REKAPITULASI
I PEKERJAAN PERSIAPAN 7,200,000.00
II PEKERJAAN DRAINASE 2,445,019.84
III PEKERJAAN TANAH 9,773,297.35
IV PEKERJAAN STRUKTUR 116,900,388.25
Penyedia Jasa