REKAPITULASI ANGGARAN BIAYA PELAKSANAAN

PEKERJAAN PINTU GERBANG


JALAN BAJI PAMAI

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)
I Ceremonial peletakan batu pertama 1 ls 7,500,000 7,500,000

II Anggaran Konstruksi 1 ls 133,420,000 133,420,000

III Ceremonial peresmian pintu gerbang 1 ls 15,000,000 15,000,000

JUMLAH 155,920,000

DIBULATKAN 156,000,000

Makassar, 11 September 2021

dibuat oleh

SWARDI HIONG
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : GERBANG KEBANGSAAN


LOKASI : JL. BAJI PAMAI

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)
A Pekerjaan Persiapan -

1 Pengukuran 42 m 10,000 420,000

2 Land Clearing 30 m2 15,000 450,000

SUB TOTAL 870,000

B Pekerjaan Tanah Dan Batu Beton

1 Galian Pondasi, Sloof 7 m3 90,000 630,000

2 Cor Pondasi Tapak 1X1M 1 m3 3,750,000 3,750,000

3 Cor Sloof 20 X 30 1.08 m3 3,750,000 4,050,000

4 Cor Kolom Ø40 3.01 m3 3,750,000 11,287,500

5 Cor Ring Balok Utama 20/50 1.8 m3 3,750,000 6,750,000

6 Cor Ring Balok Anak 20/30 0.36 m3 3,750,000 1,350,000

7 Cor Plat Lantai ± 12Cm 3.36 m3 4,500,000 15,120,000

8 Cor Listplank 1.35 m3 3,250,000 4,387,500

9 Pasang Plafond + Rangka 24 m3 280,000 6,720,000

10 Pasang Batu Merah T 20Cm Di Atas Lantai 5.4 m3 72,000 388,800

11 Pasang Batu Merah Bak Tanaman 7.2 m2 72,000 518,400

12 Plesteran 1:4 144 m2 47,000 6,768,000

13 Acian Semen 144 m2 27,500 3,960,000

14 Profil Listplank 18 m 75,000 1,350,000

15 Pasang Batu Alam 9.6 m2 275,000 2,640,000

16 Profil Tiang Kolom 4 titik 250,000 1,000,000

17 Profil List Tiang Batu Alam 4 titik 50,000 200,000

18 Miniatur Rumah Ibadah 5 bh 6,000,000 30,000,000

SUB TOTAL 100,870,200

C Lightning / Instalasi

1 Pasang Titik Lampu 2 150,000 300,000

Saklar 1 75,000 75,000

Stop Kontak 1 75,000 75,000

Lampu Sorot + Kabel 10 750,000 7,500,000

SUB TOTAL 7,950,000

D Taman 1 ls 5,000,000 5,000,000


HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)
E Pekerjaan Partisi 22 m2 300,000 6,600,000

SUB TOTAL 11,600,000

JUMLAH 121,290,200

JASA 10% 12,129,020

JUMLAH TOTAL 133,419,220

DIBULATKAN 133,420,000

Makassar, 11 September 2021

dibuat oleh

SWARDI HIONG
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : TAMAN
LOKASI : KANTOR CREDIT UNION
JL. PELITA RAYA

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
(Rp.) (Rp.)
2 Timbunan Tanah Humus 8.81 m3 175,000 1,541,750

3 Pupuk Kandang (Kotoran Sapi) 5 krg 40,000 200,000

4 Rumput Gajah Mini + Pasang 5 m2 45,000 225,000

5 Bunga Pucuk Merah T: 30 - 40 cm jarak 40 cm 50 phn 25,000 1,250,000

Are-Area T: 50 - 60 cm
6 116 phn 35,000 4,060,000
Jarak 40 cm, 2 Baris

JUMLAH TOTAL 7,276,750

DIBULATKAN 7,300,000

Makassar, 18 September 2021

dibuat oleh

SWARDI HIONG