1 Kepala Tukang Batu Orang/Hari 180.000
2 Tukang Batu Orang/Hari 150.000
3 Tukang Batu setengah terampil Orang/Hari 130.000
4 Pembantu tukang/kenek Orang/Hari 100.000
5 Kepala Tukang Kayu Orang/Hari 180.000
6 Tukang Kayu Orang/Hari 150.000
7 Tukang Kayu setengah terampil Orang/Hari 130.000
8 Kepala Tukang Cat Orang/Hari 180.000
9 Tukang Cat terampil Orang/Hari 150.000
10 Tukang Cat setengah terampil Orang/Hari 130.000
11 Mander Tukang Gali Tanah Orang/Hari 200.000
12 Kepala Tukang Gali tanah Orang/Hari 180.000
13 Tukang Gali Tanah Orang/Hari 150.000
14 Kepala Tukang Besi Orang/Hari 180.000
15 Tukang Besi terampil Orang/Hari 150.000
16 Tukang Besi setengah terampil Orang/Hari 130.000
17 Juru ukur Orang/Hari 140.000
18 Mander lapangan Orang/Hari 200.000
19 Mekanik Terampil Orang/Hari 150.000
20 Operator terampil Orang/Hari 255.000
21 Pembantu operator Orang/Hari 170.000
22 Penjaga malam Orang/Hari 130.000
23 Sopir personil Orang/Hari 130.000
24 Logistik Orang/Hari 180.000
25 Site Manager Orang/Hari 350.000

Catatan:
Standar satuan harga diatas merupakan standar harga tertinggi barang dan jasa yang mana didalamnya
sudah termasuk pajak.

129 Journal BCIM Prices


Provinsi Kepulauan Riau
~
Edisi 40 Tahun XXVII - 2021 Jurnal HSBBKI

DAFTAR HARGA SATUAN BAHAN BANGUNAN


PROVINSI KEPULAUAN RIAU

NO. JENIS BAHAN SATUAN I HARGA (Rp.)


I I
I. BAHAN PASANGAN
1 Aspal (bulk/Curah) 60/70 (pen) bulk/curah 2,000,000
2 Asal Kemasan 60/80 (pen) Drum 2,000,000
3 bata hebe! (batako Ringan) kubik 77.000
4 bata hebe! (batako Ringan) bh 7.000
5 Batako bh 2.210
6 Batako Padat bh 3.640
7 bata semen bh 1.200
8 Bata silikon bh 12.000
9 Batu Kali Pecah 3/4 M3 540.000
10 Batu Andesit (30 x 30) m2 170.000
11 Batu Bata Merah (biasa) bh 2.660
12 Batu Bata Merah (oven) bh 4.200
13 Batu belah I Batu gunung 9 inch M3 385.000
14 Batu Cor 3/4 inch Lori 1,500,000
15 Batu Granit Besar Untuk Batu Miring Lori 900.000
16 Batu Krikil 3/4 inch M3 540.000
17 Batu Tanggung Kecil Lori 1,500 ,000
18 Batu Tanggung Sedang Lori . 1,500,000
19 Batu pecah/Spleet 1-2 em 7m3 1,350,000
20 batu kali/batu belah 5-8 " 7m3 950.000
21 Batu terawang 12 x 22 x 22 em bh 8.000
22 Batu terawang 12 x 22 x 22 em bh 8.000
23 Batu terawang 12 x 15 x 30 em bh 8.000
24 Batu terawang 10 x 15 x 20 em bh 7.000
25 Batu terawang 12 x 22 x 22 em bh 8.000
26 Batu terawang 12 x 18 x 30 em bh 10.000
27 Batu terawang 8.5 x 15 x 30 em bh 8.000
28 Batu terawang 10 x 29 x 29 em bh 12.000
29 Batu terawang 12 x 15 x 26 em bh 8.000
30 Batu terawang 12 x 15 x 50 em bh 10.000
31 Batu terawang 12 x 20 x 20 em bh 8.000
32 Batu terawang 12 x 25 x 25 em bh 10.000
33 Batu terawang 12 x 22 x 22 em bh 8.000
34 Polongan beton 40 x 60 em bh 60.000
35 Polongan beton 30 x 60 em bh 40.000
36 Polongan beton 20 x 60 em bh 25.000
37 Polongan beton 15 x 60 em bh 20.000
38 Po Iongan beton 10 x 60 em bh 15.000
39 Polongan Cor Granit Non Besi 30 x 60 em bh 90.000
40 Polongan Cor Granit Non Besi 20 x 60 em bh 70.000
41 Polongan Cor Granit Non Besi 15 x 60 em bh 50.000
42 Polongan Cor Granit Non Besi 30 x 60 em bh 110.000
43 Polongan Cor Granit Non Besi 40 x 60 em bh 136.000
44 Polongan Cor Granit Non Besi 50 x 60 em bh . 165.000
45 Polongan Cor Granit Non Besi 60 x 60 em bh 205.000
46 Polongan Cor Granit Non Besi 80 x 60 em bh 245.000
47 Polongan Cor Granit ada Besi 30 x 60 em bh 165.000
48 Polongan Cor Granit ada Besi 40 x 60 em bh 205.000
49 Polongan Cor Granit ada Besi 50 x 60 em bh 245.000
50 Polongan Cor Granit ada Besi 60 x 60 em bh 290.000
51 Polongan Cor Gran it ada Besi 80 x 60 em bh 395.000
52 Polongan Cor Gran it ada Besi 100 x 60 em bh 550.000

130 Journal BCIM Prices


Provinsi Kepulauan Riau
Edisi 40 Tahun XXVII - 2021
<8> Jurnal HSBBKI

NO. .JENIS BAHAN SATUAN I HARGA (Rp.)


53
IPolongan Cor Granit ada Besi 120 x 60 em I bh 2,960,000
54 Polongan Cor Granit ada Besi 150 x 60 em bh 3,440,000
55 cincin sumur beton 90 x 30 em bh 82.000
56 cincin sumur beton 80 x 30 em bh 80.000
57 cincin sumur beton 70 x 30 em bh 70.000
58 cincin sumur beton 60 x 30 em bh 60.000
59 cincin sumur cor granit 90 x 30 em bh 115.000
60 cincin sumur cor granit 80 x 30 em bh 95.000
61 cincin sumur cor granit 70 x 30 em bh 85.000
62 cincin sumur cor gran it 60 x 30 em Bh 75.000
63 Box Culvert 100 x 120 t: 16 Bh 4,300,000
64 Box Culvert 100 x 150 x 10 t:20 em Bh 7,290,000
65 Box Culvert 50 x 50 x 120 t:8 em bh - 1,890,000
66 Cat Minyak Hitam Klg 120.000
67 Cerucuk 2 x 3 Btg 20.800
68 Cerucuk 3 x4 Btg 35.000
69 Cerucuk 4 x 5 Btg 40.000
70 Cincin Cor 1 M Luar bh 95.000
71 Cincin Cor 75 Cm Luar bh 65.000
72 Cincin Cor 80 Cm Luar bh 75.000
73 Cincin Cor 90 Cm Luar bh 85.000
74 Gorong-gorong besi dia 100 x 60 x 10 bh 762.390
75 Gorong-gorong besi dia 120 x 120 x 10 bh 3,050,850
76 Gorong-gorong besi dia 150 x 120 x 10,5 bh 4,115,100
77 Gorong-gorong besi dia 30 x 60 x 7 bh 199.100
78 Gorong-gorong besi dia 40 x 60 x 7 bh 247.500
79 Gorong-gorong besidia 50 x 60 x 7 bh 295.400
80 Gorong-gorong besi dia 60 x 60 x 7 bh 350.000
81 Gorong-gorong besi dia 80 x 60 x 8 bh 539.220
82 Gorong-gorong non besi dia 30 x 60 x 7 bh 123.100
83 Gorong-gorong non besi dia 40 x 60 x 7 bh 163.900
84 Gorong-gorong non besi dia 50 x 60 x 7 bh 199.000
85 Gorong-gorong non besi dia 60 x 60 x 7 bh 286.380
86 Granit 3/4 inch Pickup 624.000
87 Grass Block Bh 25.300
88 Kansteen 50 x 20 x 13 em keping 19.000
89 Kansteen 25 x 20 x 13 em keping 95.000
90 Kansteen(kerb) 50 x 20 x 13 em keping 19.000
91 Kansteen 50 x 20 x 13 em keping 30.000
J 92 Kansteen(kerb) 25 x 20 x 13 em keping 15.000
93 Kansteen 50 x 20 x 13 em keping 30.000
r
94 Kansteen(kerb) 90 x 20 x 13 em keping 62.000
.r,(
95 Kansteen 30 x 20 x 13 em keping 79.000
J 96
97
Kansteen 90 x 20 x 13 em
Kansteen(kerb) 60 x 20 x 13 em
keping
keping
62 .000
79.000
.r(
98 Kansteen 30 x 20 x 13 em keping 39.000
I 99 Kansteen 60 x 20 x 13 em keping 79.000
f
(
100' Socket 2" bh 13.000
[ 101 Socket 2-1/2" bh 22 .000
r.
(
102
103
Socket 3"
Socket 4"
bh
bh
32.000
63.000
104 Socket 6" bh 131 .000
~ 105 Socket 8" bh 265.000
r, 106 Socket 10" bh 419.000
107 Knee 90 1/2" bh 3.000
108 Knee 90 3/4" bh 3.000
ff 109 Knee 90 1" bh 6.000
110 Knee 90 1-1/4" bh 8.000
111 Knee 90 1-1/2" bh 11 .000
) .
131
Provinsi Kepulauan Riau Journal BCIM Prices
~
Edisi 40 Tahun XXVII - 2021 Jurnal HSBBKI

NO. JENIS BAHAN SATUAN I HARGA (Rp.)


12
IBeton Ready Mix K 350 I m3 1,355,000
13 Beton Ready Mix K 375 m3 1,427,500
14 Beton Ready Mix K 400 m3 1,500,000
15 Beton Ready Mix K 450 m3 1,600,000
16 Beton Ready Mix K 500 m3 1,710,000
VII ALAT BANTU
1 Alat pelancip I oisau besar bh 38.500
2 Angkutan Linning Beton Plat bh 7.300
3 Bak Cat bh 14.500
4 C e to k bh 20.800
5 cap engkol Headgetrimmer bh 250.000
6 Chain Block 3 Ton Unit 4,530,000
7 Chain Block 5 Ton Unit 6,985,000
8 Ember bh 13.000
9 Fisher M 6 Kotak 21.000
10 G an co bh 62.000
11 Gergaji kayu bh 67.200
12 Gergaji Pipa bh 26.000
13 Gergaji Pipa Set 71.500
14 Gerobak Dorong bh 397.500
15 Gunting pemotong baja bh 37.100
16 lsolatif Pipa bh 32.500
17 Kalbulator Headgetrimmer bh 1,400,000
18 Keranjang bh 52.500
19 Kereta dorong Unit ·438.900
20 Kikir Besar bh 33.500
21 Kikir Headgetrimmer bh 110.500
22 Kikir Kecil bh 32.000
23 Klem Selang 1 1/2 lnci bh 7.500
24 Kuas 2 1/2 lnci bh 22.000
25 Kuas 4 inch bh 29.000
26 Kuas Rol bh 41 .500
27 Kuas Roll bh 10.000
28 Kunci oembengkok tulangan 4 inch bh 21.900
29 Kunci Pintu Set 265.000
30 Kunci Pintu Bulat Set 123.500
31 Lem PVC 500 ml Kaleng 48.000
32 Lingg is bh 76.300
33 Marti I bh 60.000
34 Meteran 50 m bh 117.500
35 Meteran 7,5 m bh 41.500
36 Mollen beton (sewa) Unit I Hr 475.700
37 Obat Pengeras/Campuran ml 3.000
38 Obeng Bunga bh 20.500
39 Obeng Gepeng bh 20.000
40 Palu I martil bh 38.900
41 Pemadat timbunan (Vibro roller/stamper) Unit I M3 16.800
42 Pintu klep Unit 100.900
43 Pompa Beton (26 meter) 20 Watt m3 108.000
44 Robin 600 Kg 101.500
45 Round Sling 3 Ton Unit 907.000
46 Selang Benang 2 lnci m 75.500
47 Sewa Excavator Unit I Jam 456.300
48 Skrup 8 x 1 lnci Kotak 28.000
49 Skrup 8 x 1 1/2 lnci Kotak 28.000
50 Spray Gun Semprot bh 247.000
51 Tali Tambang 16 mm m 15.500
52 Tali Tambang 9 mm m 5.500
53 Tang pemotong kawat bh 28.400
54 Tangki Penguin 2000 L bh 4,465,000
55 Timba bh 27.100
56 Vibrator beton (sewa) Unit!Hari 232.100
57 Watermur 2 lnci bh 91.000
58 Webbing Sling 4 Ton Unit 1,175,000
59 Meteran Air PDAM Unit 175.000

136
Provinsi Kepulauan Riau Journal BCIM Prices
~
Edisi 40 Tahun XXVII - 2021 Jurnal HSBBKI

NO. ~ENIS BAHAN SATUAN I HARGA (Rp.J


60
IMeteran Air PDAM Bahan PVC I Unit 90.000
VIII BAHAN BAKAR
"1 Minyak pelumas Miditran S. 40 ltr 52 .200
2 Minyak pelumas Misran B. 40 ltr 59.000
3 Minyak Roled HD 90.140 ltr 54.100
4 Minyak tanah I Kerosin ltr -
5 Olie Hidrolis Toralix 52 ltr 75.000
6 Premium ltr -
7 Pertamax ltr -
8 Pertamax Plus ltr -
9 So I a r ltr -
10 Pertalite ltr -
11 Solar lndustri ltr 13.000
IX BAHAN ALAT KEBERSIHAN
1 As roda Qerobak sampah bh 79.800
2 Ban dalam uk. 300 x 10 bh 84.300
3 Ban luar Qerobak sampah bh 413.700
4 Bar Chainsaw bh 1,400,000
5 Bar Chainsaw bh 1,500,000
6 Bar Chainsaw bh 1,550,000
7 Batu Asah bh 26.000
8 Batu Asah Beii bh 31 .500
9 Batu Gerinda bh 20.800
10 Baut bh 13.000
11 Bearing bh 39.000
12 Block bh 525.000
13 Busi bh 39.000
14 Cakar sampah bh 72 .500
15 Cangkul Garpu bh 138.000
16 Cangkul Petak bh 98.000
17 Cap Engkol _ bh 71.500
:1 8 Cap Flywheel bh 156.000
19 Carbulator bh 364.000
20 Carbulator Chainsaw bh 1,115,000
21 CDI bh 195.000
22 Chaler gerobak sampah bh 47.300
23 Con Rud bh 214.500
24 Flexible lay 234.000
25 Gagang Start bh 585.000
26 Garuk Besi bh 55.000
27 Garuk Plastik bh 35.500
28 Handspryer Unit 676.500
29 Jaring sampah bh 325.600
30 Kampas bh 260.000
31 KantonQ Sampah bh 58.000
32 Karet Kaki bh 39.000
33 Karet Kaki Body Besi bh 104.000
34 Kepala Pisau bh 39.000
35 KeranjanQ sampah bh 26.300
36 KeranianQ sampah bambu bh 36.800
37 Knalpot bh 78.000
38 Kuku Start bh 19.500
39 manQkok Kampas bh 201 .500
40 Mata Pisau bh 91.000
41 Mesin Chainsaw Sthil Besar Unit 18,000,000
42 Mesin Chainsaw Sthil Kecil Unit 7,000,000
43 Mesin Chainsaw Sthil SedanQ Unit 12,500,000
44 Mesin HeadQetrimmer Unit 8,000,000
45 Mesin Pompa Air untuk Truck Tanki Unit 4,541 ,500
46 Mesin Potong Rumput Unit 6,000,000
47 Mesin Potong Rumput Gendong bh 6,729,900
48 Paking Set bh 19.500
49 Paking Set Set 32.000
50 Parang bh 93.000
51 Peleng gerobak sampah bh 207.000

Provinsi Kepulauan Riau


137 Journal BCIM Prices
~
Edisi 40 Tahun XXVII - 2021 Jurnal HSBBKI

DAFTAR HARGA SATUAN SEWA PERALATAN


PROVINSI KEPULAUAN RIAU

NO. JENIS PERALATAN SATUAN HARGA (Rp.)


I I I

1 Mollen beton (sewa) Unit I Hari 475.700

2 Pemadat timbunan (Vibro roller/stamper) Unit I M3 16.800

3 Sewa Excavator Unit I Jam 456.300

4 Vibrator beton (sewa) unit I Hari 232.100

5 Upah Jasa Pompa Air hari 1.575.900

6 Upah Jasa Mesin Potong Rumput hari 864.500

Catatan:
Standar satuan harga diatas merupakan standar harga tertinggi barang dan jasa yang mana didalamnya
sudah termasuk pajak.

144
Provinsi Kepulauan Riau Journal BCIM Princes

Anda mungkin juga menyukai