Anda di halaman 1dari 1

PT.

BOBOBOX MITRA INDONESIA TASK KEYPOINT


AREA : Pathway Checked/Verified QA/QC Form STR 1 /6 2022
Pengecoran SPEC : …................................. Site-Coor /
Date : 13 Agustus 2023
Task Work-Flow Pass Criterion Vendor Assembly QC Project : Bobocabin Sembalun
1 Mix desain/ Trial Mix Mutu Beton V
2 Shop Drawing & Metode pelaksanaan tersedia V Site Manager :
3 Ketersediaan Alat & Material V M Ginanjar Setianegara
Mollen Cor,Dolak Cor, Talang cor, Plastik Cor
Sekop/ Cangkul Site Coordinator/Assembly :
Alat Ukur (meteran, benang, Unting, Theodolite, Rambu Ukur Dll) Trydo Prasetyo S
Alat pemadatan ( Vibrator, besi tul dll)
4 Mixing Beton V Vendor :
Penakaran Pasir, Koral , Air 215L CV.Surabaya Satu
Semen Terpakai @40kg, u/ 1 m³ ,rata 14,5 zk (K-175) V
@40kg, u/ 1 m³ ,rata 13,5 zk (K-125) V Notes
5 Slump Test
Kolom, Balok, Plat ± 12 V
Struktur dalam Tanah ± 16
6 Pelaksanaan Pengecoran finishing broming tolong
Tinggi Jatuh Pengecoran tidak melebihi 1.5 meter V
Pemadatan seksama/ vibrator tidak terkena tulangan Akhir
diperbaiki
pengecoran rata, lurus tali air yg rusak diperbaiki
Pengecoran tidak bersambung/Monolit
Jika ada embeded/angkur, terpasang dengan benar V
HASIL PENGECORAN
7 Dimensi
Tolerasi untuk potongan melintang +10mm / -5mm V
8 kelurusan , Vertikal, Kerataan Toleransi Pergeseran +10mm
Vertikal Max 5mm / 1m V
Max penyimpangan Rata ±10 mm
9 Tampak Permukaan Beton
Tidak Tedapat keropos akibat kehilangan air semen
kerataan pengecoran pada sambungan beton Tidak Ada V
Bagian stuktur yang menonjol/Melendut
Pemukaan bersih dari sisa sisa meteial bekisting/paku
Tidak Ada retak atau kerusakan lainya

VALIDASI
Quality Control Site Manager