BoQ

SECURITY POST
GI 150 kV Bangkir

HARGA
JUMLAH
NO. URAIAN PEKERJAAN VOL SAT SATUAN KETERANGAN
( Rp ) ( Rp )
1 SECURITY POST 1 lot ( -  ) 0
2 TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH B3 1 lot 0 0
TOTAL NILAI PEKERJAAN 0
PPN (10%) 0
TOTAL NILAI PEKERJAAN (TERMASUK PPN) 0
BoQ
SECURITY POST
GI 150 kV Bangkir

HARGA SATUAN JUMLAH


NO. URAIAN PEKERJAAN VOL SAT KETERANGAN
( Rp ) ( Rp )

5 PEKERJAAN SECURITY POST


A PEKERJAAN TANAH
1 Galian Tanah untuk pondasi ( 28,97) M3 ( -) Volume BoQ include Gate dan Fence,
2 Urugan kembali lubang pondasi ( 9,66) M3 ( -) untuk Pos Jaga, nilainya sesuai
3 Urugan pasir bawah pondasi ( 0,31) M3 ( -) dengan realisasi di lapangan
4 Urugan pasir bawah lantai ( 3,60) M3 ( -)
TOTAL A ( -  )
B PEKERJAAN PONDASI & SLOOF POS JAGA
1 Pek. Pondasi Batu kali camp. 1Pc:4Psr ( 7,67) M3 ( -)
2 Pek. Lantai Kerja dibawah Pondasi & Sloof t=5 cm ( 0,79) M3 ( -)
3 Pek. Sloof SL1 20/25 Beton Bertulang K-225 + bekisting ( 1,10) M3 ( -)
TOTAL B ( -  )
C PEKERJAAN BETON POS JAGA
1 Pek. Kolom Beton Bertulang K-225 + bekisting ( 0,64) M3 ( -)
2 Pek. Kolom Praktis Beton Bertukang K-175 + bekisting ( 0,45) M3 ( -)
3 Pek. Balok Beton Bertulang K-225 + bekisting ( 0,18) M3 ( -)
4 Pek. Beton Plat Lantai t=12 cm + bekisting ( 0,26) M3 ( -)
5 Pek Beton Luifel Jendela t= 10 cm, Beton K-175 + bekisting ( 0,27) M3 ( -)
TOTAL C ( -  )
D PEKERJAAN ATAP GEDUNG POS JAGA
1 Pekerjaan Rangka Kuda-kuda Galvalume ( 25,18) M2 ( -)
2 Pasang Glasswoll ( 25,18) M2 ( -)
3 Pasang Aluminium Foil ( 25,18) M2 ( -)
4 Penutup atap Metal roof ( 25,18) M2 ( -)
TOTAL D ( -  )
E PEKERJAAN DINDING & PLESTERAN POS JAGA
1 Pasangan dinding 1/2 bata 1 : 2 (KM/WC) ( 10,08) M2 ( -)
2 Pekerjaan plester dan acian dinding 1 : 2 ( 4,08) M2 ( -)
3 Pasangan dinding 1/2 bata 1 : 4 ( 38,83) M2 ( -)
4 Pekerjaan plester dan acian dinding 1 : 4 ( 87,73) M2 ( -)
5 Pekerjaan plester dan acian Profil Tali air dinding ( 5,90) M' ( -)
TOTAL E ( -  )
F PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP AKSESORIES POS JAGA
1 Pasang Kusen+Pintu Type P3 ( 2,00) Unit ( -)
2 Pasang Kusen+Pintu Type P4 ( 1,00) Unit ( -)
3 Pasang Kusen+jendela Type J1 POS ( 1,00) Unit ( -)
4 Pasang Kusen+jendela Type J2 POS ( 2,00) Unit ( -)
TOTAL F ( -  )
G PEKERJAAN PLAFOND POS JAGA
1 Pek. Plafond GRC 4.5mm+Rangka Hollow 40x40 ( 25,18) M2 ( -)
2 Pekerjaan profil plafond Gypsum ( 38,00) M ( -)
TOTAL G ( -  )
H PEKERJAAN LANTAI POS JAGA
1 Urugan pasir bawah lantai t=10 cm ( 2,70) M3 ( -)
2 Lantai kerja t = 5 cm ( 27,04) M2 ( -)
3 Pekerjaan Lantai keramik 40X40 ( 24,79) M2 ( -)
4 Pekerjaan Lantai Keramik KM 20X20 ( 2,25) M2 ( -)
5 Pekerjaan Dinding Keramik KM 20X25 ( 6,00) M2 ( -)
TOTAL H ( -  )
I PEKERJAAN FINISHING & PENGECATAN
1 Pengecatan Tembok Eksterior ( 1.119,14) M2 ( -) Volume BoQ include Gate dan Fence,
untuk Pos Jaga, nilainya nantinya
2 Pengecatan Tembok Interior ( 47,95) M2 ( -) sesuai dengan realisasi di lapangan
3 Pengecatan Plafond ( 25,18) M2 ( -)
TOTAL I ( -  )
J PEKERJAAN PLUMBING
1 Squatting water closed complete with accessories ( 1,00) Unit ( -)
2 Installation of water supply pipe PVC dia 1/2 inc complete with clamp and accessories ( 12,25) M ( -)
3 Installation of water waste pipe PVC dia 3 inc complete with clamp and accessories ( 12,00) M ( -)
4 Septictank cap 1.5 m3 included infiltrate cap 2 m3 complete with palm fibre and sand stone ( 1,00) Unit ( -)
5 Water tank fibre glass (cap 2 m3) with water tower and pipe installation ( 1,00) Unit ( -)
6 Jet pump (include piping system) capacity : min 27 ltr/min, Suction head : min 27 m, Discharge head : ( 1,00) Unit ( -)
min 12 m
TOTAL J ( -  )
K PEKERJAAN ELEKTRIKAL
1 AC split 1/2 PK complete with accessories (stop contact and wiring) ( 1,00) No ( -)
2 Exhaus fan 40 Watt complete with accessories (stop contact and wiring) ( 1,00) No ( -)
3 Box panel MCB complete with accessories ( 1,00) No ( -)
4 Emergency lighting included wiring and lamp 100 watt ( 1,00) No ( -)
5 Indoor LED Tube Luminaires type flourescent fitting 2 x 24 watt inluded installation wiring and switch ( 3,00) No ( -)
6 Indoor LED Bulb luminaires type flourescent fitting 1 x 9 watt inluded installation wiring and switch ( 3,00) No ( -)
7 Stop contact inluded installation wiring ( 3,00) No ( -)
TOTAL K ( -  )
L FIRE FIGHTING EQUIPMENT
1 Alarm bell 6'' ( 150 mm ) diameter included installation wiring ( 1,00) Set ( -)
2 Portable fire extinghuister ( 5 kg hallon ) ( 1,00) Unit ( -)
TOTAL L ( -  )
TOTAL PEKERJAAN SECURITY POST ( -  )
BoQ
TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH B3
GI 150 kV Bangkir

HARGA
JUMLAH
NO. URAIAN PEKERJAAN VOL SAT SATUAN KETERANGAN
( Rp ) ( Rp )

6 PEKERJAAN TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH B3


A. PEKERJAAN TANAH
1 Galian Tanah - 36,60- M3 0
2 Urugan Kembali - 8,12- M3 0
3 Urugan Pasir dibawah lantai - 0,47- M3 0
4 Urugan Pasir dibawah pondasi - 1,61- M3 0
5 Urugan Tanah dibawah lantai - 9,64- M3 0
Sub Total 0
B. PEKERJAAN PASANGAN
1 Pasangan Batu Kosong - 3,30- M3 0
2 Pasangan Batu Belah 1 : 4 - 15,65- M3 0
3 Pasangan Batu Bata 1 : 4 - 60,41- M2 0
4 Pasangan Trasraam 1 : 2 - 34,60- M2 0
5 Bak Kontrol 60x60x45 cm - 2,00- Unit 0
Sub Total 0
C. PEKERJAAN PLESTERAN
1 Plesteran Trasraam 1 : 2 - 69,20- M2 0
2 Plesteran Tembok 1 : 4 - 51,62- M2 0
3 Acian Tembok - 120,82- M2 0
Sub Total 0
D. PEKERJAAN BETON
1 Beton Sloof K.175 + bekisting + besi tulangan 100 kg/m3 - 0,96- M3 0
2 Beton Kolom K.175 + bekisting + besi tulangan 100 kg/m3 - 0,91- M3 0
3 Beton Ring Balok K.175 (15x15) + bekisting + besi tulangan 100 kg/m3 - 0,54- M3 0
4 Beton Plat Kanopi K.175 + bekisting + besi tulangan 115 kg/m3 - 0,62- M3 0
Sub Total 0
E. PEKERJAAN LANTAI
1 Lantai Beton Bertulang K.225; t=10 cm - 2,24- M3 0
2 Floor Hardener - 5,98- M2 0
Sub Total 0
F. PEKERJAAN KUSEN, PINTU, DAN JENDELA
1 Pintu Besi Hollow 2X4 cm, tebal 2mm - 171,44- Kg 0
2 Jendela Teralis, besi hollow 20x40x2 mm + Kawat ram besi lapis pvc 1 cm - 4,14- Kg 0
Sub Total 0
G. PEKERJAAN ATAP
1 Atap Metal Roof - 45,17- M2 0
2 Papan Listplank GRC 30 cm, t = 4mm - 9,00- M' 0
3 Rangka Atap Baja Ringan - 45,00- M2 0
Sub Total 0
H. PEKERJAAN PLAFOND
1 Plafond PVC 8mm+Rangka Hollow 40x40 mm - 45,00- M2 0
2 List Plafond PVC - 60,00- M' 0
Sub Total 0
I. PEKERJAAN PENGECATAN
1 Cat Tembok Eksterior Weathershield ( 1lap Cat Dasar + 2 lap. Cat Penutup) - 120,82- M2 0
2 Cat Meni besi warna putih - 7,32- M2 0
Sub Total 0
J. PEKERJAAN INSTALASI LISTRIK
1 Lampu LED 11 watt (putih)+saklar+download fitting+kabel dan accessories - 2,00- set 0
2 Lampu LED 20 watt (putih)+saklar+download fitting+kabel dan accessories - 2,00- set 0
3 Stop Kontak - 2,00- unit 0
4 Sekering Kas Lengkap dengan MCB - 1,00- unit 0
Sub Total 0
K. PEKERJAAN PEMADAM KEBAKARAN
1 Fire Extinguisher 5 kg (AF11E) - 1,00- unit 0
2 Fire Extinguisher 20 kg (AF11E) - 1,00- unit 0
Sub Total 0
L. PEKERJAAN SANITASI
1 Wastafel - 1,00- Unit 0
2 Kran Stainless Steel (untuk wastafel) - 1,00- Unit 0
3 Installation of water supply pipe PVC dia 1/2 inc complete with clamp and - 35,00- M
accessories 0
4 Installation of water waste pipe PVC dia 3 inc complete with clamp and - 15,00- M
accessories 0
Sub Total 0
M. PEKERJAAN NAMA BANGUNAN
1 Huruf Timbul Stainless Steel - 1,00- Ls 0
Sub Total 0
N. PEKERJAAN PERIJINAN
1 Pengurusan Perijinan TPS LB3 - 1,00- Ls 0
Sub Total 0
TOTAL PEKERJAAN TEMPAT PENYIMPANAN SEMENTARA (TPS) LIMBAH B3 0