Terbilang : (Delapan ratus satu juta seratus dua puluh delapan ribu sembilan ratus rupiah)
ARAN BIAYA
BAGAI BAHAN BAKU PRODUK BERNILAI EKONOMI
180,400,000
Orang 4 Bulan 6,600,000 26,400,000
Orang 4 Bulan 5,500,000 44,000,000
Orang 4 Bulan 5,500,000 44,000,000
Orang 4 Bulan 5,500,000 22,000,000
Orang 4 Bulan 5,500,000 22,000,000
Orang 4 Bulan 5,500,000 22,000,000
30,800,000
Orang 4 Bulan 3,850,000 30,800,000
211,200,000
2,600,000
Laporan 1 Kali 1,300,000 2,600,000
340,549,000
42,000,000
42,000,000
447,549,004
TOTAL (A+B+C) 658,749,004
PPN (10%) 65,874,900
GRAND TOTAL 724,623,904
No Item Pekerjaan Rincian Perhitungan Vol Satuan Biaya Biaya Satuan Jumlah Total Biaya
Jumlah Volume Satuan
1 2 3 4 5 6 7 8 9 10
801,128,900
1 Gaji/Upah/Honor 211,200,000
Ketua Tim Studi 1 Orang 4 Bulan OB 6,600,000 6,600,000 26,400,000
Tenaga Ahli Proses Kimia 2 Orang 4 Bulan OB 5,500,000 11,000,000 44,000,000
Tenaga Ahli Kimia 2 Orang 4 Bulan OB 5,500,000 11,000,000 44,000,000
Tenaga Ahli Tekno Ekonomi 1 Orang 4 Bulan OB 5,500,000 5,500,000 22,000,000
Tenaga Ahli Manajemen Rantai Pasok 1 Orang 4 Bulan OB 5,500,000 5,500,000 22,000,000
Tenaga Ahli Statistik Pemasaran 1 Orang 4 Bulan OB 5,500,000 5,500,000 22,000,000
Tenaga Administrasi 2 Orang 4 Bulan OB 3,850,000 7,700,000 30,800,000
10
Sub Total 211,200,000
Total 801,128,900
728,299,000
% Seharusnya(%) 72,829,900
-
gaji / upah = 211,200,000 26.4 30 x
Alat/Bahan Habis Pakai = 415,978,900 51.9 50 x
Perjalanan Dinas = 131,950,000 16.5 15 x
Operasional Institusi = 42,000,000 5.2 5% 801,128,900
Jumlah total 801,128,900 100.0