Anda di halaman 1dari 3

PROGRES PEMOMPAAN SUMP A2 TIMUR 334,466.

02
Vol Water From Rain Proses Pemompaan Sump A2 Timur D Volume Air Sump
Plan Actual Plan Actual A Plan Actual
Tanggal Keterangan
Volume Jumlah HM Volume Jumlah HM c
Int Rain Vol In Int Rain Vol In Volume Elv Volume Elv
Pemompaan Pompa Pompa Pemompaan Pompa Pompa t
1-May-22 3.88 2,770 - - 12,000 1 20 10,071 0 201,086 m3 25.00 50,365 m3 19.1 Can't Pumping (MUD)
2-May-22 6.00 4,289 - - 12,000 1 20 (6,614) 0 193,376 m3 24.10 56,979 m3 19.3 Can't Pumping (MUD)
3-May-22 13.50 9,651 - - 12,000 1 20 9,763 1 6 191,026 m3 23.90 47,215 m3 19.0 Running Shift 2 ; Shift 1, Mud
4-May-22 1.88 1,340 - - 12,000 1 20 (9,763) 1 9 180,367 m3 23.2 56,979 m3 19.3 Running Shift 1 ; Shift 2, Mud
5-May-22 24.00 17,157 - - 12,000 1 20 21,307 0 185,524 m3 23.5 35,671 m3 18.6 Can't Pumping (MUD)
6-May-22 8.50 6,076 - - 12,000 1 20 - 1 9 179,600 m3 23.2 35,671 m3 18.6 Running Shift 2 ; Shift 1, Mud
7-May-22 3.00 2,145 10 7,149 12,000 1 20 - 1 14 169,745 m3 22.8 35,671 m3 18.6 Running : 7156
8-May-22 10.00 7,149 1 715 12,000 1 20 - 0 164,893 m3 22.5 35,671 m3 18.6 Can't Pumping (MUD)
9-May-22 12.88 9,204 12 8,578 12,000 1 20 (5,564) 0 162,097 m3 22.4 41,235 m3 18.8 Can't Pumping (MUD)
10-May-22 2.88 2,055 - - 12,000 1 20 #VALUE! 152,152 m3 22.1
11-May-22 3.50 2,502 - - 12,000 1 20 #VALUE! 142,654 m3 21.7
12-May-22 3.75 2,681 - - 12,000 1 20 #VALUE! 133,335 m3 21.4
13-May-22 5.38 3,842 - - 12,000 1 20 #VALUE! 125,178 m3 21.2
14-May-22 4.38 3,128 - - 12,000 1 20 #VALUE! 116,305 m3 20.9
15-May-22 20.63 14,744 - - 12,000 1 20 #VALUE! 119,049 m3 21.0
16-May-22 3.88 2,770 - - 12,000 1 20 #VALUE! 109,820 m3 21.0
17-May-22 10.88 7,774 - - 12,000 1 20 #VALUE! 105,594 m3 20.6
18-May-22 8.25 5,898 - - 12,000 1 20 #VALUE! 99,491 m3 20.4
19-May-22 8.00 5,719 - - 12,000 1 20 #VALUE! 93,210 m3 20.30
20-May-22 4.00 2,859 - - 12,000 1 20 #VALUE! 84,070 m3 20.00
21-May-22 19.25 13,761 - - 12,000 1 20 #VALUE! 85,831 m3 20.10
22-May-22 7.75 5,540 - - 12,000 1 20 #VALUE! 79,371 m3 19.90
23-May-22 10.50 7,506 - - 12,000 1 20 #VALUE! 74,877 m3 19.80
24-May-22 4.88 3,485 - - 12,000 1 20 #VALUE! 66,362 m3 19.60
25-May-22 3.38 2,413 - - 12,000 1 20 #VALUE! 56,775 m3 19.30
26-May-22 3.88 2,770 - - 12,000 1 20 #VALUE! 47,545 m3 19.00
27-May-22 3.88 2,770 - - 12,000 1 20 #VALUE! 38,315 m3 18.70
28-May-22 5.13 3,664 - - 12,000 1 20 #VALUE! 29,979 m3 18.40
29-May-22 1.00 715 - - 12,000 1 20 #VALUE! 18,694 m3 17.80
30-May-22 22.88 16,353 - - 12,000 1 20 #VALUE! 23,047 m3 18.10
31-May-22 14.88 10,634 - - 12,000 1 20 #VALUE! 21,680 m3 18.00
TOTAL 249 193,659 23 16,442 660 32 #VALUE!

Grafik Volume Air SUMP A2 Timur SIMULASI PEMOMPAAN SUMP A2 TIMUR


250,000 m3

Vol Water withRain Vol Water withRain Vol Water Pumping Vol Water Pumping Remain Vol Water Into
201,086 m3
200,000 m3 193,376 191,026
m3 m3
185,524 m3 Date (Estimation) (Actual) (Plan) (Actual) SUMP A2 Timur (m³)
180,367 m3 179,600 m3
169,745 164,893
m3 m3
162,097 m3
Int Rain Vol In Int Rain Vol In Vol Pumping Line Vol Pumping Line Volume Elv
152,152 m3 19.1
142,654 m3 1-May-22 3.88 2,770 0 - 12,000 1 Line 10,071 0 line 50,365
150,000 m3 133,335 m3
125,178 m3 2-May-22 6.00 4,289 0 - 12,000 1 Line - 6,614 0 line 56,979 19.3
116,305 119,049
m3 m3
109,820 105,594
m3 m3 3-May-22 13.50 9,651 0 - 12,000 1 Line 9,763 0 line 47,215 19
99,491 m3
93,210 m3
100,000 m3 84,070 85,831
m3 m3 4-May-22 1.88 1,340 0 - 12,000 1 Line - 9,763 0 line 56,979 19.3
79,371 m3
74,877 m3
56,979 m3 66,362 m3 5-May-22 24.00 17,157 0 - 12,000 1 Line 21,307 0 line 35,671 18.6
50,365
56,979
m3
m3 56,775 0 m3
m3
47,215 m3
35,671 m3 41,235 m3
47,545 m3 6-May-22 8.50 6,076 0 - 12,000 1 Line - 0 line 35,671 18.6
50,000 m3 35,671 m3 35,671 m3 35,671 m3 38,315 m3
29,979 m3 7-May-22 3.00 2,145 0 - 12,000 1 Line - 0 line 35,671 18.6
18,694 23,04721,680
m3 m3 m3
0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 8-May-22 10.00 7,149 0 - 12,000 1 Line - 0 line 35,671 18.6
0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3
m3
0 m3 9-May-22 12.88 9,204 0 - 12,000 1 Line - 5,564 0 line 41,235 18.8
10-May-22 2.88 2,055 0 - 12,000 1 Line #VALUE! 0 line 0
11-May-22 3.50 2,502 0 - 12,000 1 Line #VALUE! 0 line 0
Actual Plan 12-May-22 3.75 2,681 0 - 12,000 1 Line #VALUE! 0 line 0
13-May-22 5.38 3,842 0 - 12,000 1 Line #VALUE! 0 line 0
14-May-22 4.38 3,128 0 - 12,000 1 Line #VALUE! 0 line 0
Grafik HM Pompa SUMP A2 Timur 15-May-22 20.63 14,744 0 - 12,000 1 Line #VALUE! 0 line 0
100 1
16-May-22 3.88 2,770 0 - 12,000 1 Line #VALUE! 0 line 0
90 17-May-22 10.88 7,774 0 - 12,000 1 Line #VALUE! 0 line 0
1 18-May-22 8.25 5,898 0 - 12,000 1 Line #VALUE! 0 line 0
80
19-May-22 8.00 5,719 0 - 12,000 1 Line #VALUE! 0 line 0
70 20-May-22 4.00 2,859 0 - 12,000 1 Line #VALUE! 0 line 0
1
21-May-22 19.25 13,761 0 - 12,000 1 Line #VALUE! 0 line 0
60
22-May-22 7.75 5,540 0 - 12,000 1 Line #VALUE! 0 line 0
50 1 23-May-22 10.50 7,506 0 - 12,000 1 Line #VALUE! 0 line 0
24-May-22 4.88 3,485 0 - 12,000 1 Line #VALUE! 0 line 0
40 25-May-22 3.38 2,413 0 - 12,000 1 Line #VALUE! 0 line 0
0 26-May-22 3.88 2,770 0 - 12,000 1 Line #VALUE! 0 line 0
30
27-May-22 3.88 2,770 0 - 12,000 1 Line #VALUE! 0 line 0
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
20
14 28-May-22 5.13 3,664 0 - 12,000 1 Line #VALUE! 0 line 0
0
9 9 29-May-22 1.00 715 0 - 12,000 1 Line #VALUE! 0 line 0
10 6
30-May-22 22.88 16,353 0 - 12,000 1 Line #VALUE! 0 line 0
0 0 31-May-22 14.88 10,634 0 12,000 1 line #VALUE! 0 line 0
257 183,364 - - 372,000 1 Line

Actual Plan Jumlah Pompa


PROGRES PEMOMPAAN SUMP A5 CENTRAL 334,466.02 193,482.07
Vol Water From Rain Proses Pemompaan Sump A5 Central D Volume Air Sump
Plan Actual Plan Actual A Plan Actual
c
Tanggal Keterangan
Volume Jumlah HM Volume Jumlah HM t
Int Rain Vol In Int Rain Vol In Volume Elv Volume Elv
Pemompaan Pompa Pompa Pemompaan Pompa Pompa u
a
1-May-22 3.88 6,935 - - 56,000 4 80 (12,627) 0 0 580,228 m3 -59.4 592,856 m3 -59.3 Line HDPE Broken
2-May-22 6.00 10,737 - - 56,000 4 80 12,627 0 0 534,966 m3 -59.8 580,228 m3 -59.4 Line HDPE Broken
3-May-22 13.50 24,159 - - 56,000 4 80 (12,627) 0 0 503,125 m3 -60 592,856 m3 -59.3 Line HDPE Broken
4-May-22 1.88 3,355 - - 56,000 4 80 12,627 0 0 450,480 m3 -60.5 580,228 m3 -59.4 Line HDPE Broken
5-May-22 24.00 42,949 - - 56,000 4 80 (12,627) 0 0 437,430 m3 -60.6 592,856 m3 -59.3 Line HDPE Broken
6-May-22 8.50 15,211 - - 56,000 4 80 12,627 2 28 396,641 m3 -61 580,228 m3 -59.4 Running : 7170,7171 ; Wait Instal HDPE : 7122,7123,7124
7-May-22 3.00 5,369 10 17,896 56,000 4 80 24,917 2 46 346,009 m3 -61.4 555,312 m3 -59.6 Running : 7170,7171 ; Wait Instal HDPE : 7122,7123,7124
8-May-22 10.00 17,896 1 1,790 56,000 4 80 36,543 2 48 307,905 m3 -61.8 518,769 m3 -59.9 Running : 7170,7171 ; Wait Instal HDPE : 7122,7123,7124
9-May-22 12.88 23,041 12 21,475 56,000 4 80 11,982 2 20 274,946 m3 -61.9 506,787 m3 -60.0 Running : 7170,7171 ; Wait Instal HDPE : 7122,7123,7124
10-May-22 2.88 5,145 - - 56,000 4 80 (73,442) 224,091 m3 -62.8 580,228 m3 -59.4
11-May-22 3.50 6,263 - - 56,000 4 80 - 174,354 m3 -63.6 580,228 m3 -59.4
12-May-22 3.75 6,711 - - 56,000 4 80 - 125,065 m3 -64.6 580,228 m3 -59.4
13-May-22 5.38 9,619 - - 56,000 4 80 - 78,684 m3 -65.8 580,228 m3 -59.4
14-May-22 4.38 7,829 - - 56,000 4 80 - 30,513 m3 -67.5 580,228 m3 -59.4
15-May-22 20.63 36,910 - - 56,000 4 80 - 11,423 m3 -68.7 580,228 m3 -59.4
16-May-22 3.88 6,935 - - 14,000 1 20 - 4,357 m3 -69.4 580,228 m3 -59.4
17-May-22 10.88 19,461 - - 14,000 1 20 - 9,819 m3 -68.9 580,228 m3 -59.4
18-May-22 8.25 14,764 - - 28,000 2 40 - -3,417 m3 -69.8 580,228 m3 -59.4
19-May-22 8.00 14,316 - - 14,000 1 20 - -3,101 m3 -69.8 580,228 m3 -59.4
20-May-22 4.00 7,158 - - - 0 0 - 4,057 m3 -69.4 580,228 m3 -59.4
21-May-22 19.25 34,449 - - 42,000 3 60 - -3,494 m3 -69.8 580,228 m3 -59.4
22-May-22 7.75 13,869 - - 14,000 1 20 - -3,624 m3 -69.8 580,228 m3 -59.4
23-May-22 10.50 18,790 - - 28,000 2 40 - 1,166 m3 -69.8 580,228 m3 -59.4
24-May-22 4.88 8,724 - - 14,000 1 20 - 9,890 m3 -68.9 580,228 m3 -59.4
25-May-22 3.38 6,040 - - 14,000 1 20 - 1,930 m3 -69.8 580,228 m3 -59.4
26-May-22 3.88 6,935 - - - 0 0 - 8,864 m3 -69 580,228 m3 -59.4
27-May-22 3.88 6,935 - - 14,000 1 20 - 1,799 m3 -69 580,228 m3 -59.4
28-May-22 5.13 9,171 - - 14,000 1 20 - 10,970 m3 -69.8 580,228 m3 -59.4
29-May-22 1.00 1,790 - - - 0 0 - -1,240 m3 -69.8 580,228 m3 -59.4
30-May-22 22.88 40,936 - - 42,000 3 60 - -2,304 m3 -69.8 580,228 m3 -59.4
31-May-22 14.88 26,620 - - 28,000 2 40 - -3,684 m3 -69.8 580,228 m3 -59.4
TOTAL 247 442,315 34 60,845 1680 203 0 m3

Grafik Volume Air SUMP A5 Central 580,228 m3


650,000 m3 580,228 m3
SIMULASI PEMOMPAAN SUMP A5 CENTRAL
592,856 m3 592,856 m3
580,228 592,856
m3 m3
580,228 m3 580,228 m3 580,228 m3 580,228 580,228
m3 m3
580,228
580,228 m3 m3 580,228 m3 580,228 580,228 580,228
m3 m3 m3 580,228 580,228
m3 m3 580,228 580,228
m3 580,228 m3
m3 580,228 m3 580,228 580,228
m3 580,228
m3 580,228
m3 580,228
m3 m3
600,000 m3 555,312 m3 580,228 m3 Vol Water withRain Vol Water withRain Vol Water Pumping Vol Water Pumping Remain Vol Water Into
534,966 m3
550,000 m3 518,769 506,787
m3 m3 (Estimation) (Actual) (Plan) (Actual) SUMP A5 Barat (m³)
503,125 m3 Date
500,000 m3
450,480 m3
437,430 m3 Int Rain Vol In Int Rain Vol In Vol Pumping Line Vol Pumping Line Volume Elv
450,000 m3
396,641 m3 1-May-22 3.88 34,486 0 - 56,000 4 line - 12,627 2 line 592,856 -59.3
400,000 m3
346,009 m3 2-May-22 6.00 24,116 0 - 56,000 4 line 12,627 2 line 580,228 -59.4
350,000 m3 307,905 m3
274,946 m3 3-May-22 13.50 31,592 0 - 56,000 4 line - 12,627 3 line 592,856 -59.3
300,000 m3
250,000 m3 224,091 m3 4-May-22 1.88 10,129 0 - 56,000 12,627 3 line 580,228 -59.4
174,354 m3 5-May-22 24.00 25,081 0 - 56,000 4 line - 12,627 3 line 592,856 -59.3
200,000 m3
150,000 m3 125,065 m3 6-May-22 8.50 28,216 0 - 56,000 4 line 12,627 3 line 580,228 -59.4
100,000 m3 78,684 m3 7-May-22 3.00 10,852 0 - 56,000 4 line 24,917 3 line 555,312 -59.6
50,000 m3 30,513 m3 8-May-22 10.00 12,781 0 - 56,000 4 line 36,543 3 line 518,769 -59.9
11,423 m3
4,357 m39,819 m3 4,057 m3 1,166 m39,890 m31,930 m38,864 m31,799 10,970
m3 m3
0 m3 9-May-22 12.88 965 0 - 56,000 4 line 11,982 3 line 506,787 -60
10-May-22 2.88 40,032 0 - 56,000 4 line - 73,442 3 line 580,228 -59.4
11-May-22 3.50 50,643 0 - 56,000 4 line - 3 line 580,228 -59.4
Actual Plan 12-May-22 3.75 18,810 0 - 56,000 4 line - 3 line 580,228 -59.4
13-May-22 5.38 9,646 0 - 56,000 4 line - 3 line 580,228 -59.4
14-May-22 4.38 25,563 0 - 56,000 4 line - 3 line 580,228 -59.4
100
Grafik HM Pompa SUMP A5 Central 2.5
15-May-22 20.63 29,663 0 - 56,000 4 line - 3 line 580,228 -59.4
16-May-22 3.88 27,251 0 - 14,000 1 line - 3 line 580,228 -59.4
90 17-May-22 10.88 28,216 0 - 14,000 1 line - 3 line 580,228 -59.4
80 80 80 80 80 80 80 80 80 80 80 80 80 80 80 18-May-22 8.25 9,646 0 - 28,000 2 line - 3 line 580,228 -59.4
80 2
19-May-22 8.00 1,206 0 - 14,000 1 line - 3 line 580,228 -59.4
70 20-May-22 4.00 24,598 0 - - 0 line - 3 line 580,228 -59.4
60 60
60 1.5 21-May-22 19.25 10,611 0 - 42,000 3 line - 3 line 580,228 -59.4
48 22-May-22 7.75 25,081 0 - 14,000 1 line - 3 line 580,228 -59.4
50 46
23-May-22 10.50 67,525 0 - 14,000 1 line - 3 line 580,228 -59.4
40 40 40
40 1 24-May-22 4.88 24,116 0 - - 0 line - 3 line 580,228 -59.4
28 25-May-22 3.38 7,958 0 - 14,000 1 line - 3 line 580,228 -59.4
30
20 20 20 20 20 20 20 20 20 26-May-22 3.88 24,598 0 - - 0 line - 3 line 580,228 -59.4
20 0.5 27-May-22 3.88 22,669 0 - 14,000 1 line - 3 line 580,228 -59.4
28-May-22 5.13 41,238 0 - - 0 line - 3 line 580,228 -59.4
10
0 0 0 0 0 0 0 0 29-May-22 1.00 29,421 0 - 14,000 1 line - 3 line 580,228 -59.4
0 0 30-May-22 22.88 0 42,000 3 line - 580,228 -59.4
31-May-22 14.88 965 0 - 28,000 2 line - 3 line 580,228 -59.4
Actual Plan Jumlah Pompa 257 572,270 - - 812,000 3 Line 12,627
Note : Volume Sump A5 Central sudah termasuk volume air dan mud Sump A5 Barat
PROGRES PEMOMPAAN SUMP A5 TIMUR (EAST)
Vol Water From Rain Proses Pemompaan Sump A5 Timur D Volume Air Sump
Plan Actual Plan Actual A Plan Actual
Tanggal Keterangan
Volume Jumlah HM Volume Jumlah HM c
Int Rain Vol In Int Rain Vol In Volume Elv Volume Elv
Pemompaan Pompa Pompa Pemompaan Pompa Pompa t
1-May-22 7.05 6,619 - - 14,000 1 20 0 m3 0 0 172,236 m3 -48.1 159,074 m3 -48.7 Can't Pumping (MUD)
2-May-22 15.13 14,200 - - 14,000 1 20 0 m3 0 0 162,911 m3 -48.6 159,074 m3 -48.7 Can't Pumping (MUD)
3-May-22 3.81 3,578 - - 14,000 1 20 -2,137 m3 0 0 159,430 m3 -48.7 161,211 m3 -48.6 Can't Pumping (MUD)
4-May-22 19.27 15,014 - - 14,000 1 20 4,253 m3 0 0 146,890 m3 -49.3 156,957 m3 -48.8 Can't Pumping (MUD)
5-May-22 13.48 10,499 - - 14,000 1 20 -6,411 m3 0 0 151,590 m3 -49.1 163,369 m3 -48.5 Can't Pumping (MUD)
6-May-22 17.65 13,754 - - 14,000 1 20 0 m3 0 0 144,212 m3 -49.4 163,369 m3 -48.5 Can't Pumping (MUD)
7-May-22 5.66 4,410 10.00 7,791 14,000 1 20 -2,181 m3 0 0 132,549 m3 -50 165,550 m3 -48.4 Can't Pumping (MUD)
8-May-22 14.01 10,919 1.00 779 14,000 1 20 0 m3 0 0 126,341 m3 -50.4 165,550 m3 -48.4 Can't Pumping (MUD)
9-May-22 15.77 12,284 12.00 9,350 14,000 1 20 6,476 m3 1 1 122,372 m3 -50.6 159,074 m3 -48.7 Running : 7121
10-May-22 6.06 4,725 - - 14,000 1 20 #VALUE! 110,612 m3 -51.3
11-May-22 7.14 5,565 - - 14,000 1 20 #VALUE! 99,339 m3 -52.0
12-May-22 0.54 420 - - 14,000 1 20 #VALUE! 88,261 m3 -52.5
13-May-22 22.37 17,429 - - 14,000 1 20 #VALUE! 78,449 m3 -53.0
14-May-22 28.30 22,049 - - 14,000 1 20 #VALUE! 67,857 m3 -53.6
15-May-22 10.51 8,190 - - 14,000 1 20 #VALUE! 69,927 m3 -53.4
16-May-22 5.39 4,200 - - 14,000 1 20 #VALUE! 58,946 m3 -54.1
17-May-22 14.28 11,129 - - 14,000 1 20 #VALUE! 53,419 m3 -54.4
18-May-22 16.58 12,914 - - 14,000 1 20 #VALUE! 45,847 m3 -55.1
19-May-22 15.23 11,864 - - 14,000 1 20 #VALUE! 38,080 m3 -55.7
20-May-22 15.77 12,284 - - 14,000 1 20 #VALUE! 27,196 m3 -57.2
21-May-22 5.39 4,200 - - 14,000 1 20 #VALUE! 28,195 m3 -57
22-May-22 0.67 525 - - 14,000 1 20 #VALUE! 20,233 m3 -58.6
23-May-22 13.75 10,709 - - 14,000 1 20 #VALUE! 14,414 m3 -59.9
24-May-22 5.93 4,620 - - 14,000 1 20 #VALUE! 4,212 m3 -62.9
25-May-22 14.01 10,919 - - 14,000 1 20 #VALUE! 6,842 m3 -62
26-May-22 37.73 29,399 - - 14,000 1 20 #VALUE! 9,861 m3 -61.6
27-May-22 13.48 10,499 - - 14,000 1 20 #VALUE! -1,120 m3 -65.9
28-May-22 4.45 3,465 - - 14,000 1 20 #VALUE! 2,873 m3 -63.7
29-May-22 13.75 10,709 - - 14,000 1 20 #VALUE! 3,652 m3 -63.4
30-May-22 12.67 9,869 - - 14,000 1 20 #VALUE! 7,475 m3 -61.8
31-May-22 23.04 17,954 - - 14,000 1 20 #VALUE! 5,064 m3 -62.7
TOTAL 390 303,750 68 52,981 660 36 0 m3

Grafik Volume Air Sump A5 (East) SIMULASI PEMOMPAAN SUMP A5 TIMUR


200,000 m3
172,236 m3
Vol Water withRain Vol Water withRain Vol Water Pumping Vol Water Pumping Remain Vol Water + Mud
m3162,911
159,074 159,074 m3 m3 m3
161,211
m3159,430 163,369 165,550
m3 165,550
m3 m3
159,074 m3 Date (Estimation) (Actual) (Plan) (Actual) Into SUMP A5 Timur (m³)
156,957 163,369
m3 m3 m3
151,590
146,890 m3 144,212 m3 Int Rain Vol In Int Rain Vol In Vol Pumping Line Vol Pumping Line Volume Elv
150,000 m3
132,549 m3 1-May-22 3.88 3,019 - - 14,000 1 line - 1 line 159,074 -48.7
126,341 122,372
m3 m3
110,612 m3 2-May-22 6.00 4,675 - - 14,000 1 line - 1 line 159,074 -48.7
99,339 m3 3-May-22 13.50 10,518 - - 14,000 1 line - 2,137 1 line 161,211 -48.6
100,000 m3 88,261 m3
78,449 m3 4-May-22 1.88 1,461 - - 14,000 1 line 4,253 1 line 156,957 -48.8
67,857 69,927
m3 m3 5-May-22 24.00 18,699 - - 14,000 1 line - 6,411 1 line 163,369 -48.5
58,946 m3
53,419 m3 6-May-22 8.50 6,623 - - 14,000 1 line - 1 line 163,369 -48.5
50,000 m3
45,847 m3
38,080 m3
0 m3
7-May-22 3.00 2,337 - - 14,000 1 line - 2,181 1 line 165,550 -48.4
27,196 28,195
m3 m3
20,233 m3 8-May-22 10.00 7,791 - - 14,000 1 line - 1 line 165,550 -48.4
14,414 m3
9,861 m3
0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 0 m3 4,212 0 m3m3
6,842 m3
0 2,873
m3 3,652
0m3 m3
7,475 5,064
m3 m3
0m3 m3 0 m3 9-May-22 12.88 10,031 - - 14,000 1 line 6,476 1 line 159,074 -48.7
0 m3 0 m3
0 m3 0 m3 0 m3 10-May-22 2.88 2,240 - - 14,000 1 line #VALUE! 0 line 0
11-May-22 3.50 2,727 - - 14,000 1 line #VALUE! 0 line 0

Actual Plan 12-May-22


13-May-22
3.75
5.38
2,922
4,188
-
-
-
-
14,000
14,000
1 line
1 line
#VALUE!
#VALUE!
1 line
1 line
0
0
14-May-22 4.38 3,409 - - 14,000 1 line #VALUE! 1 line 0
15-May-22 20.63 16,070 - - 14,000 1 line #VALUE! 1 line 0
100
Grafik HM Pompa Sump A5 (East) 1 16-May-22 3.88 3,019 - - 14,000 1 line #VALUE! 1 line 0
17-May-22 10.88 8,473 - - 14,000 1 line #VALUE! 1 line 0
90 18-May-22 8.25 6,428 - - 14,000 1 line #VALUE! 1 line 0
1 19-May-22 8.00 6,233 - - 14,000 1 line #VALUE! 1 line 0
80
20-May-22 4.00 3,117 - - 14,000 1 line #VALUE! 1 line 0
70 21-May-22 19.25 14,998 - - 14,000 1 line #VALUE! 1 line 0
1
60 22-May-22 7.75 6,038 - - 14,000 1 line #VALUE! 0 line 0
23-May-22 10.50 8,181 - - 14,000 1 line #VALUE! 0 line 0
50 1 24-May-22 4.88 3,798 - - 14,000 1 line #VALUE! 0 line 0

40 25-May-22 3.38 2,630 - - 14,000 1 line #VALUE! 1 line 0

0
26-May-22 3.88 3,019 - - 14,000 1 line #VALUE! 1 line 0
30 27-May-22 3.88 3,019 - - 14,000 1 line #VALUE! 1 line 0
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 28-May-22 5.13 3,993 - - 14,000 1 line #VALUE! 1 line 0
20
0 29-May-22 1.00 779 - - 14,000 1 line #VALUE! 1 line 0
10 30-May-22 22.88 17,823 - - #VALUE! 0
0 0 0 0 0 0 0 0 1 31-May-22 14.88 11,590 - - 14,000 1 line #VALUE! 0
0 0
TOTAL 257 199,847 420,000 1 Line

Actual Plan Jumlah Pompa