Anda di halaman 1dari 1

WORK ORDER

Our Ref. No. : 16.001/PNNI/IX/21

MEDAN, 16 September 2021

KEPADA YTH :
UD .GUNA RAYA

DENGAN HORMAT,

DENGAN INI KAMI MEMBERIKAN PERSETUJUAN UNTUK :

No. PEKERJAAN Qty Harga @ Jumlah

U/ONGKOS ANGKUT PENGIRIMAN MATERIAL

1 ONGKOS ANGKUT/PENGIRIMAN MATERIAL (KG) 25,970 KG 375.00 9,738,750.00

2 ASURANSI PENGIRIMAN BARANG 1 LOT 241,759.00 241,759.00

DENGAN NOMOR DO SUB TOTAL IDR 9,980,509.00


1.128-131 /DO – PNNI/ IX /21
DISC IDR -
2.133 -134 /DO – PNNI/ IX /21
PPN IDR -
BM 8609 XM PPh () IDR -
TOTAL IDR 9,980,509.00
TERM OF PAYMENT :

DEMIKIANLAH SURAT INI KAMI PERBUAT. ATAS PERHATIAN DAN KERJASAMA YANG BAIK, KAMI SAMPAIKAN TERIMAKASIH

Ditandatangani oleh , untuk PT. PERSADA NUSA NABATI INDONESIA

Diterima & Di Konfirmasi Oleh :

(AUTHORIZED SIGNATURE)

*** WAJIB MELAMPIRKAN COPY PO PADA SAAT PENGIRIMAN BARANG, JIKA TIDAK MAKA BARANG AKAN DI TOLAK ***
***DAN LAMPIRKAN NO. REKENING SAAT PENAGIHAN***

Anda mungkin juga menyukai