HARGA
NO. URAIA N VOLUME JUMLAH (Rp)
SATUAN (Rp)
1 2 3 4 5
I. BAHAN
1 Beton Cor K255 (Holcim) 26 M³ 880,000.00 22,880,000.00
2 Pasir urug 26 M3 140,000.00 3,640,000.00
3 Makadam (Tanah Urug) 26 M3 130,000.00 3,380,000.00
4 Papan mal uk. 2/18 cm- 4m 20 Kpg 25,000.00 500,000.00
5 Kayu uk. 4/6 cm - 4 m 20 Btg 20,000.00 400,000.00
Wiremesh M5 (uk. 2,1 m x 5,4 m)
6 23 Lbr 250,000.00 5,750,000.00
Mengetahui,
Ketua RT 05 Ketua RW 14
R. Hapsarendra GD Suharjan
DENAH LAPANGAN VOLI