DAFTAR HARGA SATUAN BAHAN DAN UPAH

HARGA DASAR
NO JENIS BAHAN SAT KETERANGAN
( Rp )

I. HARGA DASAR BAHAN


1. SEMEN SEMEN PC Zak 75,000 semen tipe i; semen baturaja
Semen PC kg 1,500 : 1 zak @50 kg
Semen warna kg 12,000 setara SG
Semen putih kg 7,500
Cornis Zak 75,000 setara kingkong
Cornis kg 3,750 setara a+;1 zak @20 kg

2. PASIR Pasir Beton m3 145,000


Pasir Beton kg 76.54 BJ 14000 kg/m3
Pasir Urung m3 110,000
Pasir Urung kg 57.14 BJ 14000 kg/m3

3. BATU KALI Batu kali m3 465,000


Batu Koral m3 435,000
Batu Koral kg 322.22 BJ 1350 kg/m3
Batu split m3 487,200
Batu split kg 351.85 BJ 1350 kg/m3

4. BATU BATA Batu bata bh 650.00 uk.8x8x16cm ; batu bata


lubang press mesin
5. TANAH Tanah Urung m3 67,000
Tanah Sirtu m3 80,000

6. LAIN-LAIN Aspal kg 13,000

II. BAHAN PENUTUP ATAP

1 GENTANG METAL Genteng metal uk. 2x4 (0,25mm) lbr 29,500 setara sakura roof : 1 m2 @ 1,62 lbr
Genteng metal berpasir 2x5 ( 0,3) lbr 38,000 setara sakura roof : 1m2 @ 1,3 lbr
Genteng metal berpasir 2x5 ( 0,45) lbr 95,000
Nok genteng metal bh 23,000 panjang 90 cm
Nok genteng metal berpasir bh 47,000 panjang 80 cm

2 LAIN-LAIN Aluminium foil m2 4,600 tipe woven two side : 1 roll @ 30 m x 1,2 m
Kalsiplank btg 46,000 1 btg @ 3m
Karpet talang m' 9,000 lebar 55 cm

III. BAHAN KAYU


1. MERAWAN. KULIM Papan m3 5,500,000 Kayu klas II
1 RACUK Papan m3 1,600,000
Balok Kayu m3 1,800,000 Kayu Klas
Papan racuk t.20 cm kpg 35,000

Bambu dia. 6-8/600 cm btg 38,000 p.6 m


DAFTAR HARGA SATUAN BAHAN DAN UPAH

HARGA DASAR
NO JENIS BAHAN SAT KETERANGAN
( Rp )
IV. BAHAN PENUTUP DINDING DAN LANTAI
1. KERAMIK PUTIH 20x25 Kotak 48,000 setara mulia, arwana: 1 Kotak @ 20kpg
buah 2,400
30x30 Kotak 50,000 setara mulia, arwana: 1 Kotak @ 11 kpg
buah 4,545
40x40 Kotak 62,560 setara mulia, arwana: 1 Kotak @ 6 kpg
buah 10,427

2. KERAMIK WARNA 20x25 Kotak 55,400 setara impresso : 1 kotak @ 20 kpg


bh 2,770
20x20 (KM/WC) Kotak 55,000 setara KIA ; 1 kotak @ 25 kpg
bh 2,200
30x30 (tekstur) Kotak 55,290 setara KIA ; 1 kotak @ 11 kpg
bh 5,026
30x30 Kotak 56,000 setara Asia Tile ; 1 kotak @ 11 kpg
bh 5,091
30x60 Kotak 252,000
bh 42,000
40x40 Kotak 63,240 setara milan: 1 kotak @ 6 kpg
bh 10,540
50x50 Kotak 83,500 setara Platinum: 1 kotak @ 4 kpg
bh 20,875
50x50 (tekstur) Kotak 120,250 setara Roman: 1 kotak @ 4 kpg
bh 30,063

Nat keramik m2 12,000 setara

VI. BAHAN BESI/BAJA/ALUMINIUM/BAJA RINGAN


1. BESI BETON Besi beton kg 9,157 1 batang @ 12 m
Kawat beton kg 18,000
Wiremesh kg 9,390 uk.2,1x5,4 m; jarak 150mm x 150mm

2 BAJA RINGAN Profil C chenel 75.100 btg 113,000 setara Taso; p.6 m
Profil C chenel 75.80 btg 86,000 setara Taso; p.6 m
Profil C chenel 75.75 btg 76,000 setara Taso; p.6 m
Reng R.40.45 btg 36,000 setara Taso; p.6 m
Screw truss 12x3/4 bh 165
Dynabolt bh 1,000
Talang Jurai dalam m 39,000 panjang 6 m

VII. BAHAN PIPA


1. PIPA PVC Pipa PVC AW 1/2' btg 17,000 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3/4' btg 22,000 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 3' btg 120,000 setara Wavin; 1 batang @ 4 m
Pipa PVC AW 4' btg 210,000 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 3' btg 75,000 setara Wavin; 1 batang @ 4 m
Pipa PVC DW 4' btg 116,000 setara Wavin; 1 batang @ 4 m

2 LAIN-LAIN Lem pipa btl 8,000

VII. BAHAN LANGIT-LANGIT

1. PLYWOOD Plywood 3 mm lbr 45,000


Plywood 4 mm lbr 65,000
Plywood 6 mm lbr 80,000
Plywood 9 mm lbr 110,000
Plywood 12 mm lbr 180,000

2. SOFT BOARD Gypsum 9 mm kpg 65,000 setara jayaboard

3. HARD BOARD Calsiboard 3,5mm kpg 65,000


Eternit kpg 65,000 uk. 1,2 x 2,4

5. LIST PLAFOND List plafond 1x4 btg 8,000 1 batang @ 3,8 m


List plafond besar btg 17,000 2 batang @ 3,8 m
List plafond kecil btg 13,000 3 batang @ 1,7 m
List gypsum sedang btg 17,000 4 batang @ 1,7 m
List PVC btg 120,000 5 batang @ 4 m

6. LAIN-LAIN Skrup gypsum 1' dus 40,000


Lakban gysum roll 15,000
Paku plywood kg 25,000
Hollow galvanis 20x40 m 4,000 1 btg @ 4 m
Hollow galvanis 40x40 m 5,375 2 btg @ 4 m
DAFTAR HARGA SATUAN BAHAN DAN UPAH

HARGA DASAR
NO JENIS BAHAN SAT KETERANGAN
( Rp )

IX. BAHAN FINISHING

1. KAYU menie kg 34,000


plamir kayu kg 38,500 setara impra
cat dasar kg 33,025 bodiluc
cat penutup kg 22,240 setara impra
Teak oil ltr 57,500
Politur ltr 76,500
Residu/Ter ltr 4,500 setara bintang bola
Dempul kayu kg 7,200 setara Rj; 1 kg @ 5 kg
Vernis ltr 46,500

2. BESI mernie kg 23,371


cat penutup blk 59,596 setara Fitalite

3. TEMBOK cat tembok eksterior ltr 93,200 setara Dulux Ws; 1 galon @ 2,5 I
cat tembok interior kg 22,240 setara kingkong
dempul/plamir kg 13,965 setara Vinilex
cat dasar/sealer kg 33,025

4. THINNER thinner ltr 29,474 setara Cobra Merah

5. KUAS kuas 1" bh 4,000 setara Eterna


kuas 1 1/2" bh 5,000 setara Eterna
kuas 2" bh 8,000 setara Eterna
kuas 3" bh 12,000 setara Eterna
kuas 4" bh 16,000 setara Eterna
kuas roll bh 25,000 setara ACE

XIII. BAHAN SANITAIR


1. CLOSED Closed jongkok bh 225,000 setara toto
Closed duduk bh 2,500,000 setara toto

2 KRAN TEMBOK Kran air 1/2 - 3/4" bh 198,000 setara San-Ei


Kran air 1/2 - 3/4" bh 55,000 setara Onda

3 WASTAFEL Wastafel Sedang bh 750,000 Setara Amstand


Wastafel kecil bh 450,000 Setara Amstand
Siphon bh 90,000
Kran wastafel bh 75,000
Stop kran bh 35,000
Selang Flexsibe bh 90,000

4 LAIN-LAIN Bak air fiberglass uk. 1 m3 bh 395,000


Floor drain stainless steel bh 125,000 setara Onda

XIV. BAHAN PENGIKAT


1. PAKU Paku bermacam ukuran kg 18,000
Beton ktk 20,000 1 ktk @ 50 buah
Paku seng kg 25,000
Paku atap bitumen bh 1,100
Skrup fixer bh 700 1 ktk @ 100 pcs

2. LEM Lem kayu kg 13,000


Lem aica aibon kg 45,000
Sealent tube 25,000

XV. BAHAN LAIN-LAIN


1 Amplas lbr 5,000
2 Air ltr 67
3 Minyak Bekesting ltr 10,700
4 Minyak Pelumas ltr 23,500
20 Aluminium Composite Panel m2 570,000

XVI. HARGA DASAR UPAH

1 Pekerja OH 85,000
2 Tukang OH 100,000
3 Kepala Tukang OH 125,000
4 Mandor OH 150,000
DAFTAR ANALISA SATUAN PEKERJAAN

NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6

1 1 M' Pengukuran dan Pemasangan Bouwplank


a Bahan
Kayu 5/7 kelas IV M3 0.012 1,800,000.00 21,600.00
Paku Biasa 2" - 5" Kg 0.020 18,000.00 360.00
Kayu Papan 3/20 M3 0.007 1,600,000.00 11,200.00
JUMLAH BAHAN 33,160.00
b Tenaga
Tukang Kayu Oh 0.100 100,000.00 10,000.00
Pekerja Oh 0.100 85,000.00 8,500.00
Kepala Tukang Oh 0.010 125,000.00 1,250.00
Mandor Oh 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 20,500.00
c Peralatan
- - -
JUMLAH TENAGA PERALATAN -

d Jumlah (A+B+C) 53,660.00


e Overhead & Profit 15% X D 8,049.00
f Harga Satuan Pekerjaan (D+E) 61,709.00

2 Menggali 1 M3 Tanah Biasa Sedalam 1 M


BAHAN
JUMLAH BAHAN

Tenaga
Pekerja Oh 0.750 85,000.00 63,750.00
Mandor Oh 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 67,500.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 67,500.00


e Overhead & Profit 10% X D 6,750.00
f Harga Satuan Pekerjaan (D+E) 74,250.00

3 Pengurugan Kembali 1 M3 Galian Tanah


BAHAN

JUMLAH BAHAN
Tenaga
Pekerja Oh 0.250 85,000.00 21,250.00
Mandor Oh 0.008 150,000.00 1,200.00
JUMLAH TENAGA KERJA 22,450.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 22,450.00


e Overhead & Profit 10% X D 2,245.00
f Harga Satuan Pekerjaan (D+E) 24,695.00

4 1 m2 Pasang cerucuk gelam untuk pondasi


BAHAN
gelam dia 6- 8 Btg 6.000 12,000.00 72,000.00

JUMLAH BAHAN 72,000.00


Tenaga
Pekerja Oh 0.300 85,000.00 25,500.00
Kepala Tukang Oh 0.030 125,000.00 3,750.00
JUMLAH TENAGA KERJA 29,250.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 101,250.00


e Overhead & Profit 15% X D 15,187.50
f Harga Satuan Pekerjaan (D+E) 116,437.50
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6

5 Pengurugan 1 M3 Dengan Tanah Urug


BAHAN
Tanah Urug m3 1.200 67,000.00 80,400.00
JUMLAH BAHAN 80,400.00
Tenaga
Pekerja Oh 0.250 85,000.00 21,250.00
Mandor Oh 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 25,000.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 105,400.00


e Overhead & Profit 15% X D 15,810.00
f Harga Satuan Pekerjaan (D+E) 121,210.00

6 Pengurugan 1 M3 Dengan Pasir Urug


BAHAN
Pasir Urug M3 1.200 110,000.00 132,000.00
JUMLAH BAHAN 132,000.00
Tenaga
Pekerja Oh 0.300 85,000.00 25,500.00
Mandor Oh 0.010 150,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 159,000.00


e Overhead & Profit 15% X D 23,850.00
f Harga Satuan Pekerjaan (D+E) 182,850.00

7 Pasangan 1 m3 Pondasi Batu Bata (8x8x16) Ad. 1:4


BAHAN
Batu Bata M3 726.000 650.00 471,900.00
Semen Pc kg 136.998 1,500.00 205,497.00
Pasir Pasang M3 0.480 145,000.00 69,600.00
JUMLAH BAHAN 746,997.00
Tenaga
Pekerja oh 2.025 85,000.00 172,125.00
Tukang Batu oh 0.678 100,000.00 67,800.00
Kepala Tukang oh 0.068 125,000.00 8,437.50
Mandor oh 0.101 150,000.00 15,187.50
JUMLAH TENAGA KERJA 263,550.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 1,010,547.00


e Overhead & Profit 15% X D 151,582.05
f Harga Satuan Pekerjaan (D+E) 1,162,129.05

8 Membuat 1 M3 Lantai Keja Beton Mutu F'c=7,4 Mpa (K 100), Slump (3-6) cm, w/c=0,87
BAHAN
Semen Portland Kg 230.000 1,500.00 345,000.00
Pasir Pasang Kg 893.000 76.54 68,350.22
Kerikil (Maks. 30mm) Kg 1,027.000 351.85 361,349.95
Air Liter 200.000 66.60 13,320.00
JUMLAH BAHAN 788,020.17
TENAGA
Pekerja OH 1.200 85,000.00 102,000.00
Tukang Batu OH 0.200 100,000.00 20,000.00
Kepala Tukang OH 0.020 125,000.00 2,500.00
Mandor OH 0.060 150,000.00 9,000.00
JUMLAH TENAGA KERJA 133,500.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 921,520.17


e Overhead & Profit 15% X D 138,228.03
f Harga Satuan Pekerjaan (D+E) 1,059,748.20
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6

9 Pembesia 10 Kg Dengan Besi Polos Atau besi Ulur


BAHAN
Besi Beton ( polos/Ulir) kg 10.500 9,157.21 96,150.71
Kawat beton kg 0.150 18,000.00 2,700.00
JUMLAH BAHAN 98,850.71
TENAGA
Pekerja OH 0.070 85,000.00 5,950.00
Tukang Batu OH 0.070 100,000.00 7,000.00
Kepala Tukang OH 0.007 125,000.00 875.00
Mandor OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 14,425.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 113,275.71


e Overhead & Profit 15% X D 16,991.36
f Harga Satuan Pekerjaan (D+E) 130,267.06
1 Kg 13,026.71

10 Pemasangan 1m2 Bekesting Untuk Lantai


BAHAN
Kayu m3 0.040 1,800,000.00 72,000.00
paku kg 0.400 18,000.00 7,200.00
Minyak bekesting liter 0.200 10,700.00 2,140.00
Balok Kayu m3 0.015 1,800,000.00 27,000.00
Plywood t.9 mm lbr 0.350 110,000.00 38,500.00
Dolken Kayu dia 8-10 cm p.4m btg 2.000 16,000.00 32,000.00
JUMLAH BAHAN 178,840.00
TENAGA
Pekerja OH 0.660 85,000.00 56,100.00
Tukang Kayu OH 0.330 100,000.00 33,000.00
Kepala Tukang OH 0.033 125,000.00 4,125.00
Mandor OH 0.033 150,000.00 4,950.00
JUMLAH TENAGA KERJA 98,175.00

c Peralatan
JUMLAH TENAGA PERALATAN -

d Jumlah (A+B+C) 277,015.00


e Overhead & Profit 15% X D 41,552.25
f Harga Satuan Pekerjaan (D+E) 318,567.25
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6

11 Pembuatan 1 m3 Pondasi Beton Bertulang (110 kg Besi + bekesting)


BAHAN
Kayu Kelas m3 0.200 1,800,000.00 360,000.00
paku kg 1.500 18,000.00 27,000.00
Minyak bekesting liter 0.400 10,700.00 4,280.00
Besi beton polos kg 110.000 9,157.21 1,007,293.10
Kawat beton kg 2.250 18,000.00 40,500.00
Semen Pc kg 336.000 1,500.00 504,000.00
Pasir beton m3 0.540 145,000.00 78,300.00
Kerikil m3 0.810 435,000.00 352,350.00
JUMLAH BAHAN 2,373,723.10
TENAGA
Pekerja OH 5.300 85,000.00 450,500.00
Tukang Batu OH 0.275 100,000.00 27,500.00
Tukang Kayu OH 1.300 100,000.00 130,000.00
Tukang Besi OH 1.050 100,000.00 105,000.00
Kepala tukang OH 0.262 125,000.00 32,750.00
Mandor OH 0.265 150,000.00 39,750.00
JUMLAH TENAGA KERJA 785,500.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 3,159,223.10


e Overhead & Profit 15% X D 473,883.47
f Harga Satuan Pekerjaan (D+E) 3,633,106.57

12 Pembuatan 1 m3 Sloff Beton Bertulang (110 kg Besi + bekesting)


BAHAN
Kayu Kelas m3 0.270 1,800,000.00 486,000.00
paku kg 2.000 18,000.00 36,000.00
Minyak bekesting liter 0.600 10,700.00 6,420.00
Besi beton polos kg 110.000 9,157.21 1,007,293.10
Kawat beton kg 3.000 18,000.00 54,000.00
Semen Pc kg 336.000 1,500.00 504,000.00
Pasir beton m3 0.540 145,000.00 78,300.00
Kerikil m3 0.810 435,000.00 352,350.00
JUMLAH BAHAN 2,524,363.10
TENAGA
Pekerja OH 5.650 85,000.00 480,250.00
Tukang Batu OH 0.275 100,000.00 27,500.00
Tukang Kayu OH 1.560 100,000.00 156,000.00
Tukang Besi OH 1.400 100,000.00 140,000.00
Kepala tukang OH 0.323 125,000.00 40,375.00
Mandor OH 0.283 150,000.00 42,450.00
JUMLAH TENAGA KERJA 886,575.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 3,410,938.10


e Overhead & Profit 15% X D 511,640.72
f Harga Satuan Pekerjaan (D+E) 3,922,578.82
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
13 Membuat 1 M3 Kolom Beton Bertulang (110 Kg Besi + Bekisting)
BAHAN
Kayu Kls IV M3 0.400 1,600,000.00 640,000.00
Paku 5-12 cm Kg 4.000 18,000.00 72,000.00
Minyak Bekisting Liter 2.000 10,700.00 21,400.00
Besi Beton Polos Kg 110.000 9,157.21 1,007,293.10
Kawat Beton Kg 4.500 18,000.00 81,000.00
Semen Portland Kg 336.000 1,500.00 504,000.00
Pasir Beton M3 0.540 145,000.00 78,300.00
Kerikil Kg 0.810 351.85 285.00
Kayu Balok Kls IV M3 0.150 1,800,000.00 270,000.00
Plywood 9 mm Lbr 3.500 110,000.00 385,000.00
Dolken Kayu Ø 8-10cm P. 4m Batang 20.000 16,000.00 320,000.00
JUMLAH BAHAN 3,379,278.10
TENAGA
Pekerja OH 7.050 85,000.00 599,250.00
Tukang Batu OH 0.275 100,000.00 27,500.00
Tukang Kayu OH 1.650 100,000.00 165,000.00
Tukang Besi OH 2.100 100,000.00 210,000.00
Kepala Tukang OH 0.403 125,000.00 50,375.00
Mandor OH 0.353 150,000.00 52,950.00
JUMLAH TENAGA KERJA 1,105,075.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 4,484,353.10


e Overhead & Profit 15% X D 672,652.96
f Harga Satuan Pekerjaan (D+E) 5,157,006.06

14 Membuat 1 M3 Balok Beton Bertulang (110 Kg Besi + Bekisting)


BAHAN
Kayu Kls IV M3 0.320 1,600,000.00 512,000.00
Paku 5-12 cm Kg 3.200 18,000.00 57,600.00
Minyak Bekisting Liter 1.600 10,700.00 17,120.00
Besi Beton Polos Kg 110.000 9,157.21 1,007,293.10
Kawat Beton Kg 3.000 18,000.00 54,000.00
Semen Portland Kg 336.000 1,500.00 504,000.00
Pasir Beton M3 0.540 145,000.00 78,300.00
Kerikil Kg 0.810 351.85 285.00
Kayu Balok Kls IV M3 0.140 1,800,000.00 252,000.00
Plywood 9 mm Lbr 2.800 110,000.00 308,000.00
Dolken Kayu Ø 8-10cm P. 4m Batang 16.000 16,000.00 256,000.00
JUMLAH BAHAN 3,046,598.10
TENAGA
Pekerja OH 6.350 85,000.00 539,750.00
Tukang Batu OH 0.275 100,000.00 27,500.00
Tukang Kayu OH 1.650 100,000.00 165,000.00
Tukang Besi OH 1.400 100,000.00 140,000.00
Kepala Tukang OH 0.333 125,000.00 41,625.00
Mandor OH 0.318 150,000.00 47,700.00
JUMLAH TENAGA KERJA 961,575.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 4,008,173.10


e Overhead & Profit 15% X D 601,225.96
f Harga Satuan Pekerjaan (D+E) 4,609,399.06
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
15 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 3 Kr
TENAGA
Pekerja OH 1.650 85,000.00 140,250.00
Tukang Batu OH 0.250 100,000.00 25,000.00
Kepala Tukang OH 0.025 125,000.00 3,125.00
Mandor OH 0.080 150,000.00 12,000.00
180,375.00
BAHAN
Semen Portland Kg 232.000 1,500.00 348,000.00
Pasir Beton M3 0.520 145,000.00 75,400.00
Kerikil M 3
0.780 487,200.00 380,016.00
JUMLAH TENAGA BAHAN 803,416.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 983,791.00


e Overhead & Profit 15% X D 147,568.65
f Harga Satuan Pekerjaan (D+E) 1,131,359.65

16 1 M3 Membuat Beton Bertulang, 1 Pc : 2 Ps : 3 Kr


TENAGA
Pekerja OH 1.650 85,000.00 140,250.00
Tukang Batu OH 0.250 100,000.00 25,000.00
Kepala Tukang OH 0.025 125,000.00 3,125.00
Mandor OH 0.080 150,000.00 12,000.00
180,375.00
BAHAN
Semen Portland Kg 232.000 1,500.00 348,000.00
Pasir Beton M 3
0.520 145,000.00 75,400.00
Kerikil M 3
0.780 487,200.00 380,016.00
Besi Beton Kg 100.000 9,157.21 915,721.00
JUMLAH TENAGA BAHAN 1,719,137.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 1,899,512.00


e Overhead & Profit 15% X D 284,926.80
f Harga Satuan Pekerjaan (D+E) 2,184,438.80

17 1 M3 Pasangan Plat Lantai Besi 110 Kg + Begesting


Beton Cor Ad.1:2:3 M3 1.000 1,131,359.65 1,131,359.65
Tulangan Besi Polos/Ulir Kg 110.000 13,026.71 1,432,937.67
2,564,297.32

18 Membuat 1 M1 Kolom Praktis Beton Bertulang ( 11 x 11 ) cm


BAHAN
Kayu Kls IV M3 0.002 1,600,000.00 3,200.00
Paku 5-12 cm Kg 0.001 18,000.00 18.00
Minyak Bekisting Liter 0.100 10,700.00 1,070.00
Besi Beton Polos Kg 3.000 9,157.21 27,471.63
Kawat Beton Kg 0.450 18,000.00 8,100.00
Semen Portland Kg 4.000 1,500.00 6,000.00
Pasir Beton M 3
0.006 145,000.00 870.00
Kerikil M3 0.009 487,200.00 4,384.80
JUMLAH BAHAN 51,114.43
TENAGA
Pekerja OH 0.180 85,000.00 15,300.00
Tukang Batu OH 0.020 100,000.00 2,000.00
Tukang Kayu OH 0.020 100,000.00 2,000.00
Tukang Besi OH 0.020 100,000.00 2,000.00
Kepala Tukang OH 0.006 125,000.00 750.00
Mandor OH 0.009 150,000.00 1,350.00
JUMLAH TENAGA KERJA 23,400.00
c Peralatan
JUMLAH TENAGA PERALATAN

d Jumlah (A+B+C) 74,514.43


e Overhead & Profit 15% X D 11,177.16
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
f Harga Satuan Pekerjaan (D+E) LANTAI DASAR/LANTAI I 85,691.59
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6

19 Pemasangan 1 M2 Dinding Bata Lobang (8x8x16) cm Tebal ½ Batu Campuran 1 SP : 4 PP


TENAGA
Pekerja OH 0.600 85,000.00 51,000.00
Tukang Batu OH 0.200 100,000.00 20,000.00
Kepala Tukang OH 0.020 125,000.00 2,500.00
Mandor OH 0.030 150,000.00 4,500.00
78,000.00

BAHAN
Batu Bata Bh 66.000 650.00 42,900.00
Semen Portland Kg 17.523 1,500.00 26,284.50
Pasir Pasang M 3
0.023 145,000.00 3,398.08
72,582.58
PERALATAN

Jumlah (A+B+C) 150,582.58


Overhead & Profit 15% X D - 22,587.39
Harga Satuan Pekerjaan (D+E) 173,169.96

20 Pemasangan 1 M2 Plesteran 1 SP : 4 PP Tebal 15 mm


TENAGA
Pekerja OH 0.300 85,000.00 25,500.00
Tukang Batu OH 0.150 100,000.00 15,000.00
Kepala Tukang OH 0.015 125,000.00 1,875.00
Mandor OH 0.015 150,000.00 2,250.00
44,625.00
BAHAN
Semen Portland Kg 6.240 1,500.00 9,360.00
Pasir Pasang M3 0.024 145,000.00 3,480.00
12,840.00
PERALATAN

Jumlah (A+B+C) 57,465.00


Overhead & Profit 15% X D 8,619.75
Harga Satuan Pekerjaan (D+E) 66,084.75

21 Pemasangan 1 M2 Rangka Besi Hollow 1x40.20.2mm, Modul 60x60cm, Plafond


TENAGA
Pekerja OH 0.350 85,000.00 29,750.00
Tukang Besi OH 0.350 100,000.00 35,000.00
Kepala Tukang OH 0.035 125,000.00 4,375.00
Mandor OH 0.018 150,000.00 2,700.00
71,825.00
BAHAN
Rangka Metal Hollow 40.20.2 mm M' 4.000 4,000.00 16,000.00
Accessories (Perkuatan, Las dll) Ls 100%xRangka 4,000.00
20,000.00
PERALATAN

Jumlah (A+B+C) 91,825.00


e Overhead & Profit 15% X D 13,773.75
f Harga Satuan Pekerjaan (D+E) 105,598.75
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6

22 Pemasangan 1 M2 Lantai Keramik Km/Wc Ukuran 20cm x 20cm


TENAGA
Pekerja OH 0.270 85,000.00 22,950.00
Tukang Batu OH 0.135 100,000.00 13,500.00
Kepala Tukang OH 0.014 125,000.00 1,750.00
Mandor OH 0.014 150,000.00 2,100.00
40,300.00
BAHAN
Keramik 20 x 20 (Km/Wc) Bh 26.500 2,200.00 58,300.00
Semen Portland Kg 10.400 1,500.00 15,600.00
Pasir Pasang M3
0.045 145,000.00 6,525.00
Semen Warna Kg 1.620 12,000.00 19,440.00
99,865.00
PERALATAN

Jumlah (A+B+C) 140,165.00


e Overhead & Profit 15% X D 21,024.75
f Harga Satuan Pekerjaan (D+E) 161,189.75

23 Pemasangan 1 M2 Lantai Keramik Warna Ukuran 30cm x 30cm


TENAGA
Pekerja OH 0.250 85,000.00 21,250.00
Tukang Batu OH 0.125 100,000.00 12,500.00
Kepala Tukang OH 0.013 125,000.00 1,625.00
Mandor OH 0.013 150,000.00 1,950.00
37,325.00
BAHAN
Keramik 30 x 30 (Warna) Bh 11.870 5,090.91 60,429.10
Semen Portland Kg 10.000 1,500.00 15,000.00
Pasir Pasang M3 0.045 145,000.00 6,525.00
Semen Warna Kg 1.500 12,000.00 18,000.00
99,954.10
PERALATAN

Jumlah (A+B+C) 137,279.10


e Overhead & Profit 15% X D 20,591.87
f Harga Satuan Pekerjaan (D+E) 157,870.97

24 Pemasangan 1 M2 Dinding Keramik Warna Ukuran 20cm x 25cm


TENAGA
Pekerja OH 0.1875 85,000.00 15,937.50
Tukang Batu OH 0.3750 100,000.00 37,500.00
Kepala Tukang OH 0.0450 125,000.00 5,625.00
Mandor OH 0.0188 150,000.00 2,820.00
61,882.50
BAHAN
Keramik 20 x 25 (Warna) Bh 22.000 2,770.00 60,940.00
Semen Portland Kg 9.300 1,500.00 13,950.00
Pasir Pasang M3
0.018 145,000.00 2,610.00
Semen Warna Kg 1.940 12,000.00 23,280.00
100,780.00
PERALATAN

Jumlah (A+B+C) 162,662.50


e Overhead & Profit 15% X D 24,399.38
f Harga Satuan Pekerjaan (D+E) 187,061.88

360,410.00
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
25 Memasang 1 m' Pipa PVC Tipe AW Æ 1/2"
Bahan
Pipa PVC m' 1.200 4,250.00 5,100.00
Perlengkapan ( 35 % harga pipa PVC ) 7,700.00 7,700.00
12,800.00
TENAGA
Pekerja
Tukang batu Oh 0.036 85,000.00 3,060.00
Kepala Tukang Oh 0.060 100,000.00 6,000.00
Mandor Oh 0.006 125,000.00 750.00
Oh 0.0018 150,000.00 270.00
10,080.00

22,880.00
26 Memasang 1 m' Pipa PVC Tipe AW Æ 3"
Bahan
Pipa PVC m' 1.200 30,000.00 36,000.00
Perlengkapan ( 35 % harga pipa PVC ) 42,000.00 42,000.00
78,000.00
Tenaga
Pekerja
Tukang batu Oh 0.081 85,000.00 6,885.00
Kepala Tukang Oh 0.135 100,000.00 13,500.00
Mandor Oh 0.014 125,000.00 1,687.50
Oh 0.0041 150,000.00 615.00
22,687.50

100,687.50
27 Memasang 1 m' Pipa PVC Tipe AW Æ 4"
Bahan
Pipa PVC m' 1.200 52,500.00 63,000.00
Perlengkapan ( 35 % harga pipa PVC ) 73,500.00 73,500.00
136,500.00
Tenaga
Pekerja
Tukang batu Oh 0.081 85,000.00 6,885.00
Kepala Tukang Oh 0.135 100,000.00 13,500.00
Mandor Oh 0.014 125,000.00 1,687.50
Oh 0.0041 150,000.00 615.00
22,687.50

159,187.50
28 Memasang 1 Buah Kran Æ 3/4" atau 1/2"
Kran air bh 1.000 198,000.00 198,000.00
Seal Tape bh 0.025 3,000.00 75.00
198,075.00
Tenaga
Pekerja Oh 0.010 85,000.00 850.00
Tukang batu Oh 0.100 100,000.00 10,000.00
Kepala Tukang Oh 0.010 125,000.00 1,250.00
Mandor Oh 0.005 150,000.00 750.00
12,850.00
210,925.00
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
29 Memasang 1 buah kloset Jongkok
a. Bahan
Kloset jongkok unit 1.00 225,000.00 225,000.00
Semen Portland Kg 6.00 1,500.00 9,000.00
Batu bata Bh 7.00 650.00 4,550.00
Pasir m3 0.01 145,000.00 1,450.00
240,000.00
Tenaga
Pekerja Oh 3.300 85,000.00 85,000.00
Tukang kayu Oh 1.100 100,000.00 100,000.00
Kepala Tukang Oh 0.001 125,000.00 125,000.00
Mandor Oh 0.1600 150,000.00 150,000.00
460,000.00
700,000.00

Jumlah (A+B+C) 940,000.00


e Overhead & Profit 15% X D 141,000.00
f Harga Satuan Pekerjaan (D+E) 1,081,000.00

30 Memasang 1 Buah Wastafel


Bahan
Wastafel bh 1 750,000.00 750,000.00
Perlengkapan (12 % harga wastafel) 90,000.00 90,000.00
Semen portland kg 6 1,500.00 1,500.00
Pasir Pasang m3 0.010 145,000.00 145,000.00
986,500.00
Tenaga
Pekerja Oh 1.200 85,000.00 85,000.00
Tukang batu Oh 1.450 100,000.00 100,000.00
Kepala Tukang Oh 0.150 125,000.00 125,000.00
Mandor Oh 0.100 150,000.00 150,000.00
460,000.00
1,446,500.00
31 Pemasangan 1 M2 Langit - Langit Plywood Ukuran (120 x 240)cm (Tebal 3 mm, 4 mm, 6 mm)
TENAGA
Pekerja OH 0.100 85,000.00 8,500.00
Tukang OH 0.100 100,000.00 10,000.00
Kepala Tukang OH 0.010 125,000.00 1,250.00
Mandor OH 0.005 150,000.00 750.00
20,500.00
BAHAN
Plywood 4mm Lembar 0.375 65,000.00 24,375.00
Paku Plywood Kg 0.030 25,000.00 750.00
25,125.00
PERALATAN

Jumlah (A+B+C) 45,625.00


e Overhead & Profit 15% X D 6,843.75
f Harga Satuan Pekerjaan (D+E) 52,468.75

32 1 M2 Rangka atap baja ringan 161,205.00

BAHAN
Smartruss C 75.100 M' 2.100 18,833.33 39,550.00
Smartruss C 75.75 M' 1.200 12,666.67 15,200.00
Reng U T S 40 M' 6.200 6,000.00 37,200.00
Srew / Dynabolt Buah 30 1,000.00 30,000.00
Valery Gutter Talang Jurai M' 0.030 6,500.00 195.00
Strap Bracing M' 0.700 18,300.00 12,810.00
134,955.00
TENAGA
Tukang Terampil Oh 0.100 100,000.00 10,000.00
Pekerja Oh 0.100 85,000.00 8,500.00
Kepala Tukang Oh 0.050 125,000.00 6,250.00
Mandor Oh 0.010 150,000.00 1,500.00
26,250.00
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
33 1 M2 Pasang Atap Genteng Metal 79,790.00

BAHAN
Genteng Metal M2 1.620 29,500 47,790.00
Paku Biasa 2" - 5" Kg 0.200 18,000 3,600.00
51,390.00

TENAGA
Pekerja Oh 0.200 85,000.00 17,000.00
Tukang Kayu Oh 0.100 100,000.00 10,000.00
Kepala Tukang Oh 0.010 125,000.00 1,250.00
Mandor Oh 0.001 150,000.00 150.00
28,400.00

34 1 M' Pasang Nok Genteng Metal 66,275.00

BAHAN
Nok Genteng Metal Bh 1.100 23,000 25,300.00
Paku Biasa /2" - 1"
1
Kg 0.050 18,000 900.00
26,200.00

TENAGA
Pekerja Oh 0.250 85,000.00 21,250.00
Tukang Kayu Oh 0.150 100,000.00 15,000.00
Kepala Tukang Oh 0.015 125,000.00 1,875.00
Mandor Oh 0.013 150,000.00 1,950.00
40,075.00

35 1 M1 Lisplank GRC 55,550.00


BAHAN
GRC M' 1.050 25,000.00 26,250.00
Paku Sekrup Kg 0.050 18,000 900.00
TENAGA
Pekerja Oh 0.200 85,000.00 17,000.00
Tukang Kayu Oh 0.100 100,000.00 10,000.00
Kepala Tukang Oh 0.010 125,000.00 1,250.00
Mandor Oh 0.001 150,000.00 150.00

36 Pemasangan 1 M2 Langit - Langit Gypsum Board Ukuran (120 x 240 x 9)mm (Tebal 9 mm)
TENAGA
Pekerja OH 0.100 85,000.00 8,500.00
Tukang OH 0.050 100,000.00 5,000.00
Kepala Tukang OH 0.005 125,000.00 625.00
Mandor OH 0.005 150,000.00 750.00
14,875.00
BAHAN
Gypsum Board Lembar 0.364 65,000.00 23,660.00
Paku Gypsum Kg 0.110 40,000.00 4,400.00
Cornis Kg 0.300 3,750.00 1,125.00
Lakban Gypsum Roll 0.070 15,000.00 1,050.00
30,235.00
PERALATAN
Jumlah (A+B+C) 45,110.00
e Overhead & Profit 15% X D 6,766.50
f Harga Satuan Pekerjaan (D+E) 51,876.50
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
37 Pemasangan 1 M1 Liat Gypsum Profil
TENAGA
Pekerja OH 0.050 85,000.00 4,250.00
Tukang OH 0.050 100,000.00 5,000.00
Kepala Tukang OH 0.005 125,000.00 625.00
Mandor OH 0.003 150,000.00 450.00
10,325.00
BAHAN
List Gypsum Sedang M1 1.050 17,000.00 17,850.00
Paku Skrup Kg 0.010 25,000.00 250.00
Cornis Kg 0.100 3,750.00 375.00
18,475.00
PERALATAN
Jumlah (A+B+C) 28,800.00
e Overhead & Profit 15% X D 4,320.00
f Harga Satuan Pekerjaan (D+E) 33,120.00

38 Pemasangan 1 M2 Langit - Langit Kalsiboard Ukuran (120 x 240 x 9)mm (Tebal 3,5 mm)
TENAGA
Pekerja OH 0.100 85,000.00 8,500.00
Tukang OH 0.050 100,000.00 5,000.00
Kepala Tukang OH 0.005 125,000.00 625.00
Mandor OH 0.005 150,000.00 750.00
14,875.00
BAHAN
Kalsiboard Lembar 0.364 65,000.00 23,660.00
Paku Skrup Kg 0.110 25,000.00 2,750.00
Cornis Kg 0.300 3,750.00 1,125.00
Lakban Gypsum Roll 0.070 15,000.00 1,050.00
28,585.00
PERALATAN

Jumlah (A+B+C) 43,460.00


e Overhead & Profit 15% X D 6,519.00
f Harga Satuan Pekerjaan (D+E) 49,979.00

39 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 1 lapis Cat 34,025.88


Dasar, 2 Lapis Cat Penutup )

Cat Meni Kg 0.200 34,000.00 6,800.00


Plamir Kg 0.150 38,500.00 5,775.00
Cat Dasar Kg 0.170 33,025.10 5,614.27
Cat Penutup 2 Kali Kg 0.260 22,240.00 5,782.40
Kuas bh 0.010 12,000.00 120.00
Pengencer kg 0.030 29,473.68 884.21
Amplas lbr 0.200 5,000.00 1,000.00
25,975.88

Pekerja Oh 0.070 85,000.00 5,950.00


Tukang Cat Oh 0.009 100,000.00 900.00
Kepala Tukang Oh 0.006 125,000.00 750.00
Mandor Oh 0.003 150,000.00 450.00
8,050.00
NO. URAIAN SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH SATUAN (Rp)

1 2 3 4 5 6
40 Pengecatan 1 M2 Tembok Baru(1 Lapis plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
TENAGA
Pekerja OH 0.020 85,000.00 1,700.00
Tukang OH 0.063 100,000.00 6,300.00
Kepala Tukang OH 0.0063 125,000.00 787.50
Mandor OH 0.003 150,000.00 450.00
9,237.50
BAHAN
Cat Dasar Kg 0.100 33,025.10 3,302.51
Cat Penutup Ex. Vinilex Kg 0.260 22,240.00 5,782.40
Plamir Kg 0.100 13,965.00 1,396.50
10,481.41
PERALATAN

Jumlah (A+B+C) 19,718.91


e Overhead & Profit 15% X D 2,957.84
f Harga Satuan Pekerjaan (D+E) 22,676.75

41 Pengecatan 1 M2 Plafond (2 Lapis Cat Penutup)


TENAGA
Pekerja OH 0.028 85,000.00 2,380.00
Tukang OH 0.042 100,000.00 4,200.00
Kepala Tukang OH 0.0042 125,000.00 525.00
Mandor OH 0.003 150,000.00 450.00
7,555.00
BAHAN
Cat Penutup Ex. Vinilex Kg 0.180 22,240.00 4,003.20
4,003.20
PERALATAN
Jumlah (A+B+C) 11,558.20
e Overhead & Profit 15% X D 1,733.73
f Harga Satuan Pekerjaan (D+E) 13,291.93

42 Pemasangan 1 Buah Floor Drain Stainless Steel


TENAGA
Pekerja OH 0.010 85,000.00 850.00
Tukang OH 0.100 100,000.00 10,000.00
Kepala Tukang OH 0.010 125,000.00 1,250.00
Mandor OH 0.005 150,000.00 750.00
12,850.00
BAHAN
Floor Drain Bh 1.000 125,000.00 125,000.00
125,000.00
PERALATAN

Jumlah (A+B+C) 137,850.00


e Overhead & Profit 15% X D 20,677.50
f Harga Satuan Pekerjaan (D+E) 158,527.50

43 Pengecatan 1 M2 Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)


TENAGA
Pekerja OH 0.028 85,000.00 2,380.00
Tukang OH 0.042 100,000.00 4,200.00
Kepala Tukang OH 0.0042 125,000.00 525.00
Mandor OH 0.003 150,000.00 450.00
7,555.00
BAHAN
Cat Dasar Kg 0.120 33,025.10 3,963.01
Cat Penutup Ex. Vinilex Kg 0.180 22,240.00 4,003.20
7,966.21
PERALATAN

Jumlah (A+B+C) 15,521.21


e Overhead & Profit 10% X D 2,328.18
f Harga Satuan Pekerjaan (D+E) 17,849.39
RENCANA ANGGARAN BIAYA ( R A B )

Pekerjaan : RENCANA HARGA RUMAH APUNG/M2


Lokasi :
Tahun Anggaran :

HARGA SATUAN JUMLAH


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp) (Rp)

A PEKERJAAN PERSIAPAN
1 Pek. Perakitan Lantai Drum + Rangka 1.00 Ls 23,720,000.00 23,720,000.00

B PEKERJAAN PEMBANGUNAN RUMAH APUNG


III PEKERJAAN DINDING
1 Pasangan Lantai + Dinding Papan Kayu Kls II 1.00 M² 175,000.00 175,000.00
2 Cat Dinding 1.00 M² 28,750.00 28,750.00

IV PEKERJAAN KUSEN
1 Pas Kusen + Pintu 1.00 Unit 1,500,000.00 1,500,000.00
2 Pas Kusen + Jendela 1.00 Unit 750,000.00 750,000.00
2,250,000.00
V PEKERJAAN ATAP
1 Pas. Rangka Baja Ringan 1.00 M² 161,205.00 161,205.00
2 Pas. Atap Metal 1.00 M² 79,790.00 79,790.00
3 Pas. Nok Metal 1.00 M 1
66,275.00 66,275.00
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )

Pekerjaan : RENCANA HARGA RUMAH APUNG/M2


Lokasi : 0
Tahun Anggaran : 0

No Uraian Pekerjaan Sub Total

A PEKERJAAN PERSIAPAN Rp #REF!

B PEKERJAAN PEMBANGUNAN RUMAH APUNG Rp #REF!

### ### Rp #REF!

JUMLAH Rp #REF!
PPN 10% Rp #REF!
TOTAL Rp #REF!
PEMBULATAN Rp #REF!

Terbilang : #REF!