Anda di halaman 1dari 289

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JTM

NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KOTA NGAWI- BTS KAB MADIUN
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II /NGK / 2015 TANGGAL 25 MEI 2015
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)
SUMBER DANA : APBN TAHUN ANGGARAN 2015
MATA PEMBAYARAN : AGGREGAT S ( SEGMEN II )
PENGHAMPARAN MATERIAL AGGREGATE KLAS S KUAT TEKAN 50 KG / CM2
LOKASI Posisi Panjang Lebar Lebar Rata- Luas Tebal Rencana Volume
NO HARI/TANGGAL KM STA (M') (M') (M2)
rata (M2) (M2) (M3) KET
0 1 2 3 4 5 6 7 8 9 10=8x9 11

1 0+000 - 0+025 2.00 25.00 4.00 100.00 0.15 15.00

2 0+025 - 0+050 2.00 25.00 4.00 100.00 0.15 15.00

3 0+050 - 0+075 2.00 25.00 4.00 100.00 0.15 15.00

4 0+075 - 0+0100 2.00 25.00 4.00 100.00 0.15 15.00

5 0+0100 - 0+0125 2.00 25.00 4.00 100.00 0.15 15.00

6 0+0125 - 0+0150 2.00 25.00 4.00 100.00 0.15 15.00

7 0+0150 - 0+0175 2.00 25.00 4.00 100.00 0.15 15.00

8 0+0175 - 0+0200 2.00 25.00 4.00 100.00 0.15 15.00

9 0+0200 - 0+0225 2.00 25.00 4.00 100.00 0.15 15.00

10 0+0225 - 0+0250 2.00 25.00 4.00 100.00 0.15 15.00

11 0+0250 - 0+0275 2.00 25.00 4.00 100.00 0.15 15.00

12 0+0275 - 0+0300 2.00 25.00 4.00 100.00 0.15 15.00

13 0+0300 - 0+0335 2.00 35.00 4.00 140.00 0.15 21.00

14 0+0325 - 0+0350 2.00 25.00 4.00 100.00 0.15 15.00


216.00

VOLUME SUB TOTAL 201.00


Disetujui Oleh : Diperiksa Oleh Dibuat Oleh :
Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
DPU BINA MARGA

JUMRI S0ETARTO YOYOK


Inspektor Pelaksana lapangan

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JTM


NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KOTA NGAWI- BTS KAB MADIUN
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II /NGK / 2015 TANGGAL 25 MEI 2015
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)
SUMBER DANA : APBN TAHUN ANGGARAN 2015
MATA PEMBAYARAN : AGGREGAT S ( SEGMEN I )
No. HARI/TGL KM STA Posisi Panjang Lebar Lebar Rata- Luas Tebal Rencana Volume Keterangan
(M') (M') (M2)
rata (M2) (M2) (M3)
0 1 2 3 4 5 6 7 8 9 10=8x9 11

VOLUME PINDAHAN DARI SEGMEN II 201.00

1 0+000 - 0+019 2.00 19.00 4.00 76.00 0.150 11.40

2 0+019 - 0+020 2.00 1.00 GORONG 2

3 0+020- 0+050 2.00 30.00 4.00 120.00

4 0+050 - 0+075 2.00 25.00 4.00 100.00 0.150 15.00

5 0+075 - 0+100 2.00 25.00 4.00 100.00 0.150 15.00

6 0+100 - 0+103,5 2.00 3.50 AKSES JALAN KA/KI

7 0+103,5 - 0+125 2.00 21.50 4.00 86.00 0.150 12.90

8 0+125 - 0 +150 2.00 25.00 4.00 100.00 0.150 15.00

9 0+150 - 0+175 2.00 25.00 4.00 100.00 0.150 15.00

10 0+175 - 0+200 2.00 25.00 4.00 100.00 0.150 15.00

11 0+200 - 0+225 2.00 25.00 4.00 100.00 0.150 15.00

12 0+225 - 0+250 2.00 25.00 4.00 100.00 0.150 15.00

13 0+250 - 0+275 2.00 25.00 4.00 100.00 0.150 15.00

14 0+275 - 0+300 2.00 25.00 4.00 100.00 0.150 15.00

15 0+300- 0+325 2.00 25.00 4.00 100.00 0.150 15.00

16 0+325 - 0+350 2.00 25.00 4.00 100.00 0.150 15.00

17 0+350 - 0+355 2.00 5.00 4.00 20.00 0.150 3.00

18 0+355 - 0+362 1.00 7.00 AKSES JALAN ( KA)

19 0+355 - 0+375 1.00 20.00 2.00 40.00 0.150 6.00

20 0+362 - 0+375 1.00 13.00 2.00 26.00 0.150 3.90

21 0+375 - 0+400 2.00 25.00 4.00 100.00 0.150 15.00

22 0+400 - 0+425 2.00 25.00 4.00 100.00 0.150 15.00

23 0+425 - 0+450 2.00 25.00 4.00 100.00 0.150 15.00

24 0+450 - 0+475 2.00 25.00 4.00 100.00 0.150 15.00

25 0+475- 0+500 2.00 25.00 4.00 100.00 0.150 15.00

26 0+500 - 0+525 2.00 25.00 4.00 100.00 0.150 15.00

27 0+525 - 0+550 2.00 25.00 4.00 100.00 0.150 15.00

28 0+550 - 0+553 1.00 3.00 AKSES JALAN ( KI )

29 0 + 553 - 0 + 575 1.00 22.00 2.00 44.00 0.150 6.60


0 + 550- 0 + 575 1.00 25.00 2.00 50.00 0.150 7.50

30 0+575 - 0+600 2.00 25.00 4.00 100.00 0.150 15.00

31 0+600 - 0+625 2.00 25.00 4.00 100.00 0.150 15.00

32 0+625 - 0+650 2.00 25.00 4.00 100.00 0.150 15.00

33 0+650 - 0+675 2.00 25.00 4.00 100.00 0.150 15.00

34 0+675 - 0+700 2.00 25.00 4.00 100.00 0.15 15.00


TOTAL 597.30

Disetujui Oleh : Diperiksa Oleh Dibuat Oleh :


Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
NIP. 19670203 199302 1001

JUMRI SOETARTO AGUNG


NIP. 19670203 199302 1001 Inspektor Pelaksana lapangan
PERHITUNGAN VOLUME
NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JTM
NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA CARUBAN
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II /NGK / 2015 TANGGAL 25 MEI 2015
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)
SUMBER DANA : APBN TAHUN ANGGARAN 2015
MATA PEMBAYARAN MARKA JALAN THERMO PLASTIK SEGMEN I
Posisi Panjang KOEFISIEN Lebar Luas I posisi Luas II
No. KM STA (M') 3/8 M (M2) Putus2 M2 Keterangan
Solid
1 2 3 4 5 6 7 8 9 10 11

1 0+000 - 0+025 2.00 25.00 0.375 0.12 6.00 1.00 1.13


-
2 0+025 - 0+050 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
3 0+050 - 0+075 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
4 0+075 - 0+100 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
5 0+100 - 0+125 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
6 0+125 - 0+150 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
7 0+150 - 0+175 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
8 0+175 - 0+200 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
9 0+200 - 0+225 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
10 0+225 - 0+250 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
11 0+250 - 0+275 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
12 0+275 - 0+300 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
13 0+30 0- 0+325 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
14 0+325 - 0+350 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
15 0+350 - 0+375 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
16 0+375 - 0+400 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
17 0+400 - 0+425 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
18 0+425 - 0+450 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
19 0+450 - 0+475 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
20 0+475 - 0+500 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
21 0+500 - 0+525 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
22 0+525 - 0+550 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
23 0+550 - 0+575 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
24 0+575 - 0+600 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
0+600 - 0+625 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
0+625 - 0+650 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
0+650 - 0+675 2.00 25.00 0.375 0.12 6.00 1.00 1.13
-
0+675 - 0+700 2.00 25.00 0.375 0.12 6.00 1.00 1.13

SUB TOTAL SEGMEN I 168.00 31.50 199.500

Disetujui Oleh : Diperiksa Oleh Dibuat Oleh :


Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
DPU BINA MARGA

JUMRI SOETARTO
NIP. 19670203 199302 1001 Inspektor Pelaksana lapangan
REKAPITULASI ADD - 2
DAFTAR KUANTITAS DAN HARGA
NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA CARUBAN
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 2015
NOMOR ADD - 2 : KU.08.08 / . / WIL - II/NGK / 2015 Tgl: 4 SEPTEMBER 2015
KONSULTAN : PT. BUANA ARCHICON .PT. GLOBAL PROFEX SYNERGY. PT.KRIDA PRATAMA ADHICIPTA, (Ass).
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI URAIAN PEKERJAAAN BOBOT JUMLAH HARGA


%

1 UMUM 0.914 58,315,000.00

2 DRAINASE 7.472 476,652,672.48

3 PEKERJAAN TANAH 4.059 258,924,470.51

4 PELEBARAN PERKERASAN DAN BAHU JALAN 2.520 160,740,000.00

5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN 10.790 688,340,150.00

6 PERKERASAN ASPAL 70.125 4,473,435,017.84

7 STRUKTUR

8 PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 3.036 193,691,294.00

9 PEKERJAAN HARIAN 0.300 19,106,472.00

10 PEKERJAAN PEMELIHARAAN RUTIN 0.784 50,000,000.00


TOTAL 100.000
A JUMLAH HARGA PEKERJAAN 6,379,205,076.84
B PAJAK PERTAMBAHAN NILAI ( PPN ) = 10 % x A 637,920,507.68
C JUMLAH TOTAL HARGA PEKERJAAN = ( A ) + ( B ) 7,017,125,584.52
DIBULATKAN 7.017,125.000,00
TERBILANG : TUJUH MILYAR TUJUH BELAS JUTA SERATUS DUA PULUH LIMA RIBU RUPIAH
RENCANA ANGGARAN BIAYA PANJANG EFEKTIF 1000 M¹ ( CCO )
BALANCE BUTGET
NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JATIM
NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA CARUBAN
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 Mei 2015
KONSULTAN : PT. BUANA ARCHICON .PT. GLOBAL PROFEX SYNERGY. PT.KRIDA PRATAMA ADHICIPTA, (Ass).
SUMBER DANA : APBN TAHUN ANGGARAN 2015
MATA
PEMBA URAIAN PEKERJAAN VOLUME VOLUME HARGA JUMLAH JUMLAH VOLUME JUMLAH HARGA VOLUME JUMLAH HARGA
SAT KETERANGAN
YARAN KONTRAK MC - O SATUAN HARGA HARGA TAMBAH TAMBAH KURANG KURANG PERSENTASE VOLUME
KONTRAK KONTRAK MC - O (+) (+) (-) (-) KONTRAK ± 10%
1 2 3 4 5 6 7 8 9 10 11 12 13
DIVISI 1. UMUM
1.2 Mobilisasi Ls 1.00 1.00 12,590,000.00 12,590,000.00 12,590,000.00 100.00
1.817 Pengamanan Lingkungan Hidup Ls 1.00 1.00 18,750,000.00 18,750,000.00 18,750,000.00 100.00
1.8 ( 1 ) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 1.00 26,975,000.00 26,975,000.00 26,975,000.00 100.00
Jumlah Harga Pekerjaan Divisi 1 58,315,000.00 58,315,000.00
DIVISI 2. DRAINASE
2.1(1) Galian Untuk Selokan Drainase dan Saluran Air M³ 417.00 527.15 44,300.00 18,473,100.00 23,352,745.00 (110.150) (4,879,645.00) 126.41
2.3(12) Beton K - 250 ( fc 20) Untuk Struktur Drainase Beton Minor M³ 172.40 207.55 1,369,900.00 236,170,760.00 284,322,745.00 35.150 48,151,985.00 120.39
2.3(13) Baja Tulangan Untuk Struktur Drainase Beton Minor ( 24 Polos ) Kg 10,346.00 11,172.67 14,800.00 153,120,800.00 165,355,545.60 826.672 12,234,745.60 107.99
Jumlah Harga Pekerjaan Divisi 2 407,764,660.00 473,031,035.60
DIVISI 3. PEKERJAAN TANAH
3.1.(6) Galian Perkerasan Beraspal Dengan Cold Milling Machine M³ 38.00 38.00 347,400.00 13,201,200.00 13,201,200.00 100.00
3.1.(7) Galian Perkerasan Beraspal Tanpa Cold Milling Machine M³ 654.00 829.13 83,000.00 54,282,000.00 68,817,375.00 (175.125) (14,535,375.00) 126.78
3.1.(8) Galian Perkerasan Berbutir M³ 600.00 879.75 87,300.00 52,380,000.00 76,802,175.00 279.75 24,422,175.00 146.63
3.3.(1) Penyiapan Badan Jalan M² 5,450.00 5527.50 3,850.00 20,982,500.00 21,280,875.00 77.50 298,375.00 101.42
3.4.(3) Pemotongan Pohon Pilihan Diameter 30 - 50 cm Buah 120.00 120.00 250,000.00 30,000,000.00 30,000,000.00 100.00
Jumlah Harga Pekerjaan Divisi 3 170,845,700.00 210,101,625.00
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2 (2b) Lapis Pondasi Agregate Kelas S M³ 600.00 597.30 267,900.00 160,740,000.00 160,016,670.00 -2.70 (723,330.00) 99.55
Jumlah Harga Pekerjaan Divisi 4 160,740,000.00 160,016,670.00
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.5 (1) Lapis Pondasi Agregat Semen Klas A ( cement Treated Base ) (CTB) M³ 818.00 879.75 653,100.00 534,235,800.00 574,564,725.00 61.750 40,328,925.00 107.55
Jumlah Harga Pekerjaan Divisi 5 534,235,800.00 574,564,725.00
DIVISI 6. PERKERASAN ASPAL
6.1(2b) Lapis Perekat - Aspal Emulsi Liter 5,306.10 5706.25 12,100.00 64,203,810.00 69,045,625.00 400.15 4,841,815.00 107.54
6.3.(5b) Laston Lapis Aus Modifikasi (AC-WC Mod ) Elastomer Sintetis Ton 906.20 895.78 1,519,300.00 1,376,789,660.00 1,360,960,453.13 (10.42) (15,829,206.88) 98.85
6.3.(6b) Laston Lapis Antara Modifikasi (AC-BC Mod ) Elastomer Sintetis Ton 1,868.00 1,596.00 1,492,800.00 2,788,550,400.00 2,382,508,800.00 272.000 406,041,600.00 85.44
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L) Mod ) Elastomer Sintetis Ton 379.50 359.10 1,492,400.00 566,365,800.00 535,920,840.00 20.400 30,444,960.00 94.62
Jumlah Harga Pekerjaan Divisi 6 4,795,909,670.00 4,348,435,718.13
DIVISI 7. STRUKTUR

Jumlah Harga Pekerjaan Divisi 7 - -


DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(2) Lapis Pondasi Aggregat Klas B untuk Perkerjaan Minor M³ 40.00 40.00 235,000.00 9,400,000.00 9,400,000.00 100.00
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor M³ 12.00 12.00 3,311,327.00 39,735,924.00 39,735,924.00 100.00
8.1(9) Residu Bitumen untuk Pekerjaan Minor Liter 96.00 96.00 12,100.00 1,161,600.00 1,161,600.00 100.00
8.3(3) Pohon Jenis Mahoni dan Penanaman Buah 360.00 360.00 250,000.00 90,000,000.00 90,000,000.00 100.00
8.4(1) Marka Jalan Termoplastik M² 210.00 294.98 119,000.00 24,990,000.00 35,102,025.00 84.98 10,112,025.00 140.46
8.4(5) Patok Pengarah Buah 68.00 68.00 250,000.00 17,000,000.00 17,000,000.00 100.00
Jumlah Harga Pekerjaan Divisi 8 182,287,524.00 192,399,549.00
DIVISI 9. PEKERJAAN HARIAN
9.1(1) Mandor Jam 28.00 28.00 12,143.00 340,004.00 340,004.00 100.00
9.1(2) Pekerja Biasa Jam 84.00 84.00 8,571.00 719,964.00 719,964.00 100.00
9.1(4)a Dump Truck, Kapasitas 3-4 m3 Jam 28.00 28.00 190,000.00 5,320,000.00 5,320,000.00 100.00
9.1(11) Alat Penggali ( Excavator)80 - 140 PK Jam 28.00 28.00 142,229.00 3,982,412.00 3,982,412.00 100.00
9.1(12) Crane 10 = 15 Ton Jam 28.00 28.00 189,288.00 5,300,064.00 5,300,064.00 100.00
9.1(14) Penggilas Bervibrasi 5 - 8 Ton Jam 28.00 28.00 123,001.00 3,444,028.00 3,444,028.00 100.00

Jumlah Harga Pekerjaan Divisi 9 19,106,472.00 19,106,472.00


DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN
10.1(1) Pemeliharaan Rutin Perkerasan Ls 1.00 1.00 12,500,000.00 12,500,000.00 12,500,000.00 100.00
10.1(2) Pemeliharaan Rutin Bahu Jalan Ls 1.00 1.00 12,500,000.00 12,500,000.00 12,500,000.00 100.00
10.1(3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan Ls 1.00 1.00 12,500,000.00 12,500,000.00 12,500,000.00 100.00
10.1(4) Pemeliharaan Rutin Perlengkapan jalan Ls 1.00 1.00 12,500,000.00 12,500,000.00 12,500,000.00 100.00

Jumlah Harga Pekerjaan Divisi 10 50,000,000.00 50,000,000.00


C JUMLAH HARGA PEKERJAAN ( SUB TOTAL A + SUB TOTAL B ) 6,379,204,826.00 6,085,970,794.73 123,837,508.73 417,071,540.00
D PAJAK PERTAMBAHAN NILAI ( PPN 10 % X C ) 637,920,482.60 608,597,079.47
E JUMLAH HARGA PEKERJAAN ( C + D ) 7,017,125,308.60 6,694,567,874.20
F JUMLAH DIBULATKAN 7,017,346,000.00 7,017,346,000.00
(293,234,031.275) (293,234,031.275)
Madiun Mei 2015
Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
PELAKSNAAN JALAN NASIONAL WILAYAH II PT. BUANA ARCHICON PT. SELO MANUNGGAL SEJATI
MANTINGAN -CARUBAN-NGANJUK-KERTOSONO PT. GLOBAL PROFEX SYNERGY
PT. KRIDA PRATAM ADHICIPTA (Ass)

Ir.SURDIPUJI, MMT. Ir. PARUHUMAN LUBIS M. FARID AGUNG,W, ST.


Nip 1959 0704 1992 03 1004 Site Engineer General Superintendent
NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT
NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 2015
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod ANTARA AC-BC E.S
No sta panjang Lebar tebal Volume Luas BJ
m KA/KI (m) m m³ m2 2.28

SEGMEN II
1 0+000 - 0+025 25 5 0.06 7.50 125.00 2.28

2 0+025 - 0+050 25 5 0.06 7.50 125.00 2.28

3 0+050 - 0+075 25 5 0.06 7.50 125.00 2.28

4 0+075 - 0+100 25 5 0.06 7.50 125.00 2.28

5 0+100 - 0+125 25 5 0.06 7.50 125.00 2.28

6 0+125 - 0+150 25 5 0.06 7.50 125.00 2.28

7 0+150 - 0+175 25 5 0.06 7.50 125.00 2.28

8 0+175 - 0+200 25 5 0.06 7.50 125.00 2.28

9 0+200 - 0+225 25 5 0.06 7.50 125.00 2.28

10 0+225 - 0+250 25 5 0.06 7.50 125.00 2.28

11 0+250 - 0+275 25 5 0.06 7.50 125.00 2.28

12 0+275 - 0+300 25 5 0.06 7.50 125.00 2.28

13 0+30 0- 0+325 5 0.06 0.00 0.00 2.28

14 0+325 - 0+350 5 0.06 0.00 0.00 2.28

15 0+350 - 0+375 5 0.06 0.00 0.00 2.28


16 0+375 - 0+400 5 0.06 0.00 0.00 2.28

17 0+400 - 0+405,5 5 0.06 0.00 0.00 2.28


TOTAL 90.00 1500.00

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT


NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 20
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod AC-BC ANTARA E.S
No sta panjang Lebar tebal Volume Luas BJ
m KA/KI (m) m m³ m2 2.28
SEGMEN II
SEGMEN I
1 0+000 - 0+025 25 5 0.06 7.5 125 2.28

2 0+025 - 0+050 25 5 0.06 7.5 125 2.28

3 0+050 - 0+075 25 5 0.06 7.5 125 2.28

4 0+075 - 0+100 25 5 0.06 7.5 125 2.28

5 0+100 - 0+125 25 5 0.06 7.5 125 2.28

6 0+125 - 0+150 25 5 0.06 7.5 125 2.28

7 0+150 - 0+175 25 5 0.06 7.5 125 2.28

8 0+175 - 0+200 25 5 0.06 7.5 125 2.28

9 0+200 - 0+225 25 5 0.06 7.5 125 2.28

10 0+225 - 0+250 25 5 0.06 7.5 125 2.28

11 0+250 - 0+275 25 5 0.06 7.5 125 2.28

12 0+275 - 0+300 25 5 0.06 7.5 125 2.28

13 0+30 0- 0+325 25 5 0.06 7.5 125 2.28

14 0+325 - 0+350 25 5 0.06 7.5 125 2.28


15 0+350 - 0+375 25 5 0.06 7.5 125 2.28

16 0+375 - 0+400 25 5 0.06 7.5 125 2.28

17 0+400 - 0+425 25 5 0.06 7.5 125 2.28

18 0+425 - 0+450 25 5 0.06 7.5 125 2.28

19 0+450 - 0+475 25 5 0.06 7.5 125 2.28

20 0+475 - 0+500 25 5 0.06 7.5 125 2.28

21 0+500 - 0+525 25 5 0.06 7.5 125 2.28

22 0+525 - 0+550 25 5 0.06 7.5 125 2.28

23 0+550 - 0+575 25 5 0.06 7.5 125 2.28

24 0+575 - 0+600 25 5 0.06 7.5 125 2.28

25 0+600 - 0+625 25 5 0.06 7.5 125 2.28

26 0+625 - 0+650 25 5 0.06 7.5 125 2.28

27 0+650 - 0+675 25 5 0.06 7.5 125 2.28

28 0+675 - 0+700 25 5 0.06 7.5 125 2.28

TOTAL 210 3500

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT


NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 2015
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod ANTARA AC-BC E.S
No sta panjang Lebar tebal Volume Luas BJ
m KA/KI (m) m m³ m2 2.28

SEGMEN II
1 0+000 - 0+025 25 5 0.08 10.00 125.00 2.28
2 0+025 - 0+050 25 5 0.08 10.00 125.00 2.28

3 0+050 - 0+075 25 5 0.08 10.00 125.00 2.28

4 0+075 - 0+100 25 5 0.08 10.00 125.00 2.28

5 0+100 - 0+125 25 5 0.08 10.00 125.00 2.28

6 0+125 - 0+150 25 5 0.08 10.00 125.00 2.28

7 0+150 - 0+175 25 5 0.08 10.00 125.00 2.28

8 0+175 - 0+200 25 5 0.08 10.00 125.00 2.28

9 0+200 - 0+225 25 5 0.08 10.00 125.00 2.28

10 0+225 - 0+250 25 5 0.08 10.00 125.00 2.28

11 0+250 - 0+275 25 5 0.08 10.00 125.00 2.28

12 0+275 - 0+300 25 5 0.08 10.00 125.00 2.28

13 0+30 0- 0+325 5 0.08 0.00 0.00 2.28

14 0+325 - 0+350 5 0.08 0.00 0.00 2.28

15 0+350 - 0+375 5 0.08 0.00 0.00 2.28

16 0+375 - 0+400 5 0.08 0.00 0.00 2.28

17 0+400 - 0+405,5 5 0.08 0.00 0.00 2.28


TOTAL 120.00 1500.00

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT


NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 20
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod AC-BC ANTARA E.S
No sta panjang Lebar tebal Volume Luas BJ
m KA / KI (m) m m³ m2 2.28
SEGMEN II
SEGMEN I
1 0+000 - 0+025 25 5 0.08 10 125 2.28

2 0+025 - 0+050 25 5 0.08 10 125 2.28

3 0+050 - 0+075 25 5 0.08 10 125 2.28

4 0+075 - 0+100 25 5 0.08 10 125 2.28

5 0+100 - 0+125 25 5 0.08 10 125 2.28

6 0+125 - 0+150 25 5 0.08 10 125 2.28

7 0+150 - 0+175 25 5 0.08 10 125 2.28

8 0+175 - 0+200 25 5 0.08 10 125 2.28

9 0+200 - 0+225 25 5 0.08 10 125 2.28

10 0+225 - 0+250 25 5 0.08 10 125 2.28

11 0+250 - 0+275 25 5 0.08 10 125 2.28

12 0+275 - 0+300 25 5 0.08 10 125 2.28

13 0+30 0- 0+325 25 5 0.08 10 125 2.28

14 0+325 - 0+350 25 5 0.08 10 125 2.28

15 0+350 - 0+375 25 5 0.08 10 125 2.28

16 0+375 - 0+400 25 5 0.08 10 125 2.28

17 0+400 - 0+425 25 5 0.08 10 125 2.28

18 0+425 - 0+450 25 5 0.08 10 125 2.28

19 0+450 - 0+475 25 5 0.08 10 125 2.28

20 0+475 - 0+500 25 5 0.08 10 125 2.28

21 0+500 - 0+525 25 5 0.08 10 125 2.28

22 0+525 - 0+550 25 5 0.08 10 125 2.28

23 0+550 - 0+575 25 5 0.08 10 125 2.28


24 0+575 - 0+600 25 5 0.08 10 125 2.28

25 0+600 - 0+625 25 5 0.08 10 125 2.28

26 0+625 - 0+650 25 5 0.08 10 125 2.28

27 0+650 - 0+675 25 5 0.08 10 125 2.28

28 0+675 - 0+700 25 5 0.08 10 125 2.28

TOTAL 280 3500

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT


NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 2015
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod AC-WC AUS E.S
No sta panjang Lebar tebal Volume Luas BJ
m m m m³ m2 2.275

SEGMEN II
1 0+000 - 0+025 25 7.5 0.05 9.38 187.50 2.275

2 0+025 - 0+050 25 7.5 0.05 9.38 187.50 2.275

3 0+050 - 0+075 25 7.5 0.05 9.38 187.50 2.275

4 0+075 - 0+100 25 7.5 0.05 9.38 187.50 2.275

5 0+100 - 0+125 25 7.5 0.05 9.38 187.50 2.275

6 0+125 - 0+150 25 7.5 0.05 9.38 187.50 2.275

7 0+150 - 0+175 25 7.5 0.05 9.38 187.50 2.275

8 0+175 - 0+200 25 7.5 0.05 9.38 187.50 2.275

9 0+200 - 0+225 25 7.5 0.05 9.38 187.50 2.275

10 0+225 - 0+250 25 7.5 0.05 9.38 187.50 2.275


11 0+250 - 0+275 25 7.5 0.05 9.38 187.50 2.275

12 0+275 - 0+300 25 7.5 0.05 9.38 187.50 2.275

13 0+30 0- 0+325 25 7.5 0.05 9.38 187.50 2.275

14 0+325 - 0+350 25 7.5 0.05 9.38 187.50 2.275

15 0+350 - 0+375 7.5 0.05 0.00 0.00 2.275

16 0+375 - 0+400 7.5 0.05 0.00 0.00 2.275

17 0+400 - 0+405,5 7.5 0.05 0.00 0.00 2.275


TOTAL 131.25 2625.00

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT


NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 20
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod AC-WC AUS E.S
No sta panjang Lebar tebal Volume Luas BJ
m KA / KI (m) m m³ m2 2.275
SEGMEN II
SEGMEN I
1 0+000 - 0+025 25 7.5 0.05 9.375 187.5 2.275

2 0+025 - 0+050 25 7.5 0.05 9.375 187.5 2.275

3 0+050 - 0+075 25 7.5 0.05 9.375 187.5 2.275

4 0+075 - 0+100 25 7.5 0.05 9.375 187.5 2.275

5 0+100 - 0+125 25 7.5 0.05 9.375 187.5 2.275

6 0+125 - 0+150 25 7.5 0.05 9.375 187.5 2.275

7 0+150 - 0+175 25 7.5 0.05 9.375 187.5 2.275

8 0+175 - 0+200 25 7.5 0.05 9.375 187.5 2.275

9 0+200 - 0+225 25 7.5 0.05 9.375 187.5 2.275


10 0+225 - 0+250 25 7.5 0.05 9.375 187.5 2.275

11 0+250 - 0+275 25 7.5 0.05 9.375 187.5 2.275

12 0+275 - 0+300 25 7.5 0.05 9.375 187.5 2.275

13 0+30 0- 0+325 25 7.5 0.05 9.375 187.5 2.275

14 0+325 - 0+350 25 7.5 0.05 9.375 187.5 2.275

15 0+350 - 0+375 25 7.5 0.05 9.375 187.5 2.275

16 0+375 - 0+400 25 7.5 0.05 9.375 187.5 2.275

17 0+400 - 0+425 25 7.5 0.05 9.375 187.5 2.275

18 0+425 - 0+450 25 7.5 0.05 9.375 187.5 2.275

19 0+450 - 0+475 25 7.5 0.05 9.375 187.5 2.275

20 0+475 - 0+500 25 7.5 0.05 9.375 187.5 2.275

21 0+500 - 0+525 25 7.5 0.05 9.375 187.5 2.275

22 0+525 - 0+550 25 7.5 0.05 9.375 187.5 2.275

23 0+550 - 0+575 25 7.5 0.05 9.375 187.5 2.275

24 0+575 - 0+600 25 7.5 0.05 9.375 187.5 2.275

25 0+600 - 0+625 25 7.5 0.05 9.375 187.5 2.275

26 0+625 - 0+650 25 7.5 0.05 9.375 187.5 2.275

27 0+650 - 0+675 25 7.5 0.05 9.375 187.5 2.275

28 0+675 - 0+700 25 7.5 0.05 9.375 187.5 2.275

TOTAL 262.5 5250

TOTAL 787.50 15750.00


NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT
NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 2015
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod PERATA AC-BC (L) E.S
No sta panjang Lebar tebal Volume Luas BJ
m KA/KI (m) m m³ m2 2.28

SEGMEN II
1 0+000 - 0+025 25 2.5 0.06 3.75 62.50 2.28

2 0+025 - 0+050 25 2.5 0.06 3.75 62.50 2.28

3 0+050 - 0+075 25 2.5 0.06 3.75 62.50 2.28

4 0+075 - 0+100 25 2.5 0.06 3.75 62.50 2.28

5 0+100 - 0+125 25 2.5 0.06 3.75 62.50 2.28

6 0+125 - 0+150 25 2.5 0.06 3.75 62.50 2.28

7 0+150 - 0+175 25 2.5 0.06 3.75 62.50 2.28

8 0+175 - 0+200 25 2.5 0.06 3.75 62.50 2.28

9 0+200 - 0+225 25 2.5 0.06 3.75 62.50 2.28

10 0+225 - 0+250 25 2.5 0.06 3.75 62.50 2.28

11 0+250 - 0+275 25 2.5 0.06 3.75 62.50 2.28

12 0+275 - 0+300 25 2.5 0.06 3.75 62.50 2.28

13 0+30 0- 0+325 25 2.5 0.06 3.75 62.50 2.28

14 0+325 - 0+350 25 2.5 0.06 3.75 62.50 2.28

15 0+350 - 0+375 2.5 0.06 0.00 0.00 2.28


TOTAL 52.50 875.00

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JT


NAMA PAKET : PENINGKATAN STRUKTUR JALAN BTS KAB NGAWI- BTS KOTA C
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 20
KONSULTAN : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT.KRID
SUMBER DANA : APBN TAHUN ANGGARAN 2015

DEVISI VI
MATA PEMBAYARAN Asphalt Mod PERATA AC-BC (L) E.S
No sta panjang Lebar tebal Volume Luas BJ
m KA/KI (m) m m³ m2 2.28
SEGMEN II
SEGMEN I
1 0+000 - 0+025 25 2.5 0.06 3.75 62.5 2.28

2 0+025 - 0+050 25 2.5 0.06 3.75 62.5 2.28

3 0+050 - 0+075 25 2.5 0.06 3.75 62.5 2.28

4 0+075 - 0+100 25 2.5 0.06 3.75 62.5 2.28

5 0+100 - 0+125 25 2.5 0.06 3.75 62.5 2.28

6 0+125 - 0+150 25 2.5 0.06 3.75 62.5 2.28

7 0+150 - 0+175 25 2.5 0.06 3.75 62.5 2.28

8 0+175 - 0+200 25 2.5 0.06 3.75 62.5 2.28

9 0+200 - 0+225 25 2.5 0.06 3.75 62.5 2.28

10 0+225 - 0+250 25 2.5 0.06 3.75 62.5 2.28

11 0+250 - 0+275 25 2.5 0.06 3.75 62.5 2.28

12 0+275 - 0+300 25 2.5 0.06 3.75 62.5 2.28

13 0+30 0- 0+325 25 2.5 0.06 3.75 62.5 2.28

14 0+325 - 0+350 25 2.5 0.06 3.75 62.5 2.28

15 0+350 - 0+375 25 2.5 0.06 3.75 62.5 2.28


16 0+375 - 0+400 25 2.5 0.06 3.75 62.5 2.28

17 0+400 - 0+425 25 2.5 0.06 3.75 62.5 2.28

18 0+425 - 0+450 25 2.5 0.06 3.75 62.5 2.28

19 0+450 - 0+475 25 2.5 0.06 3.75 62.5 2.28

20 0+475 - 0+500 25 2.5 0.06 3.75 62.5 2.28

21 0+500 - 0+525 25 2.5 0.06 3.75 62.5 2.28

22 0+525 - 0+550 25 2.5 0.06 3.75 62.5 2.28

23 0+550 - 0+575 25 2.5 0.06 3.75 62.5 2.28

24 0+575 - 0+600 25 2.5 0.06 3.75 62.5 2.28

25 0+600 - 0+625 25 2.5 0.06 3.75 62.5 2.28

26 0+625 - 0+650 25 2.5 0.06 3.75 62.5 2.28

27 0+650 - 0+675 25 2.5 0.06 3.75 62.5 2.28

28 0+675 - 0+700 25 2.5 0.06 3.75 62.5 2.28

TOTAL 105 1750


BACK UP DATA QUANTITY

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN

Tgl: 25 MEI 2015


X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6.2% Ton 2% Kg

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

17.1 0.20 25.00 0.062 1.06

0 0.20 0.00 0.062 0.00

0 0.20 0.00 0.062 0.00

0 0.20 0.00 0.062 0.00


0 0.20 0.00 0.062 0.00

0 0.20 0.00 0.062 0.00


205.20 300.00 12.72

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN

Tgl: 25 MEI 2015


X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6% Ton 2% Kg
205.20 300.00

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026


17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

17.1 0.20 25 0.06 1.026

684.00 1000.00 28.73

BACK UP DATA QUANTITY

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN

Tgl: 25 MEI 2015


X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6.2% Ton 2% Kg

1000.00
22.8 0.60 75.00 0.062 1.41
22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

22.8 0.60 75.00 0.062 1.41

0 0.60 0.00 0.062 0.00

0 0.60 0.00 0.062 0.00

0 0.60 0.00 0.062 0.00

0 0.60 0.00 0.062 0.00

0 0.60 0.00 0.062 0.00


273.60 1900.00 16.96

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN

Tgl: 25 MEI 2015


X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6.2% Ton 2% Kg
273.60 1900.00
22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414


22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

22.8 0.60 75 0.062 1.414

912.00 4000.00 39.58

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN 684.00
1596.00
Tgl: 25 MEI 2015
X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6.2% Ton 2% Kg

4000.00
21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32


21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

21.328 0.15 28.13 0.062 1.32

0.000 0.15 0.00 0.062 0.00

0.000 0.15 0.00 0.062 0.00

0.000 0.15 0.00 0.062 0.00


298.59 4393.75 18.51

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN

Tgl: 25 MEI 2015


X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6% Ton 2% Kg
298.59 4393.75

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322


21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

21.328 0.15 28.125 0.062 1.322

895.78 5181.25 37.03

2388.75 19150.00 111.08


1000 28.73
300.00 12.72
20450.00 152.53
BACK UP DATA QUANTITY

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN

Tgl: 25 MEI 2015


X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6.2% Ton 2% Kg

5181.25
8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

8.55 0.20 12.50 0.062 0.53

0 0.20 0.00 0.062 0.00


119.70 5356.25 7.42

IONAL WILAYAH II JTM


B NGAWI- BTS KOTA CARUBAN

Tgl: 25 MEI 2015


X SYNERGY, PT.KRIDA PRATAMA ADHICIPTA, (Ass)

Volume hot koefisien volume Kadar Aspal Aspal Keras Kadar Filler Berat Filler
mix(Ton) emulsi Emulsi ( liter ) 6% Ton 2% Kg
119.70 5356.25

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513


8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

8.55 0.20 12.5 0.06 0.513

359.10 5706.25 14.36


Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Keterangan
Item pekerjaan vol add 2 yang dilaksanakan sisa vol harga jml harga porsi nilai

devisi 2
1 Galian drainase 434 260.4 173.6 44300 7690480
2 beton 207.41 190.5 16.91 1369900 23165009
3 baja tulangan 12601.985 11380.6 1221.385 14800 18076498

devisi 3
1 galian braspal DCMM 108.19 58.695 49.50 347400 17194563
2 galian berbutir 1443.5 997.755 445.745 87300 38913538.5

devisi 5
1 aggregate klas b 604.29 380 224.29 235000 52708150

devisi 6
1 trial ac - wc 50 TON 50 1519300 75965000 30386000 60242000 P.SURDI
2 trial ac - bc 50 TON 50 1492800 74640000 29856000
3 ac - wc 1096.81 963.52 133.29 1519300 202507497
4 ac - bc 1830.38 1771.83 58.55 1492800 87403440
2735.35
devisi 8
1 8.1(2) 40 40 235000.00 9400000
2 8.1(5) 12 6 6 3311327.00 19867962
3 8.1(9) 96 48 48 12100.00 580800
4
5
devisi 9
1 9.1(1) 28.000 28.000 12143.00 340004
2 9.1(2) 84.000 84.000 8571.00 719964
3 9.1(4)a 28.000 28.000 190000.00 5320000
4 9.1(11) 28.000 28.000 142229.00 3982412
5 9.1(12) 28.000 28.000 189288.00 5300064
6 9.1(14) 28.000 28.000 123001.00 3444028
devisi 10
1 rutin perkerasan 1 1 1250000 1250000
2 rutin bahu jalan 1 1 1250000 1250000
3 Rutin Selokan, Saluran Air 1 1 1250000 1250000
4 rutin perlengkapan jalan 1 1 1250000 1250000
TOTAL 652219409.5 0.4 260887763.8
60242000
200645763.8
Masa
Pemelihara
an
SEPTEMBER OKTOBER NOVEMBER DESEMBER KETERANGAN
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
,31-6 ,7-13 ,14-20 ,21-27 ,28-4 ,5-11 ,12-18 ,19-25 ,26-1 ,2-8 ,9-15 ,16-22 ,23-29 ,30-6 ,7-13 ,14-20

0.04 0.04 100%


0.05 0.05 0.05 0.05
0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

90%
0.93 0.93 0.93 0.93
0.60

0.21 80%

0.12 0.12 0.12 0.12 0.12 0.12 0.12

0.12 0.12 0.12 0.12 0.12 0.12 0.12

0.05 0.05 0.05 0.05 0.05 0.05 0.05

70%

0.84 0.84 0.84

60%
1.675 1.67 1.67 1.67 1.67

0.17 0.17 0.17 0.17 0.17 0.17 50%

7.19 7.19 7.19


14.57 14.57 14.57
4.44 4.44

0.47 0.47 0.47


0.39 30%
0.09 0.09 0.09

0.001 0.001 0.001 0.001 0.001 0.001


0.001 0.001 0.001 0.001 0.001 0.001 20%
0.008 0.008 0.008 0.008 0.008 0.008
0.006 0.006 0.006 0.006 0.006 0.006
0.008 0.008 0.008 0.008 0.008 0.008
0.005 0.005 0.005 0.005 0.005 0.005
10%

0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0%

1.61 1.35 1.30 2.97 2.05 2.10 16.76 16.76 19.24 12.07 7.47 7.42 1.46 1.55 1.89 0.00
5.65 6.99 8.29 11.27 13.31 15.41 32.17 48.93 68.16 80.23 87.69 95.11 96.57 98.12 100.00 100.00

Dibuat Oleh
KONTRAKTOR PELAKSANA
PT. SELO MANUNGGAL SEJATI

AGUNG
General Superintendent
LAPORAN BULANAN

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JAWA TIMUR
NAMA PAKET : PENINGKATAN STRUKTUR JALAN LINGKAR NGAWI
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI BULAN KE : 05
NOMOR KONTRAK: KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 2015 PERIODE : 5 OKTO S/D 1 NOVEM 2015
KONSULTAN : PT. BUANA ARCHICON PT. GLOBAL PROFEX SYNERGY. PT . KRIDA PRATAMA ADHICIPTA (Ass)
SUMBER DANA : APBN TAHUN ANGGARAN 2015
MATA S/D S/D
PEMBA URAIAN PEKERJAAN VOLUME BOBOT BULAN LALU BULAN INI BULAN INI
VOLUME KET.
YARAN ADD - 2 Sat % VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
BAGIAN KONTRAK HARGA SATUAN
DIVISI 1. UMUM
1.2 Mobilisasi 1.00 1.00 Ls 0.197 0.700 0.138 0.700 0.138 PROGRES BER
1.17 Pengamanan Lingkungan Hidup 1.00 1.00 Ls 0.294 1.000 0.294 1.000 0.294 DASARKAN
1.8 ( 1 ) Manajemen dan Keselamatan Lalu Lintas 1.00 1.00 LS 0.423 0.680 0.288 0.840 0.355 KONTRAK
ADD - 2
DIVISI 2. DRAINASE
2.1(1) Galian Untuk Selokan Drainase dan Saluran Air 434.00 417.00 M³ 0.301 434.000 0.301 434.000 0.301
2.3(12) Beton K - 250 ( fc 20) Untuk Struktur Drainase Beton Minor 172.40 172.40 M³ 3.702 172.400 3.702 172.400 3.702
2.3(12) Beton K - 250 ( fc 20) Untuk Struktur Drainase Beton Minor 35.01 M³ 0.561 24.100 0.386 24.100 0.386
2.3(13) Baja Tulangan Untuk Struktur Drainase Beton Minor ( 24 Polos ) 11380.60 10,346.00 Kg 2.640 11380.600 2.640 11380.600 2.640
2.3(13) Baja Tulangan Untuk Struktur Drainase Beton Minor ( 24 Polos ) 1,221.38 Kg 0.267 111.600 0.024 850.240 0.186 961.840 0.211

DIVISI 3. PEKERJAAN TANAH


3.1.(6) Galian Perkerasan Beraspal Dengan Cold Milling Machine 41.80 38.00 M³ 0.228 41.800 0.228 41.800 0.228
3.1.(6) Galian Perkerasan Beraspal Dengan Cold Milling Machine 66.39 M³ 0.341 16.895 0.087 16.895 0.087
3.1.(7) Galian Perkerasan Beraspal Tanpa Cold Milling Machine 661.50 654.00 M³ 0.861 231.316 0.301 430.184 0.566 661.500 0.861
3.1.(8) Galian Perkerasan Berbutir 660.00 600.00 M³ 0.903 159.000 0.218 501.000 0.686 660.000 0.903
3.1.(8) Galian Perkerasan Berbutir 783.50 M³ 1.072 337.755 0.462 337.755 0.462
3.3.(1) Penyiapan Badan Jalan 4,410.00 5,450.00 M² 0.266 1590.000 0.096 2820.000 0.170 4410.000 0.266
3.4.(3) Pemotongan Pohon Pilihan Diameter 30 - 50 cm 99.00 120.00 Buah 0.388
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2 (2b) Lapis Pondasi Agregate Kelas S 600.00 600.00 M³ 2.520
DIVISI 5. PERKERASAN BERBUTIR
5.5 (1) Lapis Pondasi Agregat Semen Klas A ( cement Treated Base ) (CTB) 661.50 818.00 M³ 6.772 238.500 2.442 423.000 4.331 661.500 6.772
5.5 (2) Lapis Pondasi Agregat Klas B 1,090.70 M³ 4.018 328.790 1.211 275.500 1.015 604.290 2.226
DIVISI 6. PERKERASAN ASPAL
6.1(2b) Lapis Perekat - Aspal Emulsi 5,836.71 5,306.10 Liter 1.107 985.487 0.187 4111.416 0.780 5096.903 0.967
6.1(2b) Lapis Perekat - Aspal Emulsi 708.34 Liter 0.134
6.3(5b) Laston Lapis Aus Modifikasi (AC - WC Mod) Elastomer Sintetis 996.82 906.20 TON 23.741 717.400 17.086 717.400 17.086
6.3(5b) Laston Lapis Aus Modifikasi (AC - WC Mod) Elastomer Sintetis 99.99 TON 2.312
6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Elastomer Sintetis 1,488.38 1,868.00 TON 34.830 268.700 6.288 1031.920 1300.620 30.436
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L) Mod) Elastomer Sintetis 342.00 379.50 TON 8.001 342.000 8.001 342.000 8.001
DIVISI 7. STRUKTUR
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.1(2) Lapis Pondasi Aggregat Klas B untuk Perkerjaan Minor 40.00 40.00 M³ 0.147
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor 12.00 12.00 M³ 0.623 12.000 0.623 12.000 0.623
8.1(9) Residu Bitumen untuk Pekerjaan Minor 96.00 96.00 Liter 0.018 96.000 0.018 96.000 0.018
8.3(3) Pohon Jenis Mahoni dan Penanaman 360.00 360.00 Buah 1.411
8.4(1) Marka Jalan Termoplastik 231.00 210.00 M² 0.431
8.4(1) Marka Jalan Termoplastik 74.83 M² 0.140
8.4(5) Patok Pengarah 68.00 68.00 Buah 0.266
DIVISI 9. PEKERJAAN HARIAN
9.1(1) Mandor 28.00 28.00 Jam 0.005
9.1(2) Pekerja Biasa 84.00 84.00 Jam 0.011
9.1(4)a Dump Truck Kapasitas 3-4 m3 28.00 28.00 Jam 0.083
9.1(11) Alat Penggali ( Excavator ) 80 - 140 PK 28.00 28.00 Jam 0.062 28.000 0.062 28.000 0.062
9.1(12) Crane 10 - 15 Ton 28.00 28.00 Jam 0.083
9.1(14) Penggilas Bervibrasi 5 - 8 Ton 28.00 28.00 Jam 0.054

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

10.1(1) Pemeliharaan rutin perkerasan 1.00 1.00 Ls 0.196 1.000 0.196 1.000 0.196
10.1(2) Pemeliharaan rutin bahu jalan 1.00 1.00 Ls 0.196 0.500 0.098 0.500 0.098
10.1(3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan 1.00 1.00 Ls 0.196 0.500 0.098 0.500 0.098
10.1(4) Pemeliharaan rutin perlengkapan jalan 1.00 1.00 Ls 0.196

100.00

KEMAJUAN FISIK MINGGUAN KUMULATIF REALISASI 77.418


KEMAJUAN FISIK MINGGUAN KUMULATIF RENCANA 68.160
DEVIASI POSITIP 9.258
DEVIASI NEGATIP

Disetujui, Dibuat Dibuat


PO Bina Marga Konsultan Supervisi Dibuat
Konsultan Supervisi

JUMRI ( ILHAM IRAWAN, ST. ) ( Ir. PARUHUMAN LUBIS. )


NIP. 19670203 199302 1001 Quantity Engineer Site Engineer
Ø 10 - 15 Ø 8 - 12,5

Perhitungan beton dan pembesian

beton
volume beton 172,40 m3

berat besi 10346 kg

berat besi 1m3 beton = 10346/172,4 = 60,01 kg

volume beton 1m¹


0.60 97.50
0,12 x 2 x 1 x1 = 0.24

0,12 x 1,24 x 1 = 0.15

0,15 x 1 x 1 = 0.15

0,12 x 0,12 x 2 x 1 0.03


Volume Segi tiga Beton (0,15 x 0,15)/2 X2 0.023
volume beton 0.59 350.00 207.55 m3

1.69 31.92 53.83


100.00
11,172.67
97.50 195.00
119.00 119.00 314.00

Baja tulangan 0.175 0.175 0.031


0.248 14.00 3.47
1.00 untuk saluran /meter 3.47 0.395 1.371 KG

tulangan pokok 3.14 x 7 = 21.98 m 0.617 13.562 KG

Tulangan bagi 1 x 22 = 22.00 m 0.395 8.690 KG

Tul segi tiga 0,175 x 0,175 0.031 0.061


0,248 x 14 3.47 m
Total berat besi /meter saluran 23.62 286.00 6,755.98

Tutup
Tulangan pokok 1,19 x 7 = 8.33 m 5.14 KG

Tulangan Bagi 1 x 8 8.00 m 3.16 KG


120.00 8.30 KG 995.95
TULANGAN POKOK Ø 10 - 15 13.56 5.140 18.70
TULANGAN BAGI Ø 8 - 12,5 8.69 3.160 1.37 13.22
31.92

- 11,172.67 KG

100.00

galian p = 150 m 195 m3


besi = 75 m - KG

85 M 11,172.67
175.00

12.00 100.00 12.00

1.00 36.00 22.20 0.03 0.6167


0.617
0.395
0.222

3.14 0.05 0.05 0.01


NAMA KEGIATAN SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JATIM
NAMA PAKET PENINGKATAN STRUKTUR JALAN LINGKAR NGAWI
PENYEDIA JASA PT.SELO MANUNGGAL SEJATI
NOMOR KONTRAK KU.08.08 / 2002 / WIL - II/ NGK / 2015 Tgl: 17 APRIL 2015
KONSULTAN PT.BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT. KRIDA PRATAMA ADHICIPTA, (Ass).
SUMBER DANA APBN TAHUN ANGGARAN 2015

FLOTING ITEM PEKERJAAN PAKET 12 LINGKAR NGAWI 2015


UTARA

STA 00 +600 STA 00+ 500 STA 00 + 400 STA 00+ 300 STA 00 + 200 STA 00 + 100 STA 0 + 000
JEMBATAN

KOTA NGAWI CARUBAN

KM 184 + 000 KM 183 + 900 KM 183 + 800 KM 183 + 700 KM 183 + 600 KM 183 + 500 KM 183 + 400

BATAS PEKERJAAN

PASANGAN BATU

JEMBATAN

BAHU JALAN EXISTING


PERHITUNGAN BACK UP QUANTITY
KALIBRASI ASPAL SPRAYER
TINGGI TINGGI TINGGI
NO LITER NO LITER NO LITER
( CM ) ( CM ) ( CM )
1 Err:522 Err:522 21 Err:522 Err:522 41 Err:522 Err:522
2 Err:522 Err:522 22 Err:522 Err:522 42 Err:522 Err:522
3 Err:522 Err:522 23 Err:522 Err:522 43 Err:522 Err:522
4 Err:522 Err:522 24 Err:522 Err:522 44 Err:522 Err:522
5 Err:522 Err:522 25 Err:522 Err:522 45 Err:522 Err:522
6 Err:522 Err:522 26 Err:522 Err:522 46 Err:522 Err:522
7 Err:522 Err:522 27 Err:522 Err:522 47 Err:522 Err:522
8 Err:522 Err:522 28 Err:522 Err:522 48 Err:522 Err:522
9 Err:522 Err:522 29 Err:522 Err:522 49 Err:522 Err:522
10 Err:522 Err:522 30 Err:522 Err:522 50 Err:522 Err:522
11 Err:522 Err:522 31 Err:522 Err:522 51 Err:522 Err:522
12 Err:522 Err:522 32 Err:522 Err:522 52 Err:522 Err:522
13 Err:522 Err:522 33 Err:522 Err:522 53 Err:522 Err:522
14 Err:522 Err:522 34 Err:522 Err:522 54 Err:522 Err:522
15 Err:522 Err:522 35 Err:522 Err:522 55 Err:522 Err:522

16 Err:522 Err:522 36 Err:522 Err:522 56 Err:522 Err:522


17 Err:522 Err:522 37 Err:522 Err:522 57 Err:522 Err:522
18 Err:522 Err:522 38 Err:522 Err:522 58 Err:522 Err:522
19 Err:522 Err:522 39 Err:522 Err:522 59 Err:522 Err:522
20 Err:522 Err:522 40 Err:522 Err:522 60 Err:522 Err:522

Bina Marga Konsultan Penydia jasa

Chief Inspector Pelaksana


paket legundi - bunder

tanggal awal liter akhir liter pemakaian


18/11 36 540 15 225 315
21/11 29 428 22 330 98
22/11 22 330 15 225 105
23/11 36 540 15 225 315
24/11 39 585 15 225 360
25/11 38 570 26 390 180
3-Dec 43 640 31 465 175
5-Dec 50 750 36 540 210
6-Dec 47 705 36 540 165
8-Dec 36 540 19 280 260
9-Dec 30 450 20 300 150
10-Dec 20 300 10 145 155
14-Dec 51 765 29 435 330
15-Dec 29 435 14 215 220
total liter 3038
drum 15.19
PERHITUNGAN VOLUME
DIVISI II 2.1 ( 1 ) : DRAINASE
Pekerjaan : 3
Penyedia Jasa : PT.SELO MANUNGGAL SEJATI
Konsultan : PT. BUANA ARCHICON, PT. GLOBAL PROFEX SYNERGY, PT. KRIDA PRATA

No. KM STA Posisi Kiri Panjang Lebar Lebar


Rata-rata
(M') (M') (M2)
1 2 3 4 5 6 7

1 0+000 - 0+025 1.00 25.00 1.30

2 0+025 - 0+050 1.00 25.00 1.30

3 0+050 - 0+075 1.00 25.00 1.30

4 0+075 - 0+0100 1.00 25.00 1.30

5 0+0100 - 0+0125 1.00 25.00 1.30

6 0+0125 - 0+0150 1.00 25.00 1.30

7 0+0150 - 0+0175 1.00 25.00 1.30

8 0+0175 - 0+0200 1.00 25.00 1.30

9 0+0200 - 0+0225 1.00 25.00 1.30

10 0+0225 - 0+0250 1.00 25.00 1.30

11 0+0250 - 0+0275 1.00 25.00 1.30

12 0+0275 - 0+0300 1.00 25.00 1.30

13 0+0300 - 0+0325 1.00 25.00 1.30

14 0+0325 - 0+0350 1.00 25.00 1.30

15 0+0350 - 0+0375 1.00 25.00 1.30

16 0+0375 - 0+0400 1.00 25.00 1.30

17 0+0400 - 0+0405,5 2.00 5.50 1.30


SUB TOTAL
TOTAL

Disetujui Oleh : Diperiksa Oleh


Pengawas Lapangan Konsultan Supervisi
Project Officer

MOCH. CHOIRON ASJ'ARI SOETARTO


NIP. 19670203 199302 1001 Inspektor
RGY, PT. KRIDA PRATAMA ADHICIPTA ( Ass )

Tebal
Luas Volume Keterangan
Rencana
(M2) (M2) (M3)
8 9 10=8x9 11

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

32.50 1.00 32.50

7.15 1.00 7.15


527.15 527.15
527.15 527.15

sa Oleh Dibuat Oleh :


n Supervisi Penyedia Jasa
PT. MODERNA TEHNIK PERKASA

ARTO ANDRI PURNOMO, ST


ektor Pelaksana lapangan
PERHITUNGAN VOLUME
DIVISI V ( 5.5.1 ) : PERKERASAN BERBUTIR
Pekerjaan : Lapis Pondasi Agregat Dengan Cement Treated Base ( CTB )
Penyedia Jasa : PT.SELO MANUNGGAL SEJATI
Konsultan : PT.BUANA ARCHICON. PT. GLOBAL PROFEX SYNERGY PT. KRIDA PRATAMA ADHICIPTA. (Ass)

Posisi Lebar
Tebal
No. KM STA Kanan/ Panjang Lebar Luas Volume Keterangan
Rencana
Kiri Rata-rata

(M') (M') (M2) (M2) (M2) (M3)


1 2 3 4 5 6 7 8 9 10=8x9 11

SEGMEN 1
1 0+00- 0+025 Ka/KI 25.00 5.00 125.00 0.170 21.25
2 0+25- 0+050 Ka/KI 25.00 5.00 125.00 0.170 21.25
3 0+50- 0+075 Ka/KI 25.00 5.00 125.00 0.170 21.25
4 0+75- 0+100 Ka/KI 25.00 5.00 125.00 0.170 21.25
5 0+100- 0+125 Ka/KI 25.00 5.00 125.00 0.170 21.25
6 0+125- 0+150 Ka/KI 25.00 5.00 125.00 0.170 21.25
7 0+150- 0+175 Ka/Ki 25.00 5.00 125.00 0.170 21.25
8 0+175- 0+200 Ka/KI 25.00 5.00 125.00 0.170 21.25
9 0+200- 0+225 Ka/ki 25.00 5.00 125.00 0.170 21.25
10 0+225 - 0+250 Ka/KI 25.00 5.00 125.00 0.170 21.25
11 0+2550 - 0+275 Ka/KI 25.00 5.00 125.00 0.170 21.25
12 0+275 - 0+300 Ka/KI 25.00 5.00 125.00 0.170 21.25
13 0+300 - 0+325 Ka/KI 25.00 5.00 125.00 0.170 21.25
14 0+325 - 0+350 Ka/KI 25.00 5.00 125.00 0.170 21.25
15 0+350 - 0+375 Ka/KI 25.00 5.00 125.00 0.170 21.25
16 0+375 - 0+400 Ka/KI 25.00 5.00 125.00 0.170 21.25
17 0+400 - 0+425 Ka/KI 25.00 5.00 125.00 0.170 21.25
18 0+425 - 0+450 Ka/KI 25.00 5.00 125.00 0.170 21.25
19 0+450 - 0+475 Ka/KI 25.00 5.00 125.00 0.170 21.25
20 0+475 - 0+500 Ka/KI 25.00 5.00 125.00 0.170 21.25
21 0+500 - 0+525 Ka/KI 25.00 5.00 125.00 0.170 21.25
22 0+525 - 0+550 Ka/KI 25.00 5.00 125.00 0.170 21.25
23 0+550 - 0+575 Ka/KI 25.00 5.00 125.00 0.170 21.25
24 0+575 - 0+600 Ka/KI 25.00 5.00 125.00 0.170 21.25
25 0+600 - 0+625 Ka/KI 25.00 5.00 125.00 0.170 21.25
26 0+625 - 0+650 Ka/KI 25.00 5.00 125.00 0.170 21.25
27 0+650 - 0+675 Ka/KI 25.00 5.00 125.00 0.170 21.25
28 0+675 - 0+700 Ka/KI 25.00 5.00 125.00 0.170 21.25
-
SEGMEN 2 -
1 0+00- 0+025 Ka/KI 25.00 5.00 125.00 0.170 21.25
2 0+25- 0+050 Ka/KI 25.00 5.00 125.00 0.170 21.25
3 050- 0+075 Ka/KI 25.00 5.00 125.00 0.170 21.25
4 0+75- 0+100 Ka/KI 25.00 5.00 125.00 0.170 21.25
5 0+100- 0+125 Ka/KI 25.00 5.00 125.00 0.170 21.25
6 0+125- 0+150 Ka/KI 25.00 5.00 125.00 0.170 21.25
7 0+150- 0+175 Ka/Ki 25.00 5.00 125.00 0.170 21.25
8 0+175- 0+200 Ka/KI 25.00 5.00 125.00 0.170 21.25
9 0+200- 0+225 Ka/ki 25.00 5.00 125.00 0.170 21.25
10 0+225 - 0+250 Ka/KI 25.00 5.00 125.00 0.170 21.25
11 0+2550 - 0+275 Ka/KI 25.00 5.00 125.00 0.170 21.25
12 0+275 - 0+300 Ka/KI 25.00 5.00 125.00 0.170 21.25
13 0+300 - 0+350 Ka/KI 35.00 5.00 175.00 0.170 29.75
14 -
15 -
16 -
17 -
SUB TOTAL
TOTAL 879.75

Disetujui Oleh : Diperiksa Oleh Dibuat Oleh :


Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PT. SELO MANUNGGAL SEJATI

JUMRI SOETARTO ANDRI PURNOMO, ST


NIP. 19670203 199302 1001 Inspektor Pelaksana lapangan

PERHITUNGAN VOLUME
DIVISI III 3.3.(1 ) : PENYIAPAN BADAN JALAN
Pekerjaan : PENYIAPAN BADAN JALAN
Penyedia Jasa : PT.SELO MANUNGGAL SEJATI
Konsultan : PT.BUANA ARCHICON. PT. GLOBAL PROFEX SYNERGY PT. KRIDA PRATAMA ADHICIPTA. (Ass)

Posisi Lebar
Tebal
No. KM STA Kanan/ Panjang Lebar Luas Volume Keterangan
Rencana
Kiri Rata-rata

(M') (M') (M2) (M2) (M2) (M3)


1 2 3 4 5 6 7 8 9 10=8x9 11

SEGMEN 1
1 0+00- 0+025 Ka/KI 25.00 5.00 125.00
2 0+25- 0+050 Ka/KI 25.00 5.00 125.00
3 0+50- 0+075 Ka/KI 25.00 5.00 125.00
4 0+75- 0+100 Ka/KI 25.00 5.00 125.00
5 0+100- 0+125 Ka/KI 25.00 5.00 125.00
6 0+125- 0+150 Ka/KI 25.00 5.00 125.00
7 0+150- 0+175 Ka/Ki 25.00 5.00 125.00
8 0+175- 0+200 Ka/KI 25.00 5.00 125.00
9 0+200- 0+225 Ka/ki 25.00 5.00 125.00
10 0+225 - 0+250 Ka/KI 25.00 5.00 125.00
11 0+2550 - 0+275 Ka/KI 25.00 5.00 125.00
12 0+275 - 0+300 Ka/KI 25.00 5.00 125.00
13 0+300 - 0+325 Ka/KI 25.00 5.00 125.00
14 0+325 - 0+350 Ka/KI 25.00 5.00 125.00
15 0+350 - 0+375 Ka/KI 25.00 5.00 125.00
16 0+375 - 0+400 Ka/KI 25.00 5.00 125.00
17 0+400 - 0+425 Ka/KI 25.00 5.00 125.00
18 0+425 - 0+450 Ka/KI 25.00 5.00 125.00
19 0+450 - 0+475 Ka/KI 25.00 5.00 125.00
20 0+475 - 0+500 Ka/KI 25.00 5.00 125.00
21 0+500 - 0+525 Ka/KI 25.00 5.00 125.00
22 0+525 - 0+550 Ka/KI 25.00 5.00 125.00
23 0+550 - 0+575 Ka/KI 25.00 5.00 125.00
24 0+575 - 0+600 Ka/KI 25.00 5.00 125.00
25 0+600 - 0+625 Ka/KI 25.00 5.00 125.00
26 0+625 - 0+650 Ka/KI 25.00 5.00 125.00
27 0+650 - 0+675 Ka/KI 25.00 5.00 125.00
28 0+675 - 0+700 Ka/KI 25.00 5.00 125.00

SEGMEN 2
1 0+00- 0+025 Ka/KI 25.00 5.00 125.00
2 0+25- 0+050 Ka/KI 25.00 5.00 125.00
3 050- 0+075 Ka/KI 25.00 5.00 125.00
4 0+75- 0+100 Ka/KI 25.00 5.00 125.00
5 0+100- 0+125 Ka/KI 25.00 5.00 125.00
6 0+125- 0+150 Ka/KI 25.00 5.00 125.00
7 0+150- 0+175 Ka/Ki 25.00 5.00 125.00
8 0+175- 0+200 Ka/KI 25.00 5.00 125.00
9 0+200- 0+225 Ka/ki 25.00 5.00 125.00
10 0+225 - 0+250 Ka/KI 25.00 5.00 125.00
11 0+2550 - 0+275 Ka/KI 25.00 5.00 125.00
12 0+275 - 0+300 Ka/KI 25.00 5.00 125.00
13 0+300 - 0+325 25.00 5.00 125.00
14 0+325 - 0+350 25.00 5.00 125.00
15 0+350 - 0+375 25.00 5.00 125.00
16 0+375 - 0+400 25.00 5.00 125.00
17 0+400 - 0+405,5 5.50 5.00 27.50

SUB TOTAL 5,527.50


TOTAL 5,527.50

Disetujui Oleh : Diperiksa Oleh Dibuat Oleh :


Pengawas Lapangan Konsultan Supervisi Penyedia Jasa
PT. SELO MANUNGGAL SEJATI

JUMRI SOETARTO ANDRI PURNOMO, ST


NIP. 19670203 199302 1001 Inspektor Pelaksana lapangan
PERHITUNGAN VOLUME
DIVISI III 3,1 ( 7 ) : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Tanpa Cold Milling Machine
Penyedia Jasa : PT.SELO MANUNGGAL SEJATI
Konsultan : PT.BUANA ARCHICON. PT. GLOBAL PROFEX SYNERGY PT. KRIDA PR

Posisi
No. KM STA Kanan/ Panjang Lebar
Kiri

(M') (M')
1 2 3 4 5 6

SEGMEN 1
1 0+00- 0+025 Ka/KI 25.00 5.00
2 0+25- 0+050 Ka/KI 25.00 5.00
3 0+50- 0+075 Ka/KI 25.00 5.00
4 0+75- 0+100 Ka/KI 25.00 5.00
5 0+100- 0+125 Ka/KI 25.00 5.00
6 0+125- 0+150 Ka/KI 25.00 5.00
7 0+150- 0+175 Ka/Ki 25.00 5.00
8 0+175- 0+200 Ka/KI 25.00 5.00
9 0+200- 0+225 Ka/ki 25.00 5.00
10 0+225 - 0+250 Ka/KI 25.00 5.00
11 0+2550 - 0+275 Ka/KI 25.00 5.00
12 0+275 - 0+300 Ka/KI 25.00 5.00
13 0+300 - 0+325 Ka/KI 25.00 5.00
14 0+325 - 0+350 Ka/KI 25.00 5.00
15 0+350 - 0+375 Ka/KI 25.00 5.00
16 0+375 - 0+400 Ka/KI 25.00 5.00
17 0+400 - 0+425 Ka/KI 25.00 5.00
18 0+425 - 0+450 Ka/KI 25.00 5.00
19 0+450 - 0+475 Ka/KI 25.00 5.00
20 0+475 - 0+500 Ka/KI 25.00 5.00
21 0+500 - 0+525 Ka/KI 25.00 5.00
22 0+525 - 0+550 Ka/KI 25.00 5.00
23 0+550 - 0+575 Ka/KI 25.00 5.00
24 0+575 - 0+600 Ka/KI 25.00 5.00
25 0+600 - 0+625 Ka/KI 25.00 5.00
26 0+625 - 0+650 Ka/KI 25.00 5.00
27 0+650 - 0+675 Ka/KI 25.00 5.00
28 0+675 - 0+700 Ka/KI 25.00 5.00

SEGMEN 2
1 0+00- 0+025 Ka/KI 25.00 5.00
2 0+25- 0+050 Ka/KI 25.00 5.00
3 050- 0+075 Ka/KI 25.00 5.00
4 0+75- 0+100 Ka/KI 25.00 5.00
5 0+100- 0+125 Ka/KI 25.00 5.00
6 0+125- 0+150 Ka/KI 25.00 5.00
7 0+150- 0+175 Ka/Ki 25.00 5.00
8 0+175- 0+200 Ka/KI 25.00 5.00
9 0+200- 0+225 Ka/ki 25.00 5.00
10 0+225 - 0+250 Ka/KI 25.00 5.00
11 0+2550 - 0+275 Ka/KI 25.00 5.00
12 0+275 - 0+300 Ka/KI 25.00 5.00
13 0+300 - 0+325 Ka/KI 25.00 5.00
14 0+325 - 0+350 Ka/KI 25.00 5.00
15 0+350 - 0+375 25.00 5.00
16 0+375 - 0+400 25.00 5.00
17 0+400 - 0+405,5 5.50 5.00

SUB TOTAL
TOTAL

Disetujui Oleh : Diperiksa Oleh


Pengawas Lapangan Konsultan Supervisi

JUMRI SOETARTO
NIP. 19670203 199302 1001 Inspektor

PERHITUNGAN VOLUME

DIVISI III 3,1 ( 8 ) : PEKERJAAN TANAH


Pekerjaan : Galian Perkerasan Berbutir Tanpa Cold Milling Machine
Penyedia Jasa : PT.SELO MANUNGGAL SEJATI
Konsultan : PT.BUANA ARCHICON. PT. GLOBAL PROFEX SYNERGY PT. KRIDA PR

Posisi
No. KM STA Kanan/ Panjang Lebar
Kiri

(M') (M')
1 2 3 4 5 6

SEGMEN 1
1 0+00- 0+025 Ka/KI 25.00 5.00
2 0+25- 0+050 Ka/KI 25.00 5.00
3 0+50- 0+075 Ka/KI 25.00 5.00
4 0+75- 0+100 Ka/KI 25.00 5.00
5 0+100- 0+125 Ka/KI 25.00 5.00
6 0+125- 0+150 Ka/KI 25.00 5.00
7 0+150- 0+175 Ka/Ki 25.00 5.00
8 0+175- 0+200 Ka/KI 25.00 5.00
9 0+200- 0+225 Ka/ki 25.00 5.00
10 0+225 - 0+250 Ka/KI 25.00 5.00
11 0+2550 - 0+275 Ka/KI 25.00 5.00
12 0+275 - 0+300 Ka/KI 25.00 5.00
13 0+300 - 0+325 Ka/KI 25.00 5.00
14 0+325 - 0+350 Ka/KI 25.00 5.00
15 0+350 - 0+375 Ka/KI 25.00 5.00
16 0+375 - 0+400 Ka/KI 25.00 5.00
17 0+400 - 0+425 Ka/KI 25.00 5.00
18 0+425 - 0+450 Ka/KI 25.00 5.00
19 0+450 - 0+475 Ka/KI 25.00 5.00
20 0+475 - 0+500 Ka/KI 25.00 5.00
21 0+500 - 0+525 Ka/KI 25.00 5.00
22 0+525 - 0+550 Ka/KI 25.00 5.00
23 0+550 - 0+575 Ka/KI 25.00 5.00
24 0+575 - 0+600 Ka/KI 25.00 5.00
25 0+600 - 0+625 Ka/KI 25.00 5.00
26 0+625 - 0+650 Ka/KI 25.00 5.00
27 0+650 - 0+675 Ka/KI 25.00 5.00
28 0+675 - 0+700 Ka/KI 25.00 5.00

SEGMEN 2
1 0+00- 0+025 Ka/KI 25.00 5.00
2 0+25- 0+050 Ka/KI 25.00 5.00
3 050- 0+075 Ka/KI 25.00 5.00
4 0+75- 0+100 Ka/KI 25.00 5.00
5 0+100- 0+125 Ka/KI 25.00 5.00
6 0+125- 0+150 Ka/KI 25.00 5.00
7 0+150- 0+175 Ka/Ki 25.00 5.00
8 0+175- 0+200 Ka/KI 25.00 5.00
9 0+200- 0+225 Ka/ki 25.00 5.00
10 0+225 - 0+250 Ka/KI 25.00 5.00
11 0+2550 - 0+275 Ka/KI 25.00 5.00
12 0+275 - 0+300 Ka/KI 25.00 5.00
13 0+300 - 0+350 Ka/KI 50.00 5.00

SUB TOTAL
TOTAL

Disetujui Oleh : Diperiksa Oleh


Pengawas Lapangan Konsultan Supervisi
JUMRI SOETARTO
NIP. 19670203 199302 1001 Inspektor
VOLUME

Milling Machine

ROFEX SYNERGY PT. KRIDA PRATAMA ADHICIPTA. (Ass)

Lebar
Tebal
Luas Volume Keterangan
Rencana
Rata-rata

(M2) (M2) (M2) (M3)


7 8 9 10=8x9 11

125.00 0.150 18.75


125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75

125.00 0.150 18.75


125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
125.00 0.150 18.75
27.50 0.150 4.13

5,527.50 829.13
5,527.50 829.13

sa Oleh Dibuat Oleh :


n Supervisi Penyedia Jasa
PT. SELO MANUNGGAL SEJATI

ARTO ANDRI PURNOMO, ST


ektor Pelaksana lapangan

VOLUME

lling Machine

ROFEX SYNERGY PT. KRIDA PRATAMA ADHICIPTA. (Ass)

Lebar
Tebal
Luas Volume Keterangan
Rencana
Rata-rata

(M2) (M2) (M2) (M3)


7 8 9 10=8x9 11

125.00 0.100 12.50


125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50

125.00 0.100 12.50


125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
125.00 0.100 12.50
250.00 0.100 25.00

5,250.00 525.00
5,250.00 525.00

sa Oleh Dibuat Oleh :


n Supervisi Penyedia Jasa
PT. SELO MANUNGGAL SEJATI

ARTO ANDRI PURNOMO, ST


ektor Pelaksana lapangan
PERHITUNGAN V
DIVISI VI 6.3.(6a) : PERKERASAN ASPAL
Pekerjaan : Laston Lapis Antara ( AC-BC) (gradasi halus/kasar)
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING
Lokasi : ( KM ….. + …... s/d KM …. + …... )

Sket

Posisi Lebar
No. KM STA Kanan/ Panjang Lebar Luas
Kiri Rata-rata

(M') (M') (M2) (M2)

1 2 3 4 5 6 7 8

1+325.0 Ka 3.00
1 51.70 3.00 155.10
1+376.7 Ka 3.00

1+438.3 Ka 2.60
2 41.40 2.60 107.64
1+479.7 Ka 2.60

1+833.5 Ka 2.35
3 36.80 2.35 86.48
1+870.3 Ka 2.35

1+870.3 Ka/Ki 6.00


4 29.70 6.00 178.20
1+900.0 Ka/Ki 6.00

2+044.8 Ka/ki 6.00


5 13.50 6.00 81.00
2+058.3 Ka/ki 6.00

2+069.7 Ka 3.60
6 20.80 3.60 74.88
2+090.5 Ka 3.60

2+216.2 Ka 3.60
7 16.30 3.60 58.68
2+232.5 Ka 3.60

2+458.0 Ka 3.50
8 22.00 3.50 77.00
2+480.0 Ka 3.50

2+480.0 Ka/Ki 6.00


9 8.30 6.00 49.80
2+488.3 Ka/Ki 6.00

2+488.3 Ka 3.60
10 3.40 3.60 12.24
2+491.7 Ka 3.60

2+491.7 Ka 3.60
11 4.20 3.60 15.12
2+495.9 Ka 3.60

2+512.3 Ka 3.50
12 34.60 3.50 121.10
2+546.9 Ka 3.50

2+502.5 Ki 3.60
13 9.80 3.60 35.28
2+512.3 Ki 3.60

SUB TOTAL 1,052.52


TOTAL 1,052.52

Disetujui Oleh : Diperiksa


Pengawas Lapangan Konsultan Su

MOCH. CHOIRON ASJ'ARI RAHMAT SARA


NIP. 19700104 200812 1001 Inspekt
Project Officer
PERHITUNGAN VOLUME

AMARA ENGINEERING

Tebal Volume Berat Berat Kadar Rencana

Bahan
Aspal
Rencana Jenis Tonase Aspal Aditif Pengisi Gradasi Kasar
Keras
(Filler)
(M) (M3) (M3) Ton Rencana Ton Kg Kg Ton
8*9 10*11 13*12 0.25%*14*1000 2%*(12- 12-14-15-16
13)*1000
9 10 11 12 13 14 15 16 17

0.07 10.86 2.28 24.75 0.0595 1.47 3.68 493.89 22.78

0.07 7.53 2.28 17.18 0.0595 1.02 2.56 342.40 15.81

0.07 6.05 2.28 13.80 0.0595 0.82 2.05 274.85 12.70

0.07 12.47 2.28 28.44 0.0595 1.69 4.23 567.62 26.18

0.07 5.67 2.28 12.93 0.0595 0.77 1.92 257.36 11.90

0.07 5.24 2.28 11.95 0.0595 0.71 1.78 237.83 11.00


0.07 4.11 2.28 9.37 0.0595 0.56 1.39 186.12 8.62

0.07 5.39 2.28 12.29 0.0595 0.73 1.83 244.59 11.31

0.07 3.49 2.28 7.95 0.0595 0.47 1.18 157.77 7.32

0.07 0.86 2.28 1.95 0.0595 0.12 0.29 37.88 1.80

0.07 1.06 2.28 2.41 0.0595 0.14 0.36 47.07 2.22

0.07 8.48 2.28 19.33 0.0595 1.15 2.87 385.36 17.79

0.07 2.47 2.28 5.63 0.0595 0.34 0.84 111.42 5.18

167.98 9.99 24.99 3,344.17 154.62


167.98 9.99 24.99 3,344.17 154.62

Diperiksa Oleh Dibuat Oleh :


Konsultan Supervisi Penyedia Jasa
PT. MODERNA TEHNIK PERKASA

RAHMAT SARASWO, ST ANDRI PURNOMO, ST


Inspektor Pelaksana lapangan
167.98
PERHITUNGAN VOLUME
DIVISI III 3.1.(6) : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

0+100.0 Ka 3.00
1 8.90 3.00
0+108.9 Ka 3.00

0+131.7 Ka 3.50
2 13.00 3.50
0+144.7 Ka 3.50

0+222.1 Ki 2.50
3 27.90 2.50
0+250.0 Ki 2.50

0+250.0 CL 2.00
4 10.70 2.00
0+260.7 CL 2.00

0+239.0 Ka 2.00
5 64.50 2.00
0+303.5 Ka 2.00

0+265.0 CL 2.00
6 35.00 2.00
0+300.0 CL 2.00

0+319.4 Ka 2.00
7 39.00 2.00
0+358.4 Ka 2.00

0+323.2 CL 2.00
8 4.20 2.00
0+327.4 CL 2.00

0+335.3 CL 2.00
9 39.70 2.00
0+375.0 CL 2.00

0+435.5 Ka/Ki 6.00


10 7.50 6.00
0+443.0 Ka/Ki 6.00

0+443.0 CL 1.50
11 9.00 1.50
0+452.0 CL 1.50

0+464.5 Ka 2.00
12 2.20 2.00
0+466.7 Ka 2.00

0+470.3 CL 2.00
13 7.20 2.00
0+477.5 CL 2.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket
Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

0+004.7 Ka 2.00
14 8.80 2.00
0+013.5 Ka 2.00

0+018.0 Ka 2.00
15 4.80 2.00
0+022.8 Ka 2.00

0+500.0 Ka 2.00
16 9.00 2.00
0+509.0 Ka 2.00

0+509.0 ki 3.00
17 8.60 3.00
0+517.6 Ki 3.00

0+525.0 Ka/Ki 6.00


18 5.00 6.00
0+530.0 Ka/Ki 6.00

0+530.0 CL/Ki 4.00


19 7.60 4.00
0+537.6 CL/Ki 4.00

0+537.6 Ka/Ki 6.00


20 17.40 6.00
0+555.0 Ka/Ki 6.00

0+555.0 Ka 3.00
21 12.30 3.00
0+567.3 Ka 3.00

0+584.0 Ka 6.00
22 16.00 6.00
0+600.0 Ka 6.00

0+602.0 CL 1.50
23 7.60 1.50
0+609.6 CL 1.50

0+609.6 Ka 2.50
24 6.80 2.50
0+616.4 Ka 2.50

0+623.8 CL 1.50
25 12.20 1.50
0+636.0 CL 1.50

0+632.5 Ka 2.00
26 3.50 2.00
0+636.0 Ka 2.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata
(M') (M') (M2)

1 2 3 4 5 6 7

0+646.7 Ka 3.00
27 6.40 3.00
0+653.1 Ka 3.00

0+653.1 Ka 2.00
28 16.10 2.00
0+669.2 Ka 2.00

0+671.0 Ka 4.00
29 30.00 4.00
0+701.0 Ka 4.00

0+711.5 Ka 2.00
30 13.30 2.00
0+724.8 Ka 2.00

0+737.5 Ka 3.00
31 12.50 3.00
0+750.0 Ka 3.00

0+750.0 Ka 3.00
32 28.70 3.00
0+778.7 Ka 3.00

0+786.3 Ka 2.00
33 18.90 2.00
0+805.2 Ka 2.00

0+810.5 Ka 2.00
34 14.50 2.00
0+825.0 Ka 2.00

0+825.0 Ka 4.00
35 24.00 4.00
0+849.0 Ka 4.00

0+849.0 Ka 2.00
36 11.00 2.00
0+860.0 Ka 2.00
0+860.0 CL/Ka 4.00
37 7.80 4.00
0+867.8 CL/Ka 4.00

0+866.8 Ki 3.00
38 19.00 3.00
0+885.8 Ki 3.00

0+876.8 Ka 3.00
39 7.30 3.00
0+884.1 Ka 3.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

0+000.0 Ka 3.00
40 4.30 3.00
0+004.3 Ka 3.00

0+004.3 CL/Ka 4.00


41 3.50 4.00
0+007.8 CL/Ka 4.00

0+007.8 Ka 3.00
42 3.20 3.00
0+011.0 Ka 3.00

0+914.2 Ka 3.00
43 15.60 3.00
0+929.8 Ka 3.00

0+929.8 Ka 3.50
44 17.00 3.50
0+946.8 Ka 3.50

0+948.8 Ka 2.00
45 6.20 2.00
0+955.0 Ka 2.00

0+955.0 Ka/Ki 6.00


46 11.00 6.00
0+966.0 Ka/Ki 6.00

0+975.0 Ka/Ki 6.00


47 25.00 6.00
1+000.0 Ka/Ki 6.00

1+000.0 Ka 3.00
48 13.30 3.00
1+013.3 Ka 3.00

1+025.0 Ka 3.00
49 4.00 3.00
1+029.0 Ka 3.00

1+036.0 Ka 2.00
50 14.00 2.00
1+050.0 Ka 2.00

1+073.8 Ka 2.10
51 3.50 2.10
1+077.3 Ka 2.10
1+083.3 Ka 2.00
52 4.60 2.00
1+087.9 Ka 2.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

1+098.0 Ki 3.00
53 17.00 3.00
1+115.0 Ki 3.00

1+103.7 Ka 2.30
54 26.50 2.30
1+130.2 Ka 2.30

1+135.5 Ka 1.80
55 18.80 1.80
1+154.3 Ka 1.80

1+161.4 Ka 1.90
56 6.50 1.90
1+167.9 Ka 1.90

1+175.0 Ka 2.30
57 30.60 2.30
1+205.6 Ka 2.30

1+210.0 Ka 3.50
58 40.00 3.50
1+250.0 Ka 3.50

1+250.0 Ka 3.00
59 64.00 3.00
1+314.0 Ka 3.00

1+379.6 CL 1.70
60 7.80 1.70
1+387.4 CL 1.70

1+387.4 Ka 3.00
61 20.40 3.00
1+407.8 Ka 3.00

1+396.0 Ki 3.00
62 6.40 3.00
1+402.4 Ki 3.00

1+409.3 CL 1.50
63 6.50 1.50
1+415.8 CL 1.50

1+415.8 Ka 3.20
64 22.50 3.20
1+438.3 Ka 3.20

1+438.3 CL 1.50
65 20.20 1.50
1+458.5 CL 1.50

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

1+485.9 Ka 2.30
66 8.10 2.30
1+494.0 Ka 2.30

1+494.0 Ka 3.10
67 9.50 3.10
1+503.5 Ka 3.10

1+515.0 Ka 4.00
68 14.20 4.00
1+529.2 Ka 4.00

1+538.5 Ka 2.50
69 11.50 2.50
1+550.0 Ka 2.50

1+561.0 Ka 2.30
70 18.30 2.30
1+579.3 Ka 2.30
1+597.0 Ka 3.50
71 11.30 3.50
1+608.3 Ka 3.50

1+625.0 Ka 2.70
72 10.40 2.70
1+635.4 Ka 2.70

1+635.4 CL/Ka 3.70


73 6.20 3.70
1+641.6 CL/Ka 3.70

1+641.6 Ka 3.00
74 44.70 3.00
1+686.3 Ka 3.00

1+687.1 CL 1.50
75 10.00 1.50
1+697.1 CL 1.50

1+697.1 Ki 3.00
76 8.10 3.00
1+705.2 Ki 3.00

1+689.0 Ka 2.00
77 61.00 2.00
1+750.0 Ka 2.00

1+763.8 CL/Ki 3.00


78 17.50 3.00
1+781.3 CL/Ki 3.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

1+750.0 Ka 2.50
79 50.00 2.50
1+800.0 Ka 2.50

1+800.0 Ka 1.70
80 25.00 1.70
1+825.0 Ka 1.70

1+804.8 Ki 3.00
81 10.00 3.00
1+814.8 Ki 3.00

1+825.0 Ka 2.00
82 8.50 2.00
1+833.5 Ka 2.00

1+826.0 Ki 4.00
83 16.90 4.00
1+842.9 Ki 4.00

1+849.0 Ki 3.00
84 9.20 3.00
1+858.2 Ki 3.00

1+849.0 Ka 2.30
85 21.30 2.30
1+870.3 Ka 2.30
1+900.0 Ka 4.00
86 44.20 4.00
1+944.2 Ka 4.00

1+944.2 Ka/Ki 6.00


87 8.50 6.00
1+952.7 Ka/Ki 6.00

1+963.4 CL/Ka 4.00


88 7.30 4.00
1+970.7 CL/Ka 4.00

1+970.7 Ka 2.00
89 13.20 2.00
1+983.9 Ka 2.00

1+983.9 CL/Ka 3.50


90 18.10 3.50
2+002.0 CL/Ka 3.50

2+011.2 Ka 1.50
91 27.60 1.50
2+038.8 Ka 1.50

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket
Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

2+058.3 Ki 3.00
92 4.20 3.00
2+062.5 Ki 3.00

2+058.3 Ka 3.00
93 11.40 3.00
2+069.7 Ka 3.00

2+097.2 Ka 3.00
94 15.40 3.00
2+112.6 Ka 3.00

2+112.6 Ka/Ki 6.00


95 24.10 6.00
2+136.7 Ka/Ki 6.00

2+144.7 Ka 2.50
96 14.50 2.50
2+159.2 Ka 2.50

2+159.2 Ka 3.00
97 7.70 3.00
2+166.9 Ka 3.00

2+166.9 Ka 2.50
98 42.10 2.50
2+209.0 Ka 2.50

2+233.2 Ka 2.00
99 44.30 2.00
2+277.5 Ka 2.00

2+277.5 Ka 3.00
100 11.20 3.00
2+288.7 Ka 3.00

2+288.7 Ka/Ki 6.00


101 61.30 6.00
2+350.0 Ka/Ki 6.00

2+350.0 Ki 3.00
102 1.90 3.00
2+351.9 Ki 3.00

2+351.9 Ki 1.50
103 4.80 1.50
2+356.7 Ki 1.50

2+360.5 Ki 1.50
104 5.60 1.50
2+366.1 Ki 1.50

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7
2+366.1 Ka/Ki 6.00
105 14.00 6.00
2+380.1 Ka/Ki 6.00

2+380.1 CL/Ka 4.50


106 3.80 4.50
2+383.9 CL/Ka 4.50

2+383.9 Ka/Ki 6.00


107 3.00 6.00
2+386.9 Ka/Ki 6.00

2+386.9 Ka 2.00
108 16.30 2.00
2+403.2 Ka 2.00

2+431.6 CL/Ka 3.50


109 26.40 3.50
2+458.0 CL/Ka 3.50

2+450.0 Ki 1.20
110 5.30 1.20
2+455.3 Ki 1.20

2+460.3 Ki 1.50
111 5.80 1.50
2+466.1 Ki 1.50

2+474.0 Ki 1.50
112 5.00 1.50
2+479.0 Ki 1.50

2+487.3 CL/Ki 1.50


113 3.40 1.50
2+490.7 CL/Ki 1.50

2+498.4 CL/Ka 4.00


114 13.90 4.00
2+512.3 CL/Ka 4.00

2+546.3 Ka/Ki 6.00


115 26.20 6.00
2+572.5 Ka/Ki 6.00

2+572.5 CL/Ka 4.00


116 10.30 4.00
2+582.8 CL/Ka 4.00

2+582.8 Ka 1.80
117 4.00 1.80
2+586.8 Ka 1.80

SUB TOTAL
TOTAL

Project Officer
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

2+586.8 Ka/Ki 6.00


118 13.20 6.00
2+600.0 Ka/Ki 6.00

2+650.0 CL/Ka 4.00


119 14.00 4.00
2+664.0 CL/Ka 4.00
2+686.7 Ka/Ki 6.00
120 3.80 6.00
2+690.5 Ka/Ki 6.00

2+690.5 Ka 2.00
121 4.80 2.00
2+695.3 Ka 2.00

2+695.3 CL/Ka 4.00


122 7.70 4.00
2+703.0 CL/Ka 4.00

2+690.2 Ki 1.20
123 4.50 1.20
2+694.7 Ki 1.20

2+703.0 Ka 3.00
124 5.20 3.00
2+708.2 Ka 3.00

2+708.2 Ka 2.00
125 14.70 2.00
2+722.9 Ka 2.00

2+722.9 CL/Ka 3.50


126 13.40 3.50
2+736.3 CL/Ka 3.50

2+750.0 CL/Ki 2.00


127 10.30 2.00
2+760.3 CL/Ki 2.00

2+768.8 CL/Ka 3.60


128 23.10 3.60
2+791.9 CL/Ka 3.60

2+791.5 Ki 2.40
129 5.50 2.40
2+797.0 Ki 2.40

2+791.9 Ka 2.30
130 34.60 2.30
2+826.5 Ka 2.30

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

2+830.4 Ka 2.30
131 14.40 2.30
2+844.8 Ka 2.30

2+840.5 Ki 3.00
132 21.00 3.00
2+861.5 Ki 3.00

2+888.5 Ka 2.10
133 13.20 2.10
2+901.7 Ka 2.10

2+906.8 Ki 2.00
134 5.80 2.00
2+912.6 Ki 2.00

2+943.0 Ki 1.70
135 4.50 1.70
2+947.5 Ki 1.70

2+912.6 Ka 3.00
136 40.40 3.00
2+953.0 Ka 3.00

2+953.0 Ki 1.70
137 13.30 1.70
2+966.3 Ki 1.70

2+966.3 Ka 3.00
138 15.00 3.00
2+981.3 Ka 3.00

2+985.6 CL/Ka 3.50


139 24.30 3.50
3+009.9 CL/Ka 3.50

3+009.9 Ka/Ki 6.00


140 11.30 6.00
3+021.2 Ka/Ki 6.00

3+021.2 CL/Ka 4.00


141 24.10 4.00
3+045.3 CL/Ka 4.00

3+045.3 Ka/Ki 6.00


142 4.70 6.00
3+050.0 Ka/Ki 6.00

3+050.0 CL/Ka 3.50


143 8.30 3.50
3+058.3 CL/Ka 3.50

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

3+058.3 Ka 1.80
144 12.00 1.80
3+070.3 Ka 1.80

3+078.1 Ka 3.00
145 8.30 3.00
3+086.4 Ka 3.00

3+099.0 Ka 2.00
146 4.00 2.00
3+103.0 Ka 2.00

3+103.0 CL/Ka 3.50


147 6.00 3.50
3+109.0 CL/Ka 3.50

3+109.0 Ka 1.70
148 10.30 1.70
3+119.3 Ka 1.70

3+119.3 CL/Ka 3.30


149 12.00 3.30
3+131.3 CL/Ka 3.30

3+119.3 Ki 1.60
150 10.00 1.60
3+129.3 Ki 1.60

3+131.3 Ka/Ki 6.00


151 6.70 6.00
3+138.0 Ka/Ki 6.00

3+138.0 CL 2.00
152 2.80 2.00
3+140.8 CL 2.00

3+150.0 Ki 3.00
153 11.20 3.00
3+161.2 Ki 3.00

3+140.8 CL/Ka 3.50


154 39.40 3.50
3+180.2 CL/Ka 3.50

3+180.2 Ka/Ki 6.00


155 5.00 6.00
3+185.2 Ka/Ki 6.00

3+185.2 CL/Ka 3.50


156 4.00 3.50
3+189.2 CL/Ka 3.50

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket
Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

3+189.2 Ka 1.80
157 10.80 1.80
3+200.0 Ka 1.80

3+192.5 CL 2.00
158 3.30 2.00
3+195.8 CL 2.00

3+200.0 CL 1.50
159 3.60 1.50
3+203.6 CL 1.50

3+208.0 CL/Ka 4.00


160 11.40 4.00
3+219.4 CL/Ka 4.00

3+219.4 Ka 1.70
161 4.10 1.70
3+223.5 Ka 1.70

3+223.5 CL/Ka 3.50


162 11.80 3.50
3+235.3 CL/Ka 3.50

3+235.3 Ka 1.70
163 20.50 1.70
3+255.8 Ka 1.70

3+235.3 Ki 1.50
164 4.10 1.50
3+239.4 Ki 1.50

3+275.7 Ki 3.50
165 24.30 3.50
3+300.0 Ki 3.50

3+318.0 Ki 3.00
166 32.00 3.00
3+350.0 Ki 3.00

3+323.5 Ka 2.00
167 8.20 2.00
3+331.7 Ka 2.00

3+349.0 Ka 1.80
168 8.20 1.80
3+357.2 Ka 1.80

3+372.0 Ka 2.00
169 4.50 2.00
3+376.5 Ka 2.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata
(M') (M') (M2)

1 2 3 4 5 6 7

3+391.2 Ka 2.50
170 8.80 2.50
3+400.0 Ka 2.50

3+400.0 Ka 2.00
171 8.00 2.00
3+408.0 Ka 2.00

3+400.0 Ki 3.00
172 2.50 3.00
3+402.5 Ki 3.00

3+402.5 Ki 2.50
173 36.20 2.50
3+438.7 Ki 2.50

3+434.5 Ka 1.80
174 4.20 1.80
3+438.7 Ka 1.80

3+438.7 Ka/Ki 6.00


175 13.30 6.00
3+452.0 Ka/Ki 6.00

3+452.0 Ka 2.00
176 2.50 2.00
3+454.5 Ka 2.00

3+459.3 Ka 4.00
177 24.50 4.00
3+483.8 Ka 4.00

3+485.8 Ka 3.00
178 26.90 3.00
3+512.7 Ka 3.00

3+512.7 Ka 2.20
179 8.80 2.20
3+521.5 Ka 2.20

3+521.5 CL/Ki 4.00


180 13.20 4.00
3+534.7 CL/Ki 4.00

3+534.7 Ka/Ki 6.00


181 18.30 6.00
3+553.0 Ka/Ki 6.00

3+553.0 Ki 2.10
182 3.20 2.10
3+556.2 Ki 2.10

SUB TOTAL
TOTAL

Project Officer
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7
3+556.2 Ka 1.80
183 14.30 1.80
3+570.5 Ka 1.80

3+570.5 CL/Ka 4.00


184 10.20 4.00
3+580.7 CL/Ka 4.00

3+580.7 Ka/Ki 6.00


185 14.80 6.00
3+595.5 Ka/Ki 6.00

3+605.5 Ka 3.00
186 12.10 3.00
3+617.6 Ka 3.00

3+617.6 CL/Ka 4.00


187 19.20 4.00
3+636.8 CL/Ka 4.00

3+636.8 Ka/Ki 6.00


188 65.80 6.00
3+702.6 Ka/Ki 6.00

3+702.6 Ka 3.00
189 39.40 3.00
3+742.0 Ka 3.00

3+742.0 Ka 2.50
190 9.00 2.50
3+751.0 Ka 2.50

3+751.0 Ka 1.80
191 8.70 1.80
3+759.7 Ka 1.80

3+759.7 Ka 3.00
192 4.60 3.00
3+764.3 Ka 3.00

3+764.3 4.50 1.80


193 7.00 1.80
3+771.3 4.50 1.80

3+771.3 Ka 2.00
194 3.20 2.00
3+774.5 Ka 2.00

3+775.0 Ka/Ki 6.00


195 7.30 6.00
3+782.3 Ka/Ki 6.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

3+782.3 Ka 3.00
196 7.20 3.00
3+789.5 Ka 3.00

3+789.5 Ka/Ki 6.00


197 21.00 6.00
3+810.5 Ka/Ki 6.00
3+810.5 Ka 2.00
198 7.10 2.00
3+817.6 Ka 2.00

3+817.6 Ka 3.00
199 13.40 3.00
3+831.0 Ka 3.00

3+831.0 Ka 1.80
200 13.20 1.80
3+844.2 Ka 1.80

3+829.2 Ki 2.00
201 15.00 2.00
3+844.2 Ki 2.00

3+844.2 Ka/Ki 6.00


202 35.00 6.00
3+879.2 Ka/Ki 6.00

3+879.2 Ka 3.00
203 14.70 3.00
3+893.9 Ka 3.00

3+888.9 Ki 1.80
204 5.00 1.80
3+893.9 Ki 1.80

3+893.9 Ka 6.00
205 2.70 6.00
3+896.6 Ka 6.00

3+896.6 CL/Ki 4.00


206 56.60 4.00
3+953.2 CL/Ki 4.00

3+900.0 Ki 2.00
207 6.90 2.00
3+906.9 Ki 2.00

3+989.6 Ka 3.00
208 7.00 3.00
3+996.6 Ka 3.00

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

3+996.6 Ka 2.00
209 3.40 2.00
4+000.0 Ka 2.00

4+000.0 Ka 2.00
210 14.70 2.00
4+014.7 Ka 2.00

4+014.7 Ka 3.00
211 6.70 3.00
4+021.4 Ka 3.00

4+021.4 Ka 2.00
212 4.20 2.00
4+025.6 Ka 2.00
4+043.0 Ka 2.50
213 7.00 2.50
4+050.0 Ka 2.50

4+008.0 Ka 3.00
214 7.50 3.00
4+015.5 Ka 3.00

4+024.5 Ka 2.00
215 50.50 2.00
4+075.0 Ka 2.00

4+081.7 Ka 3.00
216 18.30 3.00
4+100.0 Ka 3.00

4+100.0 Ka 3.00
217 11.00 3.00
4+111.0 Ka 3.00

4+111.0 Ki 3.00
218 5.20 3.00
4+116.2 Ki 3.00

4+133.7 Ka 2.80
219 16.30 2.80
4+150.0 Ka 2.80

4+150.0 Ka 2.80
220 21.20 2.80
4+171.2 Ka 2.80

4+180.5 Ki 3.00
221 18.50 3.00
4+199.0 Ki 3.00

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

4+197.2 Ka 3.00
222 15.00 3.00
4+212.2 Ka 3.00

4+212.2 Ka/Ki 6.00


223 19.10 6.00
4+231.3 Ka/Ki 6.00

4+231.3 Ka 3.00
224 16.40 3.00
4+247.7 Ka 3.00

4+247.7 Ka/Ki 6.00


225 93.90 6.00
4+341.6 Ka/Ki 6.00

4+341.6 Ka 3.00
226 5.00 3.00
4+346.6 Ka 3.00

4+346.6 Ka/Ki 6.00


227 22.10 6.00
4+368.7 Ka/ki 6.00

4+368.7 Ka 3.00
228 15.30 3.00
4+384.0 Ka 3.00

4+384.0 Ka/Ki 6.00


229 87.20 6.00
4+471.2 Ka/Ki 6.00

4+471.2 Ka 3.00
230 26.80 3.00
4+498.0 Ka 3.00

4+498.0 Ka/Ki 6.00


231 8.90 6.00
4+506.9 Ka/Ki 6.00

4+506.9 Ka 3.00
232 51.60 3.00
4+558.5 Ka 3.00

4+558.5 Ka/Ki 6.00


233 5.70 6.00
4+564.2 Ka/Ki 6.00

4+564.2 Ka 4.00
234 23.30 4.00
4+587.5 Ka 4.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

4+587.5 Ka 3.00
235 8.30 3.00
4+595.8 Ka 3.00

4+595.8 Ka 2.50
236 48.80 2.50
4+644.6 Ka 2.50

4+654.8 Ka 3.50
237 42.20 3.50
4+697.0 Ka 3.50

4+697.0 Ka 3.00
238 13.80 3.00
4+710.8 Ka 3.00

4+710.8 CL/Ka 4.00


239 8.50 4.00
4+719.3 CL/Ka 4.00

4+719.3 Ka 3.00
240 16.70 3.00
4+736.0 Ka 3.00

4+736.0 Ka 5.00
241 25.00 5.00
4+761.0 Ka 5.00

4+761.0 Ka/Ki 6.00


242 17.10 6.00
4+778.1 Ka/Ki 6.00

4+778.1 Ka 3.00
243 31.80 3.00
4+809.9 Ka 3.00

4+817.0 Ka 3.00
244 14.40 3.00
4+831.4 Ka 3.00

4+850.0 Ka 3.50
245 11.40 3.50
4+861.4 Ka 3.50

4+865.2 Ki 3.00
246 14.80 3.00
4+880.0 Ki 3.00

4+884.8 Ka 2.00
247 2.50 2.00
4+887.3 Ka 2.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket
Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

4+895.5 Ka/Ki 6.00


248 4.50 6.00
4+900.0 Ka/Ki 6.00

4+900.0 Ka 3.00
249 1.50 3.00
4+901.5 Ka 3.00

4+919.0 Ka 2.70
250 27.00 2.70
4+946.0 Ka 2.70

4+948.0 CL 1.50
251 3.50 1.50
4+951.5 CL 1.50

4+950.0 Ka 2.00
252 8.50 2.00
4+958.5 Ka 2.00

4+965.0 Ka 2.00
253 19.50 2.00
4+984.5 Ka 2.00

4+984.5 Ka/Ki 6.00


254 9.20 6.00
4+993.7 Ka/Ki 6.00

5+017.2 Ka 3.00
255 8.00 3.00
5+025.2 Ka 3.00

5+025.2 Ka 6.00
256 19.70 6.00
5+044.9 Ka 6.00

5+050.0 Ka 2.00
257 5.40 2.00
5+055.4 Ka 2.00

5+055.4 Ka 4.00
258 44.60 4.00
5+100.0 Ka 4.00

5+109.9 Ki 1.50
259 6.30 1.50
5+116.2 Ki 1.50

5+100.0 Ka 3.00
260 44.50 3.00
5+144.5 Ka 3.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)


1 2 3 4 5 6 7

0+000.0 Ka/Ki 6.00


261 5.50 6.00
0+005.5 Ka/Ki 6.00

0+005.5 Ka 3.00
262 32.50 3.00
0+038.0 Ka 3.00

0+005.5 Ki 1.80
263 12.50 1.80
0+018.0 Ki 1.80

5+215.0 Ka 3.00
264 12.00 3.00
5+227.0 Ka 3.00

5+227.0 Ka/Ki 6.00


265 8.50 6.00
5+235.5 Ka/Ki 6.00

5+235.5 Ka 2.50
266 8.80 2.50
5+244.3 Ka 2.50

5+250.0 Ka 1.80
267 8.00 1.80
5+258.0 Ka 1.80

5+258.0 Ka/Ki 6.00


268 7.50 6.00
5+265.5 Ka/Ki 6.00

5+287.0 Ki 2.00
269 19.70 2.00
5+306.7 Ki 2.00

5+292.7 Ka 1.80
270 5.00 1.80
5+297.7 Ka 1.80

5+313.7 Ka 2.50
271 36.30 2.50
5+350.0 Ka 2.50

5+365.0 Ka 3.00
272 10.00 3.00
5+375.0 Ka 3.00

5+388.0 Ka 1.70
273 6.30 1.70
5+394.3 Ka 1.70

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

5+394.3 Ka/Ki 6.00


274 12.20 6.00
5+406.5 Ka/Ki 6.00

5+406.5 Ka 3.00
275 43.50 3.00
5+450.0 Ka 3.00

5+505.0 Ka 2.80
276 29.40 2.80
5+534.4 Ka 2.80

5+534.4 Ka 3.00
277 4.60 3.00
5+539.0 Ka 3.00

5+539.0 Ka 2.00
278 6.30 2.00
5+545.3 Ka 2.00

5+575.0 Ka 3.15
279 103.50 3.15
5+678.5 Ka 3.15

5+692.5 Ka 1.50
280 4.50 1.50
5+697.0 Ka 1.50

5+697.0 Ka/Ki 6.00


281 6.70 6.00
5+703.7 Ka/Ki 6.00

5+703.7 Ka 3.00
282 108.80 3.00
5+812.5 Ka 3.00

5+847.3 Ka 3.00
283 14.40 3.00
5+861.7 Ka 3.00

5+882.0 Ka 3.00
284 31.70 3.00
5+913.7 Ka 3.00

5+939.8 Ka 3.20
285 17.80 3.20
5+957.6 Ka 3.20

5+957.6 Ka 3.00
286 5.50 3.00
5+963.1 Ka 3.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

5+963.1 Ka 2.10
287 25.70 2.10
5+988.8 Ka 2.10

5+988.8 Ka 3.00
288 11.20 3.00
6+000.0 Ka 3.00

6+000.0 Ka 2.00
289 9.40 2.00
6+009.4 Ka 2.00

6+009.4 Ka/Ki 6.00


290 35.10 6.00
6+044.5 Ka/Ki 6.00

6+044.5 Ka 2.00
291 10.70 2.00
6+055.2 Ka 2.00

6+064.2 Ka 2.00
292 20.50 2.00
6+084.7 Ka 2.00

6+105.6 Ka 3.00
293 13.60 3.00
6+119.2 Ka 3.00

6+119.2 Ka/Ki 6.00


294 3.70 6.00
6+122.9 Ka/Ki 6.00

6+122.9 Ka 3.00
295 47.60 3.00
6+170.5 Ka 3.00

6+170.5 Ka/Ki 6.00


296 4.00 6.00
6+174.5 Ka/Ki 6.00

6+174.5 Ka 1.80
297 7.00 1.80
6+181.5 Ka 1.80

6+191.5 CL/Ka 1.80


298 10.50 1.80
6+202.0 CL/Ka 1.80

6+206.7 Ka 2.30
299 8.00 2.30
6+214.7 Ka 2.30

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

6+214.7 Ka/Ki 6.00


300 14.50 6.00
6+229.2 Ka/Ki 6.00

6+229.2 Ki 3.00
301 31.00 3.00
6+260.2 Ki 3.00

6+260.2 CL/Ka 4.00


302 9.00 4.00
6+269.2 CL/Ka 4.00

6+280.2 Ka/Ki 6.00


303 5.60 6.00
6+285.8 Ka/Ki 6.00

6+290.0 Ki 3.00
304 10.00 3.00
6+300.0 Ka 3.00

6+292.9 Ka 3.00
305 7.10 3.00
6+300.0 Ka 3.00

6+306.5 Ka 3.00
306 7.00 3.00
6+313.5 Ka 3.00

6+335.3 Ki 3.00
307 4.00 3.00
6+339.3 Ki 3.00

6+375.0 Ka 2.00
308 10.00 2.00
6+385.0 Ka 2.00

6+398.0 Ka 2.00
309 2.00 2.00
6+400.0 Ka 2.00

6+400.0 Ka/ki 6.00


310 11.60 6.00
6+411.6 Ka/ki 6.00

6+425.5 Ka 2.00
311 5.00 2.00
6+430.5 Ka 2.00

6+469.0 Ki 3.00
312 8.70 3.00
6+477.7 Ki 3.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

6+475.0 Ka 1.50
313 7.20 1.50
6+482.2 Ka 1.50

6+512.0 Ka 2.00
314 17.00 2.00
6+529.0 Ka 2.00

6+529.0 CL 1.50
315 3.60 1.50
6+532.6 CL 1.50

6+536.5 Ka 1.80
316 13.50 1.80
6+550.0 Ka 1.80

6+553.3 CL/Ka 4.00


317 5.50 4.00
6+558.8 CL/Ka 4.00

6+558.8 Ka 1.50
318 7.80 1.50
6+566.6 Ka 1.50

6+576.0 CL 1.50
319 3.00 1.50
6+579.0 CL 1.50
6+594.2 Ki 2.00
320 5.80 2.00
6+600.0 Ki 2.00

6+612.8 Ki 2.50
321 6.00 2.50
6+618.8 Ki 2.50

6+628.4 Ka 3.00
322 14.50 3.00
6+642.9 Ka 3.00

6+651.0 CL/Ka 3.50


323 6.80 3.50
6+657.8 CL/Ka 3.50

6+670.8 CL 1.50
324 7.00 1.50
6+677.8 CL 1.50

6+677.8 Ka 3.50
325 5.10 3.50
6+682.9 Ka 3.50

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket
Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

6+695.0 Ki 2.00
326 5.00 2.00
6+700.0 Ki 2.00

6+719.0 Ka 6.00
327 4.50 6.00
6+723.5 Ka 6.00

6+803.1 Ka/Ki 6.00


328 5.50 6.00
6+808.6 Ka/Ki 6.00

6+808.6 Ka 3.00
329 40.20 3.00
6+848.8 Ka 3.00

6+868.2 CL/Ki 3.50


330 4.50 3.50
6+872.7 CL/Ki 3.50

6+872.7 CL 2.00
331 13.60 2.00
6+886.3 CL 2.00

6+889.8 CL/Ki 3.50


332 31.20 3.50
6+921.0 CL/Ki 3.50

6+921.0 Ka/Ki 6.00


333 5.00 6.00
6+926.0 Ka/Ki 6.00

6+926.0 Ki 3.00
334 49.00 3.00
6+975.0 Ki 3.00
6+963.5 Ka 3.00
335 7.30 3.00
6+970.8 Ka 3.00

6+975.0 KI 3.00
336 59.40 3.00
7+034.4 KI 3.00

6+987.0 Ka 3.00
337 16.40 3.00
7+003.4 Ka 3.00

7+019.4 Ka 3.00
338 8.00 3.00
7+027.4 Ka 3.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)


1 2 3 4 5 6 7

7+047.8 Ka/Ki 6.00


339 5.50 6.00
7+053.3 Ka/Ki 6.00

7+063.3 Ka 3.00
340 29.00 3.00
7+092.3 Ka 3.00

7+096.5 CL/Ki 1.50


341 3.50 1.50
7+100.0 CL/Ki 1.50

7+120.5 CL 1.50
342 4.00 1.50
7+124.5 CL 1.50

7+152.7 Ka 3.00
343 10.00 3.00
7+162.7 Ka 3.00

7+166.9 CL 2.00
344 4.50 2.00
7+171.4 CL 2.00

7+175.1 Ka 2.00
345 4.00 2.00
7+179.1 Ka 2.00

7+181.2 Ki 1.50
346 7.30 1.50
7+188.5 Ki 1.50

7+236.7 Ka 1.50
347 3.50 1.50
7+240.2 Ka 1.50

7+250.0 CL/Ki 1.50


348 4.50 1.50
7+254.5 CL/Ki 1.50

7+275.0 Ka 3.00
349 25.00 3.00
7+300.0 Ka 3.00
7+326.0 CL 1.80
350 13.00 1.80
7+339.0 CL 1.80

7+349.0 CL 2.00
351 7.00 2.00
7+356.0 CL 2.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

7+356.0 CL/Ki 4.50


352 5.50 4.50
7+361.5 CL/Ki 4.50
7+387.5 Ka 3.00
353 10.50 3.00
7+398.0 Ka 3.00

7+398.0 Ka/ki 6.00


354 12.00 6.00
7+410.0 Ka/ki 6.00

7+421.8 CL 2.50
355 11.50 2.50
7+433.3 CL 2.50

7+444.0 CL 1.50
356 3.00 1.50
7+447.0 CL 1.50

7+450.0 Ka 3.00
357 6.70 3.00
7+456.7 Ka 3.00

7+470.4 Ka 3.00
358 6.30 3.00
7+476.7 Ka 3.00

7+476.7 CL/Ka 1.50


359 7.60 1.50
7+484.3 CL/Ka 1.50

7+496.4 CL/Ki 2.00


360 5.60 2.00
7+502.0 CL/Ki 2.00

7+518.3 CL 2.50
361 15.30 2.50
7+533.6 CL 2.50

7+533.6 CL/Ki 4.00


362 5.80 4.00
7+539.4 CL/Ki 4.00

7+539.4 CL 2.50
363 5.20 2.50
7+544.6 CL 2.50

7+550.0 Ka/Ki 6.00


364 16.30 6.00
7+566.3 Ka/Ki 6.00

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

7+566.3 Ki 3.00
365 8.70 3.00
7+575.0 Ki 3.00

7+575.5 CL 2.00
366 10.50 2.00
7+586.0 CL 2.00

7+586.0 CL/Ki 4.00


367 14.00 4.00
7+600.0 CL/Ki 4.00
7+629.7 Ka 1.60
368 11.00 1.60
7+640.7 Ka 1.60

7+647.0 Ka 2.50
369 13.30 2.50
7+660.3 Ka 2.50

7+660.3 Ka/Ki 6.00


370 44.20 6.00
7+704.5 Ka/Ki 6.00

7+704.5 Ka 1.50
371 4.00 1.50
7+708.5 Ka 1.50

7+708.5 Ka/Ki 6.00


372 14.50 6.00
7+723.0 Ka/Ki 6.00

7+723.0 Ki 3.00
373 14.00 3.00
7+737.0 Ki 3.00

7+737.0 Ka/ki 6.00


374 18.50 6.00
7+755.5 Ka/ki 6.00

7+777.3 Ki 1.50
375 3.50 1.50
7+780.8 Ki 1.50

7+775.0 Ka 2.00
376 10.00 2.00
7+785.0 Ka 2.00

7+793.4 Ki 3.00
377 19.30 3.00
7+812.7 Ki 3.00

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

7+833.5 CL 2.00
378 16.50 2.00
7+850.0 CL 2.00

7+898.0 Ki 3.00
379 12.00 3.00
7+910.0 Ki 3.00

7+910.0 Ka/Ki 6.00


380 3.20 6.00
7+913.2 Ka/Ki 6.00

7+921.0 Ki 3.00
381 6.00 3.00
7+927.0 Ki 3.00

7+969.5 CL 2.00
382 10.50 2.00
7+980.0 CL 2.00
7+980.0 CL/Ka 3.50
383 11.30 3.50
7+991.3 CL/Ka 3.50

8+008.0 CL 1.50
384 6.50 1.50
8+014.5 CL 1.50

8+014.5 Ka/Ki 6.00


385 10.50 6.00
8+025.0 Ka/Ki 6.00

8+025.0 Ka 3.00
386 3.20 3.00
8+028.2 Ka 3.00

8+028.2 Ki 3.00
387 14.00 3.00
8+042.2 Ki 3.00

8+046.5 Ki 3.00
388 13.00 3.00
8+059.5 Ki 3.00

8+059.5 CL/Ki 1.50


389 9.00 1.50
8+068.5 CL/Ki 1.50

8+068.5 Ka 4.50
390 11.50 4.50
8+080.0 Ka 4.50

SUB TOTAL
TOTAL

PERHITUNGAN VOLUME
DIVISI : PEKERJAAN TANAH
Pekerjaan : Galian Perkerasan Beraspal Dengan Cold Milling Machine
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING

Sket

Posisi Lebar
No. KM STA Panjang Lebar
Kanan/ Kiri Rata-rata

(M') (M') (M2)

1 2 3 4 5 6 7

8+084.0 Ki 3.00
391 24.20 3.00
8+108.2 Ki 3.00

8+091.0 Ka 3.00
392 11.80 3.00
8+102.8 Ka 3.00

8+108.2 Ki 1.50
393 11.80 1.50
8+120.0 Ki 1.50

8+146.0 CL 1.50
394 9.50 1.50
8+155.5 CL 1.50

8+177.0 CL 2.00
395 5.00 2.00
8+182.0 CL 2.00

8+182.0 Ka/Ki 6.00


396 6.00 6.00
8+188.0 Ka/Ki 6.00

8+245.0 CL 2.00
397 10.00 2.00
8+255.0 CL 2.00
8+267.0 CL 2.00
398 13.00 2.00
8+280.0 CL 2.00

8+444.0 Ka 3.00
399 4.00 3.00
8+448.0 Ka 3.00

8+467.0 Ki 1.50
400 11.50 1.50
8+478.5 Ki 1.50

8+483.7 CL 1.50
401 9.80 1.50
8+493.5 CL 1.50

8+486.7 Ka 1.50
402 4.00 1.75
8+490.7 Ka 2.00

8+497.0 Ka/Ki 8.00


403 3.00 8.00
8+500.0 Ka/Ki 8.00

8+500.0 CL/Ki 5.00


404 9.70 5.00
8+509.7 CL/Ki 5.00

SUB TOTAL
TOTAL
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

26.70 0.04 1.07 2.27 2.42 0.0615 0.15 0.37 47.26

45.50 0.04 1.82 2.27 4.13 0.0615 0.25 0.64 81.40

69.75 0.04 2.79 2.27 6.33 0.0615 0.39 0.97 125.44

21.40 0.04 0.86 2.27 1.94 0.0615 0.12 0.30 37.63

129.00 0.04 5.16 2.27 11.71 0.0615 0.72 1.80 233.03

70.00 0.04 2.80 2.27 6.36 0.0615 0.39 0.98 125.89


78.00 0.04 3.12 2.27 7.08 0.0615 0.44 1.09 140.42

8.40 0.04 0.34 2.27 0.76 0.0615 0.05 0.12 14.02

79.40 0.04 3.18 2.27 7.21 0.0615 0.44 1.11 142.96

45.00 0.04 1.80 2.27 4.09 0.0615 0.25 0.63 80.49

13.50 0.04 0.54 2.27 1.23 0.0615 0.08 0.19 23.29

4.40 0.04 0.18 2.27 0.40 0.0615 0.02 0.06 6.76

14.40 0.04 0.58 2.27 1.31 0.0615 0.08 0.20 24.92

605.45 54.97 3.38 8.45 1,083.51


605.45 54.97 3.38 8.45 1,083.51

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING


Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

17.60 0.04 0.70 2.27 1.60 0.0615 0.10 0.25 30.73

9.60 0.04 0.38 2.27 0.87 0.0615 0.05 0.13 16.20

18.00 0.04 0.72 2.27 1.63 0.0615 0.10 0.25 31.46

25.80 0.04 1.03 2.27 2.34 0.0615 0.14 0.36 45.62

30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25

30.40 0.04 1.22 2.27 2.76 0.0615 0.17 0.42 53.98

104.40 0.04 4.18 2.27 9.48 0.0615 0.58 1.46 188.36

36.90 0.04 1.48 2.27 3.35 0.0615 0.21 0.52 65.78


96.00 0.04 3.84 2.27 8.72 0.0615 0.54 1.34 173.11

11.40 0.04 0.46 2.27 1.04 0.0615 0.06 0.16 19.47

17.00 0.04 0.68 2.27 1.54 0.0615 0.09 0.24 29.64

18.30 0.04 0.73 2.27 1.66 0.0615 0.10 0.26 32.00

7.00 0.04 0.28 2.27 0.64 0.0615 0.04 0.10 11.48

422.40 38.35 2.36 5.90 751.09


1,027.85 93.33 5.74 14.35 1,834.60

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana


Aspal Bahan Pengisi
Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

19.20 0.04 0.77 2.27 1.74 0.0615 0.11 0.27 33.64

32.20 0.04 1.29 2.27 2.92 0.0615 0.18 0.45 57.25

120.00 0.04 4.80 2.27 10.90 0.0615 0.67 1.68 216.69

26.60 0.04 1.06 2.27 2.42 0.0615 0.15 0.37 47.08

37.50 0.04 1.50 2.27 3.41 0.0615 0.21 0.52 66.87

86.10 0.04 3.44 2.27 7.82 0.0615 0.48 1.20 155.13

37.80 0.04 1.51 2.27 3.43 0.0615 0.21 0.53 67.41

29.00 0.04 1.16 2.27 2.63 0.0615 0.16 0.40 51.43

96.00 0.04 3.84 2.27 8.72 0.0615 0.54 1.34 173.11

22.00 0.04 0.88 2.27 2.00 0.0615 0.12 0.31 38.72


31.20 0.04 1.25 2.27 2.83 0.0615 0.17 0.44 55.43

57.00 0.04 2.28 2.27 5.18 0.0615 0.32 0.80 102.28

21.90 0.04 0.88 2.27 1.99 0.0615 0.12 0.31 38.54

616.50 55.98 3.44 8.61 1,103.57


1,644.35 149.31 9.18 22.96 2,938.17

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16
12.90 0.04 0.52 2.27 1.17 0.0615 0.07 0.18 22.20

14.00 0.04 0.56 2.27 1.27 0.0615 0.08 0.20 24.19

9.60 0.04 0.38 2.27 0.87 0.0615 0.05 0.13 16.20

46.80 0.04 1.87 2.27 4.25 0.0615 0.26 0.65 83.76

59.50 0.04 2.38 2.27 5.40 0.0615 0.33 0.83 106.82

12.40 0.04 0.50 2.27 1.13 0.0615 0.07 0.17 21.29

66.00 0.04 2.64 2.27 5.99 0.0615 0.37 0.92 118.63

150.00 0.04 6.00 2.27 13.62 0.0615 0.84 2.09 271.17

39.90 0.04 1.60 2.27 3.62 0.0615 0.22 0.56 71.23

12.00 0.04 0.48 2.27 1.09 0.0615 0.07 0.17 20.56

28.00 0.04 1.12 2.27 2.54 0.0615 0.16 0.39 49.62

7.35 0.04 0.29 2.27 0.67 0.0615 0.04 0.10 12.12


9.20 0.04 0.37 2.27 0.84 0.0615 0.05 0.13 15.48

467.65 42.46 2.61 6.53 833.26


2,112.00 191.77 11.79 29.48 3,771.43

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

51.00 0.04 2.04 2.27 4.63 0.0615 0.28 0.71 91.39

60.95 0.04 2.44 2.27 5.53 0.0615 0.34 0.85 109.46

33.84 0.04 1.35 2.27 3.07 0.0615 0.19 0.47 60.22


12.35 0.04 0.49 2.27 1.12 0.0615 0.07 0.17 21.20

70.38 0.04 2.82 2.27 6.39 0.0615 0.39 0.98 126.58

140.00 0.04 5.60 2.27 12.71 0.0615 0.78 1.95 253.01

192.00 0.04 7.68 2.27 17.43 0.0615 1.07 2.68 347.44

13.26 0.04 0.53 2.27 1.20 0.0615 0.07 0.19 22.85

61.20 0.04 2.45 2.27 5.56 0.0615 0.34 0.85 109.91

19.20 0.04 0.77 2.27 1.74 0.0615 0.11 0.27 33.64

9.75 0.04 0.39 2.27 0.89 0.0615 0.05 0.14 16.48

72.00 0.04 2.88 2.27 6.54 0.0615 0.40 1.01 129.52

30.30 0.04 1.21 2.27 2.75 0.0615 0.17 0.42 53.79

766.23 30.65 69.57 4.28 10.70 1,375.48


2,878.23 30.65 261.34 16.07 40.18 5,146.92
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

18.63 0.04 0.75 2.27 1.69 0.0615 0.10 0.26 32.60

29.45 0.04 1.18 2.27 2.67 0.0615 0.16 0.41 52.25

56.80 0.04 2.27 2.27 5.16 0.0615 0.32 0.79 101.92

28.75 0.04 1.15 2.27 2.61 0.0615 0.16 0.40 50.98

42.09 0.04 1.68 2.27 3.82 0.0615 0.24 0.59 75.21


39.55 0.04 1.58 2.27 3.59 0.0615 0.22 0.55 70.59

28.08 0.04 1.12 2.27 2.55 0.0615 0.16 0.39 49.76

22.94 0.04 0.92 2.27 2.08 0.0615 0.13 0.32 40.43

134.10 0.04 5.36 2.27 12.18 0.0615 0.75 1.87 242.30

15.00 0.04 0.60 2.27 1.36 0.0615 0.08 0.21 26.01

24.30 0.04 0.97 2.27 2.21 0.0615 0.14 0.34 42.90

122.00 0.04 4.88 2.27 11.08 0.0615 0.68 1.70 220.32

52.50 0.04 2.10 2.27 4.77 0.0615 0.29 0.73 94.11

614.19 24.57 55.77 3.43 8.57 1,099.38


3,492.42 55.22 317.11 19.50 48.76 6,246.29

PERHITUNGAN VOLUME
ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

125.00 0.04 5.00 2.27 11.35 0.0615 0.70 1.75 225.77

42.50 0.04 1.70 2.27 3.86 0.0615 0.24 0.59 75.95

30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25

17.00 0.04 0.68 2.27 1.54 0.0615 0.09 0.24 29.64

67.60 0.04 2.70 2.27 6.14 0.0615 0.38 0.94 121.53

27.60 0.04 1.10 2.27 2.51 0.0615 0.15 0.39 48.89

48.99 0.04 1.96 2.27 4.45 0.0615 0.27 0.68 87.74


176.80 0.04 7.07 2.27 16.05 0.0615 0.99 2.47 319.84

51.00 0.04 2.04 2.27 4.63 0.0615 0.28 0.71 91.39

29.20 0.04 1.17 2.27 2.65 0.0615 0.16 0.41 51.80

26.40 0.04 1.06 2.27 2.40 0.0615 0.15 0.37 46.71

63.35 0.04 2.53 2.27 5.75 0.0615 0.35 0.88 113.81

41.40 0.04 1.66 2.27 3.76 0.0615 0.23 0.58 73.95

746.84 29.87 67.81 4.17 10.43 1,340.27


4,239.26 85.09 384.92 23.67 59.18 7,586.57

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING


Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

12.60 0.04 0.50 2.27 1.14 0.0615 0.07 0.18 21.65

34.20 0.04 1.37 2.27 3.11 0.0615 0.19 0.48 60.88

46.20 0.04 1.85 2.27 4.19 0.0615 0.26 0.64 82.67

144.60 0.04 5.78 2.27 13.13 0.0615 0.81 2.02 261.36

36.25 0.04 1.45 2.27 3.29 0.0615 0.20 0.51 64.60

23.10 0.04 0.92 2.27 2.10 0.0615 0.13 0.32 40.72

105.25 0.04 4.21 2.27 9.56 0.0615 0.59 1.47 189.90

88.60 0.04 3.54 2.27 8.04 0.0615 0.49 1.24 159.67

33.60 0.04 1.34 2.27 3.05 0.0615 0.19 0.47 59.79


367.80 0.04 14.71 2.27 33.40 0.0615 2.05 5.13 666.69

5.70 0.04 0.23 2.27 0.52 0.0615 0.03 0.08 9.12

7.20 0.04 0.29 2.27 0.65 0.0615 0.04 0.10 11.85

8.40 0.04 0.34 2.27 0.76 0.0615 0.05 0.12 14.02

913.50 36.54 82.95 5.10 12.75 1,642.93


5,152.76 121.63 467.87 28.77 71.94 9,229.49

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16
84.00 0.04 3.36 2.27 7.63 0.0615 0.47 1.17 151.31

17.10 0.04 0.68 2.27 1.55 0.0615 0.10 0.24 29.82

18.00 0.04 0.72 2.27 1.63 0.0615 0.10 0.25 31.46

32.60 0.04 1.30 2.27 2.96 0.0615 0.18 0.46 57.97

92.40 0.04 3.70 2.27 8.39 0.0615 0.52 1.29 166.57

6.36 0.04 0.25 2.27 0.58 0.0615 0.04 0.09 10.32

8.70 0.04 0.35 2.27 0.79 0.0615 0.05 0.12 14.57

7.50 0.04 0.30 2.27 0.68 0.0615 0.04 0.10 12.39

5.10 0.04 0.20 2.27 0.46 0.0615 0.03 0.07 8.03

55.60 0.04 2.22 2.27 5.05 0.0615 0.31 0.78 99.74

157.20 0.04 6.29 2.27 14.27 0.0615 0.88 2.19 284.25

41.20 0.04 1.65 2.27 3.74 0.0615 0.23 0.58 73.59


7.20 0.04 0.29 2.27 0.65 0.0615 0.04 0.10 11.85

532.96 21.32 48.39 2.98 7.44 951.87


5,685.72 142.95 516.26 31.75 79.38 10,181.36

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

79.20 0.04 3.17 2.27 7.19 0.0615 0.44 1.11 142.60

56.00 0.04 2.24 2.27 5.08 0.0615 0.31 0.78 100.47


22.80 0.04 0.91 2.27 2.07 0.0615 0.13 0.32 40.17

9.60 0.04 0.38 2.27 0.87 0.0615 0.05 0.13 16.20

30.80 0.04 1.23 2.27 2.80 0.0615 0.17 0.43 54.70

5.40 0.04 0.22 2.27 0.49 0.0615 0.03 0.08 8.58

15.60 0.04 0.62 2.27 1.42 0.0615 0.09 0.22 27.10

29.40 0.04 1.18 2.27 2.67 0.0615 0.16 0.41 52.16

46.90 0.04 1.88 2.27 4.26 0.0615 0.26 0.65 83.94

20.60 0.04 0.82 2.27 1.87 0.0615 0.12 0.29 36.18

83.16 0.04 3.33 2.27 7.55 0.0615 0.46 1.16 149.79

13.20 0.04 0.53 2.27 1.20 0.0615 0.07 0.18 22.74

79.58 0.04 3.18 2.27 7.23 0.0615 0.44 1.11 143.29

492.24 19.69 44.70 2.75 6.87 877.92


6,177.96 162.64 560.96 34.50 86.25 11,059.28
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

33.12 0.04 1.32 2.27 3.01 0.0615 0.18 0.46 58.92

63.00 0.04 2.52 2.27 5.72 0.0615 0.35 0.88 113.18

27.72 0.04 1.11 2.27 2.52 0.0615 0.15 0.39 49.11

11.60 0.04 0.46 2.27 1.05 0.0615 0.06 0.16 19.84


7.65 0.04 0.31 2.27 0.69 0.0615 0.04 0.11 12.66

121.20 0.04 4.85 2.27 11.00 0.0615 0.68 1.69 218.87

22.61 0.04 0.90 2.27 2.05 0.0615 0.13 0.32 39.83

45.00 0.04 1.80 2.27 4.09 0.0615 0.25 0.63 80.49

85.05 0.04 3.40 2.27 7.72 0.0615 0.47 1.19 153.22

67.80 0.04 2.71 2.27 6.16 0.0615 0.38 0.95 121.89

96.40 0.04 3.86 2.27 8.75 0.0615 0.54 1.35 173.83

28.20 0.04 1.13 2.27 2.56 0.0615 0.16 0.39 49.98

29.05 0.04 1.16 2.27 2.64 0.0615 0.16 0.41 51.52

638.40 25.54 57.97 3.56 8.91 1,143.34


6,816.36 188.17 618.93 38.06 95.16 12,202.62
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

21.60 0.04 0.86 2.27 1.96 0.0615 0.12 0.30 38.00

24.90 0.04 1.00 2.27 2.26 0.0615 0.14 0.35 43.99

8.00 0.04 0.32 2.27 0.73 0.0615 0.04 0.11 13.30

21.00 0.04 0.84 2.27 1.91 0.0615 0.12 0.29 36.91

17.51 0.04 0.70 2.27 1.59 0.0615 0.10 0.24 30.57

39.60 0.04 1.58 2.27 3.60 0.0615 0.22 0.55 70.68


16.00 0.04 0.64 2.27 1.45 0.0615 0.09 0.22 27.83

40.20 0.04 1.61 2.27 3.65 0.0615 0.22 0.56 71.77

5.60 0.04 0.22 2.27 0.51 0.0615 0.03 0.08 8.94

33.60 0.04 1.34 2.27 3.05 0.0615 0.19 0.47 59.79

137.90 0.04 5.52 2.27 12.52 0.0615 0.77 1.93 249.20

30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25

14.00 0.04 0.56 2.27 1.27 0.0615 0.08 0.20 24.19

409.91 37.22 2.29 5.72 728.41


7,226.27 656.15 40.35 100.88 12,931.03

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING


Luas Tebal Volume Berat Berat Kadar Rencana

Aspal Bahan Pengisi


Rencana Jenis Tonase Aspal Aditif
Keras (Filler)
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

19.44 0.04 0.78 2.27 1.77 0.0615 0.11 0.27 34.07

6.60 0.04 0.26 2.27 0.60 0.0615 0.04 0.09 10.76

5.40 0.04 0.22 2.27 0.49 0.0615 0.03 0.08 8.58

45.60 0.04 1.82 2.27 4.14 0.0615 0.25 0.64 81.58

6.97 0.04 0.28 2.27 0.63 0.0615 0.04 0.10 11.43

41.30 0.04 1.65 2.27 3.75 0.0615 0.23 0.58 73.77

34.85 0.04 1.39 2.27 3.16 0.0615 0.19 0.49 62.06

6.15 0.04 0.25 2.27 0.56 0.0615 0.03 0.09 9.94


85.05 0.04 3.40 2.27 7.72 0.0615 0.47 1.19 153.22

96.00 0.04 3.84 2.27 8.72 0.0615 0.54 1.34 173.11

16.40 0.04 0.66 2.27 1.49 0.0615 0.09 0.23 28.55

14.76 0.04 0.59 2.27 1.34 0.0615 0.08 0.21 25.57

9.00 0.04 0.36 2.27 0.82 0.0615 0.05 0.13 15.11

387.52 35.19 2.16 5.41 687.75


7,613.79 691.33 42.52 106.29 13,618.77

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana


Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

22.00 0.04 0.88 2.27 2.00 0.0615 0.12 0.31 38.72

16.00 0.04 0.64 2.27 1.45 0.0615 0.09 0.22 27.83

7.50 0.04 0.30 2.27 0.68 0.0615 0.04 0.10 12.39

90.50 0.04 3.62 2.27 8.22 0.0615 0.51 1.26 163.12

7.56 0.04 0.30 2.27 0.69 0.0615 0.04 0.11 12.50

79.80 0.04 3.19 2.27 7.25 0.0615 0.45 1.11 143.69

5.00 0.04 0.20 2.27 0.45 0.0615 0.03 0.07 7.85

98.00 0.04 3.92 2.27 8.90 0.0615 0.55 1.37 176.74

80.70 0.04 3.23 2.27 7.33 0.0615 0.45 1.13 145.32

19.36 0.04 0.77 2.27 1.76 0.0615 0.11 0.27 33.93


52.80 0.04 2.11 2.27 4.79 0.0615 0.29 0.74 94.65

109.80 0.04 4.39 2.27 9.97 0.0615 0.61 1.53 198.17

6.72 0.04 0.27 2.27 0.61 0.0615 0.04 0.09 10.97

595.74 54.09 3.33 8.32 1,065.87


8,209.53 745.43 45.84 114.61 14,684.65

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16
25.74 0.04 1.03 2.27 2.34 0.0615 0.14 0.36 45.51

40.80 0.04 1.63 2.27 3.70 0.0615 0.23 0.57 72.86

88.80 0.04 3.55 2.27 8.06 0.0615 0.50 1.24 160.03

36.30 0.04 1.45 2.27 3.30 0.0615 0.20 0.51 64.69

76.80 0.04 3.07 2.27 6.97 0.0615 0.43 1.07 138.24

394.80 0.04 15.79 2.27 35.85 0.0615 2.20 5.51 715.73

118.20 0.04 4.73 2.27 10.73 0.0615 0.66 1.65 213.42

22.50 0.04 0.90 2.27 2.04 0.0615 0.13 0.31 39.63

15.66 0.04 0.63 2.27 1.42 0.0615 0.09 0.22 27.21

13.80 0.04 0.55 2.27 1.25 0.0615 0.08 0.19 23.83

12.60 0.04 0.50 2.27 1.14 0.0615 0.07 0.18 21.65

6.40 0.04 0.26 2.27 0.58 0.0615 0.04 0.09 10.39


43.80 0.04 1.75 2.27 3.98 0.0615 0.24 0.61 78.31

896.20 81.37 5.00 12.51 1,611.51


9,105.73 826.80 50.85 127.12 16,296.16

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

21.60 0.04 0.86 2.27 1.96 0.0615 0.12 0.30 38.00

126.00 0.04 5.04 2.27 11.44 0.0615 0.70 1.76 227.59


14.20 0.04 0.57 2.27 1.29 0.0615 0.08 0.20 24.56

40.20 0.04 1.61 2.27 3.65 0.0615 0.22 0.56 71.77

23.76 0.04 0.95 2.27 2.16 0.0615 0.13 0.33 41.92

30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25

210.00 0.04 8.40 2.27 19.07 0.0615 1.17 2.93 380.13

44.10 0.04 1.76 2.27 4.00 0.0615 0.25 0.62 78.86

9.00 0.04 0.36 2.27 0.82 0.0615 0.05 0.13 15.11

16.20 0.04 0.65 2.27 1.47 0.0615 0.09 0.23 28.19

226.40 0.04 9.06 2.27 20.56 0.0615 1.26 3.16 409.91

13.80 0.04 0.55 2.27 1.25 0.0615 0.08 0.19 23.83

21.00 0.04 0.84 2.27 1.91 0.0615 0.12 0.29 36.91

796.26 72.30 4.45 11.12 1,430.02


9,901.99 899.10 55.29 138.24 17,726.17
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

6.80 0.04 0.27 2.27 0.62 0.0615 0.04 0.09 11.12

29.40 0.04 1.18 2.27 2.67 0.0615 0.16 0.41 52.16

20.10 0.04 0.80 2.27 1.83 0.0615 0.11 0.28 35.27

8.40 0.04 0.34 2.27 0.76 0.0615 0.05 0.12 14.02


17.50 0.04 0.70 2.27 1.59 0.0615 0.10 0.24 30.55

22.50 0.04 0.90 2.27 2.04 0.0615 0.13 0.31 39.63

101.00 0.04 4.04 2.27 9.17 0.0615 0.56 1.41 182.19

54.90 0.04 2.20 2.27 4.98 0.0615 0.31 0.77 98.47

33.00 0.04 1.32 2.27 3.00 0.0615 0.18 0.46 58.70

15.60 0.04 0.62 2.27 1.42 0.0615 0.09 0.22 27.10

45.64 0.04 1.83 2.27 4.14 0.0615 0.25 0.64 81.65

59.36 0.04 2.37 2.27 5.39 0.0615 0.33 0.83 106.57

55.50 0.04 2.22 2.27 5.04 0.0615 0.31 0.77 99.56

469.70 42.65 2.62 6.56 836.99


10,371.69 941.75 57.92 144.79 18,563.16
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

45.00 0.04 1.80 2.27 4.09 0.0615 0.25 0.63 80.49

114.60 0.04 4.58 2.27 10.41 0.0615 0.64 1.60 206.88

49.20 0.04 1.97 2.27 4.47 0.0615 0.27 0.69 88.12

563.40 0.04 22.54 2.27 51.16 0.0615 3.15 7.87 1,021.90

15.00 0.04 0.60 2.27 1.36 0.0615 0.08 0.21 26.01

132.60 0.04 5.30 2.27 12.04 0.0615 0.74 1.85 239.57


45.90 0.04 1.84 2.27 4.17 0.0615 0.26 0.64 82.12

523.20 0.04 20.93 2.27 47.51 0.0615 2.92 7.30 948.90

80.40 0.04 3.22 2.27 7.30 0.0615 0.45 1.12 144.78

53.40 0.04 2.14 2.27 4.85 0.0615 0.30 0.75 95.74

154.80 0.04 6.19 2.27 14.06 0.0615 0.86 2.16 279.89

34.20 0.04 1.37 2.27 3.11 0.0615 0.19 0.48 60.88

93.20 0.04 3.73 2.27 8.46 0.0615 0.52 1.30 168.02

1,904.90 172.96 10.64 26.59 3,443.31


12,276.59 1,114.71 68.55 171.39 22,006.47

PERHITUNGAN VOLUME

ing Machine
ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

24.90 0.04 1.00 2.27 2.26 0.0615 0.14 0.35 43.99

122.00 0.04 4.88 2.27 11.08 0.0615 0.68 1.70 220.32

147.70 0.04 5.91 2.27 13.41 0.0615 0.82 2.06 266.99

41.40 0.04 1.66 2.27 3.76 0.0615 0.23 0.58 73.95

34.00 0.04 1.36 2.27 3.09 0.0615 0.19 0.47 60.51

50.10 0.04 2.00 2.27 4.55 0.0615 0.28 0.70 89.75

125.00 0.04 5.00 2.27 11.35 0.0615 0.70 1.75 225.77


102.60 0.04 4.10 2.27 9.32 0.0615 0.57 1.43 185.09

95.40 0.04 3.82 2.27 8.66 0.0615 0.53 1.33 172.02

43.20 0.04 1.73 2.27 3.92 0.0615 0.24 0.60 77.22

39.90 0.04 1.60 2.27 3.62 0.0615 0.22 0.56 71.23

44.40 0.04 1.78 2.27 4.03 0.0615 0.25 0.62 79.40

5.00 0.04 0.20 2.27 0.45 0.0615 0.03 0.07 7.85

875.60 79.50 4.89 12.22 1,574.10


13,152.19 1,194.22 73.44 183.61 23,580.57

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING


Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

27.00 0.04 1.08 2.27 2.45 0.0615 0.15 0.38 47.80

4.50 0.04 0.18 2.27 0.41 0.0615 0.03 0.06 6.94

72.90 0.04 2.92 2.27 6.62 0.0615 0.41 1.02 131.16

5.25 0.04 0.21 2.27 0.48 0.0615 0.03 0.07 8.30

17.00 0.04 0.68 2.27 1.54 0.0615 0.09 0.24 29.64

39.00 0.04 1.56 2.27 3.54 0.0615 0.22 0.54 69.59

55.20 0.04 2.21 2.27 5.01 0.0615 0.31 0.77 99.01

24.00 0.04 0.96 2.27 2.18 0.0615 0.13 0.34 42.35

118.20 0.04 4.73 2.27 10.73 0.0615 0.66 1.65 213.42


10.80 0.04 0.43 2.27 0.98 0.0615 0.06 0.15 18.38

178.40 0.04 7.14 2.27 16.20 0.0615 1.00 2.49 322.74

9.45 0.04 0.38 2.27 0.86 0.0615 0.05 0.13 15.93

133.50 0.04 5.34 2.27 12.12 0.0615 0.75 1.86 241.21

695.20 63.12 3.88 9.71 1,246.49


13,847.39 1,257.34 77.33 193.32 24,827.06

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

33.00 0.04 1.32 2.27 3.00 0.0615 0.18 0.46 58.70

97.50 0.04 3.90 2.27 8.85 0.0615 0.54 1.36 175.83

22.50 0.04 0.90 2.27 2.04 0.0615 0.13 0.31 39.63

36.00 0.04 1.44 2.27 3.27 0.0615 0.20 0.50 64.15

51.00 0.04 2.04 2.27 4.63 0.0615 0.28 0.71 91.39

22.00 0.04 0.88 2.27 2.00 0.0615 0.12 0.31 38.72

14.40 0.04 0.58 2.27 1.31 0.0615 0.08 0.20 24.92

45.00 0.04 1.80 2.27 4.09 0.0615 0.25 0.63 80.49

39.40 0.04 1.58 2.27 3.58 0.0615 0.22 0.55 70.32

9.00 0.04 0.36 2.27 0.82 0.0615 0.05 0.13 15.11

90.75 0.04 3.63 2.27 8.24 0.0615 0.51 1.27 163.57


30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25

10.71 0.04 0.43 2.27 0.97 0.0615 0.06 0.15 18.22

501.26 45.51 2.80 7.00 894.30


14,348.65 1,302.86 80.13 200.31 25,721.36

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

73.20 0.04 2.93 2.27 6.65 0.0615 0.41 1.02 131.70

130.50 0.04 5.22 2.27 11.85 0.0615 0.73 1.82 235.76


82.32 0.04 3.29 2.27 7.47 0.0615 0.46 1.15 148.26

13.80 0.04 0.55 2.27 1.25 0.0615 0.08 0.19 23.83

12.60 0.04 0.50 2.27 1.14 0.0615 0.07 0.18 21.65

326.03 0.04 13.04 2.27 29.60 0.0615 1.82 4.55 590.83

6.75 0.04 0.27 2.27 0.61 0.0615 0.04 0.09 11.03

40.20 0.04 1.61 2.27 3.65 0.0615 0.22 0.56 71.77

326.40 0.04 13.06 2.27 29.64 0.0615 1.82 4.56 591.51

43.20 0.04 1.73 2.27 3.92 0.0615 0.24 0.60 77.22

95.10 0.04 3.80 2.27 8.64 0.0615 0.53 1.33 171.47

56.96 0.04 2.28 2.27 5.17 0.0615 0.32 0.80 102.21

16.50 0.04 0.66 2.27 1.50 0.0615 0.09 0.23 28.73

1,223.56 111.10 6.83 17.08 2,205.99


15,572.21 1,413.96 86.96 217.40 27,927.34

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

53.97 0.04 2.16 2.27 4.90 0.0615 0.30 0.75 96.78

33.60 0.04 1.34 2.27 3.05 0.0615 0.19 0.47 59.79

18.80 0.04 0.75 2.27 1.71 0.0615 0.10 0.26 32.91

210.60 0.04 8.42 2.27 19.12 0.0615 1.18 2.94 381.22


21.40 0.04 0.86 2.27 1.94 0.0615 0.12 0.30 37.63

41.00 0.04 1.64 2.27 3.72 0.0615 0.23 0.57 73.23

40.80 0.04 1.63 2.27 3.70 0.0615 0.23 0.57 72.86

22.20 0.04 0.89 2.27 2.02 0.0615 0.12 0.31 39.09

142.80 0.04 5.71 2.27 12.97 0.0615 0.80 1.99 258.09

24.00 0.04 0.96 2.27 2.18 0.0615 0.13 0.34 42.35

12.60 0.04 0.50 2.27 1.14 0.0615 0.07 0.18 21.65

18.90 0.04 0.76 2.27 1.72 0.0615 0.11 0.26 33.09

18.40 0.04 0.74 2.27 1.67 0.0615 0.10 0.26 32.18

659.07 59.84 3.68 9.20 1,180.88


16,231.28 1,473.80 90.64 226.60 29,108.23
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

87.00 0.04 3.48 2.27 7.90 0.0615 0.49 1.21 156.76

93.00 0.04 3.72 2.27 8.44 0.0615 0.52 1.30 167.66

36.00 0.04 1.44 2.27 3.27 0.0615 0.20 0.50 64.15

33.60 0.04 1.34 2.27 3.05 0.0615 0.19 0.47 59.79

30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25


21.30 0.04 0.85 2.27 1.93 0.0615 0.12 0.30 37.45

21.00 0.04 0.84 2.27 1.91 0.0615 0.12 0.29 36.91

12.00 0.04 0.48 2.27 1.09 0.0615 0.07 0.17 20.56

20.00 0.04 0.80 2.27 1.82 0.0615 0.11 0.28 35.09

4.00 0.04 0.16 2.27 0.36 0.0615 0.02 0.06 6.03

69.60 0.04 2.78 2.27 6.32 0.0615 0.39 0.97 125.16

10.00 0.04 0.40 2.27 0.91 0.0615 0.06 0.14 16.93

26.10 0.04 1.04 2.27 2.37 0.0615 0.15 0.36 46.17

463.60 42.09 2.59 6.47 825.91


16,694.88 1,515.89 93.23 233.07 29,934.13

PERHITUNGAN VOLUME

ing Machine
ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

10.80 0.04 0.43 2.27 0.98 0.0615 0.06 0.15 18.38

34.00 0.04 1.36 2.27 3.09 0.0615 0.19 0.47 60.51

5.40 0.04 0.22 2.27 0.49 0.0615 0.03 0.08 8.58

24.30 0.04 0.97 2.27 2.21 0.0615 0.14 0.34 42.90

22.00 0.04 0.88 2.27 2.00 0.0615 0.12 0.31 38.72

11.70 0.04 0.47 2.27 1.06 0.0615 0.07 0.16 20.02

4.50 0.04 0.18 2.27 0.41 0.0615 0.03 0.06 6.94


11.60 0.04 0.46 2.27 1.05 0.0615 0.06 0.16 19.84

15.00 0.04 0.60 2.27 1.36 0.0615 0.08 0.21 26.01

43.50 0.04 1.74 2.27 3.95 0.0615 0.24 0.61 77.77

23.80 0.04 0.95 2.27 2.16 0.0615 0.13 0.33 41.99

10.50 0.04 0.42 2.27 0.95 0.0615 0.06 0.15 17.84

17.85 0.04 0.71 2.27 1.62 0.0615 0.10 0.25 31.19

234.95 21.33 1.31 3.28 410.68


16,929.83 1,537.23 94.54 236.35 30,344.81

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING


Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

10.00 0.04 0.40 2.27 0.91 0.0615 0.06 0.14 16.93

27.00 0.04 1.08 2.27 2.45 0.0615 0.15 0.38 47.80

33.00 0.04 1.32 2.27 3.00 0.0615 0.18 0.46 58.70

120.60 0.04 4.82 2.27 10.95 0.0615 0.67 1.68 217.78

15.75 0.04 0.63 2.27 1.43 0.0615 0.09 0.22 27.37

27.20 0.04 1.09 2.27 2.47 0.0615 0.15 0.38 48.17

109.20 0.04 4.37 2.27 9.92 0.0615 0.61 1.52 197.08

30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25

147.00 0.04 5.88 2.27 13.35 0.0615 0.82 2.05 265.72


21.90 0.04 0.88 2.27 1.99 0.0615 0.12 0.31 38.54

178.20 0.04 7.13 2.27 16.18 0.0615 1.00 2.49 322.38

49.20 0.04 1.97 2.27 4.47 0.0615 0.27 0.69 88.12

24.00 0.04 0.96 2.27 2.18 0.0615 0.13 0.34 42.35

793.05 72.01 4.43 11.07 1,424.19


17,722.88 1,609.24 98.97 247.42 31,769.00

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

33.00 0.04 1.32 2.27 3.00 0.0615 0.18 0.46 58.70

87.00 0.04 3.48 2.27 7.90 0.0615 0.49 1.21 156.76

5.25 0.04 0.21 2.27 0.48 0.0615 0.03 0.07 8.30

6.00 0.04 0.24 2.27 0.54 0.0615 0.03 0.08 9.67

30.00 0.04 1.20 2.27 2.72 0.0615 0.17 0.42 53.25

9.00 0.04 0.36 2.27 0.82 0.0615 0.05 0.13 15.11

8.00 0.04 0.32 2.27 0.73 0.0615 0.04 0.11 13.30

10.95 0.04 0.44 2.27 0.99 0.0615 0.06 0.15 18.66

5.25 0.04 0.21 2.27 0.48 0.0615 0.03 0.07 8.30

6.75 0.04 0.27 2.27 0.61 0.0615 0.04 0.09 11.03

75.00 0.04 3.00 2.27 6.81 0.0615 0.42 1.05 134.97


23.40 0.04 0.94 2.27 2.12 0.0615 0.13 0.33 41.26

14.00 0.04 0.56 2.27 1.27 0.0615 0.08 0.20 24.19

313.60 28.47 1.75 4.38 553.51


18,036.48 1,637.71 100.72 251.80 32,322.51

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

24.75 0.04 0.99 2.27 2.25 0.0615 0.14 0.35 43.72


31.50 0.04 1.26 2.27 2.86 0.0615 0.18 0.44 55.97

72.00 0.04 2.88 2.27 6.54 0.0615 0.40 1.01 129.52

28.75 0.04 1.15 2.27 2.61 0.0615 0.16 0.40 50.98

4.50 0.04 0.18 2.27 0.41 0.0615 0.03 0.06 6.94

20.10 0.04 0.80 2.27 1.83 0.0615 0.11 0.28 35.27

18.90 0.04 0.76 2.27 1.72 0.0615 0.11 0.26 33.09

11.40 0.04 0.46 2.27 1.04 0.0615 0.06 0.16 19.47

11.20 0.04 0.45 2.27 1.02 0.0615 0.06 0.16 19.11

38.25 0.04 1.53 2.27 3.47 0.0615 0.21 0.53 68.23

23.20 0.04 0.93 2.27 2.11 0.0615 0.13 0.32 40.90

13.00 0.04 0.52 2.27 1.18 0.0615 0.07 0.18 22.38

97.80 0.04 3.91 2.27 8.88 0.0615 0.55 1.37 176.37


395.35 35.90 2.21 5.52 701.97
18,431.83 1,673.61 102.93 257.32 33,024.47

PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

26.10 0.04 1.04 2.27 2.37 0.0615 0.15 0.36 46.17

21.00 0.04 0.84 2.27 1.91 0.0615 0.12 0.29 36.91

56.00 0.04 2.24 2.27 5.08 0.0615 0.31 0.78 100.47


17.60 0.04 0.70 2.27 1.60 0.0615 0.10 0.25 30.73

33.25 0.04 1.33 2.27 3.02 0.0615 0.19 0.46 59.15

265.20 0.04 10.61 2.27 24.08 0.0615 1.48 3.70 480.37

6.00 0.04 0.24 2.27 0.54 0.0615 0.03 0.08 9.67

87.00 0.04 3.48 2.27 7.90 0.0615 0.49 1.21 156.76

42.00 0.04 1.68 2.27 3.81 0.0615 0.23 0.59 75.04

111.00 0.04 4.44 2.27 10.08 0.0615 0.62 1.55 200.35

5.25 0.04 0.21 2.27 0.48 0.0615 0.03 0.07 8.30

20.00 0.04 0.80 2.27 1.82 0.0615 0.11 0.28 35.09

57.90 0.04 2.32 2.27 5.26 0.0615 0.32 0.81 103.92

748.30 67.95 4.18 10.45 1,342.92


19,180.13 1,741.56 107.11 267.76 34,367.40
PERHITUNGAN VOLUME

ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

33.00 0.04 1.32 2.27 3.00 0.0615 0.18 0.46 58.70

36.00 0.04 1.44 2.27 3.27 0.0615 0.20 0.50 64.15

19.20 0.04 0.77 2.27 1.74 0.0615 0.11 0.27 33.64

18.00 0.04 0.72 2.27 1.63 0.0615 0.10 0.25 31.46

21.00 0.04 0.84 2.27 1.91 0.0615 0.12 0.29 36.91


39.55 0.04 1.58 2.27 3.59 0.0615 0.22 0.55 70.59

9.75 0.04 0.39 2.27 0.89 0.0615 0.05 0.14 16.48

63.00 0.04 2.52 2.27 5.72 0.0615 0.35 0.88 113.18

9.60 0.04 0.38 2.27 0.87 0.0615 0.05 0.13 16.20

42.00 0.04 1.68 2.27 3.81 0.0615 0.23 0.59 75.04

39.00 0.04 1.56 2.27 3.54 0.0615 0.22 0.54 69.59

13.50 0.04 0.54 2.27 1.23 0.0615 0.08 0.19 23.29

51.75 0.04 2.07 2.27 4.70 0.0615 0.29 0.72 92.75

395.35 35.90 2.21 5.52 701.97


19,575.48 1,777.45 109.31 273.28 35,069.36

PERHITUNGAN VOLUME
ing Machine

ma CV. TAMARA ENGINEERING

Luas Tebal Volume Berat Berat Kadar Rencana

Bahan Pengisi
Rencana Jenis Tonase Aspal Aspal Aditif
(Filler)

Keras
(M2) (M) (M3) (M3) Ton Rencana Ton Kg Kg
8*9 10*11 13*12 0.25%*14*10 2%*(12-13)*1000
00
8 9 10 11 12 13 14 15 16

72.60 0.04 2.90 2.27 6.59 0.0615 0.41 1.01 130.61

35.40 0.04 1.42 2.27 3.21 0.0615 0.20 0.49 63.06

17.70 0.04 0.71 2.27 1.61 0.0615 0.10 0.25 30.91

14.25 0.04 0.57 2.27 1.29 0.0615 0.08 0.20 24.65

10.00 0.04 0.40 2.27 0.91 0.0615 0.06 0.14 16.93

36.00 0.04 1.44 2.27 3.27 0.0615 0.20 0.50 64.15

20.00 0.04 0.80 2.27 1.82 0.0615 0.11 0.28 35.09


26.00 0.04 1.04 2.27 2.36 0.0615 0.15 0.36 45.99

12.00 0.04 0.48 2.27 1.09 0.0615 0.07 0.17 20.56

17.25 0.04 0.69 2.27 1.57 0.0615 0.10 0.24 30.10

14.70 0.04 0.59 2.27 1.33 0.0615 0.08 0.21 25.47

7.00 0.04 0.28 2.27 0.64 0.0615 0.04 0.10 11.48

24.00 0.04 0.96 2.27 2.18 0.0615 0.13 0.34 42.35

48.50 0.04 1.94 2.27 4.40 0.0615 0.27 0.68 86.85

355.40 25.68 1.58 3.95 497.57


19,930.88 1,803.13 110.89 277.23 35,566.94
Gradasi Kasar

Ton
12-14-15-16

17

2.23

3.80

5.82

1.79

10.76

5.84
6.51

0.70

6.62

3.75

1.13

0.37

1.20

50.50
50.50
Gradasi Kasar

Ton
12-14-15-16

17

1.47

0.80

1.50

2.15

2.50

2.54

8.71

3.08
8.01

0.95

1.42

1.53

0.58

35.24
85.74
Gradasi Kasar

Ton
12-14-15-16

17

1.60

2.69

10.01

2.22

3.13

7.18

3.15

2.42

8.01

1.84
2.60

4.75

1.83

51.42
137.16

Gradasi Kasar

Ton
12-14-15-16

17
1.08

1.17

0.80

3.90

4.96

1.04

5.50

12.51

3.33

1.00

2.34

0.61
0.77

39.01
176.17

Gradasi Kasar

Ton
12-14-15-16

17

4.25

5.08

2.82
1.03

5.87

11.68

16.01

1.11

5.10

1.60

0.81

6.01

2.53

63.91
240.08
Gradasi Kasar

Ton
12-14-15-16

17

1.55

2.46

4.74

2.40

3.51
3.30

2.34

1.91

11.18

1.25

2.03

10.17

4.38

51.23
291.31
Gradasi Kasar

Ton
12-14-15-16

17

10.42

3.55

2.50

1.42

5.64

2.30

4.09
14.74

4.25

2.44

2.20

5.28

3.45

62.29
353.61
Gradasi Kasar

Ton
12-14-15-16

17

1.05

2.85

3.85

12.06

3.02

1.93

8.78

7.39

2.80
30.67

0.48

0.60

0.70

76.19
429.80

Gradasi Kasar

Ton
12-14-15-16

17
7.01

1.43

1.50

2.72

7.71

0.53

0.73

0.63

0.43

4.64

13.11

3.44
0.60

44.46
474.25

Gradasi Kasar

Ton
12-14-15-16

17

6.61

4.67
1.90

0.80

2.57

0.45

1.30

2.45

3.91

1.72

6.94

1.10

6.64

41.06
515.31
Gradasi Kasar

Ton
12-14-15-16

17

2.76

5.25

2.31

0.97
0.64

10.11

1.89

3.75

7.09

5.65

8.04

2.35

2.42

53.25
568.56
Gradasi Kasar

Ton
12-14-15-16

17

1.80

2.08

0.67

1.75

1.46

3.30
1.34

3.35

0.47

2.80

11.50

2.50

1.17

34.20
602.76
Gradasi Kasar

Ton
12-14-15-16

17

1.62

0.55

0.45

3.80

0.58

3.45

2.91

0.51
7.09

8.01

1.37

1.23

0.75

32.33
635.09
Gradasi Kasar

Ton
12-14-15-16

17

1.84

1.34

0.63

7.55

0.63

6.66

0.42

8.17

6.73

1.62
4.40

9.16

0.56

49.69
684.78

Gradasi Kasar

Ton
12-14-15-16

17
2.15

3.40

7.41

3.03

6.41

32.92

9.86

1.88

1.31

1.15

1.05

0.53
3.65

74.75
759.53

Gradasi Kasar

Ton
12-14-15-16

17

1.80

10.51
1.19

3.35

1.98

2.50

17.51

3.68

0.75

1.35

18.88

1.15

1.75

66.41
825.94
Gradasi Kasar

Ton
12-14-15-16

17

0.57

2.45

1.68

0.70
1.46

1.88

8.42

4.58

2.75

1.30

3.81

4.95

4.63

39.18
865.12
Gradasi Kasar

Ton
12-14-15-16

17

3.75

9.56

4.10

46.98

1.25

11.06
3.83

43.63

6.71

4.45

12.91

2.85

7.77

158.86
1,023.98
Gradasi Kasar

Ton
12-14-15-16

17

2.08

10.17

12.32

3.45

2.84

4.18

10.42
8.56

7.96

3.60

3.33

3.70

0.42

73.03
1,097.01
Gradasi Kasar

Ton
12-14-15-16

17

2.25

0.38

6.08

0.44

1.42

3.25

4.60

2.00

9.86
0.90

14.88

0.79

11.13

57.99
1,155.00

Gradasi Kasar

Ton
12-14-15-16
17

2.75

8.13

1.88

3.00

4.25

1.84

1.20

3.75

3.29

0.75

7.57
2.50

0.89

41.81
1,196.81

Gradasi Kasar

Ton
12-14-15-16

17

6.11

10.88
6.87

1.15

1.05

27.19

0.56

3.35

27.22

3.60

7.93

4.75

1.38

102.04
1,298.85

Gradasi Kasar

Ton
12-14-15-16

17

4.50

2.80

1.57

17.56
1.79

3.42

3.40

1.85

11.91

2.00

1.05

1.58

1.54

54.97
1,353.83
Gradasi Kasar

Ton
12-14-15-16

17

7.26

7.76

3.00

2.80

2.50
1.78

1.75

1.00

1.67

0.33

5.80

0.84

2.18

38.67
1,392.50
Gradasi Kasar

Ton
12-14-15-16

17

0.90

2.84

0.45

2.03

1.84

0.98

0.38
0.97

1.25

3.63

1.99

0.88

1.49

19.61
1,412.11
Gradasi Kasar

Ton
12-14-15-16

17

0.84

2.25

2.75

10.06

1.31

2.27

9.11

2.50

12.26
1.83

14.86

4.10

2.00

66.15
1,478.25

Gradasi Kasar

Ton
12-14-15-16

17

2.75

7.26

0.44

0.50

2.50

0.75

0.67

0.91

0.44

0.56

6.26
1.95

1.17

26.17
1,504.42

Gradasi Kasar

Ton
12-14-15-16

17

2.07
2.63

6.01

2.40

0.38

1.68

1.58

0.95

0.94

3.19

1.94

1.09

8.16
32.98
1,537.40

Gradasi Kasar

Ton
12-14-15-16

17

2.18

1.75

4.67
1.47

2.77

22.12

0.50

7.26

3.50

9.26

0.44

1.67

4.83

62.41
1,599.81
Gradasi Kasar

Ton
12-14-15-16

17

2.75

3.00

1.60

1.50

1.75
3.30

0.81

5.25

0.80

3.50

3.25

1.13

4.32

32.98
1,632.80
Gradasi Kasar

Ton
12-14-15-16

17

6.06

2.95

1.48

1.19

0.84

3.00

1.67
2.17

1.00

1.44

1.23

0.58

2.00

4.05

23.60
1,656.39
PERHITUNGAN VOLUME
DIVISI : PERKERASAN ASPAL
Pekerjaan : Lapis Perekat - Aspal Emulsi
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING
Lokasi : ( KM ….. + …... s/d KM …. + …... )

Sket

Posisi Lebar
No. KM STA Kanan/ Panjang Lebar
Kiri Rata-rata Perekat
Luas
(M') (M') (M2) (M2)
1 2 3 4 5 6 7 8

1+330.1 Ka 2.50
1 46.60 2.50 116.50
1+376.7 Ka 2.50

1+438.3 Ka 2.30
2 41.40 2.30 95.22
1+479.7 Ka 2.30

1+833.5 Ka 2.35
3 12.50 2.35 29.38
1+846.0 Ka 2.35

1+870.3 Ka/Ki 6.00


4 29.70 6.00 178.20
1+900.0 Ka/Ki 6.00

2+044.8 Ka/ki 6.00


5 13.50 6.00 81.00
2+058.3 Ka/ki 6.00

2+069.7 Ka 3.00
6 14.80 3.00 44.40
2+084.5 Ka 3.00

2+221.2 Ka 2.80
7 11.30 2.80 31.64
2+232.5 Ka 2.80
2+458.0 Ka 3.50
8 22.00 3.50 77.00
2+480.0 Ka 3.50

2+480.0 Ka/Ki 6.00


9 8.30 6.00 49.80
2+488.3 Ka/Ki 6.00

2+488.3 Ka 3.50
10 3.40 3.50 11.90
2+491.7 Ka 3.50

2+491.7 Ka 3.50
11 4.20 3.50 14.70
2+495.9 Ka 3.50

2+512.3 Ka 3.00
12 34.60 3.00 103.80
2+546.9 Ka 3.00

2+502.5 Ki 2.00
13 9.80 2.00 19.60
2+512.3 Ki 2.00

SUB TOTAL 853.14


TOTAL 853.14
AMARA ENGINEERING

Ket.

Berat Berat
L/m2 Liter
9 10 11

1.000 116.50

1.000 95.22

1.000 29.38

1.000 178.20

1.000 81.00

1.000 44.40

1.000 31.64
1.000 77.00

1.000 49.80

1.000 11.90

1.000 14.70

1.000 103.80

1.000 19.60

853.14
853.14
LAPORAN BULANAN

NAMA KEGIATAN : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II JAWA TIMUR
NAMA PAKET : PENINGKATAN STRUKTUR JALAN LINGKAR NGAWI
PENYEDIA JASA : PT. SELO MANUNGGAL SEJATI BULAN KE : 02
NOMOR KONTRAK : KU.08.08 / 2521. / WIL - II/NGK / 2015 Tgl: 25 MEI 2015 PERIODE : 1 S/D 28 JUNI 2015
KONSULTAN : PT. BUANA ARCHICON PT. GLOBAL PROFEX SYNERGY. PT . KRIDA PRATAMA ADHICIPTA (Ass)
SUMBER DANA : APBN TAHUN ANGGARAN 2015
MATA S/D S/D
PEMBA URAIAN PEKERJAAN BOBOT BULAN LALU BULAN INI BULAN INI
VOLUME
YARAN Sat % VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
BAGIAN KONTRAK HARGA SATUAN
DIVISI 1. UMUM
1.2 Mobilisasi 1.00 Ls 0.197 0.20
1.17 Pengamanan Lingkungan Hidup 1.00 Ls 0.294 0.29
1.8 ( 1 ) Manajemen dan Keselamatan Lalu Lintas 1.00 LS 0.423 0.42

DIVISI 2. DRAINASE
2.1(1) Galian Untuk Selokan Drainase dan Saluran Air 417.00 M³ 0.290
2.3(12) Beton K - 250 ( fc 20) Untuk Struktur Drainase Beton Minor 172.40 M³ 3.702
2.3(13) Baja Tulangan Untuk Struktur Drainase Beton Minor ( 24 Polos ) 10,346.00 Kg 2.400

DIVISI 3. PEKERJAAN TANAH


3.1.(6) Galian Perkerasan Beraspal Dengan Cold Milling Machine 38.00 M³ 0.207
3.1.(7) Galian Perkerasan Beraspal Tanpa Cold Milling Machine 654.00 M³ 0.851
3.1.(8) Galian Perkerasan Berbutir 600.00 M³ 0.821
3.3.(1) Penyiapan Badan Jalan 5,450.00 M² 0.329
3.4.(3) Pemotongan Pohon Pilihan Diameter 30 - 50 cm 120.00 Buah 0.470
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2 (2b) Lapis Pondasi Agregate Kelas S 600.00 M³ 2.520
DIVISI 5. PERKERASAN BERBUTIR
5.5 (1) Lapis Pondasi Agregat Semen Klas A ( cement Treated Base ) (CTB) 818.00 M³ 8.374
DIVISI 6. PERKERASAN ASPAL
6.1(2b) Lapis Perekat - Aspal Emulsi 5,306.10 Liter 1.006
6.3(5b) Laston Lapis Aus Modifikasi (AC - WC Mod) Elastomer Sintetis 906.20 TON 21.582
6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Elastomer Sintetis 1,868.00 TON 43.712
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L) Mod) Elastomer Sintetis 379.50 TON 8.878
DIVISI 7. STRUKTUR

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


8.1(2) Lapis Pondasi Aggregat Klas B untuk Perkerjaan Minor 40.00 M³ 0.147
8.1(5) Campuran Aspal Panas untuk Pekerjaan Minor 12.00 M³ 0.626
8.1(9) Residu Bitumen untuk Pekerjaan Minor 96.00 Liter 0.018
8.3(3) Pohon Jenis Mahoni dan Penanaman 360.00 Buah 1.411
8.4(1) Marka Jalan Termoplastik 210.00 M² 0.392
8.4(5) Patok Pengarah 68.00 Buah 0.266
DIVISI 9. PEKERJAAN HARIAN
9.1(1) Mandor 28.00 Jam 0.005
9.1(2) Pekerja Biasa 84.00 Jam 0.011
9.1(4)a Dump Truck Kapasitas 3-4 m3 28.00 Jam 0.083
9.1(11) Alat Penggali ( Excavator ) 80 - 140 PK 28.00 Jam 0.062
9.1(12) Crane 10 - 15 Ton 28.00 Jam 0.083
9.1(14) Penggilas Bervibrasi 5 - 8 Ton 28.00 Jam 0.054

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN

10.1(1) Pemeliharaan rutin perkerasan 1.00 Ls 0.196


10.1(2) Pemeliharaan rutin bahu jalan 1.00 Ls 0.196
10.1(3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan 1.00 Ls 0.196
10.1(4) Pemeliharaan rutin perlengkapan jalan 1.00 Ls 0.196

100.00

KEMAJUAN FISIK MINGGUAN KUMULATIF REALISASI 0.862


KEMAJUAN FISIK MINGGUAN KUMULATIF RENCANA 0.220
DEVIASI POSITIP 0.642
DEVIASI NEGATIP
APORAN BULANAN

PERIODE : 1 S/D 28 JUNI 2015

KET.

PROGRES BER
DASARKAN
KONTRAK
PENGENDALIAN M

Paket REGULER 25 BULU - TUBAN SEKSI 1


Kontraktor PT.BAITA SARI
Konsultan PT. GLOBAL PROFEX SYNERGY Ass

JENIS PENGUJIAN PENGUJIAN BULAN INI


ITEM Kode Jumlah
Jenis Pengujian
PEKERJAAN AASHTO Test
1. AC-BC Sieve Analysis T 11/27
Grading test of CA T 80
Spesific Grafity FA T 84
Spesific Grafity CA T 85
Sand Equivalent T 176
Soundness T 104
Abration Test T 96
Marshall Test T 245
Ekstraksi T 164
Bulk SG of Hot Mix T 166
Max SG of SG T 209
Air Void in Mix T 296
2. CTB

3. Urugan Pilihan
4. Aggregate B

5. Aggregate S

DIBUAT OLEH

BAGUS SETIAWAN
Lab TECH
PENGENDALIAN MUTU PEKERJAAN

BAN SEKSI 1

NERGY Ass Bulan :

PENGUJIAN BULAN INI PENGUJIAN S/D BULAN LALU PENGUJIAN S/D BULAN INI
Jumlah Jumlah
Diterima Ditolak Diterima Ditolak Diterima Ditolak
Test Test
DISETUJUI OLEH DILAPORKAN

PARUHUMAN LUBIS SUBIYANTORO


SITE ENGINEER QUALITY ENG.
Jumlah
Test Yang Test
Diperlukan Ulang
DILAPORKAN

SUBIYANTORO
QUALITY ENG.
PERHITUNGAN VOLUME
DIVISI : PERKERASAN ASPAL
Pekerjaan : Lapis Perekat - Aspal Emulsi
Penyedia Jasa : PT.BAITA SARI
Konsultan : PT. GLOBAL PROFEX SYNERGY Kerja Sama CV. TAMARA ENGINEERING
Lokasi : ( KM ….. + …... s/d KM …. + …... )

Sket

No. KM STA Posisi Kanan/ Kiri Panjang Lebar Lebar Perekat


Rata-rata
Luas
(M') (M') (M2) (M2)
1 2 3 4 5 6 7 8

1+330.1 Ka 2.50
1 46.60 2.50 116.50
1+376.7 Ka 2.50

1+438.3 Ka 2.30
2 41.40 2.30 95.22
1+479.7 Ka 2.30

1+833.5 Ka 2.35
3 12.50 2.35 29.38
1+846.0 Ka 2.35

1+870.3 Ka/Ki 6.00


4 29.70 6.00 178.20
1+900.0 Ka/Ki 6.00

2+044.8 Ka/ki 6.00


5 13.50 6.00 81.00
2+058.3 Ka/ki 6.00

2+069.7 Ka 3.00
6 14.80 3.00 44.40
2+084.5 Ka 3.00

2+221.2 Ka 2.80
7 11.30 2.80 31.64
2+232.5 Ka 2.80
2+458.0 Ka 3.50
8 22.00 3.50 77.00
2+480.0 Ka 3.50

2+480.0 Ka/Ki 6.00


9 8.30 6.00 49.80
2+488.3 Ka/Ki 6.00

2+488.3 Ka 3.50
10 3.40 3.50 11.90
2+491.7 Ka 3.50

2+491.7 Ka 3.50
11 4.20 3.50 14.70
2+495.9 Ka 3.50

2+512.3 Ka 3.00
12 34.60 3.00 103.80
2+546.9 Ka 3.00

2+502.5 Ki 2.00
13 9.80 2.00 19.60
2+512.3 Ki 2.00

SUB TOTAL 853.14


TOTAL 853.14
STATUS CH

KONTRAK A
NO. URAIAN
Tanggal

1 CCO No. 1 ###


2 Addendum No. 1

Ket.
Berat Berat
L/m2 Liter
9 10 11

1.000 116.50

1.000 95.22

1.000 29.38

1.000 178.20

1.000 81.00

1.000 44.40

1.000 31.64
1.000 77.00

1.000 49.80

1.000 11.90

1.000 14.70

1.000 103.80

1.000 19.60

853.14
853.14
STATUS CHANGE ORDER dan ADDENDUM

KONTRAK AWAL KONTRAK PERUBAHAN


Masa Masa Dasar
Nilai Tanggal Nilai Keterangan
Pelaksanaan Konstruksi Pelaksanaan
6 817 339 210.00 ### 6 817 339 0 210 Sesuai kebutuhan lapangan

Konsultan Pengawas

Site engineer
SKET PROGRES FISIK
PAKET : PELEBARANAN JALAN BULU ( BTS PROV JATENG ) - BTS KOTA TUBAN
PENYEDIA JASA : PT.BAITA SARI
KONSUTAN SUPERVISI : PT. GLOBAL PROFEX SYNERGY.Ass.CV. TAMARA ENGINEERING
BULAN : JULI
MATA PEMBAYARAN
Devisi KIRI 0+ 000 0 + 500 1 + 000 1 + 500 2 + 000 2 + 500 3 + 000 3 + 500

Ren.
Real.
Ren.
Real.
Ren.
Real.
Ren.
Real.
Ren.
Real.
KANAN
Ren.
Real.
Ren.
Real.
Ren.
Real.
Ren.
Real.
Ren.
Real.

Keterangan = Rencana PASANGAN BATU


PASANGAN CERUCUK
STRUKTUR ORGANISASI KONSULTAN PENGAWAS

PERUSAHAAN PT. BUANA ARCHICON. PT.GLOBAL PROFEX SYNERGY PT. KRIDA PRATAMA ADHICIPTA. (Ass)
NO. KONTRAK 22 / SP - PW / P2JN - JTM / III / 2015
PAKET ( 12 ) PENINGKATAN STRUKTUR JALAN LINGKAR NGAWI (CS ) ( BTS KAB NGAWI - BTS KOTA CARUBAN
TGL KONTRAK 16 MARET 2015

SITE ENGINEER
Ir. Paruhuman Lubis
OPERATOR KOMP.
Achmad Firdaus

SECRETARY
Eko Baskoro. SE

OFFICE BOY
Wijianto

CHIEF INSPECTOR QUALITY ENGINEER


Ir. Ismoyo Rahmat Saraswo. ST

T INSPECTOR 1 INSPECTOR 2 SURVEYOR 1 Surveyor 2 LAB. TECH Plant Inspecto Hari


Bagus. A Setiyawan Soetarto. Tito Julinanto Andjr Subyanto R.A. Taufik Sukiman. ST

KONSULTAN SUPERVISI
PT. BUANA ARCHICON
PT. GLOBAL PROFEX SYNERGY
PT. KRIDA PRATAMA ADHICIPTA (Ass)

PARUHUMAN LUBIS
Site Engineer
JADWAL PENUGASAN TENAGA KONSULTAN PENGAWAS
PAKET REGULER 12
KONSULTAN PT. BUANA ARCHICON. PT. GLOBAL PROFEX SYNERGY.PT. KRIDA PRATAMA ADHICIPTA (Ass)
KONTRAK NO.TGL 22 / SP - PW/ P2JN-JTM/III/2015 TANGGAL 16 MARET 2015 BULAN JULI 2015

RENCANA (M/M) REALISASI PENUGASAN


NO. POSISI NAMA KONTRAK ADD APRIL MEI JUNI JULI AGT SEP OKT
BLN MM 1 2 3 4 5 6

1 SITE ENGINEER Ir. PARUHUMAN LUBIS 7 7,5 BLN


2 QUALITY ENGINEER 1 RAHMAT SARASWO.ST 6.5 6,5 BLN
3 QUANTITY ENGINEER Ir. ISMOYO 6 6 BLN
4 INSPECTOR 1 BAGUS SETIYAWAN 6 6 BLN
5 INSPECTOR 2 SOETARTO 6 BLN
6 SURVEYOR 1 TITO JULINANTO 6 6 BLN
7 SURVEYOR 2 ANJAR SUBYANTO 2 BLN
8 PLANT INSPECTOR 2 HARI SUKIMAN. ST 6 BLN
9 LAB TEK R.A. TAUFIK 6 4 BLN
10 SEKRETARIS EKO BASKORO 7 7,5 BLN
11 OPERATOR COMPUT ACHMAD FIRDAUS 7 7,5 BLN
12 OFICE BOY WIJIYANTO 7 7,5 BLN
NOP DES
7
STRUKTUR ORGANISASI KONTRAKTOR
PAKET : PELEBARAN JALAN BULU ( BTS. PROV. JATENG ) – BTS. KOTA TUBAN

Project Manager

Lewi Virginius, ST
Site Engineer

Ir. Koeswandi General Superrintendent Div. Prod & Peralatan

ISO Dan K3 Lewi Virginius, ST Yudianto Novisa, ST

Administrasi & Keuangan Engineering Koordinator Pelaksana

Teguh Kustiono, BA Misran, ST Suprono A, ST

Manager Mutu

Ir. Koeswandi
Site Engineer
Cost Control Quantity Pelak. Drainase & Tanah

Setiadi Rokhim Masprilyanto, Amd Suprono Alfandi, ST


Manager K3 & Link Hidup Site Engineer
Dani Prasetya, ST

Umum & Logistik Quality Pelak. Struktur

Suhadi Sukamto Romli

Keamanan Drafter Pelak. Paving

Samuin Masprilyanto, Amd Sutopo

Surveyor
PT. BAITA SARI
Suyatno

Lewi Virginius, ST
General Superintendent
LAPORAN HARIAN PENGIRIMAN HOT MIX

Hari / Tanggal : SENIN 22 JUNI 2015 Jenis Campuran


Pemesan : PT. SELO MANUNGGAL SEJATI Lokasi / STA

PEKERJAAN : PEMELIHARAAN RUTIN LOKASI : LINGKAR NGAWI


Berangkat BERAT
No NO. POL Temp.
Jam Kotor Kendaraan Bersih
C
o
Ton Ton Ton
1 AE 8595 UC 150° C 8 13.87 3.87 10

2 AE 8684 UC 150° C 8.1 13.97 3.87 10.1

3 AE 8058 UC 150° C 8.45 13.98 3.87 10.11

4 AE 8745 UC 150° C 9.15 13.98 3.87 10.11

5 AE 8081 UC 150° C 9.25 13.98 3.87 10.11

6 AE 8027 UC 150° C 9.45 13.95 3.87 10.08

VOLUME HARI INI 60.51


VOLUME KEMAREN
VOLUME S/D HARI INI 60.51

LAPORAN HARIAN PENGIRIMAN HOT MIX

Hari / Tanggal : Jum'at, Jenis Campuran


Lokasi / STA Pemesan

BERAT
No NO. POL Temp. Berangkat
Kotor Kendaraan Bersih
o
C Jam Ton Ton Ton
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
VOLUME HARI INI 0.000
VOLUME KEMAREN 0
VOLUME S/D HARI INI 0.000

Bina Marga Konsultan

( …………………………………… ) ( …………………………………… )
Nama terang Nama terang

LAPORAN HARIAN PENGIRIMAN HOT MIX

Hari / Tanggal : Sabtu, Jenis Campuran


Lokasi / STA : Pemesan

BERAT
No NO. POL Temp. Berangkat
Kotor Kendaraan Bersih
o
C Jam Ton Ton Ton
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
0.000 0.000
VOLUME HARI INI 0.000
VOLUME KEMAREN 0.000
VOLUME S/D HARI INI 0.000

Bina Marga Konsultan

( ……………………… ) ( …………………………………… )
Nama terang Nama terang

LAPORAN HARIAN PENGIRIMAN HOT MIX

Hari / Tanggal : Jenis Campuran


Lokasi / STA : Pemesan

BERAT
No NO. POL Temp. Berangkat
Kotor Kendaraan Bersih
o
C Jam Ton Ton Ton
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
0.000 0.000
VOLUME HARI INI 0.000
VOLUME KEMAREN 0.000
VOLUME S/D HARI INI 0.000

Bina Marga Konsultan

( ……………………… ) ( …………………………………… )
Nama terang Nama terang

LAPORAN HARIAN PENGIRIMAN HOT MIX

Hari / Tanggal : Jenis Campuran


Lokasi / STA : Pemesan

BERAT
No NO. POL Temp. Berangkat
Kotor Kendaraan Bersih
o
C Jam Ton Ton Ton
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
0.000 0.000
VOLUME HARI INI 0.000
VOLUME KEMAREN 0.000
VOLUME S/D HARI INI 0.000

Bina Marga Konsultan

( ……………………… ) ( …………………………………… )
Nama terang Nama terang

LAPORAN HARIAN PENGIRIMAN HOT MIX

Hari / Tanggal : Jenis Campuran


Lokasi / STA : Pemesan
BERAT
No NO. POL Temp. Berangkat
Kotor Kendaraan Bersih
o
C Jam Ton Ton Ton
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
0.000 0.000
VOLUME HARI INI 0.000
VOLUME KEMAREN 0.000
VOLUME S/D HARI INI 0.000

Bina Marga Konsultan


( ……………………… ) ( …………………………………… )
Nama terang Nama terang
MIX

: AC - WC
:

Keterangan
MIX

Keterangan

0.000
Konsultan

…………………………………… )
Nama terang

MIX

:
:

Keterangan
0.000

Konsultan

…………………………………… )
Nama terang

MIX

:
:

Keterangan
0.000

Konsultan

…………………………………… )
Nama terang

MIX

:
:

Keterangan
0.000

Konsultan

…………………………………… )
Nama terang

MIX

:
:
Keterangan

0.000

Konsultan
…………………………………… )
Nama terang

Anda mungkin juga menyukai