling F23 jumbo karena batu A sudah ready. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {19.43} Start p
Batu habis. Shift 2 Mekanik Lonsghift. Shift 3 {19.00} Cek mesin, {19.50} Start produksi Giling UF-8 paletan. {20.19} Off, pipa ho

00} Cek mesin, {20.15 - 21.35} Mati lampu. {21.39} Start produksi, Giling UF-8 jumbo. {23.13} Mati lampu kembali. {00.00} Lanj
0 - 19.33} Pipa hopper jumbo mampet. {19.35} Lanjut produksi. Giling UF-5 paletan. Shift 3 Libur packing dan produksi.

produksi Giling UF-2 Jumbo. {23.50 - 01.00} Perbaikan pipa yang mampet. {01.13} Lanjut produksi ganti giling F23 jumbo. {05.5

Shift 3 {19.00} Cek mesin, {19.30} Start produksi. Giling UF-8 Jumbo. Lancar.
bo.
i, Giling
ak. UF-8
{14.00} jumbo.
Selesai perbaiakan. {14.05} Lanjut produksi, {16.00 - 16.20} Perbaikan pipa yang yang mampet. Shift 2 Mekanik Lon
anti giling UF-5 paletan. {17.30 - 17.50} Off, pipa hopper mampet. Shift 2 Mekanik Lonsghift. Shift 3 {19.00} Cek mesin perbaik
anti giling UF-5 paletan. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {19.40} Start produksi Giling mesh 400 jumbo. {00.

i lancar
mbali ke. UF-8
Gilingjumbo.
mesh 200 jumbo.
{16.00} ganti ke F23 jumbo. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {19.47} Start produksi g

giling UF-8 paletan. {23.40} Ganti giling F23 jumbo.


produksi giling F23 paletan. {23.30 - 07.50} Ganti giling F23 jumbo.
esh 200 jumbo.
Longshift. Shift 3 {19.00} Cek mesin, {20.00} Start produksi. Giling mess 200 jumbo.

njut uf-5 paletan. 16.00 Lanjut F23 jumbo. Shift 2 Mekanik Lonshift. Shift 3 {19.00} Penambahan plat pada talang feeding. {20.0
Grup packing libur karena gudang pabrik penuh. Produksi lancar. Giling mesh 200 jumbo.
5,CC. {17.50} Selesai perbaikan. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek mesin. {20.08} Start produksi. Giling F23 jumbo. {0
Batu Habis
28 29 30 31

24 24 24 24 668
1 2 1 4 78 11.7%
4 0.6%
8 9 1.3%
0 0.0%
0 0.0%
4 4 51 7.6%
23 22 11 16 78.7% 21.3%
96% 92% 46% 67%
7.98 7.79 3.14 4.94 178
0.00 0.00 0.00 0.00 5
11.29 11.85 12.38 7.91 253 436.16
80% 82% 65% 54% 65%

F1.5X
14.00 21
0.00 0
12.00 83.00 124.5
0.00 0
0.00 0
9.00 123.00 184.5
0.00 0
30.00 15.00 9.00 314.00 471
0.00 0
10.00 15
0.00 0
10.00 15
0.00 0
0.00 0
84.00 126
0.00 0
33.00 30.00 24.00 40.00 452.00 678
0.00 0
9.00 13.5
0.00 0
0.00 0
0.00 0
0.00 0
55.00 82.5
0.00 0
33.00 37.00 23.00 561.00 841.5
0.00 0
0.00 0.00 0.00 0.00 33.00
0.00 0.00 0.00 0.00 0.00
0.00 12.00 0.00 0.00 93.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 9.00 262.00
0.00 0.00 0.00 0.00 0.00
96.00 82.00 33.00 63.00 1327.00
0.00 0.00 0.00 0.00 0.00
96.00 94.00 33.00 72.00 1715.00 2573
Total
Mesh 2000
tu grade A kosong. Mesh 1250
Mesh 1200 (UF-5)
Mesh 800
Mesh 600
uksimesin.
Cek Giling F23 jumbo.
{19.25} Start produksi, Giling F23 Mesh 400 (UF-8)
Mesh 325
k mesin. {19.43} Start produksi, Giling F23 jumbo. Mesh 200
n. {20.19} Off, pipa hopper jumbo mampet. Others
Average / HR
u kembali. {00.00} Lanjut produksi. Above (Below) Ideal Average
dan produksi.

giling F23 jumbo. {05.50} Silo penuh.

et. Shift 2 Mekanik Longshift. Shift 3 {19.00} Cek


00} Cek mesin perbaikan pipa yang mampet.
mesh 400 jumbo. {00.00} Ganti giling F23

19.47} Start produksi giling F23 jumbo. {21.10}

a talang feeding. {20.00} Start produksi, Giling m

si. Giling F23 jumbo. {03.55} Off, batu habis.


Nilai Rupiah
Rp 409,500,000
Rp 21,000,000
Rp 47,250,000
Rp -
Rp -
Rp 267,750,000
Rp 745,500,000

selisih HM
-436.16
Additional Notes:

1715 Percentage Ideal Ton/H Ideal X %


33 2% 0.0
0 0% 0.0
93 5% 0.0
0 0% 0.0
0 0% 0.0
262 15.3% 0.0
0 0% 0.0
1327 77% 8 6.2
0 0% 18 0.0
3.3 Ideal Average / HR 6.2
Above (Below) Ideal Average / HR -2.93