Jl. Raya Bratasena Pasar Proyek Sidodadi, Kec. Bandar Surabaya, Lampung Tengah Page : 1 of 2
02-09-2021 10:07:02 BAGUS
Tlp/ Fax : /
[ 0563 ] M. YUSUF
003 (KSPPS BMT ASSYAFIIYAH BERKAH NASIONAL PROYEK)
Jl. Raya Bratasena Pasar Proyek Sidodadi, Kec. Bandar Surabaya, Lampung Tengah Page : 2 of 2
02-09-2021 10:07:02 BAGUS
Tlp/ Fax : /
No Rekening Gol. Pemb Nama Alamat Lama Tanggal Kelami Status Status SE Realisasi Angsuran Saldo pemb
n Realisasi
Pembukaan Jth Tmp Pokok Basil Total
1 003.71.0002028.09 Murabahah RIANTO SIDODA 5 Bulan 05-08-2021 05-01-2022 L Lama Realisasi Bar 1001 4,000,000.00 4,000,000.00 700,000.00 4,700,000.00 4,000,000.00
Ceria Jatuh DI DS III
Tempo
2 003.70.0005403.01 Murabahah SALAMA DUSUN 24 Bulan 10-08-2021 10-08-2023 P Baru Realisasi Bar 1001 8,000,000.00 333,333.00 184,000.00 517,333.00 8,000,000.00
Ceria Angsuran H I,
CEMPAK
A PUTIH
3 003.70.0005407.01 Murabahah ISMIATI DUSUN 10 Bulan 10-08-2021 10-06-2022 P Baru Realisasi Bar 1001 5,000,000.00 500,000.00 115,000.00 615,000.00 5,000,000.00
Ceria Angsuran VI
SIDODA
DI
4 003.70.0005408.01 Murabahah WAHYU DUSUN 18 Bulan 13-08-2021 13-02-2023 L Baru Realisasi Bar 1004 10,000,000.00 555,556.00 230,000.00 785,556.00 10,000,000.00
Ceria Angsuran UTOMO 1,
SIDODA
DI
5 003.70.0003225.05 Murabahah LASIMA SIDODA 10 Bulan 16-08-2021 16-06-2022 L Lama Realisasi Bar 1007 7,000,000.00 700,000.00 161,000.00 861,000.00 7,000,000.00
Ceria Angsuran N DI
6 003.70.0005178.04 Murabahah MUZAYI SURABA 7 Bulan 18-08-2021 18-03-2022 L Lama Realisasi Bar 1007 7,000,000.00 1,000,000.00 161,000.00 1,161,000.00 7,000,000.00
Ceria Angsuran N YA
BARU
7 003.70.0001969.03 Murabahah SUBATIN CEMPAK 24 Bulan 19-08-2021 21-08-2023 L Lama Realisasi Bar 1001 5,000,000.00 208,333.00 115,000.00 323,333.00 5,000,000.00
Ceria Angsuran A PUTIH
8 003.70.0005329.02 Murabahah MISTIANI sidodadi, 12 Bulan 24-08-2021 24-08-2022 P Lama Realisasi Bar 1001 4,000,000.00 333,333.00 92,000.00 425,333.00 4,000,000.00
Ceria Angsuran dusun III
9 003.71.0005213.03 Murabahah SUNARD Dusun 5 Bulan 24-08-2021 24-01-2022 L Lama Realisasi Bar 1001 20,000,000.00 20,000,000.00 3,500,000.00 23,500,000.00 20,000,000.00
Ceria Jatuh I VII
Tempo Cempaka
Putih
10 003.71.0005173.04 Murabahah TUKIYAN DUSUN 5 Bulan 25-08-2021 25-01-2022 L Lama Realisasi Bar 1001 7,000,000.00 7,000,000.00 1,225,000.00 8,225,000.00 7,000,000.00
Ceria Jatuh TO IX
Tempo CEMPAK
A PUTIH
11 003.71.0004942.06 Murabahah M.SHOLI SIDODA 5 Bulan 27-08-2021 27-01-2022 L Lama Realisasi Bar 1007 7,000,000.00 7,000,000.00 1,225,000.00 8,225,000.00 7,000,000.00
Ceria Jatuh KIN DI
Tempo
Jumlah Sub Total 84,000,000.00 41,630,555.00 7,708,000.00 49,338,555.00 84,000,000.00
Jumlah 190,000,000.00 132,338,888.00 23,826,000.00 156,164,888.00 190,000,000.00