HARGA SATUAN UPAH / BAHAN 2013

Uraian Satuan Harga

UPAH
Pekerja Hari 36,900.00
Tukang Gali Hari 36,900.00
Mandor Hari 51,900.00
Tukang kayu Hari 52,000.00
Kepala tukang kayu Hari 54,800.00
Tukang Besi Hari 51,900.00
Kepala Tukang besi Hari 54,800.00
Sopir truk Hari 70,000.00

BAHAN
Batu Bata Bh 680.00
Batu Belah M3 105,900.00
Batu Belah 40% M3 97,100.00
Batu Blonos M3 101,000.00
Batu pecah dg mesin (1-2cm) M3 218,100.00
Batu pecah dg mesin (0,5-<1 cm) / Screening M3 224,000.00
Batu pecah dg mesin (2-3 cm) M3 210,100.00
Batu pecah dg mesin (3-5 cm) M3 221,100.00
Batu Split 1-2 (pecah tangan) M3 157,800.00
Batu Split 2-3 (pecah tangan) M3 157,800.00
Batu Split 3 - 4 (pecah tangan), gambiran M3 128,600.00

582982447.xlsx 1
Uraian Satuan Harga

Batu Split 3/5 - 5/7 (pecah tangan) M3 117,800.00


Batu Tempel ( Muka Segi 6 ) tebal 10 cm Bh 2,000.00
Batu Tempel Sukabumi Hijau M2 88,000.00
Batu Tempel Palimanan Kuning M2 77,000.00
Batu Tempel ( Tidak Beraturan ) Kecil M2 33,000.00
Batu Tempel ( Tidak Beraturan ) Besar M2 38,500.00
Batu Teraso Bh 14,800.00
Batu Candi Tempel 20/20, 5/20 M2 91,600.00
Besi Beton KG 8,700.00

582982447.xlsx 2
Uraian Satuan Harga

Kawat Beton (Bendrat) KG 17,000.00

582982447.xlsx 3
Uraian Satuan Harga

Minyak Bekisting (olie bekas) Lt 2,700.00


Paku KG 12,400.00
Papan Cetak (kayu pinus) uk 2 x 20 x 200 M3 2,076,200.00
Pasir beton/ plesteran/Tabur / ayak/pasir cirebon M3 122,100.00
Pasir Urug M3 108,300.00
P C ( 50 Kg ) ZAK 62,500.00

582982447.xlsx 4
Uraian Satuan Harga

Pipa PVC ø 2"( AW ) ex Wavin M' 13,400.00


Pipa PVC ø 4" ( AW ) ex Wavin M' 45,400.00
Sirtu M3 64,700.00

582982447.xlsx 5
NO URAIAN KOEF SAT HARGA SAT JUMLAH
1 2 3 4 5 6=(3x5)
A141 C MEMASANG 1 M' PIPA PVC TIPE AW f 2" ( tertanam ) SNI
Bahan
Pipa PVC f 2" 1.2000 m' 13,400.00 16,080.00
Perlengkapan 35 % harga pipa 5,628.00
Tenaga Jumlah (1) 21,708.00
Pekerja 0.0540 org 36,900.00 1,992.60
Tukang Batu 0.0900 org 53,200.00 4,788.00
Kepala Tukang 0.0090 org 56,600.00 509.40
Mandor 0.0027 org 51,900.00 140.13
Jumlah (2) 7,430.13
Jumlah (1)+(2) 29,138.13
Jumlah Dibulatkan 29,138.00
A141 E MEMASANG 1 M' PIPA PVC TIPE AW f 4" ( tertanam ) SNI
Bahan
Pipa PVC f 4" 1.2000 m' 45,400.00 54,480.00
Perlengkapan 35 % harga pipa 19,068.00
Tenaga Jumlah (1) 73,548.00
Pekerja 0.0810 org 36,900.00 2,988.90
Tukang Batu 0.1350 org 53,200.00 7,182.00
Kepala Tukang 0.0135 org 56,600.00 764.10
Mandor 0.0041 org 51,900.00 212.79
Jumlah (2) 11,147.79
Jumlah (1)+(2) 84,695.79
Jumlah Dibulatkan 84,695.00

582982447.xlsx, ANALISA 6
DAFTAR HARGA SATUAN PEKERJAAN

HARGA SATUAN
NO JENIS PEKERJAAN ANALISA SATUAN
Rp

1 MEMBUAT BETON TUMBUK 1PC : 3 PS : 5 KR A024 m3 568,361.00


2 LANTAI KERAMIK 30/30, PUTIH POLOS A057 m2 100,855.00
3 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 4 PS SNI 03-2837-2002 A068 m2 85,548.00
4 PLESTERAN 1 PC : 4 PS , TEBAL 15 MM A070 m2
29,230.00
5 PLESTERAN BETON 1 PC : 2 PS, TEBAL 15 MM A070 A m2 35,863.00
6 PENGECATAN TEMBOK BARU ( 1 LAP PLAMIR, 1 LAP CAT DSR, 2 LAP CAT PENUTUP ) A077 m2 9,908.00
8 PEKERJAAN LISPLANK KAYU Kamper 3/20 A090 B m' 15,000.00
9 PASANG KUSEN PINTU DAN JENDELA, Kayu Bengkirai A091 m3 14,042,530.00
10 PASANG KONSTRUKSI KUDA - KUDA Kayu Bengkirai A102 m3
12,695,290.00
11 PASANG ATAP GENTENG PRESS JATIWANGI A104 A m2 11,780.00
12 PENUTUP ATAP SIRAP (4 LAPIS) + RANGKA ATAP Kayu Meranti Batu A105 m2 642,815.00
13 PENUTUP ATAP SIRAP (4 LAPIS) + RANGKA ATAP Kayu Kempas A105 A m2 1,105,481.00
14 MEMBONGKAR PLAFOND, Jika Bongkaran dipakai lagi A132 m2 21,453.00
15 MEMASANG KLOSET JONGKOK PORSELEN, WARNA TUA A134 A buah 261,680.00
19 MEMASANG 1 BUAH KRAN f 1/2" A143 A buah 43,064.00
20 PASANG ENGSEL PINTU A148 buah 97,676.00
21 PASANG KACA, TEBAL 5 MM A149 buah 16,514.00
22 LANGIT - LANGIT ETERNIT 4 MM, RANGKA KAYU KEMPAS A085 C m3 104896
23 PASANG PONDASI BATU KALI 1:6 A048 m3
405180
24 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU JATI A093 m2 487689
25 BUBUNGAN ATAP GENTENG LOKAL, Jatiwangi A106 m' 54872
26 KONSTRUKSI PENETRASI LENGKAP A116 m2 110881

harga-sat-pek
REKAPITULASI RENCANA ANGGARAN BIAYA

JUMLAH HARGA
NO. URAIAN PEKERJAAN
( Rp. )

1 Saluran Jalan Cik Dik Tiro 0

2 Saluran Jalan TEUKU UMAR 0

3 Saluran Jalan SAMAHUDI 0

4 Saluran Jalan JATISARI 0

5 Saluran IRIGASI 0

0
RENCANA ANGGARAN
HARGA PERKIRAAN SENDIRI / OE (

KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

No. Uraian Pekerjaan Analisa

1 2 3

1 Saluran Jalan Cik Dik Tiro


Sebelah Utara Jalan

A PEKERJAAN TANAH
1 Galian Tanah A009
2 Urugan Tanah Kembali A014
3 Urugan Pasir Bawah Pondasi A020 A

B PEKERJAAN PASANGAN
1 Pas. Talud A048
2 Pas. Plesteran 1:6 A074A

2 Saluran Jalan TEUKU UMAR


Sebelah Barat Jalan

A PEKEREJAAN TANAH
1 Galian Tanah A009
2 Urugan Tanah Kembali A014
3 Urugan Pasir Bawah Pondasi A020 A

B PEKERJAAN PASANGAN
1 Pas. Talud A048
2 Pas. Plesteran 1:6 A074A

3 Saluran Jalan SAMAHUDI


Sebelah Barat Jalan

A PEKEREJAAN TANAH
1 Galian Tanah A009
2 Urugan Tanah Kembali A014
3 Urugan Pasir Bawah Pondasi A020 A

B PEKERJAAN PASANGAN
1 Pas. Talud A048
2 Pas. Plesteran 1:6 A074A

4 Saluran Jalan JATISARI


Sebelah Barat Jalan

A PEKEREJAAN TANAH
1 Galian Tanah A009
2 Urugan Tanah Kembali A014
3 Urugan Pasir Bawah Pondasi A020 A

B PEKERJAAN PASANGAN
1 Pas. Talud A048
2 Pas. Plesteran 1:6 A074A

5 Saluran IRIGASI
Sebelah Barat Jalan

A PEKEREJAAN TANAH
1 Galian Tanah A009
2 Urugan Tanah Kembali A014
3 Urugan Pasir Bawah Pondasi A020 A

B PEKERJAAN PASANGAN
1 Pas. Talud A048
2 Pas. Plesteran 1:6 A074A
CANA ANGGARAN BIAYA
SENDIRI / OE ( OWNER ESTIMATED )

Volume Sat. Harga Satuan Jumlah Harga Jumlah Semua

4 5 6 7 8

660 m3 26,280.00
220 m3 8,070.00
66 m3 141,549.00

616 m3 405,064.00
m2 24,136.00

3300 m3 26,280.00
1100 m3 8,070.00
66 m3 141,549.00

1980 m3 405,064.00
m2 24,136.00

3300 m3 26,280.00
1100 m3 8,070.00
66 m3 141,549.00

343 m3 405,064.00
m2 24,136.00

3300 m3 26,280.00
1100 m3 8,070.00
66 m3 141,549.00

0 m3 405,064.00
m2 24,136.00

3300 m3 26,280.00
1100 m3 8,070.00
66 m3 141,549.00

0 m3 405,064.00
m2 24,136.00
No Nama Jalan Panjang Volume Jumlah Total

Jalan Cikdiktiro
Utara Jalan
Galian Tanah 475 2.64 1254
Urugan Pasir bawah pondasi 475 0.22 104.5
Pas. Talud 475 0.792 376.2
Pas. Plesteran 475 2.2 1045

Jalan Teuku Umar


Utara Jalan
Galian Tanah 1500 2.64 3960
Urugan Pasir bawah pondasi 1500 0.22 330
Pas. Talud 1500 0.792 1188
Pas. Plesteran 1500 2.2 3300

Jalan Samahudi
Utara Jalan
Galian Tanah 343 1.9 651.7
Urugan Pasir bawah pondasi 343 0.09 30.87
Pas. Talud 343 1.1 377.3
Pas. Plesteran 343 1.9 651.7

Jalan Rembang
Utara Jalan
Galian Tanah 328 1.9 623.2
Urugan Pasir bawah pondasi 328 0.09 29.52
Pas. Talud 328 1.1 360.8
Pas. Plesteran 328 1.9 623.2

Jalan Purbalingga
Utara Jalan
Galian Tanah 438 1.9 832.2
Urugan Pasir bawah pondasi 438 0.09 39.42
Pas. Talud 438 1.1 481.8
Pas. Plesteran 438 1.9 832.2

Jalan Nyi ageng Serang


Utara Jalan
Galian Tanah 205 1.9 389.5
Urugan Pasir bawah pondasi 205 0.09 18.45
Pas. Talud 205 1.14 233.7
Pas. Plesteran 205 2 410

Jalan Mustofa
Utara Jalan
Galian Tanah 324 1.9 615.6
Urugan Pasir bawah pondasi 324 0.09 29.16
Pas. Talud 324 1.14 369.36
Pas. Plesteran 324 2 648

Jalan Bukit Tinggi


Utara Jalan
Galian Tanah 112 1.9 212.8
Urugan Pasir bawah pondasi 112 0.09 10.08
Pas. Talud 112 1.1 123.2
Pas. Plesteran 112 1.9 212.8

Jalan Tebing Tinggi


Utara Jalan
Galian Tanah 112 1.9 212.8
Urugan Pasir bawah pondasi 112 0.09 10.08
Pas. Talud 112 1.1 123.2
Pas. Plesteran 112 1.9 212.8

Jalan Palopo
Utara Jalan
Galian Tanah 611 1.9 1160.9
Urugan Pasir bawah pondasi 611 0.09 54.99
Pas. Talud 611 1.1 672.1
Pas. Plesteran 611 1.9 1160.9

Jalan Wonogiri
Utara Jalan
Galian Tanah 238 1.9 452.2
Urugan Pasir bawah pondasi 238 0.09 21.42
Pas. Talud 238 1.1 261.8
Pas. Plesteran 238 1.9 452.2

Jalan Jepara
Utara Jalan
Galian Tanah 258 1.9 490.2
Urugan Pasir bawah pondasi 258 0.09 23.22
Pas. Talud 258 1.1 283.8
Pas. Plesteran 258 1.9 490.2

Jalan Gorontalo
Utara Jalan
Galian Tanah 438 1.9 832.2
Urugan Pasir bawah pondasi 438 0.09 39.42
Pas. Talud 438 1.1 481.8
Pas. Plesteran 438 1.9 832.2
m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2

m3
m3
m3
m2
m3
m3
m3
m2
264
352
616

1320
660
1980
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMELIHARAAN SARANA DAN PRASARANA GEDUNG
LOKASI : POLITEKNIK KESELAMATAN TRANSPORTASI JALAN
TAHUN ANGGARAN : 2013

No. Uraian Pekerjaan Analisa Volume Sat. Harga Satuan Jumlah Harga Jumlah Semua

1 2 3 4 5 6 7 8

A PEKEREJAAN PERSIAPAN
1 Administrasi dan dokumentasi ls 1.00 Ls 1,000,000.00 1,000,000.00
2 Air kerja dan listrik kerja ls 1.00 Ls 1,000,000.00 1,000,000.00
Jumlah 2,000,000.00
B PEKEREJAAN PEMELIHARAAN POS PENJAGAAN
1 Pas. Batu Bata 1:4 A068 48.00 m2 85,548.00 4,106,304.00
2 Plesteran 1:4 A070 96.00 m2 25,446.00 2,442,816.00
3 Pasang partisi rangka kayu A041 74.00 m2 150,000.00 11,100,000.00
4 Kusen + daun pintu alumunium lengkap terpasang A095 2.00 unit 2,500,000.00 5,000,000.00
5 Kusen+ daun jendela kaca rangka alumunium A100 1.00 unit 2,000,000.00 2,000,000.00
6 Pas. Kaca mati A152 2.00 ls 89,734.00 179,468.00
7 Pas. Plafond gipsum rangka ky A084 32.00 m2 119,192.00 3,814,144.00
8 Pengecatan tembok setara Movilex A077 96.00 unit 9,908.00 951,168.00
9 Instalasi listrik saklar dan stop kontak taksir 8.00 titik 150,000.00 1,200,000.00
10 Lampu TL gantung 40 watt taksir 2.00 unit 75,000.00 150,000.00
11 Lampu SL 20 watt taksir 3.00 unit 50,000.00 150,000.00
12 Lantai Kerja 1:3:5 A048 0.50 m3 568,361.00 284,180.50
13 Tiang dan kuda-kuda kayu lokal A102 1.00 ls 4,500,000.00 4,500,000.00
14 Pasang asbes sandaran sepeda A105 C 1.00 ls 2,500,000.00 2,500,000.00
15 Pasang Tempat sandaran sepeda 1.00 unit 1,000,000.00 1,000,000.00
Jumlah 39,378,080.50
C PEKERJAAN PEMELIHARAAN RUMAH MAKAN PATI
1 Pemasangan Pipa PVC Ø 4" A141 E 15.00 m' 84,494.00 1,267,410.00
2 Pemasangan PVC Tee Knee Ø 4" A 140 E 3.00 buah 210,000.00 630,000.00
3 Pemasangan talang PVC taksir 20.00 m' 75,000.00 1,500,000.00
Jumlah 3,397,410.00
D PEKERJAAN PEMELIHARAAN GEDUNG INDOOR
4 Pemasangan poli carbonat atas taksir 22.00 m2 400,000.00 8,800,000.00
Jumlah 8,800,000.00
E PEKERJAAN PEMELIHARAAN SARANA OLAH RAGA
1 Pemasangan instalasi air bersih taksir 1.00 unit 2,500,000.00 2,500,000.00
2 Pemasangan pompa taksir 1.00 unit 500,000.00 500,000.00
3 Perbaikan kawat pagar keliling lapangan taksir 1.00 ls 5,200,000.00 5,200,000.00
Jumlah 8,200,000.00
F PEKERJAAN PEMELIHARAAN RUANG KELAS
1 Perbaikan Genteng dan wuwung 1.00 unit 1,500,000.00 1,500,000.00
Jumlah 1,500,000.00
G PEKERJAAN PEMELIHARAAN RUANG PERPUSTAKAAN
1 Penggantian atap asbes (ganti yang bocor) A087 1.00 unit 750,000.00 750,000.00
2 Penggantian plafond yang rusak A088 1.00 unit 1,500,000.00 1,500,000.00
Jumlah 2,250,000.00
H PEKERJAAN PEMELIHARAAN INST AIR BUGENVILLE
1 Pemasangan instalasi air bersih taksir 1.00 unit 1,500,000.00 1,500,000.00
2 Pemindahan tanki air dan pembuatan dudukan tangki air taksir 1.00 unit 500,000.00 500,000.00
Jumlah 2,000,000.00
I PEKERJAAN PEMELIHARAAN DAPUR, PANTRY DAN TEMPAT WUDLU
1 Pas. Pondasi 1:6 C.6.2 15.44 m3 405,180.00 6,255,979.20
2 Pas Beton Sloof 15/20 A026 36.00 m1 75,239.00 2,708,604.00
3 Pas. Batu Bata 1:4 A068 72.00 m2 85,548.00 6,159,456.00
4 Plesteran 1:4 A070 144.00 m2 25,446.00 3,664,224.00
5 Pas. Beton kolom praktis 15/15 A026 54.00 m1 58,898.00 3,180,492.00
6 Pas. Beton ring balk 15/20 A026 36.00 m1 58,898.00 2,120,328.00
7 Pas.keramik dinding 25/40 A056 66.00 m2 106,523.00 7,030,518.00
8 Pas. Lantai keramik 30/30 anti selip A057 28.00 m2 100,855.00 2,823,940.00
9 Pas Pintu KM/WC multiplek rangka kayu lapis seng A097 2.00 unit 405,398.00 810,796.00
10 Pas Kloset jongkok A134 A 2.00 bh 261,680.00 523,360.00
11 Instalasi Air bersih taksir 1.00 unit 1,500,000.00 1,500,000.00
12 Kran air A143 A 10.00 bh 24,710.00 247,100.00
13 Instalasi titik lampu taksir 6.00 titik 150,000.00 900,000.00
14 Lampu SL 14 watt taksir 4.00 bh 50,000.00 200,000.00
15 Pasang rangka atap ky lokal A129 48.00 m2 84,763.00 4,068,624.00
16 Pasang atap genteng press jtw A104 A 48.00 m2 11,780.00 565,440.00
17 Pengecatan tembok setara Movilex A077 56.00 m2 9,908.00 554,848.00
Jumlah 43,313,709.20
J ASRAMA TANJUNG
1 Perbaikan bak mandi A137 A 52 unit 200,000.00 10,400,000.00
2 Pengecatan dinding Km/wc bawah (206 m2) A077 206 m2 9,908.00 2,041,048.00
3 Perbaikan pintu KM/wc A097 2 unit 405,398.00 810,796.00
4 Perbaikan plafon eternit KM/wc A085 C 5 unit 400,000.00 2,000,000.00
5 Pasang list plafond A086 42 m2 15,000.00 630,000.00
6 Perbaikan instalasi listrik taksir 5 titik 120,000.00 600,000.00
7 Pasang Lampu SL 18 watt taksir 6 bh 60,000.00 360,000.00
8 Pengecatan koridor (lihat gambar) A077 280 m2 9,908.00 2,774,240.00
9 Pas. Keramik koridor A057 10 m2 9,908.00 99,080.00
10 Pengecatan besi railing tangga A079 80 m2 9,908.00 792,640.00
11 Perbaikan engsel pintu KM/WC A149 25 unit 14,814.00 370,350.00
Jumlah 20,878,154.00
K ANGGREK
1 Pengecatan dinding KM/Wc (15 unit) A077 120 m2 9,908.00 1,188,960.00
2 Pengecatan dinding depan Km/wc (T. anduk) (15 unit) A077 120 m2 9,908.00 1,188,960.00
3 Pengecatan dinding kamar (15 kamar) A077 840 m2 9,908.00 8,322,720.00
4 Pengecatan dinding koridor A077 480 m2 9,908.00 4,755,840.00
5 Pengecatan R TV A077 100 m2 9,908.00 990,800.00
6 Pasang kunci pintu kamar A148 30 unit 83,676.00 2,510,280.00
7 Pasang keramik 30/30 A057 12 m2 100,855.00 1,210,260.00
8 Bongkar keramik lama 30/30 A057 12 m2 10,000.00 120,000.00
9 Bongkar keramik teras lama 30/30 A057 4 m2 10,000.00 40,000.00
10 Pasang keramik 30/30 teras A057 4 m2 100,855.00 403,420.00
11 Bongkar keramik 30/30 koridor A057 2 m2 10,000.00 20,000.00
12 Pasang keramik 30/30 koridor A057 2 m2 100,855.00 201,710.00
13 Pasang double teakwood A093 1 unit 487,689.00 487,689.00
14 Perbaikan eternit kamar A085 C 6 m2 120,000.00 720,000.00
15 Pasang lis plafond A086 40 m1 15,000.00 600,000.00
16 Perbaikan wuwung A106 60 m1 20,000.00 1,200,000.00
17 Perbaikan genteng A104 A 10 m2 60,000.00 600,000.00
18 Perbaikan plafond kaca A132 0.8 m2 90,000.00 72,000.00
19 Pasang kran km/wc A143 A 2 unit 24,710.00 49,420.00
20 Perbaikan bk km/wc taksir 15 unit 100,000.00 1,500,000.00
Jumlah 23,493,099.00
L FLAMBOYAN MELATI
1 Perbaikan keramik A057 6 m2 130,000.00 780,000.00
2 Rabat beton keliling A024 20 m2 80,000.00 1,600,000.00
Jumlah 2,380,000.00
M PEKERJAAN PENGASPALAN JALAN
1 Pengaspalan jalan dengan lapis penetrasi A116 200 m2 110,881.00 22,176,200.00
Jumlah 22,176,200.00

Jumlah 179,766,652.70
Dibulatkan 179,766,000.00
ppn 10 % 17,976,600.00
Jumlah total 197,742,600.00
Terbilang : Seratus sembilan puluh tujuh juta tujuh ratus empat puluh tiga ribu rupiah

Tegal, Januari 2013


Mengetahui/Menyetujui :
Direktur Pejabat Pembuat Komitmen
Politeknik Transportasi Keselamatan Jalan Politeknik Transportasi Keselamatan Jalan

BUDHY HARJOTO ANDI SAHARA


Pembina Tk I Penata Tk.I
NIP. 19560106 198603 1 001 NIP. 19800902 201012 2 0001
7000000
400000

talang 500,000.00
fiber 3,500,000.00

kawat 4000000

sanyo 2,000,000.00 uk 2*2


fiber 17000
harga 25000

336,329,023.00
45,000,000.00
291,329,023.00

70,000,000.00
3,000,000.00
13,000,000.00
10,000,000.00
96,000,000.00

140,000,000.00
#REF!
44,000,000.00
0.00
#REF!
#REF!

#REF!

336,329,023.00
45,000,000.00
RENCANA ANGGARAN BIAYA (EE)
KEGIATAN : Pengkajian Dampak Lingkungan
PEKERJAAN : Penyusunan DED IPAL INDUSTRI TAHU TEMPE
LOKASI : Debong Tengah dan Debong Kidul
TAHUN ANGGARAN : 2011

JUMLAH HARGA
NO. URAIAN PEKERJAAN
( Rp. )

1 Bak Penampung/Inlet Err:509

2 Err:509 Err:509

3 DIGESTER Err:509

4 Err:509 Err:509

Jumlah Total Err:509


Dibulatkan Err:509
Terbilang : Dua ratus lima puluh tiga juta empat ratus sepuluh ribu rupiah

Tegal, Juni 2011


CV. CITRA VASTU VIDYA

IMRON,ST
Direktur
HARGA SATUAN UPAH / BAHAN 2011

No Uraian Satuan Harga

I. UPAH
1 Pekerja Hari 36,900.00
2 Tukang Gali Hari 36,900.00
3 Mandor Hari 51,900.00
4 Tukang kayu Hari 52,000.00
5 Kepala tukang kayu Hari 54,800.00
6 Tukang Besi Hari 51,900.00
7 Kepala Tukang besi Hari 54,800.00
8 Sopir truk Hari 70,000.00
-
II BAHAN -
1 Batu Bata Bh 680.00
2 Batu Split 1-2 (pecah tangan) M3 157,800.00
3 Besi Beton KG 8,700.00
4 Minyak Bekisting (olie bekas) Lt 2,700.00
5 Paku KG 12,400.00
6 Papan Cetak (kayu pinus) uk 2 x 20 x 200 M3 2,076,200.00
7 Pasir beton/ plesteran/Tabur / ayak/pasir cirebon M3 122,100.00
8 Pasir Urug M3 108,300.00
9 P C ( 50 Kg ) ZAK 62,500.00
10 Pipa PVC ø 2"( AW ) ex Wavin M' 13,400.00
11 Pipa PVC ø 4" ( AW ) ex Wavin M' 45,400.00
12 Sirtu M3 64,700.00
DAFTAR ANALISA PEKERJAAN

NO URAIAN KOEF SAT HARGA SAT JUMLAH


1 2 3 4 5 6=(3x5)
A009 1 M3 GALIAN TANAH KERAS SEDALAM 1 M SNI
Pekerja 0.6250 org 36,900.00 23,062.50
Tukang Gali 0.0000 org 36,900.00 0.00
Kepala Tukang 0.0000 org 56,600.00 0.00
Mandor 0.0620 org 51,900.00 3,217.80
Jumlah 26,280.30
Jumlah Dibulatkan 26,280.00
A013B 1 M3 GALIAN TANAH KERAS SEDALAM 1 M SNI
Sopir Truk 0.0500 org 70,000.00 3,500.00
Biaya Angkat tanah ke Dump Truk 1.0000 org 6,875.00 6,875.00
Sewa Dump Truk + Bahan Bakar 0.0500 org 250,000.00 12,500.00
Jumlah 22,875.00
Jumlah Dibulatkan 22,875.00
A014 1 M3 URUGAN KEMBALI SNI
Pekerja 0.1920 org 36,900.00 7,084.80
Tukang Gali 0.0000 org 36,900.00 0.00
Kepala Tukang 0.0000 org 56,600.00 0.00
Mandor 0.0190 org 51,900.00 986.10
Jumlah 8,070.90
Jumlah Dibulatkan 8,070.00
A020 1 M3 URUGAN SIRTU SNI
Bahan
Sirtu 1.2000 m3 64,700.00 77,640.00
Tenaga Jumlah (1) 77,640.00
Pembantu Tukang / Pekerja 0.2500 org 36,900.00 9,225.00
Mandor 0.0250 org 51,900.00 1,297.50
Jumlah (2) 10,522.50
Jumlah (1) + (2) 88,162.50
Jumlah Dibulatkan 88,162.00
A020 A 1 M3 URUGAN PASIR SNI
Bahan
Pasir Urug 1.2000 m3 108,300.00 129,960.00
Tenaga Jumlah (1) 129,960.00
Pekerja 0.3000 org 36,900.00 11,070.00
Mandor 0.0100 org 51,900.00 519.00
Jumlah (2) 11,589.00
Jumlah (1) + (2) 141,549.00
Jumlah Dibulatkan 141,549.00
A026 A 1 M3 MEMBUAT PONDASI BETON BERTULANG 1PC : 2 PS : 3 SPLIT (150 Kg + BEKISTING) SNI
Bahan
Kayu Terentang, papan cetak pinus 0.2000 m3 2,076,200.00 415,240.00
Paku Biasa 2" - 5" 1.5000 Kg 12,400.00 18,600.00
Minyak Begisting 0.4000 Lt 2,700.00 1,080.00
Besi Beton Polos 150.0000 Kg 8,700.00 1,305,000.00
Kawat Beton 2.2500 Kg 17,000.00 38,250.00
Semen PC (50 kg) 6.4600 zak 62,500.00 403,750.00
Pasir beton 0.5200 m3 122,100.00 63,492.00
Koral Beton, Batu Split 1/2 (pecah tangan) 0.7800 m3 157,800.00 123,084.00
Tenaga Jumlah (1) 2,368,496.00
Pekerja 3.9000 org 36,900.00 143,910.00
Tukang batu 0.3500 org 53,200.00 18,620.00
Tukang Kayu 1.0400 org 52,000.00 54,080.00
Tukang Besi 1.0500 org 51,900.00 54,495.00
Kepala Tukang Besi 0.2450 org 54,800.00 13,426.00
Mandor 0.1650 org 51,900.00 8,563.50
Jumlah (2) 293,094.50
Jumlah (1)+(2) 2,661,590.50
Jumlah Dibulatkan 2,661,590.00
A026 B 1 M3 MEMBUAT SLOOF BETON BERTULANG 1PC : 2 PS : 3 SPLIT (200 Kg + BEKISTING) SNI
Bahan
Kayu Terentang, papan cetak pinus 0.2700 m3 2,076,200.00 560,574.00
Paku Biasa 2" - 5" 2.0000 Kg 12,400.00 24,800.00
Minyak Begisting 0.6000 Lt 2,700.00 1,620.00
Besi Beton Polos 200.0000 Kg 8,700.00 1,740,000.00
Kawat Beton 3.0000 Kg 17,000.00 51,000.00
Semen PC (50 kg) 6.4600 zak 62,500.00 403,750.00
Pasir beton 0.5200 m3 122,100.00 63,492.00
Koral Beton, Batu Split 1/2 (pecah tangan) 0.7800 m3 157,800.00 123,084.00
Tenaga Jumlah (1) 2,968,320.00
Pekerja 4.8500 org 36,900.00 178,965.00
Tukang batu 0.3500 org 53,200.00 18,620.00
Tukang Kayu 1.5600 org 52,000.00 81,120.00
Tukang Besi 1.4000 org 51,900.00 72,660.00
Kepala Tukang Besi 0.3310 org 54,800.00 18,138.80
Mandor 0.1700 org 51,900.00 8,823.00
Jumlah (2) 378,326.80
Jumlah (1)+(2) 3,346,646.80
Jumlah Dibulatkan 3,346,646.00
A068 1 M2 PAS. BATA MERAH TEBAL 1/2 BATA 1 PC : 4 PS SNI
Bahan
Bata merah 5 X 11 X 22 70.0000 bh 680.00 47,600.00
PC (50 kg) 0.2300 zak 62,500.00 14,375.00
Pasir Ayak 0.0430 m3 122,100.00 5,250.30
Tenaga Jumlah (1) 67,225.30
Pekerja 0.3200 org 36,900.00 11,808.00
Tukang batu 0.1000 org 53,200.00 5,320.00
Kepala Tukang batu 0.0100 org 56,600.00 566.00
Mandor 0.0150 org 51,900.00 778.50
Jumlah (2) 18,472.50
Jumlah (1)+(2) 85,697.80
Jumlah Dibulatkan 85,697.00
A068A 1 M2 PAS. BATA MERAH TEBAL 1 BATA 1 PC : 4 PS SNI
Bahan
Bata merah 5 X 11 X 22 140.0000 buah 680.00 95,200.00
PC (50 kg) 0.5310 zak 62,500.00 33,187.50
Pasir ayak 0.0930 m3 122,100.00 11,355.30
Tenaga Jumlah (1) 139,742.80
Pekerja 0.6500 org 36,900.00 23,985.00
Tukang batu 0.2000 org 53,200.00 10,640.00
Kepala Tukang batu 0.0200 org 56,600.00 1,132.00
Mandor 0.0300 org 51,900.00 1,557.00
Jumlah (2) 37,314.00
Jumlah (1)+(2) 177,056.80
Jumlah Dibulatkan 177,056.00
A071 1 M2 PLESTERAN 1 PC : 3 PS, TEBAL 15 MM SNI
Bahan
PC (50 kg) 0.1296 zak 62,500.00 8,100.00
Pasir Ayak 0.0190 m3 122,100.00 2,319.90
Tenaga Jumlah (1) 10,419.90
Pekerja 0.2000 org 36,900.00 7,380.00
Tukang batu 0.1500 org 53,200.00 7,980.00
Kepala Tukang batu 0.0150 org 56,600.00 849.00
Mandor 0.0100 org 51,900.00 519.00
Jumlah (2) 16,728.00
Jumlah (1)+(2) 27,147.90
Jumlah Dibulatkan 27,147.00
A073 1 M2 PLESTERAN 1 PC : 4 PS, TEBAL 15 MM SNI
Bahan
PC (50 Kg) 0.1040 Zak 62,500.00 6,500.00
Pasir Ayak 0.0200 M3 122,100.00 2,442.00
Tenaga Jumlah (1) 8,942.00
Pekerja 0.2000 org 36,900.00 7,380.00
Tukang batu 0.1500 org 53,200.00 7,980.00
Kepala Tukang batu 0.0150 org 56,600.00 849.00
Mandor 0.0100 org 51,900.00 519.00
Jumlah (2) 16,728.00
Jumlah (1)+(2) 25,670.00
Jumlah Dibulatkan 25,670.00
A141 C MEMASANG 1 M' PIPA PVC TIPE AW f 2" ( tertanam ) SNI
Bahan
Pipa PVC f 2" 1.2000 m' 13,400.00 16,080.00
Perlengkapan 35 % harga pipa 5,628.00
Tenaga Jumlah (1) 21,708.00
Pekerja 0.0540 org 36,900.00 1,992.60
Tukang Batu 0.0900 org 53,200.00 4,788.00
Kepala Tukang 0.0090 org 56,600.00 509.40
Mandor 0.0027 org 51,900.00 140.13
Jumlah (2) 7,430.13
Jumlah (1)+(2) 29,138.13
Jumlah Dibulatkan 29,138.00
A141 E MEMASANG 1 M' PIPA PVC TIPE AW f 4" ( tertanam ) SNI
Bahan
Pipa PVC f 4" 1.2000 m' 45,400.00 54,480.00
Perlengkapan 35 % harga pipa 19,068.00
Tenaga Jumlah (1) 73,548.00
Pekerja 0.0810 org 36,900.00 2,988.90
Tukang Batu 0.1350 org 53,200.00 7,182.00
Kepala Tukang 0.0135 org 56,600.00 764.10
Mandor 0.0041 org 51,900.00 212.79
Jumlah (2) 11,147.79
Jumlah (1)+(2) 84,695.79
Jumlah Dibulatkan 84,695.00
HARGA SATUAN UPAH / BAHAN 2013

No Uraian Satuan Harga

I. UPAH
1 Pekerja Hari 36,900.00
2 Tukang Gali Hari 36,900.00
3 Mandor Hari 51,900.00
4 Tukang cat/ plitur / batu Hari 53,200.00
5 Kepala tukang cat/ plitur / batu Hari 56,600.00
6 Tukang kayu Hari 52,000.00
7 Kepala tukang kayu Hari 54,800.00
8 Tukang Besi Hari 51,900.00
9 Kepala Tukang besi Hari 54,800.00
10 Tukang Besi Profil Hari 53,200.00
11 Kepala Tukang besi Profil Hari 59,900.00
12 Sopir truk Hari 70,000.00

II BAHAN
1 Amplas Lbr 4,200.00
2 Asbes Gelombang 300 x 102 x 0.5 cm (besar) LBR 96,800.00
3 Bak Mandi Fibreglass, Vol 150 ltr Bh 299,400.00
4 Batu Bata Bh 680.00
5 Batu Candi Tempel 20/20, 5/20 M2 91,600.00
6 Besi Beton KG 8,700.00
7 Besi IWF KG 13,700.00
8 Besi Siku / Profil KG 10,500.00
9 Besi Prestressed polos KG 12,700.00
10 Besi Strip ( tebal 5mm, lebar 5 cm ) KG 10,500.00
11 Bubungan Asbes (besar) M' 48,200.00
12 Bubungan Asbes (kecil) M' 28,800.00
13 Bubungan genteng pres JTW ( isi 4 / M' ) Bh 5,900.00
14 Cat Tembok ex Mowilex KG 16,900.00
15 Engsel Jendela Psg 10,100.00
16 Engsel Jendela Kuningan Psg 26,600.00
17 Engsel Pintu Aluminium Psg 39,900.00
18 Engsel Pintu Biasa Psg 14,600.00
19 Eternit 1 x 1 m2 t = 4 mm "Jabesmen" / Harflex t=2,7 mm Bh 14,600.00
20 Grendel jendela aluminium Psg 9,200.00
21 Grendel jendela biasa Psg 3,900.00
22 Grendel pintu aluminium Bh 13,300.00
23 Grendel pintu biasa Bh 3,900.00
24 Glass block Bh 21,800.00
25 Gypsum uk. 1,2 x 2,4, tebal 9 mm Lbr 71,100.00
26 Kawat Beton (Bendrat) KG 17,000.00
27 Keramik 30/30 (putih polos) M2 37,100.00
28 Keramik 30/30, warna M2 42,500.00
29 Kloset jongkok INA, warna tua Bh 142,300.00
30 Kloset jongkok INA, warna muda Bh 114,400.00
31 Kran f 1/2" ex Fiba Bh 36,500.00
32 Lampu bohlam 25 watt "Philip" Bh 4,600.00
33 Lampu TL 20 watt ( komplit ) Travo Sinar Set 50,100.00
34 Mur + Baut f 1/2 " Kg 15,900.00
35 Paku KG 12,400.00
36 Paku Pancing KG 39,900.00
37 Pasir Urug M3 108,300.00
38 P C ( 50 Kg ) ZAK 62,500.00
39 Pipa Besi ø 4" t = 3 mm M' 124,400.00
40 Pipa Galvanis ø 4" t = 3 mm M' 155,600.00
41 Pipa PVC ø 1" ( AW ) ex Wavin M' 8,900.00
42 Pipa PVC ø 1/2" ( AW ) ex Wavin M' 4,500.00
43 Pipa PVC ø 1 1/4" ( AW ) ex Wavin M' 12,800.00
44 Pipa PVC ø 1 1/2" ( AW ) ex Wavin M' 14,800.00
45 Pipa PVC ø 2"( AW ) ex Wavin M' 13,400.00
46 Pipa PVC ø 2 1/2"( AW ) ex Wavin M' 27,700.00
47 Pipa PVC ø 3" ( AW ) ex Wavin M' 37,400.00
48 Pipa PVC ø 3/4" ( AW ) ex Wavin M' 6,200.00
49 Pipa PVC ø 4" ( AW ) ex Wavin M' 45,400.00
50 Pipa PVC ( hitam ) 4" M' 11,400.00
51 Pintu Aluminium ( 1,8 x 0,65 ) Set 239,500.00
HARGA SATUAN UPAH / BAHAN 2013

No Uraian Satuan Harga

I. UPAH
1 Pekerja Hari 36900
2 Tukang Gali Hari 36900
3 Mandor Hari 51900
4 Tukang cat/ plitur / batu Hari 53200
5 Kepala tukang cat/ plitur / batu Hari 56600
6 Tukang kayu Hari 52000
7 Kepala tukang kayu Hari 54800
8 Tukang Besi Hari 51900
9 Kepala Tukang besi Hari 54800
10 Tukang Besi Profil Hari 53200
11 Kepala Tukang besi Profil Hari 59900
12 Mekanik Hari 86500
13 Mekanik Pembantu Hari 53200
14 Operator terlatih/ masinis Hari 86500
15 Operator kurang terlatih Hari 53200
16 Pembantu operator/ pemb. masinis Hari 49900
17 Sopir truk Hari 70000
18 Sopir personil Hari 53200
19 Pembantu sopir Hari 36600
20 Buruh lapangan tak terlatih Hari 36600
21 Buruh lapangan kurang terlatih Hari 38600
22 Buruh lapangan terlatih Hari 46600
23 Tukang masak aspal Hari 66500
24 Penjaga malam Hari 38600

II BAHAN
1 Abu batu M3 212900
2 Amplas Lbr 4200
3 Asbes Gelombang 300 x 102 x 0.5 cm (besar) LBR 96800
4 Asbes Gelombang 180 x 105 x 0.5 cm (kecil) LBR 50500
5 Aspal curah Kg 5600
6 Aspal drum Kg 7300
7 Atap sirap 4 lapis Bh 1600
8 Bak Cuci Stainless Steel "Royal" (0,4 x 1) m Bh 266200
9 Bak Cuci Stainless Steel "Viega" ( 1,00 x 0,90 ) m2 Bh 212900
10 Bak Cuci Stainless Steel 80 Cm Bh 179600
11 Bak Mandi Fibreglass, Vol 120 ltr Sudut Bh 299400
12 Bak Mandi Fibreglass, Vol 120 ltr Kotak Bh 299400
13 Bak Mandi Fibreglass, Vol 150 ltr Bh 299400
14 Batu apung ( gosok ) Kg 18400
15 Batu Bata Bh 680
16 Batu Belah M3 105900
17 Batu Belah 40% M3 97100
18 Batu Blonos M3 101000
19 Batu pecah dg mesin (1-2cm) M3 218100
20 Batu pecah dg mesin (0,5-<1 cm) / Screening M3 224000
21 Batu pecah dg mesin (2-3 cm) M3 210100
22 Batu pecah dg mesin (3-5 cm) M3 221100
23 Batu Split 1-2 (pecah tangan) M3 157800
24 Batu Split 2-3 (pecah tangan) M3 157800
25 Batu Split 3 - 4 (pecah tangan), gambiran M3 128600
26 Batu Split 3/5 - 5/7 (pecah tangan) M3 117800
27 Batu Tempel ( Muka Segi 6 ) tebal 10 cm Bh 2000
28 Batu Tempel Sukabumi Hijau M2 88000
29 Batu Tempel Palimanan Kuning M2 77000
30 Batu Tempel ( Tidak Beraturan ) Kecil M2 33000
31 Batu Tempel ( Tidak Beraturan ) Besar M2 38500
32 Batu Teraso Bh 14800
33 Batu Candi Tempel 20/20, 5/20 M2 91600
34 Besi Beton KG 8700
35 Besi IWF KG 13700
36 Besi Siku / Profil KG 10500
37 Besi Prestressed polos KG 12700
38 Besi Strip ( tebal 5mm, lebar 5 cm ) KG 10500
39 Beton K 175 Ready Mix M3 924900
40 Beton K 225 Ready Mix M3 951600
41 Beton K 300 Ready Mix M3 1044700
42 Bondex ( plat beton ) M2 218900
43 BRC tinggi 60 cm ( Pagar ) 6 mm (5,2) mm M' 53200
44 BRC tinggi 90 cm ( Pagar ) 6 mm M' 79800
45 BRC tinggi 110 cm ( Pagar ) 6 mm M' 97400
46 Bubungan Asbes (besar) M' 48200
47 Bubungan Asbes (kecil) M' 28800
48 Bubungan Genteng beton abu-2 (isi 3 / M') Bh 7900
49 Bubungan genteng beton warna (isi 3 bh) Bh 11800
50 Bubungan Genteng keramik "KIA" Bh 17900
51 Bubungan Genteng keramik pertigan "KIA" Bh 86400
52 Bubungan Genteng "Morando" natural Bh 6600
53 Bubungan Genteng "Morando" Glazur Bh 11200
54 Bubungan genteng pres JTW ( isi 4 / M' ) Bh 5900
55 Cat Besi / Kayu "Bee Brand" KG 55800
56 Cat Besi / Kayu "Yunior" KG 47800
57 Cat Besi / Kayu "Glotex" KG 47100
58 Cat Tembok (shintex) KG 14900
59 Cat Tembok ex Metrolite KG 16900
60 Dempul kayu KG 21800
61 Dolken Kayu Galam f 8-10/400 cm (Kalimantan) Batang 57200
62 Dolken Kayu Galam f 8-10 / 4 m' Batang 57200
63 Dolken Kayu Lokal f 8-10 / 4 m' Batang 22000
64 Engsel Jendela Psg 10100
65 Engsel Jendela Kuningan Psg 26600
66 Engsel Pintu Kuningan Psg 39900
67 Engsel Pintu Biasa Psg 14600
68 Eternit 1 x 1 m2 t = 4 mm "Jabesmen" / Harflex t=2,7 mm Bh 14600
69 Eternit (saflex) 1 x 1 m2, t = 5 mm Bh 12300
70 Fiber glass gelombang 180 x 0,8 Lbr 41900
71 Fiber glass plat lebar 1 M M' 26600
72 Flincote Kg 20000
73 Floor Drain / Saringan pembuang pada lantai KM/WC (Stainless) Bh 33200
74 Formika untuk Pintu Lbr 0
75 Formtie / penjaga jarak bekisting / spacer Bh 2800
76 Genteng beton abu-2 (isi 9 bh / m2 ) M2 38200
77 Genteng beton warna (isi 9 bh / m2 ) M2 53400
78 Genteng Keramik Glazur "KIA" (isi 15 bh / m2), warna muda Bh 6900
79 Genteng Keramik Glazur "KIA" (isi 15 bh / m2), warna tua Bh 11500
80 Genteng type "Morando" Glazur ( isi 20/M2 ) 1550x20 M2 66000
81 Genteng Pres JTW ( isi 25/M2 ) 750x25 M2 33000
82 Genteng Tipe "Morando" Natural ( isi 20/M2 ) M2 39600
83 Genteng Kaca 5 mm Buah 18500
84 Grefel beton ø 20 cm BUAH 26600
85 Grefel beton ø 30 cm BUAH 39900
86 Grendel jendela kuningan Psg 9200
87 Grendel jendela biasa Psg 3900
88 Grendel pintu kuningan Bh 13300
89 Grendel pintu biasa Bh 3900
90 Glass block Bh 21800
91 Gypsum uk. 1,2 x 2,4, tebal 9 mm Lbr 71100
92 Hak angin kuningan Psg 10500
93 Hak angin biasa Psg 2600
94 Hard flex uk. 0,5 x 2 M LBR 19900
95 Hard flex 0,35 mm 1,22 x 2,44 m, kalsiboard ( tahan api ) LBR 62400
96 Hotmix jadi + alat besar, tenaga dan bahan bakar ton 0
97 Injuk KG 6600
98 Jendela Nako (+ Tralis ) BUAH 30100
99 Kaca bening 5 mm M2 69800
100 Kaca ryban 5 mm M2 73100
101 Kawat Beton (Bendrat) KG 17000
102 Kawat Bronjong ø 4 mm ( Galvanis ) KG 21200
103 Kawat duri ( 1rol = 20 m ) M' 4200
104 Kawat Las KG 6700
105 Kawat Las Listrik RD 26 KG 24500
106 Kawat Las Listrik RB 26 KG 28900
107 Kayu bakar M3 330000
108 Kayu bangkirai uk 6x12x400 , 8x12x400 M3 8638100
109 Kayu jati ø 22 s/d 28 M3 11788800
110 Kayu Kempas uk 6 x12x400 , 8x12x400 M3 5723300
111 Kayu Punak Sumatra M3 5324000
112 Kayu Punak Kalimantan M3 5324000
113 Kayu Meranti Batu M3 5324000
114 Kayu reng 3/4 Meranti Batu M3 4259200
115 Kayu reng 2/3 Meranti Batu M3 4259200
116 Kayu stoot ( bambu ), 5 m Btg 12900
117 Keramik 20/25, putih M2 46500
118 Keramik 20/25, warna M2 54500
119 Keramik 20/20, anti slip ( u/lantai Km/wc) M2 46500
120 Keramik 20/20, putih M2 46500
121 Keramik 20/20, warna M2 46500
122 Keramik 30/30 (putih polos) M2 37100
123 Keramik 30/30, warna M2 42500
124 Keramik 40/40, (putih polos) M2 43800
125 Keramik 40/40, warna M2 46500
126 Kerikil sungai/Manggaran uk. 0,5 - 1 cm M3 120700
127 Kloset duduk / Monoblok "INA", Putih (tanpa pembilas) Bh 1024800
128 Kloset duduk / Monoblok "INA", Warna Tua (tanpa pembilas) Bh 1131300
129 Kloset duduk / Monoblok + pembilas otomatis "INA", warna tua Bh 1530600
130 Kloset duduk / Monoblok + pembilas otomatis "INA", warna putih Bh 1464100
131 Kloset jongkok INA, warna tua Bh 142300
132 Kloset jongkok INA, warna muda Bh 114400
133 Kloset jongkok Traso dicat Bh 39900
134 Kran f 1/2" ex Fiba Bh 36500
135 Kuas 3" Bh 6600
136 Kuas 2" Bh 5200
137 Kunci tanam 2 slag "Kuda Besar" Bh 70500
138 Lampu bohlam 25 watt "Philip" Bh 4600
139 Lampu TL 20 watt ( komplit ) Travo Sinar Set 50100
140 Lem kayu Fox KG 14600
141 Lem Kuning ( Aica Aibon ) KG 46500
142 Lem Putih ( Fox ) KG 14600
143 Lempengan Rumput Biasa M2 19900
144 Lempengan Rumput Jepang / Rumput Golf / Rumput Gajah M2 33200
145 List Kayu Profil M' 13300
146 Melamik KG 86500
147 Melamik ( lapisan ) uk. 0,9 x 2,1 LBR 156900
148 Menie Besi (Payung warna hijau) KG 25700
149 Menie Besi ( Nippon ), zinchcromate KG 43800
150 Menie kayu KG 18900
151 Minyak aspal Lt 6700
152 Minyak Bekisting (olie bekas) Lt 2700
153 Minyak Cat Ltr 17200
154 Minyak pelumas Lt 33200
155 Minyak tanah Lt 8000
156 Multiplek 9 mm uk. 1,2 x 2,4 m Lbr 146400
157 Multiplek 12 mm uk. 1,2 x 2,4 m Lbr 175600
158 Mur + Baut f 1/2 " Kg 15900
159 Oker Putih Kg 3600
160 Oker Warna Kg 3800
161 Paku KG 12400
162 Paku Pancing KG 39900
163 Papan Meranti Batu ( 2 x 20 x 400 ) M3 5563500
164 Papan Meranti Batu ( 2 x 25 x 400 ) M3 5856400
165 Papan bangkirai ( 2 x 20 x 400 ) M3 9150500
166 Papan bangkirai ( 2 x 25 x 400 ) M3 10248700
167 Papan bangkirai ( 2 x 30 x 400 ) M3 10448300
168 Papan Cetak (kayu pinus) uk 2 x 20 x 200 M3 2076200
169 Papan kayu jati M3 13310000
170 Papan Kempas (kruing) uk 3x20x400 M3 6002700
171 Papan Punak Kalimantan uk 3x20x400 M3 5563500
172 Pas. Kanstin 15 x 20 x 30 x 50 M' 65100
173 Pas. Kanstin 10 x 15 x 30 x 50 M' 61100
174 Pas. Kanstin 10 x 20 x 50 M' 30500
175 Pas. Kanstin Taman M' 57400
176 Pasir beton/ plesteran/Tabur / ayak/pasir cirebon M3 122100
177 Pasir Pasang M3 102400
178 Pasir Halus M3 86400
179 Pasir Urug M3 108300
180 Paving Block type Hexagonal tebal 6 cm (K175) M2 67800
181 Paving Block type Holland natural 6 cm (K 175 ) M2 67800
182 Paving Block type Holland natural 8 cm (K 175 ) M2 90400
183 Paving Block warna type Hexagonal tebal 6 cm (K175) M2 77100
184 Paving Block warna type Holland natural 6 cm (K 175 ) M2 77100
185 Paving Block warna type Holland natural 8 cm (K 175) M2 99700
186 P C ( 50 Kg ) ZAK 62500
187 PC Putih ( 40 kg / Zak ) ZAK 86400
188 P C ( 50 Kg ) (Harga DO = 160 zak) ZAK 69900
189 Pipa Besi ø 1" t = 2 mm M' 28800
190 Pipa Besi ø 1/2" t = 2 mm M' 16600
191 Pipa Besi ø 2" t = 2 mm M' 51800
192 Pipa Besi ø 3" t = 3 mm M' 95800
193 Pipa Besi ø 3/4" t = 2 mm M' 22500
194 Pipa Besi ø 4" t = 3 mm M' 124400
195 Pipa Beton ø 20 cm ( Buis Beton ) M' 53200
196 Pipa Beton ø 30 cm ( Buis Beton ) M' 66500
197 Pipa Beton ø 40 cm ( Buis Beton ) M' 83200
198 Pipa Beton ø 60 cm ( Buis Beton ) M' 146400
199 Pipa Beton ø 80 cm ( Buis Beton ) M' 199600
200 Pipa Galvanis ø 1" t = 2 mm M' 36500
201 Pipa Galvanis ø 1/2" t = 2 mm M' 22500
202 Pipa Galvanis ø 2" t = 2 mm M' 69800
203 Pipa Galvanis ø 3" t = 3 mm M' 119700
204 Pipa Galvanis ø 3/4" t = 2 mm M' 29900
205 Pipa Galvanis ø 4" t = 3 mm M' 155600
206 Pipa PVC ø 1" ( AW ) ex Wavin M' 8900
207 Pipa PVC ø 1/2" ( AW ) ex Wavin M' 4500
208 Pipa PVC ø 1 1/4" ( AW ) ex Wavin M' 12800
209 Pipa PVC ø 1 1/2" ( AW ) ex Wavin M' 14800
210 Pipa PVC ø 2"( AW ) ex Wavin M' 13400
211 Pipa PVC ø 2 1/2"( AW ) ex Wavin M' 27700
212 Pipa PVC ø 3" ( AW ) ex Wavin M' 37400
213 Pipa PVC ø 3/4" ( AW ) ex Wavin M' 6200
214 Pipa PVC ø 4" ( AW ) ex Wavin M' 45400
215 Pipa PVC ( hitam ) 4" M' 11400
216 Pintu Aluminium ( 1,8 x 0,65 ) Set 239500
217 Plamur Kayu KG 19900
218 Plamur tembok KG 13300
219 Plat alumunium 0,5 mm M2 79800
220 Plat alumunium 0,6 mm M2 99800
221 Plat alumunium ( Aluminium Sheet ) 0,3 mm M2 44500
222 Plat alumunium unt lap. pintu (1x2) tebal 0,3 mm LBR 133100
223 Plywood 3 mm uk. 0,9 x 2,2 m LBR 66500
224 Plywood 4 mm LBR 113000
225 Plywood 9 mm uk. 1,2 x 2,4 m LBR 70500
226 Pompa air Nasional 125 watt (dlm negeri), biasa Bh 402600
227 Pompa air Nasional 125 watt (dlm negeri), otomatis Bh 556200
228 Pompa air Sanyo 100 watt (dlm negeri) Bh 931700
229 Reng kayu Bengkirai 3/5 ikat M3 5989500
230 Reng Kayu Kempas 2/3, 3/3, 3/4 (ikat) M3 4658500
231 Reng Kayu Meranti Batu 2/3 M3 4259200
232 Rol Cat Bh 12500
233 Reservoir (Tangki air) Stainless + Kaki merk "Kettler" 1000 Lt Bh 2928200
234 Roster Bh 3900
235 Salang Kg 11800
236 Seal Tape Bh 2000
237 Sekrup asbes / pengait Bh 800
238 Seng BJLS 20, uk 90 cm M' 31900
239 Seng BJLS 30, Uk. 55 cm M' 29200
240 Seng BJLS 30, Uk. 90 cm M' 38500
241 Seng Gelombang ( 210 x 80 x 0.2 cm ) lbr 56600
242 Seng Gelombang 3' - 6' ( 90 x 180 x 0.2 cm ) lbr 56500
243 Seng glb BJLS 20(80 x 80) lbr 42500
244 Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 28 lbr 66500
245 Seng Plat BJLS 20 Lebar 90 M2 33200
246 Seng Plat BJLS 30 lebar 90 M2 46500
247 Shear Connector Ls 135300
248 Sirlak Kg 73100
249 Sirtu M3 64700
180
1.1
163.6364 31.23967 17.4
148.7603
135.2367
200 1.4641
292.82

Anda mungkin juga menyukai