MINGGU KE : 9 (SEMBILAN)
PERIODE TANGGAL : 07 DESEMBER 2020 S/D 13 DESEMBER 2020
PEMBERI TUGAS
KONSULTAN / MK
KONTRAKTOR PELAKSANA
COVER i
DAFTAR ISI
KODE
HALAMAN
1 Cover …............................................................................................................................ i
2 Daftar Isi…........................................................................................................................ ii
3 Informasi…........................................................................................................................ iii
4 Master Schedule................................................................................................................. iv
DAFTAR ISI ii
INFORMASI ( DATA TEKNIS PROYEK )
Rp. 23.356.657.000,- (Dua Puluh Tiga Milyar Tiga Ratus Lima Puluh
11 Nilai Kontrak :
Enam Juta Enam Ratus Lima Puluh Tujuh Ribu Rupiah)
INFORMASI iii
JADWAL WAKTU PELAKSANAAN
SATUAN KERJA : PELAKSANAAN PRASARANA PERMUKIMAN WILAYAH II PROVINSI SUMATERA UTARA 330 HARI
NAMA PAKET : Pembangunan Pasar Balerong Balige Kab. Toba Samosir
KALENDER
LOKASI : Pasar balerong balige - Toba Samosir (Kab.)
TAHUN ANGGARAN : APBN 2020 - 2021
WAKTU PELAKSANAAN 330 HARI KALENDER
SPMK, 16 OKTOBER 2020
MINGGU KE-
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
NO DESCRIPTIONS BOBOT BULAN KE-1 BULAN KE-2 BULAN KE-3 BULAN KE-4 BULAN KE-5 BULAN KE-6 BULAN KE-7 BULAN KE-8 BULAN KE-9 BULAN KE-10 BULAN KE-11 BULAN KE-12
16-Oct-20 19-Oct-20 26-Oct-20 2-Nov-20 9-Nov-20 16-Nov-20 23-Nov-20 30-Nov-20 7-Dec-20 14-Dec-20 21-Dec-20 28-Dec-20 4-Jan-21 11-Jan-21 18-Jan-21 25-Jan-21 1-Feb-21 8-Feb-21 15-Feb-21 22-Feb-21 1-Mar-21 8-Mar-21 15-Mar-21 22-Mar-21 29-Mar-21 5-Apr-21 12-Apr-21 19-Apr-21 26-Apr-21 3-May-21 10-May-21 17-May-21 24-May-21 31-May-21 7-Jun-21 14-Jun-21 21-Jun-21 28-Jun-21 5-Jul-21 12-Jul-21 19-Jul-21 26-Jul-21 2-Aug-21 9-Aug-21 16-Aug-21 23-Aug-21 30-Aug-21 6-Sep-21
S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
18-Oct-20 25-Oct-20 1-Nov-20 8-Nov-20 15-Nov-20 22-Nov-20 29-Nov-20 6-Dec-20 13-Dec-20 20-Dec-20 27-Dec-20 3-Jan-21 10-Jan-21 17-Jan-21 24-Jan-21 31-Jan-21 7-Feb-21 14-Feb-21 21-Feb-21 28-Feb-21 7-Mar-21 14-Mar-21 21-Mar-21 28-Mar-21 4-Apr-21 11-Apr-21 18-Apr-21 25-Apr-21 2-May-21 9-May-21 16-May-21 23-May-21 30-May-21 6-Jun-21 13-Jun-21 20-Jun-21 27-Jun-21 4-Jul-21 11-Jul-21 18-Jul-21 25-Jul-21 1-Aug-21 8-Aug-21 15-Aug-21 22-Aug-21 29-Aug-21 5-Sep-21 10-Sep-21
I. PEKERJAAN PENDAHULUAN
I.A. PEKERJAAN PERSIAPAN 0,28% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01%
I.B. PEKERJAAN RK3K KONSTRUKSI 0,71% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01% 0,01%
III.A.1 PEKERJAAN PENDAHULUAN 0,87% 0,15% 0,15% 0,15% 0,15% 0,15% 0,15%
RENCANA : 100,00% 0,166% 0,166% 0,166% 0,166% 0,542% 0,542% 0,915% 0,915% 0,949% 0,949% 1,649% 2,445% 2,445% 2,045% 2,545% 2,545% 2,545% 2,545% 2,545% 2,545% 2,545% 2,545% 2,045% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,961% 2,698% 2,698% 2,698% 2,698% 2,698% 1,622% 1,622% 1,622% 0,734% 0,021%
KOMULATIF RENCANA : 0,166% 0,332% 0,499% 0,665% 1,207% 1,748% 2,663% 3,577% 4,526% 5,475% 7,124% 9,570% 12,015% 14,060% 16,605% 19,150% 21,696% 24,241% 26,786% 29,331% 31,877% 34,422% 36,467% 39,428% 42,390% 45,351% 48,312% 51,274% 54,235% 57,197% 60,158% 63,119% 66,081% 69,042% 72,003% 74,965% 77,926% 80,888% 83,586% 86,284% 88,983% 91,681% 94,380% 96,002% 97,623% 99,245% 99,979% 100,000%
REALISASI : 0,000% 0,000% 0,000% 0,227% 0,004% 0,019% 0,490% 0,204% 0,075%
KOMULATIF REALISASI : 0,000% 0,000% 0,000% 0,227% 0,231% 0,250% 0,740% 0,944% 1,019%
DEVIASI : -0,166% -0,332% -0,499% -0,438% -0,976% -1,498% -1,923% -2,634% -3,507%
MASTER SCHEDULE iv
REKAP TOTAL PROGRESS MINGGUAN
PEMBANGUNAN PASAR BALERONG BALIGE
NAMA PROYEK : PEMBANGUNAN PASAR BALERONG BALIGE PENGGUNA JASA :
LOKASI : KABUPATEN TOBA SAMOSIR
TAHUN ANGGARAN : 2020/2021
NOMOR KONTRAK : HK.02.03/BALERONG/SATKER PPPWII-
SU/PSP-POP/03/2020
TANGGAL KONTRAK : 02 Oktober 2020 KONSULTAN / MK :
WAKTU PELAKSANAAN : 330 Hari Kalender
KONTRAKTOR PELAKSANA :
MINGGU KE : 9 (SEMBILAN)
PERIODE TANGGAL : 07 DESEMBER 2020 S/D 13 DESEMBER 2020
REALISASI BOBOT
NO URAIAN PEKERJAAN BOBOT S/D MINGGU S/D MINGGU INI
MINGGU INI (%)
LALU (%) (%)
II.C.1 PEKERJAAN SALURAN GWT DAN MENARA AIR 4,390% 0,000% 0,000% 0,000%
II.C.2 PEKERJAAN PENERANGAN KAWASAN 2,159% 0,000% 0,000% 0,000%
PEMBERI TUGAS
MINGGU KE : 9 (SEMBILAN)
KONSULTAN / MK
I. PEKERJAAN PENDAHULUAN
I.A. PEKERJAAN PERSIAPAN 0,275% 0,224% 0,000% 0,224% 81,388% 0,000% 81,388%
I.B. PEKERJAAN RK3K KONSTRUKSI 0,709% 0,231% 0,000% 0,231% 32,562% 0,000% 32,562%
I. PEKERJAAN PENDAHULUAN
1 Pek. Pagar Proyek m1 130,22 0,171% 130,22 - 130,22 0,171% 0,000% 0,171% 100,000% 0,000% 100,000%
2 Pek. Papan Nama Proyek LS 1,00 0,004% 1,00 - 1,00 0,004% 0,000% 0,004% 100,000% 0,000% 100,000%
3 Dokumentasi Proyek Ls 1,00 0,006% 0,30 - 0,30 0,002% 0,000% 0,002% 30,000% 0,000% 30,000%
4 Pek. Pembersihan dan Perapihan Lapangan Ls 1,00 0,094% 0,50 - 0,50 0,047% 0,000% 0,047% 50,000% 0,000% 50,000%
PERSIAPAN Page 7 of 38
MINGGU KE : 9 (SEMBILAN)
PERIODE TANGGAL : 07 DESEMBER 2020 S/D 13 DESEMBER 2020
e Personal K3
1 Petugas K3 OB 2,00 0,033% 1,00 - 1,00 0,016% 0,000% 0,016% 50,000% 0,000% 50,000%
2 Petugas Tanggap Darurat OB 2,00 0,033% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Petugas P3K OB 2,00 0,033% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Petugas Pengatur Lalu Lintas (Flagman OB 3,00 0,049% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Petugas Pengatur Lalu Lintas (Flagman) 6 Petugas Medis OB 1,00 0,016% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
K3K Page 8 of 38
REALISASI VOLUME REALISASI BOBOT PERSENTASE PRESTASI PEKERJAAN
BOBOT SESUAI
NO URAIAN PEKERJAAN SAT. VOLUME KONTRAK /
SPK S/D MINGGU SAMPAI MINGGU S/D MINGGU S/D MINGGU INI S/D MINGGU S/D MINGGU INI
MINGGU INI MINGGU INI (%) MINGGU INI (%)
LALU INI LALU (%) (%) LALU (%) (%)
i Biaya Konsultasi dengan ahli terkait keselamatan konstruksiLs 1,00 0,024% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
K3K Page 9 of 38
REKAP PROGRESS MINGGUAN PEKERJAAN LANSEKAP
PEMBANGUNAN PASAR BALERONG BALIGE TAHUN ANGGARAN. 2020/2021
PEMBERI TUGAS
MINGGU KE : 9 (SEMBILAN)
KONSULTAN / MK
II PEKERJAAN LANSEKAP
I PEKERJAAN PERKERASAN HALAMAN 0,269% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
II PEKERJAAN SALURAN GWT DAN MENARA AIR 2,568% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
III PEKERJAAN PENERANGAN KAWASAN 1,079% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
IV PEKERJAAN PENGHIJAUAN 0,158% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
SUB TOTAL PEKERJAAN LANSEKAP : 4,074% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 PEKERJAAN SALURAN GWT DAN MENARA AIR 2,568% 0,000% 0,000% 0,000%
2 Pekerjaan Lantai
a Pekerjaan Pasangan Bata 1:2 Keliling M2 4,80 0,003% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b Pekerjaan Plesteran bata 1:2 M2 4,80 0,001% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
c Pekerjaan Urugan tanah dipadatkan M3 1,80 0,003% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
d Pekerjaan Urugan Pasit t.10cm M3 0,90 0,001% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
e Pekerjaan Wiremesh Lantai M8 kg 48,60 0,004% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
f Pekerjaan Coran Lantai t.10cm M3 0,90 0,005% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
d Pekerjaan Pas.Plat Lantai Metal t.12mm Kg 753,60 0,109% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
e Pekerjaan Pas.Railing Pagar besi diameter 16 Kg 122,20 0,012% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
f Pek.Pas.Baseplat 30x30cm t.12 Kg 25,43 0,004% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
g Pek.Pasangan Baut Angkur dia 16 Bh 12,00 0,001% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
h Pekerjaan Pengelasan Cm 1.855,20 0,060% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
i Pekerjaan Pengecatan M2 68,22 0,014% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
j Pekerjaan Pasangan Tangki Air kap.2000L Unit 2,00 0,078% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
1 Pekerjaan Lampu PJU 50 Watt LED Unit 8,00 1,079% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
TIANG PJU H-06M Solar Panel TYPE SC
· ISO 9001: 2008
· Plate Baja ST 41 / SS 400
· Welding Las Listrik
· Finishing Hot Dip Galvanize
· Segment A = 6000mm
· Bottom Of Pole'" 134mm
· Base Plate 300x300x14mm
· Anchor Bolt'" 16mm
PEMBERI TUGAS
MINGGU KE : 9 (SEMBILAN)
KONSULTAN / MK
NO URAIAN PEKERJAAN BOBOT S/D MINGGU MINGGU INI S/D MINGGU S/D MINGGU MINGGU INI S/D MINGGU
LALU (%) (%) INI (%) LALU (%) (%) INI (%)
PERSENTASE PRESTASI
BOBOT REALISASI VOLUME REALISASI BOBOT
PEKERJAAN
SESUAI
NO URAIAN PEKERJAAN SAT. VOLUME
KONTRAK S/D SAMPAI S/D S/D S/D S/D
MINGGU MINGGU MINGGU
/ SPK MINGGU MINGGU MINGGU MINGGU MINGGU MINGGU
INI INI (%) INI (%)
LALU INI LALU (%) INI (%) LALU (%) INI (%)
1 Pekerjaan Stripping M2 9.064,06 1,112% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Pekerjaan Urugan Tanah Merah M3 917,21 1,066% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Pekerjaan Pemadatan Tanah per 10cm M3 917,21 0,254% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pekerjaan Bouwplank M1 1.608,36 0,643% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Pekerjaan Bekisting M2 241,25 0,186% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Pekerjaan Pasangan Plastic Cor M2 3.346,37 0,102% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
1 Pekerjaan Galian Tanah M3 80,42 0,024% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pekerjaan Urugan Pasir t.5cm dipadatkanM3 69,69 0,098% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pekerjaan Pasangan Paving Block (K.225) M2 1.393,83 1,479% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
7 Pekerjaan Urugan Pasir t.5cm dipadatkanM3 5,32 0,008% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
8 Pekerjaan Rabat Beton t.10cm (K.175) M3 10,65 0,050% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
1 Pekerjaan Galian M3 62,04 0,018% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Pekerjaan Urugan Pasir t.10cm M3 9,93 0,011% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Pekerjaan Pasangan Boxculvert 40x40x100M(K.350) 248,14 1,742% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pekerjaan bak kontrol Unit 12,00 0,051% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
1 Pekerjaan Lampu PJU 50 Watt LED Unit 8,00 1,079% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
· Segment A = 6000mm
1 Pek. Urugan Tanah t.20cm M3 58,53 0,068% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Pek. Penanaman Rumput Gajah Mini M2 292,66 0,048% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Pek. penanaman Pohon Palem (dia.10cm)Btg 20,00 0,012% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pek. penanaman Pohon bungur Btg 18,00 0,004% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Pek. penanaman Pohon Tanjung Btg 20,00 0,006% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
PEMBERI TUGAS
MINGGU KE : 9 (SEMBILAN)
KONSULTAN / MK
a. Pekerjaan Pondasi & Struktur Bawah 2,695% 0,190% 0,075% 0,266% 7,063% 2,795% 9,858%
b. Pekerjaan Struktur Atas 18,872% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
c. Pekerjaan Struktur Ramp dan Tangga 1,170% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
d. Pekerjaan Struktur Rangka Fasad Baru 3,873% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
e. Pekerjaan Struktur Atap 2,267% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
III.A.2.2 PEKERJAAN PERKUATAN STRUKTUR BANGUNAN EKSISTING 14,508% 0,000% 0,000% 0,000%
a. Pekerjaan Retrofit Pondasi & Struktur Bawah 5,086% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b. Pekerjaan Retrofit Struktur Atas 9,422% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. Pekerjaan Dinding Bata 6,041% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b. Pekerjaan Dinding Tanaman + Rangka dan Sistem Pemipaan Lengkap 0,623% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
c. Pekerjaan Panel Conwood 0,371% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
d. Pekerjaan Railing Tangga 0,123% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. Pekerjaan Dinding Bata 0,373% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b. Pekerjaan Signage "PASAR BALIGE" 0,009% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
c. Pekerjaan Penutup Atap 3,415% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
1 Pekerjaan Pembongkaran Atap Eksisting M2 2.615,96 0,091% 767,68 - 767,68 0,027% 0,000% 0,027% 29,346% 0,000% 29,346%
2 Pekerjaan Pembongkaran Lantai Eksisting M2 3.974,08 0,244% 864,69 - 864,69 0,053% 0,000% 0,053% 21,758% 0,000% 21,758%
3 Pekerjaan Pembongkaran Dinding Bata M2 1.383,12 0,144% 705,60 - 705,60 0,073% 0,000% 0,073% 51,015% 0,000% 51,015%
4 Pekerjaan Pembongkaran Tangga Eksisting M3 9,66 0,043% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pekerjaan Pembersihan Lapangan M2 2.038,88 0,250% 1.019,44 - 1.019,44 0,125% 0,000% 0,125% 50,000% 0,000% 50,000%
6 Pekerjaan Pasangan Bauwplank M1 256,00 0,102% 51,20 - 51,20 0,020% 0,000% 0,020% 20,000% 0,000% 20,000%
1 Pekerjaan Galian Pondasi Tapak sedalam 1,55 m M3 1,20 0,000% 1,20 - 1,20 0,000% 0,000% 0,000% 100,000% 0,000% 100,000%
2 Pekerjaan Galian Tie Beam M3 12,67 0,004% - 12,67 12,67 0,000% 0,004% 0,004% 0,000% 100,000% 100,000%
3 Pekerjaan Pasangan Lantai Kerja Pondasi Tie Beam & Sloof, t.5cm M3 30,62 0,134% 6,12 - 6,12 0,027% 0,000% 0,027% 20,000% 0,000% 20,000%
4 Pondasi Tapak 200x200x35cm (P1)
- Pembesian Kg 3.266,04 0,155% 1.633,02 326,60 1.959,62 0,078% 0,016% 0,093% 50,000% 10,000% 60,000%
- Begisting M2 64,80 0,044% 12,96 25,92 38,88 0,009% 0,018% 0,027% 20,000% 40,000% 60,000%
- Cor Beton K.300 M3 33,60 0,206% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pondasi Tapak 220x220x35cm (P2)
- Pembesian Kg 181,81 0,009% 36,36 18,18 54,54 0,002% 0,001% 0,003% 20,000% 10,000% 30,000%
- Begisting M2 3,19 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 1,69 0,010% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Pondasi Tapak 180x180x35cm (P3)
- Pembesian Kg 461,10 0,022% 92,22 46,11 138,33 0,004% 0,002% 0,007% 20,000% 10,000% 30,000%
- Begisting M2 11,25 0,008% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 5,67 0,035% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
7 Pondasi Tapak 160x160x35cm (P4)
- Pembesian Kg 1.315,43 0,063% 263,09 131,54 394,63 0,013% 0,006% 0,019% 20,000% 10,000% 30,000%
- Begisting M2 36,80 0,025% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 17,92 0,110% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
8 Pondasi Tapak 120x120x30cm (P5)
- Pembesian Kg 346,96 0,017% 69,39 34,70 104,09 0,003% 0,002% 0,005% 20,000% 10,000% 30,000%
- Begisting M2 10,80 0,007% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 4,32 0,026% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
9 Pondasi Tapak 150x310x40cm (P6)
- Pembesian Kg 279,24 0,013% 55,85 27,92 83,77 0,003% 0,001% 0,004% 20,000% 10,000% 30,000%
- Begisting M2 9,30 0,006% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 3,72 0,023% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
10 Pondasi Tapak 100x100x30cm (P7)
- Pembesian Kg 130,39 0,006% 26,08 13,04 39,12 0,001% 0,001% 0,002% 20,000% 10,000% 30,000%
- Begisting M2 6,00 0,004% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 2,40 0,015% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
11 Pondasi Tapak 120x220x35cm (P-Tg)
- Pembesian Kg 157,42 0,007% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Begisting M2 4,18 0,003% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 1,85 0,011% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Balok Baja B1 WF 400x200x8x13 Kg 26.899,70 3,099% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Balok Baja B2 WF 350x175x7x11 Kg 328,07 0,038% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Balok Baja B3 WF 300x150x6,5x9 Kg 1.705,37 0,196% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
7 Balok Baja BA1 WF 300x150x6,5x9 Kg 5.551,40 0,640% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
8 Balok Baja BA2 WF 300x150x6,5x9 Kg 4.225,51 0,487% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
9 HTB 8.8 Ø19mm termasuk ring/washer dan mur bh 1.660,00 0,168% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
10 Stiffner Kg 618,95 0,087% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
11 Pengecatan Baja dengan Zinchromate M2 736,32 0,090% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
12 Pelat Beton Lantai 2 0,000%
- Pembesian Kg 8.778,18 0,418% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Begisting M2 92,58 0,071% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 115,72 0,708% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
Tangga
TanggaTimur
1 Balok Baja B3 WF 300x150x6,5x9 Kg 839,07 0,097% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 HTB 8.8 Ø19mm termasuk ring/washer dan mur bh 96,00 0,010% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Stiffner Kg 125,86 0,018% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pengecatan Baja dengan Zinchromate M2 28,30 0,003% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
Tangga Barat
1 Balok Baja B3 WF 300x150x6,5x9 Kg 787,83 0,091% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 HTB 8.8 Ø19mm termasuk ring/washer dan mur bh 96,00 0,010% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Stiffner Kg 118,17 0,017% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pengecatan Baja dengan Zinchromate M2 26,57 0,003% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
Tangga Selatan
1 Kolom Utama 250x250x9x14 Kg 160,34 0,018% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Balok Utama 250x125x6x9 Kg 720,75 0,080% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 HTB 8.8 Ø19mm termasuk ring/washer dan mur bh 72,00 0,007% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Stiffner Kg 44,05 0,006% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pengecatan Baja dengan Zinchromate M2 28,62 0,004% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 HTB 8.8 Ø19mm termasuk ring/washer dan mur bh 156,00 0,016% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Stiffner Kg 102,65 0,014% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Pengecatan Baja dengan Zinchromate M2 87,09 0,011% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
III.A.2.2 PEKERJAAN PERKUATAN STRUKTUR BANGUNAN EKSISTING 14,508% 0,000% 0,000% 0,000%
a. Pekerjaan Retrofit Pondasi & Struktur Bawah 5,086% 0,000% 0,000% 0,000%
1 Pekerjaan Pembobokan Beton Plat Eksisting M3 45,90 0,206% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Pekerjaan Galian Pondasi Tapak Eksisting sedalam 1,55 m M3 462,44 0,137% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Pekerjaan Bore Pile dia.30cm dengan Manual/Bore Tangan sedalam 6 m
M1 1.680,00 1,503% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pekerjaan Galian Sloof Eksisting M3 169,40 0,050% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pekerjaan Pasangan Lantai Kerja Pondasi PJ1 & Sloof SJ1, t.5cm M3 32,10 0,141% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Pondasi Tapak Perkuatan 240x240x60cm (PJ1)
- Pembesian Kg 6,23 0,000% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Begisting M3 0,06 0,000% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 0,05 0,000% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Urugan Kembali Tanah Galian dengan Pemadatan M3 189,28 0,104% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Urugan Kembali Tanah Galian dengan Pemadatan M3 71,55 0,039% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
Lantai 2
1 Shearwall SW01 L 545x545x45cm + Jacketing Kol.
- Chipping permukaan Kolom Eksisting M3 1,68 0,008% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Pembesian Kg 12.179,15 0,580% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Begisting M3 123,90 0,115% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Cor Beton K.300 M3 76,62 0,469% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pekerjaan Cat Plafond Expose M2 2.350,07 0,292% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Pekerjaan Cat Lis Plafond dgn Cat Tembok M2 241,00 0,030% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
7 Pekerjaan Cat Baja Ekspose M2 835,37 0,104% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b. Pekerjaan Dinding Tanaman + Rangka dan Sistem Pemipaan Lengkap 0,623% 0,000% 0,000% 0,000%
1 Vertical Garden
- Konstruksi Hollow + Wiremesh M5 + Join Mur Baut M2 475,58 0,338% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Lapisan Polycarbonat M2 475,58 0,244% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Pengadaan dan pemasangan modul planting bag Geotextile+tanamanM2 475,58 0,018% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Instalasi Sistem Pemipaan Irigasi Tetes Lengkap Pompa dan Nosel
- Instalasi Pipa Penyiraman Ls 1,00 0,024% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
g. Instalasi Kabel NYY 4 x 6 mm2 dari PP-PL ke P-SWP 2 m1 40,00 0,014% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
h. Tray Cable 400 x 100 mm m1 180,00 0,186% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
10 Grounding titik 1,00 0,014% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
LANTAI 2
1 Panel PP-2 unit 1,00 0,050% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Fixtures unit
a. TLD LED 1 x 20 W (Lengkap) bh 46,00 0,029% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b. SL 10 W (Lengkap dengan pitting) bh 239,00 0,139% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
c. Stop kontak 100 A bh 151,00 0,046% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
d. Saklar Engkel bh 166,00 0,088% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
e. Grid Switch 6 Gang bh 3,00 0,009% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Pekerjaan Instalasi
a. Instalasi titik lampu dalam bangunan NYM 3 x 2.5 mm2 dalam PVC
titikconduit 451,00 0,587% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b. Instalasi titik stop kontak dalam bangunan NYM 3 x 2.5 mm2 dalam
titik PVC cond 151,00 0,223% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
c. Tray Cable 400 x 100 mm m1 186,00 0,192% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Grounding titik 1,00 0,014% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 EXHAUST FAN unit 4,00 0,024% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
Tipe :Exhaust Fan Toilet kap.100 CFM
- Toilet Sisi Timur m1 64,00 0,016% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Toilet Sisi Barat m1 72,00 0,018% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
d. Gate Valve Ø 50
- Riser Tiap Lantai BH 2,00 0,009% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Riser Ke Instalasi Lapak Basah BH 1,00 0,005% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
LANTAI 2
1 Air Kotor
a. Pipa PVC Ø 100 (AW)
- Pipa Riser m1 5,00 0,004% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Instalasi Pipa Toilet Sisi Timur m1 36,00 0,026% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Instalasi Pipa Toilet Sisi Barat m1 38,00 0,027% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- FCO BH 2,00 0,001% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu LS 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Air Bekas
a. Pipa PVC Ø 80 (AW)
- Pipa Riser m1 5,00 0,003% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Instalasi Pipa Toilet Sisi Timur m1 50,00 0,028% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Instalasi Pipa Toilet Sisi Barat m1 52,00 0,029% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- FCO BH 2,00 0,001% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Air Bersih
a. Instalasi Pipa HDPE Ø 50
- Toilet Sisi Timur m1 35,00 0,015% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Toilet Sisi Barat m1 32,00 0,014% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
b. Instalasi Pipa HDPE Ø 40
- Toilet Sisi Timur m1 64,00 0,027% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Toilet Sisi Barat m1 72,00 0,030% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
c. Gate Valve Ø 50
- Riser Tiap Lantai BH 2,00 0,009% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Riser Ke Instalasi Lapak Basah BH 1,00 0,005% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Instalasi Air Hujan
- Instalasi Pipa PVC Ø 100 (Dari Atap Ke Lantai 1, 24 titik kolom)
m1 336,00 0,241% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Instalasi Pipa HDPE Ø 150 m1 275,00 0,455% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
- Aksesoris dan peralatan bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
f. Pipa GIP Ø 50 m1 15,00 0,007% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
g. Gate Valve Ø 50 BH 2,00 0,009% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
h. Strainer Ø 50 BH 2,00 0,010% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
i. Flexible Joint Ø 50 BH 2,00 0,004% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
j. Aksesoris dan Peralatan Bantu Ls 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Delivery Pump unit 1,00 0,028% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Sand Filter unit 1,00 0,008% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. Tipe : Vertical Tank
b. Kapasitas : 60 L/Min
5 Carbon Filter unit 1,00 0,006% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. Tipe : Vertical Tank
b. Kapasitas : 60 L/Min
6 Sewage Pump (SWP1 & SWP 2; Lengkap dengan Panel) unit 4,00 0,277% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. Tipe : Submersible Paralel Alternatif
b. Kapasitas : 100 L/Min
c. Head : 10 m
d. Power : 0,75Kw/1500Rpm/380V/2Ph
7 Tanki air unit 4,00 0,108% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. Type : Panel Fiberglass
b. Cap. : 1000 liter
LANTAI 1
1 Siamese connection l/d check valve + bak kontrol unit 1,00 0,015% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
2 Indoor Hydrant Box (IHB) Type B Kaca, Fin.Powder Coating lengkap dengan
unit : 4,00 0,138% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. 1 bh Fire Hose ø 1½' x 30 m
b. 1 bh Hose Rack ø 1½"
c. 1 bh Hydrant Valve ø 1½"
d. 1 bh Nozzle Gun ø 1½"
e. 1 bh Gate Valve ø 65 mm
3 Pemadam Api Ringan (PAR) 3 kg Dry Chemical bh 5,00 0,010% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pipa Black steel Medium dia 150 m' 438,00 0,724% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pipa Black steel Medium dia 100 m' 115,00 0,116% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Pipa Black steel Medium dia 65 m' 30,00 0,018% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
7 Pipa Black steel Medium dia 40 m' 12,00 0,005% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
8 Pipa Riser Black steel Medium dia 100 m' 5,00 0,005% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
9 Fitting lot 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
10 Material bantu lot 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
LANTAI 2
1 Indoor Hydrant Box (IHB) lengkap dengan : unit 4,00 0,138% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
a. 1 bh Fire Hose ø 1½' x 30 m
b. 1 bh Hose Rack ø 1½"
c. 1 bh Hydrant Valve ø 1½"
d. 1 bh Nozzle Gun ø 1½"
e. 1 bh Gate Valve ø 65 mm
2 Pemadam Api Ringan (PAR) 3 kg Dry Chemical bh 5,00 0,010% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Pipa Black steel Medium dia 100 m' 245,00 0,248% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Pipa Black steel Medium dia 65 m' 38,00 0,023% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
5 Pipa Black steel Medium dia 40 m' 12,00 0,005% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
6 Fitting lot 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
7 Material bantu lot 1,00 0,002% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Ijin Dinas Tenaga Kerja unit 1,00 0,024% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
4 Testing & Commissioning Unit 1,00 0,026% - - - 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
1 Theodolite - 1 Unit
2 Bak Ukur - 1 Unit
3 Exavator Mini - 1 Unit
4 Dump Truck - 2 Unit
5 Meteran Baja - 1 Unit
RESUME Page 30 of 38
V. TENAGA KERJA SUBPROFESIONAL MINGGU INI.
Tenaga Kerja yang diserap pada minggu ini adalah :
NO JENIS TENAGA KERJA JUMLAH SATUAN KETERANGAN
1 Senin 7-Nov-20 √ - -
2 Selasa 8-Nov-20 √ - -
3 Rabu 9-Nov-20
4 Kamis 10-Nov-20
5 Jum'at 11-Nov-20
6 Sabtu 12-Nov-20
7 Minggu 13-Nov-20
RESUME Page 31 of 38
VII. PERMASALAHAN, TINDAK LANJUT DAN SARAN
A. PERMASALAHAN
1 Pekerjaan Pondasi Tapak Hanya Bisa dikerjakan 1 (satu) titik Grid Line aja yaitu di Grid Line As-I, Karena Grid Line As-G,
As-J, dan As- K, belum bisa dikerjakan karena pertimbangan teknis.
Pertimbangan teknis yang dimaksud adalah :
- Khusus Grid Line As-G tepat di jalur pagar keliling pembatas antara bangunan baru dan bangunan existing
- Khusus Grid Line As-G bisa dikerjakan setelah relokasi pedagang dari bangunan existing terrelokasi ke tempat yang
sudah ditetapkan.
- Khusus Grid line As-J dan As-K belum bisa dikerjakan karena faktor lahan yang relatif sempit, sehingga method
kerjanya harus dikerjakan secara bertahap atau estafet.
- Kontraktor belum bisa mengerjakan pekerjaan lain seperti pekerjaan GWT karena gambar detail dan lay out nya
sampai saat ini belum diterima oleh kontraktor maupun MK.
RESUME Page 32 of 38
DOKUMENTASI VISUAL
JUDUL GAMBAR :
PENINJAUAN
KASATKER KE LOKASI
JUDUL GAMBAR :
MATERIAL BATU
SPLIT UNTUK LANTAI
KERJA
JUDUL GAMBAR :
RAPAT KOORDINASI
MINGGUAN DENGAN
MK
JUDUL GAMBAR :
RAPAT KOORDINASI
MINGGUAN DENGAN
MK
JUDUL GAMBAR :
PEMINDAHAN TIANG
LISTRIK
JUDUL GAMBAR :
PEMINDAHAN TIANG
LISTRIK
JUDUL GAMBAR :
PEMBUANGAN PUING
JUDUL GAMBAR :
PEMBUANGAN PUING
JUDUL GAMBAR :
PEKERJAAN GALIAN
PONDASI
JUDUL GAMBAR :
PEKERJAAN GALIAN
PONDASI
JUDUL GAMBAR :
PEKERJAAN GALIAN
PONDASI
JUDUL GAMBAR :
PEKERJAAN GALIAN
PONDASI