BILL OF QUANTITY

DAFTAR ANALISA PEKERJAAN

DINAS : DINAS KESEHATAN KAB. KUTAI BARAT


PEKERJAAN : PEMBANGUNAN PUSTU KAMPUNG MINTA
TAHUN ANGGARAN : 2021
LOKASI : KEC. PENYINGGAHAN

HARGA HARGA JUMLAH


ANALISA
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan pemasangan bouwplank per m'
Balok Kayu Meranti 0.0120 m3 3,499,900.00 41,998.80 41,998.80
Paku 0.0200 kg 25,000.00 500.00 500.00
Papan Kayu Meranti 0.0070 m3 3,619,200.00 25,334.40 25,334.40
Pekerja 0.1000 oh 170,000.00 17,000.00 17,000.00
Tukang 0.1000 oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.0100 oh 180,000.00 1,800.00 1,800.00
Mandor 0.0050 oh 200,000.00 1,000.00 1,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 105,633.20
OVERHEAD & PROFIT 10 % Rp. 10,563.32
JUMLAH 116,196.52
DI BULATKAN Rp. 116,100.00
PEKERJAAN STRUKTUR KAYU
1 Bh Pengadaan & Pemancangan Tiang Ulin 10/10 - 200
Balok Kayu Ulin 10/10 0.0220 m3 6,248,700.00 137,471.40 137,471.40
Pekerja 0.1250 oh 170,000.00 21,250.00 21,250.00
Tukang 0.1000 oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.0100 oh 180,000.00 1,800.00 1,800.00
Mandor 0.0130 oh 200,000.00 2,600.00 2,600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 181,121.40
OVERHEAD & PROFIT 10 % Rp. 18,112.14
JUMLAH 199,233.54
DI BULATKAN Rp. 199,200.00
1 M3 Memasang Sunduk Ulin
Balok Kayu Ulin 5/10 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Pekerja 0.2500 oh 170,000.00 42,500.00 42,500.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
Tukang 0.0200 oh 180,000.00 3,600.00 3,600.00
Kepala tukang 0.0250 oh 180,000.00 4,500.00 4,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 6,958,170.00
OVERHEAD & PROFIT 10 % Rp. 695,817.00
JUMLAH 7,653,987.00
DI BULATKAN Rp. 7,653,900.00
1 M3 Memasang Kalang Ulin
Balok Kayu Ulin 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Pekerja 0.0200 oh 170,000.00 3,400.00 3,400.00
Tukang 0.0200 oh 180,000.00 3,600.00 3,600.00
Kepala tukang 0.0200 oh 180,000.00 3,600.00 3,600.00
Mandor 0.0100 oh 200,000.00 2,000.00 2,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 6,886,170.00
OVERHEAD & PROFIT 10 % Rp. 688,617.00
JUMLAH 7,574,787.00
DI BULATKAN Rp. 7,574,700.00
1 M3 Mengerjakan Sloof Kayu
Balok Kayu Ulin 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Paku Ulin 3.0000 Kg 30,000.00 90,000.00 90,000.00
Baut Ǿ14 mm - 12 s/d 15 cm 40.0000 bh 11,000.00 440,000.00 440,000.00

Page 1 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Pekerja 12.0000 oh 170,000.00 2,040,000.00 2,040,000.00


Tukang 5.0000 oh 180,000.00 900,000.00 900,000.00
Kepala tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Mandor 0.0500 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 10,443,570.00
OVERHEAD & PROFIT 10 % Rp. 1,044,357.00
JUMLAH 11,487,927.00
DI BULATKAN Rp. 11,487,900.00
1 M3 Mengerjakan Gelagar Kayu
Balok Kayu Ulin 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Paku Ulin 5.0000 Kg 30,000.00 150,000.00 150,000.00
Baut Ǿ14 mm - 17 s/d 22 cm 80.0000 bh 11,000.00 880,000.00 880,000.00
Pekerja 12.0000 oh 170,000.00 2,040,000.00 2,040,000.00
Tukang 5.0000 oh 180,000.00 900,000.00 900,000.00
Kepala tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Mandor 0.0500 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 10,943,570.00
OVERHEAD & PROFIT 10 % Rp. 1,094,357.00
JUMLAH 12,037,927.00
DI BULATKAN Rp. 12,037,900.00
1 M3 Mengerjakan Suai Kayu
Balok Kayu Ulin 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Baut Ǿ14 mm - 17 s/d 22 cm 147.0000 bh 11,000.00 1,617,000.00 1,617,000.00
Pekerja 12.0000 oh 170,000.00 2,040,000.00 2,040,000.00
Tukang 5.0000 oh 180,000.00 900,000.00 900,000.00
Kepala tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Mandor 0.0500 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 11,530,570.00
OVERHEAD & PROFIT 10 % Rp. 1,153,057.00
JUMLAH 12,683,627.00
DI BULATKAN Rp. 12,683,600.00
1 M3 Mengerjakan Kolom Kayu 5/10 & 10/10
Balok Kayu Bengkirai 1.1000 m3 4,981,500.00 5,479,650.00 5,479,650.00
Paku biasa 3.0000 Kg 25,000.00 75,000.00 75,000.00
Pekerja 1.8000 oh 170,000.00 306,000.00 306,000.00
Tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Kepala tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Mandor 0.3000 oh 200,000.00 60,000.00 60,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 8,080,650.00
OVERHEAD & PROFIT 10 % Rp. 808,065.00
JUMLAH 8,888,715.00
DI BULATKAN Rp. 8,888,700.00
1 M3 Mengerjakan Struktur Rangka Dinding
Balok Kayu Kelas II 1.1000 m3 4,981,500.00 5,479,650.00 5,479,650.00
Paku biasa 5.0000 Kg 25,000.00 125,000.00 125,000.00
Pekerja 1.8000 oh 170,000.00 306,000.00 306,000.00
Tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Kepala tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Mandor 0.3000 oh 200,000.00 60,000.00 60,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 8,130,650.00
OVERHEAD & PROFIT 10 % Rp. 813,065.00
JUMLAH 8,943,715.00
DI BULATKAN Rp. 8,943,700.00
1 m3 Pasang Ring Balk Kayu 10/10
Balok Kayu Bengkirai 1.1000 m3 4,981,500.00 5,479,650.00 5,479,650.00
Paku biasa 5.0000 Kg 25,000.00 125,000.00 125,000.00
Pekerja 2.8000 oh 170,000.00 476,000.00 476,000.00
Page 2 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00


Kepala tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Mandor 0.3000 oh 200,000.00 60,000.00 60,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 8,300,650.00
OVERHEAD & PROFIT 10 % Rp. 830,065.00
JUMLAH 9,130,715.00
DI BULATKAN Rp. 9,130,700.00
1 m3 Pek. Konstruksi Tangga
Balok Kayu Kelas I/Ex. Ulin 1.1000 m3 30,000.00 33,000.00 33,000.00
Paku 10 cm 1.2500 Kg 25,000.00 31,250.00 31,250.00
Baut 20.0000 Bh 11,000.00 220,000.00 220,000.00
Pekerja 7.0000 oh 170,000.00 1,190,000.00 1,190,000.00
Tukang 21.0000 oh 180,000.00 3,780,000.00 3,780,000.00
Kepala tukang 2.1000 oh 180,000.00 378,000.00 378,000.00
Mandor 0.3500 oh 200,000.00 70,000.00 70,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 5,702,250.00
DI BULATKAN Rp. 5,702,200.00
PEKERJAAN LANTAI DAN DINDING
1 m2 Pasang Lantai Papan, Kayu Bengkirai (Halus)
Papan Kayu Bengkirai 2,5/20 0.0275 m3 4,814,600.00 132,401.50 132,401.50
Paku ulin 0.0020 Kg 25,000.00 50.00 50.00
Pekerja 0.2800 oh 170,000.00 47,600.00 47,600.00
Tukang 0.8000 oh 180,000.00 144,000.00 144,000.00
Kepala tukang 0.0800 oh 180,000.00 14,400.00 14,400.00
Mandor 0.0140 oh 200,000.00 2,800.00 2,800.00
JUMLAH ( UPAH DAN BAHAN) Rp. 341,251.50
OVERHEAD & PROFIT 10 % Rp. 34,125.15
JUMLAH 375,376.65
DI BULATKAN Rp. 375,300.00
1 m2 Pasang Lantai Papan, Kayu Ulin (Halus)
Papan Kayu Ulin t ; 2,5 cm 0.0275 m3 6,643,400.00 182,693.50 182,693.50
Paku ulin 0.0020 Kg 30,000.00 60.00 60.00
Pekerja 0.2800 oh 170,000.00 47,600.00 47,600.00
Tukang 0.8000 oh 180,000.00 144,000.00 144,000.00
Kepala tukang 0.0800 oh 180,000.00 14,400.00 14,400.00
Mandor 0.0140 oh 200,000.00 2,800.00 2,800.00
JUMLAH ( UPAH DAN BAHAN) Rp. 391,553.50
OVERHEAD & PROFIT 10 % Rp. 39,155.35
JUMLAH 430,708.85
DI BULATKAN Rp. 430,700.00

Page 3 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 m2 Pasang Lantai Papan, Kayu Ulin (Kasar)


Papan Kayu Ulin t ; 2 cm 0.0220 m3 6,643,400.00 146,154.80 146,154.80
Paku ulin 0.0020 Kg 30,000.00 60.00 60.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
Tukang 0.6000 oh 180,000.00 108,000.00 108,000.00
Kepala tukang 0.0600 oh 180,000.00 10,800.00 10,800.00
Mandor 0.0140 oh 200,000.00 2,800.00 2,800.00
JUMLAH ( UPAH DAN BAHAN) Rp. 301,814.80
OVERHEAD & PROFIT 10 % Rp. 30,181.48
JUMLAH 331,996.28
DI BULATKAN Rp. 331,900.00
1 m2 Pemasangan Dinding, Papan Kayu Bengkirai 2/20 cm (Pakai Nat dan Alur diketam halus)
Pekerja 0.2400 oh 170,000.00 40,800.00 40,800.00
Tukang 0.3500 oh 180,000.00 63,000.00 63,000.00
Kepala tukang 0.0300 oh 180,000.00 5,400.00 5,400.00
Mandor 0.0100 oh 200,000.00 2,000.00 2,000.00
Papan Kayu Bengkirai 0.0220 m3 4,814,600.00 105,921.20 105,921.20
Paku biasa 0.2000 kg 25,000.00 5,000.00 5,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 222,121.20
OVERHEAD & PROFIT 10 % Rp. 22,212.12
JUMLAH 244,333.32
DI BULATKAN Rp. 244,300.00
1 m2 Pemasangan Dinding, Papan Kayu Meranti 2/20 cm (Pakai Nat dan Alur diketam halus)
Pekerja 0.2400 oh 170,000.00 40,800.00 40,800.00
Tukang 0.3500 oh 180,000.00 63,000.00 63,000.00
Kepala tukang 0.0300 oh 180,000.00 5,400.00 5,400.00
Mandor 0.0100 oh 200,000.00 2,000.00 2,000.00
Papan Kayu Meranti 0.0220 m3 3,619,200.00 79,622.40 79,622.40 79,622.40
Paku biasa 0.2000 kg 25,000.00 5,000.00 5,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 195,822.40
OVERHEAD & PROFIT 10 % Rp. 19,582.24
JUMLAH 215,404.64
DI BULATKAN Rp. 215,400.00
1 m' Pasang list Dinding kayu profil, Lebar 5 cm
Kayu Profil 1.050 m' 7,500.00 7,875.00 7,875.00
Paku 0.010 Kg 25,000.00 250.00 250.00
Pekerja 0.021 Oh 170,000.00 3,570.00 3,570.00
Tukang 0.021 Oh 180,000.00 3,780.00 3,780.00
Kepala tukang 0.002 Oh 180,000.00 360.00 360.00
Mandor 0.001 Oh 200,000.00 200.00 200.00
JUMLAH ( UPAH DAN BAHAN) Rp. 16,035.00
OVERHEAD & PROFIT 10 % Rp. 1,603.50
JUMLAH 17,638.50
DI BULATKAN Rp. 17,600.00
1 m2 Pasang list Dinding, Papan Kayu Ulin 2/20
Pekerja 0.2800 oh 170,000.00 47,600.00 47,600.00
Tukang 0.8000 oh 180,000.00 144,000.00 144,000.00
Kepala tukang 0.0800 oh 180,000.00 14,400.00 14,400.00
Mandor 0.0100 oh 200,000.00 2,000.00 2,000.00
Papan Kayu Ulin 0.0200 m3 6,643,400.00 132,868.00 132,868.00
Paku biasa 0.2000 kg 25,000.00 5,000.00 5,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 345,868.00
OVERHEAD & PROFIT 10 % Rp. 34,586.80
JUMLAH 380,454.80
DI BULATKAN Rp. 380,400.00
Pasangan Jalusi Mati Kusen Kayu Per m2
Paku Biasa 0.1500 Kg 25,000.00 3,750.00 3,750.00
Page 4 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Papan Kayu Ulin 0.0200 m³ 6,643,400.00 132,868.00 132,868.00


Pekerja 1.0000 oh 170,000.00 170,000.00 170,000.00
Tukang 3.0000 oh 180,000.00 540,000.00 540,000.00
Kepala tukang 0.3000 oh 180,000.00 54,000.00 54,000.00
Mandor 0.0500 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 910,618.00
OVERHEAD & PROFIT 10 % Rp. 91,061.80
JUMLAH 1,001,679.80
DI BULATKAN Rp. 1,001,600.00
PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI, BOVENLIGHT DAN KACA
1 m3 Pek. Kusen-Kusen Kayu
Balok Kayu Kelas II/Ex. BEngkirai 1.100 m³ 4,981,500.00 5,479,650.00 5,479,650.00
Paku 10 cm 1.250 kg 25,000.00 31,250.00 31,250.00
Lem Kayu 1.000 kg 50,000.00 50,000.00 50,000.00
Pekerja 7.000 oh 170,000.00 1,190,000.00 1,190,000.00
Tukang 21.000 oh 180,000.00 3,780,000.00 3,780,000.00
Kepala tukang 2.100 oh 180,000.00 378,000.00 378,000.00
Mandor 0.008 oh 200,000.00 1,600.00 1,600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 10,910,500.00
OVERHEAD & PROFIT 10 % Rp. 1,091,050.00
JUMLAH 12,001,550.00
DI BULATKAN Rp. 12,001,500.00
1 m2 Pekerjaan Daun Pintu Panel Kayu Bengkirai
Papan Kayu Kelas II (Bengkirai) 0.040 m³ 4,801,600.00 192,064.00 192,064.00
Lem Kayu 0.500 kg 50,000.00 25,000.00 25,000.00
Pekerja 1.000 oh 170,000.00 170,000.00 170,000.00
Tukang 3.000 oh 180,000.00 540,000.00 540,000.00
Kepala tukang 0.300 oh 180,000.00 54,000.00 54,000.00
Mandor 0.050 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 991,064.00
OVERHEAD & PROFIT 10 % Rp. 99,106.40
JUMLAH 1,090,170.40
DI BULATKAN Rp. 1,090,100.00
1 m2 Pekerjaan Daun Pintu Kaca Bengkirai Kayu
Papan Kayu Kelas II (Bengkirai) 0.0240 m³ 4,801,600.00 115,238.40 115,238.40
Kaca bening 5 mm 0.6400 m² 328,500.00 210,240.00 210,240.00
Pekerja 0.0800 oh 170,000.00 13,600.00 13,600.00
Tukang 2.4000 oh 180,000.00 432,000.00 432,000.00
Kepala tukang 0.2400 oh 180,000.00 43,200.00 43,200.00
Mandor 0.0400 oh 200,000.00 8,000.00 8,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 822,278.40
OVERHEAD & PROFIT 10 % Rp. 82,227.84
JUMLAH 904,506.24
DI BULATKAN Rp. 904,500.00
1 m2 Pekerjaan Daun Jendela Kaca Kayu Bengkirai
Papan Kayu Kelas II (Bengkirai) 0.0240 m³ 4,801,600.00 115,238.40 115,238.40
Kaca bening 5 mm 0.6400 m² 328,500.00 210,240.00 210,240.00
Pekerja 0.0800 oh 170,000.00 13,600.00 13,600.00
Tukang 2.4000 oh 180,000.00 432,000.00 432,000.00
Kepala tukang 0.2400 oh 180,000.00 43,200.00 43,200.00
Mandor 0.0400 oh 200,000.00 8,000.00 8,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 822,278.40
OVERHEAD & PROFIT 10 % Rp. 82,227.84
JUMLAH 904,506.24
DI BULATKAN Rp. 904,500.00
1 M² Pasang kaca 5 mm
Kaca 5 mm 1.1000 m² 328,500.00 361,350.00 361,350.00
Page 5 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Pekerja 0.0150 oh 170,000.00 2,550.00 2,550.00


Tukang 0.1500 oh 180,000.00 27,000.00 27,000.00
Kepala tukang 0.0150 oh 180,000.00 2,700.00 2,700.00
Mandor 0.0008 oh 200,000.00 150.00 150.00
JUMLAH ( UPAH DAN BAHAN) Rp. 393,750.00
OVERHEAD & PROFIT 10 % Rp. 39,375.00
JUMLAH 433,125.00
DI BULATKAN Rp. 433,100.00
PEKERJAAN RANGKA KAP DAN ATAP
Memasang 1 m³ Konstruksi Kuda-kuda Konvensional / Pas. Skor Angin
Balok Kayu Kelas III/Ex. Meranti 1.100 m3 3,499,900.00 3,849,890.00 3,849,890.00
Besi strip 15.000 Kg 23,000.00 345,000.00 345,000.00
Paku 12 cm 5.600 Kg 25,000.00 140,000.00 140,000.00
Pekerja 4.000 Oh 170,000.00 680,000.00 680,000.00
Tukang 12.000 Oh 180,000.00 2,160,000.00 2,160,000.00
Kepala tukang 1.200 Oh 180,000.00 216,000.00 216,000.00
Mandor 0.200 Oh 200,000.00 40,000.00 40,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 7,430,890.00
OVERHEAD & PROFIT 10 % Rp. 743,089.00
JUMLAH 8,173,979.00
DI BULATKAN Rp. 8,173,900.00
Memasang 1 m³ Konstruksi Gordeng
Balok Kayu Kelas III/Ex. Meranti 1.100 m³ 3,499,900.00 3,849,890.00 3,849,890.00
Besi Strip tebal 5 mm 15.000 kg 23,000.00 345,000.00 345,000.00
Paku 12 cm 3.000 kg 25,000.00 75,000.00 75,000.00
Pekerja 6.700 Oh 170,000.00 1,139,000.00 1,139,000.00
Tukang 20.100 Oh 180,000.00 3,618,000.00 3,618,000.00
Kepala tukang 2.010 Oh 180,000.00 361,800.00 361,800.00
Mandor 0.335 Oh 200,000.00 67,000.00 67,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 9,455,690.00
OVERHEAD & PROFIT 10 % Rp. 945,569.00
JUMLAH 10,401,259.00
DI BULATKAN Rp. 10,401,200.00
Memasang talang miring atap lebar 90 cm per m1 (untuk jurai)
Seng plat BJLS 0.5000 m' 50,000.00 25,000.00 25,000.00
Paku 0.0150 kg 25,000.00 375.00 375.00
Papan Kayu Ulin 0.0190 m3 6,643,400.00 126,224.60 126,224.60
Pekerja 0.0400 oh 170,000.00 6,800.00 6,800.00
Tukang 0.4000 oh - - -
Kepala tukang 0.0250 oh 180,000.00 4,500.00 4,500.00
Mandor 0.0013 oh 200,000.00 250.00 250.00
JUMLAH ( UPAH DAN BAHAN) Rp. 163,149.60
OVERHEAD & PROFIT 10 % Rp. 16,314.96
JUMLAH 179,464.56
DI BULATKAN Rp. 179,400.00
1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, (Kayu Klas I)
Papan kayu Kelas I/Ex. ulin 0.0088 m3 6,643,400.00 58,461.92 58,461.92
Paku biasa 2" - 5" 0.060 Kg 25,000.00 1,500.00 1,500.00
Pekerja 0.100 Oh 170,000.00 17,000.00 17,000.00
Tukang 0.100 Oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.010 Oh 180,000.00 1,800.00 1,800.00
Mandor 0.050 Oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 106,761.92
OVERHEAD & PROFIT 10 % Rp. 10,676.19
JUMLAH 117,438.11
DI BULATKAN Rp. 117,400.00
Pek. Atap Ex. Spandeck Zincalum
Page 6 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Atap Spandek Zincalum 1.100 m2 80,880.00 88,968.00 88,968.00


Screw Cteks 10 x 16 - 16 8.000 bh - - -
Pekerja 0.020 oh 170,000.00 3,400.00 3,400.00
Tukang 0.080 oh 180,000.00 14,400.00 14,400.00
Kepala tukang 0.010 oh 180,000.00 1,800.00 1,800.00
Mandor 0.006 oh 200,000.00 1,200.00 1,200.00
JUMLAH ( UPAH DAN BAHAN) Rp. 109,768.00
OVERHEAD & PROFIT 10 % Rp. 10,976.80
JUMLAH 120,744.80
DI BULATKAN Rp. 120,700.00
Pasang Nok/Bubungan Zincalume per m1
Nok Zincalume tebal 0,35 mm 1.1000 bh 52,000.00 57,200.00 57,200.00
Screw Cteks 10 x 16 - 16 6.0000 bh - - -
Pekerja 0.0200 oh 170,000.00 3,400.00 3,400.00
Tukang 0.0800 oh 180,000.00 14,400.00 14,400.00
Kepala tukang 0.0100 oh 180,000.00 1,800.00 1,800.00
Mandor 0.0060 oh 200,000.00 1,200.00 1,200.00
JUMLAH ( UPAH DAN BAHAN) Rp. 78,000.00
OVERHEAD & PROFIT 10 % Rp. 7,800.00
JUMLAH 85,800.00
DI BULATKAN Rp. 85,800.00
Pek. Atap Ex. Seng plastik
Atap Seng plastik 0.700 lbr 35,000.00 24,500.00 24,500.00
Paku seng 0.020 bh 45,000.00 900.00 900.00
Pekerja 0.120 oh 170,000.00 20,400.00 20,400.00
Tukang 0.060 oh 180,000.00 10,800.00 10,800.00
Kepala tukang 0.006 oh 180,000.00 1,080.00 1,080.00
Mandor 0.006 oh 200,000.00 1,200.00 1,200.00
JUMLAH ( UPAH DAN BAHAN) Rp. 58,880.00
OVERHEAD & PROFIT 10 % Rp. 5,888.00
JUMLAH 64,768.00
DI BULATKAN Rp. 64,700.00
PEKERJAAN PLAFON
Pasang 1m² Pasang rangka langit-langit (60 x 120) m, kayu Meranti
Balok Kayu Kelas III/Ex. Meranti 0.0130 m3 3,499,900.000 45,498.70 45,498.70
Paku 0.2000 kg 25,000.000 5,000.00 5,000.00
Tukang 0.3000 oh 180,000.00 54,000.00 54,000.00
Kepala tukang 0.0300 oh 180,000.00 5,400.00 5,400.00
Pekerja 0.1500 oh 170,000.00 25,500.00 25,500.00
Mandor 0.0750 oh 200,000.00 15,000.00 15,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 150,398.70
OVERHEAD & PROFIT 10 % Rp. 15,039.87
JUMLAH 165,438.57
DI BULATKAN Rp. 165,400.00
Memasang 1m² Langit-langit Lambrisering kayu, tebal 9 mm
Pekerja 0.1500 oh 170,000.00 25,500.00 25,500.00
Tukang 0.2500 oh 180,000.00 45,000.00 45,000.00
Kepala tukang 0.0250 oh 180,000.00 4,500.00 4,500.00
Mandor 0.0750 oh 200,000.00 15,000.00 15,000.00
Papan Kayu Meranti 0.0220 m3 3,950,000.00 86,900.00 86,900.00
Paku 0.0250 kg 25,000.00 625.00 625.00
JUMLAH ( UPAH DAN BAHAN) Rp. 177,525.00
OVERHEAD & PROFIT 10 % Rp. 17,752.50
JUMLAH 195,277.50
DI BULATKAN Rp. 195,200.00
1 m2 Langit-langit GRC Board
GRC Board 4 mm 0.3820 lbr 103,000.000 39,346.000 39,346.00
Page 7 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Paku Biasa 1 - 2,5 cm 0.0100 kg 25,000.000 250.000 250.00


Tukang 0.0700 oh 180,000.00 12,600.000 12,600.00
Kepala tukang 0.0070 oh 180,000.00 1,260.000 1,260.00
Pekerja 0.0300 oh 170,000.00 5,100.000 5,100.00
Mandor 0.0020 oh 200,000.00 400.000 400.00
JUMLAH ( UPAH DAN BAHAN) Rp. 58,956.00
OVERHEAD & PROFIT 10 % Rp. 5,895.60
JUMLAH 64,851.60
DI BULATKAN Rp. 64,800.00
1 m' Pasang list plafond, kayu profil
Kayu Profil 1.050 m' 7,500.00 7,875.00 7,875.00
Paku 0.010 Kg 25,000.00 250.00 250.00
Pekerja 0.050 Oh 170,000.00 8,500.00 8,500.00
Tukang 0.050 Oh 180,000.00 9,000.00 9,000.00
Kepala tukang 0.005 Oh 180,000.00 900.00 900.00
Mandor 0.003 Oh 200,000.00 600.00 600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 27,125.00
OVERHEAD & PROFIT 10 % Rp. 2,712.50
JUMLAH 29,837.50
DI BULATKAN Rp. 29,800.00
PEKERJAAN LISTRIK
1 TITIK MENGERJAKAN INSTALASI LAMPU
Pipa Pvc 5/8" 3.0000 Btg 8,900.00 26,700.00 26,700.00
Kabel 24.0000 m 3,610.00 86,640.00 86,640.00
T - Dos 5/8" 3.0000 Bh 11,800.00 35,400.00 35,400.00
L Bow 4.0000 Bh 2,500.00 10,000.00 10,000.00
Las Dop 3.0000 Bh 8,000.00 24,000.00 24,000.00
Klem biasa 24.0000 Bh 1,400.00 33,600.00 33,600.00
Mangkok 1.0000 Bh 11,800.00 11,800.00 11,800.00
Saklar 1.0000 Bh 28,000.00 28,000.00 28,000.00
Fitting 1.0000 Bh 17,500.00 17,500.00 17,500.00
Tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Pekerja 0.2500 oh 170,000.00 42,500.00 42,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 406,140.00
OVERHEAD & PROFIT 10 % Rp. 40,614.00
JUMLAH 446,754.00
DI BULATKAN Rp. 446,700.00
1 TITIK MENGERJAKAN INSTALASI STOP KONTAK
Pipa Pvc 5/8" 3.0000 Btg 8,900.00 26,700.00 26,700.00
Kabel 16.0000 m 3,610.00 57,760.00 57,760.00
T - Dos 5/8" 3.0000 Bh 11,800.00 35,400.00 35,400.00
L Bow 4.0000 Bh 2,500.00 10,000.00 10,000.00
Las Dop 3.0000 Bh 8,000.00 24,000.00 24,000.00
Klem biasa 24.0000 Bh 1,400.00 33,600.00 33,600.00
Mangkok 1.0000 Bh 11,800.00 11,800.00 11,800.00
Stop Kontak 1.0000 Bh 27,800.00 27,800.00 27,800.00
Tukang 0.4000 oh 180,000.00 72,000.00 72,000.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 333,060.00
OVERHEAD & PROFIT 10 % Rp. 33,306.00
JUMLAH 366,366.00
DI BULATKAN Rp. 366,300.00
1 Bh memasang Sekering Kast /MCB
Pipa Pvc 5/8" 3.000 Btg 8,900.00 26,700.00 26,700.00
Kabel 15.000 m 3,610.00 54,150.00 54,150.00
T - Dos 5/8" 1.000 bh 11,800.00 11,800.00 11,800.00
L Bow 2.000 bh 2,500.00 5,000.00 5,000.00

Page 8 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Klem biasa 24.000 bh 1,400.00 33,600.00 33,600.00


MCB 1.000 bh 52,000.00 52,000.00 52,000.00
Tukang 0.6000 oh 180,000.00 108,000.00 108,000.00
Pekerja 0.3000 oh 170,000.00 51,000.00 51,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 342,250.00
OVERHEAD & PROFIT 10 % Rp. 34,225.00
JUMLAH 376,475.00
DI BULATKAN Rp. 376,400.00
PEKERJAAN BETON DAN KERAMIK
1 m2 Membuat Beton Rangka Kawat Harmonika, 1 Pc : 3 Ps : 5 Kr
Semen portland 10.000 Kg 2,530.00 25,300.00 25,300.00
Pasir beton 0.026 m3 774,300.00 20,131.80 20,131.80
Kerikil Beton 0.044 m3 721,400.00 31,741.60 31,741.60
Kawat Harmonika 1.100 m' 55,000.00 60,500.00 60,500.00
Pekerja 1.150 Oh 170,000.00 195,500.00 195,500.00
Tukang 0.020 Oh 180,000.00 3,600.00 3,600.00
Kepala Tukang 0.002 Oh 180,000.00 360.00 360.00
Mandor 0.006 Oh 200,000.00 1,200.00 1,200.00
JUMLAH ( UPAH DAN BAHAN) Rp. 338,333.40
OVERHEAD & PROFIT 10 % Rp. 33,833.34
JUMLAH 372,166.74
DI BULATKAN Rp. 372,100.00
1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
PC 336.0000 kg 2,530.00 850,080.00 850,080.00
Pasir beton 0.5400 m3 774,300.00 418,122.00 418,122.00
Kerikil beton 0.8100 m3 721,400.00 584,334.00 584,334.00
Tukang 0.3500 oh 180,000.00 63,000.00 63,000.00
Kepala Tukang 0.0350 oh 180,000.00 6,300.00 6,300.00
Pekerja 2.0000 oh 170,000.00 340,000.00 340,000.00
Mandor 0.1000 oh 200,000.00 20,000.00 20,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 2,281,836.00
OVERHEAD & PROFIT 10 % Rp. 228,183.60
JUMLAH 2,510,019.60
DI BULATKAN Rp. 2,510,000.00
1 kg Pembesian dengan besi polos
Besi beton polos 1.0500 kg 18,000.00 18,900.00 18,900.00
Kawat beton 0.0150 kg 30,000.00 450.00 450.00
Tukang besi 0.0070 oh 180,000.00 1,260.00 1,260.00
Kepala tukang besi 0.0007 oh 180,000.00 126.00 126.00
Pekerja 0.0070 oh 170,000.00 1,190.00 1,190.00
Mandor 0.0003 oh 200,000.00 60.00 60.00
JUMLAH ( UPAH DAN BAHAN) Rp. 21,986.00
DI BULATKAN Rp. 21,900.00

Page 9 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 m3 Lantai Kerja
Beton 1 Pc : 2 Ps : 3 Kr 1.0000 m3 2,510,000.00 2,510,000.00
Besi Polos 59.8500 Kg 21,900.00 1,310,715.00
JUMLAH ( UPAH DAN BAHAN) Rp. 3,820,715.00
DI BULATKAN Rp. 3,820,700.00
1 m2 Pasang Keramik warna ukuran 25 x 25 cm
Keramik 25 x 25 cm (warna) 16.0000 Lbr 6,875.00 110,000.00 110,000.00
Semen PC 10.0000 kg 2,530.00 25,300.00 25,300.00
Pasir Pasang 0.0420 m3 616,400.00 25,888.80 25,888.80
Semen warna 1.500 Kg 3,158.00 4,737.00 4,737.00
Pekerja 0.7000 Oh 170,000.00 119,000.00 119,000.00
Tukang 0.3500 Oh 180,000.00 63,000.00 63,000.00
Kepala Tukang 0.0350 Oh 180,000.00 6,300.00 6,300.00
Mandor 0.0350 Oh 200,000.00 7,000.00 7,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 361,225.80
OVERHEAD & PROFIT 10 % Rp. 36,122.58
JUMLAH 397,348.38
DI BULATKAN Rp. 397,300.00
Pasang Dinding Keramik 25x40 cm (warna)per m2
Keramik 25x40 cm (warna) 10.0000 lbr 6,875.00 68,750.00 68,750.00
Semen PC 9.3000 kg 2,530.00 23,529.00 23,529.00
Pasir Pasang 0.0180 m3 616,400.00 11,095.20 11,095.20
Semen warna 1.9400 kg 3,158.00 6,126.52 6,126.52
Pekerja 0.9000 oh 170,000.00 153,000.00 153,000.00
Tukang 0.4500 oh 180,000.00 81,000.00 81,000.00
Kepala Tukang 0.0045 oh 180,000.00 810.00 810.00
Mandor 0.0450 oh 200,000.00 9,000.00 9,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 353,310.72
OVERHEAD & PROFIT 10 % Rp. 35,331.07
JUMLAH 388,641.79
DI BULATKAN Rp. 388,600.00
PEKERJAAN PENGGANTUNG & PENGUNCI
1 buah Pasang Kunci Tanam biasa 2x Putar
Kunci tanam biasa 1.000 Bh 300,000.00 300,000.00 300,000.00
Pekerja 0.005 Oh 170,000.00 850.00 850.00
Tukang 0.500 Oh 180,000.00 90,000.00 90,000.00
Kepala Tukang 0.050 Oh 180,000.00 9,000.00 9,000.00
Mandor 0.005 Oh 200,000.00 1,000.00 1,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 400,850.00
OVERHEAD & PROFIT 10 % Rp. 40,085.00
JUMLAH 440,935.00
DI BULATKAN Rp. 440,900.00
1 Set Pasang Grendel Tanam Pintu
Grendel Tanam Pintu 1.000 Bh 53,200.00 53,200.00 53,200.00
Pekerja 0.010 Oh 170,000.00 1,700.00 1,700.00
Tukang 0.500 Oh 180,000.00 90,000.00 90,000.00
Kepala Tukang 0.010 Oh 180,000.00 1,800.00 1,800.00
Mandor 0.005 Oh 200,000.00 1,000.00 1,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 147,700.00
OVERHEAD & PROFIT 10 % Rp. 14,770.00
JUMLAH 162,470.00
DI BULATKAN Rp. 162,400.00
1 buah pasang kunci tanam KM/WC
Kunci tanam KM/WC 1.000 Bh 260,000.00 260,000.00 260,000.00
Pekerja 0.005 Oh 170,000.00 850.00 850.00
Tukang 0.500 Oh 180,000.00 90,000.00 90,000.00
Kepala tukang 0.005 Oh 180,000.00 900.00 900.00
Page 10 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Mandor 0.0030 Oh 200,000.00 600.00 600.00


JUMLAH ( UPAH DAN BAHAN) Rp. 352,350.00
OVERHEAD & PROFIT 10 % Rp. 35,235.00
JUMLAH 387,585.00
DI BULATKAN Rp. 387,500.00
1 Bh Pasang engsel pintu
Ensel 5 inchi 1.0000 bh 37,400.00 37,400.00 37,400.00
Pekerja 0.0150 oh 170,000.00 2,550.00 2,550.00
Tukang 0.1500 oh 180,000.00 27,000.00 27,000.00
Kepala tukang 0.0150 oh 180,000.00 2,700.00 2,700.00
Mandor 0.0008 oh 200,000.00 150.00 150.00
JUMLAH ( UPAH DAN BAHAN) Rp. 69,800.00
OVERHEAD & PROFIT 10 % Rp. 6,980.00
JUMLAH 76,780.00
DI BULATKAN Rp. 76,700.00

Page 11 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 Bh Pasang engsel jendela


Ensel 3 inchi 1.0000 bh 31,800.00 31,800.00 31,800.00
Pekerja 0.0100 oh 170,000.00 1,700.00 1,700.00
Tukang 0.1000 oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.0100 oh 180,000.00 1,800.00 1,800.00
Mandor 0.0005 oh 200,000.00 100.00 100.00
JUMLAH ( UPAH DAN BAHAN) Rp. 53,400.00
OVERHEAD & PROFIT 10 % Rp. 5,340.00
JUMLAH 58,740.00
DI BULATKAN Rp. 58,700.00
1 Bh Pasang kait angin/Penopang Jendela
Hak angin 1.000 bh 32,700.00 32,700.00 32,700.00
Pekerja 0.015 Oh 170,000.00 2,550.00 2,550.00
Tukang 0.150 Oh 180,000.00 27,000.00 27,000.00
Kepala tukang 0.015 Oh 180,000.00 2,700.00 2,700.00
Mandor 0.00080 Oh 200,000.00 160.00 160.00
JUMLAH ( UPAH DAN BAHAN) Rp. 65,110.00
OVERHEAD & PROFIT 10 % Rp. 6,511.00
JUMLAH 71,621.00
DI BULATKAN Rp. 71,600.00
1 Bh Pasang Grendel/Pengunci jendela
Grendel jendela 1.0000 bh 32,700.00 32,700.00 32,700.00
Pekerja 0.015 Oh 170,000.00 2,550.00 2,550.00
Tukang 0.150 Oh 180,000.00 27,000.00 27,000.00
Kepala tukang 0.015 Oh 180,000.00 2,700.00 2,700.00
Mandor 0.00080 Oh 200,000.00 160.00 160.00
JUMLAH ( UPAH DAN BAHAN) Rp. 65,110.00
OVERHEAD & PROFIT 10 % Rp. 6,511.00
JUMLAH 71,621.00
DI BULATKAN Rp. 71,600.00
1 Bh Pasang Handle/Pegangan Jendela atau Lemari
Handle Jendela 1.0000 Bh 32,700.00 32,700.00 32,700.00
Pekerja 0.0150 oh 170,000.00 2,550.00 2,550.00
Tukang 0.1500 oh 180,000.00 27,000.00 27,000.00
Kepala Tukang 0.0150 oh 180,000.00 2,700.00 2,700.00
Mandor 0.0008 oh 200,000.00 150.00 150.00
JUMLAH ( UPAH DAN BAHAN) Rp. 65,100.00
OVERHEAD & PROFIT 10 % Rp. 6,510.00
JUMLAH 71,610.00
DI BULATKAN Rp. 71,600.00
PEKERJAAN INSTALASI AIR BERSIH, AIR KOTOR
Memasang pipa PVC tipe AW dia. ¾" per m'
Pipa PVC Ø ¾ 1.2000 m' 6,000.00 7,200.00 7,200.00
Perlengkapan dari harga pipa 0.3500 % 6,000.00 2,100.00 2,100.00
Pekerja 0.0360 oh 170,000.00 6,120.00 6,120.00
Tukang 0.0600 oh 180,000.00 10,800.00 10,800.00
Kepala Tukang 0.0060 oh 180,000.00 1,080.00 1,080.00
Mandor 0.0020 oh 200,000.00 400.00 400.00
JUMLAH ( UPAH DAN BAHAN) Rp. 27,700.00
OVERHEAD & PROFIT 10 % Rp. 2,770.00
JUMLAH 30,470.00
DI BULATKAN Rp. 30,400.00
Memasang pipa PVC tipe AW dia. ½" per m'
Pipa PVC Ø ½ 1.2000 m' 4,500.00 5,400.00 5,400.00
Perlengkapan dari harga pipa 0.3500 % 4,500.00 1,575.00 1,575.00
Pekerja 0.0360 oh 170,000.00 6,120.00 6,120.00
Tukang 0.0600 oh 180,000.00 10,800.00 10,800.00
Page 12 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Kepala Tukang 0.0060 oh 180,000.00 1,080.00 1,080.00


Mandor 0.0018 oh 200,000.00 360.00 360.00
JUMLAH ( UPAH DAN BAHAN) Rp. 25,335.00
OVERHEAD & PROFIT 10 % Rp. 2,533.50
JUMLAH 27,868.50
DI BULATKAN Rp. 27,800.00

Page 13 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Memasang pipa PVC tipe AW dia. 2" per m'


Pipa PVC Ø 2" 1.2000 m' 35,000.00 42,000.00 42,000.00
Perlengkapan dari harga pipa 0.3500 % 35,000.00 12,250.00 12,250.00
Pekerja 0.0540 oh 170,000.00 9,180.00 9,180.00
Tukang 0.0900 oh 180,000.00 16,200.00 16,200.00
Kepala Tukang 0.0090 oh 180,000.00 1,620.00 1,620.00
Mandor 0.0030 oh 200,000.00 600.00 600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 81,850.00
OVERHEAD & PROFIT 10 % Rp. 8,185.00
JUMLAH 90,035.00
DI BULATKAN Rp. 90,000.00
Memasang pipa PVC tipe AW dia. 4" per m'
Pipa PVC Ø 4 " 1.2000 m' 75,000.00 90,000.00 90,000.00
Perlengkapan dari harga pipa 0.3500 % 75,000.00 26,250.00 26,250.00
Pekerja 0.081 oh 170,000.00 13,770.00 13,770.00
Tukang 0.135 oh 180,000.00 24,300.00 24,300.00
Kepala tukang 0.0135 oh 180,000.00 2,430.00 2,430.00
Mandor 0.0040 oh 200,000.00 800.00 800.00
JUMLAH ( UPAH DAN BAHAN) Rp. 157,550.00
OVERHEAD & PROFIT 10 % Rp. 15,755.00
JUMLAH 173,305.00
DI BULATKAN Rp. 173,300.00
Pas. Satu Buah Closed Jongkok Porselin
Kloset jongkok porselen 1.0000 Bh 214,200.00 214,200.00 214,200.00
Semen portland 6.0000 Kg 2,530.00 15,180.00 15,180.00
Pasir pasang 0.0100 m3 616,400.00 6,164.00 6,164.00
Pekerja 1.0000 Oh 170,000.00 170,000.00 170,000.00
Tukang 1.5000 Oh 180,000.00 270,000.00 270,000.00
Kepala tukang 0.1500 Oh 180,000.00 27,000.00 27,000.00
Mandor 0.1600 Oh 200,000.00 32,000.00 32,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 734,544.00
OVERHEAD & PROFIT 10 % Rp. 73,454.40
JUMLAH 807,998.40
DI BULATKAN Rp. 807,900.00
Memasang 1 Bh Saringan Lantai KM/WC atau Floor Drain
Floor drains / Floor Strainer 1.000 Bh 30,000.00 30,000.00 30,000.00
Pekerja 0.010 Oh 170,000.00 1,700.00 1,700.00
Tukang 0.100 Oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.010 Oh 180,000.00 1,800.00 1,800.00
Mandor 0.005 Oh 200,000.00 1,000.00 1,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 52,500.00
OVERHEAD & PROFIT 10 % Rp. 5,250.00
JUMLAH 57,750.00
DI BULATKAN Rp. 57,700.00
Memasang 1 Buah Westafel
Semen Portland 6.000 kg 2,530.00 15,180.00 15,180.00
Pasir Pasang 0.010 m3 616,400.00 6,164.00 6,164.00
Westafel + Asesories 1.000 Bh 329,700.00 329,700.00 329,700.00
Perlengkapan dari hrg westapel 0.120 % 329,700.00 39,564.00 39,564.00
Pekerja 1.200 Oh 170,000.00 204,000.00 204,000.00
Tukang 1.450 Oh 180,000.00 261,000.00 261,000.00
Kepala tukang 0.150 Oh 180,000.00 27,000.00 27,000.00
Mandor 0.060 Oh 200,000.00 12,000.00 12,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 894,608.00
OVERHEAD & PROFIT 10 % Rp. 89,460.80
JUMLAH 984,068.80
DI BULATKAN Rp. 984,000.00
Page 14 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Memasang 1 buah bak cuci piring stainless steel 1 tabung


Bak cuci stainless steel 1 tbg 1.0000 Bh 308,000.00 308,000.00 308,000.00
Water drain + assesories 1.0000 Bh 67,500.00 67,500.00 67,500.00
Pekerja 0.0300 oh 170,000.00 5,100.00 5,100.00
Tukang 0.3000 oh 180,000.00 54,000.00 54,000.00
Kepala Tukang 0.0300 oh 180,000.00 5,400.00 5,400.00
Mandor 0.0150 oh 200,000.00 3,000.00 3,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 443,000.00
OVERHEAD & PROFIT 10 % Rp. 44,300.00
JUMLAH 487,300.00
DI BULATKAN Rp. 487,300.00

Page 15 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Memasang 1 Buah Kran Diameter ¾" atau ½"


Kran ¾" Atau ½" 1.0000 Bh 43,000.00 43,000.00 43,000.00
Seal Tape (Tapelon) 0.0250 Bh 5,000.00 125.00 125.00
Pekerja 0.0100 oh 170,000.00 1,700.00 1,700.00
Tukang 0.4000 oh 180,000.00 72,000.00 72,000.00
Kepala Tukang 0.0400 oh 180,000.00 7,200.00 7,200.00
Mandor 0.0050 oh 200,000.00 1,000.00 1,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 125,025.00
OVERHEAD & PROFIT 10 % Rp. 12,502.50
JUMLAH 137,527.50
DI BULATKAN Rp. 137,500.00
Galian Tanah Biasa per m3
Pekerja 0.750 Oh 170,000.00 127,500.00 127,500.00
Mandor 0.025 Oh 200,000.00 5,000.00 5,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 132,500.00
OVERHEAD & PROFIT 10 % Rp. 13,250.00
JUMLAH 145,750.00
DI BULATKAN Rp. 145,700.00
Mengurug Tanah Kembali per m3
Pekerja 0.5000 oh 170,000.00 85,000.00 85,000.00
Mandor 0.0500 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 95,000.00
OVERHEAD & PROFIT 10 % Rp. 9,500.00
JUMLAH 104,500.00
DI BULATKAN Rp. 104,500.00
Pek. Septictank (Konstruksi kayu)
Galian Tanah Biasa Sedalam 13.5 m3 145,700.00 1,966,950.00
Urugan kembali Tanah 7.02 m3 104,500.00 733,590.00
Tongkat/Tiang 10/10 (Balok Kayu Ulin) 0.12 m3 830,065.00 99,607.80
Sunduk, Balok Kayu Ulin 5/10 - 50 0.015 m3 830,065.00 12,450.98
Kalang, Balok Kayu Ulin 10/10 - 100 x 2 0.120 m3 830,065.00 99,607.80
Sloof, Balok Kayu Ulin 10/10 0.042 m3 830,065.00 34,862.73
Gelegar, Balok Kayu Ulin 5/10 & 10/10 0.040 m3 830,065.00 33,202.60
Rangka Dinding, Balok Kayu Ulin 5/10 0.096 m3 830,065.00 79,686.24
Lantai Penutup, Papan Kayu Ulin 2,5 / 20 3.500 m² 30,181.48 105,635.18
Dinding Luar, Papan Kayu Ulin 13.003 m² 22,212.12 288,828.64
Pipa Ventilasi + assesoris 1.000 Ls - -
JUMLAH ( UPAH DAN BAHAN) Rp. 3,454,421.96
DI BULATKAN Rp. 3,454,400.00
PEKERJAAN FINISHING
1 m2 Pengecatan dengan cat minyak ( 1x cat dasar, 2x cat penutup )
Cat Menie 0.200 Kg 36,800.00 7,360.00 7,360.00
Cat Dasar 1 x 0.170 Kg 84,000.00 14,280.00 14,280.00
Cat Penutup 2 x 0.260 Kg 84,000.00 21,840.00 21,840.00
Plamur 0.150 Kg
Kuas 0.010 bh
Pengencer 0.030 Kg
Ampelas 0.200 Lbr
Pekerja 0.070 Oh 170,000.00 11,900.00 11,900.00
Tukang 0.009 Oh 180,000.00 1,620.00 1,620.00
Kepala tukang 0.0060 Oh 180,000.00 1,080.00 1,080.00
Mandor 0.0030 Oh 200,000.00 600.00 600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 58,680.00
OVERHEAD & PROFIT 10 % Rp. 5,868.00
JUMLAH 64,548.00
DI BULATKAN Rp. 64,500.00
1 m2 Pengecatan dengan cat air ( 1x cat dasar, 2x cat penutup )
Page 16 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Plamur 0.10 Kg
Cat Dasar 1 x 0.100 Kg 73,500.00 7,350.00 7,350.00
Cat Penutup 2 x 0.260 Kg 73,500.00 19,110.00 19,110.00
Pekerja 0.020 Oh 170,000.00 3,400.00 3,400.00
Tukang 0.063 Oh 180,000.00 11,340.00 11,340.00
Kepala tukang 0.006 Oh 180,000.00 1,134.00 1,134.00
Mandor 0.003 Oh 200,000.00 500.00 500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 42,834.00
OVERHEAD & PROFIT 10 % Rp. 4,283.40
JUMLAH 47,117.40
DI BULATKAN Rp. 47,100.00

Page 17 of 107
ANALISA HARGA HARGA JUMLAH
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

PEKERJAAN LAIN - LAIN


Pekerjaan Meja dan Pintu Meja Dapur
Rangka meja/kusen (Kayu kelas I) 5/5 0.036 m3 1,091,050.00 39,277.80 39,277.80
Papan Kayu Kelas I/lantai (Kasar) 0.920 m2 19,582.24 18,015.66 18,015.66
Pintu Panel (Papan Kayu Kelas II) 0.980 m2 99,106.40 97,124.27 97,124.27
Engsel Lemari 3 Inchi 8.000 Bh 58,700.00 469,600.00 469,600.00
Handle Pintu Lemari 4.000 Bh 71,600.00 286,400.00 286,400.00
Pengecatan (Cat Minyak) 1.5000 m2 64,500.00 96,750.00 96,750.00

JUMLAH ( UPAH DAN BAHAN) Rp. 1,007,167.73


DI BULATKAN Rp. 1,007,100.00

Page 18 of 107
PERHITUNGAN VOLUME
UKURAN
1 ITEM PEKERJAAN SAT VOLUME
P L T N
1 Tongkat/Tiang 10/10 (Kayu Kelas I)
Jalur baris tongkat jumlah 7 bh 1.00 1.00 7.00 2.00 14.00
Jumlah baris tongkat jumlah 9 bh 1.00 1.00 9.00 2.00 18.00
Jumlah baris tongkat jumlah 11 bh 1.00 1.00 11.00 5.00 55.00
Jumlah baris tongkat jumlah 10 bh 1.00 1.00 10.00 1.00 10.00
97.00

2 Sunduk, Balok (Kayu Kelas I) 5/10 - 50 M3 0.50 0.05 0.10 97.00 0.25
3 Kalang, (Kayu Kelas I) 10/10 - 100 x 2 M3 1.00 0.05 0.10 97.00 0.49

4 Suai Tongkat, Balok (Kayu Kelas I) 5/10 - M3 1.50 0.05 0.10 16.00 0.12
Suai Tongkat, Balok (Kayu Kelas I) 5/10 - M3 2.00 0.05 0.10 64.00 0.64
0.76

5 Sloof, Balok (Kayu Kelas I) 10/10


Jalur baris tongkat jumlah 7 ( 9 m) M3 9.00 0.10 0.10 2.00 0.18
Jumlah baris tongkat jumlah 9 (12 m) M3 12.00 0.10 0.10 2.00 0.24
Jumlah baris tongkat jumlah 11 (14 m) M3 14.00 0.10 0.10 5.00 0.70
Jumlah baris tongkat jumlah 10 (12,5 m) M3 12.50 0.10 0.10 1.00 0.13
1.25
6 Gelegar, Balok (Kayu Kelas I) 5/10 & 10/10
Gelagar Induk 10/10 p. 7,5 M3 7.50 0.10 0.10 2.00 0.15
Gelagar Induk 10/10 p. 12,8 M3 12.80 0.10 0.10 4.00 0.52
Gelagar anak 5/10 p. 10,5 M3 10.50 0.05 0.10 8.00 0.42
Gelagar anak 5/10 p. 10,5 M3 12.80 0.05 0.10 15.00 0.96
2.05
7 Kolom, Balok (Kayu Kelas II) 10/10
M3 4.00 0.10 0.10 4.00 0.16
M3 4.00 0.10 0.10 2.00 0.08
M3 4.00 0.10 0.10 2.00 0.08
M3 4.00 0.10 0.10 8.00 0.32
M3 4.00 0.10 0.10 1.00 0.04
M3 4.00 0.10 0.10 8.00 0.32
M3 4.00 0.10 0.10 - -
M3 4.00 0.10 0.10 8.00 0.32
M3 4.00 0.10 0.10 3.00 0.12
M3 4.00 0.10 0.10 10.00 0.40
M3 4.00 0.10 0.10 3.00 0.12
M3 4.00 0.10 0.10 4.00 0.16
53.00 2.12
8 Kolom, Balok (Kayu Kelas II) 5/10
M3 4.00 0.05 0.10 2.00 0.04
M3 4.00 0.05 0.10 2.00 0.04
M3 4.00 0.05 0.10 3.00 0.06
M3 4.00 0.05 0.10 4.00 0.08
0.22
9 Rangka Dinding, Balok (Kayu Kelas II) 5/10
M3 1.42 0.05 0.10 2.00 0.02
M3 1.42 0.05 0.10 6.00 0.05
M3 0.37 0.05 0.10 1.00 0.01
M3 0.92 0.05 0.10 3.00 0.02
M3 1.87 0.05 0.10 1.00 0.01
M3 2.42 0.05 0.10 3.00 0.04
M3 1.92 0.05 0.10 6.00 0.06
M3 1.42 0.05 0.10 4.00 0.03
M3 1.42 0.05 0.10 6.00 0.05
M3 0.92 0.05 0.10 2.00 0.01
M3 1.87 0.05 0.10 1.00 0.01
M3 2.92 0.05 0.10 3.00 0.05
M3 0.87 0.05 0.10 1.00 0.01
M3 2.92 0.05 0.10 3.00 0.05
M3 1.42 0.05 0.10 6.00 0.05
M3 0.92 0.05 0.10 2.00 0.01
M3 0.42 0.05 0.10 4.00 0.01
M3 0.37 0.05 0.10 2.00 0.01
M3 1.42 0.05 0.10 2.00 0.02
M3 2.42 0.05 0.10 4.00 0.05
M3 1.42 0.05 0.10 6.00 0.05
M3 0.87 0.05 0.10 1.00 0.01
M3 2.92 0.05 0.10 3.00 0.05
M3 2.37 0.05 0.10 1.00 0.02
M3 2.92 0.05 0.10 3.00 0.05
M3 0.37 0.05 0.10 1.00 0.01
M3 0.92 0.05 0.10 3.00 0.02
M3 1.42 0.05 0.10 6.00 0.05
M3 0.62 0.05 0.10 1.00 0.01
M3 1.42 0.05 0.10 3.00 0.03
M3 0.29 0.05 0.10 4.00 0.01
M3 0.55 0.05 0.10 4.00 0.02
M3 2.02 0.05 0.10 2.00 0.03
M3 2.92 0.05 0.10 2.00 0.03
M3 0.84 0.05 0.10 4.00 0.02
M3 0.57 0.05 0.10 2.00 0.01
M3 1.47 0.05 0.10 2.00 0.02
M3 0.37 0.05 0.10 1.00 0.01
M3 1.42 0.05 0.10 3.00 0.03
M3 0.37 0.05 0.10 2.00 0.01
M3 1.42 0.05 0.10 2.00 0.02
M3 1.42 0.05 0.10 4.00 0.03
M3 1.52 0.05 0.10 2.00 0.02
M3 2.42 0.05 0.10 2.00 0.03
M3 2.42 0.05 0.10 4.00 0.05
M3 1.42 0.05 0.10 4.00 0.03
M3 0.62 0.05 0.10 2.00 0.01
M3 1.42 0.05 0.10 2.00 0.02
M3 2.42 0.05 0.10 4.00 0.05
M3 2.02 0.05 0.10 2.00 0.03
M3 2.92 0.05 0.10 2.00 0.03
M3 2.42 0.05 0.10 4.00 0.05
M3 4.42 0.05 0.10 4.00 0.09
M3 1.92 0.05 0.10 2.00 0.02
M3 2.92 0.05 0.10 2.00 0.03
M3 2.92 0.05 0.10 4.00 0.06
M3 0.62 0.05 0.10 2.00 0.01
M3 1.42 0.05 0.10 2.00 0.02
M3 1.80 0.05 0.10 4.00 0.04
M3 1.92 0.05 0.10 2.00 0.02
M3 2.92 0.05 0.10 2.00 0.03
M3 2.42 0.05 0.10 4.00 0.05
M3 2.92 0.05 0.10 4.00 0.06
M3 2.02 0.05 0.10 2.00 0.03
M3 2.92 0.05 0.10 2.00 0.03
M3 1.42 0.05 0.10 4.00 0.03
M3 2.02 0.05 0.10 2.00 0.03
M3 2.92 0.05 0.10 2.00 0.03
M3 2.42 0.05 0.10 4.00 0.05
M3 1.42 0.05 0.10 4.00 0.03
2.090
10 Ringbalk, Balok (Kayu Kelas II) 10/10
M3 10.60 0.10 0.10 1.00 0.11
M3 1.60 0.10 0.10 1.00 0.02
M3 1.60 0.10 0.10 1.00 0.02
M3 14.10 0.10 0.10 1.00 0.14
M3 3.10 0.10 0.10 1.00 0.03
M3 2.60 0.10 0.10 1.00 0.03
M3 8.60 0.10 0.10 1.00 0.09
M3 3.10 0.10 0.10 1.00 0.03
M3 2.60 0.10 0.10 1.00 0.03
M3 2.60 0.10 0.10 1.00 0.03
M3 14.10 0.10 0.10 1.00 0.14
M3 12.60 0.10 0.10 1.00 0.13
M3 3.90 0.10 0.10 1.00 0.04
M3 12.90 0.10 0.10 1.00 0.13
M3 12.90 0.10 0.10 1.00 0.13
M3 3.90 0.10 0.10 1.00 0.04
M3 3.10 0.10 0.10 1.00 0.03
M3 9.10 0.10 0.10 1.00 0.09
M3 6.10 0.10 0.10 1.00 0.06
M3 3.10 0.10 0.10 1.00 0.03
M3 6.10 0.10 0.10 1.00 0.06
M3 7.60 0.10 0.10 1.00 0.08
M3 3.10 0.10 0.10 1.00 0.03
M3 2.00 0.10 0.10 1.00 0.02
M3 3.10 0.10 0.10 1.00 0.03
M3 1.60 0.10 0.10 1.00 0.02
1.56
11 Lantai papan Bengkirai M2 14.1 6.10 1.00 1.00 86.01
M2 12.1 3.00 1.00 1.00 36.30
M2 9.1 1.85 1.00 1.00 16.84
139.14
lantai Kamar mandi M2 1.6 1.60 1.00 1.00 2.56
M2 1.5 2.00 1.00 1.00 3.00
5.56
133.58
1.5 12.6 1.00 1.00 18.90
11 Dinding Bagian Luar
M2 9.10 4.00 1.00 1.00 36.40
M2 2 1.5 1 1 3.00
M2 1 0.5 1.00 2.00 1.00
M2 1.95 0.5 1 1 0.98
31.42
M2 5.60 2.30 0.50 1.00 6.44
M2 4.85 0.62 1 1 3.01
M2 9.10 4.00 1.00 1.00 36.40
M2 1 0.6 1 1 0.60
M2 1 0.5 1.00 1.00 0.50
M2 1.95 0.5 1 1 0.98
34.32
M2 5.60 2.30 0.50 1.00 6.44
M2 4.85 0.62 1 1 3.01

M2 14.10 4.00 1.00 1.00 56.40


M2 2 1.5 1 1 3.00
M2 1 1.5 1 1 1.50
M2 2.4 0.9 1 1 2.16
M2 2.4 0.9 1 1 2.16
M2 1 0.5 1.00 1.00 0.50
47.08
M2 14.10 4.00 1.00 1.00 56.40
M2 2 1.5 1 1 3.00
M2 1 1.5 1 1 1.50
M2 1.95 0.5 1 2 1.95
M2 2.4 0.9 1 1 2.16
47.79
M2 1.50 4.00 1.00 1.00 6.00
1.05 2.4 1 1 2.52
3.48
M2 1.50 4.00 1.00 1.00 6.00
1.05 2.4 1 1 2.52
3.48
186.47
12 Dinding Praktisi
Ruang Gudang Alat Posyandu 8.6 3.88 1 1 33.37
1.05 2.4 1 1 2.52
30.85
Ruang keluarga dan Ruang Makan 15.6 3.88 1 1 60.53
M2 2.4 0.9 1 2 4.32
4 0.9 1 1 3.60
52.61
Kamar Tidur 1 M2
9.6 3.88 1 1 37.25
2.4 0.9 1 1 2.16
M2 1.95 0.5 1 2 1.95
33.14
Kamar Tidur 2 M2
10.6 3.88 1 1 41.13
2.4 0.9 1 1 2.16
M2 1 1.5 1 1 1.50
37.47
Kamar Tidur 2 M2
10.035 3.88 1 1 38.94
2.1 0.8 1 1 1.68
M2 0.6 0.9 1 1 0.54
2.4 0.9 1 1 2.16
4 0.9 1 1 3.60
30.96
Kamar mandi M2
5.6 2.23 1 1 12.49
2.1 0.8 1 1 1.68
10.81
Ruang pemeriksaan M2
11.6 3.88 1 1 45.01
2.4 1 1 1 2.40
M2 2 1.5 1 1 3.00
39.61
Ruang Arsip M2
11.6 3.88 1 1 45.01
2.4 1 1 1 2.40
M2 2 1.5 1 1 3.00
39.61
Gudang Obat M2
10.6 3.88 1 1 41.13
2.4 0.9 1 1 2.16
M2 1.95 0.5 1 2 1.95
37.02
Ruang Pendaftaran & Administrasi M2
12.18 3.88 1 1 47.26
2.9 2.4 1 1 6.96
40.30
Ruang Kia dan KB M2
11.6 3.88 1 1 45.01
2.4 1 1 1 2.40
M2 2 1.5 1 1 3.00
39.61
Ruang Selasar M2
13.34 3.88 1 1 51.76
2.4 0.9 1 3 6.48
M2 2.4 1 1 1 2.40
2.1 0.8 1 1 1.68
41.20
Kamar mandi M2
5.6 2.23 1 1 12.49
2.1 0.8 1 1 1.68
10.81
Kamar mandi M2
6.36 2.23 1 1 14.18
2.1 0.8 1 1 1.68
12.50
456.48
Gudang M2
7.6 2.23 1 1 16.95
2.4 1.05 1 1 2.52
14.43
470.90
List Dinding 9.14
1.52
1
1.52
1
12.96
12.96
14.18
54.28
KUSEN
Pintu dan Jendela Type 1 2.4 0.05 0.14 4 0.07
0.3 0.05 0.14 1 0.00
2.9 0.05 0.14 2 0.04
15.7 0.11
3.768

Pintu Type 1 ( 2 bh) 2.4 0.05 0.14 2 0.03


1.05 0.05 0.14 1 0.01
0.95 0.02 0.1 3 0.01
5.85 0.09
4.176
Pintu Type 2 ( 7 bh) 2.4 0.05 0.14 2 0.03
0.9 0.05 0.14 1 0.01
0.8 0.02 0.1 3 0.005
5.7 0.31
3.888

Pintu Type 3 ( 2 bh) 2.4 0.05 0.14 2 0.03


1 0.05 0.14 1 0.01
0.9 0.02 0.1 3 0.005
5.8 0.09
4.08
Pintu Type 4 ( 3 bh) 2.1 0.05 0.14 2 0.03
0.8 0.05 0.14 1 0.01
0 0.02 0.1 3 -
5 0.11
3.6
Jendela Type 1 ( 2 bh) 1.5 0.05 0.14 3 0.03
2 0.05 0.14 3 0.04
0.925 0.02 0.1 6 0.011
10.5 0.17
7.704
Jendela Type 2 ( 2 bh) 1.5 0.05 0.14 3 0.03
1 0.05 0.14 3 0.02
0.9 0.02 0.1 3 0.005
7.5 0.12
4.896
Jendela Type 3 ( 4 bh) 1.95 0.05 0.14 2 0.03
0.5 0.05 0.14 4 0.01
0.4 0.02 0.1 3 0.002
5.9 0.17
6.816
Boven Type 1 ( 3 bh) 1 0.05 0.14 2 0.01
0.4 0.05 0.14 2 0.01
0 0.02 0.1 3 -
2.8 0.06
2.016
Boven Type 2 ( 1 bh) 0.9 0.05 0.14 2 0.01
0.6 0.05 0.14 2 0.01
0 0.02 0.1 3 -
3 0.02
0.72
1.25
41.66

Pintu Type 1 ( 2 bh) 0.95 2.05 1 2 3.89


7.79
Pintu Type 2 ( 7 bh ) 0.8 2.05 1 7 11.48
22.96
Pintu Type 3 ( 2 bh ) 0.9 2.05 1 2 3.69
7.38
Pintu Type 4 ( 3 bh ) 0.7 2.05 1 3 4.30
8.61
23.37
46.74

Jendala kaca Type 1 ( 16 bh) 0.473 1.12 16 8.48


Jendala kaca Type 2 ( 4 bh) 0.483 1.1 4 2.13
10.61

Pintu Kaca Type 1 ( 2 bh) 0.67 2.06 2 2.77


Pintu Kaca Type 2 ( 2 bh) 0.62 2.06 2 2.56
Pintu Kaca Type 3 ( 2 bh) 0.32 2.06 2 1.32
6.65
KUDA-KUDA KAYU MERANTI 5/10
Kaki kuda-kuda 1 (2 bh) 7.37 0.1 0.05 2 0.08
Kaki kuda-kuda 2 (2 bh) 5.87 0.1 0.05 2 0.06
Kaki kuda-kuda 3 (8 bh) 8.35 0.1 0.05 8 0.34
Kaki kuda-kuda 4 (5 bh) 5.42 0.1 0.05 5 0.14
Kaki kuda-kuda 5 (1 bh) 8 0.1 0.05 1 0.04
Kaki kuda-kuda 6 (1 bh) 5.22 0.1 0.05 1 0.03
Kaki kuda-kuda 7 (2 bh) 6.6 0.1 0.05 2 0.07
0.76
Balok Tarik kuda-kuda 1 (2 bh) 8 0.1 0.05 2 0.08
Balok Tarik kuda-kuda 2 (2 bh) 6.4 0.1 0.05 2 0.07
Balok Tarik kuda-kuda 3 (5 bh) 7.9 0.1 0.05 5 0.2
0.35
Tiang Nok 1 (2 bh) 3.32 0.1 0.05 2 0.04
Tiang Nok 2 (2 bh) 2.6 0.1 0.05 4 0.06
Tiang Nok 3 (5 bh) 3.21 0.1 0.05 5 0.09
0.19
Balok Sokong 1 (4 bh) 2.31 0.1 0.05 4 0.05
Balok Sokong 2 (4 bh) 1.77 0.1 0.05 4 0.04
Balok Sokong 3 (10 bh) 2.28 0.1 0.05 10 0.12
Balok Sokong 4 (4 bh) 1.62 0.1 0.05 4 0.04
Balok Sokong 5 (4 bh) 1.23 0.1 0.05 4 0.03
Balok Sokong 6 (10 bh) 1.5 0.1 0.05 10 0.08
0.36
Balok Gapit 1 (15 bh) 1 0.1 0.05 15 0.08
0.08
Jurai 1 (2 bh) 9.4 0.1 0.05 2 0.1
0.1
Balok Nok 1 (1 bh) 8.2 0.1 0.05 1 0.05
Balok Nok 2 (2 bh) 2.1 0.1 0.05 2 0.03
Balok Nok 3 (1 bh) 15.04 0.1 0.05 1 0.08
0.16
Konsul 1 (15 bh) 0.0112 15 0.17
0.17
2.17
SKUR ANGIN KAYU MERANTI 5/10
Skur Angin 1 (2 bh) 3 0.1 0.05 2 0.03
Skur Angin 2 (4 bh) 1.5 0.1 0.05 4 0.03
Skur Angin 3 (8 bh) 4 0.1 0.05 8 0.16
0.22
GORDING KAYU MERANTI 5/10
1 Gording 1 (2 bh) 2.34 0.1 0.05 2 0.03
2 Gording 2 (2 bh) 2.83 0.1 0.05 2 0.03
3 Gording 3 (2 bh) 3.45 0.1 0.05 2 0.04
4 Gording 4 (2 bh) 4 0.1 0.05 2 0.04
5 Gording 5 (2 bh) 4.68 0.1 0.05 2 0.05
6 Gording 6 (2 bh) 5.29 0.1 0.05 2 0.06
7 Gording 7 (2 bh) 5.9 0.1 0.05 2 0.06
8 Gording 8 (2 bh) 6.52 0.1 0.05 2 0.07
9 Gording 9 (2 bh) 7.14 0.1 0.05 2 0.08
10 Gording 10 (2 bh) 7.75 0.1 0.05 2 0.08
11 Gording 11 (2 bh) 1.54 0.1 0.05 2 0.02
12 Gording 12 (2 bh) 2.03 0.1 0.05 2 0.03
13 Gording 13 (2 bh) 2.65 0.1 0.05 2 0.03
14 Gording 14 (2 bh) 3.26 0.1 0.05 2 0.04
15 Gording 15 (2 bh) 3.88 0.1 0.05 2 0.04
16 Gording 16 (2 bh) 4.49 0.1 0.05 2 0.05
17 Gording 17 (2 bh) 5.1 0.1 0.05 2 0.06
18 Gording 18 (2 bh) 5.72 0.1 0.05 2 0.06
19 Gording 19 (2 bh) 6.34 0.1 0.05 2 0.07
20 Gording 20 (2 bh) 6.95 0.1 0.05 2 0.07
21 Gording 21 (18 bh) 2.07 0.1 0.05 18 0.19
22 Gording 22 (7 bh) 16.14 0.1 0.05 7 0.57
23 Gording 23 (3 bh) 14.64 0.1 0.05 3 0.22
24 Gording 24 (2 bh) 7.1 0.1 0.05 2 0.08
25 Gording 25 (1 bh) 7.3 0.1 0.05 1 0.04
2.11
ATAP SPANDEX
1 Atap 1 (2 bh) 37.28 2 74.56
2 Atap 2 (1 bh) 76.85 1 76.85
3 Atap 3 (1 bh) 124.78 1 124.78
4 Atap 4 (2 bh) 10.91 2 21.82
5 Atap 5 (2 bh) 7.25 2 14.5
6 Atap 6 (1 bh) 7.46 1 7.46
319.97
ATAP TRANSPARAN
1 Atap 1 (1 bh) 4.5 1 4.5
4.5
LISTPLANK
1 Listplank 1 (2 bh) 7.27 2 14.54
2 Listplank 2 (2 bh) 2.5 2 5
3 Listplank 3 (2 bh) 1.67 2 3.34
4 Listplank 4 (2 bh) 8.23 2 16.46
5 Listplank 5 (2 bh) 0.93 2 1.86
6 Listplank 6 (2 bh) 0.95 2 1.9
7 Listplank 7 (2 bh) 5.3 2 10.6
8 Listplank 8 (2 bh) 7.26 2 14.52
9 Listplank 9 (1 bh) 14.68 1 14.68
10 Listplank 10 (1 bh) 1.5 1 1.5
11 Listplank 11 (1 bh) 7.8 1 7.8
12 Listplank 12 (2 bh) 2.02 2 4.04
13 Listplank 13 (2 bh) 7.61 2 15.22
111.46
NOK SINKALUM
1 Nok 1 (1 bh) 7.97 1 7.97
2 Nok 2 (1 bh) 14.27 1 14.27
3 Nok 3 (2 bh) 1 2 2
24.24
RANGKA PLAPON
1 Bidang 1 (1 bdg) 12.66 1.64 1 20.77
2 Bidang 2 (1 bdg) 13.86 5.86 1 81.22
3 Bidang 3 (1 bdg) 11.98 3.02 1 36.18
4 Bidang 4 (1 bdg) 8.86 2.28 1 20.21
5 Bidang 5 (2 bdg) 6.99 0.98 2 13.71
6 Bidang 6 (2 bdg) 7.97 0.98 2 15.63
7 Bidang 7 (2 bdg) 0.68 0.98 2 1.34
8 Bidang 8 (4 bdg) 4.56 0.98 4 17.88
9 Bidang 9 (2 bdg) 1.95 0.98 2 3.83
10 Bidang 10 (1 bdg) 12.64 1 1 12.64
11 Bidang 11 (2 bdg) 1.065 2.47 2 5.27
12 Bidang 12 (1 bdg) 0.86 1 1 0.86
13 Bidang 13 (1 bdg) 2.51 1 1 2.51
14 Bidang 14 (1 bdg) 7.95 1.08 1 8.59
15 Bidang 15 (2 bdg) 1 0.81 2 1.62
16 Bidang 16 (2 bdg) 7.77 0.98 2 15.23
17 Bidang 17 (1 bdg) 1.5 0.81 1 1.22
258.71
Potongan Plapon Bidang 1 2 1.53 1 3.06
Potongan Plapon Bidang 1 2 1 1 2
5.06
253.65
KETERANGAN

BARIS A & B
BARIS c & d
BARIS e,f,g,h,i
Baris J

BARIS A & B
BARIS c & d
BARIS e,f,g,h,i
Baris J

baris 1, 12
baris 4,6,8,10

baris 1
baris 2
baris 3
baris 4
baris 5
baris 6
baris 7
baris 8
baris 9
baris 10
baris 11
baris 12

baris 1
baris 2
baris 3
baris 4

S1
S1.1
S2
S2.1
S3
S3.1
S4
S5
S6
S7
S8
S8.1
S9
S9.1
S10
S11
S12
S13
S13.1
S14
S15
S16
S16.1
S17
S17.1
S18
S18.1
S19
S20
S20.1
S21
S21.1
S21.2
S22
S23
S24
S24.1
S25
S25.1
S26
S26.1
S27
S28
S28.1
S29
S30
S31
S31.1
S32
S33
S33.1
S34
S35
S36
S36.1
S37
S38
S38.1
S39
S40
S40.1
S41
S42
S43
S43.1
S44
S45
S45.1
S46
S47

baris A
baris B
baris C
baris D
baris E
baris F
baris G
baris H
baris I
baris J
baris K
baris L
baris 1
baris 2
baris 3
baris 4
baris 5
baris 6
baris 7
baris 8
baris 9
baris 10
baris 11
baris 12
baris 13
baris 14

Bagian Dalam
Dalam + Teras
Teras

teras belakang

sebelah kanan
jendela
Bovenlight
jendela

layar
layar1
sebelah kiri
jendela
Bovenlight
jendela

layar
layar1

belakang
jendela
jendela
Pintu
Pintu
Bovenlight

Depan
jendela
jendela
jendela
Pintu
Depan
Piontu

Depan
pintu

pintu

Pintu
Void

Pintu
jendela

Pintu
jendela

Pintu
jendela
Pintu
Void

Pintu

Pintu
jendela

Pintu
jendela

Pintu
jendela

Pintu

Pintu
jendela

Pintu
Pintu
Pintu

Pintu

Pintu

Pintu

m3
m2

Jalusi
m3
m2

Jalusi
m3
m2

Jalusi
m3
m2

Jalusi
m3
m2

Jalusi
m3
m2

Jalusi
m3
m2
Jalusi
m3
m2

Jalusi
m3
m2

Jalusi
m3
m2
m3
m2

m2
m2 pengecatan
m2
m2
m2
m2
m2
m2

m2
m2
m2

m2
m2
m2
m2

M3
M3
M3
M3
M3
M3
M3

M3
M3
M3

M3
M3
M3

M3
M3
M3
M3
M3
M3

M3
M3

M3
M3
M3

M3

M3
M3
M3

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

M2
M2
M2
M2
M2
M2

M2

M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1

M1
M1
M1

M1
M1
M1
Pekerjaan Lokasi divisi sub divisi Panjang

Pekerjaan Tiang Bawah Lantai 9/9 0.10

Sunduk 2/10 0.50

Kalang 2/20 0.50

Atas lantai 9/9 0.10


Atas lantai 9/9 0.10

Suai depan dan belakang 3.60

samping 4.00
2.50

Gelagar sloof 9/9 9.10

gelagar bawah lantai 4/9 8.10

Belandar/Balok ring di Atas Tiang Ulin Atas 9/9 9.10


9/9 7.90

Lantai lantai bengkirai 8.10


lantai ulin 1.98

Pekerjaan Dinding sisi depan Dinding Bangunan 2/20 8.14


Sisi Belakang 2/20 8.14
Sisi kiri 2/20 7.14
Sisi Kanan 2/20 7.14
(-Void Pintu) Pengurangan 2.30
(-Void Jendela) Pengurangan 1.50

Kanan Dinding Layar 9.00


Kiri 9.00
2.00

Pekerjaan Rangka atap Kaki Kuda2 4/9 6.40


Gording 5/7 10.02

Balok Nok 5/10 10.02

tiang kuda2 4/9 2.66

tiang kecil 4/9 1.60

Balok Skor 4/9 2.30

Balok Gapit 4/9 4.00

balok Tarik 4/9 9.10

Alas balok gantung 4/9 1.00

suai 4/9 3.80

Raling depan 4/9 1.50


0.75
1.00
1.00

samping 4/9 1.88


0.75
1.15

cat Raling depan 4/9 1.18


0.75
1.31
0.95

samping 4/9 1.88


0.75
0.75
1.15

Lispalng Atap Depan&belakang 2/20 10.02


Samping 2/20 6.45
Bawah Lantai Depan&belakang 2/20 8.14
Samping 2/20 2.00

Plafond Ruangan dalam 7.10

teras 2.00

depan teras 1.15

samping depan 6.40

samping belakang 6.40

belakang 1.15

list plafond Ruangan dalam 7.10

teras 2.00

depan teras

samping depan 6.40

samping belakang 6.40

belakang 1.15

Atap Atap Depan Atap metal 10.20

listrik Lampu dalam ruangan


teras

Saklar tuangan
ganda

terminal

kabel lampu ke saklar(horizontal 5.66


5.46
2.04
1.26
3.61
5.66

terminal ke sumbar(horizontal 7.90


1.90
6.90
7.90
1.90

saklar ke kabel lampu(Vertikal) 2.70

terminal ke kabel sumber (vertikal) 2.70

kusen pintu 12/6 2.30


12/6 1.20
2/10 1.20
12/6 0.24

jendela 12/6 1.40


12/6 1.32
2/10 1.32
12/6 0.24

cat kusen pintu 12/6 2.30


12/6 1.20
12/6 1.20
2/10 1.20
12/6 0.24

jendela 12/6 1.40


12/6 1.32
12/6 1.32
2/10 1.32
12/6 0.24

panel pintu

jendela 1.00
0.52
kaca

TERALIS

cat jendela 1.00


0.52

panel jendela 1.00


TANGGA penahan papan 5/20 1.51

balok 9/9 0.40


9/9 1.70

anak tangga papan 5/20 1.70

lis dinding 3.90


1.58
1.28
lebar tebal tinggi Trapesium/ukuran kayuKoef. Hitung Luas Berat

0.10 2.00

0.10 0.02

0.20 0.02

0.10 3.82
0.05 3.82

0.05 0.10
0.05 0.10

0.05 0.10
0.05 0.10

0.10 0.10

0.05 0.10

0.10 0.10
0.10 0.10

7.10
8.10

3.90
3.90
3.90
3.90
1.32
1.40

2.76
2.76
0.25

0.05 0.10
0.05 0.07

0.05 0.10

0.05 0.10

0.05 0.10

0.05 0.10

0.05 0.10

0.05 0.10

0.05 0.10

0.05 0.10

0.05 0.10
0.05 0.10
0.05 0.10
0.10 0.10

0.04 0.09
0.04 0.09
0.04 0.09

0.05 0.10
0.05 0.10
0.05 0.10
0.05 0.10

0.04 0.09
0.04 0.09
0.04 0.09
0.04 0.09
8.10

8.10

8.14

0.96

0.96

8.14

8.10

8.10

0.96

0.96

6.55
0.12 0.06
0.12 0.06
0.10 0.02
0.12 0.06

0.12 0.06
0.12 0.06
0.10 0.02
0.12 0.06

0.12 0.06
0.12 0.06
0.12 0.06
0.10 0.02
0.12 0.06

0.12 0.06
0.12 0.06
0.12 0.06
0.10 0.02
0.12 0.06

1.20 1.94

0.07
0.07
0.52 0.86

0.66 1.00
1.32 2.06

0.07
0.07

0.66
0.20 0.05

0.10 0.10
0.10 0.10

0.20 0.05
Jumlah julah per titik Sub Volume Volume Total Satuan

36.00 0.72 M3

36.00 0.04 M3

72.00 0.14 M3

16.00 0.61 M3
7.00 0.13 M3

6.00 0.11 0.21 M3


-

4.00 0.08
2.00 0.03

6.00 0.55 M3

19.00 0.77 M3

2.00 0.18 0.42 M3


3.00 0.24

57.51 57.51 M2
16.04 16.04 M3

1.00 31.75 133.59 M2


1.00 31.75
1.00 27.85
1.00 27.85
1.00 3.04
4.00 8.40

1.00 12.42 25.84 M2


1.00 12.42
2.00 1.00

4.00 2.00 0.26 M3 0.71


2.00 9.00 0.63 M3

1.00 1.00 0.05 M3

4.00 1.00 0.05 M3

4.00 2.00 0.06 M3

4.00 2.00 0.09 M3

4.00 1.00 0.08 M3

2.00 1.00 0.09 M3

4.00 1.00 0.02 M3

3.00 2.00 0.11 M3

2.00 4.00 0.06 0.21 M3


3.00 4.00 0.05
4.00 4.00 0.08
1.00 2.00 0.02

2.00 2.00 0.03 0.08 M3


2.00 3.00 0.02
2.00 4.00 0.03

2.00 4.00 2.83 11.11 m2


3.00 4.00 1.80
4.00 4.00 6.29
1.00 2.00 0.19

M3

2.00 2.00 1.96 5.25 m2


2.00 1.00 0.39
2.00 2.00 0.51
2.00 4.00 2.39

2.00 20.04 45.84 M


4.00 25.80
1.00 8.14 12.14 M2
2.00 4.00

1.00 57.51 117.01 M2

1.00 16.20

1.00 9.36

2.00 12.29

2.00 12.29

1.00 9.36

1.00 30.40 119.38 M1

1.00 12.10

9.92

2.00 25.60

2.00 23.30

1.00 18.06

2.00 133.62 M2

6.00 8.00 Unit


2.00

1.00 2.00 Unit


1.00

7.00 7.00 Unit

5.66 74.49 M
5.46
2.04
1.26
3.61
5.66
-
7.90
1.90
6.90 45.40
7.90
1.90
-
2.00 5.40 29.09

7.00 18.90

2.00 0.03 0.33 m3


2.00 0.02
3.00 0.01
1.00 0.00

3.00 0.03
3.00 0.03
3.00 0.01
1.00 0.00

2.00 1.00 1.10 10.44 m2


1.00 1.00 0.29
1.00 1.00 0.43
3.00 1.00 0.86
1.00 1.00 0.09

2.00 4.00 2.69


1.00 4.00 1.27
1.00 4.00 1.27
3.00 4.00 2.22
1.00 4.00 0.23

1.00 2.33 M2

2.00 8.00 1.12 1.70 M2 0.07


2.00 8.00 0.58
8.00 3.58 M2 0.30

8.00 5.28 8.00 M2


1.00 2.72

8.00 4.00 2.24 3.40 M2


8.00 4.00 1.16

8.00 5.28
2.00 0.03 0.14 M2
-
2.00 0.01
1.00 0.02

5.00 0.09
-
-

4.00 2.00 31.20 54.08


4.00 2.00 12.64
4.00 2.00 10.24
6x7 untuk 9x9 6x6 untuka 9x8

22 untuk 9X8 dan 25 untuk 9x9


22 untuk 9X8 dan 25 untuk 9x9
0.0129

0.14
0.006 0.66
0.00859797979798 1.00
PEMERINTAH KABUPATEN KUTAI BARAT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Alamat : Kompleks Perkantoran Pemkab Kutai Barat

SENDAWAR

Nomor Kontrak : 760/PGWS.SPK-021/CK-APBD/DPU-MU/VIII/2015

TAHUN ANGGARAN 2022

HARGA PERKIRAAN SENDIRI


KEGIATAN :

PEMBANGUNAN RUANG LABORATORIUM


KOMPUTER SDN 010 MUARA PAHU(DAK SD)

Tanggal Kontrak : 04 AGUSTUS 2015


Nilai Kontrak : Rp. 138.120.000,-
Sumber Dana : APBD Kab. Mahakam Ulu
PEMERINTAH KABUPATEN KUTAI BARAT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Alamat : Kompleks Perkantoran Pemkab Kutai Barat

REKAPITULASI
DINAS : DINAS PENDIDIKAN DAN KEBUDAYAAN
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER SDN 010 MUARA PAHU(DAK SD)
TAHUN ANGGARAN : 2022
LOKASI : KEC. MUARA PAHU
UKURAN : 103,14 M2

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)
1 PEKERJAAN PENDAHULUAN 3,605,120.000
2 PEKERJAAN STRUKTUR KAYU 32,268,122.000
3 PEKERJAAN LANTAI DAN DINDING, 53,787,177.000
4 PEKERJAAN KUSEN, PINTU DAN JENDELA 9,252,133.000
5 PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 34,596,360.000
6 PEKERJAAN PLAFON 30,982,838.000
8 PEKERJAAN PENGGANTUNG, PENGUNCI DAN AKSESORIS 8,876,741.000
7 PEKERJAAN LISTRIK 4,937,500.000
9 PEKERJAAN PENGECATAN 23,664,926.000
10 PEKERJAAN LAIN-LAIN 5,229,942.000
A. JUMLAH 207,200,859.00
B. PPn ( 11% x A ) 22,792,094.49
C. TOTAL 229,992,953.49
D. DIBULATKAN 229,992,000.00
TERBILANG : DUA RATUS DUA PULUH SEMBILAN JUTA SEMBILAN RATUS SEMBILAN PULUH DUA RIBU RUPIAH

D
Sendawar, 2022 i
p
e
Dibuat Oleh
Mengetahui: r
Di Buat :
PT. ARISTA
PejabatGEMILANG
Pembuat KONSULINDO
komitmen i
PT. ARIESTA GEMILANG KONSULINDO
k
s
a
/
PAULUS PAGAPPONG, D
PAULUS PAGAPPONG, NGAMPUN,
ST S.IP, M.SIST Mi
Nip: Direktur
19621127 Cabang
199103 1 002 es
Direktur Cabang
ne
g
et
ut
aj
uh
ui
,,i
P
E
J
AJ
A
B
BA
T
A
PT
Page 54 ofE107
MP
B
E
U
HARGA PERKIRAAN SENDIRI

RENCANA ANGGARAN BIAYA

DINAS : DINAS PENDIDIKAN DAN KEBUDAYAAN


PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER SDN 010 MUARA PAHU(DAK SD)
TAHUN ANGGARAN : 2022
LOKASI : KEC. MUARA PAHU

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN VOLUME SAT.
(Rp.) (Rp.)

1 PEKERJAAN PENDAHULUAN
1.1 Papan Nama Kegiatan 1.00 Ls 350,000.00 350,000.00
1.2 Pembersihan Lokasi Dan Perataan 1.00 Ls 500,000.00 500,000.00
1.3 Pengukuran dan pemb. Bouplank 42.40 m¹ 26,300.00 1,115,120.00
1.4 Manajemen dan Keselamatan Kerja 1.00 Ls 1,640,000.00 1,640,000.00
JUMLAH (Rp.) 3,605,120.00
2 PEKERJAAN STRUKTUR KAYU
2.1 Tongkat/Tiang 10/10 (Kayu Kelas I) 36.00 ttk 153,800.00 5,536,800.00
2.2 Sunduk, Balok (Kayu Kelas I) 2/10 - 50 0.03 m³ 7,653,900.00 229,617.00
2.3 Kalang, (Kayu Kelas I) 2/20 - 50 x 2 0.14 m³ 8,052,300.00 1,127,322.00
2.4 Sloof, Balok (Kayu Kelas I) 10/10 0.54 m³ 11,342,700.00 6,125,058.00
2.5 Gelegar, Balok (Kayu Kelas I) 5/10 0.76 m³ 11,747,500.00 8,928,100.00
2.6 Kolom, Balok (Kayu Kelas II) 10/10 0.61 m³ 8,888,700.00 5,422,107.00
2.7 Kolom, Balok (Kayu Kelas II) 5/10 0.13 m³ 8,888,700.00 1,155,531.00
2.8 Ringbalk, Balok (Kayu Kelas II) 10/10 0.41 m³ 9,130,700.00 3,743,587.00
JUMLAH (Rp.) 32,268,122.00
3 PEKERJAAN LANTAI DAN DINDING,
3.1 Lantai Papan Bengkirai 2,5 / 20 57.51 m² 277,000.00 15,930,270.00
3.2 Lantai Papan Kayu Ulin 2 / 20 (Selasar) 16.03 m² 331,900.00 5,320,357.00
3.3 Dinding Luar, Papan Kayu Bengkirai (Ketam 2 Sisi) 133.58 m² 234,100.00 31,271,078.00
3.4 List Dinding Kayu Bengkirai 2 / 10 54.08 m 23,400.00 1,265,472.00
JUMLAH (Rp.) 53,787,177.00
4 PEKERJAAN KUSEN, PINTU DAN JENDELA
4.1 Kusen-Kusen + Jelusi Mati, Kayu Kelas II (Bengkirai) 0.33 m³ 11,773,300.00 3,885,189.00
4.2 Pintu Panel, Papan Kayu Kelas II (Bengkirai) 2.32 m² 536,800.00 1,245,376.00
4.4 Jendela Kaca, Papan Kayu Bengkirai 5.28 m² 780,600.00 4,121,568.00
JUMLAH (Rp.) 9,252,133.00
5 PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP
5.1 Kuda-kuda, Nok dan Jurai, Balok Kayu Meranti 5/10 0.70 m³ 8,173,900.00 5,721,730.00
5.2 Pasangan Skor Angin, Balok Kayu Meranti 5/10 0.11 m³ 8,173,900.00 899,129.00
5.3 Pasangan Gording, Balok Kayu Meranti 5/7 0.63 m³ 8,532,900.00 5,375,727.00
5.4 Pekerjaan Lisplank Papan Kayu Bengkirai 2 x 2/20 45.84 m¹ 89,400.00 4,098,096.00
5.5 Pasangan Atap Soka 133.62 m² 131,900.00 17,624,478.00
5.6 Nok / Bubungan 10.20 m¹ 86,000.00 877,200.00
JUMLAH (Rp.) 34,596,360.00

Page 55 of 107
HARGA SATUAN JUMLAH HARGA
NO. JENIS PEKERJAAN VOLUME SAT.
(Rp.) (Rp.)
6 PEKERJAAN PLAFON
6.1 Pasang 1m² Pasang rangka langit-langit kayu Meranti 117.00 m² 174,600.00 20,428,200.00
6.2 Memasang 1m² Langit-langit GRC 117.00 m² 64,600.00 7,558,200.00
6.4 List plafond, kayu profil 1/4 cm 119.38 m¹ 25,100.00 2,996,438.00
JUMLAH (Rp.) 30,982,838.00
8 PEKERJAAN PENGGANTUNG, PENGUNCI DAN AKSESORIS
8.1 Teralis Pintu Dan Jendela 7.99 m2 615,900.00 4,921,041.00
8.2 Kunci tanam biasa 2 x Kali Putar 1.00 Bh 440,900.00 440,900.00
8.3 Grendel Tanam Pintu Kupu-Kupu 2.00 Bh 88,200.00 176,400.00
8.4 Ensel Pintu 5 inchi ( 3 Engsel untuk 1 Pintu) 6.00 Bh 70,800.00 424,800.00
8.5 Ensel Jendela 3 inchi ( 2 Engsel untuk 1 Jendela) 16.00 Bh 58,700.00 939,200.00
8.6 Kait / Hak Angin Jendela 16.00 Bh 61,700.00 987,200.00
8.7 Grendel Jendela 8.00 Bh 61,700.00 493,600.00
8.8 Pegangan / Handel Jendela 8.00 Bh 61,700.00 493,600.00
JUMLAH (Rp.) 8,876,741.00
7 PEKERJAAN LISTRIK
7.1 Instalasi Titik Lampu 8.00 Ttk 225,000.00 1,800,000.00
7.2 Instalasi Titik Saklar Ganda 1.00 Ttk 248,000.00 248,000.00
7.3 Instalasi Titik Saklar Tunggal 1.00 Ttk 237,000.00 237,000.00
7.4 Instalasi Titik Stop Kontak 7.00 Ttk 243,600.00 1,705,200.00
7.5 Instalasi Sekering Box / MCB (include MCB Box) 1.00 Bh 568,100.00 568,100.00
7.6 Lampu SL 18 W 8.00 Bh 47,400.00 379,200.00
JUMLAH (Rp.) 4,937,500.00
9 PEKERJAAN PENGECATAN
9.1 Cat Plafon ( Cat Air ) 117.00 m² 53,300.00 6,236,100.00
9.2 Cat List Plafon ( Cat Minyak ) 7.16 m² 59,600.00 426,736.00
9.3 Cat Kusen + Jelusi ( Cat Minyak ) 10.44 m² 59,600.00 622,224.00
9.4 Cat Pintu ( Cat Minyak ) 4.64 m² 59,600.00 276,544.00
9.5 Cat Daun Jendela ( Cat Minyak ) 3.40 m² 59,600.00 202,640.00
9.6 Cat Lisplang ( Cat Minyak ) 13.75 m² 59,600.00 819,500.00
9.7 Cat dinding Eksterior( Cat Minyak ) 133.58 m² 59,600.00 7,961,368.00
9.8 Cat dinding Dalam ( Cat Air ) 133.58 m² 53,300.00 7,119,814.00
JUMLAH (Rp.) 23,664,926.00
10 PEKERJAAN LAIN-LAIN
10.1 Pekerjaan Relling Teras, (Kayu Kelas II)
- Konstruksi Relling 0.28 m3 8,769,700.00 2,455,516.00
- Pengecatan (Cat Minyak) 16.35 m2 59,600.00 974,460.00
10.2 Pekerjaan Tangga, (kayu Kelas I)
- Konstruksi tangga 0.14 M3 12,856,900.00 1,799,966.00
JUMLAH (Rp.) 5,229,942.00

Page 56 of 107
PERHITUNGAN VOLUME
UKURAN
1 ITEM PEKERJAAN SAT VOLUME KETERANGAN
P L T N
1 Tongkat/Tiang 10/10 (Kayu Kelas I)
Jalur baris tipe 1 jumlah 6 (7ttk) Ttk 7.00 1.00 1.00 6.00 42.00 BARIS 1,2,3,9,10&11
Jalur baris tipe 2 jumlah 5 (8ttk) Ttk 8.00 1.00 1.00 5.00 40.00 BARIS 4,5,6,7,8
82.00

2 Sunduk, Balok (Kayu Kelas I) 5/10 - 50 M3 0.50 0.05 0.10 82.00 0.21
3 Kalang, (Kayu Kelas I) 5//10 - 50 x 2 M3 1.00 0.05 0.10 82.00 0.41

4 Suai Tongkat, Balok (Kayu Kelas I) 5/10 - 400 M3 4.00 0.05 0.10 20.00 0.40
Suai Tongkat, Balok (Kayu Kelas I) 5/10 - 300 M3 3.00 0.05 0.10 8.00 0.12
Suai Tongkat, Balok (Kayu Kelas I) 5/10 - 200 M3 2.00 0.05 0.10 4.00 0.04
0.520

5 Sloof, Balok (Kayu Kelas I) 10/10


Jalur baris tipe 1 jumlah 6 ( 9,1 m) M3 9.10 0.10 0.10 6.00 0.55 BARIS 1,2,3,9,10&11
Jalur baris tipe 2 jumlah 5 ( 10,6 m) M3 10.60 0.10 0.10 5.00 0.53 BARIS 4,5,6,7,8
1.080
6 Gelegar utama, Balok (Kayu ulin 10/10)
Jalur baris tipe 1 jumlah 1 ( 6,1 m) M3 5.10 0.10 0.10 1.00 0.05 GU1
Jalur baris tipe 2 jumlah 1 ( 7,2 m) M3 7.70 0.10 0.10 1.00 0.08 GU2
Jalur baris tipe 3 jumlah 1 ( 10,2 m) M3 10.20 0.10 0.10 1.00 0.10 GU3
Jalur baris tipe 4 jumlah 1 ( 3,1 m) M3 3.10 0.10 0.10 1.00 0.03 GU4
Jalur baris tipe 5 jumlah 2 ( 2,6 m) M3 2.60 0.10 0.10 2.00 0.05 GU5 & 8
Jalur baris tipe 6 jumlah 1 ( 5,1m) M3 5.10 0.10 0.10 1.00 0.05 GU6
Jalur baris tipe 7 jumlah 2 ( 13,1 m) M3 13.10 0.10 0.10 2.00 0.26 GU7 & 9
0.630
7 Gelegar Anak, Balok (Kayu ulin 5/10)
Jalur baris tipe 1 jumlah 2 ( 6,1 m) M3 5.10 0.05 0.10 2.00 0.05 GA1 & 2
Jalur baris tipe 2 jumlah 8 ( 13,1 m) M3 13.10 0.05 0.10 8.00 0.52 GA3,5,6,,7,9,10,11 & 12
Jalur baris tipe 3 jumlah 1 ( 3,1 m) M3 3.10 0.05 0.10 1.00 0.02 GA4
Jalur baris tipe 4 jumlah 1 ( 8,1 m) M3 8.10 0.05 0.10 1.00 0.04 GA8
0.630
8 Kolom, Balok (Kayu Kelas II) 10/10
Jalur baris tipe 1 jumlah 3,7 m ( 6 ttk) M3 3.70 0.10 0.10 6.00 0.22 baris 1
Jalur baris tipe 2 jumlah 3,7 m ( 20 ttk) M3 3.70 0.10 0.10 20.00 0.74 baris 2,3,6,7 & 9
Jalur baris tipe 3 jumlah 3,7 m ( 4 ttk) M3 3.70 0.10 0.10 4.00 0.15 baris 4 & 8
Jalur baris tipe 4 jumlah 3,7 m ( 10 ttk) M3 3.70 0.10 0.10 10.00 0.37 baris 5 & 10
40.00 1.480

9 Kolom, Balok (Kayu Kelas II) 5/10 M3 3.70 0.05 0.10 7.00 0.13

10 Rangka Dinding, Balok (Kayu Kelas II) 5/10


M3 1.42 0.05 0.10 48.00 0.34 S1
M3 1.42 0.05 0.10 8.00 0.06 S2
M3 0.62 0.05 0.10 8.00 0.02 S2.1
M3 0.92 0.05 0.10 8.00 0.04 S3
M3 2.42 0.05 0.10 9.00 0.11 S4
M3 0.97 0.05 0.10 3.00 0.01 S4.1
M3 2.92 0.05 0.10 2.00 0.03 S5
M3 0.40 0.05 0.10 8.00 0.02 S6
M3 1.49 0.05 0.10 2.00 0.01 S7
M3 2.42 0.05 0.10 2.00 0.02 S7.1
M3 1.49 0.05 0.10 2.00 0.01 S8
M3 2.42 0.05 0.10 8.00 0.10 S9
M3 1.52 0.05 0.10 8.00 0.06 S9.1
M3 2.52 0.05 0.10 4.00 0.05 S10
M3 1.92 0.05 0.10 4.00 0.04 S11
M3 0.92 0.05 0.10 4.00 0.02 S12
M3 2.47 0.05 0.10 6.00 0.07 S13
M3 1.42 0.05 0.10 2.00 0.01 S13.1
M3 2.92 0.05 0.10 16.00 0.23 S14
M3 3.92 0.05 0.10 2.00 0.04 S15
M3 3.02 0.05 0.10 2.00 0.03 S15.1
M3 2.92 0.05 0.10 8.00 0.12 S16
M3 3.92 0.05 0.10 4.00 0.08 S17
M3 2.92 0.05 0.10 2.00 0.03 S18
M3 2.47 0.05 0.10 2.00 0.02 S18.1
1.590
11 Ringbalk, Balok (Kayu Kelas II) 10/10
Jalur baris tipe 1 jumlah 9,1 m ( 2 brs) M3 9.10 0.10 0.10 2.00 0.18 baris 1 & 10
Jalur baris tipe 2 jumlah 3,1 m ( 2 brs) M3 3.10 0.10 0.10 2.00 0.06 baris 2 & 9
Jalur baris tipe 3 jumlah 5,7 m ( 1 brs) M3 5.70 0.10 0.10 1.00 0.06 baris 3
Jalur baris tipe 4 jumlah 1,6 m ( 1 brs) M3 1.60 0.10 0.10 1.00 0.02 baris 4
Jalur baris tipe 5 jumlah 7,6 m ( 1 brs) M3 7.60 0.10 0.10 1.00 0.08 baris 5
Jalur baris tipe 6 jumlah 3,1 m ( 2 brs) M3 3.10 0.10 0.10 2.00 0.06 baris 6 & 8
Jalur baris tipe 7 jumlah 4,7 m ( 1 brs) M3 4.70 0.10 0.10 1.00 0.05 baris 7
Jalur baris tipe 8 jumlah 5,1 m ( 2 brs) M3 5.10 0.10 0.10 2.00 0.10 baris A & D
Jalur baris tipe 9 jumlah 13,1 m ( 1 brs) M3 13.10 0.10 0.10 1.00 0.13 baris B
Jalur baris tipe 10 jumlah 13,1 m ( 3 brs) M3 13.10 0.10 0.10 3.00 0.39 baris C,F & H
Jalur baris tipe 11 jumlah 8,1 m ( 1 brs) M3 8.10 0.10 0.10 1.00 0.08 baris E
Jalur baris tipe 12 jumlah 2,7 m ( 1 brs) M3 2.70 0.10 0.10 1.00 0.03 baris L
1.24
12 lantai Kamar mandi M2 1.6 1.60 1.00 3.00 7.68 lantai KM/WC
7.680
13 Lantai papan Bengkirai Dalam & Teras M2 13.1 9.10 1.00 1.00 119.21 Lantai Bidang 1
M2 5.1 1.50 1.00 1.00 7.65 Lantai Bidang 2
126.86
119.18 dikurang lantai KM/WC
14 Dinding Bagian Luar
M2 16.10 4.00 1.00 1.00 64.40 sebelah Depan
M2 3.04 5.55 1.00 1.00 16.88 layar
M2 1.7 1.4 1.00 1.00 2.38 jendela1
M2 1.7 0.7 1.00 1.00 1.19 jendela2
M2 2.9 2.4 1.00 1.00 6.96 Pintu 1
M2 0.9 2.4 1.00 1.00 2.16 Pintu 2
M2 0.8 2.1 1.00 2.00 3.36 Pintu 3
65.23
M2 9.10 4.00 1.00 1.00 36.40 sebelah Kanan
M2 1.80 2.55 1.00 1.00 4.59 layar
M2 1.7 1.4 1.00 1.00 2.38 jendela1
M2 1 0.4 1.00 2.00 0.80 Bovenlight
37.81
M2 9.10 4.00 1.00 1.00 36.40 sebelah Kiri
M2 1.80 2.55 1.00 1.00 4.59 layar
M2 1.7 1.4 1.00 1.00 2.38 jendela1
M2 1 0.4 1.00 2.00 0.80 Bovenlight1
M2 0.9 0.6 1.00 1.00 0.54 Bovenlight2
37.27
M2 13.10 4.00 1.00 1.00 52.40 sebelah belakang
M2 1.7 1.4 1.00 1.00 2.38 jendela1
M2 0.9 2.4 1.00 1.00 2.16 Pintu 2
47.86
188.17 Total dinding
15 Dinding Bagian Dalam
Ruang Gudang Alat Posyandu + wc (4 ruang) M2 1.4 2.5 4 4 56.00
2.1 0.8 1 4 6.72 pintu
1 0.4 1 4 1.60 BV
47.68
Ruang keluarga + Ruang Makan & Dapur M2 20.7 3.675 1 1 76.07
2.4 0.9 1 2 4.32 Pintu1
2.1 0.9 1 2 3.78 Pintu 2
2.1 0.8 1 1 1.68 Pintu 3
1.7 0.7 1 1 1.19 Jendela
0.9 0.6 1 1 0.54 Void
64.56

Kamar Tidur 1 M2 2.4 3.675 1 4 35.28


2.1 0.9 1 1 1.89 Pintu
1.7 1.4 1 1 2.38 jendela
31.01

Kamar Tidur 2 + R. Arsip & Gudang Obat M2 2.4 3.675 1 6 52.92


M2 2.9 3.675 1 6 63.94
2.1 0.9 1 3 5.67 Pintu
1.7 1.4 1 3 7.14 jendela
118.33

Lobby + selasar M2 20.6 3.675 1 1 75.71


2.4 2.9 1 2 13.92 Pintu1
2.1 0.9 1 4 7.56 Pintu 2
2.1 0.8 1 1 1.68 Pintu 3
52.55
Ruang Pemeriksaan & Ruang Kia M2 2.9 3.675 1 4 42.63
M2 3.9 3.675 1 4 57.33
2.1 0.9 1 2 3.78 Pintu
1.7 1.4 1 2 4.76 jendela
100.94
415.07

16 KUSEN
Pintu dan Jendela Type 1 2.4 0.05 0.14 4 0.07
2.8 0.05 0.14 2 0.04
0.7 0.05 0.14 2 0.01
0.25 0.05 0.14 1 0.002
16.85 0.12 m3
4.044 m2

Pintu dan Jendela Type 2 2.4 0.05 0.14 2 0.03


1.7 0.05 0.14 1 0.01
1.5 0.05 0.14 2 0.02
0.65 0.05 0.14 1 0.00
1.45 0.02 0.1 3 0.01 Jalusi
14.5 0.08 m3
3.48 m2
Pintu Type 1 ( 7 bh) 2.4 0.05 0.14 2 0.03
0.8 0.05 0.14 2 0.01
0.8 0.02 0.1 3 0.005 Jalusi
61.6 0.10 m3
14.784 m2

Pintu Type 2 ( 4 bh) 2.1 0.05 0.14 2 0.03


0.7 0.05 0.14 1 0.00
0.7 0.02 0.1 3 0.004 Jalusi
28.0 0.15 m3
6.72 m2
Jendela Type 1 ( 6 bh) 1.7 0.05 0.14 3 0.04
1.4 0.05 0.14 3 0.03
1.35 0.02 0.1 3 0.008 Jalusi
80.1 0.44 m3
19.224 m2
Boven Type 1 ( 3 bh) 1 0.05 0.14 2 0.01
0.3 0.05 0.14 2 0.00
7.8 0.05 m3
1.872 m2
Boven Type 2 ( 1 bh) 0.9 0.05 0.14 2 0.01
0.5 0.05 0.14 2 0.01
2.8 0.02 m3
0.672 m2
0.96 m3
31.57 m2
17 DAUN PINTU PANIL
Pintu Type 1 ( 8 bh) 2.05 0.8 1 8 13.12 m2
26.24 m2 pengecatan
Pintu Type 2 ( 4 bh ) 2.05 0.7 1 4 5.74 m2
11.48 m2 pengecatan
18.86
37.72

18 Jendala kaca Type 1 ( 13 bh) 1.32 0.67 13 11.50 m2


3.98 0.14 13 7.25 m2 pengecatan

19 Pintu Kaca Type ( 2 bh) 0.65 2.05 2 2.67 m2


5.4 0.19 2 2.06 m2 pengecatan
20 KUDA-KUDA KAYU MERANTI 5/10
Kuda-kuda tepe 1 (5 bh) 37.51 0.1 0.05 5 0.94 M3
Kuda-kuda tepe 2 (1 bh) 22.66 0.1 0.05 1 0.12 M3
Balok Nok 19.95 0.1 0.05 1 0.1 M3
Jurai 11.80 0.1 0.05 1 0.06 M3
1.22
21 SKUR ANGIN KAYU MERANTI 5/10
Skur Angin 1 (2 bh) 4 0.1 0.05 5 0.1 M3
22 GORDING KAYU MERANTI 5/10
1 Gording 1 (2 bh) 7.425 0.1 0.05 2 0.07425 M3
2 Gording 2 (2 bh) 6.9 0.1 0.05 2 0.069 M3
3 Gording 3 (2 bh) 6.267 0.1 0.05 2 0.06267 M3
4 Gording 4 (2 bh) 5.631 0.1 0.05 2 0.05631 M3
5 Gording 5 (2 bh) 4.995 0.1 0.05 2 0.04995 M3
6 Gording 6 (2 bh) 4.358 0.1 0.05 2 0.04358 M3
7 Gording 7 (2 bh) 3.722 0.1 0.05 2 0.03722 M3
8 Gording 8 (2 bh) 5.097 0.1 0.05 2 0.05097 M3
9 Gording 9 (2 bh) 4.653 0.1 0.05 2 0.04653 M3
10 Gording 10 (2 bh) 4.017 0.1 0.05 2 0.04017 M3
11 Gording 11 (2 bh) 3.381 0.1 0.05 2 0.03381 M3
12 Gording 12 (2 bh) 2.745 0.1 0.05 2 0.02745 M3
13 Gording 13 (2 bh) 2.108 0.1 0.05 2 0.02108 M3
14 Gording 14 (2 bh) 1.478 0.1 0.05 2 0.01478 M3
15 Gording 15 (13 bh) 14.9 0.1 0.05 13 0.9685 M3
1.600

23 LISTPLANK
1 Listplank 1 (2 bh) 3.78 2 7.56 M1
2 Listplank 2 (2 bh) 4.64 2 9.28 M1
3 Listplank 3 (2 bh) 1.51 2 3.02 M1
4 Listplank 4 (4 bh) 6.71 4 26.84 M1
5 Listplank 5 (1 bh) 14.9 1 14.90 M1
61.60
24 RANGKA PLAPON
1 Bidang 1 (1 bdg) 13.14 10.94 1 143.75 M2
2 Bidang 2 (2 bdg) 0.6 7.94 2 9.53 M2
3 Bidang 3 (6 bdg) 0.6 0.56 6 2.02 M2
4 Bidang 4 (4 bdg) 6.71 0.9 4 24.16 M2
5 Bidang 5 (2 bdg) 4.64 0.9 2 8.35 M2
187.8 M2

25 KACA MATI
2.30 0.68 1 2 3.13 M2
0.26 0.68 1 4 0.71 M2
0.91 0.31 1 4 1.13 M2
0.81 0.51 1 1 0.42 M2
5.39

26 LIST PLAFO
lisplang 61.60 1 61.60
dinding luar 48.60 1 48.60
wc + gudang 5.44 4 21.76
km tdr 1 9.44 1 9.44
km tdr 2 + arsip + g obat 10.43 3 31.29
Perawatan + kia 13.44 2 26.88
Lobby 20.44 1 20.44
R. Tamu 21.44 1 21.44
trs dpn 7.35 1 7.35
trs dpn 1 0.90 3 2.70
trs blkg 2.38 1 2.38
0.00
0.00
0.00
0.00
0.00
0.00
0.00
253.88
ENGGINEER'S ESTIMATE

DAFTAR ANALISA PEKERJAAN

DINAS : DINAS PENDIDIKAN KAB. MAHAKAM ULU


PROGRAM : WAJIB BELAJAR PENDIDIKAN DASAR SEMBILAN TAHUN
KEGIATAN : PEMBANGUNAN RUMAH DINAS GRU SD & SMP
PEKERJAAN : RUMAH DINAS GURU SMPN 2 LONG BAGUN (1 UNIT)
TAHUN ANGGARAN : 2014
LOKASI : MAMAHAK BESAR
KODE ANALISA

HARGA HARGA JUMLAH


KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

PEKERJAAN PENDAHULUAN
Pengukuran dan pemasangan bouwplank per m'
Balok Kayu Meranti 0.0120 m3 Err:509 Err:509 Err:509
Paku 0.0200 kg 30,000.00 600.00 600.00
Papan Kayu Meranti 0.0070 m3 Err:509 Err:509 Err:509
Pekerja 0.1000 oh 100,000.00 10,000.00 10,000.00
Tukang Kayu 0.1000 oh 120,000.00 12,000.00 12,000.00
Kepala Tukang 0.0100 oh 150,000.00 1,500.00 1,500.00
Mandor 0.0050 oh 165,000.00 825.00 825.00
JUMLAH ( UPAH DAN BAHAN) Rp. Err:509
DI BULATKAN Rp. Err:509
PEKERJAAN STRUKTUR KAYU
1 m3 Pasang Struktur Kayu Ulin
Balok Kayu Ulin 1.1000 m3 4,800,000.00 5,280,000.00 5,280,000.00
Paku ulin 4.0000 Kg 36,000.00 144,000.00 144,000.00
Pekerja 5.0000 oh 100,000.00 500,000.00 500,000.00
Tukang Kayu 15.0000 oh 120,000.00 1,800,000.00 1,800,000.00
Kepala Tukang Kayu 1.5000 oh 150,000.00 225,000.00 225,000.00
Mandor 0.2500 oh 165,000.00 41,250.00 41,250.00
JUMLAH ( UPAH DAN BAHAN) Rp. 7,990,250.00
DI BULATKAN Rp. 7,990,200.00
1 m3 Pek. Konstruksi Gelagar & Pek. Tangga
Balok Kayu Ulin 1.100 m³ 4,800,000.00 5,280,000.00 5,280,000.00
Paku 10 cm 1.250 kg 30,000.00 37,500.00 37,500.00
Baut 20.000 Bh 7,000.00 140,000.00 140,000.00
Pekerja 7.000 oh 100,000.00 700,000.00 700,000.00
Tukang Kayu 21.000 oh 120,000.00 2,520,000.00 2,520,000.00
Kepala Tukang 2.100 oh 150,000.00 315,000.00 315,000.00
Mandor 0.350 oh 165,000.00 57,750.00 57,750.00
JUMLAH ( UPAH DAN BAHAN) Rp. 9,050,250.00
DI BULATKAN Rp. 9,050,200.00
PEKERJAAN LANTAI DAN DINDING
1 m2 Pasang Lantai Papan, Kayu Ulin (Halus)
Papan Kayu Ulin t ; 2,5 cm 0.0250 m3 5,400,000.00 135,000.00 135,000.00
Paku ulin 0.2500 Kg 36,000.00 9,000.00 9,000.00
Pekerja 0.2800 oh 100,000.00 28,000.00 28,000.00
Tukang Kayu 0.8000 oh 120,000.00 96,000.00 96,000.00
Kepala Tukang Kayu 0.0800 oh 150,000.00 12,000.00 12,000.00
Mandor 0.0140 oh 165,000.00 2,310.00 2,310.00
JUMLAH ( UPAH DAN BAHAN) Rp. 282,310.00
DI BULATKAN Rp. 282,300.00
1 m2 Pasang Lantai Papan, Kayu Ulin (Kasar)
Papan Kayu Ulin t ; 2,5 cm 0.0200 m3 5,400,000.00 108,000.00 108,000.00
Paku ulin 0.2500 Kg 36,000.00 9,000.00 9,000.00
Pekerja 0.2000 oh 100,000.00 20,000.00 20,000.00
Tukang Kayu 0.6000 oh 120,000.00 72,000.00 72,000.00
Kepala Tukang Kayu 0.0600 oh 150,000.00 9,000.00 9,000.00
Mandor 0.0140 oh 165,000.00 2,310.00 2,310.00
JUMLAH ( UPAH DAN BAHAN) Rp. 220,310.00
DI BULATKAN Rp. 220,300.00

Page 61 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 m2 Pemasangan Dinding, Papan Kayu Ulin 2/20 cm


Pekerja 0.2800 oh 100,000.00 28,000.00 28,000.00
Tukang kayu 0.8000 oh 120,000.00 96,000.00 96,000.00
Kepala tukang 0.0800 oh 150,000.00 12,000.00 12,000.00
Mandor 0.0100 oh 165,000.00 1,650.00 1,650.00
Papan Kayu Ulin 0.0200 m3 5,400,000.00 108,000.00 108,000.00
Paku biasa 0.2000 kg 30,000.00 6,000.00 6,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 251,650.00
DI BULATKAN Rp. 251,600.00
1 m2 Pemasangan Dinding, Papan Kayu Meranti 2/20 cm
Pekerja 0.2800 oh 100,000.00 28,000.00 28,000.00
Tukang kayu 0.8000 oh 120,000.00 96,000.00 96,000.00
Kepala tukang 0.0800 oh 150,000.00 12,000.00 12,000.00
Mandor 0.0100 oh 165,000.00 1,650.00 1,650.00
Papan Kayu Meranti 0.0200 m3 3,120,000.00 62,400.00 62,400.00 62,400.00
Paku biasa 0.2000 kg 30,000.00 6,000.00 6,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 206,050.00
DI BULATKAN Rp. 206,000.00
1 m' Pasang list Dinding kayu profil, Lebar 5 cm
Kayu Profil 1.050 m' 24,000.00 25,200.00 25,200.00
Paku 0.010 Kg 30,000.00 300.00 300.00
Pekerja 0.021 Oh 100,000.00 2,100.00 2,100.00
Tukang kayu 0.021 Oh 120,000.00 2,520.00 2,520.00
Kepala tukang 0.002 Oh 150,000.00 300.00 300.00
Mandor 0.001 Oh 165,000.00 165.00 165.00
JUMLAH ( UPAH DAN BAHAN) Rp. 30,585.00
DI BULATKAN Rp. 30,500.00
1 m2 Pasang list Dinding, Papan Kayu Ulin 2/20
Pekerja 0.2800 oh 100,000.00 28,000.00 28,000.00
Tukang kayu 0.8000 oh 120,000.00 96,000.00 96,000.00
Kepala tukang 0.0800 oh 150,000.00 12,000.00 12,000.00
Mandor 0.0100 oh 165,000.00 1,650.00 1,650.00
Papan Kayu Ulin 0.0220 m3 5,400,000.00 118,800.00 118,800.00
Paku biasa 0.2000 kg 30,000.00 6,000.00 6,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 262,450.00
DI BULATKAN Rp. 262,400.00
PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI, BOVENLIGHT DAN KACA
1 m3 Pek. Kusen-Kusen Kayu
Balok Kayu Ulin 1.100 m³ 4,800,000.00 5,280,000.00 5,280,000.00
Paku 10 cm 1.250 kg 30,000.00 37,500.00 37,500.00
Lem Kayu 1.000 kg 24,000.00 24,000.00 24,000.00
Pekerja 7.000 oh 100,000.00 700,000.00 700,000.00
Tukang Kayu 21.000 oh 120,000.00 2,520,000.00 2,520,000.00
Kepala Tukang 2.100 oh 150,000.00 315,000.00 315,000.00
Mandor 0.350 oh 165,000.00 57,750.00 57,750.00
JUMLAH ( UPAH DAN BAHAN) Rp. 8,934,250.00
DI BULATKAN Rp. 8,934,200.00
1 m2 Pekerjaan Daun Pintu Panel Kayu
Papan Kayu Ulin 0.040 m³ 5,400,000.00 216,000.00 216,000.00
Lem Kayu 0.500 kg 24,000.00 12,000.00 12,000.00
Pekerja 1.000 oh 100,000.00 100,000.00 100,000.00
Tukang Kayu 3.000 oh 120,000.00 360,000.00 360,000.00
Kepala Tukang 0.300 oh 150,000.00 45,000.00 45,000.00
Mandor 0.050 oh 165,000.00 8,250.00 8,250.00
JUMLAH ( UPAH DAN BAHAN) Rp. 741,250.00
DI BULATKAN Rp. 741,200.00

Page 62 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 m2 Pekerjaan Daun Jendela Kaca


Papan Kayu Bengkirai 0.0350 m³ 5,400,000.00 189,000.00 189,000.00
Kaca bening 5 mm 0.4500 Lbr - - -
Pekerja 0.0800 oh 100,000.00 8,000.00 8,000.00
Tukang Kayu 2.0000 oh 120,000.00 240,000.00 240,000.00
Kepala Tukang 0.2000 oh 150,000.00 30,000.00 30,000.00
Mandor 0.0400 oh 165,000.00 6,600.00 6,600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 473,600.00
DI BULATKAN Rp. 473,600.00
Pasangan Jalusi Mati Kusen dan Strip Realing Teras Kayu Per m2
Paku Biasa 0.1500 Kg 30,000.00 4,500.00 4,500.00
Papan Kayu Ulin 0.0200 m³ 5,400,000.00 108,000.00 108,000.00
Pekerja 0.5000 oh 100,000.00 50,000.00 50,000.00
Tukang Kayu 1.0000 oh 120,000.00 120,000.00 120,000.00
Kepala Tukang 0.2000 oh 150,000.00 30,000.00 30,000.00
Mandor 0.0250 oh 165,000.00 4,125.00 4,125.00
JUMLAH ( UPAH DAN BAHAN) Rp. 316,625.00
DI BULATKAN Rp. 316,600.00
1 M² Pasang kaca 5 mm
Kaca 5 mm 1.1000 m² - - -
Pekerja 0.0150 oh 100,000.00 1,500.00 1,500.00
Tukang kayu 0.1500 oh 120,000.00 18,000.00 18,000.00
Kepala tukang kayu 0.0150 oh 150,000.00 2,250.00 2,250.00
Mandor 0.0008 oh 165,000.00 123.75 123.75
JUMLAH ( UPAH DAN BAHAN) Rp. 21,873.75
DI BULATKAN Rp. 21,800.00
PEKERJAAN RANGKA KAP DAN ATAP
Memasang 1 m³ Konstruksi Kuda-kuda Konvensional / Pas. Skor Angin
Balok Kayu Ulin 1.100 m3 4,800,000.00 5,280,000.00 5,280,000.00
Besi strip 15.000 Kg 23,000.00 345,000.00 345,000.00
Paku 12 cm 0.800 Kg 30,000.00 24,000.00 24,000.00
Pekerja 4.000 Oh 100,000.00 400,000.00 400,000.00
Tukang kayu 12.000 Oh 120,000.00 1,440,000.00 1,440,000.00
Kepala tukang 1.200 Oh 150,000.00 180,000.00 180,000.00
Mandor 0.200 Oh 165,000.00 33,000.00 33,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 7,702,000.00
DI BULATKAN Rp. 7,702,000.00
Memasang 1 m³ Konstruksi Gordeng
Balok Kayu Meranti 1.100 m³ 3,000,000.00 3,300,000.00 3,300,000.00
Besi Strip tebal 5 mm 15.000 kg 23,000.00 345,000.00 345,000.00
Paku 12 cm 3.000 kg 30,000.00 90,000.00 90,000.00
Pekerja 2.400 Oh 100,000.00 240,000.00 240,000.00
Tukang Kayu 7.200 Oh 120,000.00 864,000.00 864,000.00
Kepala Tukang 0.720 Oh 150,000.00 108,000.00 108,000.00
Mandor 0.120 Oh 165,000.00 19,800.00 19,800.00
JUMLAH ( UPAH DAN BAHAN) Rp. 4,966,800.00
DI BULATKAN Rp. 4,966,800.00
Memasang talang miring atap lebar 90 cm per m1 (untuk jurai)
Seng plat BJLS 0.5000 m' - - -
Paku 0.0150 kg 30,000.00 450.00 450.00
Papan Kayu Ulin 0.0190 m3 5,400,000.00 102,600.00 102,600.00
Pekerja 0.0400 oh 100,000.00 4,000.00 4,000.00
Tukang Kayu 0.4000 oh 120,000.00 48,000.00 48,000.00
Kepala Tukang 0.0250 oh 150,000.00 3,750.00 3,750.00
Mandor 0.0013 oh 165,000.00 206.25 206.25
JUMLAH ( UPAH DAN BAHAN) Rp. 159,006.25
DI BULATKAN Rp. 159,000.00

Page 63 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, (Kayu Klas I)


Papan Kayu Ulin 0.0088 m3 5,400,000.00 47,520.00 47,520.00
Paku biasa 2" - 5" 0.060 Kg 30,000.00 1,800.00 1,800.00
Pekerja 0.100 Oh 100,000.00 10,000.00 10,000.00
Tukang kayu 0.100 Oh 120,000.00 12,000.00 12,000.00
Kepala tukang 0.010 Oh 150,000.00 1,500.00 1,500.00
Mandor 0.050 Oh 165,000.00 8,250.00 8,250.00
JUMLAH ( UPAH DAN BAHAN) Rp. 81,070.00
DI BULATKAN Rp. 81,000.00
Pek. Atap Ex. Soka Jempol
Atap Ex. Soka Jempol 0.750 Lbr 82,000.00 61,500.00 61,500.00
Karet Paku Payung 4.000 Bh 500.00 2,000.00 2,000.00
Paku Payung 0.020 kg 42,000.00 840.00 840.00
Pekerja 0.140 oh 100,000.00 14,000.00 14,000.00
Tukang Kayu 0.070 oh 100,000.00 7,000.00 7,000.00
Kepala Tukang 0.007 oh 120,000.00 840.00 840.00
Mandor 0.070 oh 150,000.00 10,500.00 10,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 96,680.00
DI BULATKAN Rp. 96,600.00
Pasang Nok/Bubungan atap Metal per m1
Nok/Bubungan 1.1000 Bh 45,000.00 49,500.00 49,500.00
Paku Payung 0.0500 Kg 42,000.00 2,100.00 2,100.00
Pekerja Biasa 0.2500 oh 100,000.00 25,000.00 25,000.00
Tukang Kayu 0.1500 oh 120,000.00 18,000.00 18,000.00
Kepala Tukang 0.0150 oh 150,000.00 2,250.00 2,250.00
Mandor 0.0130 oh 165,000.00 2,145.00 2,145.00
JUMLAH ( UPAH DAN BAHAN) Rp. 98,995.00
DI BULATKAN Rp. 98,900.00
PEKERJAAN PLAFON
Pasang 1m² Pasang rangka langit-langit (60 x 120) m, kayu Meranti
Balok Kayu Meranti 0.0130 m3 3,000,000.000 39,000.00 39,000.00
Paku 0.1200 kg 30,000.000 3,600.00 3,600.00
Tukang kayu 0.2700 oh 120,000.000 32,400.00 32,400.00
Kep. Tk. Kayu 0.0270 oh 150,000.000 4,050.00 4,050.00
Pekerja 0.1700 oh 100,000.000 17,000.00 17,000.00
Mandor 0.0085 oh 165,000.000 1,402.50 1,402.50
JUMLAH ( UPAH DAN BAHAN) Rp. 97,452.50
DI BULATKAN Rp. 97,400.00
Memasang 1m² Langit-langit Papan Kayu Meranti
Pekerja 0.1500 oh 100,000.00 15,000.00 15,000.00
Tukang Kayu 0.2500 oh 120,000.00 30,000.00 30,000.00
Kepala Tukang Kayu 0.0250 oh 150,000.00 3,750.00 3,750.00
Mandor 0.0750 oh 165,000.00 12,375.00 12,375.00
Papan Kayu Meranti 0.0240 m3 3,120,000.00 74,880.00 74,880.00
Paku 0.0250 kg 30,000.00 750.00 750.00
JUMLAH ( UPAH DAN BAHAN) Rp. 136,755.00
DI BULATKAN Rp. 136,700.00
1 m2 Langit2 Kalsiboard 3.5 mm ( 120x240x3,5 mm ), rangka 60 x 60 x 5/5 ky Meranti
Balok Kayu Meranti 0.0130 m3 3,000,000.000 39,000.000 39,000.00
Kalsiboard 3.5 mm 0.3600 lbr 90,000.000 32,400.000 32,400.00
Kasa gypsum 0.0500 roll 20,000.000 1,000.000 1,000.00
Tepung gypsum 0.4500 kg 4,000.000 1,800.000 1,800.00
Alkasit 0.0030 kg 350,000.000 1,050.000 1,050.00
Paku gypsum 0.0500 kg 45,000.000 2,250.000 2,250.00
Paku usuk 0.1200 kg 30,000.000 3,600.000 3,600.00
Tukang kayu 0.3700 oh 120,000.000 44,400.000 44,400.00
Kepala tukang kayu 0.0370 oh 150,000.000 5,550.000 5,550.00
Pekerja 0.2400 oh 100,000.000 24,000.000 24,000.00
Mandor 0.0120 oh 165,000.000 1,980.000 1,980.00
JUMLAH ( UPAH DAN BAHAN) Rp. 157,030.00
DI BULATKAN Rp. 157,000.00
1 m' Pasang list plafond, kayu profil
Kayu Profil 1.050 m' 24,000.00 25,200.00 25,200.00
Paku 0.010 Kg 30,000.00 300.00 300.00
Pekerja 0.021 Oh 100,000.00 2,100.00 2,100.00
Tukang kayu 0.021 Oh 120,000.00 2,520.00 2,520.00
Page 64 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Kepala tukang 0.002 Oh 150,000.00 300.00 300.00


Mandor 0.001 Oh 165,000.00 165.00 165.00
JUMLAH ( UPAH DAN BAHAN) Rp. 30,585.00
DI BULATKAN Rp. 30,500.00

Page 65 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

PEKERJAAN LISTRIK
1 TITIK MENGERJAKAN INSTALASI LISTRIK
Kabel NYM (2x2,5) mm 16.0000 m 9,000.00 144,000.00 144,000.00
Klem Service Plastik 15.0000 Bh 600.00 9,000.00 9,000.00
Pipa Pvc 5/8" 1.0000 Btg - - -
Inbow Dos 1.0000 Bh 1,000.00 1,000.00 1,000.00
Las Dop 2.0000 Bh - - -
Isolasi 1.0000 Roll 4,000.00 4,000.00 4,000.00
T - Dos 5/8" 1.0000 Bh 1,000.00 1,000.00 1,000.00
Alat Bantu 1.0000 Ls 5,000.00 5,000.00 5,000.00
Tukang Instalatur 0.3000 oh 120,000.00 36,000.00 36,000.00
Pembantu Tukang 0.3000 oh 100,000.00 30,000.00 30,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 230,000.00
DI BULATKAN Rp. 230,000.00
1 titik memasang Sekering Kast /MCB
Sekring Kast 2 Group Outomatic 1.000 Bh 280,000.00 280,000.00 280,000.00
Kabel NYFGBY 4 X 6 mm 0.025 Roll 3,000,000.00 75,000.00 75,000.00
Pekerja 0.250 Oh 100,000.00 25,000.00 25,000.00
Tukang Listrik 0.350 Oh 120,000.00 42,000.00 42,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 422,000.00
DI BULATKAN Rp. 422,000.00
PEKERJAAN BETON DAN KERAMIK
1 m2 Membuat Beton Rangka Kawat Harmonika, 1 Pc : 3 Ps : 5 Kr (tebal, 5 cm)
Semen portland 10.000 Kg 2,100.00 21,000.00 21,000.00
Pasir beton 0.026 m3 300,000.00 7,800.00 7,800.00
Kerikil Beton 0.044 m3 360,000.00 15,840.00 15,840.00
Kawat Harmonika 1.100 m' 60,500.00 66,550.00 66,550.00
Pekerja 1.150 Oh 100,000.00 115,000.00 115,000.00
Tukang batu 0.020 Oh 120,000.00 2,400.00 2,400.00
Kepala tukang 0.002 Oh 150,000.00 300.00 300.00
Mandor 0.006 Oh 165,000.00 990.00 990.00
JUMLAH ( UPAH DAN BAHAN) Rp. 229,880.00
DI BULATKAN Rp. 229,800.00
1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
PC 336.0000 kg 2,100.00 705,600.00 705,600.00
Pasir beton 0.5400 m3 300,000.00 162,000.00 162,000.00
Kerikil beton 0.8100 m3 360,000.00 291,600.00 291,600.00
Tukang batu 0.3500 oh 120,000.00 42,000.00 42,000.00
Kepala tukang batu 0.0350 oh 150,000.00 5,250.00 5,250.00
Pekerja 2.0000 oh 100,000.00 200,000.00 200,000.00
Mandor 0.1000 oh 165,000.00 16,500.00 16,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 1,422,950.00
DI BULATKAN Rp. 1,422,900.00
1 kg Pembesian dengan besi polos
Besi beton polos 1.0500 kg 21,000.00 22,050.00 22,050.00
Kawat beton 0.0150 kg 30,000.00 450.00 450.00
Tukang besi 0.0070 oh 120,000.00 840.00 840.00
Kepala tukang besi 0.0007 oh 150,000.00 105.00 105.00
Pekerja 0.0070 oh 100,000.00 700.00 700.00
Mandor 0.0003 oh 165,000.00 49.50 49.50
JUMLAH ( UPAH DAN BAHAN) Rp. 24,194.50
DI BULATKAN Rp. 24,100.00
1 m3 Lantai Kerja
Beton 1 Pc : 2 Ps : 3 Kr 1.0000 m3 1,422,900.00 1,422,900.00
Besi Polos 59.8500 Kg 24,100.00 1,442,385.00
JUMLAH ( UPAH DAN BAHAN) Rp. 2,865,285.00
DI BULATKAN Rp. 2,865,200.00

Page 66 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 m2 Pasang Keramik warna ukuran 25x 25 cm


Keramik 25 x 25 cm (warna) 16.0000 Lbr 8,200.00 131,200.00 131,200.00
Semen PC 0.2276 zak 102,000.00 23,215.20 23,215.20
Pasir Pasang 0.0420 m3 300,000.00 12,600.00 12,600.00
Semen warna 1.500 Kg 30,000.00 45,000.00 45,000.00
Pekerja 0.6200 Oh 100,000.00 62,000.00 62,000.00
Tukang Batu 0.3500 Oh 120,000.00 42,000.00 42,000.00
Kepala Tukang 0.0350 Oh 150,000.00 5,250.00 5,250.00
Mandor 0.0300 Oh 165,000.00 4,950.00 4,950.00
JUMLAH ( UPAH DAN BAHAN) Rp. 326,215.20
DI BULATKAN Rp. 326,200.00
Pasang Dinding Keramik 25x45 cm (warna)per m2
Keramik 25x40 cm (warna) 1.1000 m2 130,000.00 143,000.00 143,000.00
Semen PC 9.3000 kg 2,100.00 19,530.00 19,530.00
Pasir Pasang 0.0180 m3 300,000.00 5,400.00 5,400.00
Semen warna 1.5000 kg 30,000.00 45,000.00 45,000.00
Pekerja 0.6000 oh 100,000.00 60,000.00 60,000.00
Tukang Batu 0.3500 oh 120,000.00 42,000.00 42,000.00
Kepala Tukang 0.0450 oh 150,000.00 6,750.00 6,750.00
Mandor 0.0300 oh 165,000.00 4,950.00 4,950.00
JUMLAH ( UPAH DAN BAHAN) Rp. 326,630.00
DI BULATKAN Rp. 326,600.00
1 m2 granito Tile 60 x 60 cm, POLISHED
Granito Tile 60 x 60 cm 1.1000 m2 250,000.00 , 275,000.00 275,000.00
Semen portland 11.3800 Kg 2,100.00 23,898.00 23,898.00
Pasir pasang 0.0420 m3 300,000.00 12,600.00 12,600.00
Semen warna 1.5000 Kg 30,000.00 45,000.00 45,000.00
Pekerja 0.6200 Oh 100,000.00 62,000.00 62,000.00
Tukang batu 0.3500 Oh 120,000.00 42,000.00 42,000.00
Kepala tukang 0.0350 Oh 150,000.00 5,250.00 5,250.00
Mandor 0.0300 Oh 165,000.00 4,950.00 4,950.00
JUMLAH ( UPAH DAN BAHAN) Rp. 470,698.00
DI BULATKAN Rp. 470,600.00
PEKERJAAN PENGGANTUNG & PENGUNCI
1 buah Pasang Kunci Tanam biasa 2x Putar
Kunci tanam biasa 1.000 Bh 162,000.00 162,000.00 162,000.00
Pekerja 0.060 Oh 156,000.00 9,360.00 9,360.00
Tukang Kayu 0.600 Oh 120,000.00 72,000.00 72,000.00
Kepala Tukang 0.060 Oh 150,000.00 9,000.00 9,000.00
Mandor 0.005 Oh 165,000.00 825.00 825.00
JUMLAH ( UPAH DAN BAHAN) Rp. 253,185.00
DI BULATKAN Rp. 253,100.00
1 buah pasang kunci tanam KM/WC
Kunci tanam KM/WC 1.000 Bh 156,000.00 156,000.00 156,000.00
Pekerja 0.005 Oh 100,000.00 500.00 500.00
Tukang kayu 0.500 Oh 120,000.00 60,000.00 60,000.00
Kepala tukang 0.005 Oh 150,000.00 750.00 750.00
Mandor 0.0025 Oh 165,000.00 412.50 412.50
JUMLAH ( UPAH DAN BAHAN) Rp. 217,662.50
DI BULATKAN Rp. 217,600.00
1 Bh Pasang engsel pintu
Ensel 5 inchi 1.0000 bh 24,000.00 24,000.00 24,000.00
Pekerja 0.0150 oh 100,000.00 1,500.00 1,500.00
Tukang kayu 0.1500 oh 120,000.00 18,000.00 18,000.00
Kepala tukang kayu 0.0150 oh 150,000.00 2,250.00 2,250.00
Mandor 0.0008 oh 165,000.00 123.75 123.75
JUMLAH ( UPAH DAN BAHAN) Rp. 45,873.75
DI BULATKAN Rp. 45,800.00

Page 67 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

1 Bh Pasang engsel jendela


Ensel 3 inchi 1.0000 bh 18,000.00 18,000.00 18,000.00
Pekerja 0.0100 oh 100,000.00 1,000.00 1,000.00
Tukang kayu 0.1000 oh 120,000.00 12,000.00 12,000.00
Kepala tukang kayu 0.0100 oh 150,000.00 1,500.00 1,500.00
Mandor 0.0005 oh 165,000.00 82.50 82.50
JUMLAH ( UPAH DAN BAHAN) Rp. 32,582.50
DI BULATKAN Rp. 32,500.00
1 Bh Pasang kait angin/Penopang Jendela
Hak angin 1.0000 bh 9,000.00 9,000.00 9,000.00
Pekerja 0.015 Oh 100,000.00 1,500.00 1,500.00
Tukang kayu 0.150 Oh 120,000.00 18,000.00 18,000.00
Kepala tukang kayu 0.015 Oh 150,000.00 2,250.00 2,250.00
Mandor 0.00075 Oh 165,000.00 123.75 123.75
JUMLAH ( UPAH DAN BAHAN) Rp. 30,873.75
DI BULATKAN Rp. 30,800.00
1 Bh Pasang Grendel/Pengunci jendela
Grendel jendela 1.0000 bh 18,000.00 18,000.00 18,000.00
Pekerja 0.025 Oh 100,000.00 2,500.00 2,500.00
Tukang kayu 0.250 Oh 120,000.00 30,000.00 30,000.00
Kepala tukang kayu 0.025 Oh 150,000.00 3,750.00 3,750.00
Mandor 0.00125 Oh 165,000.00 206.25 206.25
JUMLAH ( UPAH DAN BAHAN) Rp. 54,456.25
DI BULATKAN Rp. 54,400.00
1 Bh Pasang Handle/Pegangan Jendela atau Lemari
Handle Jendela 1.0000 Bh 5,000.00 5,000.00 5,000.00
Pekerja Biasa 0.0150 oh 100,000.00 1,500.00 1,500.00
Tukang Kayu 0.1500 oh 120,000.00 18,000.00 18,000.00
Kepala Tukang 0.0150 oh 150,000.00 2,250.00 2,250.00
Mandor 0.0008 oh 165,000.00 123.75 123.75
JUMLAH ( UPAH DAN BAHAN) Rp. 26,873.75
DI BULATKAN Rp. 26,800.00
PEKERJAAN INSTALASI AIR BERSIH, AIR KOTOR
Memasang pipa PVC tipe AW dia. ½" per m'
Pipa PVC Ø ½ 1.2000 m' 3,000.00 3,600.00 3,600.00
Perlengkapan dari harga pipa 0.3500 % 3,000.00 1,050.00 1,050.00
Pekerja 0.0360 oh 100,000.00 3,600.00 3,600.00
Tukang Pipa 0.0600 oh 120,000.00 7,200.00 7,200.00
Kepala Tukang 0.0060 oh 150,000.00 900.00 900.00
Mandor 0.0018 oh 165,000.00 297.00 297.00
JUMLAH ( UPAH DAN BAHAN) Rp. 16,647.00
DI BULATKAN Rp. 16,600.00
Memasang pipa PVC tipe AW dia. 2" per m'
Pipa PVC Ø 2" 1.2000 m' 28,000.00 33,600.00 33,600.00
Perlengkapan dari harga pipa 0.3500 % 28,000.00 9,800.00 9,800.00
Pekerja 0.0540 oh 100,000.00 5,400.00 5,400.00
Tukang 0.0900 oh 120,000.00 10,800.00 10,800.00
Kepala Tukang 0.0090 oh 150,000.00 1,350.00 1,350.00
Mandor 0.0027 oh 165,000.00 445.50 445.50
JUMLAH ( UPAH DAN BAHAN) Rp. 61,395.50
DI BULATKAN Rp. 61,300.00
Memasang pipa PVC tipe AW dia. 4" per m'
Pipa PVC Ø 4 " 1.2000 m' - - -
Perlengkapan dari harga pipa 0.3500 % - - -
Pekerja 0.081 oh 100,000.00 8,100.00 8,100.00
Tukang batu 0.135 oh 120,000.00 16,200.00 16,200.00
Kepala tukang 0.0135 oh 150,000.00 2,025.00 2,025.00
Mandor 0.0041 oh 165,000.00 676.50 676.50
JUMLAH ( UPAH DAN BAHAN) Rp. 27,001.50
DI BULATKAN Rp. 27,000.00
Memasang I buah kloset jongkok porselen
Kloset jongkok porselen 1.0000 bh 400,000.000 400,000.00
Semen portland Pasir pasang 6.0000 kg 2,100.000 12,600.00
Pasir pasang 0.0100 m3 300,000.000 3,000.00
Pekerja 1.0000 Oh 100,000.000 100,000.00
Page 68 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Tukang batu 1.5000 Oh 120,000.000 180,000.00


Kepala Tukang 1.5000 Oh 150,000.000 225,000.00
Mandor 0.1600 Oh 165,000.000 26,400.00
JUMLAH ( UPAH DAN BAHAN) Rp. 947,000.00
DI BULATKAN Rp. 947,000.00
Memasang 1 Bh Saringan Lantai KM/WC atau Floor Drain
Floor drains / Floor Strainer 1.000 Bh 30,000.00 30,000.00 30,000.00
Pekerja 0.010 Oh 100,000.00 1,000.00 1,000.00
Tukang batu 0.100 Oh 120,000.00 12,000.00 12,000.00
Kepala tukang 0.010 Oh 150,000.00 1,500.00 1,500.00
Mandor 0.005 Oh 165,000.00 825.00 825.00
JUMLAH ( UPAH DAN BAHAN) Rp. 45,325.00
DI BULATKAN Rp. 45,300.00
Memasang 1 buah bak cuci piring stainless steel 1 tabung
Bak cuci stainless steel 1 tbg 1.000 Bh - - -
Water drain + assesories 1.000 set - - -
Pekerja 0.030 Oh 100,000.00 3,000.00 3,000.00
Tukang batu 0.300 Oh 120,000.00 36,000.00 36,000.00
Kepala tukang 0.030 Oh 150,000.00 4,500.00 4,500.00
Mandor 0.0015 Oh 165,000.00 247.50 247.50
JUMLAH ( UPAH DAN BAHAN) Rp. 43,747.50
DI BULATKAN Rp. 43,700.00
Memasang 1 Buah Kran Diameter ¾" atau ½"
Kran ¾" Atau ½" 1.0000 Bh 42,000.00 42,000.00 42,000.00
Seal Tape (Tapelon) 1.0000 Bh - - -
Pekerja 0.0500 oh 100,000.00 5,000.00 5,000.00
Tukang Batu 0.1000 oh 120,000.00 12,000.00 12,000.00
Kepala Tukang 0.0100 oh 150,000.00 1,500.00 1,500.00
Mandor 0.0025 oh 165,000.00 412.50 412.50
JUMLAH ( UPAH DAN BAHAN) Rp. 60,912.50
DI BULATKAN Rp. 60,900.00
Galian Tanah Biasa per m3
Pekerja 0.526 Oh 100,000.00 52,600.00 52,600.00
Mandor 0.052 Oh 165,000.00 8,580.00 8,580.00
JUMLAH ( UPAH DAN BAHAN) Rp. 61,180.00
DI BULATKAN Rp. 61,100.00
Mengurug Tanah Kembali per m3
Pekerja 0.1920 oh 100,000.00 19,200.00 19,200.00
Mandor 0.0192 oh 165,000.00 3,168.00 3,168.00
JUMLAH ( UPAH DAN BAHAN) Rp. 22,368.00
DI BULATKAN Rp. 22,300.00

Page 69 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

Pek. Septictank (Konstruksi kayu)


Galian Tanah Biasa Sedalam 13.5 m3 61,100.00 824,850.00
Urugan kembali Tanah 7.02 m3 22,300.00 156,546.00
Tongkat/Tiang 10/10 (Balok Kayu Ulin) 0.12 m3 7,990,200.00 958,824.00
Sunduk, Balok Kayu Ulin 5/10 - 50 0.015 m3 7,990,200.00 119,853.00
Kalang, Balok Kayu Ulin 10/10 - 100 x 2 0.120 m3 7,990,200.00 958,824.00
Sloof, Balok Kayu Ulin 10/10 0.042 m3 7,990,200.00 335,588.40
Gelegar, Balok Kayu Ulin 5/10 & 10/10 0.040 m3 7,990,200.00 319,608.00
Rangka Dinding, Balok Kayu Ulin 5/10 0.096 m3 7,990,200.00 767,059.20
Lantai Penutup, Papan Kayu Ulin 2,5 / 20 3.500 m² 220,300.00 771,050.00
Dinding Luar, Papan Kayu Ulin 13.003 m² 251,600.00 3,271,605.12
Pipa Ventilasi + assesoris 1.000 Ls 200,000.00 200,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 8,683,807.72
DI BULATKAN Rp. 8,683,800.00
PEKERJAAN FINISHING
1 m2 Pengecatan dengan cat minyak ( 1x cat dasar, 2x cat penutup )
Dempul kayu 0.150 Kg 23,000.00 3,450.00 3,450.00
Cat Minyak 1 x 0.170 Liter 66,000.00 11,220.00 11,220.00
Cat Minyak 2 x 0.350 Liter 66,000.00 23,100.00 23,100.00
Pekerja 0.070 Oh 100,000.00 7,000.00 7,000.00
Tukang cat 0.105 Oh 120,000.00 12,600.00 12,600.00
Kepala tukang 0.0040 Oh 150,000.00 600.00 600.00
Mandor 0.0025 Oh 165,000.00 412.50 412.50
JUMLAH ( UPAH DAN BAHAN) Rp. 58,382.50
DI BULATKAN Rp. 58,300.00
1 m2 Pengecatan dengan cat air ( 1x cat dasar, 2x cat penutup )
Cat tembok 1 x 0.100 Kg 78,000.00 7,800.00 7,800.00
Cat tembok 2 x 0.260 Kg 78,000.00 20,280.00 20,280.00
Pekerja 0.020 Oh 100,000.00 2,000.00 2,000.00
Tukang cat 0.063 Oh 120,000.00 7,560.00 7,560.00
Kepala tukang 0.006 Oh 150,000.00 945.00 945.00
Mandor 0.003 Oh 165,000.00 412.50 412.50
JUMLAH ( UPAH DAN BAHAN) Rp. 38,997.50
DI BULATKAN Rp. 38,900.00

Page 70 of 107
KODE ANALISA
HARGA HARGA JUMLAH
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

SPESIFIKASI FIRE EXTINGUISHER 6 KG


Tinggi keseluruhan 525 mm
Diameter Tabung 160 mm
Temperatur kerja 1 s/d 65 (OC)
Tekanan dalam tabung 15 Bar
Tes tekanan 25 Bar
Waktu Semprot 18 Detik
Jarak Penyemprotan 3 s/ d 11 m
Efektif Penyemprotan 96 (%)
Berat Total 8,5 Kg
Fire Rating 3 A 4B

SPESIFIKASI LEMARI DAPUR


Bahan Multipleks 12 mm
Kusen Kayu Ulin Tebal 3 cm
Fhinising Melamic
Engsel 2 bh per daun (Pegas)
gagang Pintu Minimalis

Page 71 of 107
HARGA PERKIRAAN SENDIRI

DAFTAR ANALISA PEKERJAAN

DINAS : DINAS PENDIDIKAN DAN KEBUDAYAAN


PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER SDN 010 MUARA PAHU(DAK SD)
TAHUN ANGGARAN : 2022
LOKASI : KEC. MUARA PAHU

HARGA HARGA JUMLAH


ANALISA
KODE

KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

I. PEKERJAAN PENDAHULUAN
1 Pengukuran dan pemasangan bouwplank per m'
Balok Kayu Meranti 0.0008 m3 3,499,900.00 2,694.92 2,694.92
Paku 0.0200 kg 25,000.00 500.00 500.00
Papan Kayu Meranti 0.0022 m3 3,619,200.00 7,962.24 7,962.24
Pekerja 0.0200 oh 170,000.00 3,400.00 3,400.00
Tukang 0.0400 oh 180,000.00 7,200.00 7,200.00
Kepala tukang 0.0080 oh 180,000.00 1,440.00 1,440.00
Mandor 0.0040 oh 200,000.00 800.00 800.00
JUMLAH ( UPAH DAN BAHAN) Rp. 23,997.16
OVERHEAD & PROFIT 10 % Rp. 2,399.72
JUMLAH 26,396.88
DI BULATKAN Rp. 26,300.00
II. PEKERJAAN STRUKTUR KAYU
1 1 Bh Pengadaan & Pemancangan Tiang Ulin 10/10
Balok Kayu Ulin 10/10 0.0154 m3 6,248,700.00 96,229.98 96,229.98
Pekerja 0.1250 oh 170,000.00 21,250.00 21,250.00
Tukang 0.1000 oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.0100 oh 180,000.00 1,800.00 1,800.00
Mandor 0.0130 oh 200,000.00 2,600.00 2,600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 139,879.98
OVERHEAD & PROFIT 10 % Rp. 13,988.00
JUMLAH 153,867.98
DI BULATKAN Rp. 153,800.00
2 1 M3 Memasang Sunduk Ulin
Kayu Ulin 2/10 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Pekerja 0.2500 oh 170,000.00 42,500.00 42,500.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
Tukang 0.0200 oh 180,000.00 3,600.00 3,600.00
Kepala tukang 0.0250 oh 180,000.00 4,500.00 4,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 6,958,170.00
OVERHEAD & PROFIT 10 % Rp. 695,817.00
JUMLAH 7,653,987.00
DI BULATKAN Rp. 7,653,900.00
3 1 M3 Memasang Kalang Ulin
Papan Kayu Ulin 1.1000 m3 6,643,400.00 7,307,740.00 7,307,740.00
Pekerja 0.0200 oh 170,000.00 3,400.00 3,400.00
Tukang 0.0200 oh 180,000.00 3,600.00 3,600.00
Kepala tukang 0.0200 oh 180,000.00 3,600.00 3,600.00
Mandor 0.0100 oh 200,000.00 2,000.00 2,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 7,320,340.00
OVERHEAD & PROFIT 10 % Rp. 732,034.00
JUMLAH 8,052,374.00
DI BULATKAN Rp. 8,052,300.00

Page 72 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

4 1 M3 Mengerjakan Balok Sloof, Balok (Kayu Kelas I) 10/10


Balok Kayu Ulin 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Paku Ulin 3.0000 Kg 30,000.00 90,000.00 90,000.00
Baut Ǿ14 mm - 12 s/d 15 cm 28.0000 bh 11,000.00 308,000.00 308,000.00
Pekerja 12.0000 oh 170,000.00 2,040,000.00 2,040,000.00
Tukang 5.0000 oh 180,000.00 900,000.00 900,000.00
Kepala tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Mandor 0.0500 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 10,311,570.00
OVERHEAD & PROFIT 10 % Rp. 1,031,157.00
JUMLAH 11,342,727.00
DI BULATKAN Rp. 11,342,700.00
5 1 M3 Mengerjakan Gelegar, Balok (Kayu Kelas I) 5/10
Balok Kayu Ulin 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Paku Ulin 5.0000 Kg 30,000.00 150,000.00 150,000.00
Baut Ǿ14 mm - 17 s/d 22 cm 56.0000 bh 11,000.00 616,000.00 616,000.00
Pekerja 12.0000 oh 170,000.00 2,040,000.00 2,040,000.00
Tukang 5.0000 oh 180,000.00 900,000.00 900,000.00
Kepala tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Mandor 0.0500 oh 200,000.00 10,000.00 10,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 10,679,570.00
OVERHEAD & PROFIT 10 % Rp. 1,067,957.00
JUMLAH 11,747,527.00
DI BULATKAN Rp. 11,747,500.00
6 1 M3 Mengerjakan Suai Kayu
Balok Kayu Ulin 1.1000 m3 6,248,700.00 6,873,570.00 6,873,570.00
Baut Ǿ14 mm - 17 s/d 22 cm 68.0000 bh 11,000.00 748,000.00 748,000.00
Pekerja 6.0000 oh 170,000.00 1,020,000.00 1,020,000.00
Tukang 2.0000 oh 180,000.00 360,000.00 360,000.00
Kepala tukang 0.2000 oh 180,000.00 36,000.00 36,000.00
Mandor 0.0200 oh 200,000.00 4,000.00 4,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 9,041,570.00
OVERHEAD & PROFIT 10 % Rp. 904,157.00
JUMLAH 9,945,727.00
DI BULATKAN Rp. 9,945,700.00
7 1 M3 Mengerjakan Kolom Kayu 5/10 & 10/10
Balok Kayu Bengkirai 1.1000 m3 4,981,500.00 5,479,650.00 5,479,650.00
Paku biasa 3.0000 Kg 25,000.00 75,000.00 75,000.00
Pekerja 1.8000 oh 170,000.00 306,000.00 306,000.00
Tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Kepala tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Mandor 0.3000 oh 200,000.00 60,000.00 60,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 8,080,650.00
OVERHEAD & PROFIT 10 % Rp. 808,065.00
JUMLAH 8,888,715.00
DI BULATKAN Rp. 8,888,700.00
9 1 m3 Pasang Ring Balk Kayu 10/10
Balok Kayu Bengkirai 1.1000 m3 4,981,500.00 5,479,650.00 5,479,650.00
Paku biasa 5.0000 Kg 25,000.00 125,000.00 125,000.00
Pekerja 2.8000 oh 170,000.00 476,000.00 476,000.00
Tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Kepala tukang 6.0000 oh 180,000.00 1,080,000.00 1,080,000.00
Mandor 0.3000 oh 200,000.00 60,000.00 60,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 8,300,650.00
OVERHEAD & PROFIT 10 % Rp. 830,065.00
JUMLAH 9,130,715.00
DI BULATKAN Rp. 9,130,700.00

Page 73 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

III. PEKERJAAN LANTAI DAN DINDING


1 1 m2 Pasang Lantai Papan, Kayu Bengkirai (Halus)
Papan Kayu Bengkirai 2,5/20 0.0200 m3 4,801,600.00 96,032.00 96,032.00
Paku ulin 0.0020 Kg 25,000.00 50.00 50.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
Tukang 0.6000 oh 180,000.00 108,000.00 108,000.00
Kepala tukang 0.0600 oh 180,000.00 10,800.00 10,800.00
Mandor 0.0150 oh 200,000.00 3,000.00 3,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 251,882.00
OVERHEAD & PROFIT 10 % Rp. 25,188.20
JUMLAH 277,070.20
DI BULATKAN Rp. 277,000.00
3 1 m2 Pasang Lantai Papan, Kayu Ulin
Papan Kayu Ulin t ; 2 cm 0.0220 m3 6,643,400.00 146,154.80 146,154.80
Paku ulin 0.0020 Kg 30,000.00 60.00 60.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
Tukang 0.6000 oh 180,000.00 108,000.00 108,000.00
Kepala tukang 0.0600 oh 180,000.00 10,800.00 10,800.00
Mandor 0.0140 oh 200,000.00 2,800.00 2,800.00
JUMLAH ( UPAH DAN BAHAN) Rp. 301,814.80
OVERHEAD & PROFIT 10 % Rp. 30,181.48
JUMLAH 331,996.28
DI BULATKAN Rp. 331,900.00
5 1 m2 Pemasangan Dinding, Papan Kayu Bengkirai 2/20 cm (Pakai Nat dan Alur diketam halus)
Pekerja 0.2400 oh 170,000.00 40,800.00 40,800.00
Tukang 0.3000 oh 180,000.00 54,000.00 54,000.00
Kepala tukang 0.0300 oh 180,000.00 5,400.00 5,400.00
Mandor 0.0100 oh 200,000.00 2,000.00 2,000.00
Papan Kayu Bengkirai 0.0220 m3 4,801,600.00 105,635.20 105,635.20
Paku biasa 0.2000 kg 25,000.00 5,000.00 5,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 212,835.20
OVERHEAD & PROFIT 10 % Rp. 21,283.52
JUMLAH 234,118.72
DI BULATKAN Rp. 234,100.00
5 1 m Pemasangan lis Dinding, Kayu Bengkirai 2/10 cm (Diketam halus)
Pekerja 0.0240 oh 170,000.00 4,080.00 4,080.00
Tukang 0.0300 oh 180,000.00 5,400.00 5,400.00
Kepala tukang 0.0030 oh 180,000.00 540.00 540.00
Mandor 0.0010 oh 200,000.00 200.00 200.00
Papan Kayu Bengkirai 0.0022 m3 4,801,600.00 10,563.52 10,563.52
Paku biasa 0.0200 kg 25,000.00 500.00 500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 21,283.52
OVERHEAD & PROFIT 10 % Rp. 2,128.35
JUMLAH 23,411.87
DI BULATKAN Rp. 23,400.00
IV. PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI, BOVENLIGHT DAN KACA
1 1 m3 Pek. Kusen-Kusen Kayu
Balok Kayu Kelas II/Ex. BEngkirai 1.200 m³ 4,981,500.00 5,977,800.00 5,977,800.00
Paku 10 cm 1.250 kg 25,000.00 31,250.00 31,250.00
Lem Kayu 1.000 kg 50,000.00 50,000.00 50,000.00
Pekerja 6.000 oh 170,000.00 1,020,000.00 1,020,000.00
Tukang 18.000 oh 180,000.00 3,240,000.00 3,240,000.00
Kepala tukang 1.800 oh 180,000.00 324,000.00 324,000.00
Mandor 0.300 oh 200,000.00 60,000.00 60,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 10,703,050.00
OVERHEAD & PROFIT 10 % Rp. 1,070,305.00
JUMLAH 11,773,355.00
DI BULATKAN Rp. 11,773,300.00

Page 74 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

2 1 m2 Pekerjaan Daun Pintu Panel Kayu Bengkirai


Papan Kayu Kelas II (Bengkirai) 0.040 m³ 4,801,600.00 192,064.00 192,064.00
Lem Kayu 0.500 kg 50,000.00 25,000.00 25,000.00
Pekerja 0.350 oh 170,000.00 59,500.00 59,500.00
Tukang 1.050 oh 180,000.00 189,000.00 189,000.00
Kepala tukang 0.105 oh 180,000.00 18,900.00 18,900.00
Mandor 0.018 oh 200,000.00 3,600.00 3,600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 488,064.00
OVERHEAD & PROFIT 10 % Rp. 48,806.40
JUMLAH 536,870.40
DI BULATKAN Rp. 536,800.00
4 1 m2 Pekerjaan Daun Jendela Kaca Kayu Bengkirai
Papan Kayu Kelas II (Bengkirai) 0.0138 m³ 4,801,600.00 66,022.00 66,022.00
Kaca bening 5 mm 0.4472 m² 328,500.00 146,905.20 146,905.20
Pekerja 0.0800 oh 170,000.00 13,600.00 13,600.00
Tukang 2.4000 oh 180,000.00 432,000.00 432,000.00
Kepala tukang 0.2400 oh 180,000.00 43,200.00 43,200.00
Mandor 0.0400 oh 200,000.00 8,000.00 8,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 709,727.20
OVERHEAD & PROFIT 10 % Rp. 70,972.72
JUMLAH 780,699.92
DI BULATKAN Rp. 780,600.00
V. PEKERJAAN RANGKA KAP DAN ATAP
1 Memasang 1 m³ Konstruksi Kuda-kuda Konvensional / Pas. Skor Angin
Balok Kayu Kelas III/Ex. Meranti 1.100 m3 3,499,900.00 3,849,890.00 3,849,890.00
Besi strip 15.000 Kg 23,000.00 345,000.00 345,000.00
Paku 12 cm 5.600 Kg 25,000.00 140,000.00 140,000.00
Pekerja 4.000 Oh 170,000.00 680,000.00 680,000.00
Tukang 12.000 Oh 180,000.00 2,160,000.00 2,160,000.00
Kepala tukang 1.200 Oh 180,000.00 216,000.00 216,000.00
Mandor 0.200 Oh 200,000.00 40,000.00 40,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 7,430,890.00
OVERHEAD & PROFIT 10 % Rp. 743,089.00
JUMLAH 8,173,979.00
DI BULATKAN Rp. 8,173,900.00
2 Memasang 1 m³ Konstruksi Gordeng
Balok Kayu Kelas III/Ex. Meranti 1.100 m³ 4,981,500.00 5,479,650.00 5,479,650.00
Besi Strip tebal 5 mm 15.000 kg 23,000.00 345,000.00 345,000.00
Paku 12 cm 3.000 kg 25,000.00 75,000.00 75,000.00
Pekerja 2.400 Oh 170,000.00 408,000.00 408,000.00
Tukang 7.200 Oh 180,000.00 1,296,000.00 1,296,000.00
Kepala tukang 0.720 Oh 180,000.00 129,600.00 129,600.00
Mandor 0.120 Oh 200,000.00 24,000.00 24,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 7,757,250.00
OVERHEAD & PROFIT 10 % Rp. 775,725.00
JUMLAH 8,532,975.00
DI BULATKAN Rp. 8,532,900.00

Page 75 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

4 1 m' Pasang lisplang ukuran 2 x 2/20 cm, (Kayu Klas II)


Papan Kayu Bengkirai 0.0088 m3 4,801,600.00 42,254.08 42,254.08
Paku biasa 2" - 5" 0.050 Kg 25,000.00 1,250.00 1,250.00
Pekerja 0.100 Oh 170,000.00 17,000.00 17,000.00
Tukang 0.100 Oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.010 Oh 180,000.00 1,800.00 1,800.00
Mandor 0.005 Oh 200,000.00 1,000.00 1,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 81,304.08
OVERHEAD & PROFIT 10 % Rp. 8,130.41
JUMLAH 89,434.49
DI BULATKAN Rp. 89,400.00
5 Pek. Atap Soka
Atap Seng Soka 1.100 m2 80,880.00 88,968.00 88,968.00
Paku Payung 0.020 Kg 45,000.00 900.00 900.00
Pekerja 0.100 oh 170,000.00 17,000.00 17,000.00
Tukang Kayu 0.060 oh 180,000.00 10,800.00 10,800.00
Kepala Tukang 0.006 oh 180,000.00 1,080.00 1,080.00
Mandor 0.006 oh 200,000.00 1,200.00 1,200.00
JUMLAH ( UPAH DAN BAHAN) Rp. 119,948.00
OVERHEAD & PROFIT 10 % Rp. 11,994.80
JUMLAH 131,942.80
DI BULATKAN Rp. 131,900.00
6 Pasang Nok/Bubungan Soka per m1
Nok Soka 1.1000 bh 52,000.00 57,200.00 57,200.00
Paku Payung 0.0050 kg 45,000.00 225.00 225.00
Pekerja 0.0200 oh 170,000.00 3,400.00 3,400.00
Tukang 0.0800 oh 180,000.00 14,400.00 14,400.00
Kepala tukang 0.0100 oh 180,000.00 1,800.00 1,800.00
Mandor 0.0060 oh 200,000.00 1,200.00 1,200.00
JUMLAH ( UPAH DAN BAHAN) Rp. 78,225.00
OVERHEAD & PROFIT 10 % Rp. 7,822.50
JUMLAH 86,047.50
DI BULATKAN Rp. 86,000.00
VI. PEKERJAAN PLAFON
1 Pasang 1m² Pasang rangka langit-langit (60 x 120) m, kayu Meranti
Balok Kayu Kelas III/Ex. Meranti 0.0154 m3 3,499,900.000 53,898.46 53,898.46
Paku 0.2000 kg 25,000.000 5,000.00 5,000.00
Tukang 0.3000 oh 180,000.00 54,000.00 54,000.00
Kepala tukang 0.0300 oh 180,000.00 5,400.00 5,400.00
Pekerja 0.1500 oh 170,000.00 25,500.00 25,500.00
Mandor 0.0750 oh 200,000.00 15,000.00 15,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 158,798.46
OVERHEAD & PROFIT 10 % Rp. 15,879.85
JUMLAH 174,678.31
DI BULATKAN Rp. 174,600.00

Page 76 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

2 Memasang 1m² Langit-langit GRC


Pekerja 0.0300 oh 170,000.00 5,100.00 5,100.00
Tukang 0.0700 oh 180,000.00 12,600.00 12,600.00
Kepala tukang 0.0070 oh 180,000.00 1,260.00 1,260.00
Mandor 0.0040 oh 200,000.00 800.00 800.00
GRC 0.3760 Lbr 103,000.00 38,728.00 38,728.00
Paku 0.0100 kg 25,000.00 250.00 250.00
JUMLAH ( UPAH DAN BAHAN) Rp. 58,738.00
OVERHEAD & PROFIT 10 % Rp. 5,873.80
JUMLAH 64,611.80
DI BULATKAN Rp. 64,600.00
3 1 m' Pasang List plafond, kayu profil 1/4 cm
List kayu profil 1/4 cm 1.050 m' 7,500.00 7,875.00 7,875.00
Paku 0.010 Kg 25,000.00 250.00 250.00
Pekerja 0.025 Oh 170,000.00 4,250.00 4,250.00
Tukang 0.050 Oh 180,000.00 9,000.00 9,000.00
Kepala tukang 0.005 Oh 180,000.00 900.00 900.00
Mandor 0.003 Oh 200,000.00 600.00 600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 22,875.00
OVERHEAD & PROFIT 10 % Rp. 2,287.50
JUMLAH 25,162.50
DI BULATKAN Rp. 25,100.00
VII. PEKERJAAN LISTRIK
1 1 TITIK MENGERJAKAN INSTALASI LAMPU
Pipa Pvc 5/8" 3.0000 Btg 8,900.00 26,700.00 26,700.00
Kabel NYA 1.5 mm2 9.0000 m 3,100.00 27,900.00 27,900.00
Fitting 1.0000 Bh 17,500.00 17,500.00 17,500.00
Tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Pekerja 0.2500 oh 170,000.00 42,500.00 42,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 204,600.00
OVERHEAD & PROFIT 10 % Rp. 20,460.00
JUMLAH 225,060.00
DI BULATKAN Rp. 225,000.00
2 1 TITIK MENGERJAKAN INSTALASI SAKLAR TUNGAL
Pipa Pvc 5/8" 1.0000 Btg 8,900.00 8,900.00 8,900.00
Kabel NYA 1.5 mm2 5.0000 m 3,100.00 15,500.00 15,500.00
T - Dos 5/8" 1.0000 Bh 11,800.00 11,800.00 11,800.00
Klem biasa 5.0000 Bh 1,400.00 7,000.00 7,000.00
Mangkok 1.0000 Bh 11,800.00 11,800.00 11,800.00
Saklar 1.0000 Bh 28,000.00 28,000.00 28,000.00
Tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Pekerja 0.2500 oh 170,000.00 42,500.00 42,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 215,500.00
OVERHEAD & PROFIT 10 % Rp. 21,550.00
JUMLAH 237,050.00
DI BULATKAN Rp. 237,000.00
3 1 TITIK MENGERJAKAN INSTALASI SAKLAR GANDA
Pipa Pvc 5/8" 1.0000 Btg 8,900.00 8,900.00 8,900.00
Kabel NYA 1.5 mm2 5.0000 m 3,100.00 15,500.00 15,500.00
T - Dos 5/8" 1.0000 Bh 11,800.00 11,800.00 11,800.00
Klem biasa 5.0000 Bh 1,400.00 7,000.00 7,000.00
Mangkok 1.0000 Bh 11,800.00 11,800.00 11,800.00
Saklar Ganda 1.0000 Bh 38,000.00 38,000.00 38,000.00
Tukang 0.5000 oh 180,000.00 90,000.00 90,000.00
Pekerja 0.2500 oh 170,000.00 42,500.00 42,500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 225,500.00
OVERHEAD & PROFIT 10 % Rp. 22,550.00
JUMLAH 248,050.00
DI BULATKAN Rp. 248,000.00

Page 77 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

4 1 TITIK MENGERJAKAN INSTALASI STOP KONTAK


Pipa Pvc 5/8" 1.7000 Btg 8,900.00 15,130.00 15,130.00
Kabel NYA 2.5 mm2 10.0000 m 3,500.00 35,000.00 35,000.00
T - Dos 5/8" 1.0000 Bh 11,800.00 11,800.00 11,800.00
Klem biasa 10.0000 Bh 1,400.00 14,000.00 14,000.00
Mangkok 1.0000 Bh 11,800.00 11,800.00 11,800.00
Stop Kontak 1.0000 Bh 27,800.00 27,800.00 27,800.00
Tukang 0.4000 oh 180,000.00 72,000.00 72,000.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 221,530.00
OVERHEAD & PROFIT 10 % Rp. 22,153.00
JUMLAH 243,683.00
DI BULATKAN Rp. 243,600.00
3 1 Bh memasang Sekering Kast /MCB
Pipa Pvc 5/8" 1.000 Btg 8,900.00 8,900.00 8,900.00
Kabel NYM 3x2.5 mm2 10.000 m 17,000.00 170,000.00 170,000.00
L Bow 2.000 bh 2,500.00 5,000.00 5,000.00
Klem biasa 24.000 bh 1,400.00 33,600.00 33,600.00
MCB 1.000 bh 52,000.00 52,000.00 52,000.00
Box MCB 2 Group 1.000 bh 105,000.00 105,000.00 105,000.00
Tukang 0.6000 oh 180,000.00 108,000.00 108,000.00
Pekerja 0.2000 oh 170,000.00 34,000.00 34,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 516,500.00
OVERHEAD & PROFIT 10 % Rp. 51,650.00
JUMLAH 568,150.00
DI BULATKAN Rp. 568,100.00
IX. PEKERJAAN PENGGANTUNG & PENGUNCI
1 1 buah Pasang Kunci Tanam biasa 2x Putar
Kunci tanam biasa 1.000 Bh 300,000.00 300,000.00 300,000.00
Pekerja 0.005 Oh 170,000.00 850.00 850.00
Tukang 0.500 Oh 180,000.00 90,000.00 90,000.00
Kepala Tukang 0.050 Oh 180,000.00 9,000.00 9,000.00
Mandor 0.005 Oh 200,000.00 1,000.00 1,000.00
JUMLAH ( UPAH DAN BAHAN) Rp. 400,850.00
OVERHEAD & PROFIT 10 % Rp. 40,085.00
JUMLAH 440,935.00
DI BULATKAN Rp. 440,900.00
2 1 Set Pasang Grendel Tanam Pintu
Grendel Tanam Pintu 1.000 Bh 53,200.00 53,200.00 53,200.00
Pekerja 0.0150 Oh 170,000.00 2,550.00 2,550.00
Tukang 0.1200 Oh 180,000.00 21,600.00 21,600.00
Kepala Tukang 0.0150 Oh 180,000.00 2,700.00 2,700.00
Mandor 0.0008 Oh 200,000.00 150.00 150.00
JUMLAH ( UPAH DAN BAHAN) Rp. 80,200.00
OVERHEAD & PROFIT 10 % Rp. 8,020.00
JUMLAH 88,220.00
DI BULATKAN Rp. 88,200.00

Page 78 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

4 1 Bh Pasang engsel pintu


Ensel 5 inchi 1.0000 bh 37,400.00 37,400.00 37,400.00
Pekerja 0.0150 oh 170,000.00 2,550.00 2,550.00
Tukang 0.1200 oh 180,000.00 21,600.00 21,600.00
Kepala tukang 0.0150 oh 180,000.00 2,700.00 2,700.00
Mandor 0.0008 oh 200,000.00 150.00 150.00
JUMLAH ( UPAH DAN BAHAN) Rp. 64,400.00
OVERHEAD & PROFIT 10 % Rp. 6,440.00
JUMLAH 70,840.00
DI BULATKAN Rp. 70,800.00
5 1 Bh Pasang engsel jendela
Ensel 3 inchi 1.0000 bh 31,800.00 31,800.00 31,800.00
Pekerja 0.0100 oh 170,000.00 1,700.00 1,700.00
Tukang 0.1000 oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.0100 oh 180,000.00 1,800.00 1,800.00
Mandor 0.0005 oh 200,000.00 100.00 100.00
JUMLAH ( UPAH DAN BAHAN) Rp. 53,400.00
OVERHEAD & PROFIT 10 % Rp. 5,340.00
JUMLAH 58,740.00
DI BULATKAN Rp. 58,700.00
6 1 Bh Pasang kait angin/Penopang Jendela
Hak angin 1.000 bh 32,700.00 32,700.00 32,700.00
Pekerja 0.015 Oh 170,000.00 2,550.00 2,550.00
Tukang 0.100 Oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.015 Oh 180,000.00 2,700.00 2,700.00
Mandor 0.00080 Oh 200,000.00 160.00 160.00
JUMLAH ( UPAH DAN BAHAN) Rp. 56,110.00
OVERHEAD & PROFIT 10 % Rp. 5,611.00
JUMLAH 61,721.00
DI BULATKAN Rp. 61,700.00
7 1 Bh Pasang Grendel/Pengunci jendela
Grendel jendela 1.0000 bh 32,700.00 32,700.00 32,700.00
Pekerja 0.015 Oh 170,000.00 2,550.00 2,550.00
Tukang 0.100 Oh 180,000.00 18,000.00 18,000.00
Kepala tukang 0.015 Oh 180,000.00 2,700.00 2,700.00
Mandor 0.00080 Oh 200,000.00 160.00 160.00
JUMLAH ( UPAH DAN BAHAN) Rp. 56,110.00
OVERHEAD & PROFIT 10 % Rp. 5,611.00
JUMLAH 61,721.00
DI BULATKAN Rp. 61,700.00
8 1 Bh Pasang Handle/Pegangan Jendela
Handle Jendela 1.0000 Bh 32,700.00 32,700.00 32,700.00
Pekerja 0.0150 oh 170,000.00 2,550.00 2,550.00
Tukang 0.1000 oh 180,000.00 18,000.00 18,000.00
Kepala Tukang 0.0150 oh 180,000.00 2,700.00 2,700.00
Mandor 0.0008 oh 200,000.00 150.00 150.00
JUMLAH ( UPAH DAN BAHAN) Rp. 56,100.00
OVERHEAD & PROFIT 10 % Rp. 5,610.00
JUMLAH 61,710.00
DI BULATKAN Rp. 61,700.00

Page 79 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

XI. PEKERJAAN FINISHING


1 1 m2 Pengecatan dengan cat minyak ( 1x cat dasar, 2x cat penutup )
Cat Menie 0.200 Kg 36,800.00 7,360.00 7,360.00
Cat Dasar 1 x 0.100 Kg 84,000.00 8,400.00 8,400.00
Cat Penutup 2 x 0.220 Kg 84,000.00 18,480.00 18,480.00
Kuas 0.010 bh 24,700.00 247.00 247.00
Pengencer 0.030 Kg 99,200.00 2,976.00 2,976.00
Ampelas 0.200 Lbr 8,000.00 1,600.00 1,600.00
Pekerja 0.070 Oh 170,000.00 11,900.00 11,900.00
Tukang 0.009 Oh 180,000.00 1,620.00 1,620.00
Kepala tukang 0.0060 Oh 180,000.00 1,080.00 1,080.00
Mandor 0.0030 Oh 200,000.00 600.00 600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 54,263.00
OVERHEAD & PROFIT 10 % Rp. 5,426.30
JUMLAH 59,689.30
DI BULATKAN Rp. 59,600.00
2 1 m2 Pengecatan dengan cat air ( 1x cat dasar, 2x cat penutup )
Plamur 0.10 Kg 58,200.00 5,820.00 5,820.00
Cat Dasar 1 x 0.100 Kg 73,500.00 7,350.00 7,350.00
Cat Penutup 2 x 0.260 Kg 73,500.00 19,110.00 19,110.00
Pekerja 0.020 Oh 170,000.00 3,400.00 3,400.00
Tukang 0.062 Oh 180,000.00 11,160.00 11,160.00
Kepala tukang 0.006 Oh 180,000.00 1,134.00 1,134.00
Mandor 0.003 Oh 200,000.00 500.00 500.00
JUMLAH ( UPAH DAN BAHAN) Rp. 48,474.00
OVERHEAD & PROFIT 10 % Rp. 4,847.40
JUMLAH 53,321.40
DI BULATKAN Rp. 53,300.00
XII. PEKERJAAN LAIN - LAIN
1 1 m3 Pek. Relling Selasar
Balok Kayu Kelas II/Ex. BEngkirai 1.100 m³ 4,981,500.00 5,479,650.00 5,479,650.00
Paku 10 cm 1.250 kg 25,000.00 31,250.00 31,250.00
Pekerja 6.000 oh 170,000.00 1,020,000.00 1,020,000.00
Tukang 6.000 oh 180,000.00 1,080,000.00 1,080,000.00
Kepala tukang 2.000 oh 180,000.00 360,000.00 360,000.00
Mandor 0.008 oh 200,000.00 1,600.00 1,600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 7,972,500.00
OVERHEAD & PROFIT 10 % Rp. 797,250.00
JUMLAH 8,769,750.00
DI BULATKAN Rp. 8,769,700.00
2 1 m3 Pek. Konstruksi Tangga
Balok Kayu Kelas II/Ex. Ulin 1.100 m³ 6,248,700.00 6,873,570.00 6,873,570.00
Paku 10 cm 5.000 kg 25,000.00 125,000.00 125,000.00
Baut 20.000 bh 11,000.00 220,000.00 220,000.00
Pekerja 5.000 oh 170,000.00 850,000.00 850,000.00
Tukang 18.000 oh 180,000.00 3,240,000.00 3,240,000.00
Kepala tukang 2.100 oh 180,000.00 378,000.00 378,000.00
Mandor 0.008 oh 200,000.00 1,600.00 1,600.00
JUMLAH ( UPAH DAN BAHAN) Rp. 11,688,170.00
OVERHEAD & PROFIT 10 % Rp. 1,168,817.00
JUMLAH 12,856,987.00
DI BULATKAN Rp. 12,856,900.00
3 1 m2 Pek. Teralis
Besi U24 10.000 kg 23,000.00 230,000.00 230,000.00
Besi Strip 5.000 kg 23,000.00 115,000.00 115,000.00
Elektroda 1.000 kg 55,000.00 55,000.00 55,000.00
Paku Segala Ukuran 0.400 kg 25,000.00
Pekerja 0.310 oh 170,000.00 52,632.00 52,632.00
Tukang 0.516 oh 180,000.00 92,880.00 92,880.00
Kepala tukang 0.052 oh 180,000.00 9,288.00 9,288.00
Mandor 0.026 oh 200,000.00 5,160.00 5,160.00
JUMLAH ( UPAH DAN BAHAN) Rp. 559,960.00
OVERHEAD & PROFIT 10 % Rp. 55,996.00

Page 80 of 107
HARGA HARGA JUMLAH

ANALISA
KODE
KOEF.
URAIAN PEKERJAAN SAT. SATUAN UPAH KERJA BAHAN HARGA
ANALISIS
(Rp) (Rp) (Rp) (Rp)

JUMLAH 615,956.00
DI BULATKAN Rp. 615,900.00

Page 81 of 107
ANALISA HARGA MANAJEMEN KESELAMATAN KERJA
Kegiatan : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER SDN 010 MUARA PAHU(DAK SD)

HARGA JUMLAH
No. URAIAN SATUAN VOLUME SATUAN HARGA Keterangan
(Rp.) (Rp.)

I. PENYIAPAN RKK
Penyusunan Dokumen RKK Laporan 1.00 150,000.00 150,000.00
Dituangkan dalam Penawaran

0.00
III. Asuransi dan Perizinan 0.00
1 Asuransi dan Perizinan Ls 1.00 460,000.00 460,000.00

0.00
IV. Alat Pelindung Diri 0.00
1 Helm bh 5.00 60,000.00 300,000.00
2 Rompi bh 5.00 25,000.00 125,000.00
3 Sarung Tangan Pasang 5.00 10,000.00 50,000.00
4 Safety Hardness bh 2.00 150,000.00 300,000.00
5 Police Line Roll 1.00 55,000.00 55,000.00
0.00
V. Personil 0.00
1 Petugas K3 0.00
0.00
VI. Fasilitas sarana kesehatan 0.00
1 Kotak dan Isi P3K Ls 1.00 200,000.00 200,000.00
0.00
2 Apar 6 Kg Bh - 500,000.00 0.00

TOTAL 1,640,000.00
BILL OF QUANTITY
DAFTAR HARGA SATUAN BAHAN & UPAH TENAGA KERJA

DINAS : DINAS PENDIDIKAN DAN KEBUDAYAAN


PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER SDN 010 MUARA PAHU(DAK SD)
TAHUN ANGGARAN : 2022
LOKASI : KEC. MUARA PAHU

DAFTAR HARGA SATUAN BAHAN


HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
5. Bahan Kayu
- Balok Kayu Kelas I/Ex.Ulin m3 6,248,700.00
- Papan Kayu Kelas I/Ex. Ulin m3 6,643,400.00
- Balok Kayu Kelas II/Ex. Bengkirai m3 4,981,500.00
- Papan Kayu Kelas II/Ex. Bengkirai m3 4,801,600.00
- Balok Kayu Kelas III/Ex. Meranti m3 3,499,900.00
- Papan Kayu Kayu Kelas III/Ex.Meranti m3 3,619,200.00
- List kayu profil 1/4 cm m¹ 7,500.00
6. Bahan Besi
- Besi strip Kg 23,000.00
- Paku Ulin …………………….(Segala Ukuran) Kg 30,000.00
- Paku Biasa ….….…………..(Segala Ukuran) Kg 25,000.00
- Paku Seng (Payung) Kg 45,000.00
- Mur Baut Bh 11,000.00
- Elektroda kg 55,000.00
7. Bahan Penutup
- Atap Soka M2 80,880.00
- Nok/Bubungan Bh 52,000.00
- GRC (120 X 240 ) Lbr 103,000.00
8. Bahan Cat
- Cat Minyak Kg 84,000.00
- Cat tembok Kg 73,500.00
- Dempul kayu / Dempul Jadi Kg 36,800.00
- Lem kayu Kg 50,000.00
- Tiner A Liter 99,200.00
- Plamur Kg 58,200.00
- Kuas bh 24,700.00
- Ampelas lbr 8,000.00
9. Bahan Kaca
- Kaca bening 5 mm m2 328,500.00
10. Bahan Penggantung dan Pengunci
- Kunci tanam biasa 2 x Kali Putar Bh 300,000.00
- Ensel 5 inchi Bh 37,400.00
- Ensel 3 inchi Bh 31,800.00
- Hak Angin Jendela / Lans Kar Bh 32,700.00
- Pegangan / Handel Jendela Bh 32,700.00
- Grendel Jendela Bh 32,700.00
- Grendel Pintu Kunci Tanam Bh 53,200.00
DAFTAR HARGA SATUAN BAHAN
HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
12. Bahan lampu dan instalasi listrik
- L bow Bh 2,500.00
- Isolasi Roll 68,700.00
Kabel NYA 2.5 mm2 m 3,500.00
Kabel NYA 1.5 mm2 m 3,100.00
Kabel NYM 3x2.5 mm2 m 17,000.00
- Klem Kabel Bh 1,400.00
- Lampu SL 18 W Bh 47,400.00
- Las Dop Bh 8,000.00
- MCB 10 Ampere Bh 52,000.00
- Pipa Pvc 5/8" Btg 8,900.00
- Stop Kontak Bh 27,800.00
- Saklar tunggal Bh 28,000.00
- Fitting Lampu Bh 17,500.00
- Box MCB 2 Group Bh 105,000.00
- Sakla ganda Bh 38,000.00
- Mangkok Bh 11,800.00
- T - Dos 5/8" Bh 11,800.00
HARGA UPAH TENAGA KERJA
HARGA SATUAN
NO. JENIS KETERAMPILAN SATUAN
(Rp.)
1. Mandor Org/hr 200,000.00
2. Kepala Tukang Org/hr 180,000.00
3. Tukang Kayu / Batu / Cat / Besi Org/hr 180,000.00
4. Pekerja Org/hr 170,000.00
TIME SCHEDULLE ( KURVA S )
DINAS : DINAS PENDIDIKAN DAN KEBUDAYAAN
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER SDN 010 MUARA PAHU(DAK SD)
TAHUN ANGGARAN : 2022
LOKASI : KEC. MUARA PAHU

JADWAL PELAKSANAAN PEKERJAAN


BOBOT TAHUN 2022
NO URAIAN BIAYA KET.
% BULAN I BULAN II BULAN III
M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12

1 PEKERJAAN PENDAHULUAN 3,605,120.00 1.7399 0.9 0.9


100
2 PEKERJAAN STRUKTUR KAYU 32,268,122.00 15.5734 2.6 2.6 2.6 2.6 2.6 2.6

3 PEKERJAAN LANTAI DAN DINDING, 53,787,177.00 25.9590 8.7 8.7 8.7

MASA PEMELIHARAAN
4 PEKERJAAN KUSEN, PINTU DAN JENDELA 9,252,133.00 4.4653 2.2 2.2

5 PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 34,596,360.00 16.6970 13.4 3.3
50
6 PEKERJAAN PLAFON 30,982,838.00 14.9530 3.7 11.2

7 PEKERJAAN PENGGANTUNG, PENGUNCI DAN AKSESORIS 8,876,741.00 4.2841 4.3

8 PEKERJAAN LISTRIK 4,937,500.00 2.3830 2.4

9 PEKERJAAN PENGECATAN 23,664,926.00 11.4212 2.9 8.6

10 PEKERJAAN LAIN-LAIN 5,229,942.00 2.5241 1.3 1.3


0

JUMLAH 207,200,859.00 100.000

12.5

25.5

15.7

11.2
0.9

3.5

2.6

2.6

2.6

4.8

9.5

8.6
BOBOT RENCANA (%)

100.0
12.1

17.0

29.5

55.0

70.7

81.9

91.4
0.9

4.3

6.9

9.5
BOBOT RENCANA KOMULATIF (%)

Dibuat Oleh
PT. ARISTA GEMILANG KONSULINDO

PAULUS PAGAPPONG, ST
Direktur Cabang
KEGIATAN
PEKERJAAN

LOKASI
TAHUN

NO ITEM PEKERJAAN KET


TOTAL A B C D E F G H I J M N O
SAT.
VOLUME Panjang lebar Tinggi/dalam Diameter Keliling Sisi atas Sisi Alas Luas Jumlah Berat besi Volume/unit Jumlah unit Volume total keterangan

BACK UP QUANTITY STRUKTUR


PEKERJAAN STRUKTUR KAYU
1 Tongkat/Tiang 10/10 (Balok Kayu Ulin) 4.040 m3 4.000 0.010 1.0000 101.0000 4.0400
2 Sunduk, Balok Kayu Ulin 5/10 - 50 0.283 m3 0.500 0.005 1.0000 113.0000 0.2825
3 Kalang, Balok Kayu Ulin 5/10 - 100 x 2 1.130 m3 1.000 0.005 2.0000 113.0000 1.1300
4 Suai, Balok Kayu Ulin 5/10 1.430 m3
Suai Relling 1.000 0.005 6.0000 0.0300
4.000 0.005 6.0000 5.0000 0.6000
4.000 0.005 8.0000 3.0000 0.4800
4.000 0.005 4.0000 4.0000 0.3200
1.4300

5 Sloof, Balok Kayu Ulin 10/10 1.260 1.600 0.010 6.0000 0.0960
3.100 0.010 4.0000 0.1240
2.600 0.010 0.0000 -
13.000 0.010 8.0000 1.0400
1.2600
6 Balok, Balok Kayu Ulin 10/10 m3
7 Gelegar, Balok Kayu Ulin 5/10 & 10/10 2.331 m3 10.600 0.010 3.0000 0.3180
3.600 0.010 2.0000 0.0720
12.600 0.010 2.0000 0.2520
2.100 0.010 2.0000 0.0420
10.600 0.005 22.0000 1.1660
3.600 0.005 6.0000 0.1080
9.100 0.005 6.0000 0.2730
2.000 0.005 10.0000 0.1000
2.3310

8 Kolom, Balok Kayu Ulin 10/10 1.720 m3 4.0000 0.010 43.0000 1.7200
1.2000 0.010 0.0000 -
1.7200
9 Rangka Dinding, Balok Kayu Ulin 5/10 3.480
rangka vertikal penuh (4m) 4.0000 0.005 2.0000 26.0000 1.0400
rangka vertikal separuh
rangka horisontal penuh 46.450 0.005 2.0000 5.0000 2.3225
rangka horisontal separuh 5.200 0.005 2.0000 6.0000 0.3120 0.31
rangka vertikal partisi couple (dinding pembatas antar rumah) 4.0000 0.005 1.0000 6.0000 0.1200
rangka horisontal partisi couple (dinding pembatas antar rumah) 9.130 0.005 1.0000 5.0000 0.2283
4.0228

pengurang
atasjendela j2 1.150 0.005 2.0000 5.0000 0.0575
atas p1 2.700 0.005 2.0000 2.0000 0.0540
atas pj 4.200 0.005 2.0000 1.0000 0.0420
atas pj2 5.700 0.005 2.0000 1.0000 0.0570
atas p2 3.200 0.005 2.0000 1.0000 0.0320
bukaan teras dan void pintu 30.000 0.005 2.0000 1.0000 0.3000
0.5425

10 Ringbalk, Balok Kayu Ulin 10/10 1.253 m3 13.000 0.010 1.0000 0.1300
7.100 0.010 3.0000 0.2130
3.000 0.010 8.0000 0.2400
2.000 0.010 4.0000 0.0800
10.600 0.010 5.0000 0.5300
1.500 0.010 4.0000 0.0600
1.2530
11 Pekerjaan Tangga, Kayu Ulin
tiang 2.4100 0.015 3.0000 0.1085
anak tangga 0.9500 0.009 16.0000 0.1368
alas bordes 2.290 1.1000 0.0200 1.0000 0.0504
gelagar 1.100 0.010 3.0000 0.0330
tiang/tongkat 0.5000 0.010 6.0000 0.0300
sloef 2.290 0.010 2.0000 0.0458
0.4044

PEKERJAAN LANTAI DAN DINDING,


1 Lantai (Halus), Papan Kayu Ulin 2,5 / 20 144.796 m² 144.7960 1.0000 144.7960
2 Lantai (Kasar), Papan Kayu Ulin 2 / 20 (KM/WC) 6.720 m² 2.100 1.6000 2.0000 6.7200
3 Dinding Luar, Papan Kayu Ulin 211.158 m²
dinding keliling 4.0000 57.5100 230.0400
didning teras belakang dan depan 1.0000 8.9300 2.0000 17.8600
PENGURANGAN
J2 2.0592 10.0000 20.5920
BV1 0.3000 2.0000 0.6000
BV2 0.5750 2.0000 1.1500
pj 3.3400 2.0000 6.6800
pj2 3.8600 2.0000 7.7200
36.7420
4 Dinding Partisi, Papan Kayu Meranti 203.559 m²
-
- Ruang Tamu 5.740 4.0000 2.0000 45.9200
- Ruang Tidur 1 2.900 4.0000 2.0000 23.2000
- Ruang Tidur 2 4.0000 2.0000 -
- Ruang Keluarga 17.430 4.0000 2.0000 139.4400
- Dapur 5.740 4.0000 2.0000 45.9200
- KM/WC 4.0000 2.0000 -
teras depan 1.0000 2.0000 -
teras belakang 1.0000 2.0000 -
254.4800

PENGURANGAN
- Ruang Tamu
PJ 3.2589 0.0000 2.0000 -
J2 2.0592 0.0000 2.0000 -
Bukaan Akses R. Tamu Ke R. Keluarga 1.7850 1.0000 2.0000 3.5700
- Ruang Tidur 1
J2 2.0592 0.0000 2.0000 -
P1 1.7850 0.0000 2.0000 -
- Ruang Tidur 2
J2 2.0592 0.0000 2.0000 -
P1 1.7850 0.0000 2.0000 -
- Ruang Keluarga
P1 1.7850 2.0000 2.0000 7.1400
P2 1.6800 1.0000 2.0000 3.3600
PJ2 3.9184 1.0000 2.0000 7.8368
Bukaan Akses R. Keluarga Ke dapur 1.7850 2.0000 2.0000 7.1400
- Dapur
J2 3.9184 0.0000 2.0000 -
Bukaan Akses R. Keluarga Ke dapur 1.7850 1.0000 2.0000 3.5700
- KM/WC
BV1 0.3000 0.0000 2.0000 -
P2 1.6800 0.0000 2.0000 -
Dinding Keramik warna 25/45 1.6000 5.7200 2.0000 18.3040
50.9208
5 List Dinding, kayu profil, Lebar 5 cm 257.900 m'
3.5000 35.0000 2.0000 245.0000
2.1500 3.0000 2.0000 12.9000
257.9000

6 List Kaki Dinding Luar, Kayu Ulin 2,5 x 20 cm - m² 55,48] 55,48]


-
-
PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI, BOVENLIGHT DAN KACA
1 Kusen-Kusen, Balok Kayu Ulin 1.306 m3
P1 2.560 0.007 1.7850 2.0000 4.0000 0.1475 20.48
0.850 0.007 2.0000 4.0000 0.0490 6.80
P2 2.100 0.007 1.6800 2.0000 2.0000 0.0605 8.40
0.800 0.007 1.0000 2.0000 0.0115 1.60
PJ1 2.560 0.007 1.0829 2.0000 2.0000 0.0737 10.24
2.210 0.007 2.1760 1.0000 2.0000 0.0318 4.42
1.370 0.007 2.0000 2.0000 0.0395 5.48
0.560 0.007 1.0000 2.0000 0.0081 1.12
PJ2 2.560 0.007 1.7424 2.0000 2.0000 0.0737 10.24
1.840 0.007 2.1760 2.0000 2.0000 0.0530 7.36
1.050 0.007 1.0000 2.0000 0.0151 2.10
1.760 0.007 2.0000 2.0000 0.0507 7.04
J2 1.760 0.007 2.0592 3.0000 10.0000 0.3802 52.80
1.170 0.007 3.0000 10.0000 0.2527 35.10
BV1 0.600 0.007 0.3000 2.0000 2.0000 0.0173 2.40
0.500 0.007 2.0000 2.0000 0.0144 2.00
BV2 0.500 0.007 0.5750 3.0000 1.0000 0.0108 1.50
1.150 0.007 2.0000 1.0000 0.0166 2.30
13.5765 1.3059 181.38
2 Pintu Panel, Papan Kayu Ulin 15.170 m²
P1 0.7500 2.0500 4.0000 6.1500
P2 0.7000 2.0500 2.0000 2.8700
PJ1 0.7500 2.0500 2.0000 3.0750
PJ2 0.7500 2.0500 2.0000 3.0750
15.1700
3 Jendela Kaca, Papan Kayu Ulin 16.206 m²
PJ1 0.4600 1.6500 1.0000 2.0000 1.5180
PJ2 0.4600 1.2000 2.0000 2.0000 2.2080
J2 0.5200 1.2000 2.0000 10.0000 12.4800
16.2060
4 Pas. Jalusi mati, Papan Kayu Ulin 9.072 m²
P1 0.1200 0.4200 7.0000 4.0000 1.4112
PJ1 0.1200 0.4200 11.0000 2.0000 1.1088
PJ2 0.1200 0.4200 15.0000 2.0000 1.5120
J2 0.1200 0.4200 10.0000 10.0000 5.0400
9.0720

5 Kaca mati 5 mm 1.040 m²


BV1 0.5000 0.2600 2.0000 2.0000 0.5200
BV2 0.5000 0.2600 4.0000 1.0000 0.5200
1.0400

PEKERJAAN RANGKA KAP DAN ATAP


1 Kuda-kuda, Nok dan Jurai 6/12, Balok Kayu Ulin 1.094 m3 KK1
a 7.840 0.005 1.0000 2.0000 0.0784
6.920 0.005 1.0000 2.0000 0.0692
b 1.370 0.005 2.0000 2.0000 0.0274
c 11.220 0.005 1.0000 2.0000 0.1122
d 1.850 0.005 2.0000 2.0000 0.0370
e 2.490 0.005 2.0000 2.0000 0.0498
f 2.660 0.005 2.0000 2.0000 0.0532
g 4.000 0.005 2.0000 2.0000 0.0800
h 3.790 0.005 1.0000 2.0000 0.0379
KK2
a 2.970 0.005 2.0000 2.0000 0.0594
b 3.120 0.005 1.0000 2.0000 0.0312
c 1.270 0.005 1.0000 2.0000 0.0127
KK3
a 7.870 0.005 1.0000 2.0000 0.0787
b 5.630 0.005 1.0000 2.0000 0.0563
c 1.270 0.005 1.0000 2.0000 0.0127
d 1.790 0.005 1.0000 2.0000 0.0179
e 2.230 0.005 1.0000 2.0000 0.0223
g 2.900 0.005 2.0000 2.0000 0.0580
Jurai Luar
4.000 0.005 10.0000 0.2000
1.0943

2 Pasangan Skor Angin, Balok Kayu Ulin 0.500 m3

3 Pasangan Gording 5/10, Balok Kayu Bengkirai 1.735 m3


12.600 0.005 2.0000 0.1260
11.300 0.005 2.0000 0.1130
10.020 0.005 2.0000 0.1002
8.660 0.005 2.0000 0.0866
6.990 0.005 2.0000 0.0699
4.910 0.005 2.0000 0.0491
3.630 0.005 2.0000 0.0363
2.360 0.005 2.0000 0.0236
1.080 0.005 2.0000 0.0108
1.600 0.005 8.0000 0.0640
2.760 0.005 2.0000 0.0276
3.580 0.005 2.0000 0.0358
4.860 0.005 2.0000 0.0486
6.140 0.005 2.0000 0.0614
7.420 0.005 2.0000 0.0742
8.690 0.005 2.0000 0.0869
9.970 0.005 2.0000 0.0997
5.950 0.005 8.0000 0.2380
4.670 0.005 1.0000 0.0234
3.400 0.005 1.0000 0.0170
2.120 0.005 1.0000 0.0106
2.060 0.005 4.0000 0.0412
2.700 0.005 4.0000 0.0540
3.340 0.005 4.0000 0.0668
3.980 0.005 4.0000 0.0796
4.540 0.005 4.0000 0.0908
1.7351
4 Talang/Jurai Dalam
5 Pekerjaan Lisplank Double, Balok Kayu Ulin 66.950 m² 3.200 4.0000 12.8000 Sambung Layang
2.250 1.0000 2.2500
1.650 2.0000 3.3000
2.150 4.0000 8.6000
12.500 2.0000 25.0000 Samp. Kiri & Kanan
15.000 1.0000 15.0000 Belakang
66.9500
6 Pasangan Atap Ex. Soka Jempol
7 Nok / Bubungan 10.000 4.0000 40.0000
2.750 1.0000 2.7500
4.500 2.0000 9.0000
51.7500

8 Pas. Mur Baut

PEKERJAAN PLAFON
1 Rangka langit-langit (60 x 120) m, kayu bengkirai 176.878 m2 13.140 1.0000 2.0000 26.2800
12.640 1.0000 2.0000 25.2800
Teras Depan 1.360 1.0000 2.0000 2.7200
R. Tamu 1.360 1.0000 2.0000 2.7200
2.860 2.860 2.0000 16.3592
R. Tidur 1 3.360 2.860 2.0000 19.2192
R. Tidur 2 3.360 2.860 2.0000 19.2192
R. Keluarga 5.360 3.360 2.0000 36.0192
KM/WC 1.860 1.3600 2.0000 5.0592
Dapur 2.860 2.860 2.0000 16.3592
Teras Belakang 1.980 1.930 2.0000 7.6428
176.8780
2 Langit2, Papan Kayu Meranti 176.878 m2
3 List plafond, kayu profil 205.500 m1
Luar 28.750 2.0000 57.5000
R. Tamu 13.500 2.0000 27.0000
R. Tidur 1 12.500 2.0000 25.0000
R. Tidur 2 12.500 2.0000 25.0000
R. Keluarga 17.500 2.0000 35.0000
KM/WC 6.500 2.0000 13.0000
Dapur 11.500 2.0000 23.0000
205.5000

PEKERJAAN LISTRIK
1 Instalasi kabel 35.000 ttk
2 Sekering Box / MCB 1.000 ttk 1.0000 1.0000
3 Stop Kontak 12.000 ttk 12.0000 12.0000
4 Saklar tunggal 8.000 ttk 8.0000 8.0000
5 Sakla ganda 4.000 ttk 4.0000 4.0000
6 Pas. Socket TV (Ruang ………...) 2.000 ttk 2.0000 2.0000
7 Lampu Down Light 23 Watt & Cap 20.000 Bh 20.0000 20.0000

PEKERJAAN BETON, KERAMIK, LAPIS ULUCOPAN & PARQUET


1 Beton, Rangka Kawat Harmonika, 1Pc:3Ps:5Kr 19.136 m2 1.6000 5.9800 2.0000 19.1360
2 Pekerjaan Beton Bertulang (Besi Ø 8 - 150) 0.720 m3 2.000 1.5000 0.1200 2.0000 0.7200
7 Keramik warna 20 / 20 5.171 m2 1.860 1.3900 2.0000 5.1708
8 Dinding Keramik warna 25/45 18.304 m2 1.6000 5.7200 2.0000 18.3040
9 Keramik Granito 60/60, Top Meja Pantry (Halus)

PEKERJAAN PENGGANTUNG & PENGUNCI


1 Kunci tanam biasa 2 x Kali Putar 8.000 Bh
P1 4.0000 4.0000
PJ1 2.0000 2.0000
PJ2 2.0000 2.0000
8.0000
3 Kunci tanam KM/WC 2.000 Bh
P2 2.0000 2.0000
4 Ensel Pintu 5 inchi ( 3 Engsel untuk 1 Pintu) 30.000 Bh
P1 3.0000 4.0000 12.0000
P2 3.0000 2.0000 6.0000
PJ1 3.0000 2.0000 6.0000
PJ2 3.0000 2.0000 6.0000
30.0000
5 Ensel Jendela 3 inchi 52.000 Bh
PJ1 1.0000 2.0000 2.0000 4.0000
PJ2 2.0000 2.0000 2.0000 8.0000
J2 2.0000 2.0000 10.0000 40.0000
52.0000
6 Kait / Hak Angin Jendela 52.000 Bh
PJ1 1.0000 2.0000 2.0000 4.0000
PJ2 2.0000 2.0000 2.0000 8.0000
J2 2.0000 2.0000 10.0000 40.0000
52.0000
7 Grendel Jendela 52.000 Bh
PJ1 1.0000 2.0000 2.0000 4.0000
PJ2 2.0000 2.0000 2.0000 8.0000
J2 2.0000 2.0000 10.0000 40.0000
52.0000
8 Pegangan / Handel Jendela 26.000 Bh
PJ1 1.0000 1.0000 2.0000 2.0000
PJ2 2.0000 1.0000 2.0000 4.0000
J2 2.0000 1.0000 10.0000 20.0000
26.0000

PEKERJAAN INSTALASI AIR BERSIH, AIR KOTOR


2 Instalasi Air Bersih Pipa PVC Ø 1/2 inchi 40.000 m¹
3 Saluran Air Kotor Cair Pipa PVC Ø 2 inchi 28.000 m¹
4 Saluran Air Kotor Padat Pipa PVC Ø 4 inchi 16.000 m¹
5 Pas. Closet monobloc ex.TOTO 2.000 Unit
6 Pas.shower spray/jet flush ex.TOTO 2.000 Bh
8 Pas. Floor drain ex. TOTO 2.000 Bh
9 Pas. Kitchen sink ex Teka 2.000 Set
10 Kran kitchen sink ex.San'ei 2.000 Bh
12 Kran air Ø 1/2 inchi 2.000 Bh Gambarnya 3/4 "
13 Menara Air & Instalasi Unit
14 Cilinder Water Torn Kapasitas 1200 Liter Bh

15 Pump Booster (Distribusi Air Tabung Reservoir) Bh

16 Jet Pump & Gardu Bh

17 Tangki Air/Bak Air Fiber KM/WC Bh

18 Septictank dan Resapan ( Type A ) Unit

19 Septictank dan Resapan ( Type B ) Unit

PEKERJAAN FINISHING
1 Cat Plafon ( Cat Air )
2 Cat List ( Cat Minyak )
3 Cat Kusen ( Cat Minyak ) 43.531 M2
P1 2.560 0.2400 2.0000 4.0000 4.92
0.850 0.2400 2.0000 4.0000 1.63
P2 2.100 0.2400 2.0000 2.0000 2.02
0.800 0.2400 1.0000 2.0000 0.38
PJ1 2.560 0.2400 2.0000 2.0000 2.46
2.210 0.2400 1.0000 2.0000 1.06
1.370 0.2400 2.0000 2.0000 1.32
0.560 0.2400 1.0000 2.0000 0.27
PJ2 2.560 0.2400 2.0000 2.0000 2.46
1.840 0.2400 2.0000 2.0000 1.77
1.050 0.2400 1.0000 2.0000 0.50
1.760 0.2400 2.0000 2.0000 1.69
J2 1.760 0.2400 3.0000 10.0000 12.67
1.170 0.2400 3.0000 10.0000 8.42
BV1 0.600 0.2400 2.0000 2.0000 0.58
0.500 0.2400 2.0000 2.0000 0.48
BV2 0.500 0.2400 3.0000 1.0000 0.36
1.150 0.2400 2.0000 1.0000 0.55
43.5312
4 Cat Pintu ( Cat Minyak )
5 Cat Daun Jendela ( Cat Minyak ) 13.639 m²
PJ1 0.4600 1.6500 1.0000 2.0000 1.5180
PJ2 0.4600 1.2000 2.0000 2.0000 2.2080
J2 0.5200 1.2000 2.0000 10.0000 12.4800
16.2060
PENGURANGAN
PJ1 0.2950 1.4900 1.0000 2.0000 0.8791
PJ2 0.2950 1.0400 2.0000 2.0000 1.2272
J2 0.3500 1.0400 2.0000 10.0000 7.2800
9.3863
6 Cat Jalusi Mati ( Cat Minyak )
7 Cat Lisplang ( Cat Minyak )
8 Cat dinding Luar ( Cat Minyak ) 176.652
dinding keliling 3.4000 57.5100 195.5340
didning teras belakang dan depan 1.0000 8.9300 2.0000 17.8600
PENGURANGAN
J2 2.0592 10.0000 20.5920
BV1 0.3000 2.0000 0.6000
BV2 0.5750 2.0000 1.1500
pj 3.3400 2.0000 6.6800
pj2 3.8600 2.0000 7.7200
36.7420

9 Cat dinding Partisi ( Cat Air ) 441.871


-
- Ruang Tamu 13.580 3.5000 2.0000 95.0600
- Ruang Tidur 1 12.440 3.5000 2.0000 87.0800
- Ruang Tidur 2 12.440 3.5000 2.0000 87.0800
- Ruang Keluarga 17.580 3.5000 2.0000 123.0600
- Dapur 11.440 3.5000 2.0000 80.0800
- KM/WC 6.440 3.5000 2.0000 45.0800
teras depan 6.710 1.0000 2.0000 13.4200
teras belakang 1.930 1.0000 2.0000 3.8600
534.7200

PENGURANGAN
- Ruang Tamu
PJ 3.2589 1.0000 2.0000 6.5178
J2 2.0592 2.0000 2.0000 8.2368
Bukaan Akses R. Tamu Ke R. Keluarga 1.7850 1.0000 2.0000 3.5700
- Ruang Tidur 1
J2 2.0592 1.0000 2.0000 4.1184
P1 1.7850 1.0000 2.0000 3.5700
- Ruang Tidur 2
J2 2.0592 1.0000 2.0000 4.1184
P1 1.7850 1.0000 2.0000 3.5700
- Ruang Keluarga
P1 1.7850 2.0000 2.0000 7.1400
P2 1.6800 1.0000 2.0000 3.3600
PJ2 3.9184 1.0000 2.0000 7.8368
Bukaan Akses R. Keluarga Ke dapur 1.7850 2.0000 2.0000 7.1400
- Dapur
J2 3.9184 1.0000 2.0000 7.8368
Bukaan Akses R. Keluarga Ke dapur 1.7850 1.0000 2.0000 3.5700
- KM/WC
BV1 0.3000 1.0000 2.0000 0.6000
P2 1.6800 1.0000 2.0000 3.3600
0 1.6000 5.7200 2.0000 18.3040
92.8490
PEKERJAAN LAIN-LAIN
1 Pekerjaan Ralling, Besi Hollow 15.180 m1
1.400 7.0000 9.8000
1.880 2.0000 3.7600
0.810 2.0000 1.6200
2 Pas. Ornamen Pilar Depan 15.1800
BACK UP QUANTITY ARSITEKTUR
BACK UP QUANTITY MEKANIKAL ELEKTRIKAL

C PEKERJAAN INSTALASI AIR KOTOR

SANITARY LANTAI DASAR


1 CLOSET JONGKOK bh
3 KRAN AIR (ONDA) bh
4 KRAN WASTAFEL (ONDA) bh
5 WASHTAVEL bh
7 urinuoir bh

SANITARY LANTAI 1
1 CLOSET JONGKOK bh
3 KRAN AIR (ONDA) bh
4 KRAN WASTAFEL (ONDA) bh
5 WASHTAVEL bh
7 urinuoir bh

PEKERJAAN SEPTIK TANK


Pekerjaan galian septik m3 5.100 1.8000 1.5000
Kolom KP 15/15
- Beton m3 0.130 0.1300 1.5000
- Besi Kg
Diameter 12 Kg 1.500
Diameter 10 Begel Kg 0.360
Plat penutup septik tank m3 3.600 1.8000 0.1200
- Besi Kg
Diameter 12-85 & 12-175 Kg 4.600
Diameter 12-85 & 12-175 Kg 1.500
Rabat beton Lantai septik tank m3 1.800 3.6000 0.1500
Pasangan bata m2 1.3500 14.9000
Pelesteran m2

1 Diameter 8`` m'


2 Diameter 6`` m'
3 Diameter 4`` m'
4 Diameter 3`` m'
5 Pasang bak kontrol dia. 1m x 1,5m m'
6 Pengadaan sewage pump 3,7 kw SS 532 ,3 phase 200-480 V unit
4 inch,, Head 27m, Flow 1 m3/min
7 Pasang bak Penampungan 2 x 4 x 2,77 unit
8 Penyambungan ke IPAL utama m'

II PEKERJAAN PENERANGAN

LANTAI DASAR
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 ttk 15.0000
5 DOWN LIGTH PAR 38 18 W bh 21.0000
7 DOWN LIGTH PL 13 W bh 88.0000
9 Stop kontak bh 80.0000
10 Single Switch bh 5.0000
11 Doble Switch bh 80.0000
12 Grid Switch ( 6 gang ) bh 2.0000

LANTAI 1
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 ttk 46.0000
5 DOWN LIGTH PAR 38 18 W bh
7 DOWN LIGTH PL 13 W bh 178.0000
9 Stop kontak bh 164.0000
10 Single Switch bh 2.0000
11 Doble Switch bh 164.0000
12 Grid Switch ( 6 gang ) bh 2.0000

4 TESTING & COMMISSIONING


Testing & Commisioning lot

IX PEKERJAAN PENANGKAL PETIR


1 Penangkal Petir lengkap sesuai gambar tipe EF Radius 125 m unit 1.0000
termasuk kabel, arde 1 ohm, klem, sleave, pipa, bak kontrol dan test comisioning
2 Kabel coaxial 2x35 mm2 lot 1.0000
3 Lampu obstruction lamp Philips 250 W, sesuai spesifikasi dan gambar bh 1.0000
4 Counter contakc bh 1.0000
KEGIATAN
PEKERJAAN

LOKASI
TAHUN

NO ITEM PEKERJAAN KET


TOTAL A B C D E F G H I J M N O
SAT.
VOLUME Panjang lebar Tinggi/dalam Diameter Keliling Sisi atas Sisi Alas Luas Jumlah Berat besi Volume/unit Jumlah unit Volume total keterangan

BACK UP QUANTITY STRUKTUR


PEKERJAAN STRUKTUR KAYU
1 Tongkat/Tiang 10/10 (Balok Kayu Ulin) 2.160 m3 4.000 0.010 1.0000 54.0000 2.1600
2 Sunduk, Balok Kayu Ulin 5/10 - 50 0.135 m3 0.500 0.005 1.0000 54.0000 0.1350
3 Kalang, Balok Kayu Ulin 5/10 - 100 x 2 0.540 m3 1.000 0.005 2.0000 54.0000 0.5400
4 Suai, Balok Kayu Ulin 5/10 1.430 m3
Suai Relling 1.000 0.005 6.0000 0.0300
4.000 0.005 6.0000 5.0000 0.6000
4.000 0.005 8.0000 3.0000 0.4800
4.000 0.005 4.0000 4.0000 0.3200
1.4300

5 Sloof, Balok Kayu Ulin 10/10 0.688 4.600 0.010 1.0000 0.0460
7.600 0.010 7.0000 0.5320
6.200 0.010 1.0000 0.0620
1.600 0.010 3.0000 0.0480
0.6880
6 Balok, Balok Kayu Ulin 10/10 m3
7 Gelegar, Balok Kayu Ulin 5/10 & 10/10 1.200 m3 12.600 0.010 3.0000 0.3780
10.600 0.010 1.0000 0.1060
12.600 0.005 5.0000 0.3150
10.600 0.005 7.0000 0.3710
2.000 0.005 3.0000 0.0300
1.2000

8 Kolom, Balok Kayu Ulin 10/10 0.880 m3 4.0000 0.010 22.0000 0.8800
1.2000 0.010 0.0000 -
0.8800
9 Rangka Dinding, Balok Kayu Ulin 5/10 3.480
rangka vertikal penuh (4m) 4.0000 0.005 2.0000 26.0000 1.0400
rangka vertikal separuh
rangka horisontal penuh 46.450 0.005 2.0000 5.0000 2.3225
rangka horisontal separuh 5.200 0.005 2.0000 6.0000 0.3120 0.31
rangka vertikal partisi couple (dinding pembatas antar rumah) 4.0000 0.005 1.0000 6.0000 0.1200
rangka horisontal partisi couple (dinding pembatas antar rumah) 9.130 0.005 1.0000 5.0000 0.2283
4.0228

pengurang
atasjendela j2 1.150 0.005 2.0000 5.0000 0.0575
atas p1 2.700 0.005 2.0000 2.0000 0.0540
atas pj 4.200 0.005 2.0000 1.0000 0.0420
atas pj2 5.700 0.005 2.0000 1.0000 0.0570
atas p2 3.200 0.005 2.0000 1.0000 0.0320
bukaan teras dan void pintu 30.000 0.005 2.0000 1.0000 0.3000
0.5425

10 Ringbalk, Balok Kayu Ulin 10/10 1.253 m3 13.000 0.010 1.0000 0.1300
7.100 0.010 3.0000 0.2130
3.000 0.010 8.0000 0.2400
2.000 0.010 4.0000 0.0800
10.600 0.010 5.0000 0.5300
1.500 0.010 4.0000 0.0600
1.2530
11 Pekerjaan Tangga, Kayu Ulin
tiang 2.4100 0.015 3.0000 0.1085
anak tangga 0.9500 0.009 16.0000 0.1368
alas bordes 2.290 1.1000 0.0200 1.0000 0.0504
gelagar 1.100 0.010 3.0000 0.0330
tiang/tongkat 0.5000 0.010 6.0000 0.0300
sloef 2.290 0.010 2.0000 0.0458
0.4044

PEKERJAAN LANTAI DAN DINDING,


1 Lantai (Halus), Papan Kayu Ulin 2,5 / 20 144.796 m² 144.7960 1.0000 144.7960
2 Lantai (Kasar), Papan Kayu Ulin 2 / 20 (KM/WC) 6.720 m² 2.100 1.6000 2.0000 6.7200
3 Dinding Luar, Papan Kayu Ulin 143.779 m²
dinding keliling 4.0000 36.5600 146.2400
didning teras belakang dan depan 1.0000 12.5800 1.0000 12.5800
sambulayang 4.5100
PENGURANGAN
J2 2.0592 5.0000 10.2960
BV1 0.3000 1.0000 0.3000
BV2 0.5750 1.0000 0.5750
p1 2.1700 2.0000 4.3400
j1 1.3600 2.0000 2.7200
VJ.2 0.6600 2.0000 1.3200
19.5510
4 Dinding Partisi, Papan Kayu Meranti 66.805 m²
-
- Ruang Tamu 6.760 4.0000 1.0000 27.0400
- Ruang Tidur 1 4.0000 1.0000 -
- Ruang Tidur 2 4.0000 1.0000 -
- Ruang Keluarga 10.560 4.0000 1.0000 42.2400
- Dapur 4.0000 1.0000 -
- KM/WC 1.900 4.0000 1.0000 7.6000
teras depan 1.0000 1.0000 -
teras belakang 1.0000 1.0000 -
76.8800

PENGURANGAN
- Ruang Tamu
PJ 3.2800 0.0000 1.0000 -
J2 2.0592 0.0000 1.0000 -
Bukaan Akses R. Tamu Ke R. Keluarga 1.7850 1.0000 1.0000 1.7850
- Ruang Tidur 1
J2 2.0592 0.0000 1.0000 -
P1 1.7850 0.0000 1.0000 -
- Ruang Tidur 2
J2 2.0592 0.0000 1.0000 -
P1 1.7850 0.0000 1.0000 -
- Ruang Keluarga
P1 1.7850 2.0000 1.0000 3.5700
P2 1.6800 1.0000 1.0000 1.6800
- KM/WC
Dinding Keramik warna 25/45 1.6000 1.9000 1.0000 3.0400
10.0750
5 List Dinding, kayu profil, Lebar 5 cm 257.900 m'
3.5000 35.0000 2.0000 245.0000
2.1500 3.0000 2.0000 12.9000
257.9000

6 List Kaki Dinding Luar, Kayu Ulin 2,5 x 20 cm - m² 55,48] 55,48]


-
-
PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI, BOVENLIGHT DAN KACA
1 Kusen-Kusen, Balok Kayu Ulin 0.508 m3
P1 2.560 0.005 1.7850 2.0000 4.0000 0.1024 20.48
0.850 0.005 2.0000 4.0000 0.0340 6.80
P2 2.100 0.005 1.6800 2.0000 1.0000 0.0210 4.20
0.800 0.005 1.0000 1.0000 0.0040 0.80
J2 1.760 0.005 2.0592 3.0000 5.0000 0.1320 26.40
1.170 0.005 3.0000 5.0000 0.0878 17.55
BV1 0.600 0.005 0.3000 2.0000 1.0000 0.0060 1.20
0.500 0.005 2.0000 1.0000 0.0050 1.00
BV2 0.500 0.005 0.5750 3.0000 1.0000 0.0075 1.50
1.150 0.005 2.0000 1.0000 0.0115 2.30
J1 2.200 0.005 1.3600 2.0000 2.0000 0.0440 8.80
0.500 0.005 3.0000 2.0000 0.0150 3.00
VJ.2 0.400 0.005 0.6600 3.0000 2.0000 0.0120 2.40
1.270 0.005 2.0000 2.0000 0.0254 5.08
6.3992 0.5076 101.51
2 Pintu Panel, Papan Kayu Ulin 7.585 m² 103.31
P1 0.7500 2.0500 4.0000 6.1500
P2 0.7000 2.0500 1.0000 1.4350
7.5850
3 Jendela Kaca, Papan Kayu Ulin 7.870 m²
j1 0.5000 1.6300 1.0000 2.0000 1.6300
J2 0.5200 1.2000 2.0000 5.0000 6.2400
7.8700
4 Pas. Jalusi mati, Papan Kayu Ulin 4.620 m²
P1 0.1000 0.4200 7.0000 4.0000 1.1760
J1 0.1000 0.4200 4.0000 2.0000 0.3360
J2 0.1000 0.4200 10.0000 5.0000 2.1000
VJ2 0.1000 0.4200 12.0000 2.0000 1.0080
4.6200

5 Kaca mati 5 mm 1.040 m²


BV1 0.5000 0.2600 2.0000 2.0000 0.5200
BV2 0.5000 0.2600 4.0000 1.0000 0.5200
1.0400

PEKERJAAN RANGKA KAP DAN ATAP


1 Kuda-kuda, Nok dan Jurai 6/12, Balok Kayu Ulin 0.949 m3 KK4
a 36.330 0.005 1.0000 2.0000 0.3633
KK5
a 16.560 0.005 1.0000 2.0000 0.1656
KK6
a 12.940 0.005 1.0000 2.0000 0.1294
Jurai Luar
11.370 0.005 1.0000 4.0000 0.2274
2.100 0.005 1.0000 6.0000 0.0630
0.9487

2 Pasangan Skor Angin, Balok Kayu Ulin 0.500 m3

3 Pasangan Gording 5/10, Balok Kayu Bengkirai 1.735 m3


12.600 0.005 2.0000 0.1260
11.300 0.005 2.0000 0.1130
10.020 0.005 2.0000 0.1002
8.660 0.005 2.0000 0.0866
6.990 0.005 2.0000 0.0699
4.910 0.005 2.0000 0.0491
3.630 0.005 2.0000 0.0363
2.360 0.005 2.0000 0.0236
1.080 0.005 2.0000 0.0108
1.600 0.005 8.0000 0.0640
2.760 0.005 2.0000 0.0276
3.580 0.005 2.0000 0.0358
4.860 0.005 2.0000 0.0486
6.140 0.005 2.0000 0.0614
7.420 0.005 2.0000 0.0742
8.690 0.005 2.0000 0.0869
9.970 0.005 2.0000 0.0997
5.950 0.005 8.0000 0.2380
4.670 0.005 1.0000 0.0234
3.400 0.005 1.0000 0.0170
2.120 0.005 1.0000 0.0106
2.060 0.005 4.0000 0.0412
2.700 0.005 4.0000 0.0540
3.340 0.005 4.0000 0.0668
3.980 0.005 4.0000 0.0796
4.540 0.005 4.0000 0.0908
1.7351
4 Talang/Jurai Dalam

5 Pekerjaan Lisplank Double, Balok Kayu Ulin 66.950 m² 3.200 4.0000 12.8000 Sambung Layang
2.250 1.0000 2.2500
1.650 2.0000 3.3000
2.150 4.0000 8.6000
12.500 2.0000 25.0000 Samp. Kiri & Kanan
15.000 1.0000 15.0000 Belakang
66.9500
6 Pasangan Atap Ex. Soka Jempol
7 Nok / Bubungan 10.000 4.0000 40.0000
2.750 1.0000 2.7500
4.500 2.0000 9.0000
51.7500

8 Pas. Mur Baut

PEKERJAAN PLAFON
1 Rangka langit-langit (60 x 120) m, kayu bengkirai 176.878 m2 13.140 1.0000 2.0000 26.2800
12.640 1.0000 2.0000 25.2800
Teras Depan 1.360 1.0000 2.0000 2.7200
R. Tamu 1.360 1.0000 2.0000 2.7200
2.860 2.860 2.0000 16.3592
R. Tidur 1 3.360 2.860 2.0000 19.2192
R. Tidur 2 3.360 2.860 2.0000 19.2192
R. Keluarga 5.360 3.360 2.0000 36.0192
KM/WC 1.860 1.3600 2.0000 5.0592
Dapur 2.860 2.860 2.0000 16.3592
Teras Belakang 1.980 1.930 2.0000 7.6428
176.8780
2 Langit2, Papan Kayu Meranti 176.878 m2
3 List plafond, kayu profil 205.500 m1
Luar 28.750 2.0000 57.5000
R. Tamu 13.500 2.0000 27.0000
R. Tidur 1 12.500 2.0000 25.0000
R. Tidur 2 12.500 2.0000 25.0000
R. Keluarga 17.500 2.0000 35.0000
KM/WC 6.500 2.0000 13.0000
Dapur 11.500 2.0000 23.0000
205.5000

PEKERJAAN LISTRIK
1 Instalasi kabel 35.000 ttk
2 Sekering Box / MCB 1.000 ttk 1.0000 1.0000
3 Stop Kontak 12.000 ttk 12.0000 12.0000
4 Saklar tunggal 8.000 ttk 8.0000 8.0000
5 Sakla ganda 4.000 ttk 4.0000 4.0000
6 Pas. Socket TV (Ruang ………...) 2.000 ttk 2.0000 2.0000
7 Lampu Down Light 23 Watt & Cap 20.000 Bh 20.0000 20.0000

PEKERJAAN BETON, KERAMIK, LAPIS ULUCOPAN & PARQUET


1 Beton, Rangka Kawat Harmonika, 1Pc:3Ps:5Kr 19.136 m2 1.6000 5.9800 2.0000 19.1360
2 Pekerjaan Beton Bertulang (Besi Ø 8 - 150) 0.720 m3 2.000 1.5000 0.1200 2.0000 0.7200
7 Keramik warna 20 / 20 5.171 m2 1.860 1.3900 2.0000 5.1708
8 Dinding Keramik warna 25/45 18.304 m2 1.6000 5.7200 2.0000 18.3040
9 Keramik Granito 60/60, Top Meja Pantry (Halus)

PEKERJAAN PENGGANTUNG & PENGUNCI


1 Kunci tanam biasa 2 x Kali Putar 8.000 Bh
P1 4.0000 4.0000
PJ1 2.0000 2.0000
PJ2 2.0000 2.0000
8.0000
3 Kunci tanam KM/WC 2.000 Bh
P2 2.0000 2.0000
4 Ensel Pintu 5 inchi ( 3 Engsel untuk 1 Pintu) 30.000 Bh
P1 3.0000 4.0000 12.0000
P2 3.0000 2.0000 6.0000
PJ1 3.0000 2.0000 6.0000
PJ2 3.0000 2.0000 6.0000
30.0000
5 Ensel Jendela 3 inchi 52.000 Bh
PJ1 1.0000 2.0000 2.0000 4.0000
PJ2 2.0000 2.0000 2.0000 8.0000
J2 2.0000 2.0000 10.0000 40.0000
52.0000
6 Kait / Hak Angin Jendela 52.000 Bh
PJ1 1.0000 2.0000 2.0000 4.0000
PJ2 2.0000 2.0000 2.0000 8.0000
J2 2.0000 2.0000 10.0000 40.0000
52.0000
7 Grendel Jendela 52.000 Bh
PJ1 1.0000 2.0000 2.0000 4.0000
PJ2 2.0000 2.0000 2.0000 8.0000
J2 2.0000 2.0000 10.0000 40.0000
52.0000
8 Pegangan / Handel Jendela 26.000 Bh
PJ1 1.0000 1.0000 2.0000 2.0000
PJ2 2.0000 1.0000 2.0000 4.0000
J2 2.0000 1.0000 10.0000 20.0000
26.0000

PEKERJAAN INSTALASI AIR BERSIH, AIR KOTOR


2 Instalasi Air Bersih Pipa PVC Ø 1/2 inchi 40.000 m¹
3 Saluran Air Kotor Cair Pipa PVC Ø 2 inchi 28.000 m¹
4 Saluran Air Kotor Padat Pipa PVC Ø 4 inchi 16.000 m¹
5 Pas. Closet monobloc ex.TOTO 2.000 Unit
6 Pas.shower spray/jet flush ex.TOTO 2.000 Bh
8 Pas. Floor drain ex. TOTO 2.000 Bh
9 Pas. Kitchen sink ex Teka 2.000 Set
10 Kran kitchen sink ex.San'ei 2.000 Bh
12 Kran air Ø 1/2 inchi 2.000 Bh Gambarnya 3/4 "
13 Menara Air & Instalasi Unit
14 Cilinder Water Torn Kapasitas 1200 Liter Bh

15 Pump Booster (Distribusi Air Tabung Reservoir) Bh

16 Jet Pump & Gardu Bh

17 Tangki Air/Bak Air Fiber KM/WC Bh

18 Septictank dan Resapan ( Type A ) Unit

19 Septictank dan Resapan ( Type B ) Unit

PEKERJAAN FINISHING
1 Cat Plafon ( Cat Air )
2 Cat List ( Cat Minyak )
3 Cat Kusen ( Cat Minyak ) 43.531 M2
P1 2.560 0.2400 2.0000 4.0000 4.92
0.850 0.2400 2.0000 4.0000 1.63
P2 2.100 0.2400 2.0000 2.0000 2.02
0.800 0.2400 1.0000 2.0000 0.38
PJ1 2.560 0.2400 2.0000 2.0000 2.46
2.210 0.2400 1.0000 2.0000 1.06
1.370 0.2400 2.0000 2.0000 1.32
0.560 0.2400 1.0000 2.0000 0.27
PJ2 2.560 0.2400 2.0000 2.0000 2.46
1.840 0.2400 2.0000 2.0000 1.77
1.050 0.2400 1.0000 2.0000 0.50
1.760 0.2400 2.0000 2.0000 1.69
J2 1.760 0.2400 3.0000 10.0000 12.67
1.170 0.2400 3.0000 10.0000 8.42
BV1 0.600 0.2400 2.0000 2.0000 0.58
0.500 0.2400 2.0000 2.0000 0.48
BV2 0.500 0.2400 3.0000 1.0000 0.36
1.150 0.2400 2.0000 1.0000 0.55
43.5312
4 Cat Pintu ( Cat Minyak )
5 Cat Daun Jendela ( Cat Minyak ) 13.639 m²
PJ1 0.4600 1.6500 1.0000 2.0000 1.5180
PJ2 0.4600 1.2000 2.0000 2.0000 2.2080
J2 0.5200 1.2000 2.0000 10.0000 12.4800
16.2060
PENGURANGAN
PJ1 0.2950 1.4900 1.0000 2.0000 0.8791
PJ2 0.2950 1.0400 2.0000 2.0000 1.2272
J2 0.3500 1.0400 2.0000 10.0000 7.2800
9.3863
6 Cat Jalusi Mati ( Cat Minyak )
7 Cat Lisplang ( Cat Minyak )
8 Cat dinding Luar ( Cat Minyak ) 176.652
dinding keliling 3.4000 57.5100 195.5340
didning teras belakang dan depan 1.0000 8.9300 2.0000 17.8600
PENGURANGAN
J2 2.0592 10.0000 20.5920
BV1 0.3000 2.0000 0.6000
BV2 0.5750 2.0000 1.1500
pj 3.3400 2.0000 6.6800
pj2 3.8600 2.0000 7.7200
36.7420

9 Cat dinding Partisi ( Cat Air ) 232.695


-
- Ruang Tamu 13.580 3.5000 1.0000 47.5300
- Ruang Tidur 1 13.580 3.5000 1.0000 47.5300
- Ruang Tidur 2 11.600 3.5000 1.0000 40.6000
- Ruang Keluarga 27.660 3.5000 1.0000 96.8100
- KM/WC 6.440 3.5000 1.0000 22.5400
teras depan 12.190 1.0000 1.0000 12.1900
267.2000

PENGURANGAN
- Ruang Tamu
P! 1.7850 1.0000 1.0000 1.7850
j1 1.3600 2.0000 1.0000 2.7200
vj.2 0.6600 2.0000
Bukaan Akses R. Tamu Ke R. Keluarga 1.7850 1.0000 1.0000 1.7850
- Ruang Tidur 1
J2 2.0592 1.0000 1.0000 2.0592
P1 1.7850 1.0000 1.0000 1.7850
- Ruang Tidur 2
J2 2.0592 1.0000 1.0000 2.0592
P1 1.7850 1.0000 1.0000 1.7850
- Ruang Keluarga
P1 1.7850 3.0000 1.0000 5.3550
P2 1.6800 1.0000 1.0000 1.6800
BV2 0.5750 1.0000 1.0000 0.5750
Bukaan Akses R. Keluarga Ke dapur 1.7850 1.0000 1.0000 1.7850
- KM/WC
BV1 0.3000 1.0000 1.0000 0.3000
P2 1.6800 1.0000 1.0000 1.6800
0 1.6000 5.7200 1.0000 9.1520
34.5054
PEKERJAAN LAIN-LAIN
1 Pekerjaan Ralling, Besi Hollow 15.180 m1
1.400 7.0000 9.8000
1.880 2.0000 3.7600
0.810 2.0000 1.6200
2 Pas. Ornamen Pilar Depan 15.1800
BACK UP QUANTITY ARSITEKTUR
BACK UP QUANTITY MEKANIKAL ELEKTRIKAL

C PEKERJAAN INSTALASI AIR KOTOR

SANITARY LANTAI DASAR


1 CLOSET JONGKOK bh
3 KRAN AIR (ONDA) bh
4 KRAN WASTAFEL (ONDA) bh
5 WASHTAVEL bh
7 urinuoir bh
SANITARY LANTAI 1
1 CLOSET JONGKOK bh
3 KRAN AIR (ONDA) bh
4 KRAN WASTAFEL (ONDA) bh
5 WASHTAVEL bh
7 urinuoir bh

PEKERJAAN SEPTIK TANK


Pekerjaan galian septik m3 5.100 1.8000 1.5000
Kolom KP 15/15
- Beton m3 0.130 0.1300 1.5000
- Besi Kg
Diameter 12 Kg 1.500
Diameter 10 Begel Kg 0.360
Plat penutup septik tank m3 3.600 1.8000 0.1200
- Besi Kg
Diameter 12-85 & 12-175 Kg 4.600
Diameter 12-85 & 12-175 Kg 1.500
Rabat beton Lantai septik tank m3 1.800 3.6000 0.1500
Pasangan bata m2 1.3500 14.9000
Pelesteran m2

1 Diameter 8`` m'


2 Diameter 6`` m'
3 Diameter 4`` m'
4 Diameter 3`` m'
5 Pasang bak kontrol dia. 1m x 1,5m m'
6 Pengadaan sewage pump 3,7 kw SS 532 ,3 phase 200-480 V unit
4 inch,, Head 27m, Flow 1 m3/min
7 Pasang bak Penampungan 2 x 4 x 2,77 unit
8 Penyambungan ke IPAL utama m'

II PEKERJAAN PENERANGAN

LANTAI DASAR
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 ttk 15.0000
5 DOWN LIGTH PAR 38 18 W bh 21.0000
7 DOWN LIGTH PL 13 W bh 88.0000
9 Stop kontak bh 80.0000
10 Single Switch bh 5.0000
11 Doble Switch bh 80.0000
12 Grid Switch ( 6 gang ) bh 2.0000

LANTAI 1
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 ttk 46.0000
5 DOWN LIGTH PAR 38 18 W bh
7 DOWN LIGTH PL 13 W bh 178.0000
9 Stop kontak bh 164.0000
10 Single Switch bh 2.0000
11 Doble Switch bh 164.0000
12 Grid Switch ( 6 gang ) bh 2.0000

4 TESTING & COMMISSIONING


Testing & Commisioning lot

IX PEKERJAAN PENANGKAL PETIR


1 Penangkal Petir lengkap sesuai gambar tipe EF Radius 125 m unit 1.0000
termasuk kabel, arde 1 ohm, klem, sleave, pipa, bak kontrol dan test comisioning
2 Kabel coaxial 2x35 mm2 lot 1.0000
3 Lampu obstruction lamp Philips 250 W, sesuai spesifikasi dan gambar bh 1.0000
4 Counter contakc bh 1.0000