B Lumpsum
1 Survey Lapangan 1
2 Seminar Awal 1
3 FGD Pra Laporan Akhir 1
4 FGD Laporan Akhir 1
AHAN DAERAH KABUPATEN/KOTA
san Pemerintah Daerah
Rate/Remuneration)
Waktu Upah Total Upah Keterangan/Qualifikasi
Bulan 5,780,000 17,340,000 Team Leader (sipil)
Bulan 4,540,000 9,080,000 Arsitektur
Bulan 4,540,000 9,080,000 Ahli Struktur
Bulan 4,540,000 9,080,000 Ahli Mekanika Tanah
Bulan 4,540,000 9,080,000 Estimator (sipil)
sum 1.1 53,660,000
ls 2,500,000 2,500,000
ls 5,000,000 5,000,000
ls 5,000,000 5,000,000
ls 5,000,000 5,000,000
SUM B 17,500,000
SUM 2 38,900,000
SUM 1 - 2 98,985,000