Anda di halaman 1dari 8

Laporan Pekerjaan Survey RMKO

Status
No Work Order DD/MM/YY Keterangan Pekerjaan Lokasi Kendala Output Dokumentasi
Selesai Tidak Selesai
Marking lengi 2 Jembatan Lengi 2 V Titik kordinat dilapangan
C&C Marking lantai WS TBBE EMP V Pinjaman elevasi dan markingan

JS BB Stockpile EMP Scraper 1-8, Crusher V Volume, gambar kontur


1 Produksi 1/10/2022 Monitoring saluran lahan terdampak Holila V Tahap penggalian KPL

Pemasangan patok BM Hauling Road V Titik BM lapangan


Engineering

Marking lengi 2 Jembatan Lengi 2 V Pinjaman elevasi dan markingan


C&C Marking lantai office WS EMP EMP V Pinjaman elevasi dan markingan

Monitoring saluran lahan terdampak Holila V


2 Produksi 2/10/2022

Pengamatan statik BM Hauling Road V Hujan Kordinat titik BM pengamatan


Engineering

Pemasangan cakar ayam pondasi WS EMP EMP V Pinjaman elevasi dan markingan
C&C Monitoring pekerjaan Lengi 2 Jembatan Lengi 2 V

Monitoring saluran lahan terdampak Holila V


3 Produksi 3/10/2022

Pengamatan statik BM tambahan Hauling Road V Kordinat BM pengamatan


Engineering

Marking lantai office EMP V Pinjaman elevasi dan markingan


C&C

4 Produksi 4/10/2022

Penambahan patok BM STA 10+100-11+200 Hauling Road V Titik BM lapangan


Engineering

Pengecoran lantai office WS EMP EMP V Pinjaman elevasi dan pinjaman


C&C

5 Produksi 5/10/2022

Inspeksi lahan terdampak lumpur (Sarpawi) Sarpawi V lokasi lahan


Engineering

Level top dudukan container EMP V Pinjaman elevasi dan markingan


C&C Joint Survey MC 100 SBWB Hauling Road V Data topografi MC 100

Monitoring kegiatan alat berat di lahan- Holila V


6 Produksi 6/10/2022 terdampak V

Engineering

Marking elevasi pinjaman lantai Office EMP V Pinjaman elevasi dan markingan
C&C Persiapan lahan Scraper Scraper 1-8 V Titik/patok dilapangan

Monitoring saluran area scraper Scraper 1-8, KPL V


7 Produksi 7/10/2022 Pengambilan data BB sisa PT.DBU Scraper 3-4 V Volume BB dan gambar topografi

Perbaikan/Kalibrasi Tools EMP V


Engineering Pengolahan data BB sisa PT.DBU Office EMP Volume BB dan gambar topografi

Persiapan lahan scraper 1-2 Scraper 1-2 V


C&C Monitoring jembatan lengi 2 Jembatan lengi 2 V

8 Produksi 8/10/2022

Lempar titik kordinat BM baru area stockpile Scraper 1-8 V Nilai titik BM lapangan
Engineering

Stand by Jembatan lengi 2 banjir


C&C

Stand by
9 Produksi 9/10/2022

Stand by
Engineering

Monitoring galian scraper 1 Scraper 1 V Elevasi top galian tanah


C&C

Pengambilan data weekly progress BB Scraper 1-8, Crusher V Volume BB dan gambar topografi
10 Produksi 10/10/2022

Pengolahan data Weekly progress BB Office EMP V Volume BB dan gambar topografi
Engineering

Monitoring LC STA 11+800 Hauling Road V


C&C

Pembuatan tanggul dan bak kontrol Hauling Road V


11 Produksi 11/10/2022

Kalibrasi Tools (tribrach) EMP V


Engineering

Cor LC scraper 1 Scraper 1 V


C&C

Stand by
12 Produksi 12/10/2022

Pengolahan data topografi EMP Office EMP V Training Crew Peta topografi
Engineering

S-O tepi slope scraper Scraper 1 V Titik/patok dilapangan


C&C LC STA 12+500 Hauling Road V

Stand by
13 Produksi 13/10/2022

Topografi area rencana saluran TLS TLS - Stockpile Manual V Data topografi lahan rencana
SHE Cek kordinat lokasi genset EMP V

Monitoring cor abutment Jembatan lengi 2 V


C&C

Monitoring pekerjaan tambang TBBE V Data topografi daily progress


14 Produksi 14/10/2022

Instalasi software minescape TBBE V Tidak bisa running apk


Engineering

Pengecoran tepi slope dinding scraper 1 V


C&C Pengecoran wingwall abutment

Pengecekan elevasi KPL KPL EMP V


15 SHE 15/10/2022

Stand by EMP V
Engineering Pengolahan data daily tambang TBBE V Update peta dan volume

Monitoring pemasangan besi scraper 1 Scraper 1 V


C&C Marking posisi abutment Jembatan lengi 2 V

Uji petik Disposal TBBE TBBE V Volume uji petik


16 Produksi 16/10/2022 Monitoring area tambang TBBE V Data daily topo
16 Produksi 16/10/2022
Update daily topo
Stand by
Engineering

Cek level lantai Scraper 1 V


C&C Monitoring asphalt Desa V Hujan

Pengambilan data weekly progress BB Scraper 1-8, Crusher V Volume BB dan gambar topografi
17 Produksi 17/10/2022 Monitoring area tambang TBBE V

Stand by
Engineering

Monitoring elevasi scraper 1 Scraper 1 V Marking


C&C Marking batas pilecap scraper 1 Scraper 1 V Marking

Stand by EMP
18 Produksi 18/10/2022 Monitoring area tambang TBBE V Data daily topo
Update daily topo
Stand by
Engineering

Marking batas pilecap scraper 1 Scraper 1 V Marking


C&C Marking pedestal lengi 2 Jembatan lengi 2 V Marking

Monitoring area tambang TBBE V Data daily topo


19 Produksi 19/10/2022 Update daily topo

Update drone video progress TBBE V Video progress


Engineering

C&C

Pengambilan data BB area crusher Crusher V Check volume BB


20 Produksi 20/10/2022 Monitoring area tambang TBBE V Data topo
Update topo
Update drone video progress TBBE V Update video progress
Engineering

Pengambilan data aktual setelah cor Jembatan lengi 2 V As build drawing


C&C

Monitoring area tambang TBBE V Data daily topo


21 Produksi 21/10/2022 Update daily topo

Pengecekan U-ditch EMP TLS V Check


Engineering

Marking baseplate scraper 1 Scraper 1 V Marking


C&C Monitoring elevasi galian sraper 2 Scraper 2 V Elevasi sesuai rencana

Monitoring area tambang TBBE V Data daily topo


22 Produksi 22/10/2022 Update daily topo

Update drone video progress TBBE - EMP V Update video progress


Engineering

C&C

23 23/10/2022
REKAP VOLUME SURVEY E

Periode Stockpile Customer Volume (BCM)

SCR 1-2
SCR 3-4
SCR 5-6
1/10/2022 SCR 7-8
Crusher
Manual
Total
NOTE: Acuan perhitungan dengan menggunakan data surface base original vs surface aktual lapangan
VOLUME SURVEY EMPLACEMENT

Volume (MT)
Density Deviasi Remark
Survey MCR
1.3
1.3
1.3
1.3
1.3
1.3

al lapangan
Keterangan Gambar:

`
REKAP VOLUME SURVEY TBBE

Periode Location Volume (BCM) Volume (MT)


BDY-1a 51.82 67.366
BDY-1b 113.86 148.018
BDY-2 193.74 251.862
16/10/2022
BDY-3 1463.21 1902.173
BDY-7 13.66 17.758
OB
Total Coal 1836.29 2387.177
Total OB
SURVEY TBBE

Area M2 Density Remark


1.3
1.3
1.3
1.3
1.3
Jadwal/Hari
No Kegiatan Lokasi Keterangan
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
1 P5M TBBE-EMPL 06.45 WIB TBBE-EMPL
2 Monitoring Sump Level TBBE Tim survey TBBE
3 Pengukuran Inventory Coal Expose TBBE Tim survey TBBE
4 Pengukuran Roof dan Floor Batubara TBBE Tim survey TBBE
5 Pengukuran Area Disposal TBBE Tim survey EMPL
6 Uji Petik Area Disposal TBBE Tim survey EMPL
7 Pemetaan Foto Udara TBBE Keperluan update desain tambang
8 Update Video Drone (Engineering) TBBE Keperluan update QC dan Produksi
9 Update Video Drone (HO) TBBE-EMPL Keperluan HO
10 Pengukuran Stockpile Mingguan EMPL Tim survey EMPL
11 Joint Survey Tambang TBBE Tim survey TBBE
12 Joint Survey Stockpile EMPL Tim survey EMPL
13 Work Order All Departement TBBE-EMPL Dilaksanakan jika ada WO