REKAPITULASI AJUAN PER PERIODE

PROYEK PENINGKATAN CEMOROSEWU - MAGETAN

NO. AJUAN Rp.

1 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


AJUAN RUTIN 9,833,500.00
PENGUKURAN 1,500,000.00
HARIAN KANTOR 480,000.00
Sub Total 11,813,500.00
Total 11,813,500.00

2 2 (TANGGAL 1 MEI S/D 15 MEI 2011)


AJUAN RUTIN 2,114,150.00
REKAYASA LAPANGAN 2,500,000.00
HARIAN KANTOR 3,150,000.00
Sub Total 7,764,150.00
Total 19,577,650.00

Sub Total -
Total 19,577,650.00

Sub Total -
Total 19,577,650.00
REKAPITULASI

PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. URAIAN Rp. KETERANGAN

1 AJUAN RUTIN 9,833,500.00

2 PENGUKURAN 1,500,000.00

3 HARIAN KANTOR 480,000.00

JUMLAH 11,813,500.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
REKAPITULASI

PERIODE : 2 (TANGGAL 1 MEI S/D 15 MEI 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. URAIAN Rp. KETERANGAN

1 AJUAN RUTIN 2,114,150.00

2 REKAYASA LAPANGAN 2,500,000.00

3 HARIAN KANTOR 3,150,000.00

JUMLAH 7,764,150.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
AJUAN RUTIN
PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)
PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. TANGGAL URAIAN Rp.

1 15-Apr-11 Kertas HVS A4 Sinar Dunia 4 rem 124,000.00


Tinta Balack & Color Premium Ink 4 Botol 100,000.00
Kerta BC Polos 3 Rem 82,500.00
Map Kancing 10 Lembar 25,000.00
Binder Clip 107 6 Pak 21,000.00
Lak Ban 3 Buah 36,000.00
1 Dus Bolpoin 15,000.00
Map Kertas 10 Buah 10,000.00
Clip 2 Buah 15,000.00
Isi Clip 3 Buah 4,500.00
Isi Cutter 2 Buah 10,000.00
1 Buah Penggaris Besi 9,000.00
3 Buah Tipe X 15,000.00
10 Buah Snell Hetter 10,000.00
1 Calculator Kc.109 55,000.00
1 Buah Cutter 5,000.00
2 15-Apr-11 Sewa Rumah 4 Bulan 3,000,000.00
3 15-Apr-11 Tukar Tambah ACCU Taff 550,000.00
4 15-Apr-11 Makan+Minum Pengawas+Konsultan (Pengukuran) 279,000.00
5 15-Apr-11 3 Dos Aqua (Pengukuran) 60,000.00
6 16-Apr-11 Makan+Minum Pengawas+Konsultan (Pengukuran) 198,000.00
7 16-Apr-11 Triplex 2 Lembar 180,000.00
Cat Emco 3 Kaleng 1Kg 111,000.00
2 Liter Tiner B 39,000.00
2 Kg Many 48,000.00
2 Kuas 12,000.00
10 Usuk 4x6x3 250,000.00
1 Rol Meter 50m 65,000.00
10 Pylox 210,000.00
2 Kg Paku Reng 15,000.00
Kaleng Buat Patok Rambu-Rambu 100 Buah 210,000.00

Sub Total 5,764,000.00


Total 5,764,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
AJUAN RUTIN
PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)
PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. TANGGAL URAIAN Rp.

8 16-Apr-11 10 Lonjor Bambu Buat Patok Rambu-Rambu 80,000.00


1 Buah Meteran 12,500.00
1 Cat Merah 37,000.00
3 Buah Snown Black Color 15,000.00
3 Semen Gresik 135,000.00
9 17-Apr-11 Makan+Minum Pengawas+Konsultan (Pengukuran) 235,000.00
10 19-Apr-11 Sirtu 2 Rit 600,000.00
11 25-Apr-11 Jamuan Rapat PCM 300,000.00
12 24 s/d 30 April Solar Waker 7 Hari @ 5 Liter/Hari 175,000.00
13 27 s/d 30 April Bensin Stamper 4 Hari @ 3 Liter/Hari 60,000.00
14 29-Apr-11 Servis Laptop + Ganti Catrid Canon 450,000.00
15 15 s/d 30 April Pulsa Cipto Untoro 100,000.00
16 15 s/d 30 April Pulsa Eko 50,000.00
17 15 s/d 30 April Pulsa Sunaryo 50,000.00
18 15 s/d 30 April Transport Eko 16 Hari @ 10.000 160,000.00
19 15 s/d 30 April Transport Sunaryo 16 Hari @ 10.000 160,000.00
20 15 s/d 30 April Solar Taff 16 Hari @ 25.000,00 400,000.00
21 30-Apr-2011 Gaji Sunaryo, ST (Bulan April) 750,000.00
22 30-Apr-2011 Buku Harian Standart 4 Buah 300,000.00

Sub Total 4,069,500.00


Total 9,833,500.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
AJUAN RUTIN
PERIODE : 2 (TANGGAL 1 MEI S/D 15 MEI 2011)
PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. TANGGAL URAIAN Rp.

1 1-May-11 Makan+Minum Pengawas+Konsultan 73,000.00


2 1-May-11 Listrik 33,000.00
3 3-May-11 Makan+Minum Pengawas+Konsultan 82,000.00
4 4-May-11 Transport Ke Surabaya 200,000.00
5 5-May-11 PDAM (Bayar Air) 19,000.00
6 6-May-11 Makan+Minum Pengawas+Konsultan 58,000.00
7 8-May-11 364 Lbr Foto Copy HVS @70 Gr A4 54,600.00
18 Jilid Cover 45,000.00
8 9-May-11 Makan+Minum Pengawas+Konsultan 91,000.00
9 12-May-11 Makan+Minum Pengawas+Konsultan 72,000.00
10 13-May-11 185 Lbr Foto Copy HVS @70 Gr A4 27,750.00
3 Jilid Cover 7,500.00
182 Lbr Foto Copy HVS @70 Gr Legal 27,300.00
11 15-May-11 Makan+Minum Pengawas+Konsultan 79,000.00
12 1 s/d 15 Mei Solar Waker 10 Hari @ 5 Liter/Hari 250,000.00
13 1 s/d 15 Mei Bensin Stamper 8 Hari @ 3 Liter/Hari 120,000.00
14 1 s/d 15 Mei Pulsa Cipto Untoro 100,000.00
15 1 s/d 15 Mei Pulsa Eko 50,000.00
16 1 s/d 15 Mei Pulsa Sunaryo 50,000.00
17 1 s/d 15 Mei Transport Eko 15 Hari @ 10.000 150,000.00
18 1 s/d 15 Mei Transport Sunaryo 15 Hari @ 10.000 150,000.00
19 1 s/d 15 Mei Solar Taff 15 Hari @ 25.000,00 375,000.00

Sub Total 2,114,150.00


Total 2,114,150.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
UANG MAKAN

PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

TANGGAL
NO. NAMA STATUS JML Rp. TOTAL KET
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 CIPTO UNTORO GS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 40,000.00 640,000.00


2 EKO PELAKSANA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 30,000.00 480,000.00
3 SUNARYO ADMIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 30,000.00 480,000.00

Jumlah 1,600,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
UANG MAKAN

PERIODE : 2 (TANGGAL 1 MEI S/D 15 MEI 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

TANGGAL
NO. NAMA STATUS JML Rp. TOTAL KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 CIPTO UNTORO GS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 40,000.00 600,000.00


2 EKO PELAKSANA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00
3 SUNARYO ADMIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00

Jumlah 1,500,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
UANG TRANSPORT

PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

TANGGAL
NO. NAMA STATUS JML Rp. TOTAL KETERANGAN
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Sub Total -
Total -

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
UANG TRANSPORT

### #REF! 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


### #REF! Peningkatan Cemorosewu - Magetan (Link. 062)
### #REF! April

TANGGAL
NO. NAMA STATUS JML Rp. TOTAL KETERANGAN
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 CIPTO UNTORO GS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00


2 EKO PURWANTO PELAKSANA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 35,000.00 525,000.00
3 SUNARYO ADMIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 35,000.00 525,000.00
4 FARID PENGUKURAN 1 1 1 3 35,000.00 105,000.00
5 WAWAN PENGUKURAN 1 1 1 3 35,000.00 105,000.00
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
Sub Total 1,710,000.00
Total 1,710,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
UANG TRANSPORT

### #REF!###
### #REF!###
### #REF!###

TANGGAL
NO. NAMA STATUS JML Rp. TOTAL KETERANGAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 CIPTO UNTORO GS 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00


2 EKO PURWANTO PELAKSANA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 35,000.00 525,000.00
3 SUNARYO ADMIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 35,000.00 525,000.00
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

JUMLAH 1,500,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
HARIAN KANTOR

PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. NAMA STATUS TANGGAL JML Rp. TOTAL KETERANGAN


15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 FARID 1 1 1 3 30,000.00 90,000.00 Pengukuran


2 WAWAN 1 1 1 3 30,000.00 90,000.00 Pengukuran
3 ADI, S 1 1 1 3 30,000.00 90,000.00 Pengukuran
4 SUKADI 1 1 1 1 1 1 1 7 30,000.00 210,000.00 Operator Waker

Jumlah 480,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
GENERAL SUPERINTENDENT

HARIAN KANTOR

PERIODE : 2 (TANGGAL 1 MEI S/D 15 MEI 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. NAMA STATUS TANGGAL JML Rp. TOTAL KETERANGAN


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Sukadi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00 Operator Waker


2 Saelan 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00 Buang Bekas Gal Tanah
3 Parlan 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00 Buang Bekas Gal Tanah
4 Rudi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00 Buang Bekas Gal Tanah
5 Agus 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00 Buang Bekas Gal Tanah
6 Yono 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00 Buang Bekas Gal Tanah
7 Budi 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00 Buang Bekas Gal Tanah

Jumlah 3,150,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)
CIPTO UNTORO, ST
GENERAL SUPERINTENDENT
HARIAN KANTOR

PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. NAMA STATUS TANGGAL JML Rp. TOTAL KETERANGAN


15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

1 Bandi HK 1 1 1 1 1 1 1 1 1 1 1 1 1 13 30,000.00 390,000.00


2 Parno JA 1 1 1 1 1 1 1 1 1 1 1 1 1 13 25,000.00 325,000.00

Jumlah 715,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

EKO PURWANTO
PELAKSANA
HARIAN KANTOR

PERIODE : 2 (TANGGAL 1 MEI S/D 15 MEI 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

NO. NAMA STATUS TANGGAL JML Rp. TOTAL KETERANGAN


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Bandi HK 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 30,000.00 450,000.00


2 Parno JA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 25,000.00 375,000.00
3 Saelan HK 1 1 1 1 1 1 1 1 1 1 1 11 25,000.00 275,000.00 Buang Tanah Galian
4 Parlan HK 1 1 1 1 1 1 1 1 1 1 1 11 25,000.00 275,000.00 Buang Tanah Galian
5 Rudi HK 1 1 1 1 1 1 1 1 1 1 1 11 25,000.00 275,000.00 Buang Tanah Galian
6 Agus HK 1 1 1 1 1 1 1 1 1 1 1 11 25,000.00 275,000.00 Buang Tanah Galian
7 Yono HK 1 1 1 1 1 1 1 1 1 1 1 11 25,000.00 275,000.00 Buang Tanah Galian
8 Budi HK 1 1 1 1 1 1 1 1 1 1 1 11 25,000.00 275,000.00 Buang Tanah Galian

Jumlah 2,475,000.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

EKO PURWANTO
PELAKSANA
PENGGUNAAN SOLAR
PROYEK PENINGKATAN JALAN CEMOROSEWU - MAGETAN (Link. 062)

PERIODE : 1 (TANGGAL 15 APRIL S/D 30 APRIL 2011)


PROYEK : Peningkatan Cemorosewu - Magetan (Link. 062)
BULAN : April

Tanggal Jml Ltr/ Jml Ltr Jml


Alat Berat Keterangan
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Hari Hari (Ltr) (Rp) (Rp)

Waker 1 1 1 1 1 1 1 7 5 35 4,500.00 157,500.00

- Jumlah 7 35 157,500.00

PENINGKATAN CEMOROSEWU -
MAGETAN (LINK. 062)

CIPTO UNTORO, ST
General Superintendent
AJUAN LAB SURABAYA
PROYEK CEMOROSEWU - MAGETAN (Link. 062)

NO. URAIAN RP KETERANGAN

1 Uji Petik AC 2 Titik @ 500.000 1,000,000.00


2 Uji Petik ATB 4 Titik @ 500.000 2,000,000.00
3 Uji Petik ACL 16 Titik @ 500.000 8,000,000.00
4 Uji Petik ATBL 4 Titik @ 500.000 2,000,000.00
5 Uji kepadatan CBR 5 titik @ 300.000 1,500,000.00
6 Uji Petik Mortar 3 titik @ 50.000 150,000.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

JUMLAH 14,650,000.00

PENINGKATAN CEMOROSEWU - PENINGKATAN CEMOROSEWU -


MAGETAN (LINK. 062) MAGETAN (LINK. 062)

SUYUD FAUZAN, ST CIPTO UNTORO, ST


TEKNISI LAB GENERAL SUPERINTENDENT