Kanor (BT.1, BT.2, BT.3, BT.4, BT.5,BNG.1) 547 2,188 0.12 263
Kepohbaru (BBR.1, BBR.2, BBR.3, BBR.4, BTL.1, BTL.2) 789 3,156 0.12 379
TAHAP II
2 10 Mei 2022 s/d 3 Juni 2022 TOTAL 6,000 - 2,880
PADI (Tanaman) Jaticilik (BPN.1, BPN.2, BPN.3, BPN.4, BPN.5) 570 2,280 0.12 274
RTT Sumberrejo (BS.1, BS.2, BS.3, BS.4, BS.5, BS.6, BS.7, BS.8, BS.9) 713 2,852 0.12 342
PACAL KANAN (Bdg. Mekuris Wil. Timur) 2,367 1,136
Mekuris (BM.1, BM.2, BM.3, BM.4, BM.5, BM.6, BM.7, BM.8, BM.9) 800 3,200 0.12 384
Kanor (BT.1, BT.2, BT.3, BT.4, BT.5, BNG.1, BNG.2, BNG.3, BNG.4,
547 2,188 0.12 263
BNG.5, BNG.6)
Pohwates (BPW.1, BPW.2, BPW.3, BPW.4, BPW.5, BPW.6) 231 924 0.12 111
Kepohbaru (BBR.1, BBR.2, BBR.3, BBR.4, BBR.5, BBR.6, BKJ.1, BKJ.2,
789 3,156 0.12 379
BKJ.3, BKJ.4, BKJ.5, BBD.1, BBD.2)
TAHAP III
3 4 Juni s/d 28 Juni 2022 TOTAL 6,000 - 2,880
PACAL KIRI (Wil. Barat) 900 432
Klepek (BK.Ki.1,BK.Ki.2, BK.Ki.3) 450 1,800 0.12 216
Kapas (BK.Ka.1,BK.Ka.2, BK.Ka.3, BK.Ka.4, BK.Ka.5, BBg.1) 450 1,800 0.12 216
PACAL KANAN (Wil.Tengah) 2,733 1,312
Balen (BB.1, BB.2, BB.3, BB.4, BB.5, BB.6, BB.7) 650 2,600 0.12 312
PADI (Tanaman)
Kenep (BL.1, BL.2, BL.3, BL.4, BL.5, BL.6, BL.7) 800 3,200 0.12 384
RTT
Jaticilik (BPN.1, BPN.2, BPN.3, BPN.4, BPN.5) 570 2,280 0.12 274
Sumberrejo (BS.1, BS.2, BS.3, BS.4, BS.5, BS.6, BS.7, BS.8, BS.9) 713 2,852 0.12 342
PACAL KANAN (Bdg. Mekuris Wil. Timur) 2,367 1,136
Mekuris (BM.1, BM.2, BM.3, BM.4, BM.5, BM.6, BM.7, BM.8, BM.9) 800 3,200 0.12 384
Kanor (BT.1, BT.2, BT.3, BT.4, BT.5, BNG.1, BNG.2, BNG.3, BNG.4,
547 2,188 0.12 263
BNG.5, BNG.6)
Pohwates (BPW.1, BPW.2, BPW.3, BPW.4, BPW.5, BPW.6) 231 924 0.12 111
Kepohbaru (BBR.1, BBR.2, BBR.3, BBR.4, BBR.5, BBR.6, BKJ.1, BKJ.2,
789 3,156 0.12 379
BKJ.3, BKJ.4, BKJ.5, BBD.1, BBD.2)
TAHAP I
1 PADI (Tanaman)RTT 15 April 2022 s/d 9 Mei 2022 2.880 25 24 3,600 6,220,800
TAHAP II
2 PADI (Tanaman)RTT 10 Mei 2022 s/d 3 Juni 2022 2.880 25 24 3,600 6,220,800
TAHAP III
51
Lampiran 2 Tabel kesepakatan Rapat Alokasi Air MT.2 TH.2021/2022
6 Sumberrejo Sumberrejo 1,409 BS.1, BS.2, BS.3, BS.4, BS.5, 713 BS.7, BS.8 203 BS.9, BS.10, BS.11 493
BS.6
7 Kanor Kanor 3,132 BT.1, BT.2, BT.3, BT.4, 547 BNG.2, BNG.3, BNG.4, BNG.5, 716 BT.7, BT.8, BT.9, 1,869
BT.5, BNG.1 BNG.6, BT.6 BT.10, BT.11, BT.12,
8 Pohwates Kepohbaru 1,444 BPW.1, BPW.2, BPW.3 231 BPW.4, BPW.5, BPW.6 428 BT.13
BPW.7, BPW.8, 785
BPW.9
9 Mekuris Sumberrejo 2,084 BM.1, BM.2, BM.3, BM.4, 800 BM.7, BM.8 639 BM.9, BM.10, BM.11 645
BM.5, BM.6
10 Kepohbaru Kepohbaru 2,924 BBR.1, BBR.2, BBR.3, 789 BTL.2, BKJ.1, BKJ.2, BKJ.3, 2,135 -
BBR.4, BTL.1, BTL.2 BKJ.4, BKJ.5, BKJ.6, BKJ.7,
BBD.1, BBD.2
Jumlah Areal Kerja Ranting 16,633 6,000 - 6,652 3,981 16,633
52
Lampiran 3 Rencana Tata Tanam per Daerah Irigasi Pacal
KUTIPAN LAMPIRAN KEPUTUSAN KOMISI IRIGASI MENGENAI RENCANA TATA TANAM PER DAERAH IRIGASI
Daerah irigasi : Pacal
No.Kode irigasi : 35227005
Total Luas Sawah Irigasi : 16.688
Bagian Pelaks.Kegiatan :
Padi (ha) Palawija (ha) Tebu (ha) Keperluan lain (ha) Jumlah Pemberian Air
Nama Wil Kerja Luas
Nama Wil Kerja Golo
No Pengamat/Ranting Luas (ha)
Mantri/Juru MT1 MT2 MT3 MT1 MT2 MT3 Tua Muda MT1 MT2 MT3
(MT1+MT2+MT3)
ngan Mulai Selesai
/UPTD (ha) tgl tgl
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 DI.Pacal Klepek / Sukosewu 998 998 450 0 0 548 998 0 0 0 0 0 2.994 -- --
53
Lampiran 4 Rencana Tata Tanam DI acal 2021/2022
1 2 3 4 5 6 7 8 9 10 11 12 13 = (11x12) 14 = (13:1000) 15 = (14 x hr x jm x dtk) 16 17 18 19 20 21 22 23 = (21x22) 24 = (23:1000) 25 = (24 x hr x jm x dtk) 26 27 28 29 30 31 = (29x30) 32 = (31:1000) 33 = (32 x hr x jm x dtk)
2 Kapas Kapas 967 20-Nov-21 20-Dec-21 967 20-Mar-22 20-Apr-22 450 1,800 0.12 216.00 0.216 839,808 - - 517 517 0.12 62.04 0.062 214,410 20-Jun-22 20-Aug-22 967 967 0.12 116.04 0.116 401,034
PACAL KANAN (Wil.Tengah)
3 Balen Balen 1,658 25-Nov-21 25-Dec-21 1,658 25-Mar-22 20-Apr-22 650 2,600 0.12 312.00 0.312 1,213,056 - - 1,008 1,008 0.12 120.96 0.121 418,038 20-Jul-22 20-Aug-22 1,008 1,008 0.12 120.96 0.121 418,038
4 Kenep Balen 947 25-Nov-21 25-Dec-21 947 25-Mar-22 20-Apr-22 800 3,200 0.12 384.00 0.384 1,492,992 - - 147 147 0.12 17.64 0.018 60,964 20-Jun-22 20-Aug-22 500 500 0.12 60.00 0.060 207,360
5 Jaticilik Sumberrejo 1,070 25-Nov-21 20-Dec-21 1,070 20-Mar-22 20-Apr-22 570 2,280 0.12 273.60 0.274 1,063,757 - - 500 500 0.12 60.00 0.060 207,360 5-Jul-22 20-Aug-22 700 700 0.12 84.00 0.084 290,304
6 Sumberrejo Sumberrejo 1,409 25-Nov-21 15-Dec-21 1,409 5-May-22 5-Jun-22 713 2,852 0.12 342.24 0.342 1,330,629 - - 696 696 0.12 83.52 0.084 288,645 10-Aug-22 15-Sep-22 1,009 1,009 0.12 121.08 0.121 418,452
PACAL KANAN (Bdg. Mekuris Wil. Timur)
7 Mekuris Sumberrejo 2,084 25-Nov-21 15-Dec-21 2,084 20-Mar-22 10-Apr-22 800 3,200 0.12 384.00 0.384 1,492,992 - - 1,284 1,284 0.12 154.08 0.154 532,500 1-Jul-22 10-Jul-22 1,625 1,625 0.12 195.00 0.195 673,920
8 Kanor Kanor 3,132 5-Dec-21 20-Dec-21 3,132 1-Apr-22 30-Apr-22 547 2,188 0.12 262.56 0.263 1,020,833 - - 2,585 2,585 0.12 310.20 0.310 1,072,051 1-Jul-22 30-Jul-22 2,000 2,000 0.12 240.00 0.240 829,440
9 Pohwates Kepohbaru 1,444 10-Dec-21 10-Jan-22 1,444 10-Mar-22 10-Apr-22 231 924 0.12 110.88 0.111 431,101 - - 1,213 1,213 0.12 145.56 0.146 503,055 20-Jun-22 20-Aug-22 1,100 1,100 0.12 132.00 0.132 456,192
10 Kepohbaru Kepohbaru, Baureno 2,924 10-Dec-21 10-Jan-22 2,924 10-Mar-22 10-Apr-22 789 3,156 0.12 378.72 0.379 1,472,463 - - 2,135 2,135 0.12 256.20 0.256 885,427 20-Jun-22 20-Aug-22 1,500 1,500 0.12 180.00 0.180 622,080
Jumlah Areal Kerja Ranting 16,633 16,633 6,000 2,880 2.880 11,197,440 - - 10,633 1,276 1.276 4,409,718 11,407 1,369 1.369 4,730,711
KEPALA DINAS PU PERTANIAN An. KEPALA DINAS PU SDA KEPALA DINAS PU SDA
KABUPATEN BOJONEGORO KABUPATEN BOJONEGORO PROVINSI JAWA TIMUR
54
Lampiran 5 Rencana Layanan Optimalisasi MT II (Padi) Tahun 2022
Kanor (BNG.2, BNG.3, BNG.4, BNG.5, BNG.6, BT.6) 716 716 0.12 86
TAHAP II
2 10 Mei 2022 s/d 3 Juni 2022
TOTAL 6,652 - 798
Kanor (BNG.1, BNG.2, BNG.3, BNG.4, BNG.5, BNG.6, BT.6) 716 716 0.12 86
Kanor (BNG.1, BNG.2, BNG.3, BNG.4, BNG.5, BNG.6, BT.6) 716 716 0.12 86
TAHAP I
1 PADI (Tanaman)OPTIMALISASI 15 April 2022 s/d 9 Mei 2022 0.798 25 24 3,600 1,724,198
TAHAP II
2 PADI (Tanaman)OPTIMALISASI 10 Mei 2022 s/d 3 Juni 2022 0.798 25 24 3,600 1,724,198
TAHAP III
55
Lampiran 6 Outflow Bendungan Pacal Tahun 2016
56
Lampiran 7 Outflow Bendungan Pacal Tahun 2017
57
Lampiran 8 Outflow Bendungan Pacal Tahun 2018
58
Lampiran 9 Outflow Bendungan Pacal Tahun 2019
59
Lampiran 10 Outflow Bendungan Pacal Tahun 2020
60
Lampiran 11 Outflow Bendungan Pacal Tahun 2021
61
Lampiran 12 Perrhitungan Kapasitas Tampung Waduk Gongseng Pola Tanam Padi-Padi-Palawija
TABEL VIII.5 - 3 PERHITUNGAN KAPASITAS TAMPUNGAN WADUK GONGSENG
POLA TANAM PADI-PADI-PALAWIJA (JAGUNG-TEMBAKAU)
AWAL TANAM 11 JANUARI
Perhitungan Intensitas tanam
3
Luas Daerah Irigasi Gongseng = 5,317 ha Masa Tanam % Luas (ha) Volume Waduk Total = 22,435,950.02 m
Suplesi Air Baku = 0.30 m3/det MT I 100% 5316.822 Volume sedimen = 7,681,500.00 m3
Luas Genangan = 2,860,096.38 m2 MT II 100% 5316.822 Elevasi Dead Storage = 89.71 m
Volume Air Waduk Efektif = 14,754,450.02 m3 MT III 100% 5316.822 Elevasi Muka Air Waduk Rata-rata = 92.62 m
Volume Tampungan Minimum = 7,712,722.60 m3 Total 300% Elevasi Muka Air Waduk Maksimum = 96.00 m
Maintenance Flow = 100 lt/dt 0.10 m3/det Elevasi Muka Air Waduk Minimum = 89.75 m
Jumlah Penduduk sampai tahun 2061 = 287069 Jiwa
3,612,176.01
1 Apr I 10 7.82 6,756,693 0.32 1,485,023.15 1.99 72,035.60 0.30 258,361.89 0.10 86,400.00 2.20 1,901,820.64 6,756,692.81 1,901,820.64 4,854,872.17
2 II 10 7.99 6,901,998 0.13 600,601.39 1.99 72,035.60 0.30 258,361.89 0.10 86,400.00 1.18 1,017,398.88 13,658,690.84 2,919,219.52 10,739,471.32
3 III 11 8.07 7,672,116 0.30 1,506,160.35 1.99 79,239.16 0.30 284,198.08 0.10 95,040.00 2.07 1,964,637.59 21,330,806.54 4,883,857.11 16,446,949.43
4 Mei I 10 8.83 7,628,524 0.47 2,141,349.26 3.72 134,374.43 0.30 258,361.89 0.10 86,400.00 3.03 2,620,485.58 28,959,330.68 7,504,342.69 21,454,987.99
5 II 10 8.24 7,119,956 0.46 2,114,957.02 3.72 134,374.43 0.30 258,361.89 0.10 86,400.00 3.00 2,594,093.34 36,079,286.54 10,098,436.03 25,980,850.51
6 III 8 7.15 4,940,378 1.38 5,063,968.17 3.72 107,499.54 0.30 206,689.51 0.10 69,120.00 7.88 5,447,277.23 41,019,664.08 15,545,713.25 25,473,950.83
7 Jun I 10 6.77 5,848,535 1.77 8,115,491.94 3.73 134,873.00 0.30 258,361.89 0.10 86,400.00 9.95 8,595,126.83 46,868,199.25 24,140,840.09 22,727,359.16
8 II 10 4.16 3,596,304 1.32 6,086,334.50 3.73 134,873.00 0.30 258,361.89 0.10 86,400.00 7.60 6,565,969.39 50,464,503.49 30,706,809.48 19,757,694.01
9 III 11 2.52 2,397,536 1.34 6,773,133.36 3.73 148,360.30 0.30 284,198.08 0.10 95,040.00 7.68 7,300,731.74 52,862,039.65 38,007,541.22 14,854,498.43
10 Jul I 10 3.07 2,651,820 1.41 6,500,021.85 4.00 144,656.37 0.30 258,361.89 0.10 86,400.00 8.09 6,989,440.11 55,513,859.94 44,996,981.33 10,516,878.61
11 II 10 3.03 2,615,494 1.74 8,012,652.08 4.00 144,656.37 0.30 258,361.89 0.10 86,400.00 9.84 8,502,070.34 58,129,353.93 53,499,051.67 4,630,302.26
12 III 10 3.15 2,724,473 1.80 8,266,698.58 4.00 144,656.37 0.30 258,361.89 0.10 86,400.00 10.13 8,756,116.85 60,853,826.84 62,255,168.52 -1,401,341.68
13 Agus I 10 2.77 2,397,536 1.81 8,331,168.42 3.90 140,859.78 0.30 258,361.89 0.10 86,400.00 10.20 8,816,790.09 63,251,363.00 71,071,958.61 -7,820,595.61
14 II 10 2.94 2,542,841 1.54 7,092,108.30 3.90 140,859.78 0.30 258,361.89 0.10 86,400.00 8.77 7,577,729.97 65,794,204.37 78,649,688.58 -12,855,484.21
15 III 11 3.24 3,076,838 1.52 7,670,703.07 3.90 154,945.76 0.30 284,198.08 0.10 95,040.00 8.63 8,204,886.91 68,871,042.44 86,854,575.49 -17,983,533.05
16 Sep I 10 2.77 2,397,536 1.65 7,565,853.10 4.75 171,614.71 0.30 258,361.89 0.10 86,400.00 9.35 8,082,229.69 71,268,578.60 94,936,805.18 -23,668,226.58
17 II 10 3.41 2,942,431 1.76 8,066,162.01 4.75 171,614.71 0.30 258,361.89 0.10 86,400.00 9.93 8,582,538.61 74,211,009.34 103,519,343.79 -29,308,334.45
18 III 10 3.24 2,797,126 1.88 8,626,146.32 4.75 171,614.71 0.30 258,361.89 0.10 86,400.00 10.58 9,142,522.92 77,008,134.86 112,661,866.71 -35,653,731.85
19 Okt I 10 2.86 2,470,189 1.17 5,361,022.96 4.59 165,658.08 0.30 258,361.89 0.10 86,400.00 6.80 5,871,442.93 79,478,323.63 118,533,309.64 -39,054,986.01
20 II 10 3.74 3,233,041 1.32 6,066,292.15 4.59 165,658.08 0.30 258,361.89 0.10 86,400.00 7.61 6,576,712.12 82,711,364.81 125,110,021.76 -42,398,656.95
21 III 11 3.07 2,917,002 1.19 6,029,428.56 4.59 182,223.89 0.30 284,198.08 0.10 95,040.00 6.93 6,590,890.53 85,628,367.13 131,700,912.29 -46,072,545.15
22 Nop. I 10 2.90 2,506,515 1.02 4,684,194.51 4.73 171,026.05 0.30 258,361.89 0.10 86,400.00 6.02 5,199,982.46 88,134,882.21 136,900,894.74 -48,766,012.54
23 II 10 2.65 2,288,557 0.00 0.00 4.73 171,026.05 0.30 258,361.89 0.10 86,400.00 0.60 515,787.94 90,423,439.45 137,416,682.69 -46,993,243.24
24 III 11 3.41 3,236,674 0.11 578,177.94 4.73 188,128.66 0.30 284,198.08 0.10 95,040.00 1.21 1,145,544.68 93,660,113.26 138,562,227.37 -44,902,114.11
25 Des I 10 3.87 3,342,020 0.00 0.00 3.32 120,024.14 0.30 258,361.89 0.10 86,400.00 0.54 464,786.03 97,002,133.36 139,027,013.40 -42,024,880.04
26 II 10 3.87 3,342,020 0.00 0.00 3.32 120,024.14 0.30 258,361.89 0.10 86,400.00 0.54 464,786.03 100,344,153.46 139,491,799.42 -39,147,645.96
27 III 10 3.78 3,269,367 0.00 0.00 3.32 120,024.14 0.30 258,361.89 0.10 86,400.00 0.54 464,786.03 103,613,520.95 139,956,585.45 -36,343,064.50
28 Jan I 10 4.12 3,559,978 0.33 1,522,494.71 4.27 154,070.55 0.30 258,361.89 0.10 86,400.00 2.34 2,021,327.15 107,173,498.88 141,977,912.60 -34,804,413.72
29 II 10 5.63 4,867,725 0.12 536,075.11 4.27 154,070.55 0.30 258,361.89 0.10 86,400.00 1.20 1,034,907.54 112,041,223.80 143,012,820.14 -30,971,596.34
30 III 11 7.15 6,793,019 0.22 1,134,697.59 4.27 169,477.60 0.30 284,198.08 0.10 95,040.00 1.77 1,683,413.27 118,834,242.92 144,696,233.41 -25,861,990.50
31 Peb I 10 6.64 5,739,556 0.36 1,650,212.13 4.34 156,817.05 0.30 258,361.89 0.10 86,400.00 2.49 2,151,791.07 124,573,799.17 146,848,024.49 -22,274,225.31
32 II 10 8.75 7,555,872 0.32 1,488,704.82 4.34 156,817.05 0.30 258,361.89 0.10 86,400.00 2.30 1,990,283.77 132,129,670.70 148,838,308.25 -16,708,637.55
33 III 8 5.89 4,068,546 0.26 941,429.86 4.34 125,453.64 0.30 206,689.51 0.10 69,120.00 1.94 1,342,693.01 136,198,216.91 150,181,001.27 -13,982,784.36
34 Mar I 10 6.77 5,848,535 0.28 1,295,031.23 4.14 149,570.73 0.30 258,361.89 0.10 86,400.00 2.07 1,789,363.85 142,046,752.08 151,970,365.11 -9,923,613.03
35 II 10 7.15 6,175,472 0.41 1,902,900.02 4.14 149,570.73 0.30 258,361.89 0.10 86,400.00 2.77 2,397,232.64 148,222,224.00 154,367,597.75 -6,145,373.75
36 III 11 9.50 9,030,720 0.46 2,341,579.90 4.14 164,527.80 0.30 284,198.08 0.10 95,040.00 3.04 2,885,345.78 157,252,943.53 157,252,943.53 0.00
62
Lampiran 13 Skema Irigasi Pacal Luas Tanam Eksisting
63
Lampiran 14 Skema Irigasi Pacal Setelah Difungsikan Waduk Gongseng