Perbandingan dimensi U - Ditch

Luas DTA Badan Jalan/ 50 meter Q Desain (Tr.50)


No Uraian
Km2 (m3/dt)
1 Desain Awal 0,00030 0.00521
2 Perubahan 0,00045 0.00679

U – Ditch ( 0,80 m x 1,20 m )

U – Ditch ( 1,00 m x 1,20 m )


ANALISA DETAIL HIDROLIS

h rencana so (Slope
Debit Ruas Sebelumnya STA Q' Desain(m3/s) TR.50 B rata2 m n A P (A/P)^2/3 s^1/2 v Q Hitung Q' Desain Froude
(m) 0,5%)
STA 3 - STA 4 Dari Sampai Per 50 m Akumulasi (m) (m) (m2) (m/s) (m3/s) (m3/s)

0.829 5 + 550 - 5 + 600 0.007 0.835 1.00 0.822 0.000 0.014 0.001000 0.822 2.644 0.459 0.032 1.015 0.83 0.84 0.358

5 + 600 - 5 + 650 0.007 0.842 1.00 0.828 0.000 0.014 0.001000 0.828 2.655 0.460 0.032 1.017 0.84 0.84 0.357

5 + 650 - 5 + 700 0.007 0.849 1.00 0.833 0.000 0.014 0.001000 0.833 2.666 0.460 0.032 1.019 0.85 0.85 0.356

5 + 700 - 5 + 750 0.007 0.856 1.00 0.839 0.000 0.014 0.001000 0.839 2.678 0.461 0.032 1.021 0.86 0.86 0.356

5 + 750 - 5 + 800 0.007 0.863 1.00 0.844 0.000 0.014 0.001000 0.844 2.689 0.462 0.032 1.022 0.86 0.86 0.355

5 + 800 - 5 + 850 0.007 0.869 1.00 0.850 0.000 0.014 0.001000 0.850 2.700 0.463 0.032 1.024 0.87 0.87 0.355

Koefisien Pengaliran dengan Material


Beton : 0,014 (KP. Saluran PUPR) Kebutuhan Lebar U Kecepatan > 0,8
– Dicth (1 meter) m/dt – Terpenuhi
(SE 2021)
Luas DTA Badan Jalan/ 50 meter Q Desain (Tr.50)
No Uraian
Km2 (m3/dt)
1 Desain Awal 0,00030 0.00521
2 Perubahan 0,00045 0.00679

Periode Ulang
TR.50