b = 2 * h = 2 * 40 = 26.67 cm
3 3 ∽ 30 cm
Wu = 1.4 DL + 1.6 LL
= 1.4 * 1435.50 + 1.6 * 0
= 2009.7 kg/m
Tulangan tumpuan :
Mu = 5959.25 kg-m = 59592500 N-mm (perhitungan SAP 2000 V.14.0.0)
Mn = Mu = 59592500 = 74490625 N-mm
ø 0.8
Rn = Mn = 74490625 = 74490625 = 1.987
b x d2 300 x 354 2 37488675
m = fy = 390 = 18.35
0.85 x fc' 0.85 x 25
1 2 Rn m
1 1
m fy
= 1 2 x 1.987 x 18.35
1 - 1 -
18.35 390
= 0.00536
Cek rasio penulangan :
ρmin = 1.4 = 1.4 = 0.00359
fy 390
0 ,85 fc 600
b
1
600 fy
fy
a 1.x
Mn 5-D13 As
= . fy d = As . fy d
2 2
= 664.00 * 390 354 - 0.85 * 47.79
2
= 86282730.0705882 N-mm
Mn perlu = 74490625 N-mm
Mn 5-D13 = 86282730.0705882 N-mm ≥ Mn perlu = 74490625 N-mm (OK)
300 - 60 - 20 - 65 ≥ 25 mm
4
38.75 mm ≥ 25 mm OK
Cek lebar perlu balok
#Tulangan 5D13 dapat dipasang satu baris
(2*sb) + (2*Tul. Sengkang) + (n*Tul.Utama) + ((n-1)*Tul Utama) ≤ B
60 + 20 + 65 + 52 ≤ 300 mm
197 mm ≤ 300 mm OK
Tulangan lapangan :
Mu = 2979.63 kg-m = 29796300 N-mm (perhitungan SAP 2000 V.14.0.0)
Mn = Mu = 29796300 = 37245375 N-mm
ø 0.8
Rn = Mn = 37245375 = 37245375 = 0.994
b x d2 300 x 354 2 37488675
m = fy = 390 = 18.35
0.85 x fc' 0.85 x 25
1 2 Rn m
1 1
m fy
= 1 2 x 0.994 x 18.35
1 - 1 -
18.35 390
= 0.00261
a 1.x
Mn 3-D13 As
= . fy d = As . fy d
2 2
= 398.00 * 390 354 - 0.85 * 25.58
2
= 53183067.7310924 N-mm
Mn perlu = 37245375 N-mm
Mn 3-D13 = 53183067.7310924 N-mm ≥ Mn perlu = 37245375 N-mm (OK)
Cek spasi antar tulangan utama balok
#Tulangan 3D13 dapat dipasang satu baris
B - (2*sb) - (2*Tul. Sengkang) - (n*Tul.Utama) ≥ 25 mm
(n-1)
300 - 60 - 20 - 39 ≥ 25 mm
2
90.5 mm ≥ 25 mm OK
60 + 20 + 39 + 26 ≤ 300 mm
145 mm ≤ 300 mm OK
Vu > ØVc
71511.00 > 66281.25 → hitung Vs
Dipilih Smax = 78 mm
S Hitung = 3105.67 mm
S Max = 78 mm
S Pasang = 75 mm
Direncanakan :
Pondasi tiang pancang lingkaran
Diameter tiang pancang (D) = 30 cm
Kedalaman tiang pancang = 15 m
fc = 25 Mpa = 250 kg/cm2
fy= 360 Mpa
PERHITUNGAN BERDASARKAN HASIL SONDIR
Qult = Qp + Qs
ket : Qult = daya dukung pondasi tiang pancang
Qp = daya dukung ujung tiang pancang
Qs = daya dukung lekatan tiang pancang
Menentukan QP
QP = qc * Ap (Pondasi Tiang Pancang. Sardjono hal. 33)
F
ket : Ap = luas penampang ujung tiang
F = Angka keamanan 3
qc = harga conus rata-rata 4D di bawah ujung
tiang dan 8D diatas ujung tiang
4D di bawah ujung tiang
= 4 x 0.3 = 1.2 15,00 + 1,2 = 16.2 m
8D di atas ujung tiang
= 8 x 0.3 = 2.4 15,00 - 2,4 = 12.6 m
Berati harga rata-rata konus antara kedalaman 10,8 m sampai 15,6 m
Kedalaman Nilai Conus
No
m kg/cm2 qc = 1624
1 12.6 60 19
2 12.8 70 = 85.47 kg/cm2
3 13 75
4 13.2 70 Ap = πr2
5 13.4 80 = 3.14 x 15 2
6 13.6 75 = 706.5 cm 2
7 13.8 70
8 14 80 Qp = qc x Ap
9 14.2 80 F
10 14.4 80
11 14.6 85 = 85.47 x 706.5
12 14.8 75 3
13 15 85 = 20129.053 kg
14 15.2 90 = 20.129 ton
15 15.4 100
16 15.6 105
17 15.8 114
18 16 115
19 16.2 115
Σ 1624
Sumber : Lab. Mektan Kampus ITS, Surabaya
Menentukan QS
Qs = Jhp x p (Pondasi Tiang Pancang. Sardjono hal. 43)
F
ket : JHP = Jumlah hambatan pelekat
F = Angka keamanan
P = Keliling tiang pancang
JHP = yang ditinjau 15,00 m = 1318 kg/cm2 (data sondir)
F = 5
P = Keliling tiang = 2πr = 2 x 3,14 x 0,15
= 0.942 m
Jadi : Qs = Jhp x p = 1318 x 0.942 = 248.311 kg
F 5 = 0.2483 ton
syarat jarak antar tiang (Pondasi Tiang Pancang. Sardjono hal. 51-67)
s ≥ 2.5D = 2.5 * 0.3 = 0.75
s ≥ 2D = 2 * 0.3 = 0.6
s ≤ 1,57.D.m.n = 1.57 * 0.3 * 2 * 3
m+n-2 2 + 3 - 2
= 0.942
dipakai s = 750 mm
dx = 500 - 40 - ( 0.5 * 22 )
= 449 mm
dy = 500 - 40 - 22 - ( 0.5 * 22 )
= 427 mm
Tulangan arah X :
Mn = Mu = 16046880 = 20058600 N-mm
Φ 0.8
Rn = Mn = 20058600 = 20058600 = 0.050
b x d2 2000 x 449 2 403202000
m = fy = 360 = 16.94
0.85 x fc' 0.85 x 25
1 2 Rn m
1 1
m fy
= 1 2 x 0.050 x 16.94
1 - 1 -
16.94 360
= 0.00014
Cek rasio penulangan :
ρmin = 1.4 = 1.4 = 0.00389
fy 360
0 ,85 fc 600
b 1
fy 600 fy
a 1.x
Mn 12-D22 = As . fy d = As . fy d
2 2
= 4562.00 * 360 449 - 0.81 * 34.08
2
= 714736007.9 N-mm
Mn perlu = 20058600 N-mm
Mn 12-D22 = 714736007.9 N-mm ≥ Mn perlu = 20058600 N-mm (OK)
Tulangan arah Y :
Mn = Mu = 16046880 = 20058600 N-mm
Φ 0.8
Rn = Mn = 20058600 = 20058600 = 0.055
bxd 2
2000 x 427 2 364658000
m = fy = 360 = 15.13
0.85 x fc' 0.85 x 28
1 2 Rn m
1 1
m fy
= 1 2 x 0.055 x 15.13
1 - 1 -
15.13 360
= 0.00015
Cek rasio penulangan :
ρmin = 1.4 = 1.4 = 0.00389
fy 360
0 ,85 fc 600
b 1
fy 600 fy
a 1.x
Mn 12-D22 = As . fy d = As . fy d
2 2
= 4562.00 * 360 427 - 0.81 * 42.60
2
= 672938549.8 N-mm
Mn perlu = 20058600 N-mm
Mn 12-D22 = 672938549.8 N-mm ≥ Mn perlu = 20058600 N-mm (OK)
INSTITUT TEKNOLOGI SEPULUH NOVEMBER
TEKNIK SIPIL DAN PERENCANAAN
LABORATORIUM MEKANIKA TANAH
Alamat : Jalan Raya ITS, Keputih, Sukolilo, Surabaya, Jawa Timur, 60111
Proyek : Pembangunan Gedung Dishub Provinsi Jawa Timur Type sondir : Sondir darat
Lokasi : Jl. Frontage Ahmad Yani, Surabaya Dikerjakan oleh : Silpeter
Elevasi Muka air : 2.5 m Tanggal : 30 Desember 2010
2.6 40.0 70
2.8 70.0 80 10
3 40.0 84
3.2 70.0 90 11
3.4 40.0 94
12
3.6 40.0 100
3.8 60.0 106 13
4 60.0 112
4.2 50.0 118 14
4.4 50.0 122
4.6 50.0 130 15
4.8 60.0 136
16
5 50.0 140
5.2 40.0 144 17
5.4 70.0 152
5.6 80.0 160 18
5.8 50.0 164
6 60.0 170 19
6.2 40.0 176
20
6.4 40.0 184
0 500 1000 1500 2000 2500 3000
6.6 50.0 192 Jumlah Hambatan Lekat (Kg/cm)
6.8 50.0 198
Series5 Grafik Conus
19
20
0 500 1000 1500 2000 2500 3000
Jumlah Hambatan Lekat (Kg/cm)