Misalkan:
Panjang Hollow (L) = 6000 mm
Lebar Hollow (W) = 40 mm
Tinggi hollow (H) = 40 mm
Ketebalan (B) = 2 mm
Berat jenis besi = 7850 (Kg/M3)
Berat Jenis besi (BJ) = 7.85 Kg/ 1.000.000 mm3
UPAH
NO URAIAN SAT
Rp.
I. PEKERJA
1 Pekerja 108,000 /Org/Hr
2 Tukang Aspal 150,000 /Org/Hr
3 Tukang Batu 150,000 /Org/Hr
4 Tukang Besi 150,000 /Org/Hr
5 Tukang Cat 150,000 /Org/Hr
6 Tukang Gypsum 150,000 /Org/Hr
7 Tukang Kayu 150,000 /Org/Hr
8 Tukang Las 150,000 /Org/Hr
9 Tukang Listrik 150,000 /Org/Hr
10 Tukang Taman 150,000 /Org/Hr
11 Tukang Cat Melamik 150,000 /Org/Hr
12 Tukang Pipa 150,000 /Org/Hr
13 Tukang Aluminium 150,000 /Org/Hr
14 Kepala Tukang 162,000 /Org/Hr
15 Operator 162,000 /Org/Hr
16 Mandor 180,000 /Org/Hr
UPAH
NO URAIAN SAT
Rp.
II. BAHAN
A BAHAN DASAR
1 Pasir Beton 277,200 m3
2 Pasir Pasang 277,200 m3
3 Pasir Urug 252,000 m3
4 Batu Belah / Batu Kali / Batu Gunung 289,800 m3
5 Batu Split 1x2 348,919 m3
6 Batu Split 2x3 348,919 m3
7 Sirtu (Pasir Batu) 318,902 m3
8 Tanah Urug merah 83,160 m3
9 Tanah Subur 149,676 m3
11 Bata Merah Kelas 1 900 bh
12 Batako kecil 8x10x20 2,640 bh
13 Beton ringan ( Celcon block ), Leibel 780,000 m3
14 Glass block Lokal 20 x 20 cm lokal 30,000 bh
15 Semen PC type I @ 50 kg Product Tiga Roda 77,689 Zak
16 Semen Warna untuk nat kemasan plastik 22,320 kg
17 Semen Mortar Instant ( MU-202) - Acian 4,080 kg
18 Semen Mortar Instant ( MU-302 ) - Plester Premium 2,385 kg
19 Semen Mortar Instant ( MU-382 ) - Perekat bata ringan 3,642 kg
20 Semen Grouting t=25mm - Sikagrout FM 12,902,400 m2
B BETON
B.1 BETON READY MIX
1 Beton K - B0/K-100 816,000 m3
2 Beton K - 300 1,044,000 m3
3 Beton K - 350 1,050,000 m3
4 Beton K - 375 1,116,000 m3
5 Beton K - 400 1,140,000 m3
6 Beton K - 425 1,164,000 m3
7 Beton K - 500 1,248,000 m3
8 Sewa pompa beton 78,000 m3
9 Sewa vibrator 6,300 m3
UPAH
NO URAIAN SAT
Rp.
C BAHAN BESI
1 Besi beton polos rata-rata 10,080 kg
2 Besi beton ulir rata - rata 10,080 kg
3 Kawat beton 21,600 kg
4 Paku rata - rata 19,800 kg
5 Sekruf 15,000 gross
6 Paku hak panjang 30,000 kg
7 Skruf gyp ( 20 m2/kg ) 46,896 kg
8 WM - M6-150 2,1 x 5,4 m 33,840 m2
9 WM - M7-150 2,1 x 5,4 m 44,880 m2
10 WM - M8-150 2,1 x 5,4 m 58,680 m2
11 WM - M9-150 2,1 x 5,4 m 76,080 m2
12 WM - M10-150 2,1 x 5,4 m 93,960 m2
13 Skruf + fiser untuk kusen alumunium 1,875 bh
14 Baja HB & IWF Ex. DN SII 10,800 kg
15 Siku 10,800 kg
16 Jenis CNP 10,800 kg
17 Jenis UNP 10,800 kg
18 Jenis Lips Canal 10,800 kg
19 Jenis plat ukuran 4' x 8' berlaku untuk semua ketebalan 10,800 kg
20 Besi hollow kotak 40/40 mm t.2.1mm pj=6m 162,000 btg
21 Besi kotak hollow 40/20 mm t.1,8mm pj=6m 104,280 btg
22 Besi hollow kotak 30/30 mm t.1,8mm pj=6m 103,680 btg
23 Besi kotak 20/20 mm (untuk rangka plafond) pj=4m 39,600 btg
24 Besi kotak 20/40 mm (untuk rangka plafond) pj=4m 51,120 btg
25 Besi kotak 40/40 mm (untuk rangka plafond) pj=6m 130,320 btg
26 Besi hollow kotak 40/60 mm t.2.1mm pj=6m 168,480 btg
27 Besi hollow kotak 50/100 mm t.2.1mm pj=6m 1,136,880 btg
28 Besi hollow kotak 40/40 mm t.0.40mm pj=4m ( untuk rangka plafond ) 72,000 btg
29 Besi kotak hollow 40/20 mm t.0.40mm pj=4m ( Untuk rangka plafond ) 36,000 btg
30 Besi hollow galvanis 40/40 mm t= 0.35mm 48,000 btg
31 Besi hollow galvanis 20/40 mm t= 0.35mm 28,800 btg
32 Besi hollow galvanis 40/60 mm t= 0.35mm 72,000 btg
33 Alumunium hollow 40/40 mm t= 0.35mm 48,000 btg
34 Kawat las 66,000 kg
35 Angker mur baut dia 12 38,774 bh
36 Angker mur baut dia 16 51,699 bh
37 Angker mur baut dia 19 65,487 bh
38 Angker mur baut dia 20 65,487 bh
39 Angkermur baut dia 22 A 327 75,828 bh
40 Angker mur baut dia 36 110,294 bh
41 Baut HTB M12 - panjang 60 mm 9,260 bh
42 Baut HTB M16 - panjang 60 mm 21,829 bh
43 Baut HTB M20 - panjang 60 mm 27,285 bh
44 Baut HTB M22 - panjang 70 mm 30,014 bh
45 Baut HTB M27 - panjang 70 mm 36,835 bh
46 Walter mur 16 95,917 bh
47 Kawat harmonika 64,718 m2
48 Kawat nyamuk 42,676 m2
49 Kawat kassa 34,235 m2
50 Kawat burung 26,731 m2
51 Jaring pengaman plastik 16,537 m2
52 Besi hollow kotak 50/50 mm t.2.1mm pj=6m 266,112 btg
UPAH
NO URAIAN SAT
Rp.
P1 Pintu baja single fire door finish cat anti karat, Hardware setara Griff, Ukuran 2100 x 1000 setara
1
Bostinco ( Harga Terpasang ) 15,081,600 unit
P2 Pintu baja double fire door finish cat anti karat, Hardware setara Griff, Ukuran 2100 x 1900 setara
2
Bostinco ( Harga Terpasang ) 18,688,800 unit
P3 Pintu baja double steel door finish cat anti karat, Hardware setara Griff, Ukuran 2100 x 1800 setara
3
Bostinco ( Harga Terpasang ) 17,705,178 unit
P4 Pintu baja double steel door finish cat anti karat, Hardware setara Griff, Ukuran 2200 x 1300 setara
4
Bostinco ( Harga Terpasang ) 19,584,218 unit
P5 Pintu single steel door finish cat anti karat, Hardware setara Griff, Ukuran 900 x 2000 setara Bostinco
5
( Harga Terpasang ) 7,266,000 unit
P6 Pintu baja double shaft steel door finish cat anti karat, Hardware setara Griff, Ukuran 1200 x 1200
6
setara Bostinco ( Harga Terpasang ) 7,156,800 unit
P7 Pintu baja single shaft steel door finish cat anti karat, Hardware setara Griff, Ukuran 1200 x 800
7
setara Bostinco ( Harga Terpasang ) 4,632,000 unit
UPAH
NO URAIAN SAT
Rp.
E KAYU
1 Kayu Kamper Samarinda :
Kayu jenis balok Kamper Samarinda 12,600,000 m3
Kayu jenis papan Kamper Samarinda 12,600,000 m3
2 Kayu Borneo Super
Kayu jenis balok Borneo Super 5,100,000 m3
Kayu jenis papan Borneo Super 5,100,000 m3
3 Kayu bekisting
- Jenis Papan 3,000,000 m3
- Jenis Balok 3,000,000 m3
4 Dolken Ø 8-10cm panjang 4m - 5m 30,000 bt
5 Multiplek 18 mm 264,000 lbr
6 Multiplek 15 mm 236,280 lbr
7 Multiplek 12 mm 198,000 lbr
6 Multiplek 9 mm 129,360 lbr
8 Multiplek 6 mm 92,400 lbr
9 Multiplek 4 mm 66,000 lbr
10 Multiplek 3 mm 78,000 lbr
11 Teak wood ukuran normal ( Jati ) 3mm 144,000 lbr
12 Teak wood ukuran normal ( Jati ) 4mm 156,000 lbr
13 Formika uk. Besar 120 x 240 warna putih 228,000 lbr
14 Formika uk. Besar 120 x 240 warna 228,000 lbr
15 Melaminto uk. 120 x 240 ( Triplek lapis ) 186,000 lbr
16 List Profil Kamper 5 cm 15,000 m1
17 MDF tebal 12mm 156,000 lbr
F BAHAN LANGIT - LANGIT
F.1 Bahan Penutup Langit-Langit
1 Silicate uk. 120 x 240 t=4,5mm 112,200 lbr
2 Silicate uk. 120 x 240 t=6mm 160,200 lbr
3 Silicate uk. 120 x 240 t=8mm 224,040 lbr
4 Gypsum 2.4 x 1.2 t= 9 mm 92,520 lbr
5 Gypsum 2.4 x 1.2 t= 12 mm 110,640 lbr
6 Gypsum 2.4 x 1.2 t= 9 mm Water proof 126,240 lbr
7 Gypsum 2.4 x 1.2 t= 13 mm Firestop 184,800 lbr
8 List Gypsum T. 8 - 10 cm 19,200 m1
9 List Plafond Gypsum T, 5 - 7 cm 15,960 m1
10 Tepung Gypsum @ 20 kg 125,880 zak
11 Ceiling Panel plate 12mm (600mmx1200mm) 27,240 lbr
12 Ceiling Panel acustic 12mm (600mmx1200mm) 38,760 lbr
13 Textile tape 33,000 bh
14 '"U" Channel Alumunium 4,440 m1
15 Anti bacterial ceilling setara Bioguard 16mm + Suspension system setara Prelude standard t=24mm
( Harga terpasang ) setara Armstrong 396,000 m2
16 Anti bacterial ceilling setara Bioguard 16mm + Suspension system setara cleanroom alumunium ( Harga
terpasang ) setara Armstrong 624,000 m2
17 Accustic tile ceilling setara tipe Dune 16mm + Suspension system setara Suprafine Grids t=15mm ( Harga
terpasang ) setara Armstrong 240,000 m2
18 GRC pracetak t=8mm + rangka hollow metal galpanis t=0.35mm 660,000
19 Kalsiplank uk. 8 x 300 x 3000 setara ex. Kalsiboard 78,640 lbr
UPAH
NO URAIAN SAT
Rp.
20
Anti bacterial ceilling setara Bioguard 16mm + Suspension system setara Prelude standard t=24mm
( Harga terpasang ) setara Armstrong
396,000 m2
21 Anti bacterial ceilling setara Bioguard 16mm + Suspension system setara cleanroom alumunium ( Harga
terpasang ) setara Armstrong 624,000 m2
22 Accustic tile ceilling setara tipe Dune 16mm + Suspension system setara Suprafine Grids t=15mm ( Harga
terpasang ) setara Armstrong 240,000 m2
UPAH
NO URAIAN SAT
Rp.
G BAHAN FINISHING LANTAI & DINDING
G.1 Keramik & Granit ex. Roman
1 Keramik lantai 20 x 20 type Polised Gol. A 123,600 m2
2 Keramik lantai 20 x 20 type Unpolised Gol. B 130,800 m2
3 Keramik lantai 30 x 30 type Polised Gol. B 123,600 m2
4 Keramik lantai 30 x 30 type Unpolised Gol. C 130,800 m2
5 Keramik lantai 33 x 33 type Polised Gol. AB 150,480 m2
6 Keramik lantai 33 x 33 type Unpolised Gol. C 187,200 m2
7 Keramik lantai 40 x 40 type Polised Gol. A 133,200 m2
8 Keramik lantai 40 x 40 type Unpolised Gol. B 140,400 m2
9 Keramik lantai 50 x 50 type Polised Gol. A 159,600 m2
10 Keramik lantai 50 x 50 type Unpolised Gol. B 169,200 m2
11 Keramik Dinding 20 x 25 Gol. A 132,000 m2
12 Keramik Dinding 20 x 25 Gol. B 138,600 m2
13 Keramik Dinding 20 x 20 Gol. A 120,000 m2
14 Keramik Dinding 20 x 20 Gol. B 127,200 m2
15 Keramik dinding 30 x 60 Gol. A 170,400 m2
16 Keramik dinding 20 x 40 Gol. A 121,200 m2
17 Plint keramik 10 x 30 cm polised setara lantai 3,900 bh
18 Plint keramik 10 x 40 cm polised setara lantai 4,320 bh
19 Plint keramik 10 x 50 cm polised setara lantai 7,800 bh
20 Stair nozing krmk 10 x 30 unpolised 33,000 bh
21 Step tile 30 x 30 86,400 bh
22 Stair nozing krmk 10 x 40 unpolised 41,040 bh
23 Border list keramik 8 x 25 cm 23,160 bh
24 Border list keramik 8 x 30 cm 29,760 bh
25 Border list keramik 8 x 20 cm 17,160 bh
UPAH
NO URAIAN SAT
Rp.
3 Vinyl Forbo Sarlon Sparkling 15db t=2,6mm (Harga terpasang) 888,000 m2
4 Instalasi Vinyl (Harga terpasang) 72,000 m2
5 Carpet tile 100% nylon 924,000 m2
6 Carpet tile Heavy Duty 880,837 m2
8 Lem Vinyl 72,764 kg
9 Wall Paper 191,834 m2
10 Lapisan HPL 218,294 m2
11 Epoxy floor lining 2000um ( 2mm ) --- terpasang 257,984 m2
Material : Dongyang Epoxy Primer EP 118, Dongyang Scraping Material, Dongyang Epoxy finish ET
5635 - Selfleveling type.
13 Hand Bar tipe BR-2400 setara Pawling 1,690,200 m'
14 Raised floor bolted stringe steel cementitious understructure type + finis HPL ( Harga terpasang ) 1,920,000 m'
G.6 Paving block
1 Paving block press 6 cm natural 2,040 bh
2 Paving block press 6 cm warna 2,280 bh
3 Paving block press 8 cm natural 2,280 bh
4 Paving block press 8 cm warna 2,640 bh
5 Grassblock 30x45 6 cm 20,400 bh
6 Grassblock 30x45 8 cm 22,800 bh
7 Kanstin uk. 60x30x18x22cm 66,000 bh
UPAH
NO URAIAN SAT
Rp.
UPAH
NO URAIAN SAT
Rp.
41 Partisi cubical toilet lengkap daun pintu berikut accessories : 6,512,640 unit
- Partisi Phenolic resin Board ex. D'CUBICS tebal 12mm, (100% kedap air )
- Pintu Phenolic resin Board ex. D'CUBICS uk. 800x1800x12 mm,(100% kedap air )
- Door hardware stainless steel accessories
- Rangka frame alumunium N/A
- Kaki pedestal dan Screw conection stainless steel
42 Stiker kaca sanblast lebar 120 cm, panjang 50 m/rol 63,000 m2
Biaya pasang Stiker kaca sanblast 96,000 m2
K STAINLESS STEEL
1 Plat Stainless steel t=5mm 1,266,433 m2
2 Stainless steel t=2mm 519,166 m2
3 Plat stainless steel 1,2 x 1200 x 2400 694,574 lbr
4 Pipa stainless steel Ø 1/2" 221,760 btg
5 Pipa stainless steel Ø 1" 443,520 btg
6 Pipa stainless steel Ø 1 1/2" 901,152 btg
7 Pipa stainless steel Ø 2" 1,090,656 btg
8 Pipa stainless steel Ø 2 1/4" 1,350,253 m1
9 Pipa stainless steel Ø 2 1/2" 1,507,968 btg
10 Pipa stainless steel Ø 3" 2,300,256 btg
12 Pelat Stainless stell Hairline 306,600 m2
13 U Channel Stenliss Steel Uk 3x3cm ( untuk dudukan kaca fremless ) 59,880 m1
14 Pelat Stainless stell SS 304 tebal 3 mm (1,2 x 2,4) 4,080,000 Lbr
L JENIS CAT
1 Cat Tembok interior AEP setara Jotun 34,680 Kg
2 Cat tembok exterior Weathershield setara Jotun 79,200 Kg
3 Cat tembok Interior AGE setara Jotun 68,760 Kg
4 Cat tembok Interior anti bakteri setara Jotun 100,200 Kg
5 Cat Kayu dan Besi mutu tinggi ( cat duco ) 73,320 kg
6 Cat Kayu mutu sedang 60,600 kg
7 Cat ultra Resisting Primer setara Jotun 49,560 kg
8 Cat Marka thermoplastik 94,560 kg
9 Aplikasi Cat Tahan api setara Jotun :
Primer Penguard Express 109,200 m2
Thinner No. 17 ( ±10% ) 62,400 m2
Intermediate Steelmaster 1200WF 192,000 m2
Top CoatNo.
Thinner Hardtop
10 (± AX 253,500 m2
10% ) 70,200 m2
10 Thiner ( minyak cat B spesial ) 30,000 Lt
11 Thiner ( minyak cat A spesial ) 21,600 Lt
12 Wood filer setara mutu tinggi 36,000 kg
13 Wood stand 51,600 kg
14 Sanding Sealer setara Impra 42,000 Itr
15 Clear Melamic Setara Impra 48,000 kg
16 Meni bes/Zinkcromate 48,000 kg
17 Dempul kayu setara mutu menengah 45,000 kg
18 Dempul duko setara mutu tinggi 42,000 kg
19 Kwas setara Makita 14,400 bh
20 Rool cat 36,360 bh
21 Ampelas tembok 3,840 bh
22 Ampelas kayu & besi 3,840 bh
23 Plamur tembok setara mutu ICI. Dulux 33,600 kg
24 Minyak bekisting 26,400 Lt
25 Water Proofing :
- Sika Membrane Bituseal T-130 SG 935,000 Roll
- Sika top 107 Seal ( Untuk toilet, balkon & area basah ) 55,000 m2
- Sikafloor Epolem Module ( Water cistern & rain water tank ) 96,000 kg
- Sikagard 81 Epolem ( Water cistern & rain water tank ) 26,000 kg
- Sikagard 720 Epolem ( Water cistern & rain water tank ) 25,000 kg
- Sikagard 62 ( Water cistern & rain water tank ) 361,000 kg
- Sika Chapdur ( Floor hardener ) Natural 5,100 kg
- Sika Chapdur ( Floor hardener ) warna 6,300 kg
26 Seal Bound 8,400 ltr
27 Anti rayap bitumen 16,500 m2
28 Epoxy Floor Coating t=2mm 210,000 m2
29 Epoxy Floor Coating t=3mm 250,000 m2
- Waterproofing Coating ex. Sika Rain Tile 47,500 kg
UPAH
NO URAIAN SAT
Rp.
N MATERIAL JALAN
1 Aspal curah 11,018 kg
2 Asphalt emulsi 13,594 kg
3 Asphalt minyak 12,368 kg
4 Material LPA Base Coarse A 191,834 m3
5 Material LPA Base Coarse B 158,760 m3
6 Material LPA Base Coarse C 138,914 m3
7 ATBL 1,553,051 ton
8 Material Laston (AC-WC) 1,752,333 ton
9 Material Laston (AC-BC) 2,251,035 ton
10 Aspal Bitumen 13,594 kg
11 Prime Coat ( Asphalt Emulsi ) 35,588 lt
UPAH
NO URAIAN SAT
Rp.
O SALURAN AIR
O.1 Saluran pipa air kotor
1 Buis beton 1/2 Ø 20 cm 44,319 bh
2 Buis beton 1/2 Ø 30 cm 62,338 bh
3 Buis beton Ø 20 cm panjang 1M 79,239 bh
4 Buis beton Ø 30 cm panjang 1M 112,698 bh
5 Buis beton Ø 40 cm panjang 1M 159,421 bh
6 Buis beton Ø 50 cm panjang 1M 328,923 bh
7 Buis beton Ø 60 cm panjang 1M 431,006 bh
8 Buis beton Ø 80 cm panjang 1M 455,720 bh
9 Buis beton Ø 100 cm panjang 1M 573,864 bh
10 Pipa tanah Ø 15 cm panjang 1 M 18,627 bh
11 Pipa tanah Ø 20 cm panjang 1 M 28,232 bh
O.2 Precast and Prestress Concrete
1 Saluran air kotor ( U-DITCH ) :
1.1 - 200x300mm 254,312 bh
1.2 - 300x400mm 254,312 bh
1.3 - 400x600mm 402,753 bh
1.4 - 500x600mm 497,712 bh
1.5 - 600x800mm 651,609 bh
1.6 - 800x1000mm 1,083,834 bh
1.7 - 1000x1000mm 1,473,489 bh
1.8 - 1200x1200mm 1,741,398 bh
1.8 Box culvert 20x30x100 612,600 bh
P PLUMBING
P.1 PVC Setara Maspion
1 Pipa PVC Ø 1/2" setara standard AW 8,409 Meter
2 Pipa PVC Ø 3/4" setara standard AW 10,303 Meter
3 Pipa PVC Ø 1" setara standard AW 13,129 Meter
4 Pipa PVC Ø 1 1/4" setara standard AW 18,759 Meter
5 Pipa PVC Ø 1 1/2" setara standard AW 24,363 Meter
6 Pipa PVC Ø 2" setara standard AW 35,165 Meter
7 Pipa PVC Ø 2 1/2" setara standard AW 35,173 Meter
8 Pipa PVC Ø 3" setara standard AW 70,346 Meter
9 Pipa PVC Ø 4" setara standard AW 93,795 Meter
10 Pipa PVC Ø 5" setara standard AW 125,024 Meter
11 Pipa PVC Ø 6" setara standard AW 154,625 Meter
12 Pipa PVC Ø 8" setara standard AW 291,722 Meter
13 Pipa PVC Ø 10" setara standard AW 486,203 Meter
UPAH
NO URAIAN SAT
Rp.
P.4 PIPA BSP SCHEDULE 40
1 Pipa besi BSP Ø 1" hitam ( Class Medium ) 49,711 Meter
2 Pipa besi BSP Ø 1 1/4" hitam 56,902 Meter
3 Pipa besi BSP Ø 1 1/2" hitam 67,532 Meter
4 Pipa besi BSP Ø 2" hitam standar BOS 90,980 Meter
5 Pipa besi BSP Ø 2.5" hitam standar BOS 155,543 Meter
6 Pipa besi BSP Ø 3" hitam standar BOS 179,304 Meter
7 BSP SCH. Ø 4” 257,984 Meter
8 BSP SCH. Ø 5” 284,444 Meter
9 BSP SCH. Ø 6” 324,134 Meter
10 BSP SCH.40 Ø 8” 1,252,440 Meter
11 BSP SCH.40 Ø 10” 1,565,550 Meter
12 Lem PVC ASAHI 30,957 kg
Q SANITARY ACCESSORIES
1 Closet duduk ex. TOTO Type CW660NJ - SW660J + Ecowasher TCW 03 SL 5,660,000 unit
- C 421 J closet body
- SW420JP low tank
- TR 407 HV3 Tank trim + stop valve
- TC 262 NV1 Seat & coper
- T 53 P100 Seal Garket & Flange
- T 53 DSR Screws & Cap / set
2 Closet duduk setara TOTO Type C704L - SW784JP + Ecowasher TCW 03 SL 7,200,000 unit
3 Closet jongkok
- CE 7 280,000 bh
- CE 9 + perlengkapan instalasi 3,170,000 bh
- CE 6 459,000 bh
4 Urinal UW477JNM Muslim type urinal 4,860,000 unit
- Urinal UW477JNM Muslim type urinal
- T60P
5 Urinal partition
- Urinal partition w/fittings tipe A100 1,370,000 unit
6 Wastafel LW649CJ Complete set 3,198,000 unit
- LW649CJ unit
- TX115LESBR unit
- TX277S unit
- THX1A-5N unit
7 Wastafel setara TOTO tipe LW 236 CJ 3,144,000 unit
- LW 236 CJ unit
- TX115LESBR unit
- TX277S unit
- T6JV5 unit
- THX1A-3N unit
- TX801LN unit
8 Wastafel setara TOTO tipe LW 103 JT1 2,936,000 unit
- LW 103 JT1 unit
- T205QN unit
- TX277S unit
- TX709AN unit
- TL220D unit
8 Kitchen zink setara Standar Royal tipe caroline 1 lobang complete set 484,375 unit
9 Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang complete set 812,500 unit
10 Kitchen zink setara Standar Royal tipe angela 1 lobang complete set 406,250 unit
11 Service sink setara TOTO tipe SK508-T30ARQ13N 4,200,000 unit
12 Laundry sink setara TOTO tipe SK322E-T30ARQ13N 9,720,000 unit
13 Sloop sink setara TOTO tipe SK33-T30ARQ13N 7,230,000 unit
14 Shower Spray TB19CSMCR 875,000 unit
15 Floor drain TX 1 BN 457,000 unit
16 Soap holder/Tempat sabun setara TOTO tipeS 156 NV1 151,000 unit
17 Kran dinding setara TOTO tipe T23BQ13N 422,000 unit
18 Kran zink dinding setara TOTO tipe T30ARQ13N 620,000 unit
19 Hand shower setara TOTO tipe TX471SFMBR 3,200,000 bh
20 Fixed Shower Head setara TOTO tipe TX465SMN + TX452SO 1,784,000 unit
21 Paper Holder setara TOTO tipe TX703AG 580,000 bh
UPAH
NO URAIAN SAT
Rp.
22 Grab Bar ex. Toto tipe : -
Grab bar Nylon setara tipe KFS 5A-600 990,000 unit
Grab bar Nylon setara tipe KFS 5B3 4,950,000 unit
Grab bar Nylon setara tipe KFS 6A 3,650,000 unit
Grab bar Nylon setara tipe KFS 6D-400 1,650,000 unit
Grab bar Nylon setara tipe KFS 7C 1,980,000 unit
Grab bar Nylon setara tipe KFS 5A-400 935,000 unit
23 Kursi lipat setara tipe KFS 8A 1,815,000 unit
24 Double Robe Hook TOTO Type TS 118 WSB 183,000 bh
25 Towel bar setara TOTO tipe TX 4C (L=660 mm) 1,640,000 bh
26 Tempat ganti popok bayi 1,500,000 bh
27 Gorden dari bahan blackout + rel dan sangkutan 325,000 m2
28 Roof drain cast iron dia 4" 180,000 bh
R ACCESSORIES PINTU
WILKA & DORMA
1 Lockcase tipe :
Mortice Lock tipe Art 1452.30 ( untuk pintu dobel ) 1,771,000 bh
Mortice Lock tipe Art 1490.55 ( untuk pintu engkel ) 320,000 bh
Mortice Lock tipe Art 1450.55 ( untuk pintu geser ) 771,000 bh
2 Lever Handle ART 306 SS 260,000 psg
3 Lever Handle ART 352 SS 740,000 psg
4 Double Cylinder WC Type Art 1477.60 (untuk toilet) 144,000 bh
5 Double Cylinder Type Art 1400.60 260,000 bh
6 Pull Handle tipe Art GD 9330 SS-350 ( Untuk pintu kaca ) 202,000 psg
7 Pull Handle tipe Art PH 2296 G-600 ( Untuk pintu kayu ) 1,317,000 psg
8 Pull Handle tipe Art PH 243 L-1200 ( Untuk pintu kayu ) 1,541,000 psg
9 Pull Handle tipe Art PH 243 L-1200 ( Untuk pintu Alumunium ) 1,185,000 psg
10 Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS 62,000 psg
11 Hinges Gracia Art 2302 tipe 4"x3"x2mm SS 52,000 psg
12 Track Sliding setara Calfis SD 100/2 Mtr 185,500 Btg
13 Track Sliding setara Calfis SD 100/3 Mtr 278,000 Btg
14 Channel setara Calfis CL 500/2 Mtr 48,500 Btg
15 Channel setara Calfis CL 500/3 Mtr 72,500 Btg
16 Roda Sliding Calfis SD 120 max 100Kg 200,000 set
- Hanger HW 111 (2pcs), Track Buffer with Retained ST 112 (1pcs), Floor Guide FG 115 (1 pcs)
17 Bracket setara Calfis BK 110 11,800 set
18 Friction stay top hung tipe 12"/2mm 95,000 psg
19 Friction stay top hung tipe 20"/2mm 172,000 psg
20 Friction stay top hung tipe 24"/2,5mm 247,000 psg
21 Window lock Gracia Locking tipe Art 120 ( untuk jendela alumunium ) 35,000 bh
22 Flush Handle ( untuk pintu geser ) tipe Art FH 216 96,000 bh
23 Door stop Gracia tipe Art 604/40mm SS. ( Floor ) 89,000 bh
24 Door stop Gracia tipe Art 729 ( Wall ) Silver 44,000 bh
25 Door closer tipe Dorma TS 300 EN 4 RA Silver 751,000 set
26 Fushbolt tipe Rioby 456/250 mm Silver 118,000 set
27 Dust Proof Strike Gracia tipe 115D 35,000 bh
28 Floor hinge BTS 65 Complete termasuk top pivot 1,427,900 set
29 Floor hinge BTS 84 Complete (untuk pintu kaca & alumunium) 1,913,000 set
30 Top Fact fitting PT-20, Bottom Fact fitting PT-10, Corner Lock PT - 10 LCK 3,646,100 bh
31 Fact fitting Pt-30 1,177,200 bh
32 Top Fact fitting Pt-40 1,749,500 bh
33 Door Selector Art- N250 SS 490,000 bh
34 Escutcheon tipe Art 901 DR 32,000 set
35 Shaft door tipe Art 542 60,000 bh
36 Anak kunci shaft door tipe Art 543 22,000 bh
37 Ring Handle shaft door tipe Art RH 8-3 201,000 bh
38 Automatic Fushbolt setara Wilka tipe Gracia 37M - 14" 152,000 bh
UPAH
NO URAIAN SAT
Rp.
S TANAMAN
Pohon Pelindung
1 Pohon Bintaro t=300 cm 337,232 btg
2 Pohon Sapu tangan putih t=60cm 108,000 btg
3 Dadap Merah t=2 - 4 m 214,722 btg
4 Pohon trembesi t = 3,00 m 117,085 btg
5 Angsana Tinggi 100 cm 8,996 btg
6 Pohon Cabefuya Caraiba `t=3m 218,559 btg
7 Pohon Janda merana 150,000 btg
8 Pohon bungur t=1,5 -3 m 44,982 btg
9 Pohon kiara payung t=300cm 312,228 btg
10 Pohon Kupu-kupu t=300cm 234,170 btg
11 Pohon Mahoni t= 2,5 - 3 m 343,450 btg
12 Pohon Kaliandra T=200cm 198,000 btg
13 Pohon Ketapang laut t= 2 - 4 m 291,060 btg
14 Pohon Ketapang kencana t= 2 - 4 m 312,228 btg
15 Pohon Tanjung t= 2,5 - 3 m 352,050 btg
16 Pohon Kaliandra T= 1 - 2 m 37,837 btg
Pohon Pagar :
17 Bambu Jepang (2 s/d 3m) 31,618 btg
18 Bambu Kuning (2 s/d 3m) 20,505 btg
Pohon Berbuah :
19 Pohon Nangka tinggi 100cm 19,051 btg
20 Pohon Sukun t=1,5 - 2 m 42,202 btg
21 Pohon Kelengkeng t=1 m 198,450 btg
Tananaman hias :
22 Kembang Kancing t = 30 - 50 cm 10,200 btg
23 Hanjuang merah t = 50 - 60 cm 11,774 btg
24 Kemuning t = 30 - 35 cm 5,821 btg
25 Anturium GC t = 40 - 50 cm 78,056 btg
26 Pohon semak ekor tupai 42,997 btg
27 Pohon kaca piring tinggi 40cm 38,366 btg
28 Palem botol t=100cm 78,056 btg
29 Palem Kurma t=200cm 6,000,000 btg
30 Pohon Liri muscari t=60cm 42,000 btg
31 Pohon pisang - pisangan 15,876 btg
32 Pohon Lee Kwan Yew t=50cm 15,000 btg
33 Teh-Tehan ( Duranta) 4,894 btg
34 Pohon Biola cantik t=1 - 2 m 85,994 btg
35 Pohon Jabon t= 70 cm - 80 cm 5,424 btg
36 Pohon Kasia kuning t=1 m 66,150 btg
37 Miona polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 5,400 btg
38 Lantana polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 4,233 btg
39 Tegetes polybeg 20 ( 1 Rumpun=1m2 ---25 pohon ) 4,233 btg
40 Pohon hias bougenville tunggal t = 50 cm 46,833 btg
41 Pohon hias bougenville campur 3 warna t = 100 cm 116,026 btg
42 Pohon hias bougenville sambung t = 50 cm 62,974 btg
43 Perdu Oleander 31,089 btg
44 Azalea Ungu Polybag 30 3,108 btg
45 Azalea Hibrit Polybag 30 6,614 btg
46 Bayam Merah Polybag 30 3,307 btg
Rumput :
47 Rumput Gajah 9,921 m2
48 Rumput jepang 24,475 m2
49 Rumput peking 8,599 m2
50 Rumput bermuda ( terpasang belum PPN + keuntungan ) 122,774 m2
No.
SEWA ALAT BERAT & MESIN MESIN
Jenis Barang / Jasa Satuan Harga (Rp) Harga (Rp)
1 Asphalt liquid mixer 40 HP /Jam 166,026.58 166,026.58 150,591 158,120.55 166,026.58
2 Asphalt liquid mixer 5 HP /Jam 53,424.39 53,424.39 48,458 50,880.38 53,424.39
3 Blending equipment 50 HP /Jam 276,515.27 276,515.27 250,808 263,347.88 276,515.27
4 Cold milling 248 HP /Jam 53,424.39 53,424.39 48,458 50,880.38 53,424.39
5 Concrete breaker 290 HP /Jam 891,189.34 891,189.34 808,335 848,751.75 891,189.34
6 Condrete mixer (350)/20 HP /Jam 93,228.50 93,228.50 84,561 88,789.05 93,228.50
7 Pontoon /Jam 638,039.90 638,039.90 578,721 607,657.05 638,039.90
8 Tronton 150 HP /Jam 248,100.54 248,100.54 225,035 236,286.23 248,100.54
9 Truk mixer (agitator) 220 HP /Jam 354,597.08 354,597.08 321,630 337,711.50 354,597.08
10 Vibrating hammer 4,2 HP /Jam 61,878.36 61,878.36 56,126 58,931.78 61,878.36
11 Welding set 40 HP /Jam 117,416.25 117,416.25 106,500 111,825.00 117,416.25
12 SEWA ALAT PANCANG pemakaian tiang min 400m - -
Untuk harga sewa genset dan Rental Genset tersebut diatas sudah termasuk;
Harga tersebut diatas belum termasuk PPN, perubahan harga sewaktu waktu dapat
berubah tanpa pemberitahuan terlebih dahulu..
C. Biaya Operator
Biaya operator = Rp 4,050,000.00 /bulan
Rp 200.00 /jam /
= Rp 20,250.00 /jam
C. Biaya Operator
Biaya operator = Rp 4,050,000.00 /bulan
Rp 200.00 /jam /
= Rp 20,250.00 /jam
KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
ANALISA
1 2 3 4 5 6 7
2 A.2.2.1.2 1m1 Pembuatan Pagar sementara dari seng gelombang tinggi 2 meter
Bahan 370,738.72
Kayu dolken Ø8-10 / p=400 cm 1.250 batang 30,000.00 37,500.00
Semen PC ( 50 kg / zak ) 0.050 zak 77,689.00 3,884.45
Seng gelombang BJLS 28 1.200 lbr 82,200.00 98,640.00
Pasir beton 0.005 m3 277,200.00 1,386.00
Batu split 2x3 0.009 m3 348,919.00 3,140.27
Kayu 5/7 setara lokal (sembarang) 0.072 m3 3,000,000.00 216,000.00
Paku 0.060 kg 19,800.00 1,188.00
Residu 0.400 liter 22,500.00 9,000.00
Tenaga Kerja 88,440.00
Pekerja 0.200 org/hr 108,000.00 21,600.00
Tukang kayu/batu 0.400 org/hr 150,000.00 60,000.00
Kepala Tukang 0.020 org/hr 162,000.00 3,240.00
mandor 0.020 org/hr 180,000.00 3,600.00
Jumlah : 459,178.72
Overhead & keuntungan 10% : 45,917.87
Jumlah : 505,096.59
A.2.2.1.2 1m1 Pembuatan Pagar sementara dari seng gelombang tinggi 2 meter Jumlah & pembulatan : 505,000.00
3 A.2.2.1.3 1m1 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
ANALISA
1 2 3 4 5 6 7
9 A.2.2.1.9 1m 2
Pembersihan lapangan dan perataan
Tenaga Kerja
Pekerja 0.100 org/hr 108,000.00 10,800.00
Mandor 0.050 org/hr 180,000.00 9,000.00
Jumlah : 19,800.00
Overhead & keuntungan 10% : 1,980.00
Jumlah : 21,780.00
A.2.2.1.9 1 m2 Pembersihan lapangan dan perataan Jumlah & pembulatan : 21,700.00
KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
ANALISA
1 2 3 4 5 6 7
12 A.2.2.1.12 1 m2 Pembuatan Jalan sementara
Bahan : 85,780.29
Batu belah/batu krop 0.150 m3 318,902.00 47,835.30
Batu pecah 5x7cm 0.090 m3 390,811.00 35,172.99
Pasir pasang 0.010 m3 277,200.00 2,772.00
Tenaga Kerja 108,900.00
Pekerja 1.000 0rg/hr 108,000.00 108,000.00
Mandor 0.005 0rg/hr 180,000.00 900.00
Jumlah : 194,680.29
Overhead & keuntungan 10% : 19,468.03
Jumlah : 214,148.32
A.2.2.1.12 1 m2 Pembuatan Jalan sementara Jumlah & pembulatan : 214,100.00
13 A.2.2.1.13 1m 3
Pekerjaan Bongkaran Beton Bertulang 1,559,952.00
Tenaga Kerja
Pekerja 13.334 0rg/hr 108,000.00 1,440,072.00
Mandor 0.666 0rg/hr 180,000.00 119,880.00
Jumlah 1,559,952.00
Overhead & keuntungan 10% : 155,995.20
Jumlah : 1,715,947.20
A.2.2.1.13 1m3 Pekerjaan Bongkaran Beton Bertulang Jumlah & pembulatan : 1,715,900.00
16 A.2.2.1.14b 1m 2
Pekerjaan Bongkaran Atap Genteng / Sirap 3,960.00
Tenaga Kerja
Pekerja 0.020 0rg/hr 108,000.00 2,160.00
Mandor 0.010 0rg/hr 180,000.00 1,800.00
Jumlah 3,960.00
Overhead & keuntungan 10% : 396.00
Jumlah : 4,356.00
A.2.2.1.14b 1m2 Pekerjaan Bongkaran Atap Genteng / Sirap Jumlah & pembulatan : 4,300.00
18 A.2.2.1.14d 1m 2
Pekerjaan Bongkaran Rangka Atap Kayu 117,000.00
Tenaga Kerja
Pekerja 1.000 0rg/hr 108,000.00 108,000.00
Mandor 0.050 0rg/hr 180,000.00 9,000.00
Jumlah 117,000.00
Overhead & keuntungan 10% : 11,700.00
Jumlah : 128,700.00
A.2.2.1.14d 1m2 Pekerjaan Bongkaran Rangka Atap Kayu Jumlah & pembulatan : 128,700.00
KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
ANALISA
1 2 3 4 5 6 7
22 A.2.2.1.17 1m1 Pekerjaan Pagar BRC T= 1.2 m Pondasi (Batukali + Sloof) Dihitung setiap 2.4 m
Terpasang :
Galian tanah 1.188 m³ 85,500.00 101,574.00
Urugan pasir bawah pondasi 0.132 m³ 336,600.00 44,431.20
Aanstamping 0.198 m³ 612,702.00 121,315.00
Pondasi batu kali 1PC : 5Ps 0.343 m³ 1,010,020.88 346,437.16
Sloof beton 15/20 0.030 m³ 1,468,069.32 44,042.08
- Beton 0.03 1,206,247.32
- Besi 6.00 14,190.00
- Bekistin 0.40 247,632.00
Urugan tanah 0.515 m³ 29,925.00 15,411.38
Pagar BRC 1.000 bh 360,000.00 360,000.00
Tiang pipa BRC 1.500 bh 127,008.00 190,512.00
Plesteran 1PC : 5Ps 0.960 m² 69,892.00 67,096.32
Pengecatan dinding 0.960 m² 46,548.60 44,686.66
Jumlah : 1,335,505.78
Overhead & keuntungan 10% : 133,550.58
Jumlah : 1,469,056.36
A.2.2.1.17 1m1 Pekerjaan Pagar BRC T= 1.2 m Pondasi (Batukali + Sloof) Dihitung setiap 2.4 m Jumlah & pembulatan : 1,469,000.00
2 Tenaga 138,000.00
Tukang 0.500 oh 150,000.00 75,000.00
Pekerja 0.500 oh 108,000.00 54,000.00
Kepala Tukang 0.050 oh 162,000.00 8,100.00
Mandor 0.005 oh 180,000.00 900.00
Jumlah : 1,717,875.00
Overhead & keuntungan 10% : 171,787.50
Jumlah : 1,889,662.50
A.2.2.1.18 1 Bh Pasang papan nama proyek ukuran 120 x 240cm Jumlah & pembulatan : 1,889,600.00
2 Tenaga 5,292.00
Pekerja 0.042 oh 108,000.00 4,536.00
Mandor 0.004 oh 180,000.00 756.00
Jumlah : 23,482.70
Overhead & keuntungan 10% : 2,348.27
Jumlah : 25,830.97
A.2.2.1.19 1 m2 Jaring pengaman proyek Jumlah & pembulatan : 25,800.00
KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
ANALISA
1 2 3 4 5 6 7
A.1 A.2.2.2 PEKERJAAN PERSIAPAN
( NON STANDAR )
Sarana dan prasarana fasilitas kerja sementara
1 A.2.2.2.1 1 Bulan Penyediaan listrik kerja sementara
Sewa Generator 100KVA 1.000 BL 22,000,000.00 22,000,000.00
Bahan bakar solar industri 182.000 ltr 8,000.00 1,456,000.00
Operator (harian perusahaan) 25.000 Hari 162,000.00 4,050,000.00
Jumlah : 27,506,000.00
Overhead & keuntungan 10% : 2,750,600.00
Jumlah : 30,256,600.00
A.2.2.2.1 1 Bulan Penyediaan listrik kerja sementara Jumlah & pembulatan : 30,256,600.00
4 A.2.2.2.4 1 Bulan Sewa alat tower Crane (Type ST60/15 dengan radius 60 m termasuk Genset, dengan standard mesin 150 KVA)
170,540,430.00
Sewa Tower Crane 3.6 ton/60m - 200 jam/bulan 1.000 bln 167,196,500.00 167,196,500.00
Asuransi Alat dan Ekspedisi 1.000 ls 3,343,930.00 3,343,930.00
Jumlah : 170,540,430.00
Overhead & keuntungan 10% : 17,054,043.00
A.2.2.2.4 1 Bulan Sewa alat tower Crane (Type ST60/15 dengan radius 60 m termasuk
Genset, dengan standard mesin 150 KVA) Jumlah & pembulatan : 187,594,471.00
6 A.2.2.2.6 1 Hari Mobilisasi dan Demobilisasi Alat material (Asumsi mobil Colt Diesel)
Transfortasi material asumsi mobil Colt Diesel 1.000 unit 350,000.00 350,000.00
Upah muat dan bongkar barang (pekerja) 0.350 hari 108,000.00 37,800.00
Jumlah : 387,800.00
Overhead & keuntungan 10% : 38,780.00
Jumlah : 426,580.00
A.2.2.2.6 1 Hari Mobilisasi dan Demobilisasi Alat material (Asumsi mobil Colt Diesel) Jumlah & pembulatan : 426,500.00
KODE
NO. KOEF/SATUAN/URAIAN Koef. SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
ANALISA
1 2 3 4 5 6 7
12 A.2.2.2.10 1 Unit Mob demob alat Tower crane, Mobil crane dan Alat berat pengeboran
Tower crane 1.000 pp 38,587,500.00 38,587,500.00
Asuransi Alat dan Ekspedisi 1.000 ls 240,000.00 240,000.00
Jumlah : 38,827,500.00
Overhead & keuntungan 10% : 3,882,750.00
Jumlah : 42,710,250.00
A.2.2.2.10 1 Unit Mob demob alat Tower crane, Mobil crane dan Alat berat pengeboran Jumlah & pembulatan : 42,710,200.00
Tenaga Kerja
Pekerja 0.750 org/hr Rp 108,000.00 Rp 81,000.00
Mandor 0.025 org/hr Rp 180,000.00 Rp 4,500.00
Jumlah : Rp 85,500.00
Overhead & keuntungan 10% : Rp 8,550.00
Jumlah : Rp 94,050.00
A.2.3.1.1 1 m³ Galian Tanah Dalam s/d 1 m manual Dibulatkan : Rp 94,050.00
Tenaga Kerja
Pekerja 0.900 org/hr Rp 108,000.00 Rp 97,200.00
Mandor 0.045 org/hr Rp 180,000.00 Rp 8,100.00
Jumlah : Rp 105,300.00
Overhead & keuntungan 10% : Rp 10,530.00
Jumlah : Rp 115,830.00
A.2.3.1.2 1 m³ Galian Tanah Dalam s/d 2 m manual Dibulatkan : Rp 115,800.00
Tenaga Kerja
Pekerja 1.050 org/hr Rp 108,000.00 Rp 113,400.00
Mandor 0.067 org/hr Rp 180,000.00 Rp 12,060.00
Jumlah : Rp 125,460.00
Overhead & keuntungan 10% : Rp 12,546.00
Jumlah : Rp 138,006.00
A.2.3.1.3 1 m³ Galian Tanah Dalam s/d 3 m manual Dibulatkan : Rp 138,000.00
Tenaga Kerja
Pekerja 1.000 org/hr Rp 108,000.00 Rp 108,000.00
Mandor 0.032 org/hr Rp 180,000.00 Rp 5,760.00
Jumlah : Rp 113,760.00
Overhead & keuntungan 10% : Rp 11,376.00
Jumlah : Rp 125,136.00
A.2.3.1.4 1 m³ Galian Tanah keras Dalam 1 m manual Dibulatkan : Rp 125,100.00
Tenaga Kerja
Pekerja 1.500 org/hr Rp 108,000.00 Rp 162,000.00
Mandor 0.060 org/hr Rp 180,000.00 Rp 10,800.00
Jumlah : Rp 172,800.00
Overhead & keuntungan 10% : Rp 17,280.00
Jumlah : Rp 190,080.00
A.2.3.1.5 1 m³ Galian Tanah Cadas Dalam 1 m manual Dibulatkan : Rp 190,100.00
Tenaga Kerja
Pekerja 1.200 org/hr Rp 108,000.00 Rp 129,600.00
Mandor 0.045 org/hr Rp 180,000.00 Rp 8,100.00
Jumlah : Rp 137,700.00
Overhead & keuntungan 10% : Rp 13,770.00
Jumlah : Rp 151,470.00
A.2.3.1.6 1 m³ Galian Tanah Lumpur Dalam 1 m manual Dibulatkan : Rp 151,500.00
Tenaga Kerja
Pekerja 0.050 org/hr Rp 108,000.00 Rp 5,400.00
Mandor 0.005 org/hr Rp 180,000.00 Rp 900.00
Jumlah : Rp 6,300.00
Overhead & keuntungan 10% : Rp 630.00
Jumlah : Rp 6,930.00
A.2.3.1.7 1 m² Pekerjaan Stripping Tebing 1 m Dibulatkan : Rp 6,900.00
Tenaga Kerja
Pekerja 0.330 org/hr Rp 108,000.00 Rp 35,640.00
Mandor 0.010 org/hr Rp 180,000.00 Rp 1,800.00
Jumlah : Rp 37,440.00
Overhead & keuntungan 10% : Rp 3,744.00
Jumlah : Rp 41,184.00
A.2.3.1.8 1 m³ Buang Tanah Sejauh 30 m Dibulatkan : Rp 41,200.00
Tenaga Kerja
Pekerja 0.500 org/hr Rp 108,000.00 Rp 54,000.00
Mandor 0.050 org/hr Rp 180,000.00 Rp 9,000.00
Jumlah : Rp 63,000.00
Overhead & keuntungan 10% : Rp 6,300.00
Jumlah : Rp 69,300.00
A.2.3.1.10 1 m³ Memadatkan Tanah Per 20 cm Dibulatkan : Rp 69,300.00
Bahan Rp 302,400.00
Pasir urug 1.200 m³ Rp 252,000.00 Rp 302,400.00
Tenaga Kerja Rp 34,200.00
Pekerja 0.300 org/hr Rp 108,000.00 Rp 32,400.00
Mandor 0.010 org/hr Rp 180,000.00 Rp 1,800.00
Jumlah : Rp 336,600.00
Overhead & keuntungan 10% : Rp 33,660.00
Jumlah : Rp 370,260.00
A.2.3.1.11 1 m³ Pengurugan dengan pasir urug Dibulatkan : Rp 370,300.00
Bahan Rp 200,740.00
Kapur Padam 0.135 m³ Rp 70,000.00 Rp 9,450.00
Pasir pasang 0.400 m³ Rp 277,200.00 Rp 110,880.00
Tanah liat 0.946 m³ Rp 85,000.00 Rp 80,410.00
Tenaga Kerja Rp 167,280.00
Pekerja 0.800 org/hr Rp 108,000.00 Rp 86,400.00
Tukang Batu 0.400 org/hr Rp 150,000.00 Rp 60,000.00
Kepala Tukang 0.040 org/hr Rp 162,000.00 Rp 6,480.00
Mandor 0.080 org/hr Rp 180,000.00 Rp 14,400.00
Jumlah : Rp 368,020.00
Overhead & keuntungan 10% : Rp 36,802.00
Jumlah : Rp 404,822.00
A.2.3.1.12 1 m³ Pasang Lapisan Pudel Campuran 1 KP : 3 PP : 7 TL Dibulatkan : Rp 404,800.00
Bahan Rp 202,640.00
Kapur Padam 0.248 m³ Rp 70,000.00 Rp 17,360.00
Pasir pasang 0.400 m³ Rp 277,200.00 Rp 110,880.00
Tanah liat 1.240 m³ Rp 60,000.00 Rp 74,400.00
Tenaga Kerja Rp 167,280.00
Pekerja 0.800 org/hr Rp 108,000.00 Rp 86,400.00
Tukang Gali 0.400 org/hr Rp 150,000.00 Rp 60,000.00
Kepala Tukang 0.040 org/hr Rp 162,000.00 Rp 6,480.00
Mandor 0.080 org/hr Rp 180,000.00 Rp 14,400.00
Jumlah : Rp 369,920.00
Overhead & keuntungan 10% : Rp 36,992.00
Jumlah : Rp 406,912.00
A.2.3.1.13 1 m³ Pasang Lapisan Pudel Campuran 1 KP : 5 TL Dibulatkan : Rp 406,900.00
Bahan Rp 168,828.00
Ijuk 6.000 kg Rp 28,138.00 Rp 168,828.00
Tenaga Kerja Rp 18,900.00
Pekerja 0.150 org/hr Rp 108,000.00 Rp 16,200.00
Mandor 0.015 org/hr Rp 180,000.00 Rp 2,700.00
Jumlah : Rp 187,728.00
Overhead & keuntungan 10% : Rp 18,772.80
Jumlah : Rp 206,500.80
A.2.3.1.14 1 m³ Lapisan Ijuk Tebal 10 cm, untuk bidang resapan Dibulatkan : Rp 206,500.00
Bahan Rp 382,682.40
Sirtu 1.20 m³ Rp 318,902.00 Rp 382,682.40
Rp 31,500.00
Pekerja 0.250 org/hr Rp 108,000.00 Rp 27,000.00
Mandor 0.025 org/hr Rp 180,000.00 Rp 4,500.00
Jumlah : Rp 414,182.40
Overhead & keuntungan 10% : Rp 41,418.24
Jumlah : Rp 455,600.64
A.2.3.1.15 1 m³ Urug Sirtu Padat Untuk Peniggian Lantai Bangunan Dibulatkan : Rp 455,600.00
Bahan Rp 31,980.00
Cerucuk Ø 8-10 Cm Panjang 4m' 1.000 Bh Rp 30,000.00 Rp 30,000.00
Papan Kepala Tiang kayu Kamper Medan 0.002 m³ Rp - Rp -
Paku 0.100 Kg Rp 19,800.00 Rp 1,980.00
Alat Rp 4,268.00
Excavator 0.010 Jam Rp 426,800.00 Rp 4,268.00
Tenaga Kerja Rp 7,200.00
Pekerja 0.050 org/hr Rp 108,000.00 Rp 5,400.00
Mandor 0.010 org/hr Rp 180,000.00 Rp 1,800.00
Jumlah : Rp 43,448.00
Overhead & keuntungan 10% : Rp 4,344.80
Jumlah : Rp 47,792.80
A.2.3.1a.1 1 Btg Cerucuk Kayu Ø 8-10 Cm Panjang 4 m' Dibulatkan : Rp 47,800.00
Bahan Rp 17,500.00
Anti rayap 1.000 m2 Rp 17,500.00 Rp 17,500.00
Tenaga Kerja Rp 14,720.00
Pekerja 0.107 hari Rp 108,000.00 Rp 11,520.00
Mandor 0.018 hari Rp 180,000.00 Rp 3,200.00
Jumlah : Rp 32,220.00
Overhead & keuntungan 10% : Rp 3,222.00
Jumlah : Rp 35,442.00
A.2.3.1a.2 1 m2 Penyemprotan anti rayap untuk pondasi Dibulatkan : Rp 35,400.00
Bahan Rp 11,875.80
Styrofoam t = 2.6 cm 0.030 m3 Rp 393,760.00 Rp 11,875.80
Tenaga Kerja Rp 10,452.00
Tukang 0.026 hari 150,000.00 Rp 3,900.00
Pekerja 0.052 hari Rp 108,000.00 Rp 5,616.00
Mandor 0.005 hari Rp 180,000.00 Rp 936.00
Jumlah : Rp 22,327.80
Overhead & keuntungan 10% : Rp 2,232.78
Jumlah : Rp 24,560.58
A.2.3.1a.3 1 m2 Styrofoam untuk peredam getaran mesin Dibulatkan : Rp 24,600.00
5 A.2.3.1a.5 1 m2 Pemasangan 1 m² Lapisan Geotekstil non waven tebal 5 mm untuk bidang resapan
Bahan Rp 27,225.00
Lapisan Geotextile 1.1000 M² Rp 22,500.00 Rp 24,750.00
Alat Bantu 1.0000 Ls Rp 2,475.00 Rp 2,475.00
Tenaga Kerja Rp 5,220.00
Pekerja 0.0400 org/hr Rp 108,000.00 Rp 4,320.00
Mandor 0.0050 org/hr Rp 180,000.00 Rp 900.00
Jumlah : Rp 32,445.00
Overhead & keuntungan 10% : Rp 3,244.50
Jumlah : Rp 35,689.50
A.2.3.1a.5 1 m2 Pemasangan 1 m² Lapisan Geotekstil non waven tebal 5 mm untuk bidang resapan Dibulatkan : Rp 35,700.00
6 TM.04.C 1 m³ Pemadatan tanah di lokasi pekerjaan (tanah menggunakan hasil galian setempat)
Alat berat ( Termasuk Operator ) Rp 14,115.40
Bulldozer 0.0200 jam Rp 328,900.00 Rp 6,578.00
Vibrator roller 6-8 ton 0.0178 jam Rp 330,000.00 Rp 5,874.00
Water Tanker 0.0078 jam Rp 213,256.58 Rp 1,663.40
Tenaga Kerja Rp 3,582.72
Pekerja 0.1422 jam Rp 21,600.00 Rp 3,071.52
Mandor 0.0142 jam Rp 36,000.00 Rp 511.20
Jumlah : Rp 17,698.12
Overhead & keuntungan 10% : Rp 1,769.81
Jumlah : Rp 19,467.93
TM.04.C 1 m³ Pemadatan tanah di lokasi pekerjaan (tanah menggunakan hasil galian setempat) Dibulatkan : Rp 19,500.00
7 F.5a 1 m³ Timbunan tanah berikut Pemadatan tanah tiap 20 cm (Tanah dari luar)
Jumlah : 397,787.10
Overhead & keuntungan 10% : 39,778.71
Jumlah : 437,565.81
F.04.b 1M' Pemancangan Tiang pancang beton 25cm x 25cm Dibulatkan : 437,565.00
2 F.04.c 1M' Pemancangan Tiang pancang beton 30cm x 30cm
Tenaga Kerja Rp 81,540.00
Pekerja 0.5400 org/hr Rp 108,000.00 Rp 58,320.00
Tukang 0.0900 org/hr Rp 150,000.00 Rp 13,500.00
Mandor 0.0540 org/hr Rp 180,000.00 Rp 9,720.00
Bahan Rp 317,004.13
Tiang pancang beton 30cm x 30cm 1.0300 m Rp 307,771.00 Rp 317,004.13
Peralatan Rp 52,778.03
Crane 5-10 ton 0.0900 Sewa/jam Rp 239,760.64 Rp 21,578.46
Alat pancang 0.0900 Sewa/jam Rp 346,661.91 Rp 31,199.57
Jumlah : 451,322.16
Overhead & keuntungan 10% : 45,132.22
Jumlah : 496,454.38
F.04.c 1M' Pemancangan Tiang pancang beton 30cm x 30cm Dibulatkan : 496,454.00
Jumlah : 720,716.68
Overhead & keuntungan 10% : 72,071.67
Jumlah : 792,788.35
F.04.d 1M' Pemancangan Tiang pancang beton 40cm x 40cm Dibulatkan : 792,788.00
Jumlah : 540,309.02
Overhead & keuntungan 10% : 54,030.90
Jumlah : 594,339.93
F.04.d1 1M' Sheet pile baja Dibulatkan : 594,339.00
Jumlah : 245,000.00
Overhead & keuntungan 10% : 24,500.00
Jumlah : 269,500.00
F.04.d2 1 bh Potong/pecah kepala tiang pancang 40cm x 40cm Dibulatkan : 269,500.00
Jumlah : 60,000.00
Overhead & keuntungan 10% : 6,000.00
Jumlah : 66,000.00
F.04.d2 1 bh Potong/pecah kepala tiang pancang 30 x 30 Dibulatkan : 66,000.00
1 A. A.4.1..1.4 1 m³ Membuat beton mutu fc=7,4 Mpa (K 100), slum (12 ± 2) cm, w/c = 0.87
-
Bahan
Portland Cement 230.000 kg
Pasir Beton 893.000 kg
Kerikil (maksimum 30 mm) 1,027.000 kg
Air 200.000 Liter
Tenaga Kerja
Pekerja 1.200 org/hr
Tukang Batu 0.200 org/hr
Kepala Tukang 0.020 org/hr
Mandor 0.060 org/hr
A. A.4.1..1.4 1 m³ Membuat beton mutu fc=7,4 Mpa (K 100), slum (12 ± 2) cm, w/c = 0.87
4 A. A.4.1.1.8 1 m³ Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm, w/c = 0.56
Bahan
Portland Cement 384.000 kg
Pasir Beton 692.000 kg
Kerikil (maksimum 30 mm) 1,039.000 kg
Air 215.000 Liter
Tenaga Kerja
Pekerja 1.650 org/hr
Tukang Batu 0.275 org/hr
Kepala Tukang 0.028 org/hr
A.A.4.1.1 Pek.Beton / HAL 56 DARI 236
ANALISA HARGA SATUAN PEKERJAAN
KODE
NO. URAIAN KOEF SATUAN
ANALISA
1 2 3 4 5
Mandor 0.083 org/hr
A. A.4.1.1.8 1 m³ Membuat beton mutu fc=21.7 Mpa (K 250), slum (12 ± 2) cm, w/c = 0.56
A. A.4.1.1.9 1 m³ Membuat beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53
6 A. A.4.1.1.10 1 m³ Membuat beton mutu fc=26.4 Mpa (K 300), slum (12 ± 2) cm, w/c = 0.52
-
Bahan
Portland Cement 413.000 kg
Pasir Beton 681.000 kg
Kerikil (maksimum 30 mm) 1,021.000 kg
Air 215.000 Liter
Tenaga Kerja
Pekerja 1.650 org/hr
Tukang Batu 0.275 org/hr
Kepala Tukang 0.028 org/hr
Mandor 0.083 org/hr
A. A.4.1.1.10 1 m³ Membuat beton mutu fc=26.4 Mpa (K 300), slum (12 ± 2) cm, w/c = 0.52
Pembesian tiap 10 kg
A. A.4.1.1.17 1 kg Pembesian tiap 1 kg
Bahan:
Pembesian tiap 10 kg
A. A.4.1.1.17 1 kg Pembesian tiap 1 kg
6 7 8
763,261.07
1,553.78 357,369.40
198.00 176,814.00
193.84 199,077.67
150.00 30,000.00
173,640.00
108,000.00 129,600.00
150,000.00 30,000.00
162,000.00 3,240.00
180,000.00 10,800.00
Jumlah : 936,901.07
Overhead & keuntungan 10% : 93,690.11
Jumlah : 1,030,591.00
831,527.73
1,553.78 440,683.08
198.00 162,114.48
193.84 196,480.17
150.00 32,250.00
238,926.00
108,000.00 178,200.00
150,000.00 41,250.00
162,000.00 4,536.00
180,000.00 14,940.00
Jumlah : 1,070,453.73
Overhead & keuntungan 10% : 107,045.37
Jumlah : 1,177,499.00
889,166.76
1,553.78 507,037.26
198.00 150,408.32
193.84 199,471.18
150.00 32,250.00
238,926.00
108,000.00 178,200.00
150,000.00 41,250.00
162,000.00 4,536.00
180,000.00 14,940.00
Jumlah : 1,128,092.76
Overhead & keuntungan 10% : 112,809.28
Jumlah : 1,240,902.00
967,321.32
1,553.78 596,651.52
198.00 137,016.00
193.84 201,403.80
150.00 32,250.00
238,926.00
108,000.00 178,200.00
150,000.00 41,250.00
162,000.00 4,536.00
A.A.4.1.1 Pek.Beton / HAL 73 DARI 236
HARGA STUAN SUB. Jumlah : JUMLAH
6 7 8
180,000.00 14,940.00
Jumlah : 1,206,247.32
Overhead & keuntungan 10% : 120,624.73
Jumlah : 1,326,872.05
Dibulatkan : Rp 1,326,800.00
6 7 8
997,400.51
1,553.78 630,834.68
198.00 135,432.00
193.84 198,883.83
150.00 32,250.00
238,926.00
108,000.00 178,200.00
150,000.00 41,250.00
162,000.00 4,536.00
180,000.00 14,940.00
Jumlah : 1,236,326.51
Overhead & keuntungan 10% : 123,632.65
Jumlah : 1,359,959.16
Dibulatkan : Rp 1,359,900.00
1,006,713.75
1,553.78 641,711.14
198.00 134,838.00
193.84 197,914.61
150.00 32,250.00
238,926.00
108,000.00 178,200.00
150,000.00 41,250.00
162,000.00 4,536.00
180,000.00 14,940.00
Jumlah : 1,245,639.75
Overhead & keuntungan 10% : 124,563.98
Jumlah : 1,370,203.73
Dibulatkan : Rp 1,370,200.00
6 7 8
1,179,240.00
1,044,000.00 1,096,200.00
78,000.00 78,000.00
6,300.00 5,040.00
44,340.00
108,000.00 27,000.00
150,000.00 15,000.00
162,000.00 1,620.00
180,000.00 720.00
Jumlah : 1,223,580.00
Overhead & keuntungan 10% : 122,358.00
Jumlah : 1,345,938.00
Dibulatkan : Rp 1,345,900.00
1,186,800.00
1,050,000.00 1,102,500.00
78,000.00 78,000.00
6,300.00 6,300.00
44,340.00
108,000.00 27,000.00
150,000.00 15,000.00
162,000.00 1,620.00
180,000.00 720.00
Jumlah : 1,231,140.00
Overhead & keuntungan 10% : 123,114.00
Jumlah : 1,354,254.00
Dibulatkan : Rp 1,354,200.00
1,256,100.00
1,116,000.00 1,171,800.00
78,000.00 78,000.00
6,300.00 6,300.00
44,340.00
108,000.00 27,000.00
150,000.00 15,000.00
162,000.00 1,620.00
180,000.00 720.00
Jumlah : 1,300,440.00
Overhead & keuntungan 10% : 130,044.00
Jumlah : 1,430,484.00
Dibulatkan : Rp 1,430,400.00
1,281,300.00
1,140,000.00 1,197,000.00
78,000.00 78,000.00
6,300.00 6,300.00
44,340.00
108,000.00 27,000.00
150,000.00 15,000.00
162,000.00 1,620.00
180,000.00 720.00
Jumlah : 1,325,640.00
Overhead & keuntungan 10% : 132,564.00
Jumlah : 1,458,204.00
Dibulatkan : Rp 1,458,200.00
1,306,500.00
1,164,000.00 1,222,200.00
78,000.00 78,000.00
A.A.4.1.1 Pek.Beton / HAL 76 DARI 236
HARGA STUAN SUB. Jumlah : JUMLAH
6 7 8
6,300.00 6,300.00
44,340.00
108,000.00 27,000.00
150,000.00 15,000.00
162,000.00 1,620.00
180,000.00 720.00
Jumlah : 1,350,840.00
Overhead & keuntungan 10% : 135,084.00
Jumlah : 1,485,924.00
Dibulatkan : Rp 1,485,900.00
1,394,700.00
1,248,000.00 1,310,400.00
78,000.00 78,000.00
6,300.00 6,300.00
44,340.00
108,000.00 27,000.00
150,000.00 15,000.00
162,000.00 1,620.00
180,000.00 720.00
Jumlah : 1,439,040.00
Overhead & keuntungan 10% : 143,904.00
Jumlah : 1,582,944.00
Dibulatkan : Rp 1,582,900.00
6 7 8
85,224.30
81,166.00 85,224.30
12,006.00
108,000.00 6,480.00
150,000.00 4,500.00
162,000.00 486.00
180,000.00 540.00
Jumlah : 97,230.30
Overhead & keuntungan 10% : 9,723.03
Jumlah : 106,953.33
Dibulatkan : Rp 106,900.00
96,762.75
92,155.00 96,762.75
14,178.00
108,000.00 7,560.00
150,000.00 5,250.00
162,000.00 648.00
180,000.00 720.00
Jumlah : 110,940.75
Overhead & keuntungan 10% : 11,094.08
Jumlah : 122,034.83
Dibulatkan : Rp 122,000.00
126,033.60
120,032.00 126,033.60
16,008.00
108,000.00 8,640.00
150,000.00 6,000.00
162,000.00 648.00
180,000.00 720.00
Jumlah : 142,041.60
Overhead & keuntungan 10% : 14,204.16
Jumlah : 156,245.76
Dibulatkan : Rp 156,200.00
109,080.00
10,080.00 105,840.00
21,600.00 3,240.00
19,914.00
108,000.00 7,560.00
150,000.00 10,500.00
162,000.00 1,134.00
180,000.00 720.00
Jumlah : 128,994.00
Overhead & keuntungan 10% : 12,899.40
Jumlah : 141,893.40
Dibulatkan : 141,900.00
Jumlah : Rp 14,190.00
40,778.40
33,840.00 34,178.40
66,000.00 6,600.00
23,940.00
108,000.00 10,800.00
150,000.00 11,250.00
6 7 8
162,000.00 1,215.00
180,000.00 675.00
Jumlah : 64,718.40
Overhead & keuntungan 10% : 6,471.84
Jumlah : 71,190.24
Dibulatkan : Rp 71,100.00
51,928.80
44,880.00 45,328.80
66,000.00 6,600.00
23,940.00
108,000.00 10,800.00
150,000.00 11,250.00
162,000.00 1,215.00
180,000.00 675.00
Jumlah : 75,868.80
Overhead & keuntungan 10% : 7,586.88
Jumlah : 83,455.68
Dibulatkan : Rp 83,400.00
6 7 8
65,866.80
58,680.00 59,266.80
66,000.00 6,600.00
23,940.00
108,000.00 10,800.00
150,000.00 11,250.00
162,000.00 1,215.00
180,000.00 675.00
Jumlah : 89,806.80
Overhead & keuntungan 10% : 8,980.68
Jumlah : 98,787.48
Dibulatkan : Rp 98,700.00
101,499.60
93,960.00 94,899.60
66,000.00 6,600.00
23,940.00
108,000.00 10,800.00
150,000.00 11,250.00
162,000.00 1,215.00
180,000.00 675.00
Jumlah : 125,439.60
Overhead & keuntungan 10% : 12,543.96
Jumlah : 137,983.56
Dibulatkan : Rp 137,900.00
128,580.00
3,000,000.00 120,000.00
19,800.00 5,940.00
26,400.00 2,640.00
104,052.00
108,000.00 56,160.00
150,000.00 39,000.00
162,000.00 4,212.00
180,000.00 4,680.00
Jumlah : 232,632.00
Overhead & keuntungan 10% : 23,263.20
Jumlah : 255,895.20
Dibulatkan : Rp 255,800.00
143,580.00
3,000,000.00 135,000.00
19,800.00 5,940.00
26,400.00 2,640.00
104,052.00
108,000.00 56,160.00
150,000.00 39,000.00
162,000.00 4,212.00
180,000.00 4,680.00
Jumlah : 247,632.00
Overhead & keuntungan 10% : 24,763.20
Jumlah : 272,395.20
Dibulatkan : Rp 272,300.00
283,476.00
3,000,000.00 120,000.00
19,800.00 7,920.00
A.A.4.1.1 Pek.Beton / HAL 80 DARI 236
HARGA STUAN SUB. Jumlah : JUMLAH
6 7 8
26,400.00 5,280.00
3,000,000.00 45,000.00
129,360.00 45,276.00
30,000.00 60,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 415,542.00
Overhead & keuntungan 10% : 41,554.20
Jumlah : 457,096.20
Dibulatkan : Rp 457,000.00
6 7 8
148,338.00
3,000,000.00 60,000.00
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 22,500.00
129,360.00 22,638.00
30,000.00 30,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 280,404.00
Overhead & keuntungan 10% : 28,040.40
Jumlah : 308,444.40
Dibulatkan : Rp 308,400.00
167,049.00
3,000,000.00 60,000.00
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 22,500.00
236,280.00 41,349.00
30,000.00 30,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 299,115.00
Overhead & keuntungan 10% : 29,911.50
Jumlah : 329,026.50
Dibulatkan : Rp 329,000.00
292,476.00
3,000,000.00 120,000.00
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 54,000.00
129,360.00 45,276.00
30,000.00 60,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 424,542.00
Overhead & keuntungan 10% : 42,454.20
Jumlah : 466,996.20
Dibulatkan : Rp 466,900.00
152,838.00
3,000,000.00 60,000.00
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 27,000.00
129,360.00 22,638.00
30,000.00 30,000.00
A.A.4.1.1 Pek.Beton / HAL 82 DARI 236
HARGA STUAN SUB. Jumlah : JUMLAH
6 7 8
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 284,904.00
Overhead & keuntungan 10% : 28,490.40
Jumlah : 313,394.40
Dibulatkan : Rp 313,300.00
171,549.00
3,000,000.00 60,000.00
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 27,000.00
236,280.00 41,349.00
30,000.00 30,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 303,615.00
Overhead & keuntungan 10% : 30,361.50
Jumlah : 333,976.50
Dibulatkan : Rp 333,900.00
6 7 8
288,650.40
129,360.00 5,174.40
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 45,000.00
129,360.00 45,276.00
30,000.00 180,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 420,716.40
Overhead & keuntungan 10% : 42,071.64
Jumlah : 462,788.04
Dibulatkan : Rp 462,700.00
171,774.60
236,280.00 4,725.60
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 22,500.00
236,280.00 41,349.00
30,000.00 90,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 303,840.60
Overhead & keuntungan 10% : 30,384.06
Jumlah : 334,224.66
Dibulatkan : Rp 334,200.00
249,718.80
129,360.00 3,880.80
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 60,000.00
129,360.00 22,638.00
30,000.00 90,000.00
15,000.00 60,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 381,784.80
Overhead & keuntungan 10% : 38,178.48
Jumlah : 419,963.28
Dibulatkan : Rp 419,900.00
172,778.40
129,360.00 1,940.40
19,800.00 7,920.00
26,400.00 5,280.00
3,000,000.00 30,000.00
129,360.00 22,638.00
A.A.4.1.1 Pek.Beton / HAL 84 DARI 236
HARGA STUAN SUB. Jumlah : JUMLAH
6 7 8
30,000.00 45,000.00
15,000.00 60,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 304,844.40
Overhead & keuntungan 10% : 30,484.44
Jumlah : 335,328.84
Dibulatkan : Rp 335,300.00
166,036.80
129,360.00 3,880.80
19,800.00 7,920.00
26,400.00 3,960.00
3,000,000.00 45,000.00
129,360.00 45,276.00
30,000.00 60,000.00
132,066.00
108,000.00 71,280.00
150,000.00 49,500.00
162,000.00 5,346.00
180,000.00 5,940.00
Jumlah : 298,102.80
Overhead & keuntungan 10% : 29,810.28
Jumlah : 327,913.08
Dibulatkan : Rp 327,900.00
6 7 8
57,392.59
3,000,000.00 6,000.00
19,800.00 198.00
10,080.00 30,240.00
21,600.00 9,936.00
1,553.78 6,215.12
277,200.00 1,663.20
348,919.00 3,140.27
31,032.00
108,000.00 19,440.00
150,000.00 3,000.00
150,000.00 3,000.00
150,000.00 3,000.00
162,000.00 972.00
180,000.00 1,620.00
Jumlah : 88,424.59
Overhead & keuntungan 10% : 8,842.46
Jumlah : 97,267.05
Dibulatkan : Rp 97,200.00
63,038.38
3,000,000.00 9,000.00
19,800.00 396.00
10,080.00 36,288.00
21,600.00 1,080.00
1,553.78 8,545.79
277,200.00 2,494.80
348,919.00 5,233.79
51,246.00
108,000.00 32,076.00
150,000.00 4,950.00
150,000.00 4,950.00
150,000.00 4,950.00
162,000.00 1,620.00
180,000.00 2,700.00
Jumlah : 114,284.38
Overhead & keuntungan 10% : 11,428.44
Jumlah : 125,712.81
Dibulatkan : Rp 125,700.00
10,339.80
3,500.00 3,675.00
33,074.00 6,614.80
2,500.00 50.00
22,656.00
108,000.00 8,640.00
150,000.00 12,000.00
162,000.00 1,296.00
180,000.00 720.00
Jumlah : 32,995.80
Overhead & keuntungan 10% : 3,299.58
Jumlah : 36,295.38
Dibulatkan : Rp 36,200.00
6 7 8
6 7 8
109,080.00
10,080.00 105,840.00
21,600.00 3,240.00
19,914.00
108,000.00 7,560.00
150,000.00 10,500.00
162,000.00 1,134.00
180,000.00 720.00
Jumlah : 128,994.00
A.A.4.1.1 Pek.Beton / HAL 88 DARI 236
HARGA STUAN SUB. Jumlah : JUMLAH
6 7 8
Overhead & keuntungan 10% : 12,899.40
Jumlah : 141,893.40
Dibulatkan : 141,900.00
Jumlah : Rp 14,190.00
4 1 m² Membuat Pintu Besi Plat Baja Tebal 2 mm Rangkap. Rangka Baja Siku
Bahan 519,540.00
Besi Siku L 30.30.3 15.0000 kg 10,800.00 162,000.00
Besi Plat Baja 32.8000 kg 10,800.00 354,240.00
Kawat Las 0.0500 kg 66,000.00 3,300.00
Tenaga Kerja 297,270.00
Pekerja 1.0500 org/hr 108,000.00 113,400.00
Tukang las 1.0500 org/hr 150,000.00 157,500.00
Kepala Tukang 0.1050 org/hr 162,000.00 17,010.00
Mandor 0.0520 org/hr 180,000.00 9,360.00
Jumlah 816,810.00
Overhead & keuntungan 10% : 81,681.00
Jumlah : 898,491.00
4 1 m² Membuat Pintu Besi Plat Baja Tebal 2 mm Rangkap. Rangka Baja Siku Dibulatkan : 898,400.00
Jumlah 39,211.00
5a 1 kg Memasang rangka kuda-kuda Baja IWF (Termasuk pengelasan dan perakitan) Dibulatkan : 39,200.00
5b 1 kg Memasang rangka kuda-kuda Baja C, UNP dan L ( Termasuk pengelasan dan perakitan )
Harga terpasang :
Analisa no.4 Besi Baja C, UNP dan L 1.0000 kg 32,300.00 32,300.00
Analisa no.3 Perakitan 1.0000 kg 1,241.00 1,241.00
Analisa no.5 Pengelasan 1.0000 cm 3,920.00 3,920.00
Jumlah 37,461.00
5b 1 kg Memasang rangka kuda-kuda Baja C, UNP dan L ( Termasuk pengelasan dan perakitan ) Dibulatkan : 37,400.00
Jumlah 37,281.00
5c 1 kg Memasang Plat baja ( Termasuk pengelasan dan perakitan ) Dibulatkan : 37,200.00
Jumlah 1,455,300.00
Overhead & keuntungan 10% : 145,530.00
Jumlah : 1,600,830.00
10 1 m² Memasang Rolling Door t=0.8mm + Motor penggerak Dibulatkan : 1,600,800.00
20 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
Bahan 189,000.00
Hollow 4 x 4 cm t=2mm
Assesoris 3.50 m' 27,000.00 94,500.00
(perkuatan, las dll) 100% x rangka 1.00 LS 94,500.00 94,500.00
Tenaga Kerja 70,350.00
Tukang 0.25 org/hr 150,000.00 37,500.00
Pekerja 0.25 org/hr 108,000.00 27,000.00
Kepala Tukang 0.03 org/hr 162,000.00 4,050.00
Mandor 0.01 org/hr 180,000.00 1,800.00
Jumlah 259,350.00
Overhead & keuntungan 10% : 25,935.00
Jumlah : 285,285.00
20 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi Dibulatkan : 285,200.00
20a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0.35mm, modul 60 x 120 cm, untuk partisi
Bahan 84,000.00
Hollow galvanises 4 x 4 cm
Assesoris 3.50 btg 12,000.00 42,000.00
(perkuatan, las dll) 100% x rangka 1.00 LS 42,000.00 42,000.00
Tenaga Kerja 70,350.00
Tukang 0.25 org/hr 150,000.00 37,500.00
Pekerja 0.25 org/hr 108,000.00 27,000.00
Kepala Tukang 0.03 org/hr 162,000.00 4,050.00
Mandor 0.01 org/hr 180,000.00 1,800.00
Jumlah 154,350.00
Overhead & keuntungan 10% : 15,435.00
Jumlah : 169,785.00
20a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0.35mm, modul 60 x 120 cm, untuk partis Dibulatkan : 169,700.00
21a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond
Bahan 96,000.00
Hollow galpanis 4 x 4 cm t=0.35mm
Assesoris 4.00 m' 12,000.00 48,000.00
(perkuatan, las dll) 100% x rangka 1.00 LS 48,000.00 48,000.00
Tenaga Kerja 70,350.00
Tukang 0.25 org/hr 150,000.00 37,500.00
Pekerja 0.25 org/hr 108,000.00 27,000.00
Kepala Tukang 0.03 org/hr 162,000.00 4,050.00
Mandor 0.01 org/hr 180,000.00 1,800.00
Jumlah 166,350.00
Overhead & keuntungan 10% : 16,635.00
Jumlah : 182,985.00
21a 1 m² Pemasangan 1 m2 rangka besi hollow galpanis 1x40.40.0,35mm, modul 60 x 120 cm, untuk plap Dibulatkan : 182,900.00
21b 1 m² Pasang rangka metal furing BMSys ( Untuk ceilling panel 600 x 1200 )
Bahan 46,942.77
Bracket PN-220 / PN-221 1.04 pc(s) 1,440.00 1,497.60
Suspension Rod 2400mm PN-409 0.26 pc(s) 6,080.00 1,596.00
Suspension Clip Adjuster PN-410 1.04 pc(s) 4,640.00 4,825.60
Wall Angel 3000mm PN-408 0.13 pc(s) 30,560.00 4,073.65
Main Tee 3600mm PN-400 0.22 pc(s) 53,600.00 11,909.92
Cross Tee 600mm PN-401 - pc(s) 8,160.00 -
Cross Tee 1200mm PN-401 1.44 pc(s) 16,000.00 23,040.00
Tenaga Kerja 70,350.00
Tukang 0.25 org/hr 150,000.00 37,500.00
Pekerja 0.25 org/hr 108,000.00 27,000.00
Kepala Tukang 0.03 org/hr 162,000.00 4,050.00
Mandor 0.01 org/hr 180,000.00 1,800.00
Jumlah 117,292.77
Overhead & keuntungan 10% : 11,729.28
Jumlah : 129,022.04
21b 1 m² Pasang rangka metal furing BMSys ( Untuk ceilling panel 600 x 1200 ) Dibulatkan : 129,000.00
Jumlah 2,363,737.64
Overhead & keuntungan 10% : 236,373.76
Dibulatkan : 2,600,111.40
23 1 m1 Railling tangga dari kaca dengan hand railling kayu Dibulatkan : 2,600,100.00
Jumlah 1,196,306.15
Overhead & keuntungan 10% : 119,630.62
Jumlah : 1,315,936.77
24 1 m1 Railling tangga dari pipa Stainles Dibulatkan : 1,315,900.00
Jumlah 862,760.80
Overhead & keuntungan 10% : 86,276.08
Jumlah : 949,036.88
3. finishing cat duco 0.837 m2 282,540.00 236,432.30
25 1 m1 Railling tangga tipe dari pipa BSP Dibulatkan : 1,185,400.00
Jumlah 560,121.30
Overhead & keuntungan 10% : 56,012.13
Jumlah : 616,133.43
27 1 Unit Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) :
Partisi cubical lengkap : 1 unit 6,512,640.00 6,512,640.00
- Partisi Phenolic resin Board ex. D'CUBICS
tebal 12mm, (100% kedap air )
- Pintu Phenolic resin Board ex. D'CUBICS uk.
800x1800x12 mm,(100% kedap air )
- Door hardware stainless steel accessories
- Rangka frame alumunium N/A
- Kaki pedestal dan Screw conection stainless
steel
Jumlah 6,512,640.00
Overhead & keuntungan 10% : 651,264.00
Jumlah : 7,163,904.00
27 1 Unit Partisi cubical toilet lengkap daun pintu berikut Accessories ( terpasang ) : Dibulatkan : 7,163,900.00
Jumlah 1,638,478.00
Overhead & keuntungan 10% : 163,847.80
Jumlah : 1,802,325.80
30 1 m² Pekerjaan Alumunium Composite Panel Exterior Dibulatkan : 1,802,300.00
Jumlah 1,485,388.00
Overhead & keuntungan 10% : 148,538.80
Jumlah : 1,633,926.80
30a 1 m² Pekerjaan Alumunium Composite Panel Interior Dibulatkan : 1,633,900.00
32 1m 1
Grill stainless stell l=350
1. Bahan : Plat stainless stell t=3mm 0.468 m2 1,266,433.00 592,057.43 625,057.43
Dinabolt Ø 12 m 2.500 bh 6,500.00 16,250.00
Kawat las stainlees 0.250 kg 67,000.00 16,750.00
2. Upah : Upah pembuatan & pemasangan 398,160.00
Kepala Tukang 0.120 hari 108,000.00 12,960.00
Tukang Las 1.200 hari 150,000.00 180,000.00
Pekerja 1.200 hari 162,000.00 194,400.00
Mandor 0.060 hari 180,000.00 10,800.00
Jumlah 1,023,217.43
Overhead & keuntungan 10% : 102,321.74
Jumlah : 1,125,539.17
32 1 m1 Grill stainless stell l=350 Dibulatkan : 1,125,500.00
Jumlah 1,518,045.00
Overhead & keuntungan 10% : 151,804.50
Jumlah : 1,669,849.50
33 1 m' Handrail Bar tipe BR-1200 setara Pawling Dibulatkan : 1,669,800.00
Jumlah Rp 408,060.00
Overhead & keuntungan 10% : 40,806.00
Jumlah : Rp 448,866.00
34 1 m2 Pasang Buffer plate / Kicking plate Stainless stell Hairline Dibulatkan : Rp 448,800.00
Jumlah Rp 108,348.00
Overhead & keuntungan 10% : 10,834.80
Jumlah : Rp 119,182.80
36 1 m1 pasang Memasang "U" Channel Stainless Steel Uk 3x3cm Dibulatkan : Rp 119,100.00
Jumlah Rp 3,704,000.00
Overhead & keuntungan 10% : 370,400.00
Jumlah : Rp 4,074,400.00
37 1 unit Memasang tangga monyet dari pipa Stainless steel t=±5m Dibulatkan : Rp 4,074,400.00
Jumlah Rp 37,245,045.73
Overhead & keuntungan 10% : 3,724,504.57
Jumlah : Rp 40,969,550.31
38 1 unit Pintu gerbang Dibulatkan : Rp 40,969,500.00
Jumlah Rp 15,081,600.00
Overhead & keuntungan 10% : 1,508,160.00
Jumlah : Rp 16,589,760.00
39 1 unit Type P.1 Kusen berikut daun pintu baja & accessories setara Bostinco Dibulatkan : Rp 16,589,700.00
40 1 unit Type P.2 Kusen berikut daun pintu baja & accessories setara Bostinco
Terpasang Pintu baja double fire door finish cat anti karat,
Hardware setara Griff, Ukuran 2200 x 1900 setara
Bostinco ( Harga Terpasang ) 1.000 unit 18,688,800.00 18,688,800.00 Rp 18,688,800.00
Jumlah Rp 18,688,800.00
Overhead & keuntungan 10% : 1,868,880.00
Jumlah : Rp 20,557,680.00
40 1 unit Type P.2 Kusen berikut daun pintu baja & accessories setara Bostinco Dibulatkan : Rp 20,557,600.00
41 1 unit Tipe P.3 Pintu baja double fire door finish cat anti karat, Hardware setara Griff
Terpasang Pintu baja double steel door finish cat anti karat,
Hardware setara Griff, Ukuran 2100 x 1800 setara
Bostinco ( Harga Terpasang ) 1.000 unit 17,705,178.00 17,705,178.00 Rp 17,705,178.00
Jumlah Rp 17,705,178.00
Overhead & keuntungan 10% : 1,770,517.80
Jumlah : Rp 19,475,695.80
41 1 unit Tipe P.3 Pintu baja double fire door finish cat anti karat, Hardware setara Griff Dibulatkan : Rp 19,475,600.00
42 1 unit Tipe P.4 Pintu baja double fire door finish cat anti karat, Hardware setara Griff
Terpasang Pintu baja double steel door finish cat anti karat,
Hardware setara Griff, Ukuran 2200 x 1300 setara
Bostinco ( Harga Terpasang ) 1.000 unit 19,584,218.00 19,584,218.00 Rp 19,584,218.00
Jumlah Rp 19,584,218.00
Overhead & keuntungan 10% : 1,958,421.80
Jumlah : Rp 21,542,639.80
42 1 unit Tipe P.4 Pintu baja double fire door finish cat anti karat, Hardware setara Griff Dibulatkan : Rp 21,542,600.00
43 1 unit TipeP.5 Pintu baja single door finish cat anti karat, Hardware setara Griff, setara Bostinco
Terpasang Pintu single steel door finish cat anti karat, Hardware
setara Griff, Ukuran 900 x 2000 setara Bostinco
( Harga Terpasang ) 1.000 unit 7,266,000.00 7,266,000.00 Rp 7,266,000.00
Jumlah Rp 7,266,000.00
Overhead & keuntungan 10% : 726,600.00
Jumlah : Rp 7,992,600.00
43 1 unit TipeP.5 Pintu baja single door finish cat anti karat, Hardware setara Griff, setara Bostinco Dibulatkan : Rp 7,992,600.00
44 1 unit Tipe P.6 Kusen berikut Pintu baja double shaft steel door finish cat anti karat, Hardware setara Griff, setara Bostinco
Terpasang Pintu baja double shaft steel door finish cat anti
karat, Hardware setara Griff, Ukuran 1200 x 1200
setara Bostinco ( Harga Terpasang ) 1.000 unit 7,156,800.00 7,156,800.00 Rp 7,156,800.00
Jumlah Rp 7,156,800.00
Overhead & keuntungan 10% : 715,680.00
Jumlah : Rp 7,872,480.00
44 1 unit Tipe P.6 Kusen berikut Pintu baja double shaft steel door finish cat anti karat, Hardware setara G Dibulatkan : Rp 7,872,400.00
45 1 unit Tipe P.7 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hardware setara Griff, setara Bostinco
Terpasang Pintu baja single shaft steel door finish cat anti karat,
Hardware setara Griff, Ukuran 120 x 800 setara
Bostinco ( Harga Terpasang ) 1.000 unit 4,632,000.00 4,632,000.00 Rp 4,632,000.00
Jumlah Rp 4,632,000.00
Overhead & keuntungan 10% : 463,200.00
Jumlah : Rp 5,095,200.00
45 1 unit Tipe P.7 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hardware setara Gr Dibulatkan : Rp 5,095,200.00
46 1 unit Tangga servis tipe 1 tipe dari pipa BSP finish cat duco
1. Bahan : Tiang pipa BSP Ø 2 1/2" 21.516 m1 155,543.00 3,346,663.19 4,835,585.59
Injakan pipa BSP Ø 1 1/5" 13.200 m1 67,532.00 891,422.40
Dop tutup dudukan 14.000 bh 12,000.00 168,000.00
Dinabolt Ø 12 m 28.000 bh 6,500.00 182,000.00
Kawat las 3.750 kg 66,000.00 247,500.00
2. Upah : Upah pembuatan & pemasangan 991,200.00
Pekerja 3.500 hari 108,000.00 378,000.00
Tukang Las 3.500 hari 150,000.00 525,000.00
Kepala Tukang 0.350 hari 162,000.00 56,700.00
Mandor 0.175 hari 180,000.00 31,500.00
Jumlah 5,826,785.59
Overhead & keuntungan 10% : 582,678.56
Jumlah : 6,409,464.15
3. finishing cat duco 6.648 m2 282,540.00 1,878,399.15
Jumlah 4,368,278.98
Overhead & keuntungan 10% : 436,827.90
Jumlah : 4,805,106.88
3. finishing cat duco 5.089 m2 282,540.00 1,437,934.21
47 1 unit Tangga servis tipe 3 tipe dari pipa BSP finish cat duco Dibulatkan : 6,243,000.00
48 1 bh Manhole Pelat baja + rangka baja finish cat duco, ukuran 600x600
Bahan 410,851.14
Rangka siku 50x50x5mm 19.0159 kg 10,800.00 205,371.94
Plat baja t=3mm 8.4240 kg 10,800.00 90,979.20
Kawat las 0.750 kg 66,000.00 49,500.00
Dinabolt Ø 12 m 10.000 bh 6,500.00 65,000.00
Tenaga Kerja 424,800.00
Pekerja 1.5000 org/hr 108,000.00 162,000.00
Tukang las 1.5000 org/hr 150,000.00 225,000.00
Kepala Tukang 0.1500 org/hr 162,000.00 24,300.00
Mandor 0.0750 org/hr 180,000.00 13,500.00
Jumlah 835,651.14
Overhead & keuntungan 10% : 83,565.11
Jumlah : 919,216.25
3. finishing cat duco 0.720 m2 282,540.00 203,428.80
48 1 bh Manhole Pelat baja + rangka baja finish cat duco, ukuran 600x600 Dibulatkan : 1,122,600.00
49 1 m² Pemasangan 1 m2 pagar besi hollow 20x80x3,8 dan 20x80x2,2mm finish cat duco (Modul 2.40mx2.80m)
Harga terpasang 22,958,467.13
A.4.2.1 2.a Hollow 80x100x2,5mm 39.56 kg 32,300.00 1,277,917.20
A.4.2.1 2.a Baja U 75x40x5x7 4.80 kg 37,200.00 178,560.00
A.4.2.1 2.a Hollow 20x80x2,2mm 290.14 kg 45,800.00 13,288,228.80
A.4.2.1 2.a Hollow 20x80x3.8mm 28.64 kg 60,000.00 1,718,208.00
A.4.2.1 5 Pengelasan 181.57 cm 2,835.00 514,746.41
A.4.7.1 Finishing cat duco 21.17 m2 282,540.00 5,980,806.72
50 1 unit Tipe P.21 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hardware setara Griff, setara Bostinco
Terpasang Pintu baja single shaft steel door finish cat anti karat,
Hardware setara Griff, Ukuran 60 x 800 setara
Bostinco ( Harga Terpasang ) 1.000 unit 2,779,200.00 2,779,200.00 Rp 2,779,200.00
Jumlah Rp 2,779,200.00
Overhead & keuntungan 10% : 277,920.00
Jumlah : Rp 3,057,120.00
50 1 unit Tipe P.21 Kusen berikut Pintu baja single shaft steel door finish cat anti karat, Hardware setara G Dibulatkan : Rp 3,057,100.00
51 1 m² Pemasangan 1 m2 rangka besi hollow 50.50.2mm, modul 60 x 120 cm, untuk atap
Bahan 230,630.40
Hollow 5 x 5las
(perkuatan, cmdll)
t=2mm
30% x rangka 4.00 m' 44,352.00 177,408.00
1.00 LS 53,222.40 53,222.40
Tenaga Kerja 70,350.00
Tukang 0.25 org/hr 150,000.00 37,500.00
Pekerja 0.25 org/hr 108,000.00 27,000.00
Kepala Tukang 0.03 org/hr 162,000.00 4,050.00
Mandor 0.01 org/hr 180,000.00 1,800.00
Jumlah 300,980.40
Overhead & keuntungan 10% : 30,098.04
Jumlah : 331,078.44
Jumlah 874,191.35
Overhead & keuntungan 10% : 87,419.14
Jumlah : 961,610.49
52 1 m1 Railling pengaman curtain wall dari pipa Stainles Dibulatkan : 961,600.00
53 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm
Bahan 140,400.00
Hollow 4 x 4las
(perkuatan, cmdll)
t=2mm
30% x rangka 4.00 m' 27,000.00 108,000.00
1.00 LS 32,400.00 32,400.00
Tenaga Kerja 70,350.00
Tukang 0.25 org/hr 150,000.00 37,500.00
Pekerja 0.25 org/hr 108,000.00 27,000.00
Kepala Tukang 0.03 org/hr 162,000.00 4,050.00
Mandor 0.01 org/hr 180,000.00 1,800.00
Jumlah 210,750.00
Overhead & keuntungan 10% : 21,075.00
Jumlah : 231,825.00
53 1 m² Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm Dibulatkan : 231,800.00
0 1 M1 Pemasangan 1 m1 rangka besi hollow 1x40.40.2mm Dibulatkan : 104,310.00
2 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1PC : 3PP
Bahan 311,772.71
Bata Merah kelas 1 140.000 Buah 900.00 126,000.00
PC 32.950 kg 5,423.46 178,703.01
PP 0.091 m³ 77,689.00 7,069.70
Tenaga Kerja 103,440.00
Pekerja 0.600 org/hr 108,000.00 64,800.00
Tukang Batu 0.200 org/hr 150,000.00 30,000.00
Kepala Tukang 0.020 org/hr 162,000.00 3,240.00
Mandor 0.030 org/hr 180,000.00 5,400.00
Jumlah : 415,212.71
Overhead & keuntungan 10% : 41,521.27
Jumlah : 456,733.98
2 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1P Dibulatkan : 456,700.00
4 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1PC : 5PP
Bahan 254,325.09
Bata Merah kelas 1 140.000 Buah 900.00 126,000.00
PC 22.200 kg 5,423.46 120,400.81
PP 0.102 m³ 77,689.00 7,924.28
Tenaga Kerja 103,440.00
Pekerja 0.600 org/hr 108,000.00 64,800.00
Tukang Batu 0.200 org/hr 150,000.00 30,000.00
Kepala Tukang 0.020 org/hr 162,000.00 3,240.00
Mandor 0.030 org/hr 180,000.00 5,400.00
Jumlah : 357,765.09
Overhead & keuntungan 10% : 35,776.51
Jumlah : 393,541.60
4 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1 Bata. Campuran Spesi 1P Dibulatkan : 393,500.00
8 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 1PC : 3PP
Bahan 215,095.72
Bata Merah kelas 1 70.000 Buah 900.00 63,000.00
PC 14.370 kg 10,368.00 148,988.16
PP 0.040 m³ 77,689.00 3,107.56
Tenaga Kerja 51,720.00
Pekerja 0.300 org/hr 108,000.00 32,400.00
Tukang Batu 0.100 org/hr 150,000.00 15,000.00
Kepala Tukang 0.010 org/hr 162,000.00 1,620.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah : 266,815.72
Overhead & keuntungan 10% : 26,681.57
Jumlah : 293,497.29
8 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 1 Dibulatkan : 293,400.00
10 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 1PC : 5PP
Bahan 84,686.66
Bata Merah kelas 1 70.000 Buah 900.00 63,000.00
PC 9.680 kg 1,879.20 18,190.66
PP 0.045 m³ 77,689.00 3,496.01
Tenaga Kerja 51,720.00
Pekerja 0.300 org/hr 108,000.00 32,400.00
Tukang Batu 0.100 org/hr 150,000.00 15,000.00
Kepala Tukang 0.010 org/hr 162,000.00 1,620.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah : 136,406.66
Overhead & keuntungan 10% : 13,640.67
Jumlah : 150,047.33
10 1 m² Pasangan Dinding Bata Merah kelas 1 Uk.(5x11x22)cm Tebal 1/2 Bata. Campuran Spesi 1 Dibulatkan : 150,000.00
25 1 m2 Pasangan Dinding Bata ringan tebal 7.5cm dengan mortar siap pakai
Bahan 82,316.90
Bata ringan 0.084 m3 780,000.00 65,520.00
Sement / mortal 4.612 kg 3,642.00 16,796.90
Tenaga Kerja 39,258.00
Pekerja 0.210 org/hr 108,000.00 22,680.00
Tukang Batu 0.090 org/hr 150,000.00 13,500.00
Kepala Tukang 0.009 org/hr 162,000.00 1,458.00
Mandor 0.009 org/hr 180,000.00 1,620.00
Jumlah : 121,574.90
Overhead & keuntungan 10% : 12,157.49
Jumlah : 133,732.39
25 1 m2 Pasangan Dinding Bata ringan tebal 7.5cm dengan mortar siap pakai Dibulatkan harga per m3 : 133,730.00
26 1 m2 Pasangan Dinding Bata ringan tebal 10cm dengan mortar siap pakai
. Bahan 102,596.90
Bata ringan setara Hebel 0.110 m3 780,000.00 85,800.00
Sement / mortal 4.612 kg 3,642.00 16,796.90
Tenaga Kerja 65,430.00
Pekerja 0.350 org/hr 108,000.00 37,800.00
Tukang Batu 0.150 org/hr 150,000.00 22,500.00
Kepala Tukang 0.015 org/hr 162,000.00 2,430.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah : 168,026.90
Overhead & keuntungan 10% : 16,802.69
Jumlah : 184,829.59
26 1 m2 Pasangan Dinding Bata ringan tebal 10cm dengan mortar siap pakai Dibulatkan : 184,820.00
27 1 m3 Pasangan Dinding Bata ringan tebal 15cm dengan mortar siap pakai
Bahan 148,124.00
Bata ringan 0.165 m2 780,000.00 128,700.00
Sement / mortal 5.333 kg 3,642.00 19,424.00
Tenaga Kerja 65,430.00
Pekerja 0.350 org/hr 108,000.00 37,800.00
Tukang Batu 0.150 org/hr 150,000.00 22,500.00
Kepala Tukang 0.015 org/hr 162,000.00 2,430.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah : 213,554.00
Overhead & keuntungan 10% : 21,355.40
Jumlah : 234,909.40
27 1 m3 Pasangan Dinding Bata ringan tebal 15cm dengan mortar siap pakai Dibulatkan : 234,900.00
2 1 m² Plesteran 1 : 2 Tebal 15 mm
Bahan 21,429.85
Portland Cement 10.224 Kg 1,553.78 15,885.85
Pasir Pasang 0.020 m³ 277,200.00 5,544.00
Tenaga Kerja 54,630.00
Pekerja 0.300 org/hr 90,000.00 27,000.00
Tukang Batu 0.150 org/hr 150,000.00 22,500.00
Kepala Tukang 0.015 org/hr 162,000.00 2,430.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah 76,059.85
Overhead & keuntungan 10% : 7,605.98
Jumlah : 83,665.83
2 1 m² Plesteran 1 : 2 Tebal 15 mm Dibulatkan : 83,600.00
3 1 m² Plesteran 1 : 3 Tebal 15 mm
Bahan 18,457.79
Portland Cement 7.776 Kg 1,553.78 12,082.19
Pasir Pasang 0.023 m³ 277,200.00 6,375.60
Tenaga Kerja 54,630.00
Pekerja 0.300 org/hr 90,000.00 27,000.00
Tukang Batu 0.150 org/hr 150,000.00 22,500.00
Kepala Tukang 0.015 org/hr 162,000.00 2,430.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah 73,087.79
Overhead & keuntungan 10% : 7,308.78
Jumlah : 80,396.57
3 1 m² Plesteran 1 : 3 Tebal 15 mm Dibulatkan : 80,300.00
4 1 m² Plesteran 1 : 4 Tebal 15 mm
Bahan 16,348.39
Portland Cement 6.240 Kg 1,553.78 9,695.59
Pasir Pasang 0.024 m³ 277,200.00 6,652.80
Tenaga Kerja 54,630.00
Pekerja 0.300 org/hr 90,000.00 27,000.00
Tukang Batu 0.150 org/hr 150,000.00 22,500.00
Kepala Tukang 0.015 org/hr 162,000.00 2,430.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah 70,978.39
Overhead & keuntungan 10% : 7,097.84
Jumlah : 78,076.23
4 1 m² Plesteran 1 : 4 Tebal 15 mm Dibulatkan : 78,000.00
5 1 m² Plesteran 1 : 5 Tebal 15 mm
Bahan 15,262.00
Portland Cement 5.184 Kg 1,553.78 8,054.80
Pasir Pasang 0.026 m³ 277,200.00 7,207.20
Tenaga Kerja 54,630.00
Pekerja 0.300 org/hr 90,000.00 27,000.00
Tukang Batu 0.150 org/hr 150,000.00 22,500.00
Kepala Tukang 0.015 org/hr 162,000.00 2,430.00
Mandor 0.015 org/hr 180,000.00 2,700.00
Jumlah 69,892.00
Overhead & keuntungan 10% : 6,989.20
Jumlah : 76,881.20
5 1 m² Plesteran 1 : 5 Tebal 15 mm Dibulatkan : 76,800.00
13 1 m² Plesteran 1 : 2 Tebal 20 mm
Bahan 28,665.53
Portland Cement 13.632 Kg 1,553.78 21,181.13
Pasir Pasang 0.027 m³ 277,200.00 7,484.40
Tenaga Kerja 73,200.00
Pekerja 0.400 org/hr 90,000.00 36,000.00
Tukang Batu 0.200 org/hr 150,000.00 30,000.00
Kepala Tukang 0.020 org/hr 162,000.00 3,240.00
Mandor 0.022 org/hr 180,000.00 3,960.00
Jumlah 101,865.53
A.4.4.2.Pek.Plesteran / HAL 108 DARI 236
ANALISA HARGA SATUAN PEKERJAAN
NO. URAIAN KOEF SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
1 2 2 3 4.00 5.00 6.00
Overhead & keuntungan 10% : 10,186.55
Jumlah : 112,052.08
13 1 m² Plesteran 1 : 2 Tebal 20 mm Dibulatkan : 112,000.00
15 1 m² Plesteran 1 : 4 Tebal 20 mm
Bahan 21,797.85
Portland Cement 8.320 Kg 1,553.78 12,927.45
Pasir Pasang 0.032 m³ 277,200.00 8,870.40
Tenaga Kerja 73,200.00
Pekerja 0.400 org/hr 90,000.00 36,000.00
Tukang Batu 0.200 org/hr 150,000.00 30,000.00
Kepala Tukang 0.020 org/hr 162,000.00 3,240.00
Mandor 0.022 org/hr 180,000.00 3,960.00
Jumlah 94,997.85
Overhead & keuntungan 10% : 9,499.78
Jumlah : 104,497.63
15 1 m² Plesteran 1 : 4 Tebal 20 mm Dibulatkan : 104,400.00
16 1 m² Plesteran 1 : 5 Tebal 20 mm
Bahan 20,441.73
Portland Cement 6.912 Kg 1,553.78 10,739.73
Pasir Pasang 0.035 m³ 277,200.00 9,702.00
Tenaga Kerja 73,200.00
Pekerja 0.400 org/hr 90,000.00 36,000.00
Tukang Batu 0.200 org/hr 150,000.00 30,000.00
Kepala Tukang 0.020 org/hr 162,000.00 3,240.00
Mandor 0.022 org/hr 180,000.00 3,960.00
Jumlah 93,641.73
Overhead & keuntungan 10% : 9,364.17
Jumlah : 103,005.90
16 1 m² Plesteran 1 : 5 Tebal 20 mm Dibulatkan : 103,000.00
27 1 m² Finishing Acian
Bahan 5,049.79
Portland Cement 3.250 Kg 1,553.78 5,049.79
Tenaga Kerja 36,420.00
Pekerja 0.200 org/hr 90,000.00 18,000.00
Tukang Batu 0.100 org/hr 150,000.00 15,000.00
Kepala Tukang 0.010 org/hr 162,000.00 1,620.00
Mandor 0.010 org/hr 180,000.00 1,800.00
Jumlah 41,469.79
Overhead & keuntungan 10% : 4,146.98
Jumlah : 45,616.76
27 1 m² Finishing Acian Dibulatkan : 45,600.00
29 1 m² Finish Trowel
Bahan -
34a 1 m² Pasang Lantai keramik Ukuran (33 x 33)cm unpolished setara Roman Gol. C
Bahan 232,919.46
Keramik uk. 33x33cm Unpolished/Anti slip setara Roman 1.050 M2 187,200.00 196,560.00
PC 8.190 kg 1,553.78 12,725.46
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 0.500 kg 22,320.00 11,160.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 372,989.46
Overhead & keuntungan 10% : 37,298.95
Jumlah : 410,288.40
34a 1 m² Pasang Lantai keramik Ukuran (33 x 33)cm unpolished setara Roman Gol. C Dibulatkan : 410,200.00
35 1 m² Pasang Lantai Keramik Ukuran (30 x 30)cm polished setara Roman Gol. A
Bahan 168,951.80
Keramik uk. 30x30cm Polished/Glazed setara Roman 1.050 M2 123,600.00 129,780.00
PC 10.000 kg 1,553.78 15,537.80
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 0.500 kg 22,320.00 11,160.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 309,021.80
Overhead & keuntungan 10% : 30,902.18
Jumlah : 339,923.98
35 1 m² Pasang Lantai Keramik Ukuran (30 x 30)cm polished setara Roman Gol. A Dibulatkan : 339,900.00
35a 1 m² Pasang Lantai Keramik Ukuran (30 x 30) cm Unpolished/Anti slip setara Roman Gol. B
Bahan 201,225.44
Keramik uk. 30x30cm Unpolished/Anti slip 1.068 M2 130,800.00 139,733.64
PC 10.000 kg 1,553.78 15,537.80
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.500 kg 22,320.00 33,480.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 341,295.44
Overhead & keuntungan 10% : 34,129.54
Jumlah : 375,424.98
35a 1 m² Pasang Lantai Keramik Ukuran (30 x 30) cm Unpolished/Anti slip setara Roman Gol. B Dibulatkan : 375,400.00
36 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm setara Roman Gol. A
Bahan 169,573.31
Keramik uk. 20x20cm 1.050 m2 123,600.00 129,780.00
PC 10.400 kg 1,553.78 16,159.31
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 0.500 kg 22,320.00 11,160.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 309,643.31
Overhead & keuntungan 10% : 30,964.33
Jumlah : 340,607.64
36 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm setara Roman Gol. A Dibulatkan : 340,600.00
36a 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm Unpolised setara Roman Gol. B
Bahan 177,133.31
Keramik uk. 20x20cm Unpolised setara Roman Gol. B 1.050 m2 130,800.00 137,340.00
PC 10.400 kg 1,553.78 16,159.31
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 0.500 kg 22,320.00 11,160.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 317,203.31
Overhead & keuntungan 10% : 31,720.33
Jumlah : 348,923.64
36a 1 m² Pasang Lantai Keramik Ukuran (20 x 20) cm Unpolised setara Roman Gol. B Dibulatkan : 348,900.00
36b 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Polised Setara Roman Gol. A
Bahan 195,245.04
Keramik lantai 40 x 40 type Polised Gol. A 1.040 M2 133,200.00 138,528.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.300 kg 22,320.00 29,016.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 335,315.04
Overhead & keuntungan 10% : 33,531.50
Jumlah : 368,846.55
36b 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Polised Setara Roman Gol. A Dibulatkan : 368,800.00
36c 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Unpolised Setara Roman Gol. B
Bahan 202,733.04
Keramik lantai 40 x 40 type Unpolised Gol. B 1.040 M2 140,400.00 146,016.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.300 kg 22,320.00 29,016.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 342,803.04
Overhead & keuntungan 10% : 34,280.30
Jumlah : 377,083.35
36c 1 m² Pasang Lantai keramik Ukuran (40 x 40) cm Unpolised Setara Roman Gol. B Dibulatkan : 377,000.00
36d 1 m² Pasang Lantai keramik Ukuran (50 x 50) cm Polised Setara Roman Gol. A
Bahan 229,085.04
Keramik lantai 50 x 50 type Polised Gol. A 1.080 M2 159,600.00 172,368.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.300 kg 22,320.00 29,016.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 369,155.04
Overhead & keuntungan 10% : 36,915.50
Jumlah : 406,070.55
36d 1 m² Pasang Lantai keramik Ukuran (50 x 50) cm Polised Setara Roman Gol. A Dibulatkan : 406,000.00
36e 1 m² Pasang Lantai keramik Ukuran (60 x 60) cm Unpolised Setara Roman Gol. B
Bahan 239,453.04
Keramik lantai 50 x 50 type Unpolised Gol. B 1.080 M2 169,200.00 182,736.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.300 kg 22,320.00 29,016.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 379,523.04
Overhead & keuntungan 10% : 37,952.30
Jumlah : 417,475.35
36e 1 m² Pasang Lantai keramik Ukuran (60 x 60) cm Unpolised Setara Roman Gol. B Dibulatkan : 417,400.00
36f 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Bermotif
Bahan 497,357.04
Homogeneus 600 x 600 type Polished BERMOTIF 1.080 M2 408,000.00 440,640.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.300 kg 22,320.00 29,016.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 637,427.04
Overhead & keuntungan 10% : 63,742.70
Jumlah : 701,169.75
36f 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Bermotif Dibulatkan : 701,100.00
36g 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Matte Bermotif
Bahan 484,397.04
Homogeneus 600 x 600 type Matte BERMOTIF 1.080 M2 396,000.00 427,680.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.300 kg 22,320.00 29,016.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 624,467.04
Overhead & keuntungan 10% : 62,446.70
Jumlah : 686,913.75
36g 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Matte Bermotif Dibulatkan : 686,900.00
36h 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Polos
Bahan 497,357.04
Homogeneus 600 x 600 type Polished POLOS 1.080 M2 408,000.00 440,640.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.300 kg 22,320.00 29,016.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 637,427.04
Overhead & keuntungan 10% : 63,742.70
Jumlah : 701,169.75
36h 1 m² Pasang Lantai Homogenous Ukuran (60 x 60) cm setara Niro Granit Polished Polos Dibulatkan : 701,100.00
36i 1 m² Pasang Lantai Homogenous Ukuran (40 x 60) cm setara Niro Granit
Bahan 568,565.04
Homogeneus 400 x 800 type Polished 1.020 M2 504,000.00 514,080.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.200 kg 22,320.00 26,784.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 708,635.04
Overhead & keuntungan 10% : 70,863.50
Jumlah : 779,498.55
36i 1 m² Pasang Lantai Homogenous Ukuran (40 x 60) cm setara Niro Granit Dibulatkan : 779,400.00
36j 1 m² Pasang Lantai Homogenous Ukuran (60 x 120) cm setara Niro Granit
Bahan 663,605.04
Homogeneus 600 x 1200 type Matte 1.080 M2 564,000.00 609,120.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.200 kg 22,320.00 26,784.00
Tenaga Kerja 140,070.00
Pekerja 0.700 0rg/hr 108,000.00 75,600.00
Tukang Batu 0.350 0rg/hr 150,000.00 52,500.00
Kepala Tukang 0.035 0rg/hr 162,000.00 5,670.00
Mandor 0.035 0rg/hr 180,000.00 6,300.00
Jumlah 803,675.04
Overhead & keuntungan 10% : 80,367.50
Jumlah : 884,042.55
36j 1 m² Pasang Lantai Homogenous Ukuran (60 x 120) cm setara Niro Granit Dibulatkan : 884,000.00
37 1 m² Pasang Lantai Keramik Ukuran (10 x 33) cm. polished setara Roman Gol. A
Bahan 253,939.44
Keramik uk. 10x33cm 33.000 m2 3,900.00 128,700.00
PC 9.800 kg 1,553.78 15,227.04
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 4.370 kg 22,320.00 97,538.40
Tenaga Kerja 210,276.00
Pekerja 1.050 0rg/hr 108,000.00 113,400.00
Tukang Batu 0.525 0rg/hr 150,000.00 78,750.00
Kepala Tukang 0.053 0rg/hr 162,000.00 8,586.00
Mandor 0.053 0rg/hr 180,000.00 9,540.00
Jumlah 464,215.44
Overhead & keuntungan 10% : 46,421.54
Jumlah : 510,636.99
37 1 m² Pasang Lantai Keramik Ukuran (10 x 33) cm. polished setara Roman Gol. A Dibulatkan : 510,600.00
39 1 m' Pasang Plint Keramik Ukuran (10 x 20) cm polished setara Roman Gol. A
Bahan 15,880.91
Plint Keramik Artistik 5.300 buah 2,400.00 12,720.00
PC 1.140 kg 1,553.78 1,771.31
PP 0.003 M³ 277,200.00 831.60
Semen Warna 0.025 kg 22,320.00 558.00
Tenaga Kerja 25,578.00
Pekerja 0.090 0rg/hr 108,000.00 9,720.00
Tukang Batu 0.090 0rg/hr 150,000.00 13,500.00
Kepala Tukang 0.009 0rg/hr 162,000.00 1,458.00
Mandor 0.005 0rg/hr 180,000.00 900.00
Jumlah 41,458.91
Overhead & keuntungan 10% : 4,145.89
Jumlah : 45,604.80
39 1 m' Pasang Plint Keramik Ukuran (10 x 20) cm polished setara Roman Gol. A Dibulatkan : 45,600.00
39a 1 m' Pasang Plint Keramik Ukuran (10 x 30) cm polished setara Roman Gol. A
Bahan 16,160.91
Plint Keramik 10 x 30 3.333 buah 3,900.00 13,000.00
PC 1.140 kg 1,553.78 1,771.31
PP 0.003 M³ 277,200.00 831.60
Semen Warna 0.025 kg 22,320.00 558.00
Tenaga Kerja 25,578.00
Pekerja 0.090 0rg/hr 108,000.00 9,720.00
Tukang Batu 0.090 0rg/hr 150,000.00 13,500.00
Kepala Tukang 0.009 0rg/hr 162,000.00 1,458.00
Mandor 0.005 0rg/hr 180,000.00 900.00
Jumlah 41,738.91
Overhead & keuntungan 10% : 4,173.89
Jumlah : 45,912.80
39a 1 m' Pasang Plint Keramik Ukuran (10 x 30) cm polished setara Roman Gol. A Dibulatkan : 45,900.00
54f 1 m² Pasang Dinding Homogenous Ukuran (60 x 120 ) cm setara Niro Granit
Bahan 638,736.95
Homogeneus 600 x 1200 type Matte 1.008 M2 564,000.00 568,512.00
PC 9.300 kg 1,553.78 14,450.15
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.940 kg 22,320.00 43,300.80
Tenaga Kerja 180,090.00
Pekerja 0.900 0rg/hr 108,000.00 97,200.00
Tukang Batu 0.450 0rg/hr 150,000.00 67,500.00
Kepala Tukang 0.045 0rg/hr 162,000.00 7,290.00
Mandor 0.045 0rg/hr 180,000.00 8,100.00
Jumlah 818,826.95
Overhead & keuntungan 10% : 81,882.70
Jumlah : 900,709.65
54f 1 m² Pasang Dinding Homogenous Ukuran (60 x 120 ) cm setara Niro Granit Dibulatkan : 900,700.00
55 1 m' Pasang dinding Marmer Ukuran (slab ) setara Ujung Pandang
Bahan 1,058,367.02
Marmer slab Ujungpandang 1.060 M2 960,000.00 1,017,600.00
PC 12.440 kg 1,553.78 19,329.02
PP 0.025 M³ 277,200.00 6,930.00
Semen Warna 0.650 kg 22,320.00 14,508.00
Tenaga Kerja 260,130.00
Pekerja 1.300 0rg/hr 108,000.00 140,400.00
Tukang Batu 0.650 0rg/hr 150,000.00 97,500.00
Kepala Tukang 0.065 0rg/hr 162,000.00 10,530.00
Mandor 0.065 0rg/hr 180,000.00 11,700.00
Jumlah 1,318,497.02
Overhead & keuntungan 10% : 131,849.70
Jumlah : 1,450,346.73
55 1 m' Pasang dinding Marmer Ukuran (slab ) setara Ujung Pandang Dibulatkan : 1,450,300.00
55a 1 m' Pasang dinding Marmer Ukuran (60x60) cm setara Ujung Pandang
Bahan 676,767.02
Marmer 60 x 60 type Polised 1.060 M2 600,000.00 636,000.00
PC 12.440 kg 1,553.78 19,329.02
PP 0.025 M³ 277,200.00 6,930.00
Semen Warna 0.650 kg 22,320.00 14,508.00
Tenaga Kerja 260,130.00
Pekerja 1.300 0rg/hr 108,000.00 140,400.00
Tukang Batu 0.650 0rg/hr 150,000.00 97,500.00
Kepala Tukang 0.065 0rg/hr 162,000.00 10,530.00
Mandor 0.065 0rg/hr 180,000.00 11,700.00
Jumlah 936,897.02
Overhead & keuntungan 10% : 93,689.70
Jumlah : 1,030,586.73
55a 1 m' Pasang dinding Marmer Ukuran (60x60) cm setara Ujung Pandang Dibulatkan : 1,030,500.00
55b 1 m' Pasang dinding Granit alam slab setara India
Bahan 3,581,167.02
Granit macam-macam corak slab Luar Negeri (Nero India) 1.060 M2 3,340,000.00 3,540,400.00
PC 12.440 kg 1,553.78 19,329.02
PP 0.025 M³ 277,200.00 6,930.00
Semen Warna 0.650 kg 22,320.00 14,508.00
Tenaga Kerja 260,130.00
Pekerja 1.300 0rg/hr 108,000.00 140,400.00
Tukang Batu 0.650 0rg/hr 150,000.00 97,500.00
Kepala Tukang 0.065 0rg/hr 162,000.00 10,530.00
Mandor 0.065 0rg/hr 180,000.00 11,700.00
Jumlah 3,841,297.02
Overhead & keuntungan 10% : 384,129.70
Jumlah : 4,225,426.73
55b 1 m' Pasang dinding Granit alam slab setara India Dibulatkan : 4,225,400.00
55c 1 m' Pasang Marmer tangga Ukuran (slab ) setara Ujung Pandang
Bahan 1,058,367.02
Marmer slab Ujungpandang 1.060 M2 960,000.00 1,017,600.00
PC 12.440 kg 1,553.78 19,329.02
PP 0.025 M³ 277,200.00 6,930.00
Semen Warna 0.650 kg 22,320.00 14,508.00
Tenaga Kerja 390,195.00
Pekerja 1.950 0rg/hr 108,000.00 210,600.00
Tukang Batu 0.975 0rg/hr 150,000.00 146,250.00
Kepala Tukang 0.098 0rg/hr 162,000.00 15,795.00
Mandor 0.098 0rg/hr 180,000.00 17,550.00
Jumlah 1,448,562.02
Overhead & keuntungan 10% : 144,856.20
Jumlah : 1,593,418.23
55c 1 m' Pasang Marmer tangga Ukuran (slab ) setara Ujung Pandang Dibulatkan : 1,593,400.00
55c 1 m' Pasang step Marmer tangga Ukuran (slab ) setara Ujung Pandang (termasuk grooving dan bullnose)
Bahan 1,058,367.02
Marmer slab Ujungpandang 1.060 M2 960,000.00 1,017,600.00
PC 12.440 kg 1,553.78 19,329.02
PP 0.025 M³ 277,200.00 6,930.00
Semen Warna 0.650 kg 22,320.00 14,508.00
Tenaga Kerja ( termasuk upah grooving dan bullnose ) 780,390.00
Pekerja 3.900 0rg/hr 108,000.00 421,200.00
Tukang Batu 1.950 0rg/hr 150,000.00 292,500.00
Kepala Tukang 0.195 0rg/hr 162,000.00 31,590.00
Mandor 0.195 0rg/hr 180,000.00 35,100.00
Jumlah 1,838,757.02
Overhead & keuntungan 10% : 183,875.70
Jumlah : 2,022,632.73
55c 1 m' Pasang step Marmer tangga Ukuran (slab ) setara Ujung Pandang (termasuk grooving dan bullnose) Dibulatkan : 2,022,600.00
56 1 m2 Pasang dinding bata pelapis ukuran (3x7x24) cm
Bahan 245,139.02
Bata pelapis ukuran (3x7x24) cm 63.000 buah 2,500.00 157,500.00
PC 12.440 kg 1,553.78 19,329.02
PP 0.025 M³ 277,200.00 6,930.00
Semen Warna 2.750 kg 22,320.00 61,380.00
Tenaga Kerja 200,100.00
Pekerja 1.000 0rg/hr 108,000.00 108,000.00
Tukang Batu 0.500 0rg/hr 150,000.00 75,000.00
Kepala Tukang 0.050 0rg/hr 162,000.00 8,100.00
Mandor 0.050 0rg/hr 180,000.00 9,000.00
Jumlah 445,239.02
Overhead & keuntungan 10% : 44,523.90
Jumlah : 489,762.93
56 1 m2 Pasang dinding bata pelapis ukuran (3x7x24) cm Dibulatkan : 489,700.00
59 1 m2 Pasang Vinyl setara Forbo Sarlon Sparkling 15db t=2,6mm (Harga terpasang)
Bahan 1,077,052.20
Vinyl Forbo Sarlon Sparkling 15db t=2,6mm (Harga
1.050 M2 888,000.00 932,400.00
terpasang)
Instalasi Vinyl (Harga terpasang) 1.050 M2 72,764.00 76,402.20
Pemerataan lantai 1.050 M2 65,000.00 68,250.00
Jumlah 1,077,052.20
Overhead & keuntungan 10% : 107,705.22
Jumlah : 1,184,757.42
59 1 m2 Pasang Vinyl setara Forbo Sarlon Sparkling 15db t=2,6mm (Harga terpasang) Dibulatkan : 1,184,700.00
60 1 m2 Pasang wall paper, lebar 50cm
Bahan 244,753.60
Wall paper 1.200 M' 191,834.00 230,200.80
Lem 0.200 kg 72,764.00 14,552.80
Tenaga Kerja 35,850.00
Pekerja 0.020 0rg/hr 108,000.00 2,160.00
Tukang Batu 0.200 0rg/hr 150,000.00 30,000.00
Kepala Tukang 0.020 0rg/hr 162,000.00 3,240.00
Mandor 0.003 0rg/hr 180,000.00 450.00
Jumlah 280,603.60
Overhead & keuntungan 10% : 28,060.36
Jumlah : 308,663.96
60 1 m2 Pasang wall paper, lebar 50cm Dibulatkan : 308,600.00
63 1 m' Pasang plin plin kayu Kamper Samarinda ukuran ( t=2cm x l=10 )
Bahan 40,144.80
Papan kayu Kamper Samarinda 0.003 M3 12,600,000.00 37,800.00
Sekrup+piser 0.050 kg 46,896.00 2,344.80
Tenaga Kerja 33,984.00
Pekerja 0.120 0rg/hr 108,000.00 12,960.00
Tukang Batu 0.120 0rg/hr 150,000.00 18,000.00
Kepala Tukang 0.012 0rg/hr 162,000.00 1,944.00
Mandor 0.006 0rg/hr 180,000.00 1,080.00
Jumlah 74,128.80
Overhead & keuntungan 10% : 7,412.88
Jumlah : 81,541.68
63 1 m' Pasang plin vinyl dengan perekat Dibulatkan : 81,500.00
72 1 m' Pasang Step tile Keramik Ukuran (30 x 30) cm setara Roman
Bahan 299,751.54
Step tile Keramik Ukuran (30 x 30) cm setara Roman 3.333 buah 86,400.00 288,000.00
PC 3.000 kg 1,553.78 4,661.34
PP 0.014 M³ 277,200.00 3,742.20
Semen Warna 0.150 kg 22,320.00 3,348.00
Tenaga Kerja 42,021.00
Pekerja 0.210 0rg/hr 108,000.00 22,680.00
Tukang Batu 0.105 0rg/hr 150,000.00 15,750.00
Kepala Tukang 0.011 0rg/hr 162,000.00 1,701.00
Mandor 0.011 0rg/hr 180,000.00 1,890.00
Jumlah 341,772.54
Overhead & keuntungan 10% : 34,177.25
Jumlah : 375,949.79
72 1 m' Pasang Step tile Keramik Ukuran (30 x 30) cm setara Roman Dibulatkan : 375,900.00
73 1 M² Screeding tebal 3 cm
Bahan 33,185.23
Semen 0.288 zak 77,689.00 22,374.43
Pasir beton 0.039 m³ 277,200.00 10,810.80
Tenaga Kerja 40,020.00
Tukang Batu 0.100 org/hr 150,000.00 15,000.00
Kepala Tukang 0.010 org/hr 162,000.00 1,620.00
Pekerja 0.200 org/hr 108,000.00 21,600.00
Mandor 0.010 org/hr 180,000.00 1,800.00
Jumlah 73,205.23
Overhead & keuntungan 10% : 7,320.52
Jumlah : 80,525.76
73 1 M² Screeding tebal 3 cm Dibulatkan : 80,500.00
74 1 M² Water profing coating
Bahan 62,030.00
Pre treatment/cleaning 1.050 m² 3,000.00 3,150.00
Curbing sudut 0.400 m' 2,500.00 1,000.00
Water profing ex. Sika Top 107 Seal ( 3 kali lapis ) 1.000 m² 55,000.00 55,000.00
Kuas 0.200 bh 14,400.00 2,880.00
Tenaga Kerja 45,840.00
Tukang Batu 0.200 org/hr 150,000.00 30,000.00
Kepala Tukang 0.020 org/hr 162,000.00 3,240.00
Pekerja 0.100 org/hr 108,000.00 10,800.00
Mandor 0.010 org/hr 180,000.00 1,800.00
Jumlah 107,870.00
Overhead & keuntungan 10% : 10,787.00
Jumlah : 118,657.00
74 1 M² Water profing coating Dibulatkan : 118,600.00
54g 1 m² Pasang Dinding Keramik Ukuran (30 x 30) cm polished setara Roman Gol. B
Bahan 200,004.95
Keramik Ukuran (30 x 30) cm polished setara Roman Gol. B 1.050 M2 123,600.00 129,780.00
PC 9.300 kg 1,553.78 14,450.15
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.940 kg 22,320.00 43,300.80
Tenaga Kerja 180,090.00
Pekerja 0.900 0rg/hr 108,000.00 97,200.00
Tukang Batu 0.450 0rg/hr 150,000.00 67,500.00
Kepala Tukang 0.045 0rg/hr 162,000.00 7,290.00
Mandor 0.045 0rg/hr 180,000.00 8,100.00
Jumlah 380,094.95
Overhead & keuntungan 10% : 38,009.50
Jumlah : 418,104.45
54g 1 m² Pasang Dinding Keramik Ukuran (30 x 30) cm polished setara Roman Gol. B Dibulatkan : 418,100.00
54h 1 m² Pasang Dinding Keramik Ukuran (50 x 50) cm polished setara Roman Gol. B
Bahan 247,884.95
Keramik Ukuran (50 x 50) cm polished setara Roman Gol. B 1.050 M2 169,200.00 177,660.00
PC 9.300 kg 1,553.78 14,450.15
PP 0.045 M³ 277,200.00 12,474.00
Semen Warna 1.940 kg 22,320.00 43,300.80
Tenaga Kerja 180,090.00
Pekerja 0.900 0rg/hr 108,000.00 97,200.00
Tukang Batu 0.450 0rg/hr 150,000.00 67,500.00
Kepala Tukang 0.045 0rg/hr 162,000.00 7,290.00
Mandor 0.045 0rg/hr 180,000.00 8,100.00
Jumlah 427,974.95
Overhead & keuntungan 10% : 42,797.50
Jumlah : 470,772.45
54h 1 m² Pasang Dinding Keramik Ukuran (50 x 50) cm polished setara Roman Gol. B Dibulatkan : 470,700.00
55 1 m² Raised floor bolted stringe steel cementitious understructure type + finis HPL
Terpasang 2,016,000.00
Raised floor bolted stringe steel cementitious understructure typ 1.050 M2 1,920,000.00 2,016,000.00
Jumlah 2,016,000.00
Overhead & keuntungan 10% : 201,600.00
Jumlah : 2,217,600.00
55 1 m² Raised floor bolted stringe steel cementitious understructure type + finis HPL Dibulatkan : 2,217,600.00
Jumlah 1,853,995.50
Overhead & keuntungan 10% : 185,399.55
Jumlah : 2,039,395.05
56 1 m² Raised floor 600x600x35 mm, 700 mm Finished Floor High (FFH) Dibulatkan : 2,039,300.00
1 2 3 4 5 6 7
A.4.5.2 PEKERJAAN PENUTUP ATAP
41a 1 m2 Pasang atap Zinc Allumunium Kiplok CB. 0.50 TCT Colorbond
a. Bahan: 299,803.65
Rangka alumunium hollow 33x38x1mm, MF, brack 1.0500 m2 279,813.00 293,803.65
Paku hak panjang 15 cm 0.2000 kg 30,000.00 6,000.00
b. Upah: 50,280.00
Kepala Tukang las 0.0100 hari 108,000.00 1,080.00
Tukang las 0.1000 hari 150,000.00 15,000.00
Pekerja 0.2000 hari 162,000.00 32,400.00
Mandor 0.0100 hari 180,000.00 1,800.00
Jumlah 350,083.65
Overhead & keuntungan 10% : 35,008.37
Jumlah : 385,092.02
41a 1 m2 Pasang atap Zinc Allumunium Kiplok CB. 0.50 TCT Colorbond Dibulatkan : 385,000.00
Jumlah 325,003.20
Overhead & keuntungan 10% : 32,500.32
Jumlah : 357,503.52
42.a 1 m1 Ridge capping 0.45 TCT Zincalume 940 Width Dibulatkan : 357,500.00
1 2 3 4 5 6 7
42.b 1 m1 Longtudinat pascia capping 0.45mm TCT
1 Bahan 109,950.00
Longitudinal fascia Capping - 0.45 TCT colorbo 1.200 m1 90,625.00 108,750.00
Paku hak panjang 15 cm 0.040 kg 30,000.00 1,200.00
2 Tenaga 186,000.00
Pekerja 0.100 oh 108,000.00 10,800.00
Tukang kayu 1.000 oh 150,000.00 150,000.00
Kepala tukang 0.100 oh 162,000.00 16,200.00
Mandor 0.050 oh 180,000.00 9,000.00
Jumlah 295,950.00
Overhead & keuntungan 10% : 29,595.00
Jumlah : 325,545.00
42.b 1 m1 Longtudinat pascia capping 0.45mm TCT Dibulatkan : 325,500.00
43 1 m2 Pemasangan alumunium foil/sisalation Setara Primary Smart Foam 6.5 mm
1 Bahan 177,254.70
Alumunium foil Setara Primary Smart Foam
1.050 m2
6.5 mm 168,814.00 177,254.70
2 Tenaga 20,550.00
Pekerja 0.100 oh 108,000.00 10,800.00
Tukang kayu 0.050 oh 150,000.00 7,500.00
Kepala tukang 0.005 oh 162,000.00 810.00
Mandor 0.008 oh 180,000.00 1,440.00
Jumlah 197,804.70
Overhead & keuntungan 10% : 19,780.47
Jumlah : 217,585.17
43 1 m2 Pemasangan alumunium foil/sisalation Setara Primary Smart Foam 6.5 mm Dibulatkan : 217,500.00
44 1 m1 Gutter 0.50 TCT zincalume
1 Bahan 270,883.20
- Talang U 1230 Zincalume t=0.50mm 1.050 m' 257,984.00 270,883.20
2 Tenaga 20,550.00
Pekerja 0.100 oh 108,000.00 10,800.00
Tukang kayu 0.050 oh 150,000.00 7,500.00
Kepala tukang 0.005 oh 162,000.00 810.00
Mandor 0.008 oh 180,000.00 1,440.00
Jumlah 291,433.20
Overhead & keuntungan 10% : 29,143.32
Jumlah : 320,576.52
44 1 m1 Gutter 0.50 TCT zincalume Dibulatkan : 320,500.00
45 1 m1 Talang Vertikal Pralon D 1 1/2"
a. Bahan: 7,684.27
Pralon Ø 1 1/2" setara AW 0.2750 btg 24,362.50 6,699.69
Sambungan Pelengkap (15% harga pralon) 0.1000 ls 3,654.38 365.44
Lem PVC 0.0200 kg 30,957.00 619.14
b. Upah: 13,050.00
Tukang pipa 0.0750 hari 150,000.00 11,250.00
Mandor 0.0100 hari 180,000.00 1,800.00
Jumlah 20,734.27
Overhead & keuntungan 10% : 2,073.43
Jumlah : 22,807.69
45 1 m1 Talang Vertikal Pralon D 1 1/2" Dibulatkan : 22,800.00
46 1 m1 Talang Vertikal Pralon D 2"
a. Bahan: 10,816.85
Pralon Ø 2" setara AW 0.2750 btg 35,164.50 9,670.24
Sambungan Pelengkap (15% harga pralon) 0.1000 ls 5,274.68 527.47
Lem PVC 0.0200 kg 30,957.00 619.14
b. Upah: 13,050.00
Tukang pipa 0.0750 hari 150,000.00 11,250.00
Mandor 0.0100 hari 180,000.00 1,800.00
Jumlah 23,866.85
Overhead & keuntungan 10% : 2,386.68
Jumlah : 26,253.53
46 1 m1 Talang Vertikal Pralon D 2" Dibulatkan : 26,200.00
1 2 3 4 5 6 7
47 1 m1 Talang Vertikal Pralon D 2 1/2"
a. Bahan: 10,819.31
Pralon Ø 2 1/2" setara AW 0.2750 btg 35,173.00 9,672.58
Sambungan Pelengkap (15% harga pralon) 0.1000 ls 5,275.95 527.60
Lem PVC 0.0200 kg 30,957.00 619.14
b. Upah: 13,050.00
Tukang pipa 0.0750 hari 150,000.00 11,250.00
Mandor 0.0100 hari 180,000.00 1,800.00
Jumlah 23,869.31
Overhead & keuntungan 10% : 2,386.93
Jumlah : 26,256.24
47 1 m1 Talang Vertikal Pralon D 2 1/2" Dibulatkan : 26,200.00
48 1 m1 Talang Vertikal Pralon D 3"
a. Bahan: 21,019.48
Pralon Ø 3" setara AW 0.2750 btg 70,346.00 19,345.15
Sambungan Pelengkap (15% harga pralon) 0.1000 ls 10,551.90 1,055.19
Lem PVC 0.0200 kg 30,957.00 619.14
b. Upah: 13,050.00
Tukang pipa 0.0750 hari 150,000.00 11,250.00
Mandor 0.0100 hari 180,000.00 1,800.00
Jumlah 34,069.48
Overhead & keuntungan 10% : 3,406.95
Jumlah : 37,476.43
48 1 m1 Talang Vertikal Pralon D 3" Dibulatkan : 37,400.00
49 1 m1 Talang Vertikal Pralon d 4"
a. Bahan: 27,819.62
Pralon Ø 4" setara AW 0.2750 btg 93,794.75 25,793.56
Sambungan Pelengkap (15% harga pralon) 0.1000 ls 14,069.21 1,406.92
Lem PVC 0.0200 kg 30,957.00 619.14
b. Upah: 13,050.00
Tukang pipa 0.0750 hari 150,000.00 11,250.00
Mandor 0.0100 hari 180,000.00 1,800.00
Jumlah 40,869.62
Overhead & keuntungan 10% : 4,086.96
Jumlah : 44,956.58
49 1 m1 Talang Vertikal Pralon d 4" Dibulatkan : 44,900.00
50 1 lobangSparing Pralon d 1 1/2"
a. Bahan: 1,858.14
Pralon Ø 1 1/2" setara AW 0.0750 btg 24,362.50 1,827.19
Lem PVC 0.0010 kg 30,957.00 30.96
b. Upah: 1,987.50
Tukang pipa 0.0125 hari 150,000.00 1,875.00
Mandor 0.0006 hari 180,000.00 112.50
Jumlah 3,845.64
Overhead & keuntungan 10% : 384.56
Jumlah : 4,230.21
50 1 lobangSparing Pralon d 1 1/2" Dibulatkan : 4,200.00
51 1 lobangSparing Pralon d 2"
a. Bahan: 2,668.29
Pralon Ø 2" setara AW 0.0750 btg 35,164.50 2,637.34
Lem PVC 0.0010 kg 30,957.00 30.96
b. Upah: 1,987.50
Tukang pipa 0.0125 hari 150,000.00 1,875.00
Mandor 0.0006 hari 180,000.00 112.50
Jumlah 4,655.79
Overhead & keuntungan 10% : 465.58
Jumlah : 5,121.37
51 1 lobangSparing Pralon d 2" Dibulatkan : 5,100.00
1 2 3 4 5 6 7
52 1 lobangSparing Pralon d 2 1/2"
a. Bahan: 2,668.93
Pralon Ø 2 1/2" setara AW 0.0750 btg 35,173.00 2,637.98
Lem PVC 0.0010 kg 30,957.00 30.96
b. Upah: 1,987.50
Tukang pipa 0.0125 hari 150,000.00 1,875.00
Mandor 0.0006 hari 180,000.00 112.50
Jumlah 4,656.43
Overhead & keuntungan 10% : 465.64
Jumlah : 5,122.08
52 1 lobangSparing Pralon d 2 1/2" Dibulatkan : 5,100.00
53 1 lobangSparing Pralon d 3"
a. Bahan: 5,306.91
Pralon f 3" setara AW 0.0750 btg 70,346.00 5,275.95
Lem PVC 0.0010 kg 30,957.00 30.96
b. Upah: 1,987.50
Tukang pipa 0.0125 hari 150,000.00 1,875.00
Mandor 0.0006 hari 180,000.00 112.50
Jumlah 7,294.41
Overhead & keuntungan 10% : 729.44
Jumlah : 8,023.85
53 1 lobangSparing Pralon d 3" Dibulatkan : 8,000.00
54 1 lobangSparing Pralon d 4"
a. Bahan: 7,065.56
Pralon f 3" setara AW 0.0750 btg 93,794.75 7,034.61
Lem PVC 0.0010 kg 30,957.00 30.96
b. Upah: 1,987.50
Tukang pipa 0.0125 hari 150,000.00 1,875.00
Mandor 0.0006 hari 180,000.00 112.50
Jumlah 9,053.06
Overhead & keuntungan 10% : 905.31
Jumlah : 9,958.37
54 1 lobangSparing Pralon d 4" Dibulatkan : 9,900.00
55 1 m1 Talang jurai atau datar zincalume
a. Bahan: 90,420.00
zincalume t=0.50 1.1000 m1 82,200.00 90,420.00
b. Upah: 28,800.00
Tukang 0.1500 hari 150,000.00 22,500.00
Mandor 0.0350 hari 180,000.00 6,300.00
Jumlah 119,220.00
Overhead & keuntungan 10% : 11,922.00
Jumlah : 131,142.00
55 1 m1 Talang jurai atau datar zincalume Dibulatkan : 131,100.00
56 1 m2 Rangka atap baja ringan setara GIGA Steel
a. Bahan: 291,060.00
Baja ringan setara GIGA steel ( Terpasang ) 1.0000 m2 291,060.00 291,060.00
Jumlah 291,060.00
Overhead & keuntungan 10% : 29,106.00
Jumlah : 320,166.00
56 1 m2 Rangka atap baja ringan setara GIGA Steel Dibulatkan : 320,100.00
57 1 m1 Pasang lisplank susun t=50cm calcium cilicate t=8mm rangka hollow
Bahan 140,423.79
Hollow 4 x 4 cm t=1.2mm 0.5000 btg 162,000.00 81,000.00
Drywall Screw 25mmX083 24.306 pc(s) 91.00 2,211.81
GRC t=80 0.174 lembar 224,040.00 38,895.83
Alat bantu 1.000 Ls 18,316.15 18,316.15
Tenaga Kerja 113,280.00
Tukang 0.4000 org/hr 150,000.00 60,000.00
Pekerja 0.4000 org/hr 108,000.00 43,200.00
Kepala Tukang 0.0400 org/hr 162,000.00 6,480.00
Mandor 0.0200 org/hr 180,000.00 3,600.00
Jumlah 253,703.79
Overhead & keuntungan 10% : 25,370.38
Jumlah : 279,074.17
57 1 m1 Pasang lisplank susun t=50cm calcium cilicate t=8mm rangka hollow Dibulatkan : 279,000.00
1 2 3 4 5 6 7
58 1 m2 Pasang atap asphal Bitumen tipe Marathon 20
Bahan 375,008.12
Asphal Bitumen tipe Marathon 20 1.0000 lbr 250,000.00 250,000.00
Plywood 4" x 8" x 9 mm 0.350 lbr 123,863.00 43,352.05
Paku biasa genting 0.040 kg 60,000.00 2,400.00
Lem 0.100 tube 127,000.00 12,700.00
Paku biasa 2" - 5" 0.030 kg 23,294.00 698.82
Plasing dan bubungan 0.250 m2 263,429.00 65,857.25
Tenaga Kerja 64,686.00
Pekerja 0.2000 org/hr 150,000.00 30,000.00
Tukang 0.3000 org/hr 108,000.00 32,400.00
Kepala Tukang 0.0030 org/hr 162,000.00 486.00
Mandor 0.0100 org/hr 180,000.00 1,800.00
Jumlah 439,694.12
Overhead & keuntungan 10% : 64,336.97
Jumlah : 504,031.09
58 1 m2 Pasang atap asphal Bitumen tipe Marathon 20 Dibulatkan : 504,000.00
59 1 m2 Pemasangan 1 m2 metal clading
a. Bahan: 173,850.00
Metal clading 1.0500 m2 165,000.00 173,250.00
Paku hak panjang 15 cm 0.0200 kg 30,000.00 600.00
b. Upah: 50,280.00
Pekerja 0.2000 hari 162,000.00 32,400.00
Tukang las 0.1000 hari 150,000.00 15,000.00
Kepala Tukang las 0.0100 hari 108,000.00 1,080.00
Mandor 0.0100 hari 180,000.00 1,800.00
Jumlah 224,130.00
Overhead & keuntungan 10% : 22,413.00
Jumlah : 246,543.00
59 1 m2 Pemasangan 1 m2 metal clading Dibulatkan : 246,500.00
Jumlah 197,280.00
Overhead & keuntungan 10% : 19,728.00
Jumlah : 217,008.00
60 1 m2 Pemasangan Floor metal deck BMT=0.80mm L=1m Dibulatkan : 217,000.00
Jumlah 137,679.60
Overhead & keuntungan 10% : 13,767.96
Jumlah : 151,447.56
61 1 m2 Pemasangan rockwool density 100 kg/m3 Dibulatkan : 151,400.00
2 1 m³ Membuat & memasang Kusen Pintu dan Kusen Jendela. Kayu Kelas II & III
Bahan 15,160,626.00
Balok Kayu Kmape Samarinda 1.2000 m³ 12,600,000.00 15,120,000.00
Paku 10 cm 1.2500 kg 19,800.00 24,750.00
Lem Kayu 1.0000 kg 15,876.00 15,876.00
Tenaga Kerja 3,693,600.00
Pekerja 6.0000 org/hr 108,000.00 648,000.00
Tukang Kayu 18.0000 org/hr 150,000.00 2,700,000.00
Kepala Tukang 1.8000 org/hr 162,000.00 291,600.00
Mandor 0.3000 org/hr 180,000.00 54,000.00
Jumlah 18,854,226.00
Overhead & keuntungan 10% : 1,885,422.60
Jumlah : 20,739,648.60
2 1 m³ Membuat & memasang Kusen Pintu dan Kusen Jendela. Kayu Kelas II & III Dibulatkan : 20,739,600.00
4 1 m2 Membuat & memasang Pintu Klamp sederhana. Kayu Kelas III gudang sementara
Bahan 204,990.00
Papan Kayu Borneo 0.0400 m³ 5,100,000.00 204,000.00
Paku 5cm -7 cm 0.0500 kg 19,800.00 990.00
Tenaga Kerja 215,550.00
Pekerja 0.3500 org/hr 108,000.00 37,800.00
Tukang Kayu 1.0500 org/hr 150,000.00 157,500.00
Kepala Tukang 0.1050 org/hr 162,000.00 17,010.00
Mandor 0.0180 org/hr 180,000.00 3,240.00
Jumlah 420,540.00
Overhead & keuntungan 10% : 42,054.00
Jumlah : 462,594.00
4 1 m2 Membuat & memasang Pintu Klamp sederhana. Kayu Kelas III gudang sementara Dibulatkan : 462,500.00
6a 1 m2 Membuat & memasang Pintu dan Jendela Kaca.Kayu Kamper Samarinda Kelas II
Bahan 307,162.80
Papan Kayu 0.0240 m³ 12,600,000.00 302,400.00
Lem Kayu 0.3000 kg 15,876.00 4,762.80
Tenaga Kerja 492,480.00
Pekerja 0.8000 org/hr 108,000.00 86,400.00
Tukang Kayu 2.4000 org/hr 150,000.00 360,000.00
Kepala Tukang 0.2400 org/hr 162,000.00 38,880.00
Mandor 0.0400 org/hr 180,000.00 7,200.00
Jumlah 799,642.80
Overhead & keuntungan 10% : 79,964.28
Jumlah : 879,607.08
6a 1 m2 Membuat & memasang Pintu dan Jendela Kaca.Kayu Kamper Samarinda Kelas II Dibulatkan : 879,600.00
7 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kelas I & II
Bahan 2,407,938.00
Papan Kayu Jati 0.0640 m³ 37,500,000.00 2,400,000.00
Lem Kayu 0.5000 kg 15,876.00 7,938.00
Tenaga Kerja 615,600.00
Pekerja 1.0000 org/hr 108,000.00 108,000.00
Tukang Kayu 3.0000 org/hr 150,000.00 450,000.00
Kepala Tukang 0.3000 org/hr 162,000.00 48,600.00
Mandor 0.0500 org/hr 180,000.00 9,000.00
Jumlah 3,023,538.00
Overhead & keuntungan 10% : 302,353.80
Jumlah : 3,325,891.80
7 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kelas I & II Dibulatkan : 3,325,800.00
7a 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kamper Samarinda
Bahan 814,338.00
Papan Kayu Kamper Samarinda 0.0640 m³ 12,600,000.00 806,400.00
Lem Kayu 0.5000 kg 15,876.00 7,938.00
Tenaga Kerja 615,600.00
Pekerja 1.0000 org/hr 108,000.00 108,000.00
Tukang Kayu 3.0000 org/hr 150,000.00 450,000.00
Kepala Tukang 0.3000 org/hr 162,000.00 48,600.00
Mandor 0.0500 org/hr 180,000.00 9,000.00
Jumlah 1,429,938.00
Overhead & keuntungan 10% : 142,993.80
Jumlah : 1,572,931.80
7a 1 m2 Membuat & memasang Pintu dan Jendela Jalusi. Kayu Kamper Samarinda Dibulatkan : 1,572,900.00
8 1 m2 Membuat & memasang Daun Pintu Kayu Lapis (Plywood) Rangkap.Rangka Tertutup Kayu Kamper (lebar Sampai 90 cm)
Bahan 479,532.00
Papan Kayu Kamper Samarinda 0.0250 m³ 12,600,000.00 315,000.00
Paku 1 cm - 2.5 cm 0.0300 kg 19,800.00 594.00
Lem Kayu 0.5000 kg 15,876.00 7,938.00
Plywood Tebal 4mm Uk.90x220cm 1.0000 Lembar 156,000.00 156,000.00
Tenaga Kerja 430,920.00
Pekerja 0.7000 org/hr 108,000.00 75,600.00
Tukang Kayu 2.1000 org/hr 150,000.00 315,000.00
Kepala Tukang 0.2100 org/hr 162,000.00 34,020.00
Mandor 0.0350 org/hr 180,000.00 6,300.00
Jumlah 910,452.00
Overhead & keuntungan 10% : 91,045.20
Jumlah : 1,001,497.20
8 1 m2 Membuat & memasang Daun Pintu Kayu Lapis (Plywood) Rangkap.Rangka Tertutup Kayu Dibulatkan : 1,001,400.00
9 1 m2 Membuat & memasang Pintu Plywood Rangkap.Rangka Expose Kayu Kamper Samarinda
Bahan 487,092.00
Papan Kaamper Samarinda 0.0256 m³ 12,600,000.00 322,560.00
Paku 1 cm - 2.5 cm 0.0300 kg 19,800.00 594.00
Lem Kayu 0.5000 kg 15,876.00 7,938.00
Plywood Tebal 4mm Uk.90x220cm 1.0000 Lembar 156,000.00 156,000.00
Tenaga Kerja 492,480.00
Pekerja 0.8000 org/hr 108,000.0086,400.00
Tukang Kayu 2.4000 org/hr 150,000.00
360,000.00
Kepala Tukang 0.2400 org/hr 162,000.0038,880.00
Mandor 0.0400 org/hr 180,000.00 7,200.00
Jumlah 979,572.00
Overhead & keuntungan 10% : 97,957.20
Jumlah : 1,077,529.20
9 1 m2 Membuat & memasang Pintu Plywood Rangkap.Rangka Expose Kayu Kamper Samarinda Dibulatkan : 1,077,500.00
1. Bahan : - Cope lampu kayu Kamper Samarinda 2x20 cm 0.010 m3 10,245,890.00 98,360.54 98,360.54
3. Terpasang : Cat Kayu/besi Duco non keuntungan 0.400 m2 250,000.00 100,000.00 100,000.00
Jumlah 255,660.54
Overhead & keuntungan 10% : 25,566.05
Jumlah : 281,226.60
29 1 m1 Cope lampu kayu Kamper Samarinda finish cat Duco Dibulatkan : 281,200.00
30 1 m1 Plin kayu kamper Samarinda ukuran 10 x 100mm finish melamik
1. Bahan : - Papan kayu Kamper Samarinda 2x10 cm 0.002 m3 10,245,890.00 24,590.14 24,590.14
Jumlah 73,295.14
Overhead & keuntungan 10% : 7,329.51
3. Terpasang : Finish Melamik 0.144 m2 286,460.00 41,250.24
Jumlah : 121,874.89
30 1 m1 Plin kayu kamper Samarinda ukuran 10 x 100mm finish melamik Dibulatkan : 121,800.00
31 1 m' Pasang dan pembuatan meja Counter Nurse station ukuran yang dihitung 800x13700mm
2.12 10.960
1. Bahan : - Rangka multiplek 15mm meranti 17.577 lbr 236,280.00 4,153,178.26 52,592,825.64
- Rangka multiplek 12mm meranti 1.706 lbr 198,000.00 337,795.47
- MDF 3,5mm 21.350 lbr 40,000.00 854,009.75
- HPL 21.350 lbr 218,294.00 4,660,630.10
- lem kayu putih 1.913 kg 15,876.00 30,368.09
- lem kayu kuning 19.955 kg 23,151.00 461,989.13
- Paku skrup 3.515 kg 19,800.00 69,606.34
- Rel laci/Drawer Runner 4.000 bh 150,000.00 600,000.00
- Handle laci stainless steel 2.000 bh 125,000.00 250,000.00
- Surfaces 20.550 m2 1,450,000.00 29,797,500.00
- Wall bar tipe WG-5C setara Fawling 13.700 m1 799,385.00 10,951,574.50
- Pelat Stainless stell Hairline 1.390 m2 306,600.00 426,174.00
Jumlah 59,702,350.17
Overhead & keuntungan 10% : 5,970,235.02
Jumlah Harga : 65,672,585.19
31 1unit Pasang dan pembuatan meja Counter Nurse station Dibulatkan harga m1 : 65,672,500.00
31 1 m' Pasang dan pembuatan meja Counter Nurse station Dibulatkan harga m1 : 4,793,600.00
Bahan : Pull Handle tipe Art GD 9330 SS-350 1.0000 Psg 202,000.00 202,000.00 -
Upah : Pekerja 0.050 hari 108,000.00 - 5,400.00
Tukang kayu 0.500 hari 150,000.00 - 75,000.00
Kepala tukang 0.050 hari 162,000.00 - 8,100.00
Mandor 0.0025 hari 180,000.00 - 450.00
Jumlah : 202,000.00 88,950.00 290,950.00
Overhead & keuntungan 10% : 29,095.00
4g 1 Psg Pull Handle tipe Art GD 9330 SS-350 Jumlah & pembulatan : 320,000.00
4h 1 Psg Pull Handle tipe Art PH 2296 G-600
Bahan : Pull Handle tipe Art PH 2296 G-600 1.0000 Psg 1,317,000.00 1,317,000.00 -
Upah : Pekerja 0.050 hari 108,000.00 - 5,400.00
Tukang kayu 0.500 hari 150,000.00 - 75,000.00
Kepala tukang 0.050 hari 162,000.00 - 8,100.00
Mandor 0.0025 hari 180,000.00 - 450.00
Jumlah : 1,317,000.00 88,950.00 1,405,950.00
Overhead & keuntungan 10% : 140,595.00
4h 1 Psg Pull Handle tipe Art PH 2296 G-600 Jumlah & pembulatan : 1,546,500.00
4i 1 Psg Flush Handle ( untuk pintu geser ) tipe Art FH 216
Bahan : Flush Handle ( untuk pintu geser ) tipe Art FH 216 2.0000 bh 96,000.00 192,000.00 -
Upah : Pekerja 0.050 hari 108,000.00 - 5,400.00
Tukang kayu 0.500 hari 150,000.00 - 75,000.00
Kepala tukang 0.050 hari 162,000.00 - 8,100.00
Mandor 0.0025 hari 180,000.00 - 450.00
Jumlah : 192,000.00 88,950.00 280,950.00
Overhead & keuntungan 10% : 28,095.00
4i 1 Psg Flush Handle ( untuk pintu geser ) tipe Art FH 216 Jumlah & pembulatan : 309,000.00
4j 1 Psg Push Pull Art- Arrow 8-1 SS
Bahan : Push Pull Art- Arrow 8-1 SS 2.0000 bh 406,000.00 812,000.00 -
Upah : Pekerja 0.050 hari 108,000.00 - 5,400.00
Tukang kayu 0.500 hari 150,000.00 - 75,000.00
Kepala tukang 0.050 hari 162,000.00 - 8,100.00
Mandor 0.0025 hari 180,000.00 - 450.00
Jumlah : 812,000.00 88,950.00 900,950.00
Overhead & keuntungan 10% : 90,095.00
4j 1 Psg Push Pull Art- Arrow 8-1 SS Jumlah & pembulatan : 991,000.00
4k 1 Psg Pull Handle tipe Art PH 243 L-1200
Bahan : Pull Handle tipe Art PH 243 L-1200 1.0000 Psg 1,541,000.00 1,541,000.00 -
Upah : Pekerja 0.050 hari 108,000.00 - 5,400.00
Tukang kayu 0.500 hari 150,000.00 - 75,000.00
Kepala tukang 0.050 hari 162,000.00 - 8,100.00
Mandor 0.0025 hari 180,000.00 - 450.00
Jumlah : 1,541,000.00 88,950.00 1,629,950.00
Overhead & keuntungan 10% : 162,995.00
4k 1 Psg Pull Handle tipe Art PH 243 L-1200 Jumlah & pembulatan : 1,792,900.00
4l 1 Psg Pull Handle tipe Art PH 243 A-350
Bahan : Pull Handle tipe Art PH 243 A-350 1.0000 Psg 1,185,000.00 1,185,000.00 -
Upah : Pekerja 0.050 hari 108,000.00 - 5,400.00
Tukang kayu 0.500 hari 150,000.00 - 75,000.00
Kepala tukang 0.050 hari 162,000.00 - 8,100.00
Mandor 0.0025 hari 180,000.00 - 450.00
Jumlah : 1,185,000.00 88,950.00 1,273,950.00
Overhead & keuntungan 10% : 127,395.00
4l 1 Psg Pull Handle tipe Art PH 243 A-350 Jumlah & pembulatan : 1,401,300.00
5 1 bh Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS
Bahan : Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS 1.0000 bh 31,000.00 31,000.00 -
Upah : Pekerja 0.015 hari 108,000.00 - 1,620.00
Tukang kayu 0.150 hari 150,000.00 - 22,500.00
Kepala tukang 0.015 hari 162,000.00 - 2,430.00
Mandor 0.0008 hari 180,000.00 - 144.00
Jumlah : 31,000.00 26,694.00 57,694.00
Overhead & keuntungan 10% : 5,769.40
5 1 bh Hinges Gracia Art 2201 tipe BB 4"x3"x3mm SS Jumlah & pembulatan : 63,400.00
5a 1 bh Hinges Gracia Art 2301 tipe 3"x2.5"x2mm SS
Bahan : Hinges Gracia Art 2301 tipe 3"x2.5"x2mm SS ( Untuk pintu shapt 1.0000 bh 26,000.00 26,000.00 -
Upah : Pekerja 0.011 hari 108,000.00 - 1,215.00
Tukang kayu 0.113 hari 150,000.00 - 16,875.00
Kepala tukang 0.011 hari 162,000.00 - 1,822.50
Mandor 0.00056 hari 180,000.00 - 101.25
Jumlah : 26,000.00 20,013.75 46,013.75
Overhead & keuntungan 10% : 4,601.38
5a 1 bh Hinges Gracia Art 2301 tipe 3"x2.5"x2mm SS Jumlah & pembulatan : 50,600.00
9a 1m 1
Pasang List plafon gyfsum profil
Bahan 17,702.10
gyfsum profil l=7cm 1.050 m' 15,960.00 16,758.00
Tepung gyfsum 0.150 Kg 6,294.00 944.10
Tenaga Kerja 16,992.00
Pekerja 0.060 org/hr 108,000.00 6,480.00
Tukang 0.060 org/hr 150,000.00 9,000.00
Kepala Tukang 0.006 org/hr 162,000.00 972.00
Mandor 0.003 org/hr 180,000.00 540.00
Jumlah 34,694.10
Overhead & keuntungan 10% : 3,469.41
Jumlah : 38,163.51
9a 1 m1 Pasang List plafon gyfsum profil Dibulatkan : 38,100.00
Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow galpanis 40x40x0.35mm modul 6ox120 termasuk
10 1 m²
gantungan
Pemasangan 1 m2 rangka besi hollow galpanis
A.4.2.1 21a 1.000 m2 182,900.00 182,900.00
1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond
A.4.5.1 7b Pasang Langit-langit Gypsum water prof 120 x 240 Tebal 9 mm 1.000 m2 76,800.00 76,800.00
Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow galpanis 40x40x0.35mm modul 6ox120
12 1 m²
termasuk gantungan
Pemasangan 1 m2 rangka besi hollow galpanis
A.4.2.1 21a 1.000 m2 182,900.00 182,900.00
1x40.40.0,35mm, modul 60 x 120 cm, untuk plapond
Pasang Langit-langit calcium cilicate Board 120 x 240 Tebal 6
A.4.5.1 7a 1.000 m2 90,400.00 90,400.00
mm
Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow
12 1 m² Dibulatkan :
galpanis 40x40x0.35mm modul 6ox120 termasuk gantungan 273,300.00
13 1 m² Pasang Langit-langit Gypsum 120 x 240 Tebal 9 mm termasuk rangka hollow 40x40x2mm modul 6ox120 termasuk gantungan
A.4.5.1 7b Pasang Langit-langit Gypsum water prof 120 x 240 Tebal 9 mm 1.000 m2 76,800.00 76,800.00
12 1 m² Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow galpanis 40x40x2mm modul 6ox120 termasuk
gantungan
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x
A.4.2.1 21 1.000 m2 231,800.00 231,800.00
120 cm
Pasang Langit-langit calsium cilicate 120 x 240 Tebal 6 mm termasuk rangka hollow
12 1 m² Dibulatkan :
galpanis 40x40x2mm modul 6ox120 termasuk gantungan 322,200.00
15 1 m² Pasang dinding partisi Gypsum Board rangkap .120 x 240 x 9 mm. Tebal 9 mm
Bahan 69,566.37
Gypsum Board t=9mm setara Jayaboard 0.728 Lembar 92,520.00 67,354.56
Drywall Screw 25mmX083 24.306 pc(s) 91.00 2,211.81
Jointing Compound UB-10/20/888/CCL 20kg/bag(s) 0.038 bag(s) 121,120.00 4,602.56
UB Tape 75m/roll(s) 0.032 roll(s) 32,960.00 1,054.72
Tenaga Kerja 40,020.00
Pekerja 0.200 org/hr 108,000.00 21,600.00
Tukang 0.100 org/hr 150,000.00 15,000.00
Kepala Tukang 0.010 org/hr 162,000.00 1,620.00
Mandor 0.010 org/hr 180,000.00 1,800.00
Jumlah 109,586.37
Overhead & keuntungan 10% : 10,958.64
Jumlah : 120,545.01
15 1 m² Pasang dinding partisi Gypsum Board rangkap .120 x 240 x 9 mm. Tebal 9 mm Dibulatkan : 120,500.00
17 1 m² Anti bacterial ceilling setara Bioguard 16mm + Suspension system Prelude standard t=24mm setara Armstrong
Anti bacterial ceilling setara Bioguard 16mm +
Harga terpasang Suspension system Prelude standard t=24mm setara
Armstrong 1.05 396,000.00 415,800.00
Jumlah 415,800.00
Keuntungan 15% : 41,580.00
Jumlah : 457,380.00
Anti bacterial ceilling setara Bioguard 16mm + Suspension system Prelude standard
17 1 m² Dibulatkan :
t=24mm setara Armstrong 457,300.00
18 1 m² Anti bacterial ceilling setara Bioguard 16mm + Suspension system cleanroom alumunium setara Armstrong
Anti bacterial ceilling setara Bioguard 16mm +
Harga terpasang Suspension system cleanroom alumunium setara
Armstrong 1.05 624,000.00 655,200.00
Jumlah 655,200.00
Keuntungan 15% : 65,520.00
Jumlah : 720,720.00
Anti bacterial ceilling setara Bioguard 16mm + Suspension system cleanroom
18 1 m² Dibulatkan :
alumunium setara Armstrong 720,700.00
19 1 m² Accustic tile ceilling setara tipe Dune 16mm + Suspension system Suprafine Grids t=15mm setara Armstrong
Accustic tile ceilling setara tipe Dune 16mm +
Harga terpasang Suspension system Suprafine Grids t=15mm setara
Armstrong 1.05 240,000.00 252,000.00
Jumlah 252,000.00
Keuntungan 15% : 25,200.00
Jumlah : 277,200.00
Accustic tile ceilling setara tipe Dune 16mm + Suspension system Suprafine Grids
19 1 m² Dibulatkan :
t=15mm setara Armstrong 277,200.00
20 1 m² Gypsum board TKA 2 jam t=13mm + Suspension system setara Prelude standard t=24mm
Gypsum board TKA 2 jam t=13mm + Suspension
Harga terpasang
system setara Prelude standard t=24mm 1.05 300,000.00 315,000.00
Jumlah 315,000.00
Keuntungan 15% : 31,500.00
Jumlah : 346,500.00
Gypsum board TKA 2 jam t=13mm + Suspension system setara Prelude standard
20 1 m² Dibulatkan :
t=24mm 346,500.00
Jumlah 507,753.30
Overhead & keuntungan 10% : 50,775.33
Jumlah : 558,528.63
22 1 m2 Profiled zincalume metal sheet Dibulatkan : 558,500.00
23 1 m2 Heat-strengthened clear glass t=6mm + clear PVB laminate 1.52mm + Heat-strengthened clear glass t=6mm +
rangka alumunium transm & mullio
1 Rangka terpasang 3,676,420.00
Alumunium transm & mullio 2.600 m1 309,200.00 803,920.00
2 Penutup terpasang
Heat-strengthened clear glass t=6mm + clear PVB
laminate 1.52mm + Heat-strengthened clear glass
t=6mm 1.000 m2 2,872,500.00 2,872,500.00
Jumlah 3,676,420.00
Overhead & keuntungan include : -
Jumlah : 3,676,420.00
Heat-strengthened clear glass t=6mm + clear PVB laminate 1.52mm + Heat-
23 1 m2 Dibulatkan :
strengthened clear glass t=6mm + rangka alumunium transm & mullio 3,676,400.00
Jumlah 851,025.00
Overhead & keuntungan 10% : 85,102.50
Jumlah : 936,127.50
24 1 m2 Alumunium linear ceilling finish powder coating warna/motf kayu Dibulatkan : 936,100.00
25 1 m² Perforated Accustic plaster board seamless factory pre-coated + rangka hollow 40x40mm t=0.35mm galvanized termasuk gantungan
Misalkan:
Panjang Hollow (L) = 6000 mm
Lebar Hollow (W) = 40 mm
Tinggi hollow (H) = 40 mm
Ketebalan (B) = 2 mm
Berat jenis besi = 7850 (Kg/M3)
Berat Jenis besi (BJ) = 7.85 Kg/ 1.000.000 mm3
2 Tenaga 16,650.00
Pekerja 0.150 oh 108,000.00 16,200.00
Tukang cat - oh 150,000.00 -
Kepala tukang - oh 162,000.00 -
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 17,775.00
Overhead & keuntungan 10% : 1,777.50
Jumlah : 19,552.50
1 1 m2 Mengikis/mengerok permukaan cat tembok lama Dibulatkan : 19,500.00
2 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
### Bahan 375.00
Sabun 0.050 kg 7,500.00 375.00
2 Tenaga 16,650.00
Pekerja 0.150 oh 108,000.00 16,200.00
Tukang cat - oh 150,000.00 -
Kepala tukang - oh 162,000.00 -
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 17,025.00
Overhead & keuntungan 10% : 1,702.50
Jumlah : 18,727.50
2 1 m2 Mencuci bidang permukaan tembok yang pernah dicat Dibulatkan : 18,700.00
3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
1 Bahan 375.00
Sabun 0.050 kg 7,500.00 375.00
2 Tenaga 17,640.00
Pekerja 0.150 oh 108,000.00 16,200.00
Tukang cat - oh 150,000.00 -
Kepala tukang - oh 162,000.00 -
Mandor 0.0080 oh 180,000.00 1,440.00
Jumlah 18,015.00
Overhead & keuntungan 10% : 1,801.50
Jumlah : 19,816.50
3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual Dibulatkan : 19,800.00
4 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
1 Bahan 47,877.60
Cat meni 0.200 kg 48,000.00 9,600.00
Plamir 0.150 kg 45,000.00 6,750.00
Cat dasar 0.170 kg 73,320.00 12,464.40
Cat penutup 2 kali 0.260 kg 73,320.00 19,063.20
Kuas 0.010 bh 36,360.00 363.60
Pengencer 0.030 kg 21,600.00 648.00
Ampelas 0.200 lbr 3,840.00 768.00
2 Tenaga 10,422.00
Pekerja 0.070 oh 108,000.00 7,560.00
Tukang cat 0.009 oh 150,000.00 1,350.00
Kepala tukang 0.006 oh 162,000.00 972.00
Mandor 0.0030 oh 180,000.00 540.00
Jumlah 58,299.60
Overhead & keuntungan 10% : 5,829.96
Jumlah : 64,129.56
4 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup Dibulatkan : 64,100.00
5 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
1 Bahan 54,476.40
Cat meni 0.200 kg 48,000.00 9,600.00
Plamir 0.150 kg 45,000.00 6,750.00
Cat dasar 0.170 kg 73,320.00 12,464.40
Cat penutup 2 kali 0.350 kg 73,320.00 25,662.00
Kuas 0.010 bh 36,360.00 363.60
Pengencer 0.030 kg 21,600.00 648.00
Ampelas 0.200 lbr 3,840.00 768.00
2 Tenaga 24,498.00
Pekerja 0.070 oh 108,000.00 7,560.00
Tukang cat 0.105 oh 150,000.00 15,750.00
Kepala tukang 0.004 oh 162,000.00 648.00
Mandor 0.0030 oh 180,000.00 540.00
Jumlah 78,974.40
Overhead & keuntungan 10% : 7,897.44
Jumlah : 86,871.84
5 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup Dibulatkan : 86,800.00
2 Tenaga 10,422.00
Pekerja 0.070 oh 108,000.00 7,560.00
Tukang cat 0.009 oh 150,000.00 1,350.00
Kepala tukang 0.006 oh 162,000.00 972.00
Mandor 0.0030 oh 180,000.00 540.00
Jumlah Err:509
Overhead & keuntungan 10% : Err:509
Jumlah : Err:509
6 1 m2 Pelaburan bidang kayu dengan teak oil Dibulatkan : Err:509
7 1 m2 Pelaburan bidang kayu dengan politur
1 Bahan 19,080.00
Sirlak India 0.150 kg 45,000.00 6,750.00
Sepirtus 0.372 ltr 12,500.00 4,650.00
Ampelas 2.000 lbr 3,840.00 7,680.00
2 Tenaga 27,132.00
Pekerja - oh 108,000.00 -
Tukang politur 0.160 oh 150,000.00 24,000.00
Kepala tukang 0.016 oh 162,000.00 2,592.00
Mandor 0.0030 oh 180,000.00 540.00
Jumlah 46,212.00
Overhead & keuntungan 10% : 4,621.20
Jumlah : 50,833.20
7 1 m2 Pelaburan bidang kayu dengan politur Dibulatkan : 50,800.00
2 Tenaga 44,322.00
Pekerja 0.160 oh 108,000.00 17,280.00
Tukang cat 0.160 oh 150,000.00 24,000.00
Kepala tukang 0.016 oh 162,000.00 2,592.00
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 51,900.00
Overhead & keuntungan 10% : 5,190.00
Jumlah : 57,090.00
9 1 m2 Pelaburan bidang kayu dengan vernis Dibulatkan : 57,000.00
10 1 m2 Cat tembok Interior/AEP setara Jotun (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 13,764.00
Wall filler ex. ICI Dulux 0.100 kg 33,600.00 3,360.00
Cat dasar Interior setara Jotun 0.100 lt 28,900.00 2,890.00
Cat tembok Interior setara Jotun 0.260 lt 28,900.00 7,514.00
2 Tenaga 13,170.60
Pekerja 0.020 oh 108,000.00 2,160.00
Tukang cat 0.063 oh 150,000.00 9,450.00
Kepala tukang 0.0063 oh 162,000.00 1,020.60
Mandor 0.0030 oh 180,000.00 540.00
Jumlah 26,934.60
Overhead & keuntungan 10% : 2,693.46
Jumlah : 29,628.06
Cat tembok Interior/AEP setara Jotun (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
10 1 m2 Dibulatkan :
penutup) 29,600.00
10a 1 m2 Cat tembok exterior Weathershield setara Jotun ( 1 lapis cat dasar, 2 lapis cat penutup )
1 Bahan 33,468.00
Cat jenis alkali 1 x 0.100 kg 49,560.00 4,956.00
Cat tembok exterior Weathershield setara Jotun (
0.100 lt 79,200.00 7,920.00
Cat dasar 1 x )
Cat tembok exterior Weathershield setara Jotun (
0.260 lt 79,200.00 20,592.00
Cat penutup 2 x )
2 Tenaga 13,080.60
Pekerja 0.020 oh 108,000.00 2,160.00
Tukang cat 0.063 oh 150,000.00 9,450.00
Kepala tukang 0.0063 oh 162,000.00 1,020.60
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 46,548.60
Overhead & keuntungan 10% : 4,654.86
Jumlah : 51,203.46
10a 1 m2 Cat tembok exterior Weathershield setara Jotun ( 1 lapis cat dasar, 2 lapis cat penutup ) Dibulatkan :
51,200.00
10b 1 m2 Pengecatan 1 m2 tembok baru interior AGE (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 28,113.60
Wall filler ex. ICI Dulux 0.100 kg 33,600.00 3,360.00
Cat dasar ICI Dulux ( Cat dasar 1 x ) 0.100 lt 68,760.00 6,876.00
Cat jenis AGE setara ICI Dulux (cat penutup 2 x) 0.260 lt 68,760.00 17,877.60
2 Tenaga 13,170.60
Pekerja 0.020 oh 108,000.00 2,160.00
Tukang cat 0.063 oh 150,000.00 9,450.00
Kepala tukang 0.0063 oh 162,000.00 1,020.60
Mandor 0.0030 oh 180,000.00 540.00
Jumlah 41,284.20
Overhead & keuntungan 10% : 4,128.42
Jumlah : 45,412.62
Pengecatan 1 m2 tembok baru interior AGE (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat
10b 1 m2 Dibulatkan :
penutup) 45,400.00
10c 1 m2 Pengecatan 1 m2 tembok baru interior Anti bakteri (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 39,432.00
Wall filler ex. ICI Dulux 0.100 kg 33,600.00 3,360.00
Cat dasar ( Cat dasar 1 x ) 0.100 lt 100,200.00 10,020.00
Cat jenis Anti bakteri (cat penutup 2 x) 0.260 lt 100,200.00 26,052.00
2 Tenaga 13,170.60
Pekerja 0.020 oh 108,000.00 2,160.00
Tukang cat 0.063 oh 150,000.00 9,450.00
Kepala tukang 0.0063 oh 162,000.00 1,020.60
Mandor 0.0030 oh 180,000.00 540.00
Jumlah 52,602.60
Overhead & keuntungan 10% : 5,260.26
Jumlah : 57,862.86
Pengecatan 1 m2 tembok baru interior Anti bakteri (1 lapis plamuur, 1 lapis cat dasar, 2
10c 1 m2 Dibulatkan :
lapis cat penutup) 57,800.00
10d 1 m2 Pengecatan plafon/dak beton baru jenis AEP ( lapis cat dasar, 2 lapis cat penutup)
1 Bahan 12,484.80
Plamir - kg 33,600.00 -
Cat dasar 1 x 0.100 kg 34,680.00 3,468.00
Cat penutup 2 x 0.260 kg 34,680.00 9,016.80
2 Tenaga 13,953.00
Pekerja 0.025 oh 108,000.00 2,700.00
Tukang cat 0.065 oh 150,000.00 9,750.00
Kepala tukang 0.0065 oh 162,000.00 1,053.00
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 26,437.80
Overhead & keuntungan 10% : 2,643.78
Jumlah : 29,081.58
10d 1 m2 Pengecatan plafon/dak beton baru jenis AEP ( lapis cat dasar, 2 lapis cat penutup) Dibulatkan : 29,000.00
10e 1 m2 Pengecatan plafon/dak beton baru Weathershield (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 28,512.00
Plamir - kg 33,600.00 -
Cat dasar 1 x 0.100 kg 79,200.00 7,920.00
Cat penutup 2 x 0.260 kg 79,200.00 20,592.00
2 Tenaga 13,953.00
Pekerja 0.025 oh 108,000.00 2,700.00
Tukang cat 0.065 oh 150,000.00 9,750.00
Kepala tukang 0.0065 oh 162,000.00 1,053.00
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 42,465.00
Overhead & keuntungan 10% : 4,246.50
Jumlah : 46,711.50
10e 1 m2 Pengecatan plafon/dak beton baru Weathershield (1 lapis cat dasar, 2 lapis cat penutup) Dibulatkan : 46,700.00
10f 1 m2 Pengecatan plafon/dak beton baru jenis cat anti bakteri (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 36,072.00
Plamir - kg 33,600.00 -
Cat dasar 1 x 0.100 kg 100,200.00 10,020.00
Cat penutup 2 x 0.260 kg 100,200.00 26,052.00
2 Tenaga 13,953.00
Pekerja 0.025 oh 108,000.00 2,700.00
Tukang cat 0.065 oh 150,000.00 9,750.00
Kepala tukang 0.0065 oh 162,000.00 1,053.00
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 50,025.00
Overhead & keuntungan 10% : 5,002.50
Jumlah : 55,027.50
Pengecatan plafon/dak beton baru jenis cat anti bakteri (1 lapis cat dasar, 2 lapis cat
10f 1 m2 Dibulatkan : 55,000.00
penutup)
10g 1 m2 Pengecatan plafon/dak beton baru jenis cat AGE (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 24,753.60
Plamir - kg 33,600.00 -
Cat dasar 1 x 0.100 kg 68,760.00 6,876.00
Cat penutup 2 x 0.260 kg 68,760.00 17,877.60
2 Tenaga 13,953.00
Pekerja 0.025 oh 108,000.00 2,700.00
Tukang cat 0.065 oh 150,000.00 9,750.00
Kepala tukang 0.0065 oh 162,000.00 1,053.00
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 38,706.60
Overhead & keuntungan 10% : 3,870.66
Jumlah : 42,577.26
10g 1 m2 Pengecatan plafon/dak beton baru jenis cat AGE (1 lapis cat dasar, 2 lapis cat penutup) Dibulatkan : 42,500.00
11 1 m2 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 10,404.00
Wall filler ex. ICI Dulux - kg 33,600.00 -
Cat dasar ex. Catilax 0.120 lt 34,680.00 4,161.60
Cat dasar ex. Catilax jenis AEP 0.180 lt 34,680.00 6,242.40
2 Tenaga 10,544.40
Pekerja 0.028 oh 108,000.00 3,024.00
Tukang cat 0.042 oh 150,000.00 6,300.00
Kepala tukang 0.0042 oh 162,000.00 680.40
Mandor 0.0030 oh 180,000.00 540.00
Jumlah 20,948.40
Overhead & keuntungan 10% : 2,094.84
Jumlah : 23,043.24
11 1 m2 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Dibulatkan : 23,000.00
12 1 m2 Melabur tembok dengan kalkarium
1 Bahan 600.00
Kalkarium 0.100 kg 6,000.00 600.00
2 Tenaga 10,454.40
Pekerja 0.028 oh 108,000.00 3,024.00
Tukang cat 0.042 oh 150,000.00 6,300.00
Kepala tukang 0.0042 oh 162,000.00 680.40
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 11,054.40
Overhead & keuntungan 10% : 1,105.44
Jumlah : 12,159.84
12 1 m2 Melabur tembok dengan kalkarium Dibulatkan : 12,100.00
13 1 m2 Melabur tembok dengan kapur sirih
1 Bahan 1,484.00
Ampelas 0.100 kg 3,840.00 384.00
Alang-alang 0.250 ikat 2,000.00 500.00
Perancah kayu - m3 3,000,000.00 -
Kapur sirih 0.150 kg 4,000.00 600.00
2 Tenaga 16,816.20
Pekerja 0.150 oh 108,000.00 16,200.00
Tukang cat 0.001 oh 150,000.00 150.00
Kepala tukang 0.0001 oh 162,000.00 16.20
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 18,300.20
Overhead & keuntungan 10% : 1,830.02
Jumlah : 20,130.22
13 1 m2 Melabur tembok dengan kapur sirih Dibulatkan : 20,100.00
14 1 m2 Melabur tembok lama dengan kapur sirih (pemeliharaan)
1 Bahan 1,268.00
Ampelas 0.200 kg 3,840.00 768.00
Alang-alang 0.250 ikat 2,000.00 500.00
Kapur sirih 0.300 kg 4,000.00 1,200.00
2 Tenaga 5,601.00
Pekerja 0.040 oh 108,000.00 4,320.00
Tukang cat 0.005 oh 150,000.00 750.00
Kepala tukang 0.0005 oh 162,000.00 81.00
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 6,869.00
Overhead & keuntungan 10% : 686.90
Jumlah : 7,555.90
14 1 m2 Melabur tembok lama dengan kapur sirih (pemeliharaan) Dibulatkan : 7,500.00
2 Tenaga 37,200.00
Pekerja 0.020 oh 108,000.00 2,160.00
Tukang cat 0.200 oh 150,000.00 30,000.00
Kepala tukang 0.020 oh 162,000.00 3,240.00
Mandor 0.010 oh 180,000.00 1,800.00
Jumlah 42,144.00
Overhead & keuntungan 10% : 4,214.40
Jumlah : 46,358.40
16 1 m2 Pengecatan permukaan baja dengan meni besi Dibulatkan : 46,300.00
17 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah
1 Bahan 10,944.00
Meni besi 0.100 kg 48,000.00 4,800.00
Kuas 0.010 bh 14,400.00 144.00
Perancah kayu 0.002 m3 3,000,000.00 6,000.00
2 Tenaga 65,745.00
Pekerja 0.250 oh 108,000.00 27,000.00
Tukang cat 0.225 oh 150,000.00 33,750.00
Kepala tukang 0.023 oh 162,000.00 3,645.00
Mandor 0.008 oh 180,000.00 1,350.00
Jumlah 76,689.00
Overhead & keuntungan 10% : 7,668.90
Jumlah : 84,357.90
17 1 m2 Pengecatan permukaan baja dengan meni besi dan perancah Dibulatkan : 84,300.00
1 m2 Pengecatan permukaan baja lapis seng
18 (galpanis) secara manual sistem 4 lapis cat
konvensional dengan tebal 200 um
1 Bahan 19,216.00
Meni (read lead) A 0.100 kg 35,000.00 3,500.00
Meni (read lead) B 0.100 kg 35,000.00 3,500.00
Aluminium C 0.040 kg 75,000.00 3,000.00
Aluminium B 0.040 kg 75,000.00 3,000.00
Pengencer/thiner 0.010 ltr 21,600.00 216.00
Perancah kayu 0.002 m3 3,000,000.00 6,000.00
2 Tenaga 6,543.00
Pekerja 0.006 oh 108,000.00 648.00
Tukang cat 0.006 oh 150,000.00 900.00
Kepala tukang 0.0225 oh 162,000.00 3,645.00
Mandor 0.0075 oh 180,000.00 1,350.00
Jumlah 25,759.00
Overhead & keuntungan 10% : 2,575.90
Jumlah : 28,334.90
Pengecatan permukaan baja lapis seng (galpanis) secara manual sistem 4 lapis cat
18 1 m2 Dibulatkan :
konvensional dengan tebal 200 um 28,300.00
1 m2 Pengecatan permukaan baja lapis seng
19 (galpanis) secara manual sistem 4 lapis cat
mutakhir dengan tebal 200 um
1 Bahan 22,500.00
Cat 0.300 kg 75,000.00 22,500.00
2 Tenaga 6,543.00
Pekerja 0.006 oh 108,000.00 648.00
Tukang cat 0.006 oh 150,000.00 900.00
Kepala tukang 0.0225 oh 162,000.00 3,645.00
Mandor 0.0075 oh 180,000.00 1,350.00
Jumlah 29,043.00
Overhead & keuntungan 10% : 2,904.30
Jumlah : 31,947.30
Pengecatan permukaan baja lapis seng (galpanis) secara manual sistem 4 lapis cat
19 1 m2 Dibulatkan :
mutakhir dengan tebal 200 um 31,900.00
1 m2 Pengecatan permukaan baja lapis seng
20 (galvanis) secara manual sistem 3 lapis cat
konvensional dengan tebal 200 um
1 Bahan 27,000.00
Cat dasar 0.110 kg 75,000.00 8,250.00
Cat antara 0.170 kg 75,000.00 12,750.00
Cat penutup 0.080 kg 75,000.00 6,000.00
Jumlah (1). 27,000.00
2 Tenaga 258,600.00
Pekerja 0.500 oh 108,000.00 54,000.00
Tukang cat 0.800 oh 150,000.00 120,000.00
Kepala tukang 0.300 oh 162,000.00 48,600.00
Mandor 0.200 oh 180,000.00 36,000.00
Jumlah 285,600.00
Overhead & keuntungan 10% : 28,560.00
Jumlah : 314,160.00
Pengecatan permukaan baja lapis seng (galvanis) secara manual sistem 3 lapis cat
20 1 m2 Dibulatkan :
konvensional dengan tebal 200 um 314,100.00
21 1 m2 Pengecatan permukaan baja lapis seng (galvani) secara semprot (airless spray) dengan sistem 1 lapis cat mutakhir dengan tebal 200 um
1 Bahan 22,500.00
Cat dasar 0.300 kg 75,000.00 22,500.00
2 Tenaga 216,600.00
Pekerja 0.400 oh 108,000.00 43,200.00
Tukang cat 0.700 oh 150,000.00 105,000.00
Kepala tukang 0.200 oh 162,000.00 32,400.00
Mandor 0.200 oh 180,000.00 36,000.00
Jumlah 239,100.00
Overhead & keuntungan 10% : 23,910.00
Jumlah : 263,010.00
Pengecatan permukaan baja lapis seng (galvani) secara semprot (airless spray) dengan
21 1 m2 Dibulatkan :
sistem 1 lapis cat mutakhir dengan tebal 200 um 263,000.00
22 10 m2 Pengecatan melamik
1 Bahan 375,840.00
Wood filer ex. Imfra 1.500 kg 36,000.00 54,000.00
Wood Stend 1.500 kg 51,600.00 77,400.00
Sending Seller 1.500 kg 42,000.00 63,000.00
Clear 2.400 kg 48,000.00 115,200.00
Tiner Serba Guna 2.000 ltr 21,600.00 43,200.00
Ampelas 6.000 lbr 3,840.00 23,040.00
2 Tenaga 2,228,400.00
Pekerja 2.0000 oh 108,000.00 216,000.00
Tukang cat 12.0000 oh 150,000.00 1,800,000.00
Kepala tukang 1.2000 oh 162,000.00 194,400.00
Mandor 0.1000 oh 180,000.00 18,000.00
Jumlah 2,604,240.00
Overhead & keuntungan 10% : 260,424.00
Jumlah : 2,864,664.00
22 10 m2 Pengecatan melamik Dibulatkan : 2,864,600.00
22 1 m2 Pengecatan melamik Dibulatkan : 286,460.00
23 10 m2 Pengecatan Duco bidang kayu baru/besi ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
1 Bahan 340,200.00
Dempul duco setara mutu tinggi 1.5000 kg 42,000.00 63,000.00
Meni 1.9200 kg 48,000.00 92,160.00
Cat kayu DUCO setara mutu tinggi 3.0000 kg 60,600.00 181,800.00
Hampelas 6.0000 lb 3,840.00 23,040.00
Thiner ( minyak cat A ) 2.0000 lt 21,600.00 43,200.00
2 Tenaga 2,228,400.00
Pekerja 2.0000 oh 108,000.00 216,000.00
Tukang cat 12.0000 oh 150,000.00 1,800,000.00
Kepala tukang 1.2000 oh 162,000.00 194,400.00
Mandor 0.1000 oh 180,000.00 18,000.00
Jumlah 2,568,600.00
Overhead & keuntungan 10% : 256,860.00
Jumlah : 2,825,460.00
Pengecatan Duco bidang kayu baru/besi ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat
23 10 m2 Dibulatkan :
penutup 2,825,400.00
Pengecatan Duco bidang kayu baru/besi ( 1 lapis plamir), 1 lapis cat dasar, 3 lapis cat
23 1 m2 Dibulatkan :
penutup 282,540.00
24 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
1 Bahan 10,404.00
Cat dasar 0.120 kg 34,680.00 4,161.60
Cat penutup 2 x 0.180 kg 34,680.00 6,242.40
2 Tenaga 10,454.40
Pekerja 0.028 oh 108,000.00 3,024.00
Tukang cat 0.042 oh 150,000.00 6,300.00
Kepala tukang 0.0042 oh 162,000.00 680.40
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 20,858.40
Overhead & keuntungan 10% : 2,085.84
Jumlah : 22,944.24
24 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Dibulatkan : 22,900.00
2 Tenaga 25,455.00
Pekerja 0.040 oh 108,000.00 4,320.00
Tukang cat 0.125 oh 150,000.00 18,750.00
Kepala tukang 0.0125 oh 162,000.00 2,025.00
Mandor 0.0020 oh 180,000.00 360.00
Jumlah 356,415.00
Overhead & keuntungan 10% : 35,641.50
Jumlah : 392,056.50
25 1 m2 Pengecatan marka jalan/garis parkir t=2-3mm Dibulatkan : 392,000.00
25.a Dibulatkan per m1 l=5cm : 19,600.00
25.b Dibulatkan per m1 l=10cm : 39,200.00
25.c Dibulatkan per m1 l=15cm : 58,800.00
2 Tenaga 44,322.00
Pekerja 0.160 oh 108,000.00 17,280.00
Tukang cat 0.160 oh 150,000.00 24,000.00
Kepala tukang 0.016 oh 162,000.00 2,592.00
Mandor 0.0025 oh 180,000.00 450.00
Jumlah 186,178.37
Overhead & keuntungan 10% : 18,617.84
Jumlah : 204,796.21
26 1 m2 Pasang lapisan HPL Dibulatkan : 204,700.00
1 1 Unit Closet duduk ex. TOTO Type CW 660 NJ / SW660J + Ecowasher TCW 03 SL
a. Bahan: 5,999,600.00
Closet duduk ex. TOTO Type CW660NJ - SW660J + Ecowas 1.000 set 5,660,000.00 5,660,000.00
Perlengkapan 0.06 % 5,660,000.00 339,600
b. Upah: 598,800.00
- Tukang 1.100 hari 150,000.00 165,000.00
- Pekerja 3.300 hari 108,000.00 356,400.00
- Kepala tukang 0.300 hari 162,000.00 48,600.00
- Mandor 0.160 hari 180,000.00 28,800.00
Jumlah 6,598,400.00
Overhead & keuntungan 10% : 659,840.00
Jumlah : 7,258,240.00
1 1 Unit Closet duduk ex. TOTO Type CW 660 NJ / SW660J + Ecowasher TCW 03 SL Dibulatkan : 7,258,200.00
1a 1 Unit Closet duduk setara TOTO Type C704L - SW784JP + Ecowasher TCW 03 SL
a. Bahan: 7,200,000.00
Closet duduk setara TOTO Type C704L - SW784JP +
Ecowasher TCW 03 SL 1.000 set 7,200,000.00 7,200,000.00
Perlengkapan 0.06 % 7,200,000.00 432,000
b. Upah: 598,800.00
- Tukang 1.100 hari 150,000.00 165,000.00
- Pekerja 3.300 hari 108,000.00 356,400.00
- Kepala tukang 0.300 hari 162,000.00 48,600.00
- Mandor 0.160 hari 180,000.00 28,800.00
Jumlah 7,798,800.00
Overhead & keuntungan 10% : 779,880.00
Jumlah : 8,578,680.00
1a 1 Unit Closet duduk setara TOTO Type C704L - SW784JP + Ecowasher TCW 03 SL Dibulatkan : 8,578,600.00
2 1 Unit Closet jongkok ex Toto type CE 9 / TV 150 NWV 12
a. Bahan: 3,182,094.68
- CE 9 1.000 bh 3,170,000.000 3,170,000.00
- Semen 0.120 zak 77,689.000 9,322.68
- Pasir pasang 0.010 m3 277,200.000 2,772.00
b. Upah: 410,400.00
- Tukang 1.500 hari 150,000.00 225,000.00
- Pekerja 1.000 hari 108,000.00 108,000.00
- Kepala tukang 0.300 hari 162,000.00 48,600.00
- Mandor 0.160 hari 180,000.00 28,800.00
Jumlah 3,592,494.68
Overhead & keuntungan 10% : 359,249.47
Jumlah : 3,951,744.15
2 1 Unit Closet jongkok ex Toto type CE 9 / TV 150 NWV 12 Dibulatkan : 3,951,700.00
2a 1 Unit Closet jongkok ex. Toto type CE 7
a. Bahan: 292,094.68
- CE 7 1.000 bh 280,000.000 280,000.00
- Semen 0.120 zak 77,689.000 9,322.68
- Pasir pasang 0.010 m3 277,200.000 2,772.00
b. Upah: 410,400.00
- Tukang 1.500 hari 150,000.00 225,000.00
- Pekerja 1.000 hari 108,000.00 108,000.00
- Kepala tukang 0.300 hari 162,000.00 48,600.00
- Mandor 0.160 hari 180,000.00 28,800.00
Jumlah 702,494.68
Overhead & keuntungan 10% : 70,249.47
Jumlah : 772,744.15
2a 1 Unit Closet jongkok ex. Toto type CE 7 Dibulatkan : 772,700.00
4 1 Unit Urinal ex. Toto tipe UW477JNM Muslim type urinal
a. Bahan: 6,330,094.68
- Urinal UW477JNM Muslim type urinal 1.000 unit 4,860,000.000 4,860,000.00
- Semen 0.120 zak 77,689.000 9,322.68
- Pasir pasang 0.010 m3 277,200.000 2,772.00
Perlengkapan 30% Lot 4,860,000.00 1,458,000
b. Upah: 283,200.00
- Tukang 1.000 hari 150,000.00 150,000.00
- Pekerja 1.000 hari 108,000.00 108,000.00
- Kepala tukang 0.100 hari 162,000.00 16,200.00
- Mandor 0.050 hari 180,000.00 9,000.00
Jumlah 6,613,294.68
Overhead & keuntungan 10% : 661,329.47
Jumlah : 7,274,624.15
4 1 Unit Urinal ex. Toto tipe UW477JNM Muslim type urinal Dibulatkan : 7,274,600.00
12 1 Unit Kitchen zink setara Standar Royal tipe caroline 1 lobang complete set
a. Bahan: 484,375.00
Kitchen zink setara Standar Royal tipe caroline 1 lobang
complete set 1.000 unit 484,375.00 484,375.00
b. Upah: 66,330.00
- Pekerja 0.150 hari 108,000.00 16,200.00
- Tukang 0.300 hari 150,000.00 45,000.00
- Kepala tukang 0.030 oh 162,000.00 4,860.00
- Mandor 0.0015 hari 180,000.00 270.00
Jumlah 550,705.00
Overhead & keuntungan 10% : 55,070.50
Jumlah : 605,775.50
12 1 Unit Kitchen zink setara Standar Royal tipe caroline 1 lobang complete set Dibulatkan : 605,700.00
12a 1 Unit Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang complete set
a. Bahan: 812,500.00
Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang
complete set 1.000 unit 812,500.00 812,500.00
b. Upah: 66,330.00
- Tukang 0.300 hari 150,000.00 45,000.00
- Pekerja 0.150 hari 108,000.00 16,200.00
- Kepala tukang 0.030 hari 162,000.00 4,860.00
- Mandor 0.0015 hari 180,000.00 270.00
Jumlah 878,830.00
Overhead & keuntungan 10% : 87,883.00
Jumlah : 966,713.00
12a 1 Unit Kitchen zink setara Standar Royal tipe Elizabeth 2 lobang complete set Dibulatkan : 966,700.00
12b 1 Unit Kitchen zink setara Standar Royal tipe angela 1 lobang complete set
a. Bahan: 406,250.00
Kitchen zink setara Standar Royal tipe angela 1 lobang
complete set 1.000 unit 406,250.00 406,250.00
b. Upah: 332,340.00
- Tukang 1.450 hari 150,000.00 217,500.00
- Pekerja 0.725 hari 108,000.00 78,300.00
- Kepala tukang 0.145 hari 162,000.00 23,490.00
- Mandor 0.073 hari 180,000.00 13,050.00
Jumlah 738,590.00
Overhead & keuntungan 10% : 73,859.00
Jumlah : 812,449.00
12b 1 Unit Kitchen zink setara Standar Royal tipe angela 1 lobang complete set Dibulatkan : 812,400.00
12c 1 Unit Laundry sink setara TOTO tipe SK322E-T30ARQ13N
a. Bahan: 9,720,000.00
Laundry sink setara TOTO tipe SK322E-T30ARQ13N 1.000 unit 9,720,000.00 9,720,000.00
b. Upah: 332,340.00
- Tukang 1.450 hari 150,000.00 217,500.00
- Pekerja 0.725 hari 108,000.00 78,300.00
- Kepala tukang 0.145 hari 162,000.00 23,490.00
- Mandor 0.073 hari 180,000.00 13,050.00
Jumlah 10,052,340.00
Overhead & keuntungan 10% : 1,005,234.00
Jumlah : 11,057,574.00
12c 1 Unit Laundry sink setara TOTO tipe SK322E-T30ARQ13N Dibulatkan : 11,057,500.00
14e 1 Unit Fixed Shower Head setara TOTO tipe TX465SMN + TX452SO
a. Bahan: 1,784,000.00
Fixed Shower Head setara TOTO tipe TX465SMN + TX452S 1.000 unit 1,784,000.000 1,784,000.00
b. Upah: 33,930.00
- Tukang 0.150 hari 150,000.00 22,500.00
- Pekerja 0.075 hari 108,000.00 8,100.00
- Kepala tukang 0.015 hari 162,000.00 2,430.00
- Mandor 0.005 hari 180,000.00 900.00
Jumlah 1,817,930.00
Overhead & keuntungan 10% : 181,793.00
Jumlah : 1,999,723.00
14e 1 Unit Fixed Shower Head setara TOTO tipe TX465SMN + TX452SO Dibulatkan : 1,999,700.00
14o 1 Unit Soap holder/Tempat sabun setara TOTO tipeS 156 NV1
a. Bahan: 151,000.00
Soap holder/Tempat sabun setara TOTO tipeS 156 NV1 1.000 bh 151,000.000 151,000.00
b. Upah: 13,740.00
- Tukang 0.055 hari 150,000.00 8,250.00
- Pekerja 0.028 hari 108,000.00 2,970.00
- Kepala tukang 0.010 hari 162,000.00 1,620.00
- Mandor 0.005 hari 180,000.00 900.00
Jumlah 164,740.00
Overhead & keuntungan 10% : 16,474.00
Jumlah : 181,214.00
14o 1 Unit Soap holder/Tempat sabun setara TOTO tipeS 156 NV1 Dibulatkan : 181,200.00
14p 1 Unit Grab bar Nylon setara tipe KFS 7C
a. Bahan: 1,980,000.00
Grab bar Nylon setara tipe KFS 7C 1.000 bh 1,980,000.000 1,980,000.00
b. Upah: 22,920.00
- Tukang 0.100 hari 150,000.00 15,000.00
- Pekerja 0.050 hari 108,000.00 5,400.00
- Kepala tukang 0.010 hari 162,000.00 1,620.00
- Mandor 0.005 hari 180,000.00 900.00
Jumlah 2,002,920.00
Overhead & keuntungan 10% : 200,292.00
Jumlah : 2,203,212.00
14p 1 Unit Grab bar Nylon setara tipe KFS 7C Dibulatkan : 2,203,200.00
1 2 3 4 5 6 7
26 1M 1
Memasang Pipa PVC Tipe AW Ø 3/4"
### 4,172.82
Pipa PVC Ø 3/4" 1.200 m' 2,575.81 3,090.98
Perlengkapan 35% Harga Pipa 1.000 Ls 1,081.84 1,081.84
Tenaga Kerja 14,220.00
Pekerja 0.036 0rg/hr 108,000.00 3,888.00
Tukang Pipa 0.060 0rg/hr 150,000.00 9,000.00
Kepala Tukang 0.006 0rg/hr 162,000.00 972.00
Mandor 0.002 0rg/hr 180,000.00 360.00
Jumlah 18,392.82
Overhead & keuntungan 10% : 1,839.28
Jumlah : 20,232.10
26 1 M1 Memasang Pipa PVC Tipe AW Ø 3/4" Dibulatkan : 20,200.00
1 2 3 4 5 6 7
29 1M 1
Memasang Pipa PVC Tipe AW Ø 2"
Bahan 14,241.62
Pipa PVC Ø 2" 1.200 m' 8,791.13 10,549.35
Perlengkapan 35% Harga Pipa 1.000 Ls 3,692.27 3,692.27
Tenaga Kerja 21,330.00
Pekerja 0.054 0rg/hr 108,000.00 5,832.00
Tukang Pipa 0.090 0rg/hr 150,000.00 13,500.00
Kepala Tukang 0.009 0rg/hr 162,000.00 1,458.00
Mandor 0.003 0rg/hr 180,000.00 540.00
Jumlah 35,571.62
Overhead & keuntungan 10% : 3,557.16
Jumlah : 39,128.78
29 1 M1 Memasang Pipa PVC Tipe AW Ø 2" Dibulatkan : 39,100.00
30 1M 1
Memasang Pipa PVC Tipe AW Ø 2 1/2"
Bahan 14,245.07
Pipa PVC Ø 2 1/2" 1.200 m' 8,793.25 10,551.90
Perlengkapan 35% Harga Pipa 1.000 Ls 3,693.17 3,693.17
Tenaga Kerja 23,581.80
Pekerja 0.050 0rg/hr 108,000.00 5,346.00
Tukang Pipa 0.099 0rg/hr 150,000.00 14,850.00
Kepala Tukang 0.010 0rg/hr 162,000.00 1,603.80
Mandor 0.010 0rg/hr 180,000.00 1,782.00
Jumlah 37,826.87
Overhead & keuntungan 10% : 3,782.69
Jumlah : 41,609.55
30 1 M1 Memasang Pipa PVC Tipe AW Ø 2 1/2" Dibulatkan : 41,600.00
32 1M 1
Memasang Pipa PVC Tipe AW Ø 4"
Bahan 37,986.87
Pipa PVC Ø 4" 1.200 m' 23,448.69 28,138.43
Perlengkapan 35% Harga Pipa 1.000 Ls 9,848.45 9,848.45
Tenaga Kerja 28,533.98
Pekerja 0.060 0rg/hr 108,000.00 6,468.66
Tukang Pipa 0.120 0rg/hr 150,000.00 17,968.50
Kepala Tukang 0.012 0rg/hr 162,000.00 1,940.60
Mandor 0.012 0rg/hr 180,000.00 2,156.22
Jumlah 66,520.85
Overhead & keuntungan 10% : 6,652.09
Jumlah : 73,172.94
32 1 M1 Memasang Pipa PVC Tipe AW Ø 4" Dibulatkan : 73,100.00
1 2 3 4 5 6 7
32b 1M 1
Memasang Pipa PVC Tipe AW Ø 6"
Bahan 62,623.23
Pipa PVC Ø 6" 1.200 m' 38,656.31 46,387.58
Perlengkapan 35% Harga Pipa 1.000 Ls 16,235.65 16,235.65
Tenaga Kerja 34,526.11
Pekerja 0.072 0rg/hr 108,000.00 7,827.08
Tukang Pipa 0.145 0rg/hr 150,000.00 21,741.89
Kepala Tukang 0.014 0rg/hr 162,000.00 2,348.12
Mandor 0.014 0rg/hr 180,000.00 2,609.03
Jumlah 97,149.34
Overhead & keuntungan 10% : 9,714.93
Jumlah : 106,864.27
32b 1 M1 Memasang Pipa PVC Tipe AW Ø 6" Dibulatkan : 106,800.00
32c 1M 1
Memasang Pipa PVC Tipe AW Ø 8"
Bahan 118,147.21
Pipa PVC Ø 8" 1.200 m' 72,930.38 87,516.45
Perlengkapan 35% Harga Pipa 1.000 Ls 30,630.76 30,630.76
Tenaga Kerja 37,978.72
Pekerja 0.080 0rg/hr 108,000.00 8,609.79
Tukang Pipa 0.159 0rg/hr 150,000.00 23,916.07
Kepala Tukang 0.016 0rg/hr 162,000.00 2,582.94
Mandor 0.016 0rg/hr 180,000.00 2,869.93
Jumlah 156,125.93
Overhead & keuntungan 10% : 15,612.59
Jumlah : 171,738.53
32c 1 M1 Memasang Pipa PVC Tipe AW Ø 8" Dibulatkan : 171,700.00
33 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 50x50x100cm termasuk tutup
a. Terpasang
- Galian Tanah 0.70 m3 85,500.00 60,192.00
- Pasir urug t=5cm 0.32 m3 336,600.00 107,712.00
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.32 m3 1,177,499.00 376,799.68
- Pembesian 150kg/m3 50.70 kg 12,899.400 653,999.58
- Bekisting dinding bagian luar 2 x pakai 3.52 m2 381,784.800 1,343,882.50
- Bekisting dinding dan tutup 2 x pakai 3.38 m2 381,784.800 1,290,432.62
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.34 m3 1,245,639.75 421,026.24
- Urugan kembali bekas galian 0.25 m3 117,810.00 29,028.38
- Buangan tanah kearea site 0.46 m3 37,440.00 17,132.54
Jumlah Rp 4,300,205.54
Overhead & keuntungan 10% : Rp 430,020.55
Jumlah : Rp 4,730,226.10
33 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 50x50x100cm termasuk tutup Dibulatkan : Rp 4,730,200.00
34 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 60x60x100cm termasuk tutup
a. Terpasang
- Galian Tanah 0.89 m3 85,500.00 76,180.50
- Pasir urug t=5cm 0.41 m3 336,600.00 136,323.00
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.41 m3 1,177,499.00 476,887.10
- Pembesian 150kg/m3 61.20 kg 12,899.400 789,443.28
- Bekisting dinding bagian luar 2 x pakai 3.96 m2 381,784.800 1,511,867.81
- Bekisting dinding dan tutup 2 x pakai 4.08 m2 381,784.800 1,557,681.98
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.41 m3 1,245,639.75 508,221.02
- Urugan kembali bekas galian 0.31 m3 117,810.00 36,739.05
- Buangan tanah kearea site 0.58 m3 37,440.00 21,683.38
Jumlah Rp 5,115,027.11
Overhead & keuntungan 10% : Rp 511,502.71
Jumlah : Rp 5,626,529.82
34 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 60x60x100cm termasuk tutup Dibulatkan : Rp 5,626,500.00
35 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 70x70x120cm termasuk tutup
a. Terpasang
- Galian Tanah 1.57 m3 85,500.00 134,491.50
- Pasir urug t=5cm 0.59 m3 336,600.00 199,957.23
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.59 m3 1,177,499.00 699,493.28
- Pembesian 150kg/m3 96.30 kg 12,899.400 1,242,212.22
- Bekisting dinding bagian luar 2 x pakai 5.20 m2 381,784.800 1,985,280.96
- Bekisting dinding dan tutup 2 x pakai 5.35 m2 381,784.800 2,042,548.68
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.64 m3 1,245,639.75 799,700.72
- Urugan kembali bekas galian 0.55 m3 117,810.00 64,860.30
- Buangan tanah kearea site 1.02 m3 37,440.00 38,280.53
Jumlah Rp 7,206,825.41
Overhead & keuntungan 10% : Rp 720,682.54
Jumlah : Rp 7,927,507.96
35 1bh Pembuatan bak kontrol dari beton bertulang t= 100mm uk. 70x70x120cm termasuk tutup Dibulatkan : Rp 7,927,500.00
36 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 80x80x130cm termasuk tutup
a. Terpasang
- Galian Tanah 2.02 m3 85,500.00 172,368.00
- Pasir urug t=5cm 0.59 m3 336,600.00 199,957.23
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.59 m3 1,177,499.00 699,493.28
- Pembesian 150kg/m3 102.97 kg 12,899.400 1,328,277.02
- Bekisting dinding bagian luar 2 x pakai 6.27 m2 381,784.800 2,394,554.27
- Bekisting dinding dan tutup 2 x pakai 5.72 m2 381,784.800 2,184,063.58
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 0.69 m3 1,245,639.75 855,106.78
- Urugan kembali bekas galian 0.71 m3 117,810.00 83,126.74
- Buangan tanah kearea site 1.31 m3 37,440.00 49,061.38
Jumlah Rp 7,966,008.26
Overhead & keuntungan 10% : Rp 796,600.83
Jumlah : Rp 8,762,609.09
36 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 80x80x130cm termasuk tutup Dibulatkan : Rp 8,762,600.00
37 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 90x90x150cm termasuk tutup
a. Terpasang
- Galian Tanah 3.33 m3 85,500.00 284,886.00
- Pasir urug t=5cm 0.65 m3 336,600.00 218,722.68
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.65 m3 1,177,499.00 765,138.85
- Pembesian 150kg/m3 156.95 kg 12,899.400 2,024,504.07
- Bekisting dinding bagian luar 2 x pakai 7.68 m2 381,784.800 2,932,107.26
- Bekisting dinding dan tutup 2 x pakai 8.72 m2 381,784.800 3,328,858.03
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 1.05 m3 1,245,639.75 1,303,317.85
- Urugan kembali bekas galian 1.17 m3 117,810.00 137,390.02
- Buangan tanah kearea site 2.17 m3 37,440.00 81,087.55
Jumlah Rp 11,076,012.32
Overhead & keuntungan 10% : Rp 1,107,601.23
Jumlah : Rp 12,183,613.55
37 1bh Pembuatan bak kontrol dari beton bertulang t= 120mm uk. 90x90x150cm termasuk tutup Dibulatkan : Rp 12,183,600.00
38 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 100x100x200cm termasuk tutup
a. Terpasang
- Galian Tanah 4.95 m3 85,500.00 423,225.00
- Pasir urug t=5cm 0.85 m3 336,600.00 284,427.00
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.85 m3 1,177,499.00 994,986.66
- Pembesian 150kg/m3 283.05 kg 12,899.400 3,651,175.17
- Bekisting dinding bagian luar 2 x pakai 11.76 m2 381,784.800 4,489,789.25
- Bekisting dinding dan tutup 2 x pakai 15.73 m2 381,784.800 6,003,565.98
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 1.89 m3 1,245,639.75 2,350,522.21
- Urugan kembali bekas galian 1.73 m3 117,810.00 204,105.83
- Buangan tanah kearea site 3.22 m3 37,440.00 120,463.20
Jumlah Rp 18,522,260.29
Overhead & keuntungan 10% : Rp 1,852,226.03
Jumlah : Rp 20,374,486.32
38 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 100x100x200cm termasuk tutup Dibulatkan : Rp 20,374,400.00
39 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 120x120x200cm termasuk tutup
a. Terpasang
- Galian Tanah 6.36 m3 85,500.00 543,609.00
- Pasir urug t=5cm 1.04 m3 336,600.00 348,986.88
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 1.04 m3 1,177,499.00 1,220,830.96
- Pembesian 150kg/m3 344.25 kg 12,899.400 4,440,618.45
- Bekisting dinding bagian luar 2 x pakai 13.44 m2 381,784.800 5,131,187.71
- Bekisting dinding dan tutup 2 x pakai 15.30 m2 381,784.800 5,841,307.44
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 2.30 m3 1,245,639.75 2,858,743.23
- Urugan kembali bekas galian 2.23 m3 117,810.00 262,162.59
- Buangan tanah kearea site 4.13 m3 37,440.00 154,728.29
Jumlah Rp 20,802,174.55
Overhead & keuntungan 10% : Rp 2,080,217.46
Jumlah : Rp 22,882,392.01
39 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 120x120x200cm termasuk tutup Dibulatkan : Rp 22,882,300.00
40 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 140x140x200cm termasuk tutup
a. Terpasang
- Galian Tanah 7.94 m3 85,500.00 679,041.00
- Pasir urug t=5cm 1.45 m3 336,600.00 486,387.00
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 1.45 m3 1,177,499.00 1,701,486.06
- Pembesian 150kg/m3 409.05 kg 12,899.400 5,276,499.57
- Bekisting dinding bagian luar 2 x pakai 16.72 m2 381,784.800 6,383,441.86
- Bekisting dinding dan tutup 2 x pakai 18.18 m2 381,784.800 6,940,847.66
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 2.73 m3 1,245,639.75 3,396,859.60
- Urugan kembali bekas galian 2.78 m3 117,810.00 327,476.46
- Buangan tanah kearea site 5.16 m3 37,440.00 193,276.51
Jumlah Rp 25,385,315.71
Overhead & keuntungan 10% : Rp 2,538,531.57
Jumlah : Rp 27,923,847.29
40 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 140x140x200cm termasuk tutup Dibulatkan : Rp 27,923,800.00
41 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 200x200x300cm termasuk tutup
a. Terpasang
- Galian Tanah 20.00 m3 85,500.00 1,710,000.00
- Pasir urug t=5cm 0.26 m3 336,600.00 89,030.70
- Lantai kerja beton mutu fc=7,4 Mpa (K 100) 0.26 m3 1,177,499.00 311,448.49
- Pembesian 150kg/m3 818.55 kg 12,899.400 10,558,803.87
- Bekisting dinding bagian luar 2 x pakai 32.00 m2 381,784.800 12,217,113.60
- Bekisting dinding dan tutup 2 x pakai 36.38 m2 381,784.800 13,889,331.02
- Beton mutu fc=24.0 Mpa (K 275), slum (12 ± 2) cm, w/c = 0.53 5.46 m3 1,245,639.75 6,797,456.12
- Urugan kembali bekas galian 7.00 m3 117,810.00 824,670.00
- Buangan tanah kearea site 13.00 m3 37,440.00 486,720.00
Jumlah Rp 46,884,573.80
Overhead & keuntungan 10% : Rp 4,688,457.38
Jumlah : Rp 51,573,031.18
41 1bh Pembuatan bak kontrol dari beton bertulang t= 150mm uk. 200x200x300cm termasuk tutup Dibulatkan : Rp 51,573,000.00
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 100,00 ton pekerjaan
- Kereta dorong = 2 buah
- Sekop = 4 buah
- Garokan = 2 buah
A. TENAGA
B. BAHAN
C. PERALATAN
ALAT BANTU
Diperlukan setiap : 75,00 m3 pekerjaan
- Kereta dorong = 3 buah
- Sekop = 5 buah
- Sapu = 5 buah
- Pengki = 3 buah
- Karung = 5 buah
- Cerek Aspal = 3 buah
- Kaleng Aspal = 3 buah
PEKERJAAN JALAN/PERKERASAN
DIRJEN Binamarga-PERMEN PU NOMOR 28/PRT/M/2016 Edisi Penyempurnaan
P.01 1 Hr Pekerjaan Menggilas
P.019 1 m³ Sub base course kelas B t=15 cm batu crop ( CBR 60% )
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan 382,682.40
Batu krop 1.20 m³ 318,902.00 382,682.40
Tenaga Kerja 1,590.31
Pekerja 0.0595 jam 21,600.00 1,284.48
Mandor 0.0085 jam 36,000.00 305.83
Sewa alat 192,604.17
Wheel Loader 0.0085 jam 346,027.08 2,941.23
Dump Truck 0.5043 jam 350,000.00 176,505.00
Motor Grader 0.0094 jam 258,500.00 2,429.90
Tandem roller 0.0428 jam 180,400.00 7,721.12
Water tank Truck 0.0141 jam 213,256.58 3,006.92
Jumlah 576,876.87
Overhead & keuntungan 10% : 57,687.69
Jumlah : 634,564.56
P.019 1 m³ Sub base course kelas B t=15 cm batu crop ( CBR 60% ) Dibulatkan : 634,500.00
P.020 1 m³ Urug Sirtu Padat Untuk jalan ( CBR 75% ) t=40 cm
DIRJEN Binamarga-Panduan Analisis Satuan No 008BM2008
Bahan 382,682.40
Sirtu 1.20 m³ 318,902.00 382,682.40
Tenaga Kerja 1,590.31
Pekerja 0.0595 jam 21,600.00 1,284.48
Mandor 0.0085 jam 36,000.00 305.83
Sewa alat 192,604.17
Wheel Loader 0.0085 jam 346,027.08 2,941.23
Dump Truck 0.5043 jam 350,000.00 176,505.00
Motor Grader 0.0094 jam 258,500.00 2,429.90
Tandem roller 0.0428 jam 180,400.00 7,721.12
Water tank Truck 0.0141 jam 213,256.58 3,006.92
Jumlah 576,876.87
Overhead & keuntungan 10% : 57,687.69
Jumlah : 634,564.56
P.020 1 m³ Urug Sirtu Padat Untuk jalan ( CBR 75% ) t=40 cm Dibulatkan : 634,500.00
P.021 1 m' Pekerjaan Kansteen ( 15.28.60 )
PERMEN PU 11/PRT/M/2013
Pek. Analisa sebelum keuntungan 26,361.11
Galian Tanah 0.088 m³ 85,500.00 7,481.25
Urugan pasir 0.010 m³ 336,600.00 3,366.00
Mengurug Kembali 0.031 m³ 28,500.00 872.81
Adukan 1:5 / screed untuk penahan 0.200 m2 73,205.23 14,641.05
Bahan 103,248.90
Beton kansteen 1.667 bh 57,288.00 95,480.00
Semen untuk pengikat 0.100 zak 77,689.00 7,768.90
Tenaga Kerja ( Upah pasanga ) 39,120.00
Pekerja 0.2000 org/hr 108,000.00 21,600.00
Tukang Batu 0.1000 org/hr 150,000.00 15,000.00
Kepala Tukang Batu 0.0100 org/hr 162,000.00 1,620.00
Mandor 0.0050 org/hr 180,000.00 900.00
Jumlah 168,730.01
Overhead & keuntungan 10% : 16,873.00
Jumlah : 185,603.01
P.021 1 m' Pekerjaan Kansteen ( 15.28.60 ) Dibulatkan : 185,600.00
1 1 M3 Pek. Galian lubang tanam pada tanah biasa maks kedalaman 1 M'
Pekerja 0.7500 org 108,000.00 81,000.00
Mandor 0.0250 org 180,000.00 4,500.00
Jumlah : 85,500.00
Overhead & keuntungan 10% : 8,550.00
Jumlah : 94,050.00
1 1 M3 Pek. Galian lubang tanam pada tanah biasa maks kedalaman 1 M' Dibulatkan : 94,000.00
2 1M3 Urugan Tanah Humus / Timbunan
Bahan : 164,643.60
Tanah Urug gembur 1.1000 m3 149,676.00 164,643.60
Tenaga : 31,500.00
Pekerja 0.2500 org 108,000.00 27,000.00
Mandor 0.0250 org 180,000.00 4,500.00
Jumlah : 196,143.60
Overhead & keuntungan 10% : 19,614.36
Jumlah : 215,757.96
2 1M3 Urugan Tanah Humus / Timbunan Dibulatkan : 215,700.00
3 1 M3 Pek. Pemadatan dan pengolahan Tanah urugan
Pekerja 0.5000 org 108,000.00 54,000.00
Mandor 0.0500 org 180,000.00 9,000.00
Jumlah : 63,000.00
Overhead & keuntungan 10% : 6,300.00
Jumlah : 69,300.00
3 1 M3 Pek. Pemadatan dan pengolahan Tanah urugan Dibulatkan : 69,300.00
4 1 M3 Buangan siasa Pekerjaan keluar Lokasi Max 30 M
Pekerja 0.3300 org 108,000.00 35,640.00
Mandor 0.0100 org 180,000.00 1,800.00
Jumlah : 37,440.00
Overhead & keuntungan 10% : 3,744.00
Jumlah : 41,184.00
4 1 M3 Buangan siasa Pekerjaan keluar Lokasi Max 30 M Dibulatkan : 41,100.00
5 1.lbg. Lubang Tanam dan pengolahan untuk Pohon
Galian Tanah 60x60x60 0.2160 m3 85,500.00 18,468.00
Penimbunan Kembali lubang tanam 0.0648 m3 29,925.00 1,939.14
Tambahan Urugan Tanah Humus perlubang 0.0432 m3 196,143.60 8,473.40
Jumlah : 28,880.54
Overhead & keuntungan 10% : 2,888.05
Jumlah : 31,768.60
5 1.lbg. Lubang Tanam dan pengolahan untuk Pohon Dibulatkan : 31,700.00
6 1 M2 Penyiraman Tanaman
Bahan : 675.00
Air Baku 0.1500 m3 4,500.00 675.00
Tenaga : 2,494.80
Pekerja 0.0225 org 108,000.00 2,430.00
Mandor 0.0004 org 180,000.00 64.80
Peralatan 1.0000 Lot 475.47 475.47 475.47
Jumlah : 3,645.27
Overhead & keuntungan 10% : 364.53
Jumlah : 4,009.80
6 1 M2 Penyiraman Tanaman Dibulatkan : 4,000.00
Jumlah : 128,912.70
Overhead & keuntungan 10% : 12,891.27
Jumlah : 141,803.97
56 1M2. Penanaman Rumput bermuda Dibulatkan : 141,800.00
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
1 1 Unit Standing Signage tipe SS-1 & SS-2 ukuran 800x2100 mm
1 Harga terpasang 13,026,298.96
Terpasang Rangka hollow 40x40x2mm 1.10 m2 210,750.00 231,825.00
Terpasang MDF t=12mm 1.10 m2 179,400.00 197,340.00
Terpasang lapisan HPL 1.10 m2 186,178.37 204,796.21
Signika Negative t=100mm terpasang stainless 20.00 cm 9,450.00 189,000.00
Signika Negative t=50mm terpasang Stainless 185.00 cm 9,450.00 1,748,250.00
Signika Negative t=30mm terpasang Stainless 45.00 cm 9,450.00 425,250.00
Signika Negative t=20 & 15mm terpasang Stainless 854.00 cm 9,450.00 8,070,300.00
Plat stainless steel t=4,5mm 1.10 m2 1,456,397.95 1,602,037.75
Grafir pola batik 1.00 Lot 357,500.00 357,500.00
2 Alat batu dan bahan penunjang 1.00 LS 1,302,629.90 1,302,629.90 1,302,629.90
Jumlah : 14,328,928.85
Overhead + Profit 10% : 1,432,892.89
Jumlah & pembulatan : 15,761,821.00
Jumlah : 13,935,678.85
Overhead + Profit 10% : 1,393,567.89
Jumlah & pembulatan : 15,329,246.00
3 1 Unit Ceilling hanging Signage tipe S2-1 s/d S2-6 & S2-22 s/d S2-24 ukuran 640x1200 mm
1 Harga terpasang 1,226,774.03
Terpasang Rangka hollow 40x40x2mm 0.77 m2 210,750.00 161,856.00
Terpasang Acrylic t=10mm warna 1.54 m2 693,306.01 1,064,918.03
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 781,166.59 781,166.59 781,166.59
Jumlah : 2,007,940.62
Overhead + Profit 10% : 200,794.06
Jumlah & pembulatan : 2,208,734.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 122,057.28 122,057.28 122,057.28
Jumlah : 339,030.72
Overhead + Profit 10% : 33,903.07
Jumlah & pembulatan : 372,933.00
5 1 Unit Ceilling hanging Signage tipe S2-8 s/d S2-10 & S2-21 ukuran 200x1200 mm
1 Harga terpasang 383,366.89
Terpasang Rangka hollow 40x40x2mm 0.24 m2 210,750.00 50,580.00
Terpasang Acrylic t=10mm warna 0.48 m2 693,306.01 332,786.89
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 244,114.56 244,114.56 244,114.56
Jumlah : 627,481.45
Overhead + Profit 10% : 62,748.14
Jumlah & pembulatan : 690,229.00
6 1 Unit Ceilling hanging Signage tipe S2-11 & S2-12 & S2-20 ukuran 200x1500 mm
1 Harga terpasang 271,216.80
Terpasang Rangka hollow 40x40x2mm 0.30 m2 210,750.00 63,225.00
Terpasang Acrylic t=10mm warna 0.30 m2 693,306.01 207,991.80
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 152,571.60 152,571.60 152,571.60
Jumlah : 423,788.40
Overhead + Profit 10% : 42,378.84
Jumlah & pembulatan : 466,167.00
ANALISA HARGA SATUAN PEKERJAAN
H. SATUAN BAHAN TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
7 1 Unit Ceilling hanging Signage tipe S2-13 ukuran 200x1800 mm
1 Harga terpasang 325,460.16
Terpasang Rangka hollow 40x40x2mm 0.36 m2 210,750.00 75,870.00
Terpasang Acrylic t=10mm warna 0.36 m2 693,306.01 249,590.16
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 183,085.92 183,085.92 183,085.92
Jumlah : 508,546.08
Overhead + Profit 10% : 50,854.61
Jumlah & pembulatan : 559,400.00
8 1 Unit Ceilling hanging Signage tipe S2-14, S2-16 & S2-18 ukuran 200x600 mm
1 Harga terpasang 108,486.72
Terpasang Rangka hollow 40x40x2mm 0.12 m2 210,750.00 25,290.00
Terpasang Acrylic t=10mm warna 0.12 m2 693,306.01 83,196.72
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 61,028.64 61,028.64 61,028.64
Jumlah : 169,515.36
Overhead + Profit 10% : 16,951.54
Jumlah & pembulatan : 186,466.00
9 1 Unit Ceilling hanging Signage tipe S2-15 & S2-19 ukuran 200x1200 mm
1 Harga terpasang 216,973.44
Terpasang Rangka hollow 40x40x2mm 0.24 m2 210,750.00 50,580.00
Terpasang Acrylic t=10mm warna 0.24 m2 693,306.01 166,393.44
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 122,057.28 122,057.28 122,057.28
Jumlah : 339,030.72
Overhead + Profit 10% : 33,903.07
Jumlah & pembulatan : 372,933.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 183,085.92 183,085.92 183,085.92
Jumlah : 508,546.08
Overhead + Profit 10% : 50,854.61
Jumlah & pembulatan : 559,400.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 512,640.58 512,640.58 512,640.58
Jumlah : 1,317,711.04
Overhead + Profit 10% : 131,771.10
Jumlah & pembulatan : 1,449,482.00
Jumlah : 213,600.24
Overhead + Profit 10% : 21,360.02
Jumlah & pembulatan : 234,960.00
Jumlah : 106,800.12
Overhead + Profit 10% : 10,680.01
Jumlah & pembulatan : 117,480.00
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
Jumlah : 413,850.47
Overhead + Profit 10% : 41,385.05
Jumlah & pembulatan : 455,235.00
Jumlah : 453,900.51
Overhead + Profit 10% : 45,390.05
Jumlah & pembulatan : 499,290.00
ANALISA HARGA SATUAN PEKERJAAN
H. SATUAN BAHAN TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
16 1 Unit Wall Signage tipe S3-6 s/d S3-8 ukuran variabel
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00 Lot 461,529.09 461,529.09 461,529.09
Jumlah : 461,529.09
Overhead + Profit 10% : 46,152.91
Jumlah & pembulatan : 507,681.00
17 1 Unit Wall Signage tipe S3-9 s/d S3-10 ukuran 400 x 2340mm
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00 Lot 714,035.09 714,035.09 714,035.09
Jumlah : 714,035.09
Overhead + Profit 10% : 71,403.51
Jumlah & pembulatan : 785,438.00
Jumlah : 377,614.71
Overhead + Profit 10% : 37,761.47
Jumlah & pembulatan : 415,376.00
Jumlah : 236,867.41
Overhead + Profit 10% : 23,686.74
Jumlah & pembulatan : 260,554.00
Jumlah : 289,504.61
Overhead + Profit 10% : 28,950.46
Jumlah & pembulatan : 318,455.00
Jumlah : 4,240,178.36
Overhead + Profit 10% : 424,017.84
Jumlah & pembulatan : 4,664,196.00
Jumlah : 10,658,651.98
Overhead + Profit 10% : 1,065,865.20
Jumlah & pembulatan : 11,724,517.00
Jumlah : 10,537,611.84
Overhead + Profit 10% : 1,053,761.18
Jumlah & pembulatan : 11,591,373.00
23 1 Unit Wall Signage tipe S3-17 & S3-18 ukuran 2520 x 7505mm
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00 Lot 9,618,418.81 9,618,418.81 9,618,418.81
Jumlah : 9,618,418.81
Overhead + Profit 10% : 961,841.88
Jumlah & pembulatan : 10,580,260.00
ANALISA HARGA SATUAN PEKERJAAN
H. SATUAN BAHAN TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 89,000.10 89,000.10 89,000.10
Jumlah : 228,769.28
Overhead + Profit 10% : 22,876.93
Jumlah & pembulatan : 251,646.00
Jumlah : 210,439.80
Overhead + Profit 10% : 21,043.98
Jumlah & pembulatan : 231,483.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 17,800.02 17,800.02 17,800.02
Jumlah : 49,441.98
Overhead + Profit 10% : 4,944.20
Jumlah & pembulatan : 54,386.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 34,328.61 34,328.61 34,328.61
Jumlah : 95,352.39
Overhead + Profit 10% : 9,535.24
Jumlah & pembulatan : 104,887.00
Jumlah : 126,000.00
Overhead + Profit 10% : 12,600.00
Jumlah & pembulatan : 138,600.00
Jumlah : 252,000.00
Overhead + Profit 10% : 25,200.00
Jumlah & pembulatan : 277,200.00
Jumlah : 322,333.16
Overhead + Profit 10% : 32,233.32
Jumlah & pembulatan : 354,566.00
Jumlah : 105,000.00
Overhead + Profit 10% : 10,500.00
Jumlah & pembulatan : 115,500.00
ANALISA HARGA SATUAN PEKERJAAN
H. SATUAN BAHAN TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
ANALISA HARGA SATUAN PEKERJAAN
H. SATUAN BAHAN TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
32 1 Unit Floor Signage tipe S6-1 ukuran Ø800
1 Harga terpasang
Finishing cat huruf dan Gambar 1.00 Lot 204,137.58 204,137.58 204,137.58
Jumlah : 204,137.58
Overhead + Profit 10% : 20,413.76
Jumlah & pembulatan : 224,551.00
Jumlah : 1,079,523.73
Overhead + Profit 10% : 107,952.37
Jumlah & pembulatan : 1,187,476.00
2 1 Unit Ceilling hanging Signage tipe S7-1 s/d S7-3 ukuran 200x600 mm
1 Harga terpasang 108,486.72
Terpasang Rangka hollow 40x40x2mm 0.12 m2 210,750.00 25,290.00
Terpasang Acrylic t=10mm warna 0.12 m2 693,306.01 83,196.72
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 61,028.64 61,028.64 61,028.64
Jumlah : 169,515.36
Overhead + Profit 10% : 16,951.54
Jumlah & pembulatan : 186,466.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 122,057.28 122,057.28 122,057.28
Jumlah : 313,740.72
Overhead + Profit 10% : 31,374.07
Jumlah & pembulatan : 345,114.00
Jumlah : 252,887.43
Overhead + Profit 10% : 25,288.74
Jumlah & pembulatan : 278,176.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 Lot 122,057.28 122,057.28 122,057.28
3 Biaya pemasangan :
Galian + pengecoran 1.00 lobang 130,567.00 130,567.00 130,567.00
Jumlah : 689,894.30
Overhead + Profit 10% : 68,989.43
Jumlah & pembulatan : 758,883.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 81,371.52 81,371.52 81,371.52
Jumlah : 226,020.48
Overhead + Profit 10% : 22,602.05
Jumlah & pembulatan : 248,622.00
ANALISA HARGA SATUAN PEKERJAAN
H. SATUAN BAHAN TOTAL
No URAIAN JENIS PEKERJAAN Koef. SATUAN Rp Rp Rp
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
7 1 Unit Wall Signage tipe S7-8 ukuran 100x700 mm
1 Harga terpasang 30,252.60
Plat alumunium t=3mm 0.07 m2 432,180.00 30,252.60
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 Lot 53,400.06 53,400.06 53,400.06
Jumlah : 83,652.66
Overhead + Profit 10% : 8,365.27
Jumlah & pembulatan : 92,017.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 Lot 91,542.96 91,542.96 91,542.96
Jumlah : 143,404.56
Overhead + Profit 10% : 14,340.46
Jumlah & pembulatan : 157,745.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 25,428.60 25,428.60 25,428.60
Jumlah : 70,631.40
Overhead + Profit 10% : 7,063.14
Jumlah & pembulatan : 77,694.00
10 1 Unit Ceilling hanging Signage tipe S7-11 & S7-12 ukuran 200x600 mm
1 Harga terpasang 108,486.72
Terpasang Rangka hollow 40x40x2mm 0.12 m2 210,750.00 25,290.00
Terpasang Acrylic t=10mm warna 0.12 m2 693,306.01 83,196.72
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 61,028.64 61,028.64 61,028.64
Jumlah : 169,515.36
Overhead + Profit 10% : 16,951.54
Jumlah & pembulatan : 186,466.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 Lot 122,057.28 122,057.28 122,057.28
3 Biaya pemasangan :
Galian + pengecoran 1.00 lobang 130,567.00 130,567.00 130,567.00
Jumlah : 689,894.30
Overhead + Profit 10% : 68,989.43
Jumlah & pembulatan : 758,883.00
2 Biaya finishing
Finishing cat huruf dan Gambar 1.00 LS 162,743.04 162,743.04 162,743.04
Jumlah : 418,320.96
Overhead + Profit 10% : 41,832.10
Jumlah & pembulatan : 460,153.00
1 3 4 5 6 7 9
R. Harga satuan pekerjaan Signage
Jumlah : 501,849.42
Overhead + Profit 10% : 50,184.94
Jumlah & pembulatan : 552,034.00
ANALISA HARGA SATUAN PEKERJAAN
KOEF SATUAN HARGA STUAN SUB. JUMLAH JUMLAH
NO. URAIAN
Rp. Rp. Rp.
1 2 3 4 5 6 7
S PEKERJAAN RAK SEPEDA
Jumlah 17,424,416.93
Overhead & keuntungan 10% : 1,742,441.69
Jumlah : 19,166,858.63
3. Finishing cat duco 12.744 282,540.00 3,600,687.05 3,600,687.05
1 1 Unit Rak sepeda per segmet isi 10 sepeda Dibulatkan : 22,767,500.00