STRUKTUR BAWAH
`
Desain Alternatif Penahan Galian, Merial Tower RS Pelni.
Keterangan:
1. Analisa menggunakan data drained condition.
2. Material concrete sheet pile.
3. Kedalaman 17.5m
4. Beban “surcharge”, 5 kN/m2, dengan jarak 2 m dari sisi galian.
5. Exercise sebelumnya menggunakan material: conrete sheet pile, steel
sheet pile dan secant-pile (modifikasi size dan jarak antar pile).
Output Plaxis:
Displacement (m) Forces
Galian Depth-
Description Axial Shear Bending Moment
ke- m Horizontal Vertical
(kN/m) (kN/m) (kN.m/m)
0 0.00 Instlasi Concrete Sheet Pile 0.0011 -0.0050 -42.43 1.25 2.14
1 1.00 Galian-1 0.0048 0.0272 -13.78 5.03 -9.88
2 2.00 Galian-2 0.0187 0.0479 -14.31 -9.31 8.02
3 3.00 Galian-3 0.0290 0.0624 -23.58 -20.8 33.78
4 4.00 Galian-4 0.0334 0.0708 -35.43 -34.81 66.39
5 5.00 Galian-5 0.0368 0.0795 -37.47 -32.92 72.04
6 6.00 Galian-6 0.0368 0.0844 -38.78 -32.38 75.09
7 6.15 Galian-7 0.0395 0.0866 -39.40 -32.20 78.56
1 1
2 2
Depth (mm)
Depth (mm)
3 3
4 4
5 5
6 6
7 7
1 1
2 2
Depth (mm)
Depth (mm)
3 3
4 4
5 5
6 6
7 7
2
Depth (mm)
7
Desain Alternatif Penahan Galian, Merial Tower RS Pelni.
LAMPIRAN