“DARUSSALAM ‘
RT. 04 RW.01 DESA KEDUNGBANG KECAMATAN TAYU KABUPATEN PATI
TAHUN 2019
Ketua Sekretaris
Mengetahui
Kepala Desa Kedungbang
H. MASKURI
Pendapatan Anggaran :
2. Pengeluaran : Rp.121.997.00
( terlampir )
PEMBANGUNAN MUSHOLLA
“DARUSSALAM”
RT. 04 RW.01 DESA KEDUNGBANG KECAMATAN TAYU KABUPATEN PATI
DIAJUKAN OLEH :
PANITIA PEMBANGUNAN MUSHOLLA DARUSSALAM
RT. 04 RW.01 DESA KEDUNGBANG KECAMATAN TAYU KABUPATEN PATI
TAHUN 2019
Rencanana Anggaran Biaya
25.800.000,
A Besi 00
56.000, 16.800.000,
5 Semen Sak 300,000 00 00
200.000, 3.000.000,
6 Pasir M³ 10,000 00 00
300.000, 6.000.000,
7 Pasir B M³ 20,000 00 00
23.400.000,
B PEKERJAAN 00
110.000, 9.900.000,
1 Tukang Kayu Orang 90,000 00 00
100.000, 13.500.000,
2 Tukang Batu Orang 135,000 00 00
C PEKERJAAN PONDASI -
389.500,
1 Pasangan Pondasi Batu Kali 1 Pc: 5 Ps m³ 00 -
90.000,
3 Pembantu tukang Batu Orang 225,000 00
40.953.915,
E PEKERJAAN BETON 00
Membuat sloof Beton Bertulang (200Kg 4.530.000, 15.121.140,
1 besi+bekisting) m³ 3,338 00 00
Membuat Kolom Beton Bertulang (300Kg 7.800.000, 25.186.200,
2 besi+bekisting) m³ 3,229 00 00
75.000, 250.350,
3 Membuat Ring Balok (200Kg besi+bekisting) m³ 3,338 00 00
75.000, 396.225,
4 Membuat Kuda-Kuda Beton (200Kg besi+bekisting) m³ 5,283 00 00
8.543.718,
F PEKERJAAN PLAFON 83
8.186, 1.158.413,
1 Pasang List Plafon Kayu Profil m¹ 141,500 67 33
39.980, 7.385.305,
2 Langit-langit Asbes m² 184,725 00 50
20.463.513,
J PEKERJAAN PENUTUP LANTAI DAN DINDING 00
131.200,
1 Pekerjaan Urug Pasir Bawah Lantai m³ 00 -
116.669, 1.633.366,
2 Pasang Lantai Keramik 33X33 cm m² 14,000 00 00
298.891, 18.830.147,
3 Pasang Lantai Keramik 10X20 cm m² 63,000 22 00
15.234,
4 Pasang plint ubin pc abu-abu ukuran 10x30 cm m² 00 -
410.000,
K PEKERJAAN KUNCI DAN KACA 00
20.000, 160.000,
3 Pasang Engsel Jendela Bh 8,000 00 00
20.000, 100.000,
4 Pasang Pegangan Pintu/Door holder Bh 5,000 00 00
25.000, 150.000,
5 Pasang Kaca tebal 3 mm m² 6,000 00 00
107.370,
6 Pasang Kaca wireglass tebal 5 mm m² 00 -
1.968.777,
L PEKERJAAN PENGECATAN 50
26.352, 263.525,
1 Pengecatan Kayu m² 10,000 50 00
27.067, 1.705.252,
2 Pengecatan Tembok Baru m² 63,000 50 50
457.500,
M PEKERJAAN INSTALASI LISTRIK 00
2.000.000,
1 Penyambungan Listrik PLN 2400 watt LS 00 -
30.000, 300.000,
2 Pemasangan Lampu SL 25 Watt Bh 10,000 00 00
17.500, 17.500,
3 Pemasangan Sekering Group Bh 1,000 00 00
12.500, 62.500,
4 Pemasangan Stop Kontak Bh 5,000 00 00
17.500, 52.500,
5 Pemasangan Sakelar Tunggal Bh 3,000 00 00
12.500, 25.000,
6 Pemasangan Sakelar Ganda Bh 2,000 00 00
121.997.424,3
3
DAFTAR DONATUR
RENOVASI MUSHOLLA DARUSSALAM RT,04 RW,01 KEDUNGBANG
TAHUN 2019
JUMLAH DONATUR
NO NAMA ALAMAT Tt
(Rp.
1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29