HARGA DASAR
NO JENIS BAHAN SAT KETERANGAN
( Rp )
1 GENTANG METAL Genteng metal uk. 2x4 (0,25mm) lbr 29,500 setara sakura roof : 1 m2 @ 1,62 lbr
Genteng metal berpasir 2x5 ( 0,3) lbr 38,000 setara sakura roof : 1m2 @ 1,3 lbr
Genteng metal berpasir 2x5 ( 0,45) lbr 95,000
Nok genteng metal bh 23,000 panjang 90 cm
Nok genteng metal berpasir bh 47,000 panjang 80 cm
2 LAIN-LAIN Aluminium foil m2 4,600 tipe woven two side : 1 roll @ 30 m x 1,2 m
Kalsiplank btg 46,000 1 btg @ 3m
Karpet talang m' 9,000 lebar 55 cm
HARGA DASAR
NO JENIS BAHAN SAT KETERANGAN
( Rp )
IV. BAHAN PENUTUP DINDING DAN LANTAI
1. KERAMIK PUTIH 20x25 Kotak 48,000 setara mulia, arwana: 1 Kotak @ 20kpg
buah 2,400
30x30 Kotak 50,000 setara mulia, arwana: 1 Kotak @ 11 kpg
buah 4,545
40x40 Kotak 62,560 setara mulia, arwana: 1 Kotak @ 6 kpg
buah 10,427
2 BAJA RINGAN Profil C chenel 75.100 btg 113,000 setara Taso; p.6 m
Profil C chenel 75.80 btg 86,000 setara Taso; p.6 m
Profil C chenel 75.75 btg 76,000 setara Taso; p.6 m
Reng R.40.45 btg 36,000 setara Taso; p.6 m
Screw truss 12x3/4 bh 165
Dynabolt bh 1,000
Talang Jurai dalam m 39,000 panjang 6 m
HARGA DASAR
NO JENIS BAHAN SAT KETERANGAN
( Rp )
3. TEMBOK cat tembok eksterior ltr 93,200 setara Dulux Ws; 1 galon @ 2,5 I
cat tembok interior kg 22,240 setara kingkong
dempul/plamir kg 13,965 setara Vinilex
cat dasar/sealer kg 33,025
1 Pekerja OH 85,000
2 Tukang OH 100,000
3 Kepala Tukang OH 125,000
4 Mandor OH 150,000
DAFTAR ANALISA SATUAN PEKERJAAN
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)
1 2 3 4 5 6
Tenaga
Pekerja Oh 0.750 85,000.00 63,750.00
Mandor Oh 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 67,500.00
c Peralatan
JUMLAH TENAGA PERALATAN
JUMLAH BAHAN
Tenaga
Pekerja Oh 0.250 85,000.00 21,250.00
Mandor Oh 0.008 150,000.00 1,200.00
JUMLAH TENAGA KERJA 22,450.00
c Peralatan
JUMLAH TENAGA PERALATAN
1 2 3 4 5 6
8 Membuat 1 M3 Lantai Keja Beton Mutu F'c=7,4 Mpa (K 100), Slump (3-6) cm, w/c=0,87
BAHAN
Semen Portland Kg 230.000 1,500.00 345,000.00
Pasir Pasang Kg 893.000 76.54 68,350.22
Kerikil (Maks. 30mm) Kg 1,027.000 351.85 361,349.95
Air Liter 200.000 66.60 13,320.00
JUMLAH BAHAN 788,020.17
TENAGA
Pekerja OH 1.200 85,000.00 102,000.00
Tukang Batu OH 0.200 100,000.00 20,000.00
Kepala Tukang OH 0.020 125,000.00 2,500.00
Mandor OH 0.060 150,000.00 9,000.00
JUMLAH TENAGA KERJA 133,500.00
c Peralatan
JUMLAH TENAGA PERALATAN
1 2 3 4 5 6
c Peralatan
JUMLAH TENAGA PERALATAN -
1 2 3 4 5 6
1 2 3 4 5 6
13 Membuat 1 M3 Kolom Beton Bertulang (110 Kg Besi + Bekisting)
BAHAN
Kayu Kls IV M3 0.400 1,600,000.00 640,000.00
Paku 5-12 cm Kg 4.000 18,000.00 72,000.00
Minyak Bekisting Liter 2.000 10,700.00 21,400.00
Besi Beton Polos Kg 110.000 9,157.21 1,007,293.10
Kawat Beton Kg 4.500 18,000.00 81,000.00
Semen Portland Kg 336.000 1,500.00 504,000.00
Pasir Beton M3 0.540 145,000.00 78,300.00
Kerikil Kg 0.810 351.85 285.00
Kayu Balok Kls IV M3 0.150 1,800,000.00 270,000.00
Plywood 9 mm Lbr 3.500 110,000.00 385,000.00
Dolken Kayu Ø 8-10cm P. 4m Batang 20.000 16,000.00 320,000.00
JUMLAH BAHAN 3,379,278.10
TENAGA
Pekerja OH 7.050 85,000.00 599,250.00
Tukang Batu OH 0.275 100,000.00 27,500.00
Tukang Kayu OH 1.650 100,000.00 165,000.00
Tukang Besi OH 2.100 100,000.00 210,000.00
Kepala Tukang OH 0.403 125,000.00 50,375.00
Mandor OH 0.353 150,000.00 52,950.00
JUMLAH TENAGA KERJA 1,105,075.00
c Peralatan
JUMLAH TENAGA PERALATAN
1 2 3 4 5 6
15 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr
TENAGA
Pekerja OH 1.650 85,000.00 140,250.00
Tukang Batu OH 0.250 100,000.00 25,000.00
Kepala Tukang OH 0.025 125,000.00 3,125.00
Mandor OH 0.080 150,000.00 12,000.00
180,375.00
BAHAN
Semen Portland Kg 232.000 1,500.00 348,000.00
Pasir Beton M3 0.520 145,000.00 75,400.00
Kerikil M 3
0.780 487,200.00 380,016.00
JUMLAH TENAGA BAHAN 803,416.00
c Peralatan
JUMLAH TENAGA PERALATAN
1 2 3 4 5 6
f Harga Satuan Pekerjaan (D+E) LANTAI DASAR/LANTAI I 85,691.59
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)
1 2 3 4 5 6
BAHAN
Batu Bata Bh 66.000 650.00 42,900.00
Semen Portland Kg 17.523 1,500.00 26,284.50
Pasir Pasang M 3
0.023 145,000.00 3,398.08
72,582.58
PERALATAN
1 2 3 4 5 6
360,410.00
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)
1 2 3 4 5 6
25 Memasang 1 m' Pipa PVC Tipe AW Æ 1/2"
Bahan
Pipa PVC m' 1.200 4,250.00 5,100.00
Perlengkapan ( 35 % harga pipa PVC ) 7,700.00 7,700.00
12,800.00
TENAGA
Pekerja
Tukang batu Oh 0.036 85,000.00 3,060.00
Kepala Tukang Oh 0.060 100,000.00 6,000.00
Mandor Oh 0.006 125,000.00 750.00
Oh 0.0018 150,000.00 270.00
10,080.00
22,880.00
26 Memasang 1 m' Pipa PVC Tipe AW Æ 3"
Bahan
Pipa PVC m' 1.200 30,000.00 36,000.00
Perlengkapan ( 35 % harga pipa PVC ) 42,000.00 42,000.00
78,000.00
Tenaga
Pekerja
Tukang batu Oh 0.081 85,000.00 6,885.00
Kepala Tukang Oh 0.135 100,000.00 13,500.00
Mandor Oh 0.014 125,000.00 1,687.50
Oh 0.0041 150,000.00 615.00
22,687.50
100,687.50
27 Memasang 1 m' Pipa PVC Tipe AW Æ 4"
Bahan
Pipa PVC m' 1.200 52,500.00 63,000.00
Perlengkapan ( 35 % harga pipa PVC ) 73,500.00 73,500.00
136,500.00
Tenaga
Pekerja
Tukang batu Oh 0.081 85,000.00 6,885.00
Kepala Tukang Oh 0.135 100,000.00 13,500.00
Mandor Oh 0.014 125,000.00 1,687.50
Oh 0.0041 150,000.00 615.00
22,687.50
159,187.50
28 Memasang 1 Buah Kran Æ 3/4" atau 1/2"
Kran air bh 1.000 198,000.00 198,000.00
Seal Tape bh 0.025 3,000.00 75.00
198,075.00
Tenaga
Pekerja Oh 0.010 85,000.00 850.00
Tukang batu Oh 0.100 100,000.00 10,000.00
Kepala Tukang Oh 0.010 125,000.00 1,250.00
Mandor Oh 0.005 150,000.00 750.00
12,850.00
210,925.00
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)
1 2 3 4 5 6
29 Memasang 1 buah kloset Jongkok
a. Bahan
Kloset jongkok unit 1.00 225,000.00 225,000.00
Semen Portland Kg 6.00 1,500.00 9,000.00
Batu bata Bh 7.00 650.00 4,550.00
Pasir m3 0.01 145,000.00 1,450.00
240,000.00
Tenaga
Pekerja Oh 3.300 85,000.00 85,000.00
Tukang kayu Oh 1.100 100,000.00 100,000.00
Kepala Tukang Oh 0.001 125,000.00 125,000.00
Mandor Oh 0.1600 150,000.00 150,000.00
460,000.00
700,000.00
BAHAN
Smartruss C 75.100 M' 2.100 18,833.33 39,550.00
Smartruss C 75.75 M' 1.200 12,666.67 15,200.00
Reng U T S 40 M' 6.200 6,000.00 37,200.00
Srew / Dynabolt Buah 30 1,000.00 30,000.00
Valery Gutter Talang Jurai M' 0.030 6,500.00 195.00
Strap Bracing M' 0.700 18,300.00 12,810.00
134,955.00
TENAGA
Tukang Terampil Oh 0.100 100,000.00 10,000.00
Pekerja Oh 0.100 85,000.00 8,500.00
Kepala Tukang Oh 0.050 125,000.00 6,250.00
Mandor Oh 0.010 150,000.00 1,500.00
26,250.00
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)
1 2 3 4 5 6
33 1 M2 Pasang Atap Genteng Metal 79,790.00
BAHAN
Genteng Metal M2 1.620 29,500 47,790.00
Paku Biasa 2" - 5" Kg 0.200 18,000 3,600.00
51,390.00
TENAGA
Pekerja Oh 0.200 85,000.00 17,000.00
Tukang Kayu Oh 0.100 100,000.00 10,000.00
Kepala Tukang Oh 0.010 125,000.00 1,250.00
Mandor Oh 0.001 150,000.00 150.00
28,400.00
BAHAN
Nok Genteng Metal Bh 1.100 23,000 25,300.00
Paku Biasa /2" - 1"
1
Kg 0.050 18,000 900.00
26,200.00
TENAGA
Pekerja Oh 0.250 85,000.00 21,250.00
Tukang Kayu Oh 0.150 100,000.00 15,000.00
Kepala Tukang Oh 0.015 125,000.00 1,875.00
Mandor Oh 0.013 150,000.00 1,950.00
40,075.00
36 Pemasangan 1 M2 Langit - Langit Gypsum Board Ukuran (120 x 240 x 9)mm (Tebal 9 mm)
TENAGA
Pekerja OH 0.100 85,000.00 8,500.00
Tukang OH 0.050 100,000.00 5,000.00
Kepala Tukang OH 0.005 125,000.00 625.00
Mandor OH 0.005 150,000.00 750.00
14,875.00
BAHAN
Gypsum Board Lembar 0.364 65,000.00 23,660.00
Paku Gypsum Kg 0.110 40,000.00 4,400.00
Cornis Kg 0.300 3,750.00 1,125.00
Lakban Gypsum Roll 0.070 15,000.00 1,050.00
30,235.00
PERALATAN
Jumlah (A+B+C) 45,110.00
e Overhead & Profit 15% X D 6,766.50
f Harga Satuan Pekerjaan (D+E) 51,876.50
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)
1 2 3 4 5 6
37 Pemasangan 1 M1 Liat Gypsum Profil
TENAGA
Pekerja OH 0.050 85,000.00 4,250.00
Tukang OH 0.050 100,000.00 5,000.00
Kepala Tukang OH 0.005 125,000.00 625.00
Mandor OH 0.003 150,000.00 450.00
10,325.00
BAHAN
List Gypsum Sedang M1 1.050 17,000.00 17,850.00
Paku Skrup Kg 0.010 25,000.00 250.00
Cornis Kg 0.100 3,750.00 375.00
18,475.00
PERALATAN
Jumlah (A+B+C) 28,800.00
e Overhead & Profit 15% X D 4,320.00
f Harga Satuan Pekerjaan (D+E) 33,120.00
38 Pemasangan 1 M2 Langit - Langit Kalsiboard Ukuran (120 x 240 x 9)mm (Tebal 3,5 mm)
TENAGA
Pekerja OH 0.100 85,000.00 8,500.00
Tukang OH 0.050 100,000.00 5,000.00
Kepala Tukang OH 0.005 125,000.00 625.00
Mandor OH 0.005 150,000.00 750.00
14,875.00
BAHAN
Kalsiboard Lembar 0.364 65,000.00 23,660.00
Paku Skrup Kg 0.110 25,000.00 2,750.00
Cornis Kg 0.300 3,750.00 1,125.00
Lakban Gypsum Roll 0.070 15,000.00 1,050.00
28,585.00
PERALATAN
1 2 3 4 5 6
40 Pengecatan 1 M2 Tembok Baru(1 Lapis plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
TENAGA
Pekerja OH 0.020 85,000.00 1,700.00
Tukang OH 0.063 100,000.00 6,300.00
Kepala Tukang OH 0.0063 125,000.00 787.50
Mandor OH 0.003 150,000.00 450.00
9,237.50
BAHAN
Cat Dasar Kg 0.100 33,025.10 3,302.51
Cat Penutup Ex. Vinilex Kg 0.260 22,240.00 5,782.40
Plamir Kg 0.100 13,965.00 1,396.50
10,481.41
PERALATAN
A PEKERJAAN PERSIAPAN
1 Pek. Perakitan Lantai Drum + Rangka 1.00 Ls 23,720,000.00 23,720,000.00
IV PEKERJAAN KUSEN
1 Pas Kusen + Pintu 1.00 Unit 1,500,000.00 1,500,000.00
2 Pas Kusen + Jendela 1.00 Unit 750,000.00 750,000.00
2,250,000.00
V PEKERJAAN ATAP
1 Pas. Rangka Baja Ringan 1.00 M² 161,205.00 161,205.00
2 Pas. Atap Metal 1.00 M² 79,790.00 79,790.00
3 Pas. Nok Metal 1.00 M 1
66,275.00 66,275.00
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
JUMLAH Rp #REF!
PPN 10% Rp #REF!
TOTAL Rp #REF!
PEMBULATAN Rp #REF!
Terbilang : #REF!