D KAYU
1 Balok kayu kls III m3 2,832,500.00
2 Kayu Gording 5/10 kayu lokal m3 80,000.00 5,000,000.00
3 Kayu Lokal Usuk 5/7 (lokal) m' 60,000.00
4 Usuk 3 m btg
5 Usuk 2m btg
6 Kayu Lokal Reng 2/3 (lokal) m'
7 Papan Cor ( 1"x8") 1 lembar 70,000.00 2,916,666.67
8 Kusen Pintu (0.9x2.1 m) Unit 250,000.00
9 Daun Pintu (0.9x2.1 m) Unit 550,000.00
10 Pintu PVC/ Standart kelas menengah unit 250,000.00
11 Kusen Jendela (0.6x1.5m) Unit 250,000.00
12 Daun Jendela unit 250,000.00
13 Daun Pintu Tripleks unit
E ATAP
F SANITASI
1 Pipa PVC dia. 1/2" m' 5,150.00 22,000.00
2 Perlengkapan %
3 Pipa PVC dia. 3" m' 40,943.00 90,000.00
4 Perlengkapan %
5 Pipa PVC dia. 4" m' 67,000.00 130,000.00
6 Perlengkapan %
7 Kran 1/2" buah 20,000.00
8 Seal tape buah 3,090.00
9 Bak Mandi fiber buah 257,000.00
10 Closet Jongkok kelas menengah buah 180,000.00
11 Asesoris %
12 Floor Drain buah 36,000.00
13 Septictank 2x2x2 m3 bh 2,500,000.00
14 Sumur Resapan ls
G LAIN - LAIN
RISHA
Panel 1 BH 120,000.00
Panel 2 BH 110,000.00
Panel 3 BH 100,000.00
Mur, baut, ring, dan plat sambung Bh 3,700.00
Pekerja 74,000
Tukang 95,500
Kaso 5/7 cm
3,115,800
Kawat Beton 28,200
Kayu balok 5/7 3,115,800
Kayu Kelas III 2,832,500
Kayu papan 3/20 2,832,500
Kerikil 213
Lem Kayu 45,600
Minyak Bekisting 17,000
Paku 23,000
Paku 2”-3” 18,540
Paku 5 -12 cm 18,540
kayu kelas II begisting 3,811,000
Pasir beton 125
Pasir Pasang 175,000
Pasir Urug 103,000
Rangka atap baja ringan dan spandex 270,000
Rangka metal hollow 40.40.2mm 15,500
Semen Portland 1,236
Split 383,160
Tanah Urug 87,000
Plamur 10,000
Cat Dasar 20,600
Cat Penutup 20,600
Tripleks 118,450
Paku Tripleks 18,540
Kloset jongkok kelas biasa bh 120000
No. URAIAN PEKERJAAN KODE ANALISA SAT
A PEKERJAAN PERSIAPAN
1 Uitzet Bouwplank m
Pekerja OH
Tukang kayu OH
Kayu balok 5/7 m3
Paku 2”-3” kg
Kayu papan 3/20 m3
B PEKERJAAN TANAH
1 Galian tanah m3
Pekerja OH
4 #REF! #REF!
Pekerja OH
Pasir urug m3
5 #REF! #REF!
Pekerja OH
Tanah timbun m3
C PEKERJAAN PASANGAN
1 Pasangan Batu Belah (1 SP : 5 PS) m3
Pekerja OH
Tukang batu OH
Batu belah m3
Semen Portland kg
Pasir pasang m3
2 Pasangan Aanstamping m3
Pekerja OH
Tukang batu OH
Bata merah buah
Semen Portland Kg
Pasir pasang m3
4 Plesteran 1SP:6PP m2
Pekerja OH
Tukang batu OH
PC Kg
Pasir Pasang m3
5 Acian m2
Pekerja OH
Tukang batu OH
Semen PC Kg
6 #REF! #REF!
Pekerja OH
Tukang OH
Kalsiboard 1200 x 2400 lbr
KalsiScrew CE bh
KalsiKompon IN-F @20 Kg zak
Kalsi tape roll
D PEKERJAAN BETON
1 Coor Slooof 15/20 (1Sp:2Ps:Kr) 0
G PEKERJAAN KAYU
1 Kusen Pintu Kayu Lokal LS
2 Kusen Jendela Kayu Lokal LS
3 Daun Pintu Lapis Double Triplek 3 mm LS
4 Daun Jendela Kaca 3 mm LS
#REF! #REF! #REF!
H PEKERJAAN ATAP
#REF! #REF! #REF!
Pekerja OH
Tukang kayu OH
Tripleks Lembar
Paku tripleks kg
2 0.00 0.00
Pekerja OH
Tukang batu OH
Pipa PVC 4” M
Perlengkapan %
3 #REF! #REF!
Pekerja OH
Tukang batu OH
Pipa PVC 3” M
Perlengkapan %
4 #REF! #REF!
Pekerja OH
Tukang batu OH
Pipa PVC 1/2” M
Perlengkapan %
5 #REF! #REF!
Pekerja OH
Tukang batu OH
Kran air M
Sealtape Buah
6 #REF! #REF!
7 #REF! #REF!
H #REF!
1 #REF! LS
2 #REF! LS
3 #REF! LS
4 #REF! LS
5 #REF! LS
6 #REF! LS
7 #REF! LS
VOLUME KOEF VOLUME BAHAN HARGA SATUAN
12.00
0.10 1.20 Rp 74,000.00
0.10 1.20 Rp 95,000.00
0.01 0.14 Rp 2,832,500.00
0.02 0.24 Rp 20,000.00
0.01 0.08 Rp 2,832,500.00
TOTAL A
11.72
0.75 8.79 Rp 74,000.00
3.31
1 1.65 Rp 74,000.00
6.96
0.3 2.09 Rp 74,000.00
1.2 8.36 Rp 65,000.00
#REF!
0.3 #REF! Rp 74,000.00
1.2 #REF! Rp 65,000.00
#REF!
0.3 #REF! Rp 74,000.00
1.2 #REF! Rp 87,000.00
TOTAL B
5.31
1.5 7.96 Rp 74,000.00
0.75 3.98 Rp 95,000.00
1.20 6.37 Rp 170,000.00
163.00 864.80 Rp 1,236.00
0.52 2.76 Rp 152,000.00
3.78
0.3 1.13 Rp 74,000.00
0.1 0.38 Rp 95,000.00
70.00 264.60 Rp 567.00
11.50 43.47 Rp 1,236.00
0.04 0.16 Rp 152,000.00
22.20
0.3 6.66 Rp 74,000.00
0.1 2.22 Rp 95,000.00
70.00 1,553.65 Rp 567.00
11.50 255.24 Rp 1,236.00
0.04 0.95 Rp 152,000.00
44.39
0.3 13.32 Rp 74,000.00
0.15 6.66 Rp 95,000.00
4.42 196.03 Rp 1,236.00
0.027 1.20 Rp 152,000.00
31.84
0.2 6.37 Rp 74,000.00
0.1 3.18 Rp 95,000.00
3.25 103.49 Rp 1,236.00
#REF!
0.1 #REF! Rp 74,000.00
0.3 #REF! Rp 95,000.00
0.4 #REF! Rp 73,250.00
12 #REF! Rp 66.00
0.06 #REF! Rp 95,000.00
0.12 #REF! Rp 36,000.00
#REF!
0.020 #REF! Rp 74,000.00
0.063 #REF! Rp 95,000.00
0.100 #REF! Rp 11,300.00
0.100 #REF! Rp 20,600.00
0.260 #REF! Rp 20,600.00
TOTAL C
1.08 1 Rp 886,365.40
2.25
1.65 3.72 Rp 74,000.00
0.275 0.62 Rp 95,000.00
247 556.44 Rp 1,236.00
869 1,957.68 Rp 108.57
999 2,250.55 Rp 125.56
215 484.35 Rp 5.00
TOTAL D
1 4.00 Rp 300,000.00
1 3.00 Rp 250,000.00
1 3.00 Rp 400,000.00
1 6.00 Rp 250,000.00
1 #REF! #REF!
TOTAL E
#REF!
0.1 #REF! Rp 74,000.00
0.1 #REF! Rp 95,000.00
0.375 #REF! Rp 118,450.00
0.03 #REF! Rp 20,000.00
#REF!
0.2 #REF! Rp 74,000.00
0.3 #REF! Rp 95,000.00
0.0163 #REF! Rp 3,115,800.00
0.25 #REF! Rp 20,000.00
68.80 1
0.2 13.76 Rp 74,000.00
0.45 30.96 Rp 95,000.00
1.488 102.37 Rp 14,500.00
2.232 153.56 Rp 12,500.00
28 1,926.40 Rp 350.00
1.6 110.08 Rp 3,500.00
3.6 247.68 Rp 7,000.00
0.124 8.53 Rp 48,000.00
TOTAL F
50.40
1 50.40 Rp 74,000.00
1.5 75.60 Rp 95,000.00
1 50.40 Rp 120,000.00
6 302.40 Rp 1,236.00
0.01 0.50 Rp 152,000.00
-
0.081 - Rp 74,000.00
0.135 - Rp 95,000.00
1.2 - Rp 67,000.00
35 - Rp 804.00
#REF!
0.081 #REF! Rp 74,000.00
0.135 #REF! Rp 95,000.00
1.2 #REF! Rp 40,943.00
35 #REF! Rp 491.32
#REF!
0.036 #REF! Rp 74,000.00
0.06 #REF! Rp 95,000.00
1.2 #REF! Rp 5,150.00
35 #REF! Rp 61.80
#REF!
0.0100 #REF! Rp 74,000.00
0.4000 #REF! Rp 95,000.00
1.0000 #REF! Rp 20,000.00
0.0250 #REF! Rp 3,090.00
1.0000 #REF! #REF!
1.0000 #REF! #REF!
TOTAL G
0 1 0 #REF!
1 0 #REF!
1 0 #REF!
1 0 #REF!
1 0 #REF!
1 0 #REF!
1 0 #REF!
TOTAL H
NO. URAIAN KEBUTUHAN
JUMLAH BOBOT
A Pembayaran Upah Ker
1 Pekerja
2 Tukang
B Pembelian Bahan Mate
Kayu balok 5/7
Rp 853,410.00 1.39 Paku (2”-3”) (triplek) (b
Rp 88,800.00 Kayu papan 3/20
Rp 114,000.00 Pasir Urug
Rp 407,880.00 Pasir Pasang
Rp 4,800.00 Tanah Urug
Rp 237,930.00 Batu Belah
Rp 853,410.00 Semen Portland
Bata Merah
Pasir Beton
Rp 650,349.00 Kerikil
Rp 650,349.00 Air
Kusen Pintu
Rp 122,396.00 Kusen Jendela
Rp 122,396.00 Daun Pintu
Daun Jendela
Rp 697,712.64 Pintu PVC
Rp 154,583.04 Rangka Baja Atap + Pen
Rp 543,129.60 Panel Risha
Rangka metal hollow 40
#REF! Pipa PVC 4"
#REF! Perlengkapan Pipa PVC
#REF! Pipa PVC 3"
Perlengkapan Pipa PVC
#REF! Pipa PVC 1/2"
#REF! Perlengkapan Pipa PVC
#REF! Kalsiboard 1200 x 2400
#REF! KalsiScrew CE
KalsiKompon IN-F @20
Kalsi tape
Rp 3,537,484.57 Plamuur
Rp 588,910.50 Cat dasar tembok
Rp 378,016.88 Cat penutup tembok
Rp 1,082,322.00 Pemasangan InstalasiLis
Rp 1,068,888.47 Fitting Lampu
Rp 419,346.72 Saklar Tunggal
Saklar Ganda
Rp 348,289.20 Stop Kontak
Rp 83,916.00 Sekring Box 1 Lobang
Rp 35,910.00 MCB 4 A
Rp 150,028.20
Rp 53,728.92
Rp 24,706.08
Rp 2,045,047.30
Rp 492,729.00
Rp 210,852.50
Rp 880,919.55
Rp 315,479.73
Rp 145,066.52
Rp 2,042,480.49
Rp 985,458.00
Rp 632,557.50
Rp 242,288.43
Rp 182,176.56
Rp 901,684.07
Rp 471,269.00
Rp 302,503.75
Rp 127,911.32
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rp 886,365.40
Rp 861,547.17
Rp 861,547.17
Rp -
Rp -
Rp -
Rp 1,519,222.02
Rp 275,066.88
Rp 58,854.40
Rp 687,761.82
Rp 212,548.46
Rp 282,568.70
Rp 2,421.76
Rp 3,267,134.59
Rp 1,200,000.00
Rp 750,000.00
Rp 1,200,000.00
Rp 1,500,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rp 13,971,560.00
Rp 1,018,240.00
Rp 2,941,200.00
Rp 1,484,428.80
Rp 1,919,520.00 LUMP SUMP
Rp 674,240.00
Rp 385,280.00
Rp 1,733,760.00
Rp 409,497.60
#REF!
Rp 17,409,974.40
Rp 3,729,600.00
Rp 7,182,000.00
Rp 6,048,000.00
Rp 373,766.40
Rp 76,608.00
Rp -
Rp -
Rp -
Rp -
Rp -
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
URAIAN KEBUTUHAN SATUAN Volume
No Uraian Belanja Satuan Volume Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6
I BERSUMBER DANA BANTUAN STIMULAN
1 Rencana Pencairan Dana Tahap I (50%)
a Coor Slooof 15/20 (1Sp:2Ps:Kr) LS 1 Rp 886,365.40 Rp 886,365.40
b Uitzet Bouwplank
Pekerja OH 1.20 Rp 74,000.00 Rp 88,800.00
Tukang kayu OH 1.20 Rp 95,000.00 Rp 114,000.00
Kayu balok 5/7 m3 0.14 Rp 2,832,500.00 Rp 407,880.00
Paku 2”-3” kg 0.24 Rp 20,000.00 Rp 4,800.00
Kayu papan 3/20 m3 0.08 Rp 2,832,500.00 Rp 237,930.00
d Pasangan Batu Belah (1 SP : 5 PS)
Pekerja OH 7.96 Rp 74,000.00 Rp 588,910.50
Tukang batu OH 3.98 Rp 95,000.00 Rp 378,016.88
Batu belah m3 6.37 Rp 170,000.00 Rp 1,082,322.00
Semen Portland kg 864.80 Rp 1,236.00 Rp 1,068,888.47
Pasir pasang m3 2.76 Rp 152,000.00 Rp 419,346.72
e ADMINISTRASI DAN PELAPORAN LS 1.00 Rp 276,000.00 Rp 276,000.00
Sub Jumlah I Rp 5,553,259.97
Terbilang :
Catatan:
1. Kelebihan biaya ditanggung oleh penerima bantuan Perbaikan Rumah
2. Kepala Keluarga (KK) yang mempunyai kepemilikan rumah lebih dari satu, maka bantuan
diberikan hanya untuk satu rumah dengan nilai sesuai ketentuan
3. Apabila Kepala Keluarga meninggal dunia, maka ahli warisnya hanya berhak mendapat
bantuan stimulan perbaikan atas satu rumah
........................................ ........................................
Menyetujui
PPK BPBD Kabupaten/Kota
........................................
RENCANA PENGELUARAN DANA TAHAP 1 (terminj 1)
BANTUAN PERBAIKAN RUMAH KORBAN BENCANA
Di Kabupaten Lombok Utara
Provinsi Nusa Tenggara Barat
POKMAS ………………………………
Dusun ……………………………..
Desa …………………………….
Kecamatan : Bayan
Kabupaten/Kota : Lombok Utara
Provinsi : Nusa Tenggara Barat
STIMULAN
NO URAIAN PEKERJAAN RINCIAN ITEM JUMLAH ANGGOTA VOLUME KOEFISIEN KEBUTUHAN BAHAN SAT HARGA SATUAN JUMLAH
JUMLAH BOBOT
A PEKERJAAN PERSIAPAN Rp -
3
1 Uitzet Bouwplank 17 12.00 m Rp 103,860.00
a Pekerja 0.1 1.2 OH Rp 75,000.00 Rp 7,500.00
b Tukang kayu 0.1 1.2 OH Rp 110,000.00 Rp 11,000.00
3
c Kayu balok 5/7 0.01 0.12 m Rp 4,250,000.00 Rp 42,500.00
d Paku 2" - 3" 0.02 0.24 Kg Rp 18,000.00 Rp 360.00
3
e Kayu papan 3/20 0.01 0.12 m Rp 4,250,000.00 Rp 42,500.00
B PEKERJAAN TANAH
1 Galian Tanah 17 11.72 m3 Rp 56,250.00
a Pekerja 0.75 8.7885 OH Rp 75,000.00 Rp 56,250.00
2 Urugan Kembali 17 3.31 m3 Rp 75,000.00
a Pekerja 1 3.308 OH Rp 75,000.00 Rp 75,000.00
3 Urugan Pasir Bawah Pondasi 17 6.96 m3 Rp 262,500.00
a Pekerja 0.3 2.08896 OH Rp 75,000.00 Rp 22,500.00
b Pasir urug 1.2 8.35584 m3 Rp 200,000.00 Rp 240,000.00
4 Timbunan Tanah Peninggi Lantai 17 #REF! m3 Rp 126,900.00
a Pekerja 0.3 #REF! OH Rp 75,000.00 Rp 22,500.00
b Tanah timbun 1.2 #REF! m3 Rp 87,000.00 Rp 104,400.00
5 Urugan Pasir Bawah Lantai 17 #REF! m3 Rp 262,500.00 #REF! #REF!
a Pekerja 0.3 2.08896 OH Rp 75,000.00 Rp 22,500.00
b Pasir urug 1.2 8.35584 m3 Rp 200,000.00 Rp 240,000.00
C PEKERJAAN PASANGAN
1 Pasangan Batu Belah (1 SP : 4 PS) 17 5.31 m3 Rp 739,600.00 Rp 66,707,112.60 #REF!
a Pekerja 1.5 7.95825 OH Rp 75,000.00 Rp 112,500.00
b Tukang batu 0.75 3.979125 OH Rp 110,000.00 Rp 82,500.00
c Batu belah / Pondasi 1.2 6.3666 m3 Rp 150,000.00 Rp 180,000.00
d Semen portland 163 864.7965 Kg Rp 1,200.00 Rp 195,600.00
e Pasir pasang 0.52 2.75886 m3 Rp 325,000.00 Rp 169,000.00
2
5 Acian - m Rp 29,900.00
a Pekerja 0.2 0 OH Rp 75,000.00 Rp 15,000.00
b Tukang batu 0.1 0 OH Rp 110,000.00 Rp 11,000.00
c Semen portland 3.25 0 Kg Rp 1,200.00 Rp 3,900.00
6 Pasangan Penutup Gunung-gunung #REF! m2 Rp 71,500.00
a Pekerja 0.1 #REF! OH Rp 75,000.00 Rp 7,500.00
b Tukang batu 0.3 #REF! OH Rp 110,000.00 Rp 33,000.00
c Kalsiboard 1200 x 2400 0.4 #REF! Lbr Rp 55,000.00 Rp 22,000.00
d Kalsi screw CE 12 #REF! Bh Rp 350.00 Rp 4,200.00
e Kalsi kompon IN-F @20 Kg 0.06 #REF! Zak Rp 60,000.00 Rp 3,600.00
f Kalsi tape 0.12 #REF! Roll Rp 10,000.00 Rp 1,200.00
7 Pengecatan #REF! m2 Rp 13,555.00
a Pekerja 0.02 #REF! OH Rp 75,000.00 Rp 1,500.00
b Tukang cat 0.063 #REF! OH Rp 110,000.00 Rp 6,930.00
c Plamir 0.1 #REF! Kg Rp 3,000.00 Rp 300.00
d Cat dasar tembok 0.1 #REF! Kg Rp 9,250.00 Rp 925.00
e Cat penutup tembok 0.26 #REF! Kg Rp 15,000.00 Rp 3,900.00
D PEKERJAAN BETON
1 Pekerjaan Rabat Beton 17 2.25 m3 Rp 725,687.50
a Pekerja 1.65 3.71712 OH Rp 75,000.00 Rp 123,750.00
b Tukang batu 0.275 0.61952 OH Rp 110,000.00 Rp 30,250.00
c Semen portland 247 556.4416 Kg Rp 1,200.00 Rp 296,400.00
d Pasir beton 869 1.40 Kg Rp 100.00 Rp 86,900.00
e Kerikil (Maks 30 mm) 0,5 - 1 cm 999 1.67 Kg Rp 187.50 Rp 187,312.50
f Air 215 484.352 Liter Rp 5.00 Rp 1,075.00
D PEKERJAAN BETON
1 Membuat 1 m3 beton, 1 Pc : 2 Ps : 3 Kr 17 1.97 m3 Rp 940,675.00 Rp 31,573,168.45 #REF!
a Semen portland 336 663.39 Kg Rp 1,200.00 Rp 403,200.00
b Pasir beton 0.54 1.0661625 m3 Rp 140,000.00 Rp 75,600.00
c Kerikil (Maks 30 mm) 0,5 - 1 cm 0.81 1.59924375 m3 Rp 337,500.00 Rp 273,375.00
d Tukang batu 0.35 0.69103125 OH Rp 110,000.00 Rp 38,500.00
e Pekerja 2 3.94875 OH Rp 75,000.00 Rp 150,000.00
Terbilang :
Empat Ratus Tujuh Puluh Empat Juta Enam Ratus Tujuh Belas Ribu Tiga Ratus Tujuh Puluh Rupiah
Catatan :
1. Kelebihan biaya ditanggung oleh penerima bantuan Perbaikan Rumah (swadaya)
2. Kepala Keluarga (KK) yang mempunyai kepemilikan rumah lebih dari satu, maka bantuan diberikan hanya untuk satu rumah dengan nilai sesuai ketentuan
3. Apabila Kepala Keluarga meninggal dunia, maka ahli warisnya hanya berhak mendapat bantuan stimulan perbaikan atas satu rumah
(............................................)
(............................................)
Menyetujui
PPK BPBD KABUPATEN LOMBOK UTARA
(MUHADI, SH)
TABEL PERHITUNGAN VOLUME PONDASI BATU KALI
RUMAH T 36 KONVENSIONAL
NO. PONDASI BATU KALI PERHITUNGAN VOLUME
BLOK DELATASI SKET ( PBK-1 ) JUMLAH P L.a L.b T VOLUME KET.
(m) (m) (m) (m) ( m3 )
2. Timbunan / urugan Kem 1 32.250 0.30 0.80 0.80 14.190 pas. Batu kali
1 32.250 0.90 0.80 0.80 21.930 galian
7.740
Total M3
Galian Tanah 21.930
Timbunan Kembal 7.740
Urugan Pasir 2.580
Aanstamping 5.160
Lantai kerja -
Pas. Batu Kali 7.256
HARGA UPAH DAN BAHAN "UD. Galang"
B Upah
1 Mandor OH Rp 105,000.00
2 Kepala tukang besi OH Rp 100,000.00
3 Kepala tukang kayu OH Rp 100,000.00
4 Tukang gali OH Rp 110,000.00
5 Tukang kayu OH Rp 110,000.00
6 Tukang batu OH Rp 110,000.00
7 Tukang besi Rp 110,000.00
8 Tukang cat OH Rp 110,000.00
9 Tukang listrik OH Rp 110,000.00
10 Tukang ledeng OH Rp 110,000.00
11 Pekerja OH Rp 75,000.00
DAFTAR HARGA SATUAN
HARGA SATUAN
NO ITEM PEKERJAAN SAT
SURVEY - 1 SURVEY - 2 TERPAKAI
A UPAH
1 Pekerja OH 80,000 80,000 80,000
2 Tukang OH 100,000 100,000 100,000
B BAHAN
1 Pasir urug m3 78,000 78,000 78,000
2 Tanah Urug m3 67,000 67,000 67,000
3 Batu Belah m3 163,000 165,000 163,000
4 Pasir pasang m3 150,000 145,000 145,000
5 Bata merah bh 750 750 750
6 Kerikil Pecah 1/2 m3 350,000 320,000 320,000
7 Semen portland zak 65,000 62,000 62,000
8 Paku 2" - 3" kg 20,000 20,000 20,000
9 Besi Ø 12 ljr 120,000 120,000 120,000
10 Besi Ø 8 ljr 54,000 56,000 54,000
11 Kawat bendrat kg 20,000 20,000 20,000
12 Kalsiboard 1200 x 2400 lbr 65,000 65,000 65,000
13 Kalsi screw CE bh 150 150 150
14 Kalsi kompon IN-F @20 Kg kg 25,000 25,000 25,000
15 Kalsi tape kg 20,000 20,000 20,000
16 Air ltr 200 200 200
17 Minyak Bekisting ltr 3,000 1,500 1,500
18 Balok Kayu kelas III m3 3,000,000 2,750,000 2,750,000
19 Papan Kayu Kls III m3 3,000,000 2,750,000 2,750,000
20 Balok Kayu kelas II m3 5,000,000 4,500,000 4,500,000
21 Triplek 6 mm lbr 150,000 150,000 150,000
22 Steger Bambu (4 m) btg 5,000 5,000 5,000
23 C - 75, 0.75 m 14,500 14,250 14,250
24 C - 75, 0.6 m 12,500 13,000 12,500
25 Baut (Srew driver) Bh 200 200 200
26 Dynabolt Bh 5,000 5,000 5,000
27 Reng m 7,000 7,000 7,000
28 Spandek 0,3 mm m 40,000 40,000 40,000
29 Bubungan Spandek 0,3 mm m 25,000 25,000 25,000
30 Kalsiplank 0,8 x 20 m 20,000 22,000 20,000
31 Kusen Pintu Kayu Lokal Bh 300,000 300,000 300,000
32 Kusen Jendela Kayu Lokal Bh 250,000 250,000 250,000
33 Daun Pintu Lapis Double Triplek 3 mm Bh 400,000 400,000 400,000
34 Daun Jendela Kaca 3 mm Bh 250,000 250,000 250,000
35 Kunci Pintu Bh 85,000 85,000 85,000
36 Engsel Pintu Psg 25,000 25,000 25,000
37 Engsel Jendela Psg 15,000 15,000 15,000
38 Grendel Jendela Bh 10,000 10,000 10,000
39 Haag Angin Bh 5,000 5,000 5,000
HITUNGAN VOLUME RUMAH RIKO TYPE (5 m x 7 m)
P L T
NO ITEM PEKERJAAN Jumlah LUAS VOLUME SAT
(m) (m) (m)
A. PEKERJAAN PERSIAPAN
1 Uitzet Bouwplank 1 12 12 m
B PEKERJAAN TANAH
1 Galian tanah 0.7 0.7 0.6 9 2.646 m3
2.7 0.7 0.4 12 9.072 m3
11.718 m3
C PEKERJAAN PASANGAN
1 Pasangan Batu Belah (1 SP : 5 PS) 0.45 0.5 0.7 9 1.4175 m3
0.4 0.3 2.7 12 3.888 m3
5.3055 m3
5 Acian PC 31.8425 m2
- Dinding 0 2 0 m2
- Lantai 2.35 3.35 2 2.35 6.85 31.8425 m2
E PEMBESIAN
1 SLOOF 15X20
- Diameter 12 mm 23.6 48.8 86.4 158.8 140.9763 kg
- Diameter 8 mm 0.6 240 144 56.81664 kg
2 KOLOM 15X15
- Diameter 12 mm 4.15 4 9 149.4 132.6313 kg
- Diameter 8 mm 0.5 171 85.5 33.73488 kg
G PEKERJAAN KAYU
1 Kusen Pintu Kayu Lokal 3 4 Unit
2 Kusen Jendela Kayu Lokal 3 3 Unit
3 Daun Pintu Lapis Double Triplek 3 mm 3 3 Unit
4 Daun Jendela Kaca 3 mm 6 6 Unit
5 Kunci Pintu 3 3 Bh
6 Engsel Pintu 3 3 Psg
7 Engsel Jendela 6 6 Psg
8 Grendel Jendela 6 6 Bh
9 Haag Angin 6 6 Bh
H PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Baja Ringan + Penutup Atap Spandek 0,3 mm 8.6 8 68.8 m2
2 Bubungan Spandek 0,3 mm 8.6 8.6 m
3 Pekerjaan Lisplank Kalsiplank 0,8 x 20 25.2 2 50.4 m
A. PEKERJAAN PERSIAPAN
1 Uitzet Bouwplank 1 12 12 m
B PEKERJAAN TANAH
1 Galian tanah 0.7 0.7 36 17.64 m3
17.64 m3
C PEKERJAAN PASANGAN
1 Pasangan Batu Belah (1 SP : 5 PS) 0.45 0.6 3 12 9.72 m3
9.72 m3
5 Acian PC 32.49 m2
- Dinding 0 2 0 m2
- Lantai 2.85 2.85 4.35 2.85 3.8475 32.49 m2
E PEMBESIAN
1 SLOOF 15X20
1 Diameter 12 mm 147.0131 kg
Diameter 12 mm 7 4 3 84 74.57184 kg
Diameter 12 mm 6.2 4 2 49.6 44.0329 kg
Diameter 12 mm 4 4 2 32 28.40832 kg
2 Diameter 8 mm 51.48219 kg
Diameter 8 mm 0.56 39 5 109.2 43.08595 kg
Diameter 8 mm 0.56 19 2 21.28 8.396237 kg
2 KOLOM 15X15
1 Diameter 12 mm 4 4 9 144 127.8374 kg
2 Diameter 8 mm 0.46 171 78.66 31.03609 kg
G PEKERJAAN KAYU
1 Kusen Pintu Kayu Lokal 3 3 Unit
2 Kusen Jendela Kayu Lokal 4 4 Unit
3 Daun Pintu Lapis Double Triplek 3 mm 3 3 Unit
4 Daun Jendela Kaca 3 mm 4 4 Unit
5 Kunci Pintu 3 3 Bh
6 Engsel Pintu 3 3 Psg
7 Engsel Jendela 4 4 Psg
8 Grendel Jendela 4 4 Bh
9 Haag Angin 8 8 Bh
H PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Baja Ringan + Penutup Atap Spandek 0,3 mm 7.6 9 68.4 m2
2 Bubungan Spandek 0,3 mm 7.6 7.6 m
3 Pekerjaan Lisplank Kalsiplank 0,8 x 20 24.2 2 48.4 m
0.00
0.00
0.00
0.00
0.00 17 Pekerjaan Plafond 1
0.00
0.00
0.00
0.00 18 Pekerjaan Atap 1
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 21 Pekerjaan Listrik 1
0.00
0 0.00
0.00
0.00
0.00
0 0.00
0.00
0.00
0.00
0.00
12.6 0.00
6.88275 0.00 0.602240625
0.00
0.00
0 0.00
0.00
0.00
0.00
0 0.00
0.00
0.00
0.00
3.303125 0.00 15.903125
#REF! 0.00 #REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
VOLUME VOLUME SAT
TERPAKAI
#REF! #REF! m2
#REF! #REF! m2
0 0 titik
ANALISA HARGA SATUAN
NO URAIAN PEKERJAAN RINCIAN ITEM KODE ANALISA VOLUME KOEFISIEN KEBUTUHAN BAHAN SAT HARGA SATUAN HARGA SAT. PEKERJAAN
A PEKERJAAN PERSIAPAN
1 Uitzet Bouwplank 12.00 m3 Rp 73,400.00
a Pekerja 0.1 1.20 OH Rp 80,000.00 Rp 8,000.00
b Tukang 0.1 1.20 OH Rp 100,000.00 Rp 10,000.00
3
c Balok Kayu kelas III 0.01 0.12 m Rp 2,750,000.00 Rp 27,500.00
d Paku 2" - 3" 0.02 0.24 Kg Rp 20,000.00 Rp 400.00
3
e Papan Kayu Kls III 0.01 0.12 m Rp 2,750,000.00 Rp 27,500.00
B PEKERJAAN TANAH
1 Galian Tanah 11.72 m3 Rp 60,000.00
a Pekerja 0.75 8.79 OH Rp 80,000.00 Rp 60,000.00
C PEKERJAAN PASANGAN
1 Pasangan Batu Belah (1 SP : 5 PS) 5.31 m3 Rp 637,540.00
a Pekerja 1.5 7.96 OH Rp 80,000.00 Rp 120,000.00
b Tukang 0.75 3.98 OH Rp 100,000.00 Rp 75,000.00
3
c Batu Belah 1.2 6.37 m Rp 163,000.00 Rp 195,600.00
d Semen portland 2.72 14.43 zak Rp 62,000.00 Rp 168,640.00
e Pasir pasang 0.54 2.86 m3 Rp 145,000.00 Rp 78,300.00
2
4 Plesteran 1 SP : 5 PP 44.39 m Rp 49,198.16
a Pekerja 0.3 13.32 OH Rp 80,000.00 Rp 24,000.00
b Tukang 0.15 6.66 OH Rp 100,000.00 Rp 15,000.00
c Semen portland 0.10368 4.60 zak Rp 62,000.00 Rp 6,428.16
d Pasir pasang 0.026 1.15 m3 Rp 145,000.00 Rp 3,770.00
145.47 Rp 13,535.36
a Pekerja 0.07 1.02 OH Rp 80,000.00 Rp 560.00
b Tukang 0.07 1.02 OH Rp 100,000.00 Rp 700.00
c Besi Ø 8 10.5 32.26 ljr Rp 54,000.00 Rp 11,975.36
d Kawat bendrat 0.15 2.18 kg Rp 20,000.00 Rp 300.00
F BEGISTING 2 X PAKAI
1 Sloof 15/20 7.20 M2 Rp 211,800.00
a Pekerja 0.52 3.74 OH Rp 80,000.00 Rp 41,600.00
b Tukang 0.26 1.87 OH Rp 100,000.00 Rp 26,000.00
c Papan Kayu Kls III 0.045 0.32 m3 Rp 2,750,000.00 Rp 123,750.00
d Balok Kayu kelas III 0.0052 0.04 m3 Rp 2,750,000.00 Rp 14,300.00
e Paku 2" - 3" 0.3 2.16 kg Rp 20,000.00 Rp 6,000.00
f Minyak Bekisting 0.1 0.72 ltr Rp 1,500.00 Rp 150.00
2 Kolom Utama 15/15 7.70 M2 Rp 266,600.00
a Pekerja 0.66 5.08 OH Rp 80,000.00 Rp 52,800.00
b Tukang 0.33 2.54 OH Rp 100,000.00 Rp 33,000.00
c Balok Kayu kelas III 0.04 0.31 m3 Rp 2,750,000.00 Rp 110,000.00
d Paku 2" - 3" 0.4 3.08 kg Rp 20,000.00 Rp 8,000.00
e Minyak Bekisting 0.2 1.54 ltr Rp 1,500.00 Rp 300.00
g Triplek 6 mm 0.35 2.69 lbr Rp 150,000.00 Rp 52,500.00
h Steger Bambu (4 m) 2 15.39 btg Rp 5,000.00 Rp 10,000.00
3 Ringbalk 12/15 9.18 M2 Rp 266,600.00
a Pekerja 0.66 6.06 OH Rp 80,000.00 Rp 52,800.00
b Tukang 0.33 3.03 OH Rp 100,000.00 Rp 33,000.00
c Balok Kayu kelas III 0.04 0.37 m3 Rp 2,750,000.00 Rp 110,000.00
d Paku 2" - 3" 0.4 3.67 kg Rp 20,000.00 Rp 8,000.00
e Minyak Bekisting 0.2 1.84 ltr Rp 1,500.00 Rp 300.00
g Triplek 6 mm 0.35 3.21 lbr Rp 150,000.00 Rp 52,500.00
h Steger Bambu (4 m) 2 18.36 btg Rp 5,000.00 Rp 10,000.00
G PEKERJAAN KAYU
1 Kusen Pintu Kayu Lokal a Kusen Pintu Kayu Lokal Ls 4.00 1 4.00 Unit Rp 300,000.00 Rp 300,000.00
2 Kusen Jendela Kayu Lokal b Kusen Jendela Kayu Lokal Ls 3.00 1 3.00 Unit Rp 250,000.00 Rp 250,000.00
3 Daun Pintu Lapis Double Triplek 3 mm c Daun Pintu Lapis Double Triplek 3 m Ls 3.00 1 3.00 Unit Rp 400,000.00 Rp 400,000.00
4 Daun Jendela Kaca 3 mm d Daun Jendela Kaca 3 mm Ls 6.00 1 6.00 Unit Rp 250,000.00 Rp 250,000.00
5 Kunci Pintu e Kunci Pintu Ls 3.00 1 3.00 Bh Rp 85,000.00 Rp 85,000.00
6 Engsel Pintu f Engsel Pintu Ls 3.00 1 3.00 Psg Rp 25,000.00 Rp 25,000.00
7 Engsel Jendela g Engsel Jendela Ls 6.00 1 6.00 Psg Rp 15,000.00 Rp 15,000.00
8 Grendel Jendela h Grendel Jendela Ls 6.00 1 6.00 Bh Rp 10,000.00 Rp 10,000.00
9 Haag Angin i Haag Angin Ls 6.00 1 6.00 Bh Rp 5,000.00 Rp 5,000.00
8.60 Rp 69,250.00
2 Pekerjaan Bubungan Spandek a Pekerja 0.20 1.72 OH Rp 80,000.00 Rp 16,000.00
b Tukang 0.25 2.15 OH Rp 100,000.00 Rp 25,000.00
c Bubungan Spandek 0,3 mm 1.05 9.03 m Rp 25,000.00 Rp 26,250.00
d Baut (Srew driver) 10.00 86 bh Rp 200.00 Rp 2,000.00
50.40 Rp 70,000.00
3 Pekerjaan Lisplank Kalsiplank 0,8 x 20 a Pekerja 0.20 10.08 OH Rp 80,000.00 Rp 16,000.00
b Tukang 0.30 15.12 OH Rp 100,000.00 Rp 30,000.00
c Kalsiplank 0,8 x 20 1.10 55.44 m Rp 20,000.00 Rp 22,000.00
d Baut (Srew driver) 10.00 504 bh Rp 200.00 Rp 2,000.00
ANALISA HARGA SATUAN
NO URAIAN PEKERJAAN RINCIAN ITEM KODE ANALISA VOLUME KOEFISIEN KEBUTUHAN BAHAN SAT HARGA SATUAN HARGA SAT. PEKERJAAN
A. PEKERJAAN PERSIAPAN
1 Uitzet Bouwplank 12.00 m m3 Rp 73,400.00
a Pekerja 0.1 1.20 OH Rp 80,000.00 Rp 8,000.00
b Tukang 0.1 1.20 OH Rp 100,000.00 Rp 10,000.00
3
c Balok Kayu kelas III 0.01 0.12 m Rp 2,750,000.00 Rp 27,500.00
d Paku 2" - 3" 0.02 0.24 Kg Rp 20,000.00 Rp 400.00
3
e Papan Kayu Kls III 0.01 0.12 m Rp 2,750,000.00 Rp 27,500.00
B PEKERJAAN TANAH
1 Galian tanah 17.64 m3 m3 Rp 60,000.00
a Pekerja 0.75 13.23 OH Rp 80,000.00 Rp 60,000.00
3
2 Urugan Pasir Bawah Pondasi dan Lantai 1.26 m3 m Rp 117,600.00
a Pekerja 0.3 0.38 OH Rp 80,000.00 Rp 24,000.00
3
b Pasir urug 1.2 1.51 m Rp 78,000.00 Rp 93,600.00
3
3 Urugan Tanah Peninggian Lantai 3.38 m3 m Rp 104,400.00
a Pekerja 0.3 1.014 OH Rp 80,000.00 Rp 24,000.00
b Tanah Urug 1.2 4.057 m3 Rp 67,000.00 Rp 80,400.00
C PEKERJAAN PASANGAN
1 Pasangan Batu Belah (1 SP : 5 PS) 9.72 m3 m3 Rp 637,540.00
a Pekerja 1.5 14.58 OH Rp 80,000.00 Rp 120,000.00
b Tukang 0.75 7.29 OH Rp 100,000.00 Rp 75,000.00
c Batu Belah 1.2 11.66 m3 Rp 163,000.00 Rp 195,600.00
d Semen portland 2.72 26.44 zak Rp 62,000.00 Rp 168,640.00
e Pasir pasang 0.54 5.25 m3 Rp 145,000.00 Rp 78,300.00
2
5 Acian PC 32.49 m2 m Rp 30,030.00
a Pekerja 0.2 6.50 OH Rp 80,000.00 Rp 16,000.00
b Tukang 0.1 3.25 OH Rp 100,000.00 Rp 10,000.00
c Semen portland 0.065 2.11 zak Rp 62,000.00 Rp 4,030.00
E PEMBESIAN
1 SLOOF 15X20
Diameter 12 mm 147.01 kg Rp 13,387.52
a Pekerja 0.07 1.03 OH Rp 80,000.00 Rp 560.00
b Tukang 0.07 1.03 OH Rp 100,000.00 Rp 700.00
c Besi Ø 12 10.5 14.49 ljr Rp 120,000.00 Rp 11,827.52
d Kawat bendrat 0.15 2.21 kg Rp 20,000.00 Rp 300.00
2 KOLOM 15X15
Diameter 12 mm 127.84 kg Rp 13,387.52
a Pekerja 0.07 0.89 OH Rp 80,000.00 Rp 560.00
b Tukang 0.07 0.89 OH Rp 100,000.00 Rp 700.00
c Besi Ø 12 10.5 12.60 ljr Rp 120,000.00 Rp 11,827.52
d Kawat bendrat 0.15 1.92 kg Rp 20,000.00 Rp 300.00
F BEGISTING pakai 2 x
a Sloof 15 x 20 7.20 m2 Rp 154,050.00
a Pekerja 0.52 3.74 OH Rp 80,000.00 Rp 41,600.00
b Tukang 0.26 1.87 OH Rp 100,000.00 Rp 26,000.00
c Papan Kayu Kls III 0.024 0.17 m3 Rp 2,750,000.00 Rp 66,000.00
d Balok Kayu kelas III 0.0052 0.04 m3 Rp 2,750,000.00 Rp 14,300.00
e Paku 2" - 3" 0.3 2.16 kg Rp 20,000.00 Rp 6,000.00
f Minyak Bekisting 0.1 0.72 ltr Rp 1,500.00 Rp 150.00
b Kolom 15 x 15 7.70 m2 Rp 280,100.00
a Pekerja 0.66 5.08 OH Rp 80,000.00 Rp 52,800.00
b Tukang 0.33 2.54 OH Rp 100,000.00 Rp 33,000.00
c Balok Kayu kelas III 0.04 0.31 m3 Rp 2,750,000.00 Rp 110,000.00
d Paku 2" - 3" 0.4 3.08 kg Rp 20,000.00 Rp 8,000.00
e Minyak Bekisting 0.2 1.54 ltr Rp 1,500.00 Rp 300.00
g Papan Kayu Kls III 0.024 0.18 lbr Rp 2,750,000.00 Rp 66,000.00
h Steger Bambu (4 m) 2 15.39 btg Rp 5,000.00 Rp 10,000.00
c Ring Balok 13 x 15 7.74 m2 Rp 280,100.00
a Pekerja 0.66 5.11 OH Rp 80,000.00 Rp 52,800.00
b Tukang 0.33 2.55 OH Rp 100,000.00 Rp 33,000.00
c Balok Kayu kelas III 0.04 0.31 m3 Rp 2,750,000.00 Rp 110,000.00
d Paku 2" - 3" 0.4 3.10 kg Rp 20,000.00 Rp 8,000.00
e Minyak Bekisting 0.2 1.55 ltr Rp 1,500.00 Rp 300.00
g Papan Kayu Kls III 0.024 0.19 lbr Rp 2,750,000.00 Rp 66,000.00
h Steger Bambu (4 m) 2 15.48 btg Rp 5,000.00 Rp 10,000.00
G PEKERJAAN KAYU
1 Kusen Pintu Kayu Lokal a Kusen Pintu Kayu Lokal Ls 3.00 Unit 3.00 Unit Rp 300,000.00 Rp 900,000.00
2 Kusen Jendela Kayu Lokal b Kusen Jendela Kayu Lokal Ls 4.00 Unit 4.00 Unit Rp 250,000.00 Rp 1,000,000.00
3 Daun Pintu Lapis Double Triplek 3 mm c Daun Pintu Lapis Double Triplek 3 Ls 3.00 Unit 3.00 Unit Rp 400,000.00 Rp 1,200,000.00
4 Daun Jendela Kaca 3 mm d Daun Jendela Kaca 3 mm Ls 4.00 Unit 4.00 Unit Rp 250,000.00 Rp 1,000,000.00
5 Kunci Pintu e Kunci Pintu Ls 3.00 Bh 3.00 Bh Rp 85,000.00 Rp 255,000.00
6 Engsel Pintu f Engsel Pintu Ls 3.00 Psg 3.00 Psg Rp 25,000.00 Rp 75,000.00
7 Engsel Jendela g Engsel Jendela Ls 4.00 Psg 4.00 Psg Rp 15,000.00 Rp 60,000.00
8 Grendel Jendela h Grendel Jendela Ls 4.00 Bh 4.00 Bh Rp 10,000.00 Rp 40,000.00
9 Haag Angin i Haag Angin Ls 8.00 Bh 8.00 Bh Rp 5,000.00 Rp 40,000.00
2
H PEKERJAAN ATAP 68.40 m2 m Rp 203,075.00
1 Pekerjaan Rangka Atap Baja Ringan + Penutup Atap a Pekerja 0.20 13.68 OH Rp 80,000.00 Rp 16,000.00
b Tukang 0.45 30.78 OH Rp 100,000.00 Rp 45,000.00
c C - 75, 0.75 3.50 239.4 m Rp 14,250.00 Rp 49,875.00
d Baut (Srew driver) 10.00 684 bh Rp 200.00 Rp 2,000.00
e Dynabolt 1.00 68.4 bh Rp 5,000.00 Rp 5,000.00
f Reng 3.60 246.24 m Rp 7,000.00 Rp 25,200.00
g Spandek 0,3 mm 1.50 102.6 m Rp 40,000.00 Rp 60,000.00
7.60 m Rp 69,250.00
2 Bubungan Spandek 0,3 mm a Pekerja 0.20 1.52 OH Rp 80,000.00 Rp 16,000.00
b Tukang 0.25 1.9 OH Rp 100,000.00 Rp 25,000.00
c Bubungan Spandek 0,3 mm 1.05 7.98 m Rp 25,000.00 Rp 26,250.00
d Baut (Srew driver) 10.00 76 bh Rp 200.00 Rp 2,000.00
48.40 m Rp 70,000.00
3 Pekerjaan Lisplank Kalsiplank 0,8 x 20 a Pekerja 0.20 9.68 OH Rp 80,000.00 Rp 16,000.00
b Tukang 0.30 14.52 OH Rp 100,000.00 Rp 30,000.00
c Kalsiplank 0,8 x 20 1.10 53.24 m Rp 20,000.00 Rp 22,000.00
d Baut (Srew driver) 10.00 484 bh Rp 200.00 Rp 2,000.00
Rp 69,250.00
Rp 70,000.00
Rp 100,000.00
RENCANA ANGGARAN BIAYA STIMULAN PERBAIKAN RUMAH RIKO 5x7
RAB BSP
No. URAIAN PEKERJAAN KODE ANALISA VOLUME SAT HARGA SATUAN JUMLAH BOBOT
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik
RENCANA ANGGARAN BIAYA STIMULAN PERBAIKAN RUMAH RIKO 5x7
RAB BSP
KODE
No. URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH BOBOT
ANALISA
A BAHAN
1 Pasir urug 5.60 - 5.60 m3 Rp 78,000.00 Rp - Rp 436,999.68 Rp 436,999.68 0.69%
2 Tanah Urug 8.36 - 8.36 m3 Rp 67,000.00 Rp - Rp 559,841.28 Rp 559,841.28 0.88%
3 Batu Belah 10.90 8.00 2.90 m3 Rp 163,000.00 Rp 1,304,000.00 Rp 473,123.80 Rp 1,777,123.80 2.80%
4 Pasir pasang 17.04 12.00 5.04 m3 Rp 145,000.00 Rp 1,740,000.00 Rp 731,276.37 Rp 2,471,276.37 3.89%
5 Bata merah 1553.65 1500.00 53.65 bh Rp 750.00 Rp 1,125,000.00 Rp 40,237.50 Rp 1,165,237.50 1.83%
6 Kerikil Pecah 1/2 3.96 3.50 0.46 m3 Rp 320,000.00 Rp 1,120,000.00 Rp 147,068.56 Rp 1,267,068.56 1.99%
7 Semen portland 54.97 54.00 0.97 zak Rp 62,000.00 Rp 3,348,000.00 Rp 60,343.03 Rp 3,408,343.03 5.37%
8 Paku 2" - 3" 9.72 9.00 0.72 kg Rp 20,000.00 Rp 180,000.00 Rp 14,340.00 Rp 194,340.00 0.31%
9 Besi Ø 12 52.68 52.00 0.68 ljr Rp 120,000.00 Rp 6,240,000.00 Rp 81,000.00 Rp 6,321,000.00 9.95%
10 Besi Ø 8 32.26 32.00 0.26 ljr Rp 54,000.00 Rp 1,728,000.00 Rp 14,107.50 Rp 1,742,107.50 2.74%
11 Kawat bendrat 10.20 10.00 0.20 kg Rp 20,000.00 Rp 200,000.00 Rp 3,971.74 Rp 203,971.74 0.32%
12 Kalsiboard 1200 x 2400 24.10 24.00 0.10 lbr Rp 65,000.00 Rp 1,560,000.00 Rp 6,617.00 Rp 1,566,617.00 2.47%
13 Kalsi screw CE 723.05 720.00 3.05 bh Rp 150.00 Rp 108,000.00 Rp 458.10 Rp 108,458.10 0.17%
14 Kalsi kompon IN-F @20 Kg 3.62 3.00 0.62 kg Rp 25,000.00 Rp 75,000.00 Rp 15,381.75 Rp 90,381.75 0.14%
15 Kalsi tape 7.23 7.00 0.23 kg Rp 20,000.00 Rp 140,000.00 Rp 4,610.80 Rp 144,610.80 0.23%
16 Air 450.56 - 450.56 ltr Rp 200.00 Rp - Rp 90,112.00 Rp 90,112.00 0.14%
17 Minyak Bekisting 4.28 - 4.28 ltr Rp 1,500.00 Rp - Rp 6,426.00 Rp 6,426.00 0.01%
18 Balok Kayu kelas III 1.45 1.12 0.33 m3 Rp 2,750,000.00 Rp 3,080,000.00 Rp 906,491.74 Rp 3,986,491.74 6.28%
19 Papan Kayu Kls III 0.53 0.50 0.03 m3 Rp 2,750,000.00 Rp 1,375,000.00 Rp 79,887.50 Rp 1,454,887.50 2.29%
20 Triplek 6 mm 5.91 5.00 0.91 lbr Rp 150,000.00 Rp 750,000.00 Rp 135,937.50 Rp 885,937.50 1.39%
21 Steger Bambu (4 m) 33.75 15.00 18.75 btg Rp 5,000.00 Rp 75,000.00 Rp 93,750.00 Rp 168,750.00 0.27%
22 C - 75, 0.75 240.80 228.00 12.80 m Rp 14,250.00 Rp 3,249,000.00 Rp 182,400.00 Rp 3,431,400.00 5.40%
23 C - 75, 0.6 - - 0.00 m Rp 12,500.00 Rp - Rp - Rp - 0.00%
24 Baut (Srew driver) 1278.00 1270.00 8.00 Bh Rp 200.00 Rp 254,000.00 Rp 1,600.00 Rp 255,600.00 0.40%
25 Dynabolt 68.80 68.00 0.80 Bh Rp 5,000.00 Rp 340,000.00 Rp 4,000.00 Rp 344,000.00 0.54%
26 Reng 247.68 246.00 1.68 m Rp 7,000.00 Rp 1,722,000.00 Rp 11,760.00 Rp 1,733,760.00 2.73%
27 Spandek 0,3 mm 103.20 103.00 0.20 m Rp 40,000.00 Rp 4,120,000.00 Rp 8,000.00 Rp 4,128,000.00 6.50%
28 Bubungan Spandek 0,3 mm 9.03 9.00 0.03 m Rp 25,000.00 Rp 225,000.00 Rp 750.00 Rp 225,750.00 0.36%
29 Kalsiplank 0,8 x 20 55.44 55.00 0.44 m Rp 20,000.00 Rp 1,100,000.00 Rp 8,800.00 Rp 1,108,800.00 1.75%
30 Kusen Pintu Kayu Lokal 4.00 4.00 - Bh Rp 300,000.00 Rp 1,200,000.00 Rp - Rp 1,200,000.00 1.89%
31 Kusen Jendela Kayu Lokal 3.00 3.00 - Bh Rp 250,000.00 Rp 750,000.00 Rp - Rp 750,000.00 1.18%
32 Daun Pintu Lapis Double Triplek 3 mm 3.00 3.00 - Bh Rp 400,000.00 Rp 1,200,000.00 Rp - Rp 1,200,000.00 1.89%
33 Daun Jendela Kaca 3 mm 6.00 6.00 - Bh Rp 250,000.00 Rp 1,500,000.00 Rp - Rp 1,500,000.00 2.36%
34 Kunci Pintu 3.00 3.00 - Bh Rp 85,000.00 Rp 255,000.00 Rp - Rp 255,000.00 0.40%
35 Engsel Pintu 3.00 3.00 - Psg Rp 25,000.00 Rp 75,000.00 Rp - Rp 75,000.00 0.12%
36 Engsel Jendela 6.00 6.00 - Psg Rp 15,000.00 Rp 90,000.00 Rp - Rp 90,000.00 0.14%
37 Grendel Jendela 6.00 6.00 - Bh Rp 10,000.00 Rp 60,000.00 Rp - Rp 60,000.00 0.09%
38 Haag Angin 6.00 6.00 - Bh Rp 5,000.00 Rp 30,000.00 Rp - Rp 30,000.00 0.05%
TOTAL BAHAN ( A ) Rp 40,318,000.00 Rp 4,119,291.84 Rp 44,437,291.84 69.96%
B UPAH
1 Pekerja 111.11 80.00 31.11 OH Rp 80,000.00 Rp 6,400,000.00 Rp 2,488,659.14 Rp 8,888,659.14 13.99%
2 Tukang 99.14 36.00 63.14 OH Rp 100,000.00 Rp 3,600,000.00 Rp 6,314,318.87 Rp 9,914,318.87 15.61%
TOTAL UPAH ( B ) Rp 10,000,000.00 Rp 8,802,978.01 Rp 18,802,978.01 29.60%
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik
REKAP UPAH DAN BAHAN 1 UNIT RUMAH KONVENSIONAL 6 M X 6 M
A BAHAN
1 Pasir urug 3.69 - 3.69 m3 Rp 78,000.00 Rp - Rp 287,763.84 Rp 287,763.84 0.43%
2 Tanah Urug 4.06 - 4.06 m3 Rp 67,000.00 Rp - Rp 271,818.33 Rp 271,818.33 0.40%
3 Batu Belah 17.71 12.00 5.71 m3 Rp 163,000.00 Rp 1,956,000.00 Rp 931,056.00 Rp 2,887,056.00 4.28%
4 Pasir pasang 15.82 12.00 3.82 m3 Rp 145,000.00 Rp 1,740,000.00 Rp 553,659.29 Rp 2,293,659.29 3.40%
5 Bata merah 5666.33 5600.00 66.33 bh Rp 750.00 Rp 4,200,000.00 Rp 49,743.75 Rp 4,249,743.75 6.29%
6 Kerikil Pecah 1/2 3.51 2.50 1.01 m3 Rp 320,000.00 Rp 800,000.00 Rp 323,831.76 Rp 1,123,831.76 1.66%
7 Semen portland 86.75 80.00 6.75 zak Rp 62,000.00 Rp 4,960,000.00 Rp 418,582.75 Rp 5,378,582.75 7.96%
8 Paku 2" - 3" 8.57 4.00 4.57 kg Rp 20,000.00 Rp 80,000.00 Rp 91,480.00 Rp 171,480.00 0.25%
9 Besi Ø 12 41.58 41.00 0.58 ljr Rp 120,000.00 Rp 4,920,000.00 Rp 69,600.00 Rp 4,989,600.00 7.39%
10 Besi Ø 8 30.17 30.00 0.17 ljr Rp 54,000.00 Rp 1,620,000.00 Rp 8,943.75 Rp 1,628,943.75 2.41%
11 Kawat bendrat 8.37 6.00 2.37 kg Rp 20,000.00 Rp 120,000.00 Rp 47,366.43 Rp 167,366.43 0.25%
12 Kalsiboard 1200 x 2400 2.00 2.00 0.00 lbr Rp 65,000.00 Rp 130,000.00 Rp - Rp 130,000.00 0.19%
13 Kalsi screw CE 53.51 50.00 3.51 bh Rp 150.00 Rp 7,500.00 Rp 525.75 Rp 8,025.75 0.01%
14 Kalsi kompon IN-F @20 Kg 0.27 0.00 0.27 kg Rp 25,000.00 Rp - Rp 6,688.13 Rp 6,688.13 0.01%
15 Kalsi tape 0.54 0.00 0.54 kg Rp 20,000.00 Rp - Rp 10,701.00 Rp 10,701.00 0.02%
16 Air 450.56 - 450.56 ltr Rp 200.00 Rp - Rp 90,112.00 Rp 90,112.00 0.13%
17 Minyak Bekisting 3.81 - 3.81 ltr Rp 1,500.00 Rp - Rp 5,710.50 Rp 5,710.50 0.01%
18 Balok Kayu kelas III 0.82 0.71 0.11 m3 Rp 2,750,000.00 Rp 1,961,250.00 Rp 293,156.55 Rp 2,254,406.55 3.34%
19 Papan Kayu Kls III 0.66 0.65 0.01 m3 Rp 2,750,000.00 Rp 1,787,500.00 Rp 36,410.00 Rp 1,823,910.00 2.70%
20 Triplek 6 mm 0.00 - - lbr Rp 150,000.00 Rp - Rp - Rp - 0.00%
21 Steger Bambu (4 m) 30.87 - 30.87 btg Rp 5,000.00 Rp - Rp 154,350.00 Rp 154,350.00 0.23%
22 C - 75, 0.75 239.40 239.00 0.40 m Rp 14,250.00 Rp 3,405,750.00 Rp 5,700.00 Rp 3,411,450.00 5.05%
23 C - 75, 0.6 0.00 - 0.00 m Rp 12,500.00 Rp - Rp - Rp - 0.00%
24 Baut (Srew driver) 1244.00 1200.00 44.00 Bh Rp 200.00 Rp 240,000.00 Rp 8,800.00 Rp 248,800.00 0.37%
25 Dynabolt 68.40 68.00 0.40 Bh Rp 5,000.00 Rp 340,000.00 Rp 2,000.00 Rp 342,000.00 0.51%
26 Reng 246.24 246.00 0.24 m Rp 7,000.00 Rp 1,722,000.00 Rp 1,680.00 Rp 1,723,680.00 2.55%
27 Spandek 0,3 mm 102.60 102.00 0.60 m Rp 40,000.00 Rp 4,080,000.00 Rp 24,000.00 Rp 4,104,000.00 6.08%
28 Bubungan Spandek 0,3 mm 8.00 8.00 - m Rp 25,000.00 Rp 200,000.00 Rp - Rp 200,000.00 0.30%
29 Kalsiplank 0,8 x 20 53.24 53.00 0.24 m Rp 20,000.00 Rp 1,060,000.00 Rp 4,800.00 Rp 1,064,800.00 1.58%
30 Kusen Pintu Kayu Lokal 3.00 3.00 - Bh Rp 300,000.00 Rp 900,000.00 Rp - Rp 900,000.00 1.33%
31 Kusen Jendela Kayu Lokal 4.00 4.00 - Bh Rp 250,000.00 Rp 1,000,000.00 Rp - Rp 1,000,000.00 1.48%
32 Daun Pintu Lapis Double Triplek 3 mm 3.00 3.00 - Bh Rp 400,000.00 Rp 1,200,000.00 Rp - Rp 1,200,000.00 1.78%
33 Daun Jendela Kaca 3 mm 4.00 4.00 - Bh Rp 250,000.00 Rp 1,000,000.00 Rp - Rp 1,000,000.00 1.48%
34 Kunci Pintu 3.00 3.00 - Bh Rp 85,000.00 Rp 255,000.00 Rp - Rp 255,000.00 0.38%
35 Engsel Pintu 3.00 3.00 - Psg Rp 25,000.00 Rp 75,000.00 Rp - Rp 75,000.00 0.11%
36 Engsel Jendela 4.00 4.00 - Psg Rp 15,000.00 Rp 60,000.00 Rp - Rp 60,000.00 0.09%
37 Grendel Jendela 4.00 4.00 - Bh Rp 10,000.00 Rp 40,000.00 Rp - Rp 40,000.00 0.06%
38 Haag Angin 8.00 8.00 - Bh Rp 5,000.00 Rp 40,000.00 Rp - Rp 40,000.00 0.06%
TOTAL BAHAN ( A ) Rp 39,900,000.00 Rp 3,698,479.82 Rp 43,598,479.82 64.56%
B UPAH
1 Pekerja 164.46 80.00 84.46 OH Rp 80,000.00 Rp 6,400,000.00 Rp 6,756,485.24 Rp 13,156,485.24 19.48%
2 Tukang 106.76 36.00 70.76 OH Rp 100,000.00 Rp 3,600,000.00 Rp 7,076,027.12 Rp 10,676,027.12 15.81%
TOTAL UPAH ( B ) Rp 10,000,000.00 Rp 13,832,512.36 Rp 23,832,512.36 35.29%
C ADMINISTRASI
1 ADMINISTRASI DAN PELAPORAN 1.00 1.00 0.00 Bh Rp 100,000.00 Rp 100,000.00 Rp - Rp 100,000.00 0.15%
TOTAL ADMINISTRASI ( C ) Rp 100,000.00 Rp - Rp 100,000.00 0.15%
A BAHAN
1 Pasir urug 11 61.63 - 61.63 m3 Rp 78,000.00 Rp - Rp 4,806,996.48 Rp 4,806,996.48 0.69%
2 Tanah Urug 11 91.91 - 91.91 m3 Rp 67,000.00 Rp - Rp 6,158,254.08 Rp 6,158,254.08 0.88%
3 Batu Belah 11 119.93 88.00 31.93 m3 Rp 163,000.00 Rp 14,344,000.00 Rp 5,204,361.80 Rp 19,548,361.80 2.80%
4 Pasir pasang 11 187.48 132.00 55.48 m3 Rp 145,000.00 Rp 19,140,000.00 Rp 8,044,040.03 Rp 27,184,040.03 3.89%
5 Bata merah 11 17090.15 16,500.00 590.15 bh Rp 750.00 Rp 12,375,000.00 Rp 442,612.50 Rp 12,817,612.50 1.83%
6 Kerikil Pecah 1/2 11 43.56 38.50 5.06 m3 Rp 320,000.00 Rp 12,320,000.00 Rp 1,617,754.13 Rp 13,937,754.13 1.99%
7 Semen portland 11 604.71 594.00 10.71 zak Rp 62,000.00 Rp 36,828,000.00 Rp 663,773.35 Rp 37,491,773.35 5.37%
8 Paku 2" - 3" 11 106.89 99.00 7.89 kg Rp 20,000.00 Rp 1,980,000.00 Rp 157,740.00 Rp 2,137,740.00 0.31%
9 Besi Ø 12 11 579.43 572.00 7.43 ljr Rp 120,000.00 Rp 68,640,000.00 Rp 891,000.00 Rp 69,531,000.00 9.95%
10 Besi Ø 8 11 354.87 352.00 2.87 ljr Rp 54,000.00 Rp 19,008,000.00 Rp 155,182.50 Rp 19,163,182.50 2.74%
11 Kawat bendrat 11 112.18 110.00 2.18 kg Rp 20,000.00 Rp 2,200,000.00 Rp 43,689.11 Rp 2,243,689.11 0.32%
12 Kalsiboard 1200 x 2400 11 265.12 264.00 1.12 lbr Rp 65,000.00 Rp 17,160,000.00 Rp 72,787.00 Rp 17,232,787.00 2.47%
13 Kalsi screw CE 11 7953.59 7,920.00 33.59 bh Rp 150.00 Rp 1,188,000.00 Rp 5,039.10 Rp 1,193,039.10 0.17%
14 Kalsi kompon IN-F @20 Kg 11 39.77 33.00 6.77 kg Rp 25,000.00 Rp 825,000.00 Rp 169,199.25 Rp 994,199.25 0.14%
15 Kalsi tape 11 79.54 77.00 2.54 kg Rp 20,000.00 Rp 1,540,000.00 Rp 50,718.80 Rp 1,590,718.80 0.23%
16 Air 11 4956.16 - 4956.16 ltr Rp 200.00 Rp - Rp 991,232.00 Rp 991,232.00 0.14%
17 Minyak Bekisting 11 47.12 - 47.12 ltr Rp 1,500.00 Rp - Rp 70,686.00 Rp 70,686.00 0.01%
18 Balok Kayu kelas III 11 15.95 12.32 3.63 m3 Rp 2,750,000.00 Rp 33,880,000.00 Rp 9,971,409.14 Rp 43,851,409.14 6.28%
19 Papan Kayu Kls III 11 5.82 5.50 0.32 m3 Rp 2,750,000.00 Rp 15,125,000.00 Rp 878,762.50 Rp 16,003,762.50 2.29%
20 Triplek 6 mm 11 64.97 55.00 9.97 lbr Rp 150,000.00 Rp 8,250,000.00 Rp 1,495,312.50 Rp 9,745,312.50 1.39%
21 Steger Bambu (4 m) 11 371.25 165.00 206.25 btg Rp 5,000.00 Rp 825,000.00 Rp 1,031,250.00 Rp 1,856,250.00 0.27%
22 C - 75, 0.75 11 2648.80 2,508.00 140.80 m Rp 14,250.00 Rp 35,739,000.00 Rp 2,006,400.00 Rp 37,745,400.00 5.40%
23 C - 75, 0.6 11 0.00 - 0.00 m Rp 12,500.00 Rp - Rp - Rp - 0.00%
24 Baut (Srew driver) 11 14058.00 13,970.00 88.00 Bh Rp 200.00 Rp 2,794,000.00 Rp 17,600.00 Rp 2,811,600.00 0.40%
25 Dynabolt 11 756.80 748.00 8.80 Bh Rp 5,000.00 Rp 3,740,000.00 Rp 44,000.00 Rp 3,784,000.00 0.54%
26 Reng 11 2724.48 2,706.00 18.48 m Rp 7,000.00 Rp 18,942,000.00 Rp 129,360.00 Rp 19,071,360.00 2.73%
27 Spandek 0,3 mm 11 1135.20 1,133.00 2.20 m Rp 40,000.00 Rp 45,320,000.00 Rp 88,000.00 Rp 45,408,000.00 6.50%
28 Bubungan Spandek 0,3 mm 11 99.33 99.00 0 m Rp 25,000.00 Rp 2,475,000.00 Rp 8,250.00 Rp 2,483,250.00 0.36%
29 Kalsiplank 0,8 x 20 11 609.84 605.00 4.84 m Rp 20,000.00 Rp 12,100,000.00 Rp 96,800.00 Rp 12,196,800.00 1.75%
30 Kusen Pintu Kayu Lokal 11 44.00 44.00 - Bh Rp 300,000.00 Rp 13,200,000.00 Rp - Rp 13,200,000.00 1.89%
31 Kusen Jendela Kayu Lokal 11 33.00 33.00 - Bh Rp 250,000.00 Rp 8,250,000.00 Rp - Rp 8,250,000.00 1.18%
32 Daun Pintu Lapis Double Triplek 3 mm 11 33.00 33.00 - Bh Rp 400,000.00 Rp 13,200,000.00 Rp - Rp 13,200,000.00 1.89%
33 Daun Jendela Kaca 3 mm 11 66.00 66.00 - Bh Rp 250,000.00 Rp 16,500,000.00 Rp - Rp 16,500,000.00 2.36%
34 Kunci Pintu 11 33.00 33.00 - Bh Rp 85,000.00 Rp 2,805,000.00 Rp - Rp 2,805,000.00 0.40%
35 Engsel Pintu 11 33.00 33.00 - Psg Rp 25,000.00 Rp 825,000.00 Rp - Rp 825,000.00 0.12%
36 Engsel Jendela 11 66.00 66.00 - Psg Rp 15,000.00 Rp 990,000.00 Rp - Rp 990,000.00 0.14%
37 Grendel Jendela 11 66.00 66.00 - Bh Rp 10,000.00 Rp 660,000.00 Rp - Rp 660,000.00 0.09%
38 Haag Angin 11 66.00 66.00 - Bh Rp 5,000.00 Rp 330,000.00 Rp - Rp 330,000.00 0.05%
TOTAL BAHAN ( A ) Rp 443,498,000.00 Rp 45,312,210.27 Rp 488,810,210.27 69.96%
B UPAH
1 Pekerja 11 1222.19 880.00 342.19 OH Rp 80,000.00 Rp 70,400,000.00 Rp 27,375,250.58 Rp 97,775,250.58 13.99%
2 Tukang 11 1090.58 396.00 694.58 OH Rp 100,000.00 Rp 39,600,000.00 Rp 69,457,507.54 Rp 109,057,507.54 15.61%
TOTAL UPAH ( B ) Rp 110,000,000.00 Rp 96,832,758.11 Rp 206,832,758.11 29.60%
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik
Menyetujui
PPK BPBD Kabupaten Lombok Utara
MUHADI, SH
NIP: 19680420 199303 1 016
REKAP UPAH DAN BAHAN POKMAS, RUMAH KONVENSIONAL 6 M X 6 M
A BAHAN
1 Pasir urug 7 25.82 - 25.82 m3 Rp 78,000.00 Rp - Rp 2,014,346.88 Rp 2,014,346.88 0.43%
2 Tanah Urug 7 28.40 - 28.40 m3 Rp 67,000.00 Rp - Rp 1,902,728.31 Rp 1,902,728.31 0.40%
3 Batu Belah 7 123.98 84.00 39.98 m3 Rp 163,000.00 Rp 13,692,000.00 Rp 6,517,392.00 Rp 20,209,392.00 4.28%
4 Pasir pasang 7 110.73 84.00 26.73 m3 Rp 145,000.00 Rp 12,180,000.00 Rp 3,875,615.03 Rp 16,055,615.03 3.40%
5 Bata merah 7 39664.28 39,200.00 464.28 bh Rp 750.00 Rp 29,400,000.00 Rp 348,206.25 Rp 29,748,206.25 6.29%
6 Kerikil Pecah 1/2 7 24.58 17.50 7.08 m3 Rp 320,000.00 Rp 5,600,000.00 Rp 2,266,822.30 Rp 7,866,822.30 1.66%
7 Semen portland 7 607.26 560.00 47.26 zak Rp 62,000.00 Rp 34,720,000.00 Rp 2,930,079.22 Rp 37,650,079.22 7.96%
8 Paku 2" - 3" 7 60.02 28.00 32.02 kg Rp 20,000.00 Rp 560,000.00 Rp 640,360.00 Rp 1,200,360.00 0.25%
9 Besi Ø 12 7 291.06 287.00 4.06 ljr Rp 120,000.00 Rp 34,440,000.00 Rp 487,200.00 Rp 34,927,200.00 7.39%
10 Besi Ø 8 7 211.16 210.00 1.16 ljr Rp 54,000.00 Rp 11,340,000.00 Rp 62,606.25 Rp 11,402,606.25 2.41%
11 Kawat bendrat 7 58.58 42.00 16.58 kg Rp 20,000.00 Rp 840,000.00 Rp 331,565.04 Rp 1,171,565.04 0.25%
12 Kalsiboard 1200 x 2400 7 14.00 14.00 0.00 lbr Rp 65,000.00 Rp 910,000.00 Rp - Rp 910,000.00 0.19%
13 Kalsi screw CE 7 374.54 350.00 24.54 bh Rp 150.00 Rp 52,500.00 Rp 3,680.25 Rp 56,180.25 0.01%
14 Kalsi kompon IN-F @20 Kg 7 1.87 - 1.87 kg Rp 25,000.00 Rp - Rp 46,816.88 Rp 46,816.88 0.01%
15 Kalsi tape 7 3.75 - 3.75 kg Rp 20,000.00 Rp - Rp 74,907.00 Rp 74,907.00 0.02%
16 Air 7 3153.92 - 3153.92 ltr Rp 200.00 Rp - Rp 630,784.00 Rp 630,784.00 0.13%
17 Minyak Bekisting 7 26.65 - 26.65 ltr Rp 1,500.00 Rp - Rp 39,973.50 Rp 39,973.50 0.01%
18 Balok Kayu kelas III 7 5.74 4.99 0.75 m3 Rp 2,750,000.00 Rp 13,728,750.00 Rp 2,052,095.85 Rp 15,780,845.85 3.34%
19 Papan Kayu Kls III 7 4.64 4.55 0.09 m3 Rp 2,750,000.00 Rp 12,512,500.00 Rp 254,870.00 Rp 12,767,370.00 2.70%
20 Triplek 6 mm 7 0.00 - 0.00 lbr Rp 150,000.00 Rp - Rp - Rp - 0.00%
21 Steger Bambu (4 m) 7 216.09 - 216.09 btg Rp 5,000.00 Rp - Rp 1,080,450.00 Rp 1,080,450.00 0.23%
22 C - 75, 0.75 7 1675.80 1,673.00 2.80 m Rp 14,250.00 Rp 23,840,250.00 Rp 39,900.00 Rp 23,880,150.00 5.05%
23 C - 75, 0.6 7 0.00 - - m Rp 12,500.00 Rp - Rp - Rp - 0.00%
24 Baut (Srew driver) 7 8708.00 8,400.00 308.00 Bh Rp 200.00 Rp 1,680,000.00 Rp 61,600.00 Rp 1,741,600.00 0.37%
25 Dynabolt 7 478.80 476.00 2.80 Bh Rp 5,000.00 Rp 2,380,000.00 Rp 14,000.00 Rp 2,394,000.00 0.51%
26 Reng 7 1723.68 1,722.00 1.68 m Rp 7,000.00 Rp 12,054,000.00 Rp 11,760.00 Rp 12,065,760.00 2.55%
27 Spandek 0,3 mm 7 718.20 714.00 4.20 m Rp 40,000.00 Rp 28,560,000.00 Rp 168,000.00 Rp 28,728,000.00 6.08%
28 Bubungan Spandek 0,3 mm 7 56.00 56.00 - m Rp 25,000.00 Rp 1,400,000.00 Rp - Rp 1,400,000.00 0.30%
29 Kalsiplank 0,8 x 20 7 372.68 371.00 1.68 m Rp 20,000.00 Rp 7,420,000.00 Rp 33,600.00 Rp 7,453,600.00 1.58%
30 Kusen Pintu Kayu Lokal 7 21.00 21.00 - Bh Rp 300,000.00 Rp 6,300,000.00 Rp - Rp 6,300,000.00 1.33%
31 Kusen Jendela Kayu Lokal 7 28.00 28.00 - Bh Rp 250,000.00 Rp 7,000,000.00 Rp - Rp 7,000,000.00 1.48%
32 Daun Pintu Lapis Double Triplek 3 mm 7 21.00 21.00 - Bh Rp 400,000.00 Rp 8,400,000.00 Rp - Rp 8,400,000.00 1.78%
33 Daun Jendela Kaca 3 mm 7 28.00 28.00 - Bh Rp 250,000.00 Rp 7,000,000.00 Rp - Rp 7,000,000.00 1.48%
34 Kunci Pintu 7 21.00 21.00 - Bh Rp 85,000.00 Rp 1,785,000.00 Rp - Rp 1,785,000.00 0.38%
35 Engsel Pintu 7 21.00 21.00 - Psg Rp 25,000.00 Rp 525,000.00 Rp - Rp 525,000.00 0.11%
36 Engsel Jendela 7 28.00 28.00 - Psg Rp 15,000.00 Rp 420,000.00 Rp - Rp 420,000.00 0.09%
37 Grendel Jendela 7 28.00 28.00 - Bh Rp 10,000.00 Rp 280,000.00 Rp - Rp 280,000.00 0.06%
38 Haag Angin 7 56.00 56.00 - Bh Rp 5,000.00 Rp 280,000.00 Rp - Rp 280,000.00 0.06%
TOTAL BAHAN ( A ) Rp 279,300,000.00 Rp 25,889,358.75 Rp 305,189,358.74 64.56%
B UPAH
1 Pekerja 7 1151.19 560.00 591.19 OH Rp 80,000.00 Rp 44,800,000.00 Rp 47,295,396.70 Rp 92,095,396.70 19.48%
2 Tukang 7 747.32 252.00 495.32 OH Rp 100,000.00 Rp 25,200,000.00 Rp 49,532,189.81 Rp 74,732,189.81 15.81%
TOTAL UPAH ( B ) Rp 70,000,000.00 Rp 96,827,586.51 Rp 166,827,586.51 35.29%
A BAHAN
1 Pasir urug - - - - m3 Rp 78,000.00 Rp - Rp - Rp - Rp -
2 Tanah Urug - - - - m3 Rp 67,000.00 Rp - Rp - Rp - Rp -
3 Batu Belah 8.00 9.00 - (1) m3 Rp 163,000.00 Rp 1,304,000.00 Rp 1,467,000.00 Rp - -Rp 163,000.00
4 Pasir pasang 12.00 12.00 - - m3 Rp 145,000.00 Rp 1,740,000.00 Rp 1,740,000.00 Rp - Rp -
5 Bata merah 1500.00 - 1500.00 - bh Rp 750.00 Rp 1,125,000.00 Rp - Rp 1,125,000.00 Rp -
6 Kerikil Pecah 1/2 3.50 3.50 - - m3 Rp 320,000.00 Rp 1,120,000.00 Rp 1,120,000.00 Rp - Rp -
7 Semen portland 54.00 54.00 - - zak Rp 62,000.00 Rp 3,348,000.00 Rp 3,348,000.00 Rp - Rp -
8 Paku 2" - 3" 9.00 9.00 - - kg Rp 20,000.00 Rp 180,000.00 Rp 180,000.00 Rp - Rp -
9 Besi Ø 12 52.00 52.00 - - ljr Rp 120,000.00 Rp 6,240,000.00 Rp 6,240,000.00 Rp - Rp -
10 Besi Ø 8 32.00 32.00 - - ljr Rp 54,000.00 Rp 1,728,000.00 Rp 1,728,000.00 Rp - Rp -
11 Kawat bendrat 10.00 10.00 - - kg Rp 20,000.00 Rp 200,000.00 Rp 200,000.00 Rp - Rp -
12 Kalsiboard 1200 x 2400 24.00 - - 24 lbr Rp 65,000.00 Rp 1,560,000.00 Rp - Rp - Rp 1,560,000.00
13 Kalsi screw CE 720.00 - - 720 bh Rp 150.00 Rp 108,000.00 Rp - Rp - Rp 108,000.00
14 Kalsi kompon IN-F @20 Kg 3.00 - - 3 kg Rp 25,000.00 Rp 75,000.00 Rp - Rp - Rp 75,000.00
15 Kalsi tape 7.00 - - 7 kg Rp 20,000.00 Rp 140,000.00 Rp - Rp - Rp 140,000.00
16 Air - - - - ltr Rp 200.00 Rp - Rp - Rp - Rp -
17 Minyak Bekisting - - - - ltr Rp 1,500.00 Rp - Rp - Rp - Rp -
18 Balok Kayu kelas III 1.12 0.72 - 0.4 m3 Rp 2,750,000.00 Rp 3,080,000.00 Rp 1,980,000.00 Rp - Rp 1,100,000.00
19 Papan Kayu Kls III 0.50 0.50 - - m3 Rp 2,750,000.00 Rp 1,375,000.00 Rp 1,375,000.00 Rp - Rp -
20 Triplek 6 mm 5.00 5.00 - - lbr Rp 150,000.00 Rp 750,000.00 Rp 750,000.00 Rp - Rp -
21 Steger Bambu (4 m) 15.00 15.00 - - btg Rp 5,000.00 Rp 75,000.00 Rp 75,000.00 Rp - Rp -
22 C - 75, 0.75 228.00 - 228.00 - m Rp 14,250.00 Rp 3,249,000.00 Rp - Rp 3,249,000.00 Rp -
23 C - 75, 0.6 - - - m Rp 12,500.00 Rp - Rp - Rp - Rp -
24 Baut (Srew driver) 1270.00 - 1270.00 - Bh Rp 200.00 Rp 254,000.00 Rp - Rp 254,000.00 Rp -
25 Dynabolt 68.00 - 68.00 - Bh Rp 5,000.00 Rp 340,000.00 Rp - Rp 340,000.00 Rp -
26 Reng 246.00 - 246.00 - m Rp 7,000.00 Rp 1,722,000.00 Rp - Rp 1,722,000.00 Rp -
27 Spandek 0,3 mm 103.00 - 103.00 - m Rp 40,000.00 Rp 4,120,000.00 Rp - Rp 4,120,000.00 Rp -
28 Bubungan Spandek 0,3 mm 9.00 - 9.00 - m Rp 25,000.00 Rp 225,000.00 Rp - Rp 225,000.00 Rp -
29 Kalsiplank 0,8 x 20 55.00 - 55.00 - m Rp 20,000.00 Rp 1,100,000.00 Rp - Rp 1,100,000.00 Rp -
30 Kusen Pintu Kayu Lokal 4.00 - - 4 Bh Rp 300,000.00 Rp 1,200,000.00 Rp - Rp - Rp 1,200,000.00
31 Kusen Jendela Kayu Lokal 3.00 - - 3 Bh Rp 250,000.00 Rp 750,000.00 Rp - Rp - Rp 750,000.00
32 Daun Pintu Lapis Double Triplek 3 mm 3.00 - - 3.00 Bh Rp 400,000.00 Rp 1,200,000.00 Rp - Rp - Rp 1,200,000.00
33 Daun Jendela Kaca 3 mm 6.00 - - 6.00 Bh Rp 250,000.00 Rp 1,500,000.00 Rp - Rp - Rp 1,500,000.00
34 Kunci Pintu 3.00 - - 3.00 Bh Rp 85,000.00 Rp 255,000.00 Rp - Rp - Rp 255,000.00
35 Engsel Pintu 3.00 - - 3.00 Psg Rp 25,000.00 Rp 75,000.00 Rp - Rp - Rp 75,000.00
36 Engsel Jendela 6.00 - - 6.00 Psg Rp 15,000.00 Rp 90,000.00 Rp - Rp - Rp 90,000.00
37 Grendel Jendela 6.00 - - 6.00 Bh Rp 10,000.00 Rp 60,000.00 Rp - Rp - Rp 60,000.00
38 Haag Angin 6.00 - - 6.00 Bh Rp 5,000.00 Rp 30,000.00 Rp - Rp - Rp 30,000.00
TOTAL BAHAN ( A ) Rp 40,318,000.00 Rp 20,203,000.00 Rp 12,135,000.00 Rp 7,980,000.00
B UPAH
1 Pekerja 80.00 45.00 22.00 13.00 OH Rp 80,000.00 Rp 6,400,000.00 Rp 3,600,000.00 Rp 1,760,000.00 Rp 1,040,000.00
2 Tukang 36.00 18.00 10.00 8.00 OH Rp 100,000.00 Rp 3,600,000.00 Rp 1,800,000.00 Rp 1,000,000.00 Rp 800,000.00
TOTAL UPAH ( B ) Rp 10,000,000.00 Rp 5,400,000.00 Rp 2,760,000.00 Rp 1,840,000.00
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik Ketua
Menyetujui
PPK BPBD Kabupaten Lombok Utara
MUHADI, SH
NIP: 19680420 199303 1 016
RENCANA PENGGUNAAN DANA 1 KK RUMAH TYPE 36 RIKO
A BAHAN
1 Pasir urug - - - - m3 Rp 78,000.00 Rp - Rp - Rp - Rp -
2 Tanah Urug - - - - m3 Rp 67,000.00 Rp - Rp - Rp - Rp -
3 Batu Belah 12.00 12.00 - - m3 Rp 163,000.00 Rp 1,956,000.00 Rp 1,956,000.00 Rp - Rp -
4 Pasir pasang 12.00 12.00 - - m3 Rp 145,000.00 Rp 1,740,000.00 Rp 1,740,000.00 Rp - Rp -
5 Bata merah 5,600.00 3,600 2,000 - bh Rp 750.00 Rp 4,200,000.00 Rp 2,700,000.00 Rp 1,500,000.00 Rp -
6 Kerikil Pecah 1/2 2.50 2.50 - - m3 Rp 320,000.00 Rp 800,000.00 Rp 800,000.00 Rp - Rp -
7 Semen portland 80.00 30.00 - 50 zak Rp 62,000.00 Rp 4,960,000.00 Rp 1,860,000.00 Rp - Rp 3,100,000.00
8 Paku 2" - 3" 4.00 4.00 - - kg Rp 20,000.00 Rp 80,000.00 Rp 80,000.00 Rp - Rp -
9 Besi Ø 12 41.00 41.00 - - ljr Rp 120,000.00 Rp 4,920,000.00 Rp 4,920,000.00 Rp - Rp -
10 Besi Ø 8 30.00 30.00 - - ljr Rp 54,000.00 Rp 1,620,000.00 Rp 1,620,000.00 Rp - Rp -
11 Kawat bendrat 6.00 6.00 - - kg Rp 20,000.00 Rp 120,000.00 Rp 120,000.00 Rp - Rp -
12 Kalsiboard 1200 x 2400 2.00 - - 2 lbr Rp 65,000.00 Rp 130,000.00 Rp - Rp - Rp 130,000.00
13 Kalsi screw CE 50.00 - - 50 bh Rp 150.00 Rp 7,500.00 Rp - Rp - Rp 7,500.00
14 Kalsi kompon IN-F @20 Kg - - - - kg Rp 25,000.00 Rp - Rp - Rp - Rp -
15 Kalsi tape - - - - kg Rp 20,000.00 Rp - Rp - Rp - Rp -
16 Air - - - - ltr Rp 200.00 Rp - Rp - Rp - Rp -
17 Minyak Bekisting - - - - ltr Rp 1,500.00 Rp - Rp - Rp - Rp -
18 Balok Kayu kelas III 0.71 0.71 - - m3 Rp 2,750,000.00 Rp 1,961,250.00 Rp 1,961,250.00 Rp - Rp -
19 Papan Kayu Kls III 0.65 0.65 - - m3 Rp 2,750,000.00 Rp 1,787,500.00 Rp 1,787,500.00 Rp - Rp -
20 Triplek 6 mm - - - - lbr Rp 150,000.00 Rp - Rp - Rp - Rp -
21 Steger Bambu (4 m) - - - - btg Rp 5,000.00 Rp - Rp - Rp - Rp -
22 C - 75, 0.75 239.00 - 239.00 - m Rp 14,250.00 Rp 3,405,750.00 Rp - Rp 3,405,750.00 Rp -
23 C - 75, 0.6 - - - m Rp 12,500.00 Rp - Rp - Rp - Rp -
24 Baut (Srew driver) 1,200.00 - 1200.00 - Bh Rp 200.00 Rp 240,000.00 Rp - Rp 240,000.00 Rp -
25 Dynabolt 68.00 - 68.00 - Bh Rp 5,000.00 Rp 340,000.00 Rp - Rp 340,000.00 Rp -
26 Reng 246.00 - 246.00 - m Rp 7,000.00 Rp 1,722,000.00 Rp - Rp 1,722,000.00 Rp -
27 Spandek 0,3 mm 102.00 - 102.00 - m Rp 40,000.00 Rp 4,080,000.00 Rp - Rp 4,080,000.00 Rp -
28 Bubungan Spandek 0,3 mm 8.00 - 8.00 - m Rp 25,000.00 Rp 200,000.00 Rp - Rp 200,000.00 Rp -
29 Kalsiplank 0,8 x 20 53.00 - 53.00 - m Rp 20,000.00 Rp 1,060,000.00 Rp - Rp 1,060,000.00 Rp -
30 Kusen Pintu Kayu Lokal 3.00 - - 3 Bh Rp 300,000.00 Rp 900,000.00 Rp - Rp - Rp 900,000.00
31 Kusen Jendela Kayu Lokal 4.00 - - 4 Bh Rp 250,000.00 Rp 1,000,000.00 Rp - Rp - Rp 1,000,000.00
32 Daun Pintu Lapis Double Triplek 3 mm 3.00 - - 3.00 Bh Rp 400,000.00 Rp 1,200,000.00 Rp - Rp - Rp 1,200,000.00
33 Daun Jendela Kaca 3 mm 4.00 - - 4.00 Bh Rp 250,000.00 Rp 1,000,000.00 Rp - Rp - Rp 1,000,000.00
34 Kunci Pintu 3.00 - - 3.00 Bh Rp 85,000.00 Rp 255,000.00 Rp - Rp - Rp 255,000.00
35 Engsel Pintu 3.00 - - 3.00 Psg Rp 25,000.00 Rp 75,000.00 Rp - Rp - Rp 75,000.00
36 Engsel Jendela 4.00 - - 4.00 Psg Rp 15,000.00 Rp 60,000.00 Rp - Rp - Rp 60,000.00
37 Grendel Jendela 4.00 - - 4.00 Bh Rp 10,000.00 Rp 40,000.00 Rp - Rp - Rp 40,000.00
38 Haag Angin 8.00 - - 8.00 Bh Rp 5,000.00 Rp 40,000.00 Rp - Rp - Rp 40,000.00
TOTAL BAHAN ( A ) Rp 39,900,000.00 Rp 19,544,750.00 Rp 12,547,750.00 Rp 7,807,500.00
B UPAH
1 Pekerja 80.00 40.00 23.00 17.00 OH Rp 80,000.00 Rp 6,400,000.00 Rp 3,200,000.00 Rp 1,840,000.00 Rp 1,360,000.00
2 Tukang 36.00 18.00 10.00 8.00 OH Rp 100,000.00 Rp 3,600,000.00 Rp 1,800,000.00 Rp 1,000,000.00 Rp 800,000.00
TOTAL UPAH ( B ) Rp 10,000,000.00 Rp 5,000,000.00 Rp 2,840,000.00 Rp 2,160,000.00
Menyetujui
PPK BPBD Kabupaten Lombok Tengah
H.LALU ERWIN RAHMAN, ST.
NIP: 197601152007011010
RENCANA PENGGUNAAN DANA TAHAP 1 POKMAS
A BAHAN
1 Pasir urug 11 0.00 0.00 m3 Rp 78,000.00 Rp - Rp -
2 Tanah Urug 11 - - m3 Rp 67,000.00 Rp - Rp -
3 Batu Belah 11 88.00 99.00 m3 Rp 163,000.00 Rp 14,344,000.00 Rp 16,137,000.00
4 Pasir pasang 11 132.00 132.00 m3 Rp 145,000.00 Rp 19,140,000.00 Rp 19,140,000.00
5 Bata merah 11 16500.00 - bh Rp 750.00 Rp 12,375,000.00 Rp -
6 Kerikil Pecah 1/2 11 38.50 38.50 m3 Rp 320,000.00 Rp 12,320,000.00 Rp 12,320,000.00
7 Semen portland 11 594.00 594.00 zak Rp 62,000.00 Rp 36,828,000.00 Rp 36,828,000.00
8 Paku 2" - 3" 11 99.00 99.00 kg Rp 20,000.00 Rp 1,980,000.00 Rp 1,980,000.00
9 Besi Ø 12 11 572.00 572.00 ljr Rp 120,000.00 Rp 68,640,000.00 Rp 68,640,000.00
10 Besi Ø 8 11 352.00 352.00 ljr Rp 54,000.00 Rp 19,008,000.00 Rp 19,008,000.00
11 Kawat bendrat 11 110.00 110.00 kg Rp 20,000.00 Rp 2,200,000.00 Rp 2,200,000.00
12 Kalsiboard 1200 x 2400 11 264.00 - lbr Rp 65,000.00 Rp 17,160,000.00 Rp -
13 Kalsi screw CE 11 7920.00 - bh Rp 150.00 Rp 1,188,000.00 Rp -
14 Kalsi kompon IN-F @20 Kg 11 33.00 - kg Rp 25,000.00 Rp 825,000.00 Rp -
15 Kalsi tape 11 77.00 - kg Rp 20,000.00 Rp 1,540,000.00 Rp -
16 Air 11 - - ltr Rp 200.00 Rp - Rp -
17 Minyak Bekisting 11 0.00 0.00 ltr Rp 1,500.00 Rp - Rp -
18 Balok Kayu kelas III 11 12.32 7.92 m3 Rp 2,750,000.00 Rp 33,880,000.00 Rp 21,780,000.00
19 Papan Kayu Kls III 11 5.50 5.50 m3 Rp 2,750,000.00 Rp 15,125,000.00 Rp 15,125,000.00
20 Triplek 6 mm 11 55.00 55.00 lbr Rp 150,000.00 Rp 8,250,000.00 Rp 8,250,000.00
21 Steger Bambu (4 m) 11 165.00 165.00 btg Rp 5,000.00 Rp 825,000.00 Rp 825,000.00
22 C - 75, 0.75 11 2508.00 - m Rp 14,250.00 Rp 35,739,000.00 Rp -
23 C - 75, 0.6 11 - - m Rp 12,500.00 Rp - Rp -
24 Baut (Srew driver) 11 13970.00 - Bh Rp 200.00 Rp 2,794,000.00 Rp -
25 Dynabolt 11 748.00 - Bh Rp 5,000.00 Rp 3,740,000.00 Rp -
26 Reng 11 2706.00 - m Rp 7,000.00 Rp 18,942,000.00 Rp -
27 Spandek 0,3 mm 11 1133.00 - m Rp 40,000.00 Rp 45,320,000.00 Rp -
28 Bubungan Spandek 0,3 mm 11 99.00 - m Rp 25,000.00 Rp 2,475,000.00 Rp -
29 Kalsiplank 0,8 x 20 11 605.00 - m Rp 20,000.00 Rp 12,100,000.00 Rp -
30 Kusen Pintu Kayu Lokal 11 44.00 - Bh Rp 300,000.00 Rp 13,200,000.00 Rp -
31 Kusen Jendela Kayu Lokal 11 33.00 - Bh Rp 250,000.00 Rp 8,250,000.00 Rp -
32 Daun Pintu Lapis Double Triplek 3 mm 11 33.00 - Bh Rp 400,000.00 Rp 13,200,000.00 Rp -
33 Daun Jendela Kaca 3 mm 11 66.00 - Bh Rp 250,000.00 Rp 16,500,000.00 Rp -
34 Kunci Pintu 11 33.00 - Bh Rp 85,000.00 Rp 2,805,000.00 Rp -
35 Engsel Pintu 11 33.00 - Psg Rp 25,000.00 Rp 825,000.00 Rp -
36 Engsel Jendela 11 66.00 - Psg Rp 15,000.00 Rp 990,000.00 Rp -
37 Grendel Jendela 11 66.00 - Bh Rp 10,000.00 Rp 660,000.00 Rp -
38 Haag Angin 11 66.00 - Bh Rp 5,000.00 Rp 330,000.00 Rp -
TOTAL BAHAN ( A ) Rp 443,498,000.00 Rp 222,233,000.00
B UPAH
1 Pekerja 11 880.00 495.00 OH Rp 80,000.00 Rp 70,400,000.00 Rp 39,600,000.00
2 Tukang 11 396.00 198.00 OH Rp 100,000.00 Rp 39,600,000.00 Rp 19,800,000.00
TOTAL UPAH ( B ) Rp 110,000,000.00 Rp 59,400,000.00
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik Ketua
TABEL PERHITUNGAN VOLUME CETAKAN BETON SLOOF
RUMAH T 36 KONVENSIONAL
I -
11.288
3.76 3xpakai
1.935
I
K ( 15/ 15 ) 9 0.15 0.15 2.85 15.390
5.130 3 x pakai
-
NO. CETAKAN BETON PERHITUNGAN VOLUME
BLOK SKET BALOK P L T LUAS KET.
(m) (m) (m) ( m2 )
15.093
5.03 3 x pakai
0.684
0.3
3.634 1 x pakai
0.3
0.120
TABEL PERHITUNGAN VOLUME BESI
RUMAH T 36 KONVENSIONAL
Kode
B.T.1 PEKERJAAN : SLOOF 15/20 N= 6 BH
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT TOTAL
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' BERAT KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( cm ) ( btg ) (m) ( kg/m ) ( kg )
Kode
B.T.2 PEKERJAAN : KOLOM 15 /15 N= 9 BH
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT TOTAL
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' BERAT KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( cm ) ( btg ) (m) ( kg/m ) ( kg )
1 12 0.48 3.00 0.48 3.96 36.00 142.56 0.888 126.559
skur: 12 0.48 0.30 0.48 1.26 92.00 115.92 0.888 102.909
###
2 8 0.48 0.11 0.11 0.11 0.11 0.48 1.40 0.15 ### 180 252.00 0.395 99.429
Kode BLOK
B.T.3 PEKERJAAN : RING BALK 13/15 N= 6 BH
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT TOTAL
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' BERAT KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( cm ) ( btg ) (m) ( kg/m ) ( kg )
1 12 0.05 6.00 0.05 6.10 24 146.40 0.888 129.968
2 8 0.05 0.11 0.09 0.11 0.09 0.05 0.50 0.15 ### 240 120.00 0.395 47.347
tabel besi
berat per meter
diameter
ulir polos
6 0.222 0.22
8 0.395 0.4
9 0.5 0.5
10 0.617 0.62
12 0.888 0.89
13 1.04 1.04
16 1.578 1.57
19 2.223 2.23
22 2.985 2.98
BLOK : II
PEKERJAAN : SLOOF 15/20 N= 5 BH
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT TOTAL
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' BERAT KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m ) ( kg )
BLOK : III
PEKERJAAN : SLOOF 15/20 N= 0 BH
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT TOTAL
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' BERAT KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m ) ( kg )
BLOK IV
PEKERJAAN : SLOOF 15/20 N= 1 BH
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT TOTAL
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' BERAT KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m ) ( kg )
BLOK V
PEKERJAAN : SLOOF 15/20 N= 1 BH
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT TOTAL
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' BERAT KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m ) ( kg )
REKAP D-19
D-12
D-10
6 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 410 500.20 0.617 Lp
4 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 26 31.72 0.617 Lp
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
BLOK : III ( DELATASI - II )
ELEVASI : - 0.25
PEKERJAAN : SLOOF 15/20 N= 1 BH P= 11.35 P = 9.70
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m )
6 10 0.05 0.72 0.22 0.72 0.22 0.05 1.98 120 ### 126 249.48 0.617 Lp
6 10 0.05 0.72 0.22 0.72 0.22 0.05 1.98 120 ### 126 249.48 0.617 Lp
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
6 10 0.05 0.43 0.23 0.43 0.23 0.05 1.42 120 ### 292 414.64 0.617 Lp
REKAP D-19
D-12
D-10
6 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 504 614.88 0.617 Lp
4 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 42 51.24 0.617 Lp
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
BLOK : V ( DELATASI - IV )
ELEVASI : - 0.25
PEKERJAAN : SLOOF 30/50 N= 4 BH P= 15.00
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m )
6 10 0.05 0.43 0.23 0.43 0.23 0.05 1.42 120 ### 252 357.84 0.617 Lp
BLOK : V ( DELATASI - IV )
ELEVASI : - 0.25
PEKERJAAN : SLOOF 30/50 N= 1 BH P= 28.26
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m )
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
BLOK : V ( DELATASI - IV )
ELEVASI : - 0.25
PEKERJAAN : SLOOF 25/45 N= 5 BH P= 19.60
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m )
6 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 410 500.20 0.617 Lp
BLOK : V ( DELATASI - IV )
ELEVASI : - 0.25
PEKERJAAN : SLOOF 25/45 N= 1 BH P= 4.72
DIAMETER PANJANG BESI JARAK JUMLAH TOTAL BERAT
NO. BENTUK POTONGAN BESI a b c d e f g h JUMLAH BATANG BATANG PANJANG PER-M' KET.
( mm ) (m) (m) (m) (m) (m) (m) (m) (m) (m) ( mm ) ( btg ) (m) ( kg/m )
4 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 20 24.40 0.617 Lp
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
6 10 0.05 0.72 0.22 0.72 0.22 0.05 1.98 120 ### 156 308.88 0.617 Lp
4 10 0.05 0.72 0.22 0.72 0.22 0.05 1.98 120 ### 123 243.54 0.617 Lp
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
6 10 0.05 0.53 0.23 0.53 0.23 0.05 1.62 120 ### 164 265.68 0.617 Lp
6 10 0.05 0.53 0.23 0.53 0.23 0.05 1.62 120 ### 20 32.40 0.617 Lp
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
6 10 0.05 0.43 0.23 0.43 0.23 0.05 1.42 120 ### 270 383.40 0.617 Lp
4 10 0.05 0.43 0.23 0.43 0.23 0.05 1.42 120 ### 58 82.36 0.617 Lp
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
6 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 415 506.30 0.617 Lp
6 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 42 51.24 0.617 Lp
6 10 0.05 0.38 0.18 0.38 0.18 0.05 1.22 120 ### 21 25.62 0.617 Lp
TOTAL BERAT BESI
BESI DIAMETER - 19
BESI DIAMETER - 12
BESI DIAMETER - 10
B UPAH
1 Pekerja 11 880.00 242 OH Rp 80,000.00 Rp 70,400,000.00 Rp 19,360,000.00
###
2 Tukang 11 396.00 110 OH Rp 100,000.00 Rp 39,600,000.00 Rp 11,000,000.00
###
TOTAL UPAH ( B ) Rp 110,000,000.00 Rp 30,360,000.00
###
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik Ketua
RENCANA PENGGUNAAN DANA TAHAP 3 POKMAS
A BAHAN
1 Pasir urug 11 0.00 - m3 Rp 78,000.00 Rp - Rp -
2 Tanah Urug 11 - - m3 Rp 67,000.00 Rp - Rp -
3 Batu Belah 11 88.00 (11) m3 Rp 163,000.00 Rp 14,344,000.00 -Rp 1,793,000.00
4 Pasir pasang 11 132.00 - m3 Rp 145,000.00 Rp 19,140,000.00 Rp -
5 Bata merah 11 16500.00 - bh Rp 750.00 Rp 12,375,000.00 Rp -
6 Kerikil Pecah 1/2 11 38.50 - m3 Rp 320,000.00 Rp 12,320,000.00 Rp -
7 Semen portland 11 594.00 - zak Rp 62,000.00 Rp 36,828,000.00 Rp -
8 Paku 2" - 3" 11 99.00 - kg Rp 20,000.00 Rp 1,980,000.00 Rp -
9 Besi Ø 12 11 572.00 - ljr Rp 120,000.00 Rp 68,640,000.00 Rp -
10 Besi Ø 8 11 352.00 - ljr Rp 54,000.00 Rp 19,008,000.00 Rp -
11 Kawat bendrat 11 110.00 - kg Rp 20,000.00 Rp 2,200,000.00 Rp -
12 Kalsiboard 1200 x 2400 11 264.00 264 lbr Rp 65,000.00 Rp 17,160,000.00 Rp 17,160,000.00
13 Kalsi screw CE 11 7920.00 7,920 bh Rp 150.00 Rp 1,188,000.00 Rp 1,188,000.00
14 Kalsi kompon IN-F @20 Kg 11 33.00 33 kg Rp 25,000.00 Rp 825,000.00 Rp 825,000.00
15 Kalsi tape 11 77.00 77 kg Rp 20,000.00 Rp 1,540,000.00 Rp 1,540,000.00
16 Air 11 - - ltr Rp 200.00 Rp - Rp -
17 Minyak Bekisting 11 0.00 - ltr Rp 1,500.00 Rp - Rp -
18 Balok Kayu kelas III 11 12.32 4 m3 Rp 2,750,000.00 Rp 33,880,000.00 Rp 12,100,000.00
19 Papan Kayu Kls III 11 5.50 - m3 Rp 2,750,000.00 Rp 15,125,000.00 Rp -
20 Triplek 6 mm 11 55.00 - lbr Rp 150,000.00 Rp 8,250,000.00 Rp -
21 Steger Bambu (4 m) 11 165.00 - btg Rp 5,000.00 Rp 825,000.00 Rp -
22 C - 75, 0.75 11 2508.00 - m Rp 14,250.00 Rp 35,739,000.00 Rp -
23 C - 75, 0.6 11 - - m Rp 12,500.00 Rp - Rp -
24 Baut (Srew driver) 11 13970.00 - Bh Rp 200.00 Rp 2,794,000.00 Rp -
25 Dynabolt 11 748.00 - Bh Rp 5,000.00 Rp 3,740,000.00 Rp -
26 Reng 11 2706.00 - m Rp 7,000.00 Rp 18,942,000.00 Rp -
27 Spandek 0,3 mm 11 1133.00 - m Rp 40,000.00 Rp 45,320,000.00 Rp -
28 Bubungan Spandek 0,3 mm 11 99.00 - m Rp 25,000.00 Rp 2,475,000.00 Rp -
29 Kalsiplank 0,8 x 20 11 605.00 - m Rp 20,000.00 Rp 12,100,000.00 Rp -
30 Kusen Pintu Kayu Lokal 11 44.00 44 Bh Rp 300,000.00 Rp 13,200,000.00 Rp 13,200,000.00
31 Kusen Jendela Kayu Lokal 11 33.00 33 Bh Rp 250,000.00 Rp 8,250,000.00 Rp 8,250,000.00
32 Daun Pintu Lapis Double Triplek 3 mm 11 33.00 33 Bh Rp 400,000.00 Rp 13,200,000.00 Rp 13,200,000.00
33 Daun Jendela Kaca 3 mm 11 66.00 66 Bh Rp 250,000.00 Rp 16,500,000.00 Rp 16,500,000.00
34 Kunci Pintu 11 33.00 33 Bh Rp 85,000.00 Rp 2,805,000.00 Rp 2,805,000.00
35 Engsel Pintu 11 33.00 33 Psg Rp 25,000.00 Rp 825,000.00 Rp 825,000.00
36 Engsel Jendela 11 66.00 66 Psg Rp 15,000.00 Rp 990,000.00 Rp 990,000.00
37 Grendel Jendela 11 66.00 66 Bh Rp 10,000.00 Rp 660,000.00 Rp 660,000.00
38 Haag Angin 11 66.00 66 Bh Rp 5,000.00 Rp 330,000.00 Rp 330,000.00
TOTAL BAHAN ( A ) Rp 443,498,000.00 Rp 87,780,000.00
B UPAH
1 Pekerja 11 880.00 143 OH Rp 80,000.00 Rp 70,400,000.00 Rp 11,440,000.00
2 Tukang 11 396.00 88 OH Rp 100,000.00 Rp 39,600,000.00 Rp 8,800,000.00
TOTAL UPAH ( B ) Rp 110,000,000.00 Rp 20,240,000.00
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik Ketua
RENCANA PENGGUNAAN DANA TAHAP 1 RUMAH TYPE 36 RIKO
A BAHAN
1 Pasir urug 7 - - m3 Rp 78,000.00 Rp - Rp -
2 Tanah Urug 7 - - m3 Rp 67,000.00 Rp - Rp -
3 Batu Belah 7 84.00 84.00 m3 Rp 163,000.00 Rp 13,692,000.00 Rp 13,692,000.00
4 Pasir pasang 7 84.00 84.00 m3 Rp 145,000.00 Rp 12,180,000.00 Rp 12,180,000.00
5 Bata merah 7 39,200.00 25,200.00 bh Rp 750.00 Rp 29,400,000.00 Rp 18,900,000.00
6 Kerikil Pecah 1/2 7 17.50 17.50 m3 Rp 320,000.00 Rp 5,600,000.00 Rp 5,600,000.00
7 Semen portland 7 560.00 210.00 zak Rp 62,000.00 Rp 34,720,000.00 Rp 13,020,000.00
8 Paku 2" - 3" 7 28.00 28.00 kg Rp 20,000.00 Rp 560,000.00 Rp 560,000.00
9 Besi Ø 12 7 287.00 287.00 ljr Rp 120,000.00 Rp 34,440,000.00 Rp 34,440,000.00
10 Besi Ø 8 7 210.00 210.00 ljr Rp 54,000.00 Rp 11,340,000.00 Rp 11,340,000.00
11 Kawat bendrat 7 42.00 42.00 kg Rp 20,000.00 Rp 840,000.00 Rp 840,000.00
12 Kalsiboard 1200 x 2400 7 14.00 - lbr Rp 65,000.00 Rp 910,000.00 Rp -
13 Kalsi screw CE 7 350.00 - bh Rp 150.00 Rp 52,500.00 Rp -
14 Kalsi kompon IN-F @20 Kg 7 - - kg Rp 25,000.00 Rp - Rp -
15 Kalsi tape 7 - - kg Rp 20,000.00 Rp - Rp -
16 Air 7 - - ltr Rp 200.00 Rp - Rp -
17 Minyak Bekisting 7 - - ltr Rp 1,500.00 Rp - Rp -
18 Balok Kayu kelas III 7 4.99 4.99 m3 Rp 2,750,000.00 Rp 13,728,750.00 Rp 13,728,750.00
19 Papan Kayu Kls III 7 4.55 4.55 m3 Rp 2,750,000.00 Rp 12,512,500.00 Rp 12,512,500.00
20 Triplek 6 mm 7 - - lbr Rp 150,000.00 Rp - Rp -
21 Steger Bambu (4 m) 7 - - btg Rp 5,000.00 Rp - Rp -
22 C - 75, 0.75 7 1,673.00 - m Rp 14,250.00 Rp 23,840,250.00 Rp -
23 C - 75, 0.6 7 - - m Rp 12,500.00 Rp - Rp -
24 Baut (Srew driver) 7 8,400.00 - Bh Rp 200.00 Rp 1,680,000.00 Rp -
25 Dynabolt 7 476.00 - Bh Rp 5,000.00 Rp 2,380,000.00 Rp -
26 Reng 7 1,722.00 - m Rp 7,000.00 Rp 12,054,000.00 Rp -
27 Spandek 0,3 mm 7 714.00 - m Rp 40,000.00 Rp 28,560,000.00 Rp -
28 Bubungan Spandek 0,3 mm 7 56.00 - m Rp 25,000.00 Rp 1,400,000.00 Rp -
29 Kalsiplank 0,8 x 20 7 371.00 - m Rp 20,000.00 Rp 7,420,000.00 Rp -
30 Kusen Pintu Kayu Lokal 7 21.00 - Bh Rp 300,000.00 Rp 6,300,000.00 Rp -
31 Kusen Jendela Kayu Lokal 7 28.00 - Bh Rp 250,000.00 Rp 7,000,000.00 Rp -
32 Daun Pintu Lapis Double Triplek 3 mm 7 21.00 - Bh Rp 400,000.00 Rp 8,400,000.00 Rp -
33 Daun Jendela Kaca 3 mm 7 28.00 - Bh Rp 250,000.00 Rp 7,000,000.00 Rp -
34 Kunci Pintu 7 21.00 - Bh Rp 85,000.00 Rp 1,785,000.00 Rp -
35 Engsel Pintu 7 21.00 - Psg Rp 25,000.00 Rp 525,000.00 Rp -
36 Engsel Jendela 7 28.00 - Psg Rp 15,000.00 Rp 420,000.00 Rp -
37 Grendel Jendela 7 28.00 - Bh Rp 10,000.00 Rp 280,000.00 Rp -
38 Haag Angin 7 56.00 - Bh Rp 5,000.00 Rp 280,000.00 Rp -
TOTAL BAHAN ( A ) Rp 279,300,000.00 Rp 136,813,250.00
B UPAH
1 Pekerja 7 560.00 280.00 OH Rp 80,000.00 Rp 44,800,000.00 Rp 22,400,000.00
2 Tukang 7 252.00 126.00 OH Rp 100,000.00 Rp 25,200,000.00 Rp 12,600,000.00
TOTAL UPAH ( B ) Rp 70,000,000.00 Rp 35,000,000.00
C ADMINISTRASI
1 ADMINISTRASI DAN PELAPORAN 7 7.00 7.00 Bh Rp 100,000.00 Rp 700,000.00 Rp 700,000.00
TOTAL ADMINISTRASI ( C ) Rp 700,000.00 Rp 700,000.00
B UPAH
1 Pekerja 7 560.00 161 OH Rp 80,000.00 Rp 44,800,000.00 Rp 12,880,000.00
###
2 Tukang 7 252.00 70 OH Rp 100,000.00 Rp 25,200,000.00 Rp 7,000,000.00
###
TOTAL UPAH ( B ) Rp 70,000,000.00 Rp 19,880,000.00
###
C ADMINISTRASI
1 ADMINISTRASI DAN PELAPORAN 7 7.00 - Bh Rp 100,000.00 Rp 700,000.00 Rp ###
-
TOTAL ADMINISTRASI ( C ) Rp 700,000.00 Rp ###
-
A BAHAN
1 Pasir urug 7 - - m3 Rp 78,000.00 Rp - Rp -
2 Tanah Urug 7 - - m3 Rp 67,000.00 Rp - Rp -
3 Batu Belah 7 84.00 - m3 Rp 163,000.00 Rp 13,692,000.00 Rp -
4 Pasir pasang 7 84.00 - m3 Rp 145,000.00 Rp 12,180,000.00 Rp -
5 Bata merah 7 39,200.00 - bh Rp 750.00 Rp 29,400,000.00 Rp -
6 Kerikil Pecah 1/2 7 17.50 - m3 Rp 320,000.00 Rp 5,600,000.00 Rp -
7 Semen portland 7 560.00 350 zak Rp 62,000.00 Rp 34,720,000.00 Rp 21,700,000.00
8 Paku 2" - 3" 7 28.00 - kg Rp 20,000.00 Rp 560,000.00 Rp -
9 Besi Ø 12 7 287.00 - ljr Rp 120,000.00 Rp 34,440,000.00 Rp -
10 Besi Ø 8 7 210.00 - ljr Rp 54,000.00 Rp 11,340,000.00 Rp -
11 Kawat bendrat 7 42.00 - kg Rp 20,000.00 Rp 840,000.00 Rp -
12 Kalsiboard 1200 x 2400 7 14.00 14 lbr Rp 65,000.00 Rp 910,000.00 Rp 910,000.00
13 Kalsi screw CE 7 350.00 350 bh Rp 150.00 Rp 52,500.00 Rp 52,500.00
14 Kalsi kompon IN-F @20 Kg 7 - - kg Rp 25,000.00 Rp - Rp -
15 Kalsi tape 7 - - kg Rp 20,000.00 Rp - Rp -
16 Air 7 - - ltr Rp 200.00 Rp - Rp -
17 Minyak Bekisting 7 - - ltr Rp 1,500.00 Rp - Rp -
18 Balok Kayu kelas III 7 4.99 - m3 Rp 2,750,000.00 Rp 13,728,750.00 Rp -
19 Papan Kayu Kls III 7 4.55 - m3 Rp 2,750,000.00 Rp 12,512,500.00 Rp -
20 Triplek 6 mm 7 - - lbr Rp 150,000.00 Rp - Rp -
21 Steger Bambu (4 m) 7 - - btg Rp 5,000.00 Rp - Rp -
22 C - 75, 0.75 7 1,673.00 - m Rp 14,250.00 Rp 23,840,250.00 Rp -
23 C - 75, 0.6 7 - - m Rp 12,500.00 Rp - Rp -
24 Baut (Srew driver) 7 8,400.00 - Bh Rp 200.00 Rp 1,680,000.00 Rp -
25 Dynabolt 7 476.00 - Bh Rp 5,000.00 Rp 2,380,000.00 Rp -
26 Reng 7 1,722.00 - m Rp 7,000.00 Rp 12,054,000.00 Rp -
27 Spandek 0,3 mm 7 714.00 - m Rp 40,000.00 Rp 28,560,000.00 Rp -
28 Bubungan Spandek 0,3 mm 7 56.00 - m Rp 25,000.00 Rp 1,400,000.00 Rp -
29 Kalsiplank 0,8 x 20 7 371.00 - m Rp 20,000.00 Rp 7,420,000.00 Rp -
30 Kusen Pintu Kayu Lokal 7 21.00 21 Bh Rp 300,000.00 Rp 6,300,000.00 Rp 6,300,000.00
31 Kusen Jendela Kayu Lokal 7 28.00 28 Bh Rp 250,000.00 Rp 7,000,000.00 Rp 7,000,000.00
32 Daun Pintu Lapis Double Triplek 3 mm 7 21.00 21 Bh Rp 400,000.00 Rp 8,400,000.00 Rp 8,400,000.00
33 Daun Jendela Kaca 3 mm 7 28.00 28 Bh Rp 250,000.00 Rp 7,000,000.00 Rp 7,000,000.00
34 Kunci Pintu 7 21.00 21 Bh Rp 85,000.00 Rp 1,785,000.00 Rp 1,785,000.00
35 Engsel Pintu 7 21.00 21 Psg Rp 25,000.00 Rp 525,000.00 Rp 525,000.00
36 Engsel Jendela 7 28.00 28 Psg Rp 15,000.00 Rp 420,000.00 Rp 420,000.00
37 Grendel Jendela 7 28.00 28 Bh Rp 10,000.00 Rp 280,000.00 Rp 280,000.00
38 Haag Angin 7 56.00 56 Bh Rp 5,000.00 Rp 280,000.00 Rp 280,000.00
TOTAL BAHAN ( A ) Rp 279,300,000.00 Rp 54,652,500.00
B UPAH
1 Pekerja 7 560.00 119 OH Rp 80,000.00 Rp 44,800,000.00 Rp 9,520,000.00
2 Tukang 7 252.00 56 OH Rp 100,000.00 Rp 25,200,000.00 Rp 5,600,000.00
TOTAL UPAH ( B ) Rp 70,000,000.00 Rp 15,120,000.00
C ADMINISTRASI
1 ADMINISTRASI DAN PELAPORAN 7 7.00 - Bh Rp 100,000.00 Rp 700,000.00 Rp -
TOTAL ADMINISTRASI ( C ) Rp 700,000.00 Rp -
A BAHAN
1 Pasir urug 13 - - m3 Rp 78,000.00 Rp - Rp -
2 Tanah Urug 13 - - m3 Rp 67,000.00 Rp - Rp -
3 Batu Belah 13 172.00 183.00 m3 Rp 163,000.00 Rp 28,036,000.00 Rp 29,829,000.00
4 Pasir pasang 13 216.00 216.00 m3 Rp 145,000.00 Rp 31,320,000.00 Rp 31,320,000.00
5 Bata merah 13 55,700.00 25,200.00 bh Rp 750.00 Rp 41,775,000.00 Rp 18,900,000.00
6 Kerikil Pecah 1/2 13 56.00 56.00 m3 Rp 320,000.00 Rp 17,920,000.00 Rp 17,920,000.00
7 Semen portland 13 1,154.00 804.00 zak Rp 62,000.00 Rp 71,548,000.00 Rp 49,848,000.00
8 Paku 2" - 3" 13 127.00 127.00 kg Rp 20,000.00 Rp 2,540,000.00 Rp 2,540,000.00
9 Besi Ø 12 13 859.00 859.00 ljr Rp 120,000.00 Rp 103,080,000.00 Rp 103,080,000.00
10 Besi Ø 8 13 562.00 562.00 ljr Rp 54,000.00 Rp 30,348,000.00 Rp 30,348,000.00
11 Kawat bendrat 13 152.00 152.00 kg Rp 20,000.00 Rp 3,040,000.00 Rp 3,040,000.00
12 Kalsiboard 1200 x 2400 13 278.00 - lbr Rp 65,000.00 Rp 18,070,000.00 Rp -
13 Kalsi screw CE 13 8,270.00 - bh Rp 150.00 Rp 1,240,500.00 Rp -
14 Kalsi kompon IN-F @20 Kg 13 33.00 - kg Rp 25,000.00 Rp 825,000.00 Rp -
15 Kalsi tape 13 77.00 - kg Rp 20,000.00 Rp 1,540,000.00 Rp -
16 Air 13 - - ltr Rp 200.00 Rp - Rp -
17 Minyak Bekisting 13 - - ltr Rp 1,500.00 Rp - Rp -
18 Balok Kayu kelas III 13 17.31 12.91 m3 Rp 2,750,000.00 Rp 47,608,750.00 Rp 35,508,750.00
19 Papan Kayu Kls III 13 10.05 10.05 m3 Rp 2,750,000.00 Rp 27,637,500.00 Rp 27,637,500.00
20 Triplek 6 mm 13 55.00 55.00 lbr Rp 150,000.00 Rp 8,250,000.00 Rp 8,250,000.00
21 Steger Bambu (4 m) 13 165.00 165.00 btg Rp 5,000.00 Rp 825,000.00 Rp 825,000.00
22 C - 75, 0.75 13 4,181.00 - m Rp 14,250.00 Rp 59,579,250.00 Rp -
23 C - 75, 0.6 13 - - m Rp 12,500.00 Rp - Rp -
24 Baut (Srew driver) 13 22,370.00 - Bh Rp 200.00 Rp 4,474,000.00 Rp -
25 Dynabolt 13 1,224.00 - Bh Rp 5,000.00 Rp 6,120,000.00 Rp -
26 Reng 13 4,428.00 - m Rp 7,000.00 Rp 30,996,000.00 Rp -
27 Spandek 0,3 mm 13 1,847.00 - m Rp 40,000.00 Rp 73,880,000.00 Rp -
28 Bubungan Spandek 0,3 mm 13 155.00 - m Rp 25,000.00 Rp 3,875,000.00 Rp -
29 Kalsiplank 0,8 x 20 13 976.00 - m Rp 20,000.00 Rp 19,520,000.00 Rp -
30 Kusen Pintu Kayu Lokal 13 65.00 - Bh Rp 300,000.00 Rp 19,500,000.00 Rp -
31 Kusen Jendela Kayu Lokal 13 61.00 - Bh Rp 250,000.00 Rp 15,250,000.00 Rp -
32 Daun Pintu Lapis Double Triplek 3 mm 13 54.00 - Bh Rp 400,000.00 Rp 21,600,000.00 Rp -
33 Daun Jendela Kaca 3 mm 13 94.00 - Bh Rp 250,000.00 Rp 23,500,000.00 Rp -
34 Kunci Pintu 13 54.00 - Bh Rp 85,000.00 Rp 4,590,000.00 Rp -
35 Engsel Pintu 13 54.00 - Psg Rp 25,000.00 Rp 1,350,000.00 Rp -
36 Engsel Jendela 13 94.00 - Psg Rp 15,000.00 Rp 1,410,000.00 Rp -
37 Grendel Jendela 13 94.00 - Bh Rp 10,000.00 Rp 940,000.00 Rp -
38 Haag Angin 13 122.00 - Bh Rp 5,000.00 Rp 610,000.00 Rp -
TOTAL BAHAN ( A ) Rp 722,798,000.00 Rp 359,046,250.00
B UPAH
1 Pekerja 13 1,440.00 775.00 OH Rp 80,000.00 Rp 115,200,000.00 Rp 62,000,000.00
2 Tukang 13 648.00 324.00 OH Rp 100,000.00 Rp 64,800,000.00 Rp 32,400,000.00
TOTAL UPAH ( B ) Rp 180,000,000.00 Rp 94,400,000.00
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik Ketua
Menyetujui
PPK BPBD Kabupaten Lombok Utara
MUHADI, SH
NIP: 19680420 199303 1 016
TOTAL RENCANA PENGGUNAAN DANA TAHAP 2 RUMAH TYPE 36 RIKO
A BAHAN
1 Pasir urug 13 - - m3 Rp 78,000.00 Rp - Rp -
2 Tanah Urug 13 - - m3 Rp 67,000.00 Rp - Rp -
3 Batu Belah 13 172.00 - m3 Rp 163,000.00 Rp 28,036,000.00 Rp -
4 Pasir pasang 13 216.00 - m3 Rp 145,000.00 Rp 31,320,000.00 Rp -
5 Bata merah 13 55,700.00 30,500.00 bh Rp 750.00 Rp 41,775,000.00 Rp 22,875,000.00
6 Kerikil Pecah 1/2 13 56.00 - m3 Rp 320,000.00 Rp 17,920,000.00 Rp -
7 Semen portland 13 1,154.00 - zak Rp 62,000.00 Rp 71,548,000.00 Rp -
8 Paku 2" - 3" 13 127.00 - kg Rp 20,000.00 Rp 2,540,000.00 Rp -
9 Besi Ø 12 13 859.00 - ljr Rp 120,000.00 Rp 103,080,000.00 Rp -
10 Besi Ø 8 13 562.00 - ljr Rp 54,000.00 Rp 30,348,000.00 Rp -
11 Kawat bendrat 13 152.00 - kg Rp 20,000.00 Rp 3,040,000.00 Rp -
12 Kalsiboard 1200 x 2400 13 278.00 - lbr Rp 65,000.00 Rp 18,070,000.00 Rp -
13 Kalsi screw CE 13 8,270.00 - bh Rp 150.00 Rp 1,240,500.00 Rp -
14 Kalsi kompon IN-F @20 Kg 13 33.00 - kg Rp 25,000.00 Rp 825,000.00 Rp -
15 Kalsi tape 13 77.00 - kg Rp 20,000.00 Rp 1,540,000.00 Rp -
16 Air 13 - - ltr Rp 200.00 Rp - Rp -
17 Minyak Bekisting 13 - - ltr Rp 1,500.00 Rp - Rp -
18 Balok Kayu kelas III 13 17.31 - m3 Rp 2,750,000.00 Rp 47,608,750.00 Rp -
19 Papan Kayu Kls III 13 10.05 - m3 Rp 2,750,000.00 Rp 27,637,500.00 Rp -
20 Triplek 6 mm 13 55.00 - lbr Rp 150,000.00 Rp 8,250,000.00 Rp -
21 Steger Bambu (4 m) 13 165.00 - btg Rp 5,000.00 Rp 825,000.00 Rp -
22 C - 75, 0.75 13 4,181.00 4,181.00 m Rp 14,250.00 Rp 59,579,250.00 Rp 59,579,250.00
23 C - 75, 0.6 13 - - m Rp 12,500.00 Rp - Rp -
24 Baut (Srew driver) 13 22,370.00 22,370.00 Bh Rp 200.00 Rp 4,474,000.00 Rp 4,474,000.00
25 Dynabolt 13 1,224.00 1,224.00 Bh Rp 5,000.00 Rp 6,120,000.00 Rp 6,120,000.00
26 Reng 13 4,428.00 4,428.00 m Rp 7,000.00 Rp 30,996,000.00 Rp 30,996,000.00
27 Spandek 0,3 mm 13 1,847.00 1,847.00 m Rp 40,000.00 Rp 73,880,000.00 Rp 73,880,000.00
28 Bubungan Spandek 0,3 mm 13 155.00 155.00 m Rp 25,000.00 Rp 3,875,000.00 Rp 3,875,000.00
29 Kalsiplank 0,8 x 20 13 976.00 976.00 m Rp 20,000.00 Rp 19,520,000.00 Rp 19,520,000.00
30 Kusen Pintu Kayu Lokal 13 65.00 - Bh Rp 300,000.00 Rp 19,500,000.00 Rp -
31 Kusen Jendela Kayu Lokal 13 61.00 - Bh Rp 250,000.00 Rp 15,250,000.00 Rp -
32 Daun Pintu Lapis Double Triplek 3 mm 13 54.00 - Bh Rp 400,000.00 Rp 21,600,000.00 Rp -
33 Daun Jendela Kaca 3 mm 13 94.00 - Bh Rp 250,000.00 Rp 23,500,000.00 Rp -
34 Kunci Pintu 13 54.00 - Bh Rp 85,000.00 Rp 4,590,000.00 Rp -
35 Engsel Pintu 13 54.00 - Psg Rp 25,000.00 Rp 1,350,000.00 Rp -
36 Engsel Jendela 13 94.00 - Psg Rp 15,000.00 Rp 1,410,000.00 Rp -
37 Grendel Jendela 13 94.00 - Bh Rp 10,000.00 Rp 940,000.00 Rp -
38 Haag Angin 13 122.00 - Bh Rp 5,000.00 Rp 610,000.00 Rp -
TOTAL BAHAN ( A ) Rp 722,798,000.00 Rp 221,319,250.00
B UPAH
1 Pekerja 13 1,440.00 403.00 OH Rp 80,000.00 Rp 115,200,000.00 Rp 32,240,000.00
2 Tukang 13 648.00 180.00 OH Rp 100,000.00 Rp 64,800,000.00 Rp 18,000,000.00
TOTAL UPAH ( B ) Rp 180,000,000.00 Rp 50,240,000.00
C ADMINISTRASI DAN PELAPORAN
1 ADMINISTRASI DAN PELAPORAN THP I 13 13.00 Bh - Rp 1,844,000.00 Rp -
2 ADMINISTRASI DAN PELAPORAN THP II 13 13.00 13 Bh - #REF! #REF!
3 ADMINISTRASI DAN PELAPORAN THP III 13 13.00 - Bh - #REF! #REF!
TOTAL ADMINISTRASI ( C ) #REF! #REF!
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik Ketua
Menyetujui
PPK BPBD Kabupaten Lombok Utara
MUHADI, SH
NIP: 19680420 199303 1 016
TOTAL RENCANA PENGGUNAAN DANA TAHAP 3 RUMAH TYPE 36 RIKO
A BAHAN
1 Pasir urug 13 - - m3 Rp 78,000.00 Rp - Rp -
2 Tanah Urug 13 - - m3 Rp 67,000.00 Rp - Rp -
3 Batu Belah 13 172.00 (11.00) m3 Rp 163,000.00 Rp 28,036,000.00 -Rp 1,793,000.00
4 Pasir pasang 13 216.00 - m3 Rp 145,000.00 Rp 31,320,000.00 Rp -
5 Bata merah 13 55,700.00 - bh Rp 750.00 Rp 41,775,000.00 Rp -
6 Kerikil Pecah 1/2 13 56.00 - m3 Rp 320,000.00 Rp 17,920,000.00 Rp -
7 Semen portland 13 1,154.00 350.00 zak Rp 62,000.00 Rp 71,548,000.00 Rp 21,700,000.00
8 Paku 2" - 3" 13 127.00 - kg Rp 20,000.00 Rp 2,540,000.00 Rp -
9 Besi Ø 12 13 859.00 - ljr Rp 120,000.00 Rp 103,080,000.00 Rp -
10 Besi Ø 8 13 562.00 - ljr Rp 54,000.00 Rp 30,348,000.00 Rp -
11 Kawat bendrat 13 152.00 - kg Rp 20,000.00 Rp 3,040,000.00 Rp -
12 Kalsiboard 1200 x 2400 13 278.00 278.00 lbr Rp 65,000.00 Rp 18,070,000.00 Rp 18,070,000.00
13 Kalsi screw CE 13 8,270.00 8,270.00 bh Rp 150.00 Rp 1,240,500.00 Rp 1,240,500.00
14 Kalsi kompon IN-F @20 Kg 13 33.00 33.00 kg Rp 25,000.00 Rp 825,000.00 Rp 825,000.00
15 Kalsi tape 13 77.00 77.00 kg Rp 20,000.00 Rp 1,540,000.00 Rp 1,540,000.00
16 Air 13 - - ltr Rp 200.00 Rp - Rp -
17 Minyak Bekisting 13 - - ltr Rp 1,500.00 Rp - Rp -
18 Balok Kayu kelas III 13 17.31 4.40 m3 Rp 2,750,000.00 Rp 47,608,750.00 Rp 12,100,000.00
19 Papan Kayu Kls III 13 10.05 - m3 Rp 2,750,000.00 Rp 27,637,500.00 Rp -
20 Triplek 6 mm 13 55.00 - lbr Rp 150,000.00 Rp 8,250,000.00 Rp -
21 Steger Bambu (4 m) 13 165.00 - btg Rp 5,000.00 Rp 825,000.00 Rp -
22 C - 75, 0.75 13 4,181.00 - m Rp 14,250.00 Rp 59,579,250.00 Rp -
23 C - 75, 0.6 13 - - m Rp 12,500.00 Rp - Rp -
24 Baut (Srew driver) 13 22,370.00 - Bh Rp 200.00 Rp 4,474,000.00 Rp -
25 Dynabolt 13 1,224.00 - Bh Rp 5,000.00 Rp 6,120,000.00 Rp -
26 Reng 13 4,428.00 - m Rp 7,000.00 Rp 30,996,000.00 Rp -
27 Spandek 0,3 mm 13 1,847.00 - m Rp 40,000.00 Rp 73,880,000.00 Rp -
28 Bubungan Spandek 0,3 mm 13 155.00 - m Rp 25,000.00 Rp 3,875,000.00 Rp -
29 Kalsiplank 0,8 x 20 13 976.00 - m Rp 20,000.00 Rp 19,520,000.00 Rp -
30 Kusen Pintu Kayu Lokal 13 65.00 65.00 Bh Rp 300,000.00 Rp 19,500,000.00 Rp 19,500,000.00
31 Kusen Jendela Kayu Lokal 13 61.00 61.00 Bh Rp 250,000.00 Rp 15,250,000.00 Rp 15,250,000.00
32 Daun Pintu Lapis Double Triplek 3 mm 13 54.00 54.00 Bh Rp 400,000.00 Rp 21,600,000.00 Rp 21,600,000.00
33 Daun Jendela Kaca 3 mm 13 94.00 94.00 Bh Rp 250,000.00 Rp 23,500,000.00 Rp 23,500,000.00
34 Kunci Pintu 13 54.00 54.00 Bh Rp 85,000.00 Rp 4,590,000.00 Rp 4,590,000.00
35 Engsel Pintu 13 54.00 54.00 Psg Rp 25,000.00 Rp 1,350,000.00 Rp 1,350,000.00
36 Engsel Jendela 13 94.00 94.00 Psg Rp 15,000.00 Rp 1,410,000.00 Rp 1,410,000.00
37 Grendel Jendela 13 94.00 94.00 Bh Rp 10,000.00 Rp 940,000.00 Rp 940,000.00
38 Haag Angin 13 122.00 122.00 Bh Rp 5,000.00 Rp 610,000.00 Rp 610,000.00
TOTAL BAHAN ( A ) Rp 722,798,000.00 Rp 142,432,500.00
B UPAH
1 Pekerja 13 1,440.00 262.00 OH Rp 80,000.00 Rp 115,200,000.00 Rp 20,960,000.00
2 Tukang 13 648.00 144.00 OH Rp 100,000.00 Rp 64,800,000.00 Rp 14,400,000.00
TOTAL UPAH ( B ) Rp 180,000,000.00 Rp 35,360,000.00
C ADMINISTRASI DAN PELAPORAN
1 ADMINISTRASI DAN PELAPORAN THP I 13 13.00 - Bh - Rp 1,844,000.00 Rp -
2 ADMINISTRASI DAN PELAPORAN THP II 13 13.00 - Bh - #REF! #REF!
3 ADMINISTRASI DAN PELAPORAN THP III 13 13.00 13 Bh - #REF! #REF!
TOTAL ADMINISTRASI ( C ) #REF! #REF!
( ………………………………………... ) ( ………………………………………... )
Fasilitator Teknik Ketua
Menyetujui
PPK BPBD Kabupaten Lombok Utara
MUHADI, SH
NIP: 19680420 199303 1 016
HARGA BAHAN DAN MATERIAL
DUSUN SULIN, DESA LABULIA, KEC. JONGGAT
Rp 652,000.00 Rp 1,304,000.00
Rp 652,500.00 Rp 1,957,500.00
Rp 750,000.00 Rp 5,250,000.00
Rp 1,440,000.00 Rp 1,440,000.00
Rp 62,000.00 Rp 3,100,000.00
Rp 20,000.00 Rp 60,000.00
Rp 120,000.00 Rp 5,760,000.00
Rp 54,000.00 Rp 2,052,000.00
Rp 20,000.00 Rp 60,000.00
Rp 20,000.00 Rp 80,000.00
Rp 35,000.00 Rp 700,000.00