Anda di halaman 1dari 57

ASB KONSTRUKSI BIDANG SUMBER DA

No Kode Uraian Pekerjaan


I. ASB SDA 01 Talud Pasangan Batu
1 Kab. Bangka
Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
2 Kab. Bangka Barat
Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
3 Kab. Bangka Selatan
Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
4 Kab. Bangka Tengah
Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
5 Kab. Belitung
Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
6 Kab.Belitung Timur
Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
7 Kota Pangkalpinang
Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.

II. ASB SDA 02 Gorong-gorong dan Plat deker


1 Kab. Bangka
2 Kab. Bangka Barat
Pembuatan Plat deker ukuran 5 x 4,5 (m)
Pembuatan Plat deker ukuran 3 x 4 (m)
3 Kab. Bangka Selatan
Pembuatan Plat deker ukuran 5 x 4,5 (m)
Pembuatan Plat deker ukuran 3 x 4 (m)
4 Kab. Bangka Tengah
Pembuatan Plat deker ukuran 5 x 4,5 (m)
Pembuatan Plat deker ukuran 3 x 4 (m)
5 Kab. Belitung
6 Kab.Belitung Timur
7 Kota Pangkalpinang
Pembuatan Plat deker ukuran 5 x 4,5 (m)
Pembuatan Plat deker ukuran 3 x 4 (m)

III. ASB SDA 03 Pengerukan/Normalisasi saluran dan Sungai


1 Kab. Bangka
2 Kab. Bangka Barat
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 20 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 15 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 10 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 8 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 6 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 4 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3,5 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3 m, kedalaman kurang lebih 2 m
Pengerukan Sungai Menggunakan Kapal Keruk CSD
3 Kab. Bangka Selatan
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 20 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 15 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 10 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 8 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 6 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 4 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3,5 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3 m, kedalaman kurang lebih 2 m
Pengerukan Sungai Menggunakan Kapal Keruk CSD
4 Kab. Bangka Tengah
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 20 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 15 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 10 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 8 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 6 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 4 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3,5 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3 m, kedalaman kurang lebih 2 m
Pengerukan Sungai Menggunakan Kapal Keruk CSD
5 Kab. Belitung
6 Kab.Belitung Timur
7 Kota Pangkalpinang
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 20 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 15 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 10 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 8 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 6 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 4 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3,5 m, kedalaman kurang lebih 2 m
Pengerukan Saluran Banjir/Sungai dengan lebar kurang lebih 3 m, kedalaman kurang lebih 2 m
Pengerukan Sungai Menggunakan Kapal Keruk CSD
IV. ASB SDA 04 Jaringan Irigasi
1 Kab. Bangka
2 Kab. Bangka Barat
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 1,9 m, Lb = 0,6 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,5 m, Lb = 1,5 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,4 m, Lb = 1,2 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,0 m, Lb = 1,0 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 1,8 m, Lb = 0,8 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 1,6 m, Lb = 0,6 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 1,2 m, T = 1,2 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 1,0 m, T = 1,0 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 0,8 m, T = 0,8 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 0,7 m, T = 0,75 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 0,6 m, T = 0,5 m
Saluran Tanah dengan lebar kurang lebih 10 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 8 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 6 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 4 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 3,5 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 3 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 2 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 1 m, kedalaman kurang lebih 1,5 m
Bangunan Bagi Sadap (2 pintu) untuk Irigasi Permukaan
Bangunan Bagi Sadap (1 pintu) untuk Irigasi Rawa
Bangunan Bagi Sadap (2 pintu) untuk Irigasi Rawa
3 Kab. Bangka Selatan
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m
4 Kab. Bangka Tengah
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m
5 Kab. Belitung
6 Kab.Belitung Timur
7 Kota Pangkalpinang
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 1,9 m, Lb = 0,6 m, T = 0,65 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,5 m, Lb = 1,5 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,4 m, Lb = 1,2 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,0 m, Lb = 1,0 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 1,8 m, Lb = 0,8 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 1,6 m, Lb = 0,6 m, T = 0,5 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 1,2 m, T = 1,2 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 1,0 m, T = 1,0 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 0,8 m, T = 0,8 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 0,7 m, T = 0,75 m
Saluran terbuka pasangan batu berbentuk Segiempat, Ukuran L = 0,6 m, T = 0,5 m
Saluran Tanah dengan lebar kurang lebih 10 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 8 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 6 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 4 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 3,5 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 3 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 2 m, kedalaman kurang lebih 1,5 m
Saluran Tanah dengan lebar kurang lebih 1 m, kedalaman kurang lebih 1,5 m
V. ASB SDA 05 Talud Sistem Panel Serbaguna
1 Kab. Bangka
2 Kab. Bangka Barat
Pemasangan Talud Sistem Panel Serbaguna H=3m
3 Kab. Bangka Selatan
Pemasangan Talud Sistem Panel Serbaguna H=3m
4 Kab. Bangka Tengah
Pemasangan Talud Sistem Panel Serbaguna H=3m
5 Kab. Belitung
Pemasangan Talud Sistem Panel Serbaguna H=3m
6 Kab.Belitung Timur
7 Kota Pangkalpinang
Pemasangan Talud Sistem Panel Serbaguna H=3m
VI. ASB SDA 06 Revetmen Pengaman Pantai
1 Kab. Bangka
2 Kab. Bangka Barat
Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m; buis dia. 80, tebal 0,5 m
Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m
3 Kab. Bangka Selatan
4 Kab. Bangka Tengah
5 Kab. Belitung
6 Kab.Belitung Timur
7 Kota Pangkalpinang
Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m; buis dia. 80, tebal 0,5 m
Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m

IX. ANALISA HARGA SATUAN PEKERJAAN BIDANG SDA SESUAI PERMEN PU NO. 28/PRT/2016
A.1 Pekerjaan tanah
A.1.1 Pekerjaan tanah secara manual dan semi mekanis (Normatif)
T.01 AHSP pembersihan dan pengupasan permukaan tanah
T.01.a 1 m2 pembersihan dan striping/kosrekan
T.01.b 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanama
T.01.c Cabut 1 tunggul pohon tanaman keras ø > 15 cm dan membuang sisa tung
T.02 AHSP uitzet trase saluran dan pasang profil melintang penampang
T.02.a 1 m¹ uitset trase saluran
T.02.b Pasang 1 m' profil melintang galian tanah saluran dan pasang bouwplank
T.02.b.1) Pasang 1 m' profil melintang galian tanah
T.02.b.2) Pasang 1 m' bouwplank
T.03 Pengadaan dan pemasangan patok
T.03.a Patok kayu (Ukuran 5/7)
T.03.b Patok Tetap Bantu (PTB)
T.03.c Patok Tetap Utama (PTU)
T.06 Galian tanah biasa
T.06.a Cara manual
T.06.a.1) 1 m3 galian tanah biasa sedalam ≤ 1 m
T.06.a.2) 1 m3 galian tanah biasa sedalam > 1 m s.d. 2 m
T.06.a.3) 1 m3 galian tanah biasa sedalam > 2 m s.d. 3 m
T.06.a.4) 1 m3 galian tanah biasa > 3 m, untuk setiap penambahan ked
T.06.b Cara semi mekanis
T.06.b.1) 1 m3 galian tanah biasa sedalam ≤ 1 m
T.06.b.2) 1 m3 galian tanah biasa sedalam > 1 m s.d. 2 m
T.06.b.3) 1 m3 galian tanah biasa sedalam > 2 m s.d. 3 m
T.06.b.4) Kedalaman yang > 3 m menggunakan AHSP T.06.b.3) + {AHS
T.07 Galian tanah berbatu
T.07.a Cara manual
T.07.a.1) 1 m3 galian tanah berbatu sedalam ≤ 1 m
T.07.a.2) 1 m3 galian tanah berbatu sedalam > 1 m s.d. 2 m
T.07.a.3) 1 m3 galian tanah berbatu sedalam > 2 m s.d. 3 m
T.07.a.4) 1 m3 galian tanah berbatu > 3 m, untuk setiap penambahan ke
T.07.b Cara semi mekanis
T.07.b.1) 1 m3 galian tanah berbatu sedalam ≤ 1 m
T.07.b.2) 1 m3 galian tanah berbatu sedalam > 1 m s.d. 2 m
T.07.b.3) 1 m3 galian tanah berbatu sedalam > 2 m s.d. 3 m
T.07.b.4) Kedalaman yang > 3 m menggunakan AHSP T.07.b.3) + {AHS
T.08 Galian batu
T.08.a Cara manual
T.08.a.1) 1 m3 Galian batu sedalam ≤ 1 m
T.08.a.2) 1 m3 Galian batu sedalam > 1 m s.d. 2 m
T.08.a.3) 1 m3 Galian batu sedalam > 2 m s.d.3 m
T.08.a.4) 1 m3 Galian batu > 3 m untuk setiap penambahan kedalaman
T.08.b Cara semi mekanis
T.08.b.1) 1 m3 Galian batu sedalam ≤ 1 m
T.08.b.2) 1 m3 Galian batu sedalam > 1 m s.d. 2 m
T.08.b.3) 1 m3 Galian batu sedalam > 2 m s.d. 3 m
T.08.b.4) Kedalaman yang > 3 m menggunakan AHSP T.08b.3) + {AHS
T.09 Galian tanah cadas atau tanah keras
T.09.a Cara manual
T.09.a.1) 1 m3 Galian tanah cadas atau tanah keras sedalam ≤ 1 m
T.09.a.2) 1 m3 Galian tanah cadas atau tanah keras sedalam > 1 m s.d
T.09.a.3) 1 m3 Galian tanah cadas/tanah keras sedalam > 2 m s.d 3 m
T.09.a.4) 1 m3 Galian tanah cadas atau tanah keras > 3 m untuk setiap
T.09.b Cara semi mekanis
T.09.b.1) 1 m3 Galian tanah cadas atau tanah keras sedalam ≤ 1 m
T.09.b.2) 1 m3 Galian tanah cadas atau tanah keras sedalam > 1 m s.d
T.09.b.3) 1 m3 Galian tanah cadas atau tanah keras sedalam > 2 m s.d
T.09.b.4) Kedalaman yang > 3 m menggunakan AHSP T.09.b.3) + {AHS
T.10 Galian lumpur
T.10.a Cara manual
T.10.a.1) 1 m3 Galian lumpur sedalam ≤ 1 m
T.10.a.2) 1 m3 Galian lumpur sedalam > 1 m s.d. 2 m
T.10.a.3) 1 m3 Galian lumpur sedalam > 2 m s.d. 3 m
T.10.a.4) 1 m3 Galian lumpur > 3 m untuk setiap penambahan kedalam
T.10.b Cara semi mekanis
T.10.b.1) 1 m3 Galian lumpur sedalam ≤ 1 m
T.10.b.2) 1 m3 Galian lumpur sedalam > 1 m s.d. 2 m
T.10.b.3) 1 m3 Galian lumpur sedalam > 2 m s.d. 3 m
T.10.b.4) 1 m3 Galian lumpur sedalam > 3 m untuk setiap penambahan
T.11 Galian pasir
T.11.a Cara manual
T.11.a.1) 1 m3 Galian pasir sedalam ≤ 1 m1
T.11.a.2) 1 m3 Galian pasir sedalam > 1 m s.d. 2 m1
T.11.a.3) 1 m3 Galian pasir untuk pondasi bangunan sedalam > 2 m s.d
T.11.a.4) 1 m3 Galian pasir kedalaman >3 m untuk setiap penambahan
T.11.b Cara semi mekanis
T.11.b.1) 1 m3 Galian pasir sedalam ≤ 1 m1
T.11.b.2) 1 m3 Galian pasir sedalam > 1 m s.d. 2 m1
T.11.b.3) 1 m3 Galian pasir sedalam > 2 m s.d. 3 m1
T.11.b.4) 1 m3 Galian pasir sedalam > 3 m untuk setiap penambahan ke
T.12 Perkuatan dinding galian
T.12.a (K3) 1 m2 Pasangan 2-lapis seseg bambu, JAT < 1,0 m'
T.12.b (K3) 1 m2 pasangan papan 3/20, JAT < 1,5 m'
T.12.c (K3) 1 m2 Pasangan balok kayu 8/12, tebal 8 cm, JAT 4,0 m'
T.12.d (K3) 1 m2 Pasangan balok kayu 8/12, tebal 12 cm, JAT < 6,0 m'
T.13 Peledakan batuan
T.14 Timbunan dan pemadatan
T.14.a 1 m3 Timbunan tanah atau urugan tanah kembali
T.14.b 1 m3 Pemadatan tanah
T.14.c 1 m3 Timbunan pasir sebagai bahan pengisi
T.14.d 1 m3 Pemadatan pasir sebagai bahan pengisi
T.14.e 1 M3 Timbunan pilihan tanah didatangkan
T.15 Angkutan material dan/atau hasil galian
T.15.a Angkutan material dan/atau hasil galian untuk jarak horizontal (datar)
T.15.a.1) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.2) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.3) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.4) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.5) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.6) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.7) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.8) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.9) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.10) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.a.11) Mengangkut 1 m3 material atau hasil galian dengan jarak ang
T.15.b Angkutan material dan/atau hasil galian untuk jarak vertikal menurun
T.15.b.1) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.2) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.3) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.4) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.5) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.6) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.7) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.8) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.9) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.10) Menurunkan 1 m3 material atau hasil galian tanah sampai bed
T.15.b.11) Menurunkan 1 m3 material atau hasil galian tanah dengan bed
T.15.c Angkutan material dan/atau hasil galian untuk jarak vertikal naik
T.15.c.1) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.2) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.3) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.4) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.5) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.6) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.7) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.8) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.9) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.10) Menaikkan 1 m3 material atau hasil galian tanah sampai beda
T.15.c.11) Menaikkan 1 m3 material atau hasil galian tanah dengan beda
T.15.d Konversi berat material tanah biasa (lepas) kepada jenis material Lain
T.15.d.1) Jika biaya angkutan dimasukan dalam HSD - bahan (dihitung
T.15.d.1) a) Untuk jarak angkut horizontal 100 m
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.15.d.1) b) Untuk jarak angkut vertikal turun 3 m
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.15.d.1) c) Untuk jarak angkut vertikal naik 3 m
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.15.d.2) Jika biaya angkutan dipisahkan dari HSD Komponen Pekerjaa
ditulis masing-masing
yang sudah
T.15.d.2) a) termasuk Overhead
Untuk jarak + keuntungan
angkut horizontal 100 m
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.15.d.2) b) Untuk jarak angkut vertikal turun 3 m
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.15.d.2) c) Untuk jarak angkut vertikal naik 3 m
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.
T.

A.1.2 Pekerjaan tanah secara mekanis (Informatif)


TM.01 AHSP Penggalian tanah di Kolong/waduk (PC Long arm+Ponton+Buldozer)
TM.01.a AHSP Angkutan material atau hasil galian dengan ponton 2 (jarak angkut ke
TM.01.b AHSP Angkutan material atau hasil galian dengan ponton 2 (jarak angkut ke
TM.01.c AHSP Angkutan material atau hasil galian dengan ponton 2 (jarak angkut ke

TM.02 Pekerjaan Normalisasi/Restorasi sungai secara mekanis


TM.02.a AHSP Penggalian tanah di sungai menggunakan Excavator (di darat), tanah
TM.02.a.1) Menggali tanah di sungai dengan Excavator
TM.02.a.2) DT angkut material atau hasil galian sejauh 3 km
TM.02.a.2).a) Jarak angkut 5 km
TM.02.a.2).b) Jarak angkut = 10 km
TM.02.a.2).c) Jarak angkut = 20 km
TM.02.a.2).d) Jarak angkut = 30 km
TM.02.a.3) Timbunan: Tanah dihampar, diratakan dan dirapihkan menggu
TM.02.a.4) Timbunan: Agregat dihampar, diratakan dan dirapihkan mengg
TM.02.b AHSP Penggalian tanah di sungai menggunakan Excavator diatas ponton, ta
TM.02.b.1) 1 m3 Galian dan perapihan posisi dekat (PC standard)
TM.02.b.2) 1 m3 Galian dan perapihan posisi jauh (PC Long arm)
TM.02.b.3) Galian dan urug posisi jauh (PC Long arm di darat)
TM.03 AHSP angkutan material atau hasil galian lintas pulau
TM.03.a Excavator standard menggali Material di BA kemudian hasil galian dari BA d
TM.03.b DT angkut material atau hasil galian dari Borrow Area (BA) ke pelabuhan ter
TM.03.c Di B material atau hasil galian dimuatkan ke Tongkang
TM.03.d Tongkang angkut material atau hasil galian ke pulau (C), jarak angkut 20 km
TM.03.e Di C material atau hasil galian dimuatkan ke perahu
TM.03.f Perahu angkut material atau hasil galian dari C ke D, jarak angkut 2 km

TM.04 Pekerjaan galian, angkut material/hasil galian dan pemadatan


TM.04.1 Excavator gali tanah di Borrow Area (untuk timbunan tidak termasuk beli tan
TM.04.1.a 1 m3 galian tanah biasa sedalam sd 2 m (excavator standard)
TM.04.1.b 1 m3 galian tanah biasa sedalam 2 m - 4 m
TM.04.1.c 1 m3 galian tanah biasa sedalam > 4 m (excavator long arm)
TM.04.2 Galian tanah berbatu di saluran/sungai menggunakan hydraulic breaker
TM.04.2.a Excavator+hydraulic breaker
TM.04.2.b Excavator standard mengambil/memuat batu ke tepi saluran d
TM.04.2.b Excavator long arm mengambil/memuat batu ke tepi saluran d
TM.04.3 DT angkut material dari BA ke lokasi pekerjaan, jarak 1 km
TM.04.4 Pemadatan tanah di lokasi pekerjaan

TM.06 Pekerjaan Infrastruktur Irigasi Secara Mekanis


TM.06.1 Pembuatan Saluran lebar s.d 1m (Excavator Mini)
TM.06.2 Pembuatan Saluran lebar >2 m (Excavator Standard)
TM.07 Pengerukan Lumpur/Sedimen di Sungai Menggunakan Kapal Keruk

A.2 Pekerjaan pasangan (Normatif)


A.2.1 Koefisien untuk analisis harga satuan Pekerjaan pasangan (Normatif)
P.01 Pasangan batu dengan mortar jenis PC-PP (1 m3)
P.01.a Mortar tipe M (setara campuran 1 PC:2 PP)
P.01.a.1) Manual
P.01.a.2) Menggunakan molen
P.01.b Mortar tipe S (setara campuran 1 PC:3 PP)
P.01.b.1) Manual
P.01.b.2) Menggunakan molen
P.01.c Mortar tipe N (setara campuran 1 PC:4 PP)
P.01.c.1) Manual
P.01.c.2) Menggunakan molen
P.01.d Mortar tipe O (setara campuran 1 PC:5 PP)
P.01.d.1) Manual
P.01.d.2) Menggunakan molen
P.01.e Bongkar dan pemanfaatan batu bekas pasangan
P.01.e.1) Bongkar 1 m3 pasangan batu dan pembersihan batu (manual)
P.01.e.2) Bongkar 1 m3 pasangan batu (manual)
P.01.e.3) Bongkar 1 m3 pasangan batu dengan jack hammer
P.01.e.4) Pembersihan 1 m3 bongkaran pasangan batu untuk pemanfaa
P.01.e.5) 1 m3 batu dari bekas bongkaran pasangan batu **)
P.02 1 m3 pasangan bata merah
P.02.a Mortar tipe M (setara campuran 1 PC:2 PP)
P.02.a.1) Manual
P.02.a.2) Menggunakan molen
P.02.b Mortar tipe S (setara campuran 1 PC:3 PP)
P.02.b.1) Manual
P.02.b.2) Menggunakan molen
P.02.c Mortar tipe N (setara campuran 1 PC:4 PP)
P.02.c.1) Manual
P.02.c.2) Menggunakan molen
P.02.d Mortar tipe O (setara campuran 1 PC:5 PP)
P.02.d.1) Manual
P.02.d.2) Menggunakan molen
P.02.e Mortar campuran 1 PC:6 PP
P.02.e.1) Manual
P.02.e.2) Menggunakan molen
P.02.f Bongkar 1 m3 pasangan bata merah
P.02.f.1) Manual
P.02.f.2) Bongkar 1 m3 pasangan bata merah dengan jack hammer
P.03 1 m2 Pekerjaan siaran dengan mortar jenis PC-PP
P.03.a Siaran dengan mortar tipe M (setara campuran 1 PC:2 PP)
P.03.b Siaran dengan mortar tipe S (setara campuran 1 PC:3 PP)
P.04 1 m2 Pekerjaan plesteran dengan mortar jenis PC-PP (1 m2)
P.04.a Trasraam tebal 1 cm, dengan mortar tipe M (setara campuran 1 PC:2 PP)
P.04.b Plesteran tebal 1 cm, dengan mortar tipe S (setara campuran 1 PC:3 PP)
P.04.c Plesteran tebal 1 cm, dengan mortar tipe N (setara campuran 1 PC:4 PP)
P.04.d Trasraam tebal 1,5 cm, dengan mortar tipe M (setara campuran 1 PC:2 PP)
P.04.e Plesteran tebal 1,5 cm, dengan mortar tipe S (setara campuran 1 PC:3 PP)
P.04.f Plesteran tebal 1,5 cm, dengan mortar tipe N (setara campuran 1 PC:4 PP)
P.04.g 1 m2 pekerjaan acian
P.05 1 m3 pasangan batu kosong*
P.06 Pasangan batu bronjong kawat (SNI 03-0090-1999)
P.06.a 1 m3 pasangan batu bronjong kawat Bentuk I
P.06.a.1) Bentuk I, Tipe A bronjong kawat ukuran L=2,0 m x B=1,0 m x T
P.06.a.1) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.1) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.1) c) Kawat bronjong wire mesh ø 5 mm ulir, dan ka
P.06.a.2) Bentuk I, Tipe B bronjong kawat ukuran L=3,0 m x B=1,0 m x T
P.06.a.2) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.2) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.2) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat
P.06.a.3) Bentuk I, Tipe C bronjong kawat ukuran L = 4,0 m x B = 1,0 m
P.06.a.3) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.3) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.3) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat
P.06.a.4) Bentuk I, Tipe D bronjong kawat ukuran L=2,0 m x B=1,0 m x
P.06.a.4) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.4) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.4) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat
P.06.a.5) Bentuk I, Tipe E bronjong kawat ukuran L=3,0 m x B=1,0 m x T
P.06.a.5) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.5) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.5) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat
P.06.a.6) Bentuk I, Tipe F Bronjong kawat ukuran L = 4,0 m x B = 1,0 m
P.06.a.6) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.6) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.a.6) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat
P.06.a.7) Pasangan bronjong pabrikasi (tenaga kerja untuk 1m3 ba
P.06.b 1 m3 Pasangan bronjong kawat Bentuk II
P.06.b.1) Bentuk II, Tipe G bronjong kawat ukuran L = 6,0 m x B = 2,0 m
P.06.b.1) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.b.1) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.b.2) Bentuk II, Tipe H bronjong kawat ukuran L = 6,0 m x B = 2,0 m
P.06.b.2) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.b.2) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.b.3) Bentuk II, Tipe I bronjong kawat ukuran L = 6,0 m x B = 2,0 m
P.06.b.3) a) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.b.3) b) Kawat bronjong galvanis kawat anyaman 3 lilit
P.06.b.4) Pasangan bronjong pabrikasi (tenaga kerja untuk 1 m3 batu b
P.07 Cerucuk dan pemasangan modul bronjong
P.07.a 1 m’ panjang cerucuk kayu atau dolken ø 8 - 10 cm
P.07.b 1 m panjang cerucuk bambu ø 8 cm - 10 cm
P.07.c 1 m panjang cerucuk tiang beton ø 10 cm - 15 cm
P.07.d 1 m3 Pemasangan modul bronjong kawat menjadi struktur krib sungai
P.08 1 m2 Pasangan batu muka dan batu candi
P.08.a 1 m2 Pasangan batu muka
P.08.b 1 m2 Pasangan batu candi
P.09 1 m2 Pasangan geotekstil
P.09.a 1 m2 Pemasangan geotekstil, Tipe-A, tipis
P.09.b 1 m2 Pemasangan geotekstil, Tipe-B, tebal sedang
P.09.c 1 m2 Pemasangan geotekstil, Tipe-C, tebal
P.10 Pasangan bar screen (saringan kasar) bangunan intake, pengukur, dan pengatur 1 buah pa
P.11 1 buah pasangan ambang ukur pada bangunan pengukur dan/atau pengatur
P.12 1 m2 pasangan lempengan rumput
P.12.a Penanaman rumput lempengan
P.12.b Pembabadan rumput
P.12.b.1) Secara manual
P.12.b.1)a) Perhitungan secara umum (jika tidak diketahui
P.12.b.1)b) Perhitungan secara detail (jika diketahui kondis
P.
P.
P.
P.
P.
P.12.b.2) Secara semi mekanis
P.12.b.2)a) Perhitungan secara umum (jika tidak diketahui
P.12.b.2)b) Perhitungan secara detail (jika diketahui
P.
P.
P.
P.
P.
P.13 Pekerjaan pantai
P.13.a Penanaman 1 pohon bakau
P.13.b Matras bambu
P.14 Pasangan armor
P.14.a Pembuatan 1 buah kubus beton ukuran 30 cm x 30 cm x 30 cm
P.14.b Pembuatan 1 buah kubus beton ukuran 40 cm x 40 cm x 40 cm
P.14.c Pembuatan 1 buah 3B: blok beton bergigi
P.14.d Pembuatan 1 buah blok beton berat 0,5 ton quadripod, tetrapod, dolos, triba
P.14.e Pembuatan 1 buah blok beton berat 0,75 ton quadripod, tetrapod, dolos
P.14.f Pembuatan blok beton berat 1,0 ton quadripod, tetrapod, dolos, tribar dan la
P.14.g Pembuatan 1 buah blok beton berat 1,5 ton quadripod, tetrapod, dolos, triba
P.14.h Pembuatan 1 buah blok beton berat 2,0 ton quadripod, tetrapod, dolos, triba
P.14.i Pembuatan 1 buah blok beton berat 2,5 ton quadripod, tetrapod, dolos, triba
P.14.j Pemasangan 1 m3 berbagai jenis armor
P.14.k 1 m3 pasangan batu 1 kg - 3 kg, void maksimum 15%
P.14.l 1 m3 pasangan batu 3 kg - 5 kg, void maksimum 15%
P.14.m 1 m3 pasangan batu 5 kg - 10 kg, void maksimum 20%
P.14.n 1 m3 pasangan batu 10 kg - 30 kg, void maksimum 20%
P.14.o 1 m3 pasangan batu 30 kg - 50 kg, void maksimum 25%
P.14.p 1 m3 pasangan batu 50 kg - 100 kg, void maksimum 25%
P.14.q 1 m3 pasangan batu 100 kg - 200 kg, void maksimum 30%
P.14.r 1 m3 pasangan batu 200 kg - 300 kg, void maksimum 30%
P.14.s 1 m3 pasangan batu 300 kg - 400 kg, void maksimum 30%
P.14.t 1 m3 pasangan batu 400 kg - 500 kg, void maksimum 35%
P.14.u 1 m3 pasangan batu 200 kg - 500 kg, void maksimum 32%
P.14.v 1 m3 pasangan batu 500 kg - 650 kg, void maksimum 35%
P.14.w 1 m3 pasangan batu 650 kg - 800 kg, void maksimum 35%
P.15 Struktur krib laut
P.15.a 1 Buah buis beton diangkut < 30 m dan dipasang untuk konstruksi pengama
P.15.b Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton f'c = 7
P.16 1 m’ pasangan pipa suling-suling
P.17 1 m' peilskaal/mistar duga muka air (diambil dari AHSP Hidrologi)
A.3 Pekerjaan beton (Normatif)
A.3.1 Koefisien untuk analisis harga satuan pekerjaan pembuatan beton
B.01 1 m³ beton untuk lantai kerja (bedding)
B.01.a Tipe-1: menggunakan campuran beton tumbuk fc' = 1,8 s.d 3,7 (B0: K-40 s.d
B.01.b Tipe-2: menggunakan campuran beton fc' = 5,6 s.d 7,4 Mpa (K-80 s.d. K-100
B.01.c Tipe-3: menggunakan campuran beton fc' ~ 7,4 MPa (K-100) atau setara 1P
B.02 1 m³ beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87
B.02.a Manual
B.02.b Menggunakan molen
B.03 1 m³ Beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78
B.03.a Manual
B.03.b Menggunakan molen
B.04 1 m³ Beton mutu, f’c = 12,2 MPa (K150), slump (12±2) cm, w/c = 0,72
B.04.a Manual
B.04.b Menggunakan molen
B.05 1 m³ beton mutu f’c=14,5 MPa (K175), slump (12±2) cm, w/c = 0,66
B.05.a Manual
B.05.b Menggunakan molen
B.06 1 m³ Beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c = 0,61
B.06.a Manual
B.06.b Menggunakan molen
B.07 1 m³ Beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58
B.07.a Manual
B.07.b Menggunakan molen
B.08 1 m³ Beton mutu, f’c = 21,7 MPa (K250) kedap air,slump (12±2) cm, w/c = 0,56
B.08.a Manual
B.08.b Menggunakan molen
B.09 1 m³ Beton mutu, f’c = 24,0 MPa (K275) kedap air, slump (12±2) cm, w/c = 0,53
B.09.a Manual
B.09.b Menggunakan molen
B.10 1 m³ Beton mutu, f’c = 26,4 MPa (K300) kedap air, slump (12±2)cm, w/c = 0,52 (kedap air)
B.10.a Manual
B.10.b Menggunakan molen
B.11 1 m³ Beton mutu, f’c = 28,8 MPa, (K325) kedap air, slump (12±2) cm, w/c = 0,49 (kedap air)
B.11.a Manual
B.11.b Menggunakan molen
B.12 1 m³ Beton mutu, f’c = 31,2 MPa, (K350) kedap air , slump (12±2) cm, w/c = 0,48 (kedap air
B.12.a Manual
B.12.b Menggunakan molen
B.13 1 m³ Beton menggunakan Ready Mixed dan bahan aditif
B.13.a 1 m³ Beton menggunakan Ready Mixed dan pompa beton
B.13.b 1 m³ beton menggunakan bahan aditif
A.3.2 Penambahan koefisien tenaga kerja dan/atau peralatan
B.14 Mengangkut/menaikan campuran beton dengan jarak > 5 m
B.14.a 1 m³ beton dicorkan pada tapak berjarak < 25 m dengan beda tinggi < 1 m
B.14.a.1) Manual
B.14.b 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m
B.14.b.1) Manual
B.14.b.2) Menggunakan pompa beton
B.15 1 m3 Pemadatan beton pada saat mengecor
B.15.a Vibrator
B.15.b Manual (menggunakan penusuk besi beton)
B.16 1 m3 beton dicorkan pada tapak setiap kenaikan 4 m (vertikal)
B.16.a Manual
B.16.b Menggunakan pompa beton
A.3.3 Koefisien untuk analisa harga satuan pekerjaan pembesian beton
B.17 Pembesian 100 kg dengan besi polos atau ulir
B.17.a Untuk pembesian pelat
B.17.b Untuk pembesian kolom, balok, ring balk dan sloof
B.18 Pembesian 100 kg jaring kawat (Wiremesh) untuk pelat atau dinding
B.19 Pembesian 100 kg kabel prestressed polos/strand
B.20 Mengangkut/menaikkan 100 kg tulangan setiap kenaikan vertikal 4 m atau jarak horizontal s
B.20.a Manual (kenaikan 4 m)
B.20.b Mekanis (penambahan jarak horizontal 10 m s.d 25 m)
B.20.c Mekanis (setiap penambahan jarak horizontal 25 m)
B.20.d Mekanis (setiap kenaikan 4 m)
A.3.4 Koefisien untuk analisa harga satuan pekerjaan pembuatan/penyediaan bekisting beton
B.21 Bekisting lantai
B.21.a 1 m² bekisting lantai beton expose dengan multiflex 18 mm (TP)
B.21.b 1 m² bekisting lantai beton biasa dengan multiflex 12 mm atau 18 mm (TP)
B.21.c 1 m² bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP)
B.21.d 1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT
B.21.e 1 m2 perancah bekisting lantai menggunakan dolken ø 8-10 cm, tinggi 4 m, J
B.21.f 1 m2 perancah bekisting lantai menggunakan bambu ø 8-10 cm, tinggi 4 m,
B.22 Floordeck
B.22.a 1 m2 Bekisting lantai Floordeck tipe pelat (JAP < 0,6 m)
B.22.b 1 m2 Bekisting lantai Floordeck tipe pelat (JAP < 0,8 m)
B.22.c 1 m2 bekisting lantai Floordeck tipe balok T (JAP < 1,2 m)
B.22.d 1 m2 bekisting lantai dengan Floordeck tipe balok T (JAP < 2,0 m)
B.23 Bekisting balok
B.23.a 1m2 Bekisting balok beton expose menggunakan multiflex 18 mm, JAT < 1,0
B.23.b 1 m2 Bekisting balok beton biasa menggunakan multiflex 12 mm atau 18 mm
B.23.c 1 m2 Bekisting balok beton biasa menggunakan kayu papan 3/20 cm (TP)
B.23.d 1 m2 perancah bekisting balok menggunakan Kaso 5/7, tinggi 4 m dan JAT <
B.23.e 1 m2 Perancah bekisting balok menggunakan dolken ø 8-10 cm, tinggi 4 m**
B.23.f 1 m2 Perancah bekisting balok beton menggunakan bamboo ø 8-10 cm, ting
B.24 Bekisting kolom
B.24.a 1 m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP)
B.24.b 1 m2 Bekisting kolom beton biasa menggunakan multiflex 12mm atau 18 mm
B.24.c 1 m2 Bekisting kolom beton biasa menggunakan kayu papan 3/20 cm (TP)
B.24.d 1 m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm, tinggi 4 m
B.24.e 1 m2 Perancah bekisting kolom beton dengan kayu dolken ø 8 -10 cm, tingg
B.24.f 1 m2 perancah bekisting kolom beton dengan bambu ø 8-10 cm, tinggi 4 m,
B.25 Bekisting Dinding
B.25.a 1 m2 Bekisting dinding beton expose dengan multiflex 18 mm
B.25.b 1 m2 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm (TP
B.25.c 1 m2 Bekisting dinding beton biasa menggunakan kayu papan 3/20 cm
B.25.d 1 m2 Perancah/penyokong bekisting dinding beton menggunakan kayu 5/7,
B.25.e 1 m2 Perancah/penyokong bekisting dinding beton menggunakan kayu 8/12
B.26 Bekisting fondasi dan sloof
B.26.a 1 m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm
B.26.b 1 m2 Bekisting fondasi dan sloof beton biasa menggunakan papan 3/20 cm
B.26.c 1 m2 Perancah/penyokong bekisting sloof dan fondasi beton menggunakan
B.27 Bongkar Bekisting
B.27.a Bongkar 1m2 Bekisting secara biasa (membersihkan dan membereskan puin
B.27.b Bongkar 1 m² bekisting secara hati-hati (dan membereskan puing) *)
A.3.5 Koefisien untuk AHSP pelaksanaan curing
B.28 Pelaksanaan Curring Beton
B.28.a Menggenangi 100 m² permukaan beton dengan air
B.28.b Menyirami 100 m² permukaan beton menggunakan media terpal selama
B.28.c Menyirami 100 m² permukaan beton menggunakan media karung goni selam
B.28.d Curing dengan steam (uap)
A.3.6 Pembongkaran konstruksi beton
B.29 Pembongkaran konstruksi beton
B.29.a Bongkar 1 m3 beton secara konvensional
B.29.b Bongkar 1 m3 beton dengan jack hammer
B.30 Pemasangan waterstop
B.30.a 1 m’ pasangan water stop PVC lebar 150 mm
B.30.b 1 m’ pasangan water stop PVC lebar 200 mm
B.30.c 1 m’ pasangan water stop PVC lebar 230 mm - 320 mm
B.30.d 1 m’ pasangan water stop rubber lebar 150 mm - 200 mm
A.4 Pekerjaan pemancangan manual (Normatif)
A.4.1 AHSP pemancangan secara manual (tanpa mesin) menggunakan tripod dan Hammer
F.01 Per-m' penetrasi tiang pancang kayu gelondongan ø 15 - 20 cm
F.02 Per-m' penetrasi tiang pancang kayu atau dolken ø 8-10 cm
F.03 Per-m’ penetrasi tiang pancang baja pipa ø 30 cm atau kotak 30 x 30 cm
F.04 Tiang pancang beton bertulang
F.04.a Per-m’ penetrasi tiang pancang beton kotak 20 cm x 20 cm
F.04.b Per-m' penetrasi tiang pancang beton kotak 25 x 25 cm
F.04.c Per-m' penetrasi tiang pancang beton kotak 30 x 30 cm
F.04.d Per-m' penetrasi tiang pancang beton ø 40 atau kotak 40 x 40 cm
F.04.e Per-m' penetrasi tiang pancang (hollow) beton ø 40 cm
F.05 Turap Kayu
F.05.a Per m' penetrasi untuk 1 m’ lebar turap (10-12,5 buah) dolken ø8-10
F.05.b Per-m' penetrasi untuk 1 m' lebar turap kayu (10 buah) papan (2-3)/10 cm
F.05.c Per-m' penetrasi untuk 1 m' lebar turap (5 buah) kayu papan (2-3)/20 cm
F.05.d Per-m' penetrasi untuk 1 m' lebar turap (4 buah) kayu papan (2-3)/25 cm
F.05.e Per-m' penetrasi untuk 1 m' lebar turap (3,33 buah) kayu papan (2-3)/30 cm
F.05.f Per-m' penetrasi untuk 1 m' lebar turap (14 buah) kayu kaso 5/7 tebal 5 cm
F.05.g Per-m' penetrasi untuk 1 m' lebar turap (20 buah) kayu kaso 5/7 tebal 7 cm
F.05.h Per-m' penetrasi untuk 1 m' lebar turap (8 buah) kayu balok 8/12 tebal 8 cm
F.05.i Per-m' penetrasi untuk 1 m' lebar (12,5 buah) turap kayu balok 8/12 tebal 12
F.06 Turap Baja
F.06.a Per-m' penetrasi (1 buah) turap baja profil Larsen lebar 350 mm
F.06.b Per-m' penetrasi untuk 1 m' lebar turap (7 buah) baja profil INP-8 + UNP-8
F.06.c Per-m' penetrasi untuk 1 m' lebar turap (5,56 buah) baja profil INP-10 + UNP
F.07 Turap Beton Pre-cast
F.07.a Per-m' penetrasi 1 buah turap beton pre-cast 12 x 30 cm
F.07.b Per-m' penetrasi 1 buah turap beton pre-cast 15 x 40 cm
F.07.c Per-m' penetrasi 1 buah turap beton pre-cast 22 x 50 cm
A.4.2 AHSP pemancangan secara mekanis
TM.05 Pemancangan secara mekanis
TM.05.1 Tiang pancang Kayu Gelondongan ø 15 - 20 cm
TM.05.2.a Tiang Pancang Beton kotak 20 x 20 cm
TM.05.2.b Per-m' penetrasi tiang pancang baja ø 20 cm atau kotak 20 x 20
TM.05.2.c Per-m' penetrasi tiang pancang Baja ø 30 cm atau kotak 30 x 30
TM.05.3.a Per-m' penetrasi tiang pancang beton ø 20 cm /kotak 20 x 20
TM.05.3.b Per-m' penetrasi tiang pancang beton ø 25 cm atau kotak 25 x 25
TM.05.3.c Per-m' penetrasi tiang pancang beton ø 30 cm / kotak 30 x 30
TM.05.3.d Per-m' penetrasi pancang beton ø 40 cm atau kotak 40 x 40
TM.05.3.e Per-m' penetrasi tiang pancang beton hollow ø 40 cm
A.5 Pekerjaan Dewatering (Normatif)
A.5.1 AHSP Pekerjaan Dewatering (Normatif)
D.01 Kistdam pasir/tanah
D.01.a 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm
D.01.b 1 buah kistdam pasir/tanah dibungkus karung plastik/bagor/goni atau terpal u
D.01.c 1 Buah geobag pasir/tanah ukuran 145 x 240 cm
D.02 Kerangka kayu untuk 1 m3 kistdam pasir/tanah ukuran 43 cm x 65 cm
D.03 Kerangka baja profil L.50.50.5 atau L.60.60.6 atau profil besi berlubang untuk 1 m3 kis
D.04 Pengoperasian per-jam pompa air diesel daya 5 kW dengan suction head maks. 3 m dan di
D.05 Pengoperasian per-jam pompa air diesel daya 10 kW dengan suction head maksimal 3 m d
D.06 Pengoperasian per-jam pompa air diesel daya 20 kW dengan suction head maksimal 3 m d
A.6 Pekerjaan pintu air (Normatif)
A.6.1 Biaya pemasangan (jika harga pintu air belum termasuk harga pemasangan)
H.01 Pintu angkat
H.01.a Pintu angkat Lebar B=200 mm; H=250 mm; H1=500 mm dan TR=1050 mm.
H.02 Pintu sorong kayu
H.02.a Pintu sorong kayu Lebar B = 1500 mm; H = 1500 mm; H1 = 3000 mm dan TR
H.03 Pintu sorong baja
H.03.a Pintu sorong baja Lebar B = 500 mm; H = 500 mm; H1 = 1000 mm dan TR =
A.6.2 Biaya OP untuk pelumasan pintu air
H.04 AHSP pelumasan pintu air (pelaksanaan pelumasan dilakukan setiap 2 minggu sekali atau
H.04.a Pintu angkat
H.04.b Pintu sorong kayu dengan roda gigi
H.04.b.1) Stang tunggal < 1 m
H.04.b.2) Stang Double < 1 m
H.04.b.3) Stang tunggal 1 - 2 m
H.04.b.4) Stang Double 1 - 2 m
H.04.b.5) Stang tunggal > 2 m
H.04.b.6) Stang Double > 2 m
H.04.c Pintu sorong baja dengan roda gigi
H.04.c.1) Stang tunggal < 1 m
H.04.c.2) Stang Double < 1 m
H.04.c.3) Stang tunggal 1 - 2 m
H.04.c.4) Stang Double 1 - 2 m
H.04.c.5) Stang tunggal > 2 m
H.04.c.6) Stang Double > 2 m
A.7 Pekerjaan air tanah (Informatif)
A.7.1 AHSP Pekerjaan Air Tanah (Informatif)
AT.01 1 m' pengambilan dan deskripsi sampel batuan (dalam laporan)
AT.02 1 m' pengeboran ø 8 3/4"
AT.03 1 m' reaming ø 8 3/4" - 12"
AT.04 1 m' reaming ø 8 3/4" - 14 3/4"
AT.05 Bongkar pasang temporary cassing (ID) 12"
AT.06 Bongkar pasang temporary cassing (ID) 17"
AT.07 1 m' pengadaan dan pemasangan cassing pipa black steel 6"
AT.08 1 m' pengadaan dan pemasangan LC screen 6"
AT.09 1 m' pengadaan dan pemasangan cassing pipa black steel 8"
AT.10 1 m' pengadaan dan pemasangan LC screen 8"
AT.11 1 m' pengadaan dan pemasangan pipa sounding PVC 1"
AT.12 1 m3 pengadaan dan pemasangan gravel pack
AT.13 1 jam pencucian sumur*)
AT.14 1 jam uji pemompaan*)
AT.15 1 lokasi pasang dan bongkar peralatan uji pemompaan
AT.16 Sampling 1 sampel analisa kualitas air
AT.17 1 buah Patok sumur
AT.18 1 Titik Electric Logging
A.8 Pekerjaan lain-lain (Normatif/Informatif)
A.8.1 AHSP Pekerjaan lain-lain (Normatif/Informatif)
LA.01 Pemagaran daerah kerja
LA.01.a Rangka baja L.40.40.4
LA.01.b Rangka kayu
LA.02 Pembuatan direksi keet, los kerja dan gudang
LA.03 Pembuatan papan nama pekerjaan
LA.03.a 1 Buah papan nama pekerjaan menggunakan multiflex 18 mm, frame besi si
LA.03.b 1 Buah papan nama pekerjaan menggunakan multiflex 10 mm, frame allumu
LA.04 Mobilisasi
LA.04.a Investigasi lapangan
LA.04.b Sewa lahan
LA.04.c Fasilitas
LA.04.d Kebutuhan lain-lain
LA.05 Foto dokumentasi
LA.05.a 1 Set foto dokumentasi menggunakan kamera (jika menggunakan kamera de
LA.05.b 1 Set foto dokumentasi menggunakan kamera digital tanpa film (jika menggu
LA.06 Test bahan dan pengujian mutu pekerjaan
LA.07 Penggambaran
LA.07.a Penggambaran dengan CAD untuk 1 buah gambar (file autocad) layout, tam
LA.07.b Penggambaran secara manual untuk 1 lembar gambar layout, tampak, poto
LA.07.c Pencetakan 1 lembar gambar layout, tampak, potongan dan detail untuk
LA.08 Copy atau penggandaan buku/kontrak/laporan
LA.08.a Foto copy dan jilid
LA.08.b 1 Set as built drawing (reduce dan copy kalkir serta blue/black print)
LA.09 1 m2 Pengangkatan gulma dan/atau sampah apung
LA.09.a Secara manual
LA.09.b Secara mekanis
LA.10 1 m3 Pengangkatan gulma padat, ketebalan 25 cm
LA.10.a Secara manual
LA.10.b Secara mekanis
LA.11 Pekerjaan Kayu
LA.11.a Secara Manual
LA.11.a.1) 1 m2 Pekerjaan serutan papan atau balok kayu (Manual)
LA.11.a.2) 1 m2 Membuat pasangan/konstruksi kayu dari bahan baku pa
LA.11.a.3) 1 m' Pembuatan Profil pada sudut kayu dengan alat serutan p
LA.11.a.4) 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku ba
LA.11.a.5) 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku ba
LA.11.b Secara Semi Mekanis
LA.11.b.1) 1 m2 Pekerjaan serutan papan atau balok kayu (Semi Mekani
LA.11.b.2) 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku pa
LA.12 Pekerjaan logam besi atau baja
LA.12.a Pemasangan 1 kg besi profil Siku, IWF, INP, UNP
LA.12.b Pengerjaan 100 kg pekerjaan perakitan konstruksi besi/baja
LA.12.c Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
LA.12.d Pengerjaan 10 cm pengelasan dengan las listrik
UKSI BIDANG SUMBER DAYA AIR

Uraian Pekerjaan Harga Satuan

m, Lb = 150 cm, Tp = 100 cm. 4,998,493.00 M'


m, Lb = 130 cm, Tp = 80 cm. 3,544,230.00 M'
m, Lb = 120 cm, Tp = 60 cm. 2,609,717.00 M'
m, Lb = 110 cm, Tp = 50 cm. 2,260,838.00 M'

m, Lb = 150 cm, Tp = 100 cm. 5,937,931.00 M'


m, Lb = 130 cm, Tp = 80 cm. 4,205,861.00 M'
m, Lb = 120 cm, Tp = 60 cm. 2,832,722.00 M'
m, Lb = 110 cm, Tp = 50 cm. 2,688,062.00 M'

m, Lb = 150 cm, Tp = 100 cm. 6,411,888.00 M'


m, Lb = 130 cm, Tp = 80 cm. 4,533,704.00 M'
m, Lb = 120 cm, Tp = 60 cm. 3,493,615.33 M'
m, Lb = 110 cm, Tp = 50 cm. 2,973,571.00 M'

m, Lb = 150 cm, Tp = 100 cm. 5,118,342.00 M'


m, Lb = 130 cm, Tp = 80 cm. 3,614,057.00 M'
m, Lb = 120 cm, Tp = 60 cm. 2,787,199.67 M'
m, Lb = 110 cm, Tp = 50 cm. 2,373,771.00 M'

m, Lb = 150 cm, Tp = 100 cm. 5,304,578.00 M'


m, Lb = 130 cm, Tp = 80 cm. 3,759,279.00 M'
m, Lb = 120 cm, Tp = 60 cm. 2,756,978.00 M'
m, Lb = 110 cm, Tp = 50 cm. 2,391,668.00 M'

m, Lb = 150 cm, Tp = 100 cm. 5,349,994.00 M'


m, Lb = 130 cm, Tp = 80 cm. 3,766,145.00 M'
m, Lb = 120 cm, Tp = 60 cm. 2,667,622.00 M'
m, Lb = 110 cm, Tp = 50 cm. 2,350,154.00 M'

m, Lb = 150 cm, Tp = 100 cm. 5,937,931.00 M'


m, Lb = 130 cm, Tp = 80 cm. 4,205,861.00 M'
m, Lb = 120 cm, Tp = 60 cm. 2,832,722.00 M'
m, Lb = 110 cm, Tp = 50 cm. 2,688,062.00 M'

43,668,047.00 Unit
23,669,099.00 Unit

48,266,978.00 Unit
38,541,262.00 Unit

39,643,773.00 Unit
30,623,294.00 Unit

40,899,563.00 Unit
32,020,463.00 Unit

bar kurang lebih 20 m, kedalaman kurang lebih 2 m 1,392,105.00 M' Ponton+Long arm
bar kurang lebih 15 m, kedalaman kurang lebih 2 m 759,356.00 M' Long arm di darat
bar kurang lebih 10 m, kedalaman kurang lebih 2 m 462,257.00 M' Long arm di darat
bar kurang lebih 8 m, kedalaman kurang lebih 2 m 364,521.00 M' Long arm di darat
bar kurang lebih 6 m, kedalaman kurang lebih 2 m 279,769.00 M' standard
bar kurang lebih 4 m, kedalaman kurang lebih 2 m 299,400.00 M' standard
bar kurang lebih 3,5 m, kedalaman kurang lebih 2 m 256,723.00 M' standard
bar kurang lebih 3 m, kedalaman kurang lebih 2 m 180,235.00 M' mini
1,104,742,000.00 KM

bar kurang lebih 20 m, kedalaman kurang lebih 2 m 1,412,986.58 M'


bar kurang lebih 15 m, kedalaman kurang lebih 2 m 770,746.34 M'
bar kurang lebih 10 m, kedalaman kurang lebih 2 m 469,190.86 M'
bar kurang lebih 8 m, kedalaman kurang lebih 2 m 369,988.82 M'
bar kurang lebih 6 m, kedalaman kurang lebih 2 m 283,965.54 M'
bar kurang lebih 4 m, kedalaman kurang lebih 2 m 303,891.00 M'
bar kurang lebih 3,5 m, kedalaman kurang lebih 2 m 260,573.85 M'
bar kurang lebih 3 m, kedalaman kurang lebih 2 m 182,938.53 M'
1,121,313,130.00 KM

bar kurang lebih 20 m, kedalaman kurang lebih 2 m 1,378,183.95 M'


bar kurang lebih 15 m, kedalaman kurang lebih 2 m 751,762.44 M'
bar kurang lebih 10 m, kedalaman kurang lebih 2 m 457,634.43 M'
bar kurang lebih 8 m, kedalaman kurang lebih 2 m 360,875.79 M'
bar kurang lebih 6 m, kedalaman kurang lebih 2 m 276,971.31 M'
bar kurang lebih 4 m, kedalaman kurang lebih 2 m 296,406.00 M'
bar kurang lebih 3,5 m, kedalaman kurang lebih 2 m 254,155.77 M'
bar kurang lebih 3 m, kedalaman kurang lebih 2 m 178,432.65 M'
1,093,694,580.00 KM

bar kurang lebih 20 m, kedalaman kurang lebih 2 m 1,392,105.00 M' Ponton+Long arm
bar kurang lebih 15 m, kedalaman kurang lebih 2 m 759,356.00 M' Long arm di darat
bar kurang lebih 10 m, kedalaman kurang lebih 2 m 462,257.00 M' Long arm di darat
bar kurang lebih 8 m, kedalaman kurang lebih 2 m 364,521.00 M' Long arm di darat
bar kurang lebih 6 m, kedalaman kurang lebih 2 m 279,769.00 M' standard
bar kurang lebih 4 m, kedalaman kurang lebih 2 m 299,400.00 M' standard
bar kurang lebih 3,5 m, kedalaman kurang lebih 2 m 256,723.00 M' standard
bar kurang lebih 3 m, kedalaman kurang lebih 2 m 180,235.00 M' mini
1,104,742,000.00 KM

apesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m 3,738,254.00 M'


apesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m 3,560,951.00 M'
apesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m 3,228,004.00 M'
apesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m 3,071,470.00 M'
apesium, Ukuran La = 1,9 m, Lb = 0,6 m, T = 0,65 m 2,826,729.00 M'
apesium, Ukuran La = 2,5 m, Lb = 1,5 m, T = 0,5 m 3,502,140.00 M'
apesium, Ukuran La = 2,4 m, Lb = 1,2 m, T = 0,5 m 3,324,837.00 M'
apesium, Ukuran La = 2,0 m, Lb = 1,0 m, T = 0,5 m 2,991,891.00 M'
apesium, Ukuran La = 1,8 m, Lb = 0,8 m, T = 0,5 m 2,835,356.00 M'
apesium, Ukuran La = 1,6 m, Lb = 0,6 m, T = 0,5 m 2,590,616.00 M'
egiempat, Ukuran L = 1,2 m, T = 1,2 m 4,541,580.00 M'
egiempat, Ukuran L = 1,0 m, T = 1,0 m 4,114,854.00 M'
egiempat, Ukuran L = 0,8 m, T = 0,8 m 3,708,824.00 M'
egiempat, Ukuran L = 0,7 m, T = 0,75 m 3,298,027.00 M'
egiempat, Ukuran L = 0,6 m, T = 0,5 m 2,559,750.00 M'
m, kedalaman kurang lebih 1,5 m 761,306.00 M'
m, kedalaman kurang lebih 1,5 m 620,045.00 M'
m, kedalaman kurang lebih 1,5 m 482,034.00 M'
m, kedalaman kurang lebih 1,5 m 328,689.00 M'
5 m, kedalaman kurang lebih 1,5 m 271,185.00 M'
m, kedalaman kurang lebih 1,5 m 137,898.00 M'
m, kedalaman kurang lebih 1,5 m 71,228.00 M'
m, kedalaman kurang lebih 1,5 m 58,570.00 M'
Permukaan 86,806,405.00 Unit
96,710,198.00 Unit
120,268,997.00 Unit

apesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m 3,991,726.00


apesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m 3,929,052.00
apesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m 3,422,491.00
apesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m 3,322,060.00

apesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m 3,166,656.00


apesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m 3,147,568.00
apesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m 2,625,169.00
apesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m 2,465,346.00

apesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65 m 3,738,254.00 M'


apesium, Ukuran La = 2,5 m, Lb = 1,2 m, T = 0,65 m 3,560,951.00 M'
apesium, Ukuran La = 2,3 m, Lb = 1,0 m, T = 0,65 m 3,228,004.00 M'
apesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65 m 3,071,470.00 M'
apesium, Ukuran La = 1,9 m, Lb = 0,6 m, T = 0,65 m 2,826,729.00 M'
apesium, Ukuran La = 2,5 m, Lb = 1,5 m, T = 0,5 m 3,502,140.00 M'
apesium, Ukuran La = 2,4 m, Lb = 1,2 m, T = 0,5 m 3,324,837.00 M'
apesium, Ukuran La = 2,0 m, Lb = 1,0 m, T = 0,5 m 2,991,891.00 M'
apesium, Ukuran La = 1,8 m, Lb = 0,8 m, T = 0,5 m 2,835,356.00 M'
apesium, Ukuran La = 1,6 m, Lb = 0,6 m, T = 0,5 m 2,590,616.00 M'
egiempat, Ukuran L = 1,2 m, T = 1,2 m 4,541,580.00 M'
egiempat, Ukuran L = 1,0 m, T = 1,0 m 4,114,854.00 M'
egiempat, Ukuran L = 0,8 m, T = 0,8 m 3,708,824.00 M'
egiempat, Ukuran L = 0,7 m, T = 0,75 m 3,298,027.00 M'
egiempat, Ukuran L = 0,6 m, T = 0,5 m 2,559,750.00 M'
m, kedalaman kurang lebih 1,5 m 761,306.00 M'
m, kedalaman kurang lebih 1,5 m 620,045.00 M'
m, kedalaman kurang lebih 1,5 m 482,034.00 M'
m, kedalaman kurang lebih 1,5 m 328,689.00 M'
5 m, kedalaman kurang lebih 1,5 m 271,185.00 M'
m, kedalaman kurang lebih 1,5 m 137,898.00 M'
m, kedalaman kurang lebih 1,5 m 71,228.00 M'
m, kedalaman kurang lebih 1,5 m 58,570.00 M'

15,751,300.00 M'
15,751,300.00

2,50 m; buis dia. 80, tebal 0,5 m 8,956,100.00 M'


9,735,720.00 M'

2,50 m; buis dia. 80, tebal 0,5 m 8,956,100.00 M'


9,735,720.00 M'

SESUAI PERMEN PU NO. 28/PRT/2016


ekanis (Normatif)
an permukaan tanah
dan striping/kosrekan 9,660.00 M2
berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan ø 12,075.00 M2
hon tanaman keras ø > 15 cm dan membuang sisa tunggul kayu dan aka 32,244.00 bh
ang profil melintang penampang
4,922.00 m'
melintang galian tanah saluran dan pasang bouwplank
ng 1 m' profil melintang galian tanah 42,738.00 m'
ng 1 m' bouwplank 65,496.00

11,241.00 Bh
221,337.01 Bh
391,416.84 Bh

galian tanah biasa sedalam ≤ 1 m 90,643.00 M3


galian tanah biasa sedalam > 1 m s.d. 2 m 108,675.00 M3
galian tanah biasa sedalam > 2 m s.d. 3 m 122,360.00 M3
galian tanah biasa > 3 m, untuk setiap penambahan kedalaman 1 m 12,075.00 M3

galian tanah biasa sedalam ≤ 1 m 40,963.00 M3


galian tanah biasa sedalam > 1 m s.d. 2 m 47,403.00 M3
galian tanah biasa sedalam > 2 m s.d. 3 m 53,843.00 M3
aman yang > 3 m menggunakan AHSP T.06.b.3) + {AHSP T.06.a.4) untu 60,375.00 M3

galian tanah berbatu sedalam ≤ 1 m 217,511.00 M3


galian tanah berbatu sedalam > 1 m s.d. 2 m 241,500.00 M3
galian tanah berbatu sedalam > 2 m s.d. 3 m 265,650.00 M3
galian tanah berbatu > 3 m, untuk setiap penambahan kedalaman 1 m 22,540.00 M3

galian tanah berbatu sedalam ≤ 1 m 83,088.00 M3


galian tanah berbatu sedalam > 1 m s.d. 2 m 95,508.00 M3
galian tanah berbatu sedalam > 2 m s.d. 3 m 102,355.00 M3
aman yang > 3 m menggunakan AHSP T.07.b.3) + {AHSP T.07.a.4) untu 143,629.00 M3

Galian batu sedalam ≤ 1 m 543,858.00 M3


Galian batu sedalam > 1 m s.d. 2 m 603,750.00 M3
Galian batu sedalam > 2 m s.d.3 m 664,125.00 M3
Galian batu > 3 m untuk setiap penambahan kedalaman 1 M 60,375.00 M3

Galian batu sedalam ≤ 1 m 188,716.00 M3


Galian batu sedalam > 1 m s.d. 2 m 220,916.00 M3
Galian batu sedalam > 2 m s.d. 3 m 240,236.00 M3
aman yang > 3 m menggunakan AHSP T.08b.3) + {AHSP T.08a.4) untuk 345,702.00 M3

Galian tanah cadas atau tanah keras sedalam ≤ 1 m 201,250.00 M3


Galian tanah cadas atau tanah keras sedalam > 1 m s.d. 2 m 224,112.00 M3
Galian tanah cadas/tanah keras sedalam > 2 m s.d 3 m 241,500.00 M3
Galian tanah cadas atau tanah keras > 3 m untuk setiap penambahan k 16,100.00 M3

Galian tanah cadas atau tanah keras sedalam ≤ 1 m 65,325.00 M3


Galian tanah cadas atau tanah keras sedalam > 1 m s.d. 2 m 81,425.00 M3
Galian tanah cadas atau tanah keras sedalam > 2 m s.d. 3 m 94,305.00 M3
aman yang > 3 m menggunakan AHSP T.09.b.3) + {AHSP T.09.a.4) untu 126,965.00 M3
Galian lumpur sedalam ≤ 1 m 133,630.00 M3
Galian lumpur sedalam > 1 m s.d. 2 m 161,000.00 M3
Galian lumpur sedalam > 2 m s.d. 3 m 185,150.00 M3
Galian lumpur > 3 m untuk setiap penambahan kedalaman 1 m 24,150.00 M3

Galian lumpur sedalam ≤ 1 m 48,650.00 M3


Galian lumpur sedalam > 1 m s.d. 2 m 55,482.00 M3
Galian lumpur sedalam > 2 m s.d. 3 m 62,177.00 M3
Galian lumpur sedalam > 3 m untuk setiap penambahan kedalaman 1 m 5,889.00 M3

Galian pasir sedalam ≤ 1 m1 106,260.00 M3


Galian pasir sedalam > 1 m s.d. 2 m1 128,800.00 M3
Galian pasir untuk pondasi bangunan sedalam > 2 m s.d. 3 m1 148,120.00 M3
Galian pasir kedalaman >3 m untuk setiap penambahan kedalaman 1 m 16,100.00 M3

Galian pasir sedalam ≤ 1 m1 52,449.00 M3


Galian pasir sedalam > 1 m s.d. 2 m1 59,300.00 M3
Galian pasir sedalam > 2 m s.d. 3 m1 65,042.00 M3
Galian pasir sedalam > 3 m untuk setiap penambahan kedalaman 1 m 5,191.00 M3

n 2-lapis seseg bambu, JAT < 1,0 m' 10,078.00 M2


n papan 3/20, JAT < 1,5 m' 53,902.00 M2
n balok kayu 8/12, tebal 8 cm, JAT 4,0 m' 185,079.00 M2
n balok kayu 8/12, tebal 12 cm, JAT < 6,0 m' 275,294.00 M2

ah atau urugan tanah kembali 53,130.00 M3


89,125.00 M3
ir sebagai bahan pengisi 206,646.00 M3
asir sebagai bahan pengisi 33,350.00 M3
han tanah didatangkan 167,559.98 M3

dan/atau hasil galian untuk jarak horizontal (datar)


angkut 1 m3 material atau hasil galian dengan jarak angkut 5 m 37,076.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 10 m 40,664.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 20 m 47,104.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 30 m 53,222.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 50 m 63,089.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 100 m 89,700.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 200 m 142,025.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 300 m 194,350.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 400 m 246,675.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut 500 m 291,525.00 M3
angkut 1 m3 material atau hasil galian dengan jarak angkut > 500 m un 52,624.00 M3
an/atau hasil galian untuk jarak vertikal menurun
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi 1 m 22,425.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 1 m s. 31,395.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 2 m s. 41,450.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 3 m s. 51,796.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 4 m s. 61,635.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 5 m s. 70,278.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 6 m s. 77,316.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 7 m s. 82,726.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 8 m s. 86,834.00 M3
runkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 9 m s 90,325.00 M3
runkan 1 m3 material atau hasil galian tanah dengan beda tinggi > 10 2,254.00 M3
an/atau hasil galian untuk jarak vertikal naik
ikkan 1 m3 material atau hasil galian tanah sampai beda 1 m 44,850.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 1 m s.d. 2 m 65,605.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 2 m s.d. 3 m 90,252.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 3 m s.d. 4 m 118,105.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 4 m s.d. 5 m 146,648.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 5 m s.d. 6 m 175,030.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 6 m s.d. 7 m 200,882.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 7 m s.d. 8 m 224,940.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 8 m s.d. 9 m 246,560.00 M3
ikkan 1 m3 material atau hasil galian tanah sampai beda > 9 m s.d. 10 m 268,272.00 M3
ikkan 1 m3 material atau hasil galian tanah dengan beda tinggi > 10 m 7,590.00 M3
rial tanah biasa (lepas) kepada jenis material Lain
iaya angkutan dimasukan dalam HSD - bahan (dihitung tanpa Overhead + keuntungan)
Untuk jarak angkut horizontal 100 m
* Tanah gambut 51,054.55 M3
* Agregat kasar 89,345.45 M3
* Agregat halus 92,890.91 M3
* Split/koral/kerikil 88,636.36 M3
* Batu kali 68,781.82 M3
* Batu belah 66,654.55 M3
* Pasir pasang 90,763.64 M3
Pipa Beton (tidak bertulang) umum 140,400.00 M3
Pipa Beton (tidak bertulang) fc'= 12,5 MPa 153,163.64 M3
Pipa Beton (bertulang 155 kg besi/m3) 159,545.45 M3
Kayu 56,727.27 M3
Plastik 48,218.18 M3
PVC 54,245.45 M3
HDPE 51,054.55 M3
GIP 453,818.18 M3
DCIP 453,818.18 M3
Baja Profil 442,472.73 M3
Besi beton 387,163.64 M3
Untuk jarak angkut vertikal turun 3 m
* Tanah gambut 23,592.44 M3
* Agregat kasar 41,286.76 M3
* Agregat halus 42,925.13 M3
* Split/koral/kerikil 40,959.09 M3
* Batu kali 31,784.25 M3
* Batu belah 30,801.24 M3
* Pasir pasang 41,942.11 M3
Pipa Beton (tidak bertulang) umum 64,879.20 M3
Pipa Beton (tidak bertulang) fc'= 12,5 MPa 70,777.31 M3
Pipa Beton (bertulang 155 kg besi/m3) 73,726.36 M3
Kayu 26,213.82 M3
Plastik 22,281.75 M3
PVC 25,066.96 M3
HDPE 23,592.44 M3
GIP 209,710.55 M3
DCIP 209,710.55 M3
Baja Profil 204,467.78 M3
Besi beton 178,909.31 M3
Untuk jarak angkut vertikal naik 3 m
* Tanah gambut 51,368.73 M3
* Agregat kasar 89,895.27 M3
* Agregat halus 93,462.55 M3
* Split/koral/kerikil 89,181.82 M3
* Batu kali 69,205.09 M3
* Batu belah 67,064.73 M3
* Pasir pasang 91,322.18 M3
Pipa Beton (tidak bertulang) umum 141,264.00 M3
Pipa Beton (tidak bertulang) fc'= 12,5 MPa 154,106.18 M3
Pipa Beton (bertulang 155 kg besi/m3) 160,527.27 M3
Kayu 57,076.36 M3
Plastik 48,514.91 M3
PVC 54,579.27 M3
HDPE 51,368.73 M3
GIP 456,610.91 M3
DCIP 456,610.91 M3
Baja Profil 445,195.64 M3
Besi beton 389,546.18 M3
iaya angkutan dipisahkan dari HSD Komponen Pekerjaan Konstruksi - Biaya konstruksi dan biaya Angkut
masing-masing
sudah termasuk Overhead
Untuk jarak + keuntungan
angkut horizontal 100 m
* Tanah gambut 58,712.73 M3
* Agregat kasar 102,747.27 M3
* Agregat halus 106,824.55 M3
* Split/koral/kerikil 101,931.82 M3
* Batu kali 79,099.09 M3
* Batu belah 76,652.73 M3
* Pasir pasang 104,378.18 M3
Pipa Beton (tidak bertulang) umum 161,460.00 M3
Pipa Beton (tidak bertulang) fc'= 12,5 MPa 176,138.18 M3
Pipa Beton (bertulang 155 kg besi/m3) 183,477.27 M3
Kayu 65,236.36 M3
Plastik 55,450.91 M3
PVC 62,382.27 M3
HDPE 58,712.73 M3
GIP 521,890.91 M3
DCIP 521,890.91 M3
Baja Profil 508,843.64 M3
Besi beton 445,238.18 M3
Untuk jarak angkut vertikal turun 3 m
* Tanah gambut 27,130.91 M3
* Agregat kasar 47,479.09 M3
* Agregat halus 49,363.18 M3
* Split/koral/kerikil 47,102.27 M3
* Batu kali 36,551.36 M3
* Batu belah 35,420.91 M3
* Pasir pasang 48,232.73 M3
Pipa Beton (tidak bertulang) umum 74,610.00 M3
Pipa Beton (tidak bertulang) fc'= 12,5 MPa 81,392.73 M3
Pipa Beton (bertulang 155 kg besi/m3) 84,784.09 M3
Kayu 30,145.45 M3
Plastik 25,623.64 M3
PVC 28,826.59 M3
HDPE 27,130.91 M3
GIP 241,163.64 M3
DCIP 241,163.64 M3
Baja Profil 235,134.55 M3
Besi beton 205,742.73 M3
Untuk jarak angkut vertikal naik 3 m
* Tanah gambut 59,074.04 M3
* Agregat kasar 103,379.56 M3
* Agregat halus 107,481.93 M3
* Split/koral/kerikil 102,559.09 M3
* Batu kali 79,585.85 M3
* Batu belah 77,124.44 M3
* Pasir pasang 105,020.51 M3
Pipa Beton (tidak bertulang) umum 162,453.60 M3
Pipa Beton (tidak bertulang) fc'= 12,5 MPa 177,222.11 M3
Pipa Beton (bertulang 155 kg besi/m3) 184,606.36 M3
Kayu 65,637.82 M3
Plastik 55,792.15 M3
PVC 62,766.16 M3
HDPE 59,074.04 M3
GIP 525,102.55 M3
DCIP 525,102.55 M3
Baja Profil 511,974.98 M3
Besi beton 447,978.11 M3

waduk (PC Long arm+Ponton+Buldozer) 159,225.75 M3


terial atau hasil galian dengan ponton 2 (jarak angkut ke tepi 1 km) 31,606.71 M3
terial atau hasil galian dengan ponton 2 (jarak angkut ke tepi 3 km) 71,234.39 M3
terial atau hasil galian dengan ponton 2 (jarak angkut ke tepi 5 km) 106,466.19 M3

ungai secara mekanis M3


anah di sungai menggunakan Excavator (di darat), tanah dibuang keluar 134,130.32 M3
gali tanah di sungai dengan Excavator 31,037.81 M3
ngkut material atau hasil galian sejauh 3 km 86,366.77 M3
Jarak angkut 5 km 76,647.76 M3
Jarak angkut = 10 km 133,302.35 M3
Jarak angkut = 20 km 246,611.53 M3
Jarak angkut = 30 km 359,920.70 M3
unan: Tanah dihampar, diratakan dan dirapihkan menggunakan bulldozer 16,725.74 M3
unan: Agregat dihampar, diratakan dan dirapihkan menggunakan bulldoz 20,705.70 M3
anah di sungai menggunakan Excavator diatas ponton, tanah dibuang ditepian sungai, dirapih M3
Galian dan perapihan posisi dekat (PC standard) 34,081.53 M3
Galian dan perapihan posisi jauh (PC Long arm) 39,963.84 M3
n dan urug posisi jauh (PC Long arm di darat) 30,587.74 M3
galian lintas pulau 379,912.38 M3
menggali Material di BA kemudian hasil galian dari BA dimuat ke DT 36,465.33 M3
atau hasil galian dari Borrow Area (BA) ke pelabuhan terdekat (B), jarak 69,622.19 M3
asil galian dimuatkan ke Tongkang 22,467.59 M3
aterial atau hasil galian ke pulau (C), jarak angkut 20 km 99,226.66 M3
asil galian dimuatkan ke perahu 23,085.15 M3
erial atau hasil galian dari C ke D, jarak angkut 2 km 119,122.77 M3

hasil galian dan pemadatan


h di Borrow Area (untuk timbunan tidak termasuk beli tanah)
galian tanah biasa sedalam sd 2 m (excavator standard) 25,468.13 M3
galian tanah biasa sedalam 2 m - 4 m 26,234.00 M3
galian tanah biasa sedalam > 4 m (excavator long arm) 35,971.60 M3
u di saluran/sungai menggunakan hydraulic breaker
vator+hydraulic breaker gali batu di sungai/saluran 49,102.56 M3
vator standard mengambil/memuat batu ke tepi saluran dan merapihkann 26,312.10 M3
vator long arm mengambil/memuat batu ke tepi saluran dan merapihkann 46,117.16 M3
dari BA ke lokasi pekerjaan, jarak 1 km 30,820.10 M3
lokasi pekerjaan 30,043.10 M3

lebar s.d 1m (Excavator Mini) 44,548.84 M3


lebar >2 m (Excavator Standard) 34,851.13 M3
ungai Menggunakan Kapal Keruk 32,080.68 M3

aan pasangan (Normatif)


s PC-PP (1 m3)
a campuran 1 PC:2 PP)
1,594,114.00 M3
gunakan molen 1,449,252.00 M3
a campuran 1 PC:3 PP)
1,513,903.00 M3
gunakan molen 1,369,040.00 M3
a campuran 1 PC:4 PP)
1,451,326.00 M3
gunakan molen 1,306,463.00 M3
a campuran 1 PC:5 PP)
1,406,266.00 M3
gunakan molen 1,261,403.00 M3
nfaatan batu bekas pasangan
kar 1 m3 pasangan batu dan pembersihan batu (manual) 225,405.00 M3
kar 1 m3 pasangan batu (manual) 193,204.00 M3
kar 1 m3 pasangan batu dengan jack hammer 96,623.00 M3
ersihan 1 m3 bongkaran pasangan batu untuk pemanfaatan kembali mate 32,200.00 M3
batu dari bekas bongkaran pasangan batu **) 257,646.00 M3

a campuran 1 PC:2 PP)


945,727.00 M3
gunakan molen 800,876.00 M3
a campuran 1 PC:3 PP)
873,936.00 M3
gunakan molen 729,085.00 M3
a campuran 1 PC:4 PP)
833,271.00 M3
gunakan molen 688,420.00 M3
a campuran 1 PC:5 PP)
808,072.00 M3
gunakan molen 663,220.00 M3

793,602.00 M3
gunakan molen 648,751.00 M3
ngan bata merah
96,601.00 M3
kar 1 m3 pasangan bata merah dengan jack hammer 3,229.00 M3
rtar jenis PC-PP
ar tipe M (setara campuran 1 PC:2 PP) 91,619.00 M2
ar tipe S (setara campuran 1 PC:3 PP) 89,764.00 M2
mortar jenis PC-PP (1 m2)
m, dengan mortar tipe M (setara campuran 1 PC:2 PP) 93,396.00 M2
m, dengan mortar tipe S (setara campuran 1 PC:3 PP) 91,238.00 M2
m, dengan mortar tipe N (setara campuran 1 PC:4 PP) 89,097.00 M2
cm, dengan mortar tipe M (setara campuran 1 PC:2 PP) 116,923.00 M2
cm, dengan mortar tipe S (setara campuran 1 PC:3 PP) 113,920.00 M2
cm, dengan mortar tipe N (setara campuran 1 PC:4 PP) 110,649.00 M2
58,460.00 M2
775,007.00 M3
NI 03-0090-1999)
u bronjong kawat Bentuk I
k I, Tipe A bronjong kawat ukuran L=2,0 m x B=1,0 m x T=1,0 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, 2,005,552.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, k 2,028,252.00 M3
Kawat bronjong wire mesh ø 5 mm ulir, dan kawat pengikat ø 2,687,868.00 M3
k I, Tipe B bronjong kawat ukuran L=3,0 m x B=1,0 m x T=1,0 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, 3,801,523.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, k 2,997,925.00 M3
Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 3,827,564.00 M3
k I, Tipe C bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 1,0 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, 3,986,352.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, k 3,951,269.00 M3
Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 5,054,043.00 M3
k I, Tipe D bronjong kawat ukuran L=2,0 m x B=1,0 m x T= 0,5 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, 1,193,573.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, k 1,209,890.00 M3
Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 1,572,609.00 M3
k I, Tipe E bronjong kawat ukuran L=3,0 m x B=1,0 m x T=0,5 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, 1,714,932.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, k 2,201,136.00 M3
Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 2,976,155.00 M3
k I, Tipe F Bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 0,5 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, 2,268,034.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, k 2,298,054.00 M3
Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 2,976,155.00 M3
ngan bronjong pabrikasi (tenaga kerja untuk 1m3 batu bronjong) 752,000.00 M3
njong kawat Bentuk II
k II, Tipe G bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,17 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, 3,887,126.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, k 2,942,094.00 M3
k II, Tipe H bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,23 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, 3,344,507.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, k 3,530,266.00 M3
uk II, Tipe I bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,30 m
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, 3,951,099.00 M3
Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, k 4,700,024.00 M3
ngan bronjong pabrikasi (tenaga kerja untuk 1 m3 batu bronjong) 2,332,531.00 M3

uk kayu atau dolken ø 8 - 10 cm 22,709.00


k bambu ø 8 cm - 10 cm 42,187.00 M'
k tiang beton ø 10 cm - 15 cm 34,548.00 M'
modul bronjong kawat menjadi struktur krib sungai 34,522.00 M3

196,853.00 M2
210,136.00 M2

geotekstil, Tipe-A, tipis 31,855.00 M2


geotekstil, Tipe-B, tebal sedang 44,068.00 M2
geotekstil, Tipe-C, tebal 60,122.00 M2
sar) bangunan intake, pengukur, dan pengatur 1 buah pasangan bar scre 618,436.00 bh
da bangunan pengukur dan/atau pengatur 391,732.00 bh

lempengan 61,640.00 M2

Perhitungan secara umum (jika tidak diketahui kondisi medan s 2,001.00 M2


Perhitungan secara detail (jika diketahui kondisi medan secara
Daerah datar sampai pelandaian naik dengan kemiringan 1v: 1,288.00 M2
Daerah dengan kemiringan 1v:10h s.d 1v:2,5h 2,001.00 M2
Daerah dengan kemiringan 1v:2,5h s.d 1v:1h 2,695.00 M2
Daerah dengan kemiringan 1v:1h s.d 1h:2,5v 4,025.00 M2
Daerah dengan kemiringan 2,5v:1h sampai dengan tegak 8,050.00 M2
a semi mekanis
Perhitungan secara umum (jika tidak diketahui kondisi medan s 554.00 M2
Perhitungan secara detail (jika diketahui kondisi medan secara detail)
Daerah datar sampai pelandaian naik dengan kemiringan 1v 448.00 M2
Daerah dengan kemiringan 1v : 10h s.d 1v : 2,5h 568.00 M2
Daerah dengan kemiringan 1v : 2,5h s.d 1v : 1h 800.00 M2
Daerah dengan kemiringan 1v : 1h s.d 2,5v : 1h 1,242.00 M2
Daerah dengan kemiringan 2,5v:1h sampai dengan tegak 2,208.00 M2

35,791.00 bh
94,875.00 M2

kubus beton ukuran 30 cm x 30 cm x 30 cm 9,894.00 bh


kubus beton ukuran 40 cm x 40 cm x 40 cm 19,797.00 bh
3B: blok beton bergigi 23,762.00 bh
blok beton berat 0,5 ton quadripod, tetrapod, dolos, tribar 37,641.00 bh
h blok beton berat 0,75 ton quadripod, tetrapod, dolos, tribar 55,472.00 bh
on berat 1,0 ton quadripod, tetrapod, dolos, tribar dan lain-lain 79,237.00 bh
blok beton berat 1,5 ton quadripod, tetrapod, dolos, tribar 1,090,548.00 bh
blok beton berat 2,0 ton quadripod, tetrapod, dolos, tribar 79,179.00 bh
blok beton berat 2,5 ton quadripod, tetrapod, dolos, tribar 87,475.00 bh
berbagai jenis armor 102,856.00 M3
u 1 kg - 3 kg, void maksimum 15% 707,334.00 M3
u 3 kg - 5 kg, void maksimum 15% 765,405.00 M3
u 5 kg - 10 kg, void maksimum 20% 814,293.00 M3
u 10 kg - 30 kg, void maksimum 20% 835,564.00 M3
u 30 kg - 50 kg, void maksimum 25% 875,944.00 M3
u 50 kg - 100 kg, void maksimum 25% 875,944.00 M3
u 100 kg - 200 kg, void maksimum 30% 892,961.00 M3
u 200 kg - 300 kg, void maksimum 30% 892,961.00 M3
u 300 kg - 400 kg, void maksimum 30% 946,103.00 M3
u 400 kg - 500 kg, void maksimum 35% 954,611.00 M3
u 200 kg - 500 kg, void maksimum 32% 940,169.00 M3
u 500 kg - 650 kg, void maksimum 35% 973,010.00 M3
u 650 kg - 800 kg, void maksimum 35% 985,772.00 M3

iangkut < 30 m dan dipasang untuk konstruksi pengaman pantai 32,200.00 bh


buis beton diameter 1 m' dengan campuran beton f'c = 7,4 MPa (K-100) 1,099,963.00 bh
25,438.00 M'
r (diambil dari AHSP Hidrologi) 153,168.00 M'

aan pembuatan beton

an campuran beton tumbuk fc' = 1,8 s.d 3,7 (B0: K-40 s.d. K-60) atau set 1,064,972.00 M3
an campuran beton fc' = 5,6 s.d 7,4 Mpa (K-80 s.d. K-100) atau setara 1 1,061,823.00 M3
an campuran beton fc' ~ 7,4 MPa (K-100) atau setara 1PC : 2PB : 3Kr 1,073,565.00 M3
00), slump (12±2) cm, w/c = 0,87
1,188,097.00 M3
1,117,609.00 M3
125), slump (12±2) cm, w/c = 0,78
1,237,405.00 M3
1,166,917.00 M3
K150), slump (12±2) cm, w/c = 0,72
1,275,186.00 M3
1,204,698.00 M3
75), slump (12±2) cm, w/c = 0,66
1,321,009.00 M3
1,250,521.00 M3
K200), slump (12±2) cm, w/c = 0,61
1,362,934.00 M3
1,292,446.00 M3
K225), slump (12±2) cm, w/c = 0,58
1,397,054.00 M3
1,326,566.00 M3
K250) kedap air,slump (12±2) cm, w/c = 0,56
1,415,993.00 M3
1,345,505.00 M3
K275) kedap air, slump (12±2) cm, w/c = 0,53
1,448,460.00 M3
1,377,972.00 M3
K300) kedap air, slump (12±2)cm, w/c = 0,52 (kedap air)
1,458,455.00 M3
1,387,967.00 M3
K325) kedap air, slump (12±2) cm, w/c = 0,49 (kedap air)
1,496,773.00 M3
1,426,285.00 M3
K350) kedap air , slump (12±2) cm, w/c = 0,48 (kedap air)
1,509,860.00 M3
1,439,372.00 M3
Mixed dan bahan aditif
nakan Ready Mixed dan pompa beton 212,810.00 M3
nakan bahan aditif 97,267.00 M3

beton dengan jarak > 5 m


pada tapak berjarak < 25 m dengan beda tinggi < 1 m
66,010.00 M3
n pada tapak berjarak setiap tambahan jarak 25 m
80,500.00 M3
gunakan pompa beton 32,260.00 M3

40,303.00 M3
kan penusuk besi beton) 80,500.00 M3
etiap kenaikan 4 m (vertikal)
40,250.00 M3
32,260.00 M3
an pembesian beton
los atau ulir
1,694,671.00 Kg
olom, balok, ring balk dan sloof 2,077,931.00 Kg
iremesh) untuk pelat atau dinding 115,441.00 Kg
ed polos/strand 455,693.00 Kg
angan setiap kenaikan vertikal 4 m atau jarak horizontal setiap 25 m ke tapak pemasangan
66,700.00 Kg
han jarak horizontal 10 m s.d 25 m) 39,571.00 Kg
ambahan jarak horizontal 25 m) 66,711.00 Kg
66,711.00 Kg
an pembuatan/penyediaan bekisting beton

beton expose dengan multiflex 18 mm (TP) 180,067.00 M2


beton biasa dengan multiflex 12 mm atau 18 mm (TP) 117,757.00 M2
beton biasa menggunakan papan kayu 3/20 cm (TP) 129,576.00 M2
sting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT < 60 cm 125,810.00 M2
sting lantai menggunakan dolken ø 8-10 cm, tinggi 4 m, JAT < 80 cm 109,265.00 M2
sting lantai menggunakan bambu ø 8-10 cm, tinggi 4 m, JAT < 80 cm 99,047.00 M2

ai Floordeck tipe pelat (JAP < 0,6 m) 222,879.00 M2


ai Floordeck tipe pelat (JAP < 0,8 m) 217,845.00 M2
i Floordeck tipe balok T (JAP < 1,2 m) 208,290.00 M2
i dengan Floordeck tipe balok T (JAP < 2,0 m) 204,089.00 M2

beton expose menggunakan multiflex 18 mm, JAT < 1,0m 223,831.00 M2


k beton biasa menggunakan multiflex 12 mm atau 18 mm, JAT < 1,0m 146,840.00 M2
k beton biasa menggunakan kayu papan 3/20 cm (TP) 155,836.00 M2
sting balok menggunakan Kaso 5/7, tinggi 4 m dan JAT < 1,0 m 122,780.00 M2
sting balok menggunakan dolken ø 8-10 cm, tinggi 4 m**, JAT < 1,2 m 118,764.00 M2
sting balok beton menggunakan bamboo ø 8-10 cm, tinggi 4 m**, JAT < 125,888.00 M2

m beton expose menggunakan multiflex 18 mm (TP) 192,856.00 M2


m beton biasa menggunakan multiflex 12mm atau 18 mm, (TP) 126,621.00 M2
m beton biasa menggunakan kayu papan 3/20 cm (TP) 146,390.00 M2
sting kolom beton menggunakan kayu 5/7 cm, tinggi 4 m, JAT < 1,0m 117,490.00 M2
sting kolom beton dengan kayu dolken ø 8 -10 cm, tinggi 4 m, JAT < 1,2 112,092.00 M2
sting kolom beton dengan bambu ø 8-10 cm, tinggi 4 m, JAT < 1,0 m 118,706.00 M2

ng beton expose dengan multiflex 18 mm 204,876.00 M2


ng beton biasa dengan multiflex 12 mm atau 18 mm (TP) 128,729.00 M2
ng beton biasa menggunakan kayu papan 3/20 cm 149,602.00 M2
yokong bekisting dinding beton menggunakan kayu 5/7, tinggi maksimum 120,702.00 M2
yokong bekisting dinding beton menggunakan kayu 8/12, tinggi maksimu 110,684.00 M2

asi dan sloof beton biasa menggunakan multiflex 12 mm atau 18 mm (T 130,288.00 M2


asi dan sloof beton biasa menggunakan papan 3/20 cm 119,399.00 M2
yokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7, tingg 57,925.00 M2

ing secara biasa (membersihkan dan membereskan puing-puing) 6,440.00 M2


ing secara hati-hati (dan membereskan puing) *) 9,660.00 M2

m² permukaan beton dengan air 119,995.00 M2


permukaan beton menggunakan media terpal selama 4 hari 1,210,490.00 M2
ermukaan beton menggunakan media karung goni selama 4 hari 300,581.00 M2
-

n secara konvensional 621,025.00 M3


n dengan jack hammer 220,916.00 M3

r stop PVC lebar 150 mm 143,111.00 M'


r stop PVC lebar 200 mm 145,756.00 M'
r stop PVC lebar 230 mm - 320 mm 148,401.00 M'
r stop rubber lebar 150 mm - 200 mm 441,572.00 M'

mesin) menggunakan tripod dan Hammer


yu gelondongan ø 15 - 20 cm 86,322.00 M'
yu atau dolken ø 8-10 cm 15,636.00 M'
a pipa ø 30 cm atau kotak 30 x 30 cm 47,860.00 M'

ng pancang beton kotak 20 cm x 20 cm 80,538.00 M'


ng pancang beton kotak 25 x 25 cm 92,038.00 M'
ng pancang beton kotak 30 x 30 cm 103,538.00 M'
ng pancang beton ø 40 atau kotak 40 x 40 cm 126,606.00 M'
ng pancang (hollow) beton ø 40 cm 115,096.00 M'

uk 1 m’ lebar turap (10-12,5 buah) dolken ø8-10 166,774.00 M'


uk 1 m' lebar turap kayu (10 buah) papan (2-3)/10 cm 133,424.00 M'
uk 1 m' lebar turap (5 buah) kayu papan (2-3)/20 cm 160,200.00 M'
uk 1 m' lebar turap (4 buah) kayu papan (2-3)/25 cm 173,516.00 M'
uk 1 m' lebar turap (3,33 buah) kayu papan (2-3)/30 cm 186,839.00 M'
uk 1 m' lebar turap (14 buah) kayu kaso 5/7 tebal 5 cm 89,112.00 M'
uk 1 m' lebar turap (20 buah) kayu kaso 5/7 tebal 7 cm 115,672.00 M'
uk 1 m' lebar turap (8 buah) kayu balok 8/12 tebal 8 cm 133,640.00 M'
uk 1 m' lebar (12,5 buah) turap kayu balok 8/12 tebal 12 cm 160,200.00 M'

buah) turap baja profil Larsen lebar 350 mm 67,681.00 M'


uk 1 m' lebar turap (7 buah) baja profil INP-8 + UNP-8 95,307.00 M'
uk 1 m' lebar turap (5,56 buah) baja profil INP-10 + UNP-10 86,562.00 M'

uah turap beton pre-cast 12 x 30 cm 57,548.00 M'


uah turap beton pre-cast 15 x 40 cm 92,077.00 M'
uah turap beton pre-cast 22 x 50 cm 115,096.00 M'

u Gelondongan ø 15 - 20 cm 62,165.00 M'


on kotak 20 x 20 cm 51,554.00 M'
ng pancang baja ø 20 cm atau kotak 20 x 20 35,899.00 M'
ng pancang Baja ø 30 cm atau kotak 30 x 30 36,838.00 M'
ng pancang beton ø 20 cm /kotak 20 x 20 46,661.00 M'
ng pancang beton ø 25 cm atau kotak 25 x 25 51,159.00 M'
ng pancang beton ø 30 cm / kotak 30 x 30 52,803.00 M'
ncang beton ø 40 cm atau kotak 40 x 40 100,840.00 M'
ng pancang beton hollow ø 40 cm 103,420.00 M'

r/tanah dibungkus karung plastik bagor 43 cm x 65 cm 18,309.00 bh


r/tanah dibungkus karung plastik/bagor/goni atau terpal ukuran 45 x 120 35,865.00 bh
r/tanah ukuran 145 x 240 cm 350,414.00 bh
m pasir/tanah ukuran 43 cm x 65 cm 107,419.00 M2
au L.60.60.6 atau profil besi berlubang untuk 1 m3 kistdam pasir/t 211,493.00 M2
diesel daya 5 kW dengan suction head maks. 3 m dan discharge head ma 84,828.00 Jam
diesel daya 10 kW dengan suction head maksimal 3 m dan discharge hea 114,954.00 Jam
diesel daya 20 kW dengan suction head maksimal 3 m dan discharge hea 558,280.00 Jam

m termasuk harga pemasangan)

B=200 mm; H=250 mm; H1=500 mm dan TR=1050 mm. 206,418.00 bh

ebar B = 1500 mm; H = 1500 mm; H1 = 3000 mm dan TR = 3800 mm 4,634,190.00 bh

ebar B = 500 mm; H = 500 mm; H1 = 1000 mm dan TR = 1900 mm 978,535.00 bh

anaan pelumasan dilakukan setiap 2 minggu sekali atau 26 kali/tahun)


17,922.00 Lot
engan roda gigi
tunggal < 1 m 35,186.00 Lot
Double < 1 m 53,458.00 Lot
tunggal 1 - 2 m 52,538.00 Lot
Double 1 - 2 m 87,131.00 Lot
tunggal > 2 m 85,943.00 Lot
Double > 2 m 137,184.00 Lot
engan roda gigi
tunggal < 1 m 53,131.00 Lot
Double < 1 m 88,207.00 Lot
tunggal 1 - 2 m 87,241.00 Lot
Double 1 - 2 m 139,186.00 Lot
tunggal > 2 m 137,888.00 Lot
Double > 2 m 223,611.00 Lot

mpel batuan (dalam laporan) 264,500.00 M'


63,926.00 M'
58,834.00 M'
59,639.00 M'
67,137.00 M'
67,896.00 M'
cassing pipa black steel 6" 15,344.00 M'
LC screen 6" 15,394.00 M'
cassing pipa black steel 8" 15,353.00 M'
LC screen 8" 17,128.00 M'
pipa sounding PVC 1" 5,410.00 M'
gravel pack 806,581.00 M3
118,811.00 Jam
118,811.00 Jam
atan uji pemompaan 1,472,000.00 Lokasi
103,500.00 Sampel
214,395.00 bh
329,549.00 ttk

432,052.00 M2
368,405.00 M2
3,120,067.00 M2

a pekerjaan menggunakan multiflex 18 mm, frame besi siku dan tiang kay 1,261,341.07 bh
a pekerjaan menggunakan multiflex 10 mm, frame allumunium siku dan tiang 522,083.00 bh
120,395,580.00
1,380,000.00 Set
- Set
101,765,580.00 Set
17,250,000.00 Set

asi menggunakan kamera (jika menggunakan kamera dengan isi film sel 989,246.00 Set
asi menggunakan kamera digital tanpa film (jika menggunakan kamera d 735,671.00 Set
-

gan CAD untuk 1 buah gambar (file autocad) layout, tampak potongan dan d 276,009.00 Set
ara manual untuk 1 lembar gambar layout, tampak, potongan dan detail 247,192.00 Set
ar gambar layout, tampak, potongan dan detail untuk kondisi tidak ru 26,738.00 Set
rak/laporan
46,000.00 Set
ng (reduce dan copy kalkir serta blue/black print) 2,576,000.00 Set
u sampah apung
4,830.00 M2
1,099.00 M2
ketebalan 25 cm
80,500.00 M3
33,344.00 M3

Pekerjaan serutan papan atau balok kayu (Manual) 41,515.00 M2


Membuat pasangan/konstruksi kayu dari bahan baku papan kayu 456,735.00 M2
Pembuatan Profil pada sudut kayu dengan alat serutan profil, takikan/sa 7,371.00 M'
Membuat pasangan/konstruksi kayu dari bahan baku balok kayu kelas I 47,653,590.00 M3
Membuat pasangan/konstruksi kayu dari bahan baku balok kayu Kelas II 2,216,486.00 M3

Pekerjaan serutan papan atau balok kayu (Semi Mekanis) 17,164.00 M2


Membuat pasangan/konstruksi kayu dari bahan baku papan atau balok 859,135.00 M3

esi profil Siku, IWF, INP, UNP 21,390.00 Kg


pekerjaan perakitan konstruksi besi/baja 43,798.00 Kg
ntu besi plat baja tebal 2 mm rangkap, rangka baja siku 1,646,439.00 M2
engelasan dengan las listrik 36,366.00 Cm
Ponton+Long arm
Long arm di darat
Long arm di darat
Long arm di darat

Ponton+Long arm
Long arm di darat
Long arm di darat
Long arm di darat
Usulan Analisis Standar Belanja (ASB) Konstruksi Tahun 2022
Dinas Pekerjaan Umum Penataan Ruang dan Perumahan Rakyat Kawasan Permukiman
Provinsi Kepulauan Bangka Belitung
Bidang Sumber Daya Air

I. ASB-SDA001 ASB Talud Pasangan Batu


Kelompok Belanja : Konstruksi
Deskripsi
Pembangunan Talud Pasangan Batu merupakan kegiatan yang dilakukan oleh Perangkat Daerah
untuk belanja konstruksi yang dibangun di tepi sepanjang sungai/Jalan yang dapat dipergunakan oleh
Pemerintah Daerah dan atau masyarakat.

Tujuan :
Untuk memperoleh besarnya belanja konstruksi dalam melaksanakan kegiatan pembangunan talud
pasangan batu.

Jenis Belanja :
Pekerjaan umum, galian tanah dengan alat, pemasangan kayu cerucuk, pemasangan batu belah,
pemasangan pipa serapan, plesteran dan dewatering.

Spesifikasi Teknis :
Pemasangan talud tegak pasangan batu belah camp. 1 PC : 4 PS

Standar belanja talud pasangan batu ditetapkan sebagai berikut :


1 Lokasi Kabupaten Bangka harga per 100 m' panjang
1). Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Anggaran per meter panjang (m’) : Rp 4,998,493.00 Rp 499,849,300.00

2). Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Anggaran per meter panjang (m’) : Rp 3,544,230.00 Rp 354,423,000.00

3). Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Anggaran per meter panjang (m’) : Rp 2,609,717.00 Rp 260,971,700.00

4). Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
Anggaran per meter panjang (m’) : Rp 2,260,838.00 Rp 226,083,800.00

2 Lokasi Kabupaten Bangka Barat


1). Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Anggaran per meter panjang (m’) : Rp 5,937,931.00 Rp 593,793,100.00

2). Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Anggaran per meter panjang (m’) : Rp 4,205,861.00

3). Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Anggaran per meter panjang (m’) : Rp 2,832,722.00

4). Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
Anggaran per meter panjang (m’) : Rp 2,688,062.00 Rp 268,806,200.00
3 Lokasi Kabupaten Bangka Selatan
1). Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Anggaran per meter panjang (m’) : Rp -

2). Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Anggaran per meter panjang (m’) :

3). Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Anggaran per meter panjang (m’) :

4). Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
Anggaran per meter panjang (m’) : Rp -

4 Lokasi Kabupaten Bangka Tengah


1). Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Anggaran per meter panjang (m’) : Rp -

2). Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Anggaran per meter panjang (m’) :

3). Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Anggaran per meter panjang (m’) :

4). Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
Anggaran per meter panjang (m’) : Rp -
5 Lokasi Kabupaten Belitung
1). Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Anggaran per meter panjang (m’) : Rp 5,304,578.00 Rp 795,686,700.00

2). Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Anggaran per meter panjang (m’) : Rp 3,759,279.00

3). Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Anggaran per meter panjang (m’) : Rp 2,756,978.00

4). Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
Anggaran per meter panjang (m’) : Rp 2,391,668.00 Rp 239,166,800.00

6 Lokasi Kabupaten Belitung Timur


1). Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Anggaran per meter panjang (m’) : Rp -

2). Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Anggaran per meter panjang (m’) :

3). Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Anggaran per meter panjang (m’) :

4). Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
Anggaran per meter panjang (m’) : Rp -
7 Lokasi Kota Pangkalpinang
1). Talud pasangan batu H = 180 cm, La = 50 cm, Lb = 150 cm, Tp = 100 cm.
Anggaran per meter panjang (m’) : Rp -

2). Talud pasangan batu H = 150 cm, La = 40 cm, Lb = 130 cm, Tp = 80 cm.
Anggaran per meter panjang (m’) :

3). Talud pasangan batu H = 120 cm, La = 40 cm, Lb = 120 cm, Tp = 60 cm.
Anggaran per meter panjang (m’) :

4). Talud pasangan batu H = 100 cm, La = 30 cm, Lb = 110 cm, Tp = 50 cm.
Anggaran per meter panjang (m’) : Rp -
Usulan Analisis Standar Belanja (ASB) Konstruksi Tahun 2022
Dinas Pekerjaan Umum Penataan Ruang dan Perumahan Rakyat Kawasan Permukiman
Provinsi Kepulauan Bangka Belitung
Bidang Sumber Daya Air

III. ASB-03 ASB Pengerukan Saluran/Sungai


Kelompok Belanja : Konstruksi
Deskripsi
Pengerukan Saluran/Sungai merupakan kegiatan yang dilakukan oleh Perangkat Daerah untuk
belanja konstruksi yang dilaksanakan secara mekanis untuk mengoptimalkan kapasitas penampang
sungai/saluran agar daya tampung sungai/saluran mendekati daya tampung semula/rencana dan
ideal.

Tujuan :
Untuk memperoleh besaran harga belanja konstruksi dalam melaksanakan kegiatan Pengerukan/
Normalisasi Sungai/Saluran.

Standar belanja Pengerukan Saluran/Sungai ditetapkan sebagai berikut :


1 Lokasi Kab Bangka Barat
a. Pengerukan dengan menggunakan excavator mini.
Anggaran per meter panjang (m’) : Rp 180,235.00
Jenis belanja : Pekerjaan umum, galian tanah dengan alat excavator
mini dengan lebar kurang lebih 3 m dan kedalaman
galian kurang lebih 1,5 m.

b. Pengerukan dengan menggunakan excavator standar.


Anggaran per meter panjang (m’) : Rp 299,400.00
Jenis belanja : Pekerjaan umum, galian tanah dengan alat excavator
standar lebar kurang lebih 10 m dan kedalaman
galian kurang lebih 2 m.

c. Pengerukan dengan menggunakan excavator longarm.


Anggaran per meter panjang (m’) : Rp 759,356.00
Jenis belanja : Pekerjaan umum, galian tanah dengan alat excavator
longarm lebar kurang lebih 15 m dan kedalaman
galian kurang lebih 2 m.

d. Pengerukan dengan menggunakan excavator long arm+ponton.


Anggaran per meter panjang (m’) : Rp 1,392,105.00
Jenis belanja : Pekerjaan umum, galian tanah dengan alat excavator
long arm+ponton lebar lebih dari 15 m dan
kedalaman galian kurang lebih 2 m atau dengan
kondisi tanggul yang tidak memungkinkan untuk
pijakan excavator
e. Pengerukan dengan menggunakan kapal keruk.
Anggaran per meter panjang (m’) : Rp 1,104,742,000.00
Jenis belanja : Pekerjaan umum, galian tanah secara mekanis
menggunakan kapal keruk CSD (Cutter Suction
Dredger), membuat tanggul spoilbank 100m x 100m,
pipa hisap 20m, pipa apung HDPE 200 m, pipa di
darat 280 m, lumpur 20% air 80%, lebar sungai
15~20m, tebal galian 1~2m
Usulan Analisis Standar Belanja (ASB) Konstruksi Tahun 2022
Dinas Pekerjaan Umum Penataan Ruang dan Perumahan Rakyat Kawasan Permukiman
Provinsi Kepulauan Bangka Belitung
Bidang Sumber Daya Air

IV. ASB-04 ASB Jaringan Irigasi Rawa


Kelompok Belanja : Konstruksi
Deskripsi
Rehabilitasi merupakan kegiatan perbaikan jaringan irigasi guna mengembalikan fungsi dan kondisi
pelayanan irigasi seperti semula dan/atau mengurangi kehilangan airpada saluran melalui pasangan
batu/lining plat beton.

Peningkatan merupakan kegiatan meningkatkan fungsi serta kondisi jaringan irigasi yang sudah ada
dalam rangka meningkatkan indeks Pertanaman (IP) dan/atau kegiatan menambah luasan areal
fungsional pada jaringan irigasi yang sudah ada dengan mempertimbangkan perubahan kondisi
lingkungan daerah irigasi.

Pembangunan merupakan merupakan kegiatan menyediakan/membangun jaringan irigasi yang


belum ada jaringan irigasinya.

Tujuan :
Untuk memperoleh besarnya belanja konstruksi dalam melaksanakan kegiatan Jaringan Irigasi Rawa.

Standar belanja jaringan irigasi ditetapkan sebagai berikut :


1 Lokasi Kab Bangka Barat
Rehabilitasi maksimal per hektar :
Peningkatan maksimal per hektar :
Pembangunan maksimal per hektar :
a. Galian Saluran Tanah dengan alat
Galian Saluran Tanah dengan alat excavator standar dengan lebar kurang lebih 10 m.
Anggaran per meter panjang (m’) : Rp 761,306.00
Jenis belanja : Pengukuran dan pemasangan patok, galian tanah
dengan alat excavator standar dengan lebar kurang
lebih 10 m, kedalaman galian kurang lebih 1,5 m dan
tanah hasil galian dijadikan tanggul, dirata dan
dirapikan

b. Galian Saluran Tanah dengan alat


Galian Saluran Tanah dengan alat excavator standar dengan lebar kurang lebih 8 m.
Anggaran per meter panjang (m’) : Rp 620,045.00
Jenis belanja : Pengukuran dan pemasangan patok, galian tanah
dengan alat excavator standar dengan lebar kurang
lebih 8 m, kedalaman galian kurang lebih 1,5 m dan
tanah hasil galian dijadikan tanggul, dirata dan
dirapikan
c. Galian Saluran Tanah dengan alat
Galian Saluran Tanah dengan alat excavator standar lebar kurang lebih 6 m.
Anggaran per meter panjang (m’) : Rp 482,034.00
Jenis belanja : Pengukuran dan pemasangan patok, galian tanah
dengan alat excavator standar dengan lebar kurang
lebih 6 m, kedalaman galian kurang lebih 1,5 m dan
tanah hasil galian dijadikan tanggul, dirata dan
dirapikan

d. Galian Saluran Tanah dengan alat


Galian Saluran Tanah dengan alat excavator standar lebar kurang lebih 4 m.
Anggaran per meter panjang (m’) : Rp 328,689.00
Jenis belanja : Pengukuran dan pemasangan patok, galian tanah
dengan alat excavator standar dengan lebar kurang
lebih 4 m, kedalaman galian kurang lebih 1,5 m dan
tanah hasil galian dijadikan tanggul, dirata dan
dirapikan

e. Galian Saluran Tanah dengan alat


Galian Saluran Tanah dengan alat excavator mini lebar kurang lebih 3 m.
Anggaran per meter panjang (m’) : Rp 271,185.00
Jenis belanja : Pengukuran dan pemasangan patok, galian tanah
dengan alat excavator standar dengan lebar kurang
lebih 3,5 m, kedalaman galian kurang lebih 1,5 m dan
tanah hasil galian dijadikan tanggul, dirata dan
dirapikan
d. Gorong-gorong/plat deker
Plat deker uk L = 3 m, P = 4 m.
Anggaran per unit (unit) : Rp 23,669,099.00
Jenis belanja : Pengukuran dan pemasangan bowplank, galian tanah
dengan alat, pemasangan kayu cerucuk, pemasangan
batu belah, plesteran dan dewatering.

d. Gorong-gorong/plat deker
Plat deker uk L = 5 m, P = 4,5 m.
Anggaran per unit (unit) : Rp 43,668,047.00
Jenis belanja : Pengukuran dan pemasangan bowplank, galian tanah
dengan alat, pemasangan kayu cerucuk, pemasangan
batu belah, plesteran dan dewatering.

e. Bangunan Bagi dan Sadap


Bangunan Bagi dan Sadap dengan pintu 1 unit uk. 1 m
Anggaran per unit (unit) : Rp 96,710,198.00
Jenis belanja : Pengukuran dan pemasangan bowplank, galian tanah
dengan alat, pemasangan kayu cerucuk, pemasangan
batu belah, plesteran, dewatering dan pintu sorong
baja uk. 1 m.

Rp 870,391,782.00
41,666,667
Usulan Analisis Standar Belanja (ASB) Konstruksi Tahun 2022
Dinas Pekerjaan Umum Penataan Ruang dan Perumahan Rakyat Kawasan Permukiman
Provinsi Kepulauan Bangka Belitung
Bidang Sumber Daya Air

IV. ASB-SDA004 Irigasi Permukaan ASB Saluran Pasangan Batu


Kelompok Belanja : Konstruksi
Deskripsi
Pembangunan Saluran Pasangan Batu merupakan kegiatan yang dilakukan oleh Perangkat Daerah
untuk belanja konstruksi yang dibangun di Daerah Irigasi Permukaan yang dapat dipergunakan oleh
Pemerintah Daerah dan atau masyarakat.

Tujuan :
Untuk memperoleh besarnya belanja konstruksi dalam melaksanakan kegiatan pembangunan
/peningkatan/rehabilitasi Jaringan Irigasi Permukaan.

Standar belanja Saluran pasangan batu ditetapkan sebagai berikut :


1 Lokasi Kabupaten Bangka Barat
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,8 m, Lb = 1,5 m, T = 0,65
a.
m
Pasangan batu belah 1 Pc : 4 Ps
Anggaran per meter panjang (m’) : Rp 3,738,254.00
Aktivitas Pemasangan saluran pasangan batu berbentuk
: trapesium dengan kemiringan dinding saluran 1:1 dan
tinggi 65 cm.
Jenis belanja :
Pekerjaan umum, galian tanah dengan alat (eksavator
mini), pemasangan kayu cerucuk, pemasangan batu
belah 1 Pc : 4 Ps, plesteran, timbunan tanah pilihan
didatangkan dan dewatering.

Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 2,1 m, Lb = 0,8 m, T = 0,65
b.
m
Pasangan batu belah 1 Pc : 4 Ps
Anggaran per meter panjang (m’) : Rp 3,071,470.00
Aktivitas Pemasangan saluran pasangan batu berbentuk
: trapesium dengan kemiringan dinding saluran 1:1 dan
tinggi 65 cm.
Jenis belanja :
Pekerjaan umum, galian tanah dengan alat (eksavator
mini), pemasangan kayu cerucuk, pemasangan batu
belah 1 Pc : 4 Ps, plesteran, timbunan tanah pilihan
didatangkan dan dewatering.
Saluran terbuka pasangan batu berbentuk Trapesium, Ukuran La = 1,6 m, Lb = 0,6 m, T = 0,5
c.
m
Pasangan batu belah 1 Pc : 4 Ps
Anggaran per meter panjang (m’) : Rp 2,590,616.00
Aktivitas Pemasangan saluran pasangan batu berbentuk
: trapesium dengan kemiringan dinding saluran 1:1 dan
tinggi 65 cm.
Jenis belanja :
Pekerjaan umum, galian tanah dengan alat (eksavator
mini), pemasangan kayu cerucuk, pemasangan batu
belah 1 Pc : 4 Ps, plesteran, timbunan tanah pilihan
didatangkan dan dewatering.
Usulan Analisis Standar Belanja (ASB) Konstruksi Tahun 2022
Dinas Pekerjaan Umum Penataan Ruang dan Perumahan Rakyat Kawasan Permukiman
Provinsi Kepulauan Bangka Belitung
Bidang Sumber Daya Air

V. ASB-SDA05 Pemasangan Talud Panel SPS


Kelompok Belanja : Konstruksi
Deskripsi
Sistem Panel Serbaguna (SPS) merupakan suatu teknologi konstruksi berupa material panel
beton pracetak yang dirangkai menjadi sistem struktur rangka dan dinding beton yang didalamnya
terperangkap tanah urugan yang dipadatkan. Adapun kegunaan dari Sistem Panel Serbaguna (SPS)
diantaranya sebagai tanggul sungai, jalan akses, dinding penahan tanah, pondasi perkuatan rel
kereta dan lain sebagainya. Pengisian tanah didalam SPS dilakukan dengan penimbunan bertahap
lapis per lapis dengan pemadatan yang baik dan terdapat proses konsolidasi yang dirancang.

Tujuan :
Untuk memperoleh besarnya belanja konstruksi dalam melaksanakan kegiatan pemasangan talud
sistem panel serbaguna

Jenis Belanja :
Pengadaan komponen panel SPS beton pracetak uk. 600.150.30; komponen pengunci, bracing;
pekerjaan pengurugan dan pemadatan tanah didatangkan dari luar site; pemasangan geotekstil

Spesifikasi Teknis :
Mutu beton panel pracetak K350; Tinggi Talud 2x150 cm; Geotekstil type woven G-300

Standar belanja talud pasangan batu ditetapkan sebagai berikut :


1 Lokasi Kabupaten Bangka
Pemasangan Talud Sistem Panel Serbaguna H=3m
Anggaran per meter panjang (m’) : Rp -

2 Lokasi Kabupaten Bangka Barat


Pemasangan Talud Sistem Panel Serbaguna H=3m
Anggaran per meter panjang (m’) : Rp 15,751,300.00
3 Lokasi Kabupaten Bangka Selatan
Pemasangan Talud Sistem Panel Serbaguna H=3m
Anggaran per meter panjang (m’) :

4 Lokasi Kabupaten Bangka Tengah


Pemasangan Talud Sistem Panel Serbaguna H=3m
Anggaran per meter panjang (m’) :
5 Lokasi Kabupaten Belitung
Pemasangan Talud Sistem Panel Serbaguna H=3m
Anggaran per meter panjang (m’) : Rp -

6 Lokasi Kabupaten Belitung Timur


Pemasangan Talud Sistem Panel Serbaguna H=3m
Anggaran per meter panjang (m’) : Rp -
7 Lokasi Kota Pangkalpinang
Pemasangan Talud Sistem Panel Serbaguna H=3m
Anggaran per meter panjang (m’) : Rp 15,751,300.00
Usulan Analisis Standar Belanja (ASB) Konstruksi Tahun 2022
Dinas Pekerjaan Umum Penataan Ruang dan Perumahan Rakyat Kawasan Permukiman
Provinsi Kepulauan Bangka Belitung
Bidang Sumber Daya Air

VI. ASB-SDA06 ASB Revetmen Pengaman Pantai


Kelompok Belanja : Konstruksi
Deskripsi
Revetmen adalah struktur di pantai yang dibangun searah pantai dengan tujuan untuk melindungi
pantai yang tererosi.

Tujuan :
Untuk memperoleh besarnya belanja konstruksi dalam melaksanakan kegiatan pembangunan
revetmen pengaman pantai

Jenis Belanja :
Pekerjaan umum, galian pasir, pengadaan/pengangkutan/pemasangan buis beton, pengecoran beton
mutu rendah, pemasangan rip-rap batu belah

Spesifikasi Teknis :
Buis beton bertulang dia. 80 cm, tinggi 50 cm; Bahan isian buis beton sebagai pemberat adalah beton
mutu K100; dipasang pelindung kaki dari rip-rap batu gunung berat 50-60 kg/bh

Standar belanja talud pasangan batu ditetapkan sebagai berikut :


1 Lokasi Kabupaten Bangka
1). Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m
Anggaran per meter panjang (m’) : Rp -

2). Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m


Anggaran per meter panjang (m’) : Rp -

2 Lokasi Kabupaten Bangka Barat


1). Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m
Anggaran per meter panjang (m’) : Rp -

2). Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m


Anggaran per meter panjang (m’) : Rp -
3 Lokasi Kabupaten Bangka Selatan
1). Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m
Anggaran per meter panjang (m’) :

2). Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m


Anggaran per meter panjang (m’) :

4 Lokasi Kabupaten Bangka Tengah


1). Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m
Anggaran per meter panjang (m’) :

2). Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m


Anggaran per meter panjang (m’) :
5 Lokasi Kabupaten Belitung
1). Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m
Anggaran per meter panjang (m’) : Rp -

2). Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m


Anggaran per meter panjang (m’) : Rp -

6 Lokasi Kabupaten Belitung Timur


1). Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m
Anggaran per meter panjang (m’) : Rp -

2). Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m


Anggaran per meter panjang (m’) :
7 Lokasi Kota Pangkalpinang
1). Revetmen Pengaman Pantai H = 1,50 m, L = 2,50 m
Anggaran per meter panjang (m’) : Rp 8,956,100.00

2). Revetmen Pengaman Pantai H = 2,00 m, L = 1,60 m


Anggaran per meter panjang (m’) : Rp 9,735,720.00

Anda mungkin juga menyukai