̅=( 〖 Ʃ𝐴 〗 _i 𝑦_𝑖)/(Ʃ𝐴_𝑖 ) =
(𝑦𝑡) ̅=H−
(𝑦𝑏) ̅ =
𝑧_(𝑏,𝑚_𝑖 𝑛)=(𝑀𝑡−𝑅𝑀_
DIMENSI PENAMPANG PCI H170 f'c
H 1700 mm f'ci
hf1 200 mm
hf2 120 mm
h web 880 mm
hf3 250 mm
hf4 250 mm
Wa 800 mm
Wa 1 300 mm
t web 200 mm
Wb 700 mm
Wb 1 250 mm
d 150 mm
L 30 m
R 0.75
Section Properties
b h Ai Yi
Segmen
mm mm mm² mm
1 800 200 160000 1600
2 300 120 18000 1460
3 300 120 18000 1460
4 200 1250 250000 875
5 250 250 31250 333.333
6 250 250 31250 333.333
7 700 250 175000 125
ƩAi 683500 ƩAi.yi
866.030 mm
Momen Inersia
δYi =(𝑦𝑏) ̅
Yi- Ai δYi² Ii
Segmen
mm mm4 mm4
1 766.030 93888371724 533333333.33
2 626.030 7054449426.84 14400000
3 626.030 7054449426.84 14400000
4 41.030 420870077.379 32552083333
5 -500.636 7832401099.45 108506944.44
6 -500.636 7832401099.45 108506944.44
7 -708.970 87961671966 911458333.33
212044614820 34242688889
Zb=I𝑥/(𝑦𝑏) ̅
295319224.384109 mm³
αt=Ʃ𝐴𝑖/𝑍𝑡
0.00240341933081291 mmˉ¹
αb=Ʃ𝐴𝑖/𝑍𝑏
0.002314444653664 mmˉ¹
Kombinasi Pembebanan
γbeton = 25 kN/m³
PENGECEKAN PENAMPANG
𝑧_(𝑏,𝑚_𝑖 𝑛)=(𝑀𝑡−𝑅𝑀_0)/(𝐹_𝑡−𝑅𝐹𝑐ⅈ)
134042946 mm³
AiYi
mm³
256000000
26280000
26280000
218750000
10416666.667
10416666.667
21875000
570018333.33
683.970 mm
Ukuran Pipa