Anda di halaman 1dari 28

koefisien satuan jumlah

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING H

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Tulang Bawang
ITEM PEMBAYARAN NO. : 6.3.(8)
JENIS PEKERJAAN : timbunan pilihan
SATUAN PEMBAYARAN m3

NO. KOMPONEN

A. TENAGA

1. Pekerja (L01)
2. Mandor (L03)

B. BAHAN

1. Bahan anti pengelupasan (M66)

C. PERALATAN

dump truck
whwlloader
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING H

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Tulang Bawang
ITEM PEMBAYARAN NO. : 6.3.(8)
JENIS PEKERJAAN lappis pondasi agg kls A
SATUAN PEMBAYARAN m3

NO. KOMPONEN

A. TENAGA

1. Pekerja (L01)
2. Mandor (L03)

B. BAHAN

1. agg kls A (M66)


C. PERALATAN

dump truck
whwlloader
motor grader
vibrator roller

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING H

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Tulang Bawang
ITEM PEMBAYARAN NO. : 6.3.(8)
JENIS PEKERJAAN laston lapis aus asbuton ac-wc
SATUAN PEMBAYARAN m3

NO. KOMPONEN

A. TENAGA

1. Pekerja (L01)
2. Mandor (L03)
B. BAHAN

1. agg pecah mesin 5 - 10 (M66)


agg pecah mesin 0- 5
aspal
asbuton b 5/20

C. PERALATAN

dump truck
whwlloader
genset
amp
asp.finisher
tendem roller
p.tree roller

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING H

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Tulang Bawang
ITEM PEMBAYARAN NO. : 6.3.(8)
JENIS PEKERJAAN laston lapis antara asbuton ( ac-bc)
SATUAN PEMBAYARAN m3
NO. KOMPONEN

A. TENAGA

1. Pekerja (L01)
2. Mandor (L03)

B. BAHAN

1. agg pecah mesin 5 - 10 (M66)


agg pecah mesin 0- 5
aspal
asbuton b 5/20
semen

C. PERALATAN

dump truck
whwlloader
genset
amp
asp.finisher
tendem roller
p.tree roller

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING H

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Tulang Bawang
ITEM PEMBAYARAN NO. : 6.3.(8)
JENIS PEKERJAAN lapis pondasi agg kls s
SATUAN PEMBAYARAN m3

NO. KOMPONEN

A. TENAGA

1. Pekerja (L01)
2. Mandor (L03)

B. BAHAN

1. agg kelas S (M66)

C. PERALATAN

dump truck
whwlloader
motor grader
vibrator roller

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING H

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Tulang Bawang
ITEM PEMBAYARAN NO. : 6.3.(8)
JENIS PEKERJAAN lapis resap pengikat
SATUAN PEMBAYARAN m3

NO. KOMPONEN

A. TENAGA

1. Pekerja (L01)
2. Mandor (L03)

B. BAHAN

1. aspal emulsi css -1 (M66)

C. PERALATAN

asp dristributor
compresoor
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING H

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : Tulang Bawang
ITEM PEMBAYARAN NO. : 6.3.(8)
JENIS PEKERJAAN lapis perekat - aspal cair
SATUAN PEMBAYARAN m3

NO. KOMPONEN

A. TENAGA

1. Pekerja (L01)
2. Mandor (L03)

B. BAHAN

1. aspal emulsi crs -1 (M66)


C. PERALATAN

asp dristributor
compresoor
power brom

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT
F. HARGA SATUAN PEKERJAAN ( D + E )

volume

ac - wc 230
ac bc 345
lps pnds kls A 750
lps pnds kls S 100
tmbn plhn 750
lps perekat 750
lps resap pengikat 2125
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

………………………………………………
…………………………………………………………………..
………………………………………………………………….
ulang Bawang
PERKIRAAN VOL. PEK.
mbunan pilihan TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

PERKIRAAN HARGA
SATUAN KUANTITAS SATUAN
(Rp.)

Jam 0.0142 14,142.86


Jam 0.0071 22,785.71

JUMLAH HARGA TENAGA

Kg 1.0500 137,500.00

JUMLAH HARGA BAHAN

0.1380 287,732.17
0.0071 525,560.84
JUMLAH HARGA PERALATAN

BAHAN DAN PERALATAN ( A + B + C )


10.0 % x D
AN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

………………………………………………
…………………………………………………………………..
………………………………………………………………….
ulang Bawang
PERKIRAAN VOL. PEK.
ppis pondasi agg kls A TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

PERKIRAAN HARGA
SATUAN KUANTITAS SATUAN
(Rp.)

Jam 0.0779 14,142.86


Jam 0.0097 22,785.71

JUMLAH HARGA TENAGA

Kg 1.2890 32,923.00

JUMLAH HARGA BAHAN


0.0087 287,732.17
0.1360 525,560.84
0.0010 487,142.17
0.0097 310,636.41

JUMLAH HARGA PERALATAN

BAHAN DAN PERALATAN ( A + B + C )


10.0 % x D
AN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

………………………………………………
…………………………………………………………………..
………………………………………………………………….
ulang Bawang
PERKIRAAN VOL. PEK.
ton lapis aus asbuton ac-wc TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

PERKIRAAN HARGA
SATUAN KUANTITAS SATUAN
(Rp.)

Jam 0.2008 14,142.86


Jam 0.0201 22,785.71

JUMLAH HARGA TENAGA


Kg 0.3234 344,300.00
0.4068 336,592.91
58.7100 13,200.00
25.7500 1,045.00

JUMLAH HARGA BAHAN

0.0491 287,732.17
0.0054 525,560.84
0.0201 388,367.37
0.0201 10,277,759.48
0.0125 343028.47
0.0128 504,645.08
0.0084 538,089.36

JUMLAH HARGA PERALATAN

BAHAN DAN PERALATAN ( A + B + C )


10.0 % x D
AN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

………………………………………………
…………………………………………………………………..
………………………………………………………………….
ulang Bawang
PERKIRAAN VOL. PEK.
ton lapis antara asbuton ( ac-bc) TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

PERKIRAAN HARGA
SATUAN KUANTITAS SATUAN
(Rp.)

Jam 0.0142 14,142.86


Jam 0.0071 22,785.71

JUMLAH HARGA TENAGA

Kg 0.3751 344,300.00
0.3591 336,592.91
53.5600 13,200.00
25.7500 1,045.00
0.0000

JUMLAH HARGA BAHAN

0.0491 287,732.17
0.0054 525,560.84
0.0201 388,367.37
0.0201 10,277,759.48
0.0084 343028.47
0.0085 504,645.08
0.0056 538,089.36

JUMLAH HARGA PERALATAN

BAHAN DAN PERALATAN ( A + B + C )


10.0 % x D
AN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

………………………………………………
…………………………………………………………………..
………………………………………………………………….
ulang Bawang
PERKIRAAN VOL. PEK.
pis pondasi agg kls s TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

PERKIRAAN HARGA
SATUAN KUANTITAS SATUAN
(Rp.)

Jam 0.0779 14,142.86


Jam 0.0097 22,785.71

JUMLAH HARGA TENAGA

Kg 1.2890 122,580.11

JUMLAH HARGA BAHAN

0.1360 287,732.17
0.0087 525,560.84
0.0010 487,142.17
0.0097 310,636.41

JUMLAH HARGA PERALATAN

BAHAN DAN PERALATAN ( A + B + C )


10.0 % x D
AN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

………………………………………………
…………………………………………………………………..
………………………………………………………………….
ulang Bawang
PERKIRAAN VOL. PEK.
pis resap pengikat TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

PERKIRAAN HARGA
SATUAN KUANTITAS SATUAN
(Rp.)

Jam 0.0015 14,142.86


Jam 0.0007 22,785.71

JUMLAH HARGA TENAGA

Kg 1.7167 13,200.00

JUMLAH HARGA BAHAN

0.00020 460,266.52
0.00073 185,556.85
JUMLAH HARGA PERALATAN

BAHAN DAN PERALATAN ( A + B + C )


10.0 % x D
AN ( D + E )

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

………………………………………………
…………………………………………………………………..
………………………………………………………………….
ulang Bawang
PERKIRAAN VOL. PEK.
pis perekat - aspal cair TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

PERKIRAAN HARGA
SATUAN KUANTITAS SATUAN
(Rp.)

Jam 0.0016 14,142.86


Jam 0.0008 22,785.71

JUMLAH HARGA TENAGA

Kg 1.7167 13,200.00
JUMLAH HARGA BAHAN

0.00020 460,266.52
0.0010 185,556.85
0.0008 95,091.32

JUMLAH HARGA PERALATAN

BAHAN DAN PERALATAN ( A + B + C )


10.0 % x D
AN ( D + E )

1,300,073.34 299,016,867.31
1,225,819.85 422,907,848.82
121,240.36 90,930,267.49
206,532.78 20,653,278.17
188,176.13 141,132,096.43
23,054.98 17,291,235.27
22,925.11 48,715,867.44
1,040,647,460.93
overhead 10% 104,064,746.09
1,144,712,207.03

ppn 10 % 114,471,220.70
total biaya pekerjaan jalan sta 0 + 000 - sta 0 + 500 1,259,183,427.73
1,259,000,000.00
KIRAAN VOL. PEK. : 1.00
L HARGA (Rp.) : 113,300.00
D. BIAYA PROYEK : #VALUE!

JUMLAH
HARGA
(Rp.)

200.83
161.78

362.61

144,375.00

144,375.00

39,707.04
3,731.48
43,438.52

188,176.13
18,817.61
206,993.74

KIRAAN VOL. PEK. : 1.00


L HARGA (Rp.) : 113,300.00
D. BIAYA PROYEK : #VALUE!

JUMLAH
HARGA
(Rp.)

1,101.73
221.02

1,322.75

42,437.75

42,437.75
2,503.27
71,476.27
487.14
3,013.17

77,479.86

121,240.36
12,124.04
133,364.39

KIRAAN VOL. PEK. : 1.00


L HARGA (Rp.) : 113,300.00
D. BIAYA PROYEK : #VALUE!

JUMLAH
HARGA
(Rp.)

2,839.89
457.99

3,297.88
111,346.62
136,926.00
774,972.00
26,908.75

1,050,153.37

14,127.65
2,838.03
7,806.18
206,582.97
4,287.86
6,459.46
4,519.95
0.00
246,622.09

1,300,073.34
130,007.33
1,430,080.67

KIRAAN VOL. PEK. : 1.00


L HARGA (Rp.) : 113,300.00
D. BIAYA PROYEK : #VALUE!

JUMLAH
HARGA
(Rp.)

200.83
161.78

362.61

129,146.93
120,870.51
706,992.00
26,908.75
0.00

983,918.19

14,127.65
2,838.03
7,806.18
206,582.97
2,881.44
4,289.48
3,013.30

241,539.05

1,225,819.85
122,581.99
1,348,401.84
KIRAAN VOL. PEK. : 1.00
L HARGA (Rp.) : 113,300.00
D. BIAYA PROYEK : #VALUE!

JUMLAH
HARGA
(Rp.)

1,101.73
221.02

1,322.75

158,005.76

158,005.76

39,131.58
4,572.38
487.14
3,013.17

47,204.27

206,532.78
20,653.28
227,186.06

KIRAAN VOL. PEK. : 1.00


L HARGA (Rp.) : 113,300.00
D. BIAYA PROYEK : #VALUE!

JUMLAH
HARGA
(Rp.)

21.21
15.95

37.16

22,660.44

22,660.44

92.05
135.46
227.51

22,925.11
2,292.51
25,217.63

KIRAAN VOL. PEK. : 1.00


L HARGA (Rp.) : 113,300.00
D. BIAYA PROYEK : #VALUE!

JUMLAH
HARGA
(Rp.)

22.63
18.23

40.86

22,660.44
22,660.44

92.05
185.56
76.07

353.68

23,054.98
2,305.50
25,360.48

1,203.00