Bill Of Quantity (Boq)

Pengadaan Peralatan Kandang Ayam Al-Ma'arif


Kecamatan Baradatu Kabupaten Way Kanan

NO ITEM PEKERJAAN QTY TOTAL

I PEKERJAAN PERSIAPAN
1 Mobilisasi 1 Ls 13.165.098
JUMLAH I 13.165.098
II PENGADAAN PERALATAN
1 Cone Fan Butterfly Punos 50’’ (3 Phase) Siemens 8 Roll 53.360.000
2 Kabel Eterna Uk.3 X 2,5 Mm @50 Mtr 8 Pcs 7.135.336
3 Collingpad Punos Uk.150 X 60 X 15 Cm 60 Btg 24.495.000
4 Gutter Atas 12 Btg 6.555.000
5 Gutter Bawah 12 Btg 6.555.000
6 Gutter Samping 8 Unit 2.530.000
7 Regulator Nipple 4 Set 1.610.000
8 Super Feeder Punos 600 Btg 17.043.000

9 Paket Pipa Pvc Wavin Uk.3/4’’ + Nipple Punos : 16 Pcs 150 Unit 20.700.000

Paket Box Panel 4 Kipas + Climate Punos 207 (1 Suhu) +


10 2 Roll 27.260.750
Heater + Collingpad
11 Terpal Korea @A12 Diamond 4 Roll 8.901.000
12 Terpal Korea @A8 Diamond 5 Roll 9.573.750
13 Terpal Korea @A5 Diamond 5 Pcs 7.762.500
14 Lampu Philips 8 Watt 120 Pcs 5.261.250
15 Fitting Gantung Broco Hitam 120 Roll 2.045.160
16 Kabel Eterna Lampu Penerangan Uk. 2 X 1,5 Mm @50 Mtr 7 Unit 3.380.195
17 Pompa Shi 250 Bit 2 Unit 3.625.375
18 Dosatron D25Re 2% 1 Unit 6.037.500
19 Heater Solar Riscstar @60 Kw (Estimasi Ready : Tgl 11 Nov) 3 Pcs 18.112.500
20 Klem Seling 5 Mm 128 Mtr 250.240
21 Kawat Seling 5 Mm 380 Pcs 2.840.500
22 Pulley Nylon 7/8’’ 116 Pcs 727.030
23 Pulley Besi 3 ½’’ 12 Unit 952.200
24 Handwinch 2.500 Lbs 4 Kg 2.070.000
25 Tali Nylon 4 Pcs 299.000
26 Hanging Plate / G Hook 116 Btg 466.900
27 Pipa Galvanis ¾’’ 1 Mm Full @ 6 Mtr 56 Pcs 6.684.720
28 Shock Pipa Galvanis ¾’’ 56 Pcs 869.400
29 Box Panel 63 Amphere 1 Unit 6.555.000
30 Genset 50,000 Watt (62 Kva) 1 Unit 115.000.000
31 Tandon Air 2 Bh 7.590.000
32 Instalasi Listrik 1 Pkt 34.500
33 Kabel Twist 4 X 35 50 Mtr 2.213.750
JUMLAH II 378.496.556
III JASA INSTALASI DAN PEMASANGAN
1 Instalasi Listrik 120 titik
2 Seting peralatan kandang 1 Pkt 32.912.744
JUMLAH III 32.912.744

JUMLAH KESELURUHAN 424.574.398