Anda di halaman 1dari 5

Jelebu Musa Haven

Costing Projek Pisang

Cost/unit
No. Date Progress Item UNIT Total
(RM)
1 1/23/2021 Mesin Rumput Upah pekerja 40 1 40
Minyak Petrol 8 1 8
2 1/28/2021 Tebang pokok Minyak Petrol 8 1 8
3 2/20/2021 Tolak tanah Upah JCB 500 3 1500
4 2/25/2021 Plough & Rotor Upah Traktor 200 1 200
5 Pagar Eletrik Set Letrik 1000 1 1000
Bateri 250 1 250
Paip Condute 2.9 100 290
Pagar Kebun Tiang pagar 0
Zink/Net 0
Kayu 0
Kunci 0
Gazebo Rehat Tiang 20 4 80
Atap Zink 0 10 0
kayu kocai 50 2 100
Skrew 0 0
Anak Pokok Pisang Tanduk 300 1.5 450
Pisang Nangka 150 1.5 225
Pisang Berangan 200 1.5 300
Pisang Emas 200 1.5 300
Baja Baja NPK (daun)300g 120 6 720
Baja Kalium (Buah)300g 120 6 720
Baja Organik Senandung 0
Racun Pam Racun (1tong) 250 1 250
Kelengkapan Kebun 2T(4L) 50 1 50
Mesin Rumput 450 1 450
Minyak 20 6 120
Tong Air 200 1 200
Paip Irigasi 120 3 360
Sewa & Cukai Sewa 500 1 500
Cukai Tanah 0
0
0
0
0
0
0
0
0
0
TOTAL COST 8121
1275
Jelebu Musa Haven
Sale Projek Pisang

Cost/unit
No. Date Item Kg Total
(RM)
1 Tanduk 3 0
Emas 2 0
Nangka 2 0
Tanduk 3 0
Emas 2 0
Nangka 2 0
Tanduk 3 0
Emas 2 0
Nangka 2 0
Tanduk 3 0
Emas 2 0
Nangka 2 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL COST 0

Anda mungkin juga menyukai