kecelakaan lalu lintas luka berat 1. Mengecekan kondisi ban, oli , hand rem dll
2. Pengemudi harus mempunai SIM
3. Kendaraan harus sesuai standar Pabrik
2 6 3 36 1 3 3 9
Task Risk Assessment
Comment: F-SHE-001/PRO-SHE-012. I/2/20
short describtion of a
Comment: potential hazardous Comment: Comment:
It is important to event, such as Describe the possible Qualitative Risk Assessment Tanggal : Dilakukan oleh : <20If the Very
"today"Low
Plant/department: Sipil describe the task in standing on the edge consequence of the 17-Sep-20 20 -situation has not
70 Possible
detail, including the of the roof to lift hazard, such as sufficently reduced
Aktivitas : Pekerjaan Pondasi Strauss Pile location, the tools, lossing control falling off the 15
Baseline Assessment Halaman : Direview oleh : 70-200 Significant
risk add additional
frequency of the task while climbing the meter high roof, Re-assessment 1 200-400
controls High Risk
and manage
and special ladder, spashing getting chemicals in Working Draft Disetujui Oleh : >400for continuous
Very High
circumstances. chemicals while filling the eye, etc. improvement.
a container. Resiko Awal Resiko saat ini RESIKO FINAL
Lapisan Pertahanan (Control Measures) Lapisan Pertahanan ( Control Measures)
Nr Task Kejadian berbahaya Konsekuensi
E S P Risk Kondisi saat ini E S P Risk termasuk proposal perubahan E S P Risk
tertusuk memar
tersandung luka
terpeleset luka
Task Risk Assessment
Comment:
short describtion of a
Comment: potential hazardous Comment:
It is important to event, such as Normally the Comment:
Plant/department: Sipil describe the task in standing on the edge reliability of these The reliability of
detail, including the of the roof to lift defence layers is high administrative control
Aktivitas : Pekerjaan Pondasi Strauss Pile location, the tools, lossing control Engineering Kehandalan Lapisan Pertanhanan
if:1-designed very / Control Measures Reliablity is normally not very
Elimination
Substitution Administration
frequency of the task while climbing the Control PPE well, 2-maintained high, people make
control
and special ladder, spashing very well, and 3- mistakes! Multiple of
circumstances. chemicals while filling tested on a these controls are
a container. Kategori Kontrol Deskripsikan kehandalan Lapisan Pertahanan ( Control
predetermined Measureneeded
) to get a
frequency reliable defence layer
Nr Task Kejadian berbahaya Konsekuensi
A B C D E ABC D
terpeleset
6. Pengecoran
terjatuh
tertusuk memar
tersandung luka
terpeleset luka
Comment:
Task Risk Assessment
Reliability
For the reliability it is
Comment: important to evaluate
short describtion of a the “failure on
Comment: potential hazardous demand”, does the
Comment: Comment: Implementation
It is important to event, such as protection works Resonsible person:
Plant/department: Sipil describe the task in standing on the edge The reliability of The reliability
100% of
of the time name who is
deadline:
administrative control administrative controlimprove Add a specific date
Aktivitas : Pekerjaan Pondasi
detail, including the
Strauss Lapisan
Pile location,
of the roof to lift whenAction
needed.untuk responsible to
by when the
Kehandalan Pertanhanan
the / Control Measures
tools,Reliablity
lossing control is normally not very is normallylayer:
Protection not very
is implement the
high, people make
kehandalan
high, people
lapisan
make
pertahanan proposed changes
frequency of the task while climbing the the formal word for proposed changes.
mistakes! Multiple of mistakes! Multiple are to be
and special ladder, spashing “safeguard”, under of
these controls are these controls are implemented.
circumstances. chemicals while filling the condition the
Deskripsikan kehandalan Lapisan Pertahanan
a container.( Control Measureneeded
) to get a needed toisget
safeguard aa
with
reliable defence layer Responsible
reliable defence
reliability of > 90% Implementation
layer
Nr Task Kejadian berbahaya Konsekuensi
E Person the
eliminating deadline
severity or likelihood
terpeleset
6. Pengecoran
terjatuh