Specification and Bill of Quantity

PROJECT :- G+1 Residential Bldg


CLIENT :- Ato Kebede Berta
Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
A. SUBSTRUCTURE
1. EXCAVATION AND EARTH WORK
1.01 Site clearing and removing the top 200 mm thick soil m2 169.20 11.00 1,861.15
1.02 Bulk excavation in ordinary soil to a depth of up to 1500
mm from reduced level. 0.00 65.00 -
m3
1.05 Pit Excavation not exceeding150 cm from reduced level
of site cle 61.91 70.00 4,333.77
m3
1.06 Fill around footing and foundation columns with imported
selected materials from out side well rolled and 52.40 70.00 3,668.07
compacted in layers not exceeding 200 mm thick. m 3

1.07 Fill under hard core with imported selected materials from
out side well rolled and compacted in layers not 143.11 70.00 10,017.66
exceeding 200 mm thick. 3
m
1.08 Remove surplus excavated materials and deposit to a
95.75 60.00 5,745.00
distance 5Km. m3
1.09 250mm thick basaltic stone or equivalent hardcore well
rolled, consolidated and blinded with crushed stone . m2 121.11 95.00 11,505.45

Total Carried to Summary………………… 37,131.10


2. CONCRETE WORK
2.01 50mm lean concrete quality C-5, 150 kg of cement/m3,

a) Under isolated footing m2 29.06 85.00 2,470.10


2.02 Reinforced concrete quality C-25,minimum cement content
of 360 kg of cement/m3 filled in to form work and
vibrated around rod reinforcement (formwork and
reinforcement measured separately)
a) To isolated footing m3 8.86 2500.00 22,155.00
b) To sub-structure column m 3
1.61 2500.00 4,014.00
c) To grade beam m3 5.52 2500.00 13,800.00
d) To staires m3 1.77 2500.00 4,428.00
e) To 100mm thick ground floor slab m2 121.11 250.00 30,277.50

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
2.03 Formwork shall be timbered or steel or a combination of
two, sufficient to contain the wet concrete without
leakage. Enough to support temporary loading and -
pressure from placing Compaction or vibration without
displacement or appreciable deflection.
a) To isolated footing m2 27.92 160.00 4,467.20
b) To Foundation column m 2
26.76 160.00 4,281.60
c) To grade beam m2 55.20 160.00 8,832.00
d) To stairs m 2
15.17 160.00 2,426.40
2.04 Mild steel bar reinforcement according to structural
drawings. Reinforcement shall be free from dirt, oil,
grease, paint, readers paint, etc and any other
substances which may affect the reinforcement and
concrete bond (price include cutting bending and placing
in position).
a) In Footing Pad
Dia. 12 deformed bar kg 485.20 40.00 19,408.13
b) In Foundation Column
Dia. 8 deformed bar kg 21.33 40.00 853.20
Dia. 14 deformed bar kg 160.34 40.00 6,413.50
Dia. 16 deformed bar kg 135.20 40.00 5,408.12
c) In Grade beam
Dia. 8 deformed bar kg 174.91 40.00 6,996.24
Dia.14 deformed bar kg 496.25 40.00 19,849.85
d) In Ground Slab
Dia. 8 deformed bar kg 387.34 40.00 15,493.48
e) In stair case
Dia. 8 deformed bar kg 90.30 40.00 3,611.88
Dia.14 deformed bar kg 130.57 40.00 5,222.88
Total Carried to Summary………………… 180,409.08
3.00 Masonary work
50 cm thick stone masonry work imbedded in 1:3 cement
31.36 1700.00 53,305.20
to sand ratio mortar m3
Total Carried to Summary………………… 53,305.20

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
B. SUPERSTRUCTURE
1. CONCRETE WORK
1.01 C-25 reinforced concrete with a minimum cement content
of
360kg/m3 to be poured into formwork around
reinforcement
bar (unless otherwise described. formwork and
reinforcement measured separately)
a) To elevation columns m3 5.14 2500.00 12,852.00
b) To First floor & top tie beams m3 9.74 2500.00 24,360.00
c) To suspended Floor Slab of 15 cm thick. m2 112.34 2500.00 280,842.50
d) Staircase m3 3.16 2500.00 7,905.00
1.02 Provide, cut and fix in position sawn zigba wood or steel
-
formwork which ever appropriate.
a) To elevation columns m2 78.48 170.00 13,341.60
b) To Beams m 2
110.41 170.00 18,769.02
c) To suspended floors m 2
112.34 170.00 19,097.29
d) Staircase m 2
16.60 170.00 2,822.00
1.03 Mild steel bar reinforcement according to structural
drawings. Reinforcement shall be free from dirt, oil,
grease, paint, readers paint, etc and any other
substances which may affect the reinforcement and
concrete bond (price include cutting bending and placing
in position).
a) To elevation columns
Dia. 8 deformed bar kg 127.98 40.00 5,119.20
Dia. 14 deformed bar kg 405.67 40.00 16,226.71
Dia. 16 deformed bar kg 137.85 40.00 5,514.16
b) To first floor & Roof beams
Dia. 8 deformed bar kg 364.03 40.00 14,561.28
Dia. 14 deformed bar kg 186.86 40.00 7,474.52
Dia. 16 deformed bar kg 650.77 40.00 26,030.69
c) To 150mm thick suspended slab 40.00
Dia. 8 deformed bar kg 453.18 40.00 18,127.02
Dia. 10 deformed bar kg 461.15 40.00 18,446.08
Dia. 12 deformed bar kg 154.88 40.00 6,195.40
f) Staircase and landing -
Dia. 8 deformed bar kg 69.44 40.00 2,777.64
Dia. 14 deformed bar kg 310.64 40.00 12,425.62
-
Total Carried to Summary………………… 512,887.74

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
2. BLOCK WORK
2.01 20cm thick class 'B' H.C.B wall bedded and jointed in
cement mortar (1:3) both side left for aproprate finishing. 241.64 350.00 84,573.93
2
m
2.02 Ditto but 15cm thick class 'B' H.C.B wall bedded and
jointed in cement mortar (1:3) both side left for aproprate 82.26 310.00 25,500.32
finishing. m2
-
Total Carried to Summary………………… 110,074.25
3. ROOFING
Roof cover in decra tile including roof ridge cover fixed
to zigba purlin at c/c 90 cm (as per detail in the drawing).
3.01 146.54 750.00 109,906.50
Roof cover measured in horizontal projection and purlin
measured separately m2
Supply and Fix Dia 110cm UPVC down pipe and
3.02 ml 57.12 250.00 14,280.00
accessories With fixing brackets c/c 100cm
3.03 Gutter G-26 with development length size of 100 cm. ml 49.66 270 13,408.20
Total Carried to Summary………………… 137,594.70
4. Carpentry & Joinery -
4.10 Eucalyptus Truss
Diameter 12cm ml 447.03 45.00 20,116.35
Diameter 10 cm ml 283.20 35.00 9,912.00
4.20 Purline
Zigba Purlin 5X7cm ml 193.16 60.00 11,589.60
4.30 Joinery
Suspended Ceillling
Chipwood
8mm thick with necessary buttons and corner list m2 112.34 270.00 30,330.99

4.40 Doors
FLUSH WOODEN DOORS
Flush wood doors with semi solid core covered with
approved veneer on both sides to a finished thickness of
4cm. Price shall include frames hard wood lopping and
edgings at sides, top and bottom and 12cm high kick
plate.
75 cm x 210 cm No 4.00 2200.00 8,800.00
80m x 210 cm No 2.00 2500.00 5,000.00
90m x 210 cm No 1.00 2700.00 2,700.00
-
Total Carried to Summary………………… 88,448.94

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
5. METAL WORK -
Supply and fix door and windows made of standared
Aluminume frame glazed with 4 mm Clear glassas as
shown on the detail drawing .Price shall include all the
neccssary best quality iron monagry , door stoper , -
cylindericl lock ,handle and glazing.the contractor must
submit the sample for appoval befor production.

5.01 Aluminium framed window


At Groung floor
W(size 260x276) pcs 1.00 14,300.00 14,300.00
W(size 345x276) pcs 1.00 19,000.00 19,000.00
W(size 170x276) pcs 1.00 7,000.00 7,000.00
W(size 200x276) pcs 1.00 11,000.00 11,000.00
W(size 250x176) pcs 1.00 13,000.00 13,000.00
W(size 140x176) pcs 1.00 5,500.00 5,500.00
W(size 210x176) pcs 1.00 12,000.00 12,000.00
W9(size 140x110) pcs 1.00 3,080.00 3,080.00
At First floor
W(size 200x176) pcs 1.00 7,040.00 7,040.00
W(size 225x176) pcs 1.00 7,920.00 7,920.00
W(size 260x176) pcs 1.00 9,152.00 9,152.00
W9(size 140x176) pcs 1.00 4,930.00 4,930.00
W(size 210x176) pcs 1.00 7,390.00 7,390.00
W7(size 140x110) pcs 1.00 3,080.00 3,080.00
5.02 Doors -
At Groung floor
D4(90x210)cm pcs 1.00 4160.00
D1(80x210)cm pcs 2.00 3695.00 7,390.00
D2(75x210)cm pcs 1.00 3465.00 3,465.00
At First floor -
D6(75x210)cm pcs 2.00 3465.00 6,930.00
-
5.03 RHS Steel Handrail -
Staircase ml 30.91 1800.00 55,638.00
-
Total Carried to Summary………………… 197,815.00
6.FINISHING
6.1 .WALL FINISH
6.1.1 Apply two coats of plastering in cement mortar (1:3)
.Price shall include exposed surface of beams & -
column,pre-cleaning and preparation of the surface.

a) To internal and extrernal wall surfaces m² 647.80 125.00 80,974.73


b) To concrete surfaces m² 317.82 125.00 39,727.88

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
5.2. FLOOR FINISH -
6.2.1 Total areas of Parquet finish m² 43.70 700.00 30,590.00
6.2.2 Total areas of Porcelain finish with minimum
57,880.00
thickness of 6mm m² 144.70 400.00
6.2.3 Total of ceramic tile finish at kitchen with minimum
4,200.00
thickness of 4mm m² 12.00 350.00
Total of ceramic tile to toilets with minimum
8,085.00
thickness of 4mm m² 23.10 350.00
6.2.4 Supply and fix Marble floor tile on landing bedded on
cement mortar (1:3) ratio . Price shall include cement 6,384.00
screed , mirror polishing and all nessasery works.
m² 4.26 1500.00
6.2.5 3cm thick and 30 cm wide and 1 m long marble trade
bedded in cement mortar (1:3) ratio . Price shall include 8,100.00
mirror polishing and all nessasery works.
ml 18.00 450.00
6.2.6 Ditto but 2cm thick 1m long and 17 cm wide marble rise
for stair bedded on cement mortar (1:3) ratio . Price
ml 18.00 300.00 5,400.00
shall include cement screed , mirror polishing and all
nessasery works.
6.2.7 10 cm high Porcelain skirting. ml 186.18 55.00 10,239.90
-
Total Carried to Summary………………… 251,581.50
7. PAINTING
6.01 Apply three coats of plastic emulsion paint. Price shall
include pre - cleaning & preparation of the surface.
a) To external and internal plastered wall surface. m2 647.80 35.00 22,672.92
b) To RC ceiling. m 2
317.82 35.00 11,123.81
-
Total Carried to Summary………………… 33,796.73

8. SANITARY INSTALLATION -

SANITARY EQUIPMENT (FIXTURES)


Supply and fix hand wash basins with chrome plated cold
and hot water tap made of white vitreious china,complete
with plug, chrome plated chain holder, P-smell trap with
connection pipe and with all other necessary accessories.

8.00 Size :- 500 x 400 mm No 3.00 1800.00 5,400.00


8.02 Supply and fix wash down water closets made of white No
vitreous china with plastic seat and cover including all 3.00 1500.00 4,500.00
accessories.
8.03 Supply and fix toilet paper holder with chrome plated No
brass wall flanged roll with chrome plated fastening 3.00 450.00 1,350.00
screws and other accessories.
8.04 Supply and fix crystal glass mirrors for toilets and wash No
basins with copper back protection, size: 500/400 mm
including chrome plated brass mirror clips with chrome 3.00 650.00 1,950.00
plated screws and etc... for hand wash basins.

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
8.05 Supply and fix single tubular chrome plated swing pattern No
towel rails, with chrome plated fastening screws, 3.00 500.00 1,500.00
complete with all the accessories. /For hand wash basins/
8.06 Supply and fix soap holder in white vitreous china of size No
150 x 150 mm. Complete with the necessary fixing and 3.00 500.00 1,500.00
other accessories for hand wash basins.
8.07 Supply and fix floor drains made of enamealed cast iron
of approved quality, complete with P-smell trap and all -
other necessary fittings and accessories.
Size:- Dia. 50 mm No 4.00 350.00 1,400.00
8.08 Supply and fix electric water heater with a capacity given
below. Complete with all water proofing, mounting and
-
fastening material, safety, one-way valve and gate valve
and with all the accessories.
Capacity 80 Liter No 3.00 3000.00 9,000.00
8.09 Supply and fix stainless steel kitchen sink with Double
bowl complete with plastic smell trap, plug, chain holder, -
drain pipe, mixing faucet, etc; and all other accessories.
Size: 1500 x 600 mm No 1.00 2500.00 2,500.00
-
8.10 Supply and fix pressed steel enameled cast iron shower
tray, including shower head, mixing faucet, smell trap, -
etc.. Complete with all the necessary accessories.
Size:- 700mm X 700mm No 1.00 1200.00 1,200.00
8.11 Supply and fix fire extingusher 2 kg weight CO2 for No
1.00 2000.00 2,000.00
kitchen
8.12 Supply and fix pressed steel enameled cast iron shower
tray, including shower head, mixing faucet, smell trap,
etc.. Complete with all the necessary accessories.
Size:- 700mm X 700mm
8.13 Supply and fix pressed steel enameled cast iron Bath
tray, complete with all the necessary accessories.
Size:- 1700mm X 700mm No 2.00 2500.00 5,000.00
-
8.14 Suplly and fix 2000 lt capacity fiber or Roto water tanker No
1.00 6500.00 6,500.00
WATER SUPPLY PIPE LINE AND VALVES -
Cold and hot water pipes shall be PPR pipes , and be
fixed to slabs, walls, beams or etc…with metal straps or
similar material. Unit price shall include all assistance
civil works and necessary fittings such as T, bends,
-
elbows, etc; and according to where shown on the
drawing. All water pipes shall be tested two times the
working pressure or 50 meters head, which ever is greater
at the expense of the constractor.
8.15 Supply and install PPR pipes, complete with all the
necessary fittings and accessories, to internal water -
distribution system as shown on the drawing
i) Dia. 15mm Pipe (1/2") ml 56.00 75.00 4,200.00
ii) Dia. 20mm Pipe (3/4") ml 27.00 85.00 2,295.00
iii) Dia.25mm Pipe (1") ml 23.00 95.00 2,185.00

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
8.16 Supply and fix chrome valves of approved standard
before hand wash basins, water closets and other fixtures.
Complete with unions, elastic water proofing, hand -
wheels of normal quality and with all other necessary
accessories.
Dia. 15 mm No -
8.17 Supply, fix, test, and commission isolating valves made of
brass on the water supply pipe including accessories, all
-
as specified in the technical specification and shown on
the drawings.
Dia. 15 mm (1/2") No 10.00 150.00 1,500.00
Dia. 20 mm (3/4") No 9.00 225.00 2,025.00
Dia. 25 mm (1") No 2.00 250.00 500.00
WASTE, VENT AND RAIN WATER PIPES AND -
ACCESSORIES -
All domestic waste, vent and storm water pipe lines shall
comply to BS45/4:1983 and DIN 19531 PVC pipes and
shall be provided with a minimum slope as specified in
the drawing. Unit price shall include all the necessary -
assistance civil works, such as excavation, cartaway,
fixing or hanging to walls, beams or slabs. etc., necessary
fittings such as bends, Y, T, etc.
8.18 Supply and lay internal PVC waste pipes according to
where shown on the drawings. Complete with all the -
necessary fittings.
Dia. 50 mm ml 32.00 50.00 1,600.00
Dia. 110 mm ml 24.00 120.00 2,880.00
8.19 Vent caps made of PVC, complete with all accessories
-
and as shown on the drawing.
Dia. 50 mm No. 1.00 60.00 60.00
SITE WORK -
8.20 Supply and install water meter of approved quality price
-
shall include gate valves after and before water meter.
Dia. 25 mm. No 1.00 2500.00 2,500.00
8.21 Supply and PVC pipe for waste water drainage from the
manhole to the septic tank with minimum slope as shown
on the drawing or natural ground slope which ever is -
greater on a firm bed of sand 100 mm thick below and
200 mm thick above the crown of pipe in open ground.
Dia. 110 mm ml 19.00 180.00 3,420.00
8.22 Construct manholes on a sanitary sewer drainage systems
as where shown on the drawing in double brick with 15
cm thick reinforced concrete bottom slab in
-
dia.10c.c150mm both ways and 120mm thick reinforced
cover slab in dia.10c.c150 mm both ways. Price shall
include all assistance civil works and handle.
a) size 600 mm x 600 mm x 600mm No 3.00 2500.00 7,500.00
Ditch size: 1/2 Diameter 300mm ml 60.00 350.00 21,000.00
-
TOTAL CARRIED TO SUMMARY
95,465.00
...................................................

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No

9. Electrical Installation
9.01 Distribution Boards
Flush mounting main distribution board (MDB)
with bus bar rating of 32A/3ph with all necessary fixing
and connecting acessories and consisting of:-
1 pc main MCB of 25A/1ph
2 pcs MCB of 20A/3ph
1 pcs MCB of 20A/1ph
3 pcs MCB of 16A/1ph
2 pcs MCB of 10A/1ph -
1 pcs MCB of 6A/1ph Nº 1.00 7000.00
Flush mounting main distribution board (SDB-1) -
with bus bar rating of 20A/1ph with all necessary fixing -
and connecting acessories and consisting of:- -
1 pcs MCB of 16A/1ph Nº 1.00 4500.00 4,500.00

9.02 Light points in thermoplastic conduit -


of dia. 16mm fed by conductor of 2x2.5 sq.mm Nº 29.00 300.00 8,700.00
Switch type Legrand -
Single switch Nº 6.00 280.00 1,680.00
Double switch Nº 8.00 350.00 2,800.00
Two way switch Nº 15.00 350.00 5,250.00
9.03 SOCKET OUTET (siements shucko type)
Single socket outlet type SCHUKO or equivalent -
in thermoplastic conduit of dia.16mm -
fed by pvc conductor of 3x2.5 sq.mm Nº 25.00 300.00 7,500.00
Ditto but for water heater 16A, 1ph with on/off switch Nº 3.00 400.00
Stove socket fed by pvc dia 19 3x4 sq.mm Nº 1.00 400.00 400.00
Ditto as stove above but for Enjera Mitad Nº 1.00 400.00 400.00
For bell 2x8 sq.mm fed by dia 19 mm pvc conduit Nº 9.00 300.00 2,700.00
Telephone points for a dia . of 19mm Nº 5.00 350.00 1,750.00
TV points for a dia. of 19mm Nº 2.00 250.00 500.00
9.04 Type of Light Fittings -
Light fitting No.0(Resturant light fixture at middle Nº
-
positions)
Light fitting No.1(45209.002), P(W)=18 Nº 3.00 200.00 600.00
Light fitting No.2(RZB 20107.002 .Q), P(W) =18 Nº 13.00 200.00 2,600.00
Light fittig No.3 (Massive 70368/01/73), P(W) =40 Nº 2.00 300.00 600.00
Light fitting No.4(Massive 38785/43/10), P(W) = 5*40 Nº 1.00 4000.00 4,000.00
Light fitting No.5(Massive 38787/43/10), P(w) = 3*40 Nº 2.00 3000.00 6,000.00
Light fitting No.6(Massive 1302/43/10), P(w) = 40 Nº 4.00 300.00 1,200.00
Light fitting No.7(RZB 201013.963 .Q), P(W) = 2*18 Nº 4.00 250.00 1,000.00
Light fitting No.8(RZB 20107.002 .Q), P(w) = 75 Nº 0.00 400.00 -

9.05 Power cables


Power cable 4x10 sq.mm ml 25.00 350.00 8,750.00
Power cable 5X4 sq.mm ml 15.00 300.00 4,500.00

Client: Kebede Berta


Specification and Bill of Quantity

Item
DESCRIPTION UNIT QTY UNIT RATE AMOUNT
No
9.06 Electric Manhole
Construct manholes on a electrical line drawing systems
as where shown on the drawing in double brick with 15
cm thick plain concrete bottom slab and in 120mm thick
-
reinforced cover slab in dia.10c.c150 mm both ways.
Price shall include all assistance civil works and handle of
cover slab.
a) size 600 mm x 600 mm x 600mm No 2.00 2000.00 4,000.00
9.07 Earthing system -
Complete set of earthing system with Bare soft
drawn earth copper conductor of 1x10mm2 inside 65,000.00 65,000.00
PVC conduit of earth terminal to eargh rearth rod. No 1
-
TOTAL CARRIED TO SUMMARY
134,430.00
...................................................