Pre Job Hazard Analysis (PJHA) version1.

Job activity description Identify LIFEsavers

“ Unloading Material Plate Coil,Tools dan Loading ( Moving


Container 40” Ke Area Pabrikasi ) PERMIT REQUIRED
Tool Box Meeting Working at height Mobile powered equipment Electrical work Confined space entry

Persiapan
Mobilisasi Trailer ke Site dan Pemarkiran Trailer PERMIT REQUIRED PERMIT REQUIRED PERMIT REQUIRED
Hot work Hazardous materials Lifting and rigging Excavation and trench work
Work area Site Ware Work date 22/06/20
House
Start time 08:00 WIB End time 21:00 WIB Lock Out Tag Out-energy isolation Bulk material handling and storage Motor vehicle-traffic safety Railcar safety
Company PT.Maju Job leader Other permits may apply, like: Electrical system change permit, Line-break permit, CSD by-pass permit
Bersama
Critical work steps Hazard identification (refer to page 2) Control measures(refer to page 2 or to permit)

1.Tool Box Meeting -Miskomunikasi Rencana dan Metode kerja -Pastikan semua Team yang terlibat mengikuti Tool
Box
Meeting sebelum bekerja
-Sampaikan kembali Methode kerja dengan semua
Team yang terlibat

2.Persiapan Alat kerja dan Proteksi Area kerja -Alat kerja tidak tersedia dan tidak siap atau tidak layak -Chek kelengkapan Alat kerja untuk Lifting ( Sling
pakai belt,Shakle,Tali kemudi )
-Pastikan Alat yang di gunakan Bersetifikat ,aman dan di
buatkan Anchor bolt pakai sling/pipa secaff.
-Siapkan Safety Baricade safety line dan Rambu -
Rambu keselamatan kerja
3.Mobilisasi Trailer ke Site -Kondisi kendaraan tidak layak/ tidak lolos cheklist -Pastikan kelayakan dan kelengkapan sudah di
Koordinasikan dengan bagian pengiriman
4.Pemarkiran Trailer di Posis Pengangkatan -Tertabrak Kendaraan -Strelisasi dan Baricade Area

1 -Siapkan FLAGman untuk Control lalu lalang orang


-Pasang Choke Wheel saat kendaraan sedang parkir
-Pastikan Mesin Kendaraan Mati pada saat Lifting