Rp 800,000.00
Rp 960,000.00 tinggi = 0.5 m
Rp 1,300,000.00 lebar atas = 0.15 m
Rp 4,580,000.00 Lebar Bawah = 0.5 m
Panjang = 4 m
Volume = 0.65 m3
V total 1.3 m3
0.65
0.325
0.26 1.56
Pemasangan Pondasi harga total volume
KSDB KOEF HARGA SATUAN Jumlah 4.16
PASIR 0.544 200,000 108,800
SEMENT 136 1,200 163,200
272,000 1,131,520
KSDM
Pekerja 1.5 75,000 112,500
Tukang 0.75 100,000 75,000
Kepala Tukang 0.075 150,000 11,250
198,750 826,800
6.24
2.72
800,000