Struktur Tiang :
A. Rangka Baja Tasso (TS) C.75.65 Tebal 0,65 mm 26 Btg 124.570,65 3.238.836,90
B. Baut Hex Roofing SDS 12x75 2 Kg 187.000,50 374.001,00
C. Baut Hex Roofing SDS 10x16 3 Kg 198.806,23 596.418,69
Atap :
A. Atap Spandek Zincalume Panjang 4 m tebal 0,35 mm 43,28 Lbr 252.800,25 10.941.194,82
B. Baut Hex Roofing SDS 12x75 2 Kg 187.000,50 374.001,00
C. Baut Hex Roofing SDS 12x70 2 Kg 180.300,25 360.600,50
D. Baut Hex Roofing SDS 12x50 2 Kg 177.500,51 355.001,02
E. Baut Hex Roofing SDS 10x16 6 Kg 198.806,23 1.192.837,38
Pekerja :
A. Pengawas Lapangan (1) 7 HOK 200.000,00 1.400.000,00
B. Kepala Tukang (1) 7 HOK 150.000,00 1.050.000,00
C. Tukang (2) 14 HOK 140.000,00 1.960.000,00
D. Pembantu (2) 14 HOK 100.000,00 1.400.000,00
Transportasi :
A. Mobilisasi Material dan Peralatan 1 Ls 1.000.000,00 1.000.000,00
B. Demobilisasi Material dan Peralatan 1 Ls 1.500.000,00 1.500.000,00
TOTAL Rp 38.006.452,37
DPP Rp 34.551.320
PPn Rp 3.800.645
PPh Rp 691.026
Keuntungan (15%) Rp 7.500.000
TOTAL+PPn+PPh + KU Rp 49.998.124