RENCANA ANGGARAN BIAYA

NO BAHAN/JASA KOEF VOL JUMLAH SATUAN HARGA TOTAL

PEKERJAAN MEZANIN 22.5M2


Baja WF 100 1.2 20 4.8 Btg 950000 4560000
Hollow 5x8, 2mm 1.2 100 24 Btg 450000 10800000
Railing Hollow 4x4 1 10 10 M 725000 7250000
Triplek 18mm 0.35 22.5 7.875 Lmbr 365000 2874375
Vinyl 3mm 1.1 22.5 24.75 M2 215000 5321250
Lem Vinyl 0.35 22.5 7.875 Kg 65000 511875
Paku 0.05 22.5 1.125 Kg 25000 28125
Cat Meni Besi 0.25 25 6.25 M2 65000 406250
Cat Duco 0.25 25 6.25 M2 90000 562500
Pekerja 1.75 22.5 39.375 HOK 125000 4921875
Tukang 2.25 22.5 50.625 HOK 165000 8353125
Kepala 0.15 22.5 3.375 HOK 175000 590625
JUMLAH Rp 46,180,000.00

PEKERJAAN PAS.BATU BATA 390M2


Batu Bata 72 390 28080 Bh 575 16146000
Semen 0.379 390 147.81 Zak 55000 8129550
Pasir 0.038 390 14.82 M3 110000 1630200
Pekerja 0.3 390 117 HOK 125000 14625000
Tukang 0.1 390 39 HOK 165000 6435000
Kepala 0.01 390 3.9 HOK 175000 682500
Mandor 0.03 390 11.7 HOK 175000 2047500
JUMLAH Rp 49,695,750.00

PEKERJAAN PLESTERAN 580M2


Semen 0.24 580 139.2 Zak 55000 7656000
Pasir 0.014 580 8.12 M3 110000 893200
Pekerja 0.1 580 58 HOK 125000 7250000
Tukang 0.1 580 58 HOK 165000 9570000
Kepala 0.02 580 11.6 HOK 175000 2030000
Mandor 0.01 580 5.8 HOK 175000 1015000
JUMLAH Rp 28,414,200.00

PEKERJAAN ACIAN 580M2


Semen 0.035 580 20.3 Zak 55000 1116500
Pekerja 0.1 580 58 HOK 125000 7250000
Tukang 0.05 580 29 HOK 165000 4785000
Kepala 0.01 580 5.8 HOK 175000 1015000
Mandor 0.01 580 5.8 HOK 175000 1015000
JUMLAH Rp 15,181,500.00
PEKERJAAN LANTAI KERJA 10M3
Semen 6.175 10 61.75 Bh 650 40137.5
Pasir 0.621 10 6.20714 Zak 55000 341392.8571
Kerikil 0.689 10 6.88966 M3 120000 826758.6207
Pekerja 1.65 10 16.5 HOK 125000 2062500
Tukang 0.275 10 2.75 HOK 165000 453750
Kepala 0.028 10 0.28 HOK 175000 49000
Mandor 0.085 10 0.85 HOK 175000 148750
JUMLAH Rp 3,922,288.98

PEKERJAAN LANTAI VINYL 85M2


Vinyl 1.1 85 93.5 M2 215000 20102500
Lem Vinyl 0.35 85 29.75 Kg 65000 1933750
Pekerja 0.25 85 21.25 HOK 125000 2656250
Tukang 0.25 85 21.25 HOK 165000 3506250
Kepala 0.015 85 1.275 HOK 175000 223125
Mandor 0.008 85 0.68 HOK 175000 119000
JUMLAH Rp 28,540,875.00

PEKERJAAN PAS.WALLPAPER 395M2


Wallpaper 2.2 295 649 M2 20000 12980000
Lem Wallpaper 0.25 295 73.75 Kg 25000 1843750
Pekerja 0.2 295 59 HOK 125000 7375000
Tukang 0.15 295 44.25 HOK 165000 7301250
Kepala 0.017 295 5.015 HOK 175000 877625
Mandor 0.002 295 0.59 HOK 175000 103250
JUMLAH Rp 30,480,875.00

PEKERJAAN PENGECATAN 100M2


Sealer 0.1 260 26 Kg 25000 650000
Cat Dasar 0.1 260 26 Kg 35000 910000
Cat Interior 0.26 260 67.6 Kg 45000 3042000
Pekerja 0.02 260 5.2 HOK 125000 650000
Tukang 0.065 260 16.9 HOK 165000 2788500
Kepala 0.007 260 1.69 HOK 175000 295750
Mandor 0.003 260 0.78 HOK 175000 136500
JUMLAH Rp 8,472,750.00

PEKERJAAN PAS GRANIT


GRANIT 60x60 3 60.75 182.25 bh 65000 11846250
Semen 0.368 60.75 22.3256 Zak 55000 1227909.375
Pasir 0.068 60.75 4.10063 Kg 110000 451068.75
Grout Granit 1.95 60.75 118.463 Kg 15000 1776937.5
Pekerja 0.02 60.75 1.215 HOK 125000 151875
Tukang 0.065 60.75 3.94875 HOK 165000 651543.75
Kepala 0.007 60.75 0.39488 HOK 175000 69103.125
Mandor 0.003 60.75 0.18225 HOK 175000 31893.75
JUMLAH Rp 16,206,581.25

PEKERJAAN RANGKA ATAP


Baja Ringan C75 2.65 200 530 M 20000 10600000
Baja Ringan C60 2.15 200 430 M 12500 5375000
Skrup 0.05 200 10 Kg 40000 400000
Pekerja 0.052 200 10.4 HOK 125000 1300000
Tukang 0.157 200 31.44 HOK 165000 5187600
Kepala 0.005 200 0.94 HOK 175000 164500
Mandor 0.001 200 0.24 HOK 175000 42000
JUMLAH Rp 23,069,100.00

PEKERJAAN ATAP METAL PASIR


Metal Pasir 1.62 200 324 Lmbr 50000 16200000
Skrup 0.2 200 40 Kg 40000 1600000
Pekerja 0.25 200 50 HOK 125000 6250000
Tukang 0.15 200 30 HOK 165000 4950000
Kepala 0.002 200 0.3 HOK 175000 52500
Mandor 0.001 200 0.24 HOK 175000 42000
JUMLAH Rp 29,094,500.00

PEKERJAAN PLAFOND PVC


Plafon PVC 1.05 150 157.5 Lmbr 41500 6536250
Skrup 18 150 2700 Bh 250 675000
Hollow 4/4 0.415 150 62.25 Btg 30000 1867500
Hollow 2/4 0.15 150 22.5 Btg 20000 450000
Pekerja 0.15 150 22.5 HOK 125000 2812500
Tukang 0.2 150 30 HOK 165000 4950000
Kepala 0.002 150 0.225 HOK 175000 39375
Mandor 0.001 150 0.18 HOK 175000 31500
JUMLAH Rp 17,362,125.00

PEKERJAAN PETON BERTULANG


Semen 9.275 12 111.3 Zak 55000 6121500
Pasir 0.499 12 5.98286 M3 110000 658114.2857
Kerikil 0.722 12 8.66483 M3 365000 3162662.069
Pekerja 1.65 12 19.8 HOK 125000 2475000
Tukang 0.275 12 3.3 HOK 165000 544500
Kepala 0.028 12 0.336 HOK 175000 58800
Mandor 0.085 12 1.02 HOK 175000 178500
JUMLAH Rp 13,199,076.35

PEKERJAAN PEMBESIAN
Besi 12 0.225 200.65 45.1463 Btg 115000 5191818.75
Besi 10 0.41 200.65 82.2665 Btg 85000 6992652.5
Besi 8 1.125 200.65 225.731 Btg 27500 6207609.375
Kawat Beton 0.15 200.65 30.0975 Kg 20000 601950
Pekerja 0.06 200.65 12.039 HOK 125000 1504875
Tukang 0.06 200.65 12.039 HOK 165000 1986435
Kepala 0.006 200.65 1.2039 HOK 175000 210682.5
Mandor 0.006 200.65 1.2039 HOK 175000 210682.5
JUMLAH Rp 22,906,705.63

TOTAL Rp 332,726,327.21