PERHITUNGAN PENDAPATAN
PERBAIKAN KOMPOR
Keterangan Tahun ke-1 Tahun ke-2
Perbaikan/overhaul 200,000 0
PENJUALAN KOMPOR
Keterangan Tahun ke-1 Tahun ke-2
Penjualan 2 buah kompor 0 200,000
PERHITUNGAN BIAYA
2 Perbaikan 200,000 0
Lain-lain 10,000,000
AWAL DEBET
TAHUN DEPRESIASI
0 -
1 400,000
2 400,000
N IL A I B U K U ( d a la m rib u a n )
DEPRESIASI METODE
1,200
1,000
800
600
400
200
-
0 1
TA
Page 6
Depresiasi
2
500,000
1,000,000
200,000
2
1,200
1,000
800
600
400
200
-
0 1 2
TAHUN
Page 7
Depresiasi
NILAI
BUKU
1,000,000
600,000
200,000
E GARIS LURUS
2
TAHUN
Page 8
Depresiasi
0 200
1 200
2 200
Page 9
Depresiasi
1000
600
200
Page 10
PINJAMAN
PINJAMAN 100,000,000
JANGKA WAKTU (tahun) 2
GRACE PERIOD (bulan) 0
BUNGA PER TAHUN 10.00%
PEMBAYARAN Bulanan
Angsuran
Tahun Bulan Saldo awal Bunga Saldo Akhir
Pokok
0 100,000,000
1 1 100,000,000 4,166,667 (833,333) 95,833,333
2 95,833,333 4,166,667 (798,611) 91,666,667
3 91,666,667 4,166,667 (763,889) 87,500,000
4 87,500,000 4,166,667 (729,167) 83,333,333
5 83,333,333 4,166,667 (694,444) 79,166,667
6 79,166,667 4,166,667 (659,722) 75,000,000
7 75,000,000 4,166,667 (625,000) 70,833,333
8 70,833,333 4,166,667 (590,278) 66,666,667
9 66,666,667 4,166,667 (555,556) 62,500,000
10 62,500,000 4,166,667 (520,833) 58,333,333
11 58,333,333 4,166,667 (486,111) 54,166,667
12 54,166,667 4,166,667 (451,389) 50,000,000
2 1 50,000,000 4,166,667 (416,667) 45,833,333
2 45,833,333 4,166,667 (381,944) 41,666,667
3 41,666,667 4,166,667 (347,222) 37,500,000
4 37,500,000 4,166,667 (312,500) 33,333,333
5 33,333,333 4,166,667 (277,778) 29,166,667
6 29,166,667 4,166,667 (243,056) 25,000,000
7 25,000,000 4,166,667 (208,333) 20,833,333
8 20,833,333 4,166,667 (173,611) 16,666,667
9 16,666,667 4,166,667 (138,889) 12,500,000
10 12,500,000 4,166,667 (104,167) 8,333,333
11 8,333,333 4,166,667 (69,444) 4,166,667
12 4,166,667 4,166,667 (34,722) (0)
PEMBAYARAN POKOK PINJAMAN DAN BUNGA
Biaya
Operasional 178,810,000 178,810,000
Perbaikan 200,000 0
Sewa Gedung 12,000,000 12,000,000
Pembayaran bunga 7,708,333 2,708,333
Penyusutan 400,000 400,000
Sub total 199,118,333 193,918,333
Laba kotor 189,681,667 238,281,667
Pajak 10% 48,154,500 62,734,500
Laba setelah pajak (EAT) 141,527,167 175,547,167
PENILAIAN PROYEK DENGAN INTERNAL RATE OF RETURN
(10.36)
3.86
PENILAIAN PROYEK DENGAN NET PRESENT VALUE