Jam Ke Hujan Tc
1 51% Karena luas DAS ≥ 16 km
2 25% Tl
3 9% Tp
4 5% Qp
5 4% luas DAS ≥ 2 km2
6 3% Tb
7 2% Tb
8 1%
Tabel nilai Parame
Tl(Jam)
2.69544407265565
t / Tp Qt / Qp T Qt
0 0 0.000 0.000
0.1 0.015 0.670 0.424
Hidrograf Sat
0.2 0.075 1.339 2.120 30.000
11; 28.270
0.3 0.16 2.009 4.523
0.4 0.28 2.678 7.916 25.000
Hujan
No Kala Ulang (Tahun Rencana
Harian
(mm)
1 25 239.2
2 50 275.2
3 100 317.6
an 0.8 Durasi Hujan
i 16.25 km Curve Number (CN)
vasi Sungai Utama (∆H) 536 m Base Flow
ata-rata Aliran Sungai Utama (S) 0.032 m/m
4.49240678775942 Jam
Karena luas DAS ≥ 16 km2
2.69544407265565 Jam
6.69544407265565 Jam
28.2699695413817 m³/detik
luas DAS ≥ 2 km2
5 5 s/d 20 T_p ............ kita mengambil nilai konstanta yaitu 5
33.4772203632782 Jam
S
Jam Ke
1
2
3
4
0 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000 5
Waktu (Jam) 6
7
8
Jam Ke
0
1
2
3
4
5
6
7
jan 8 Jam
mber (CN) 76
w 6 m³/detik
Base Flow
250
215.84
200
150
Debit(m³/detik)
100
50
0
0.000 5.000 10
5 m³/detik
Debit Puncak untuk kala ulang 25 tahun Flow
HSS Hujan Efektif
(m³/deti (m³/det Debit Total
k) 6.030 1.545 0.035 0.022 0.057 0.110 0.184 0.280 ik) (m³/detik)
0.000 0 0 0 0 0 0 0 0 5 5
0.424 2.557 0 0 0 0 0 0 0 5 7.55699752
2.120 12.785 0 0 0 0 0 0 0 5 17.7849876
4.523 27.2746 0.655 0 0 0 0 0 0 5 32.9296056
7.916 47.7306 3.2748 0.0149 0 0 0 0 0 5 56.0203392
12.156 73.3006 6.9863 0.0745 0 0 0 0 0 5 85.3613525
16.962 102.28 12.226 0.1588 0.0093 0 0 0 0 5 119.67405
21.768 131.259 18.776 0.278 0.0464 0 0 0 0 5 155.359272
25.160 151.715 26.199 0.4269 0.099 0.0241 0 0 0 5 183.463814
27.422 165.353 33.622 0.5957 0.1733 0.1205 0.04672 0 0 5 204.910244
28.270 170.467 38.861 0.7644 0.2661 0.2571 0.23361 0 0 5 215.849036
27.705 167.057 42.354 0.8836 0.3713 0.4499 0.49837 0.0779 0 5 216.692724
26.008 156.829 43.664 0.963 0.4765 0.691 0.87215 0.3897 0 5 208.88589
23.747 143.192 42.791 0.9928 0.5507 0.9642 1.33937 0.8314 0.11871 5 195.780128
21.202 127.85 40.171 0.9729 0.6002 1.2374 1.86888 1.455 0.59353 5 179.749025
18.658 112.508 36.678 0.9134 0.6188 1.4302 2.3984 2.2345 1.2662 5 163.047373
15.831 95.4612 32.748 0.8339 0.6064 1.5587 2.77218 3.1179 2.21584 5 144.314508
11.873 71.5959 28.818 0.7446 0.5693 1.607 3.02136 4.0013 3.4029 5 118.760775
9.046 54.5493 24.452 0.6552 0.5198 1.5748 3.11481 4.6248 4.74824 5 99.239047
6.785 40.912 18.339 0.556 0.4641 1.4784 3.05251 5.0406 6.09357 5 80.9360825
5.089 30.684 13.973 0.417 0.4084 1.3498 2.86562 5.1964 7.04322 5 66.9370707
3.675 22.1606 10.479 0.3177 0.3465 1.2052 2.61644 5.0925 7.67632 5 54.8947975
2.770 16.7057 7.8596 0.2383 0.2599 1.0606 2.3361 4.7807 7.91373 5 46.1546202
2.120 12.785 5.6764 0.1787 0.198 0.8999 2.05577 4.365 7.75546 5 38.9142076
1.018 6.13679 4.2791 0.1291 0.1485 0.6749 1.74429 3.8973 7.28063 5 29.2906535
0.509 3.0684 3.2748 0.0973 0.1114 0.5142 1.30822 3.4297 6.64753 5 23.4515324
0.254 1.5342 1.5719 0.0745 0.0804 0.3857 0.99674 2.91 5.9353 5 18.4887327
0.113 0.68187 0.786 0.0357 0.0606 0.2893 0.74755 2.1825 5.22306 5 15.0065816
Debit Puncak / Debit Rencana untuk Kala Ulang 25 tahun (Q25) 216.692724
Hidrograf Banjir
250
215.849035749597
200
Hujan Jam 1
Hujan Jam 2
Hujan Jam 3
150
Debit(m³/detik)
Hujan Jam 4
Hujan Jam 5
Hujan Jam 6
100 Hujan Jam 7
Hujan Jam 8
Base Flow
Debit Total
50
0
0.000 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000
Waktu (Jam)
Debit Puncak untuk kala ulang 50 tahun Flow
HSS Hujan Efektif
No t (Jam) (m³/deti (m³/deti
k) 7.556 2.093 0.086 0.007 0.034 0.084 0.159 0.264 k)
1 0.000 0.000 0 0 0 0 0 0 0 0 5
2 0.670 0.424 3.20399 0 0 0 0 0 0 0 5
3 1.339 2.120 16.02 0 0 0 0 0 0 0 5
4 2.009 4.523 34.1759 0.88765 0 0 0 0 0 0 5
5 2.678 7.916 59.8078 4.43826 0.0363 0 0 0 0 0 5
6 3.348 12.156 91.8477 9.46829 0.1815 0 0 0 0 0 5
7 4.017 16.962 128.16 16.5695 0.3872 0.003 0 0 0 0 5
8 4.687 21.768 164.472 25.446 0.6777 0.014 0 0 0 0 5
9 5.356 25.160 190.103 35.5061 1.0407 0.03 0.0143 0 0 0 5
10 6.026 27.422 207.191 45.5662 1.4522 0.053 0.0715 0.035 0 0 5
11 6.695 28.270 213.599 52.6674 1.8636 0.081 0.1525 0.177 0 0 5
12 7.365 27.705 209.327 57.4015 2.154 0.113 0.2668 0.379 0.068 0 5
13 8.035 26.008 196.511 59.1768 2.3477 0.145 0.4098 0.663 0.338 0 5
14 8.704 23.747 179.424 57.9933 2.4203 0.168 0.5718 1.018 0.721 0.1119 5
15 9.374 21.202 160.2 54.4427 2.3719 0.183 0.7338 1.42 1.262 0.5596 5
16 10.043 18.658 140.976 49.7085 2.2267 0.189 0.8482 1.822 1.938 1.1938 5
17 10.713 15.831 119.616 44.3826 2.033 0.185 0.9244 2.106 2.704 2.0892 5
18 12.052 11.873 89.7118 39.0567 1.8152 0.174 0.953 2.295 3.47 3.2084 5
19 13.391 9.046 68.3518 33.139 1.5974 0.159 0.9339 2.366 4.01 4.4769 5
20 14.730 6.785 51.2639 24.8543 1.3554 0.142 0.8768 2.319 4.371 5.7453 5
21 16.069 5.089 38.4479 18.9366 1.0165 0.125 0.8005 2.177 4.506 6.6407 5
22 17.408 3.675 27.7679 14.2024 0.7745 0.106 0.7147 1.988 4.416 7.2376 5
23 18.747 2.770 20.9327 10.6518 0.5809 0.079 0.629 1.775 4.146 7.4615 5
24 20.086 2.120 16.02 7.69299 0.4357 0.06 0.5337 1.562 3.785 7.3122 5
25 23.434 1.018 7.68958 5.79933 0.3146 0.045 0.4003 1.325 3.379 6.8645 5
26 26.782 0.509 3.84479 4.43826 0.2372 0.034 0.305 0.994 2.974 6.2676 5
27 30.129 0.254 1.92239 2.13037 0.1815 0.025 0.2287 0.757 2.523 5.5961 5
28 33.477 0.113 0.8544 1.06518 0.0871 0.019 0.1715 0.568 1.893 4.9246 5
Debit Puncak / Debit Rencana untuk Kala Ulang 50 tahun (Q50)
Hidrograf Banjir
300
273.541610659377
250
Hujan Jam 1
Hujan Jam 2
200
Hujan Jam 3
Hujan Jam 4
Debit(m³/detik)
Hujan Jam 5
Hujan Jam 6 150
Hujan Jam 7
Hujan Jam 8
Base Flow 100
Debit Total
50
0
0.000 5.000 10.000 15.000 20.000 25.000 30.000 35.000 40.000
Waktu (Jam)
Total Debit Puncak untuk kala ulang 100 tahun
HSS Hujan Efektif
(m³/detik No t (Jam) (m³/det
) ik) 9.417 2.796 0.170 0.000 0.014 0.058 0.133
5 1 0.000 0.000 0 0 0 0 0 0 0
8.203991 2 0.670 0.424 3.9934 0 0 0 0 0 0
21.01996 3 1.339 2.120 19.967 0 0 0 0 0 0
40.06356 4 2.009 4.523 42.5963 1.1857 0 0 0 0 0
69.2824 5 2.678 7.916 74.5435 5.9283 0 0 0 0 0
106.4976 6 3.348 12.156 114.478 12.647 0.0719 0 0 0 0
150.1192 7 4.017 16.962 159.736 22.132 0.3596 1E-05 0 0 0
195.6094 8 4.687 21.768 204.995 33.989 0.7671 7E-05 0 0 0
231.6948 9 5.356 25.160 236.942 47.426 1.3424 0.0001 0.0061 0 0
259.3696 10 6.026 27.422 258.24 60.864 2.0616 0.0003 0.0307 0.0244 0
273.5416 11 6.695 28.270 266.227 70.349 2.8766 0.0004 0.0656 0.1221 0
274.7094 12 7.365 27.705 260.902 76.673 3.6916 0.0006 0.1147 0.2604 0.0565
264.5918 13 8.035 26.008 244.929 79.044 4.2669 0.0007 0.1762 0.4558 0.2823
247.4274 14 8.704 23.747 223.631 77.463 4.6505 0.0008 0.2459 0.6999 0.6023
226.1723 15 9.374 21.202 199.67 72.72 4.7943 0.0009 0.3155 0.9767 1.054
203.9014 16 10.043 18.658 175.71 66.397 4.6984 0.0009 0.3647 1.2534 1.6186
179.0397 17 10.713 15.831 149.087 59.283 4.4108 0.0009 0.3975 1.4487 2.2585
145.6839 18 12.052 11.873 111.815 52.169 4.0272 0.0009 0.4098 1.5789 2.8984
120.0344 19 13.391 9.046 85.1926 44.265 3.5957 0.0008 0.4016 1.6278 3.3501
95.92709 20 14.730 6.785 63.8944 33.198 3.1642 0.0007 0.377 1.5952 3.6512
77.64993 21 16.069 5.089 47.9208 25.294 2.6848 0.0006 0.3442 1.4975 3.7642
62.20661 22 17.408 3.675 34.6095 18.971 2.0136 0.0005 0.3073 1.3673 3.6889
51.25549 23 18.747 2.770 26.0902 14.228 1.5342 0.0004 0.2705 1.2208 3.463
42.40178 24 20.086 2.120 19.967 10.276 1.1506 0.0003 0.2295 1.0743 3.1619
30.81833 25 23.434 1.018 9.58417 7.7463 0.863 0.0002 0.1721 0.9115 2.8231
24.09465 26 26.782 0.509 4.79208 5.9283 0.6233 0.0002 0.1311 0.6837 2.4843
18.36424 27 30.129 0.254 2.39604 2.8456 0.4698 0.0001 0.0983 0.5209 2.1079
14.58176 28 33.477 0.113 1.06491 1.4228 0.3596 9E-05 0.0738 0.3907 1.5809
274.7094 Debit Puncak / Debit Rencana untuk Kala Ulang 100 tahun (Q100)
Hidrograf Banjir
400
350 344.640451579288
Hujan Jam 4
Hujan Jam 5
200
Hujan Jam 6
Hujan Jam 7
Hujan Jam 8 150
Base Flow
Debit Total 100
50
0
5.000 40.000 0.000 5.000 10.000 15.000 20.000 25.000 30.000
Waktu (Jam)
ahun Flow Total
(m³/deti (m³/detik NO Kala Ulang (Tahun)
0.246 k) )
0 5 5 1 25
0 5 8.993402 2 50
0 5 24.96701 3 100
0 5 48.78195
0 5 85.4718
0 5 132.1965
0 5 187.2279
0 5 244.7507
0 5 290.7169
0 5 326.2207
0 5 344.6405
0 5 346.6986
0 5 334.1544
0.10423 5 312.3971
0.52117 5 285.053
1.11183 5 256.1544
1.9457 5 223.8319
2.98804 5 180.8874
4.16936 5 147.6024
5.35068 5 116.2319
6.18455 5 92.69073
6.74046 5 72.69812
6.94893 5 58.75591
6.80995 5 47.66928
6.39302 5 33.49344
5.8371 5 25.48003
5.2117 5 18.65043
4.58629 5 14.47902
ahun (Q100) 346.6986
af Banjir
Hujan Jam 1
Hujan Jam 2
Hujan Jam 3
Hujan Jam 4
Hujan Jam 5
Hujan Jam 6
Hujan Jam 7
Hujan Jam 8
Base Flow
Debit Total