2,151,458
3,016 77,230
10,000 40,000
117,230
273,750 821,250
150,000 5,400
826,650
273,750 204,327
83,600 250,800
455,127
B BAHAN
1 Besi Beton (Polos/Ulir) kg 1.050 -
2 Kawat Beton kg 0.011 -
TOTAL BAHAN -
C PERALATAN
1 Mesin potong besi Hari 0.0001 10,000 1
TOTAL PERALATAN 1
B BAHAN
1 Multiflex 12mm lbr 0.200 150,000 30,000
2 Kaso 5/7 m3 0.020 1,800,000 36,000
3 Paku 5cm dan 7cm kg 0.250 22,000 5,500
4 Minyak Bekisting ltr 0.200 15,000 3,000
TOTAL BAHAN 74,500
C PERALATAN
TOTAL PERALATAN -
B BAHAN
1 PC kg 326 1,500 489,000
2 Pasir Beton kg 760 110 83,600
3 Kerikil kg 1,029 190 195,510
4 Air Ltr 215 75 16,125
TOTAL BAHAN 784,235
C PERALATAN
Molen 0,35 m3 Hari 0.200 600,000 120,000
TOTAL PERALATAN 120,000
B BAHAN
-
TOTAL BAHAN -
C PERALATAN
TOTAL PERALATAN -
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN 69,000
OVERHEAD DAN PROFIT 50% 34,500
HARGA SATUAN PEKERJAAN 103,500
By WIKA
By WIKA
1400
107.1429
185.1852
60
JUMLAH
No KABUPATEN/KOTA KECAMATAN DESA/KEL
TITIK
TOTAL 150
METODE
PENGECORAN
PRECAST INSITU
2 1 3
-
-
6 6
-
-
-
-
-
-
-
-
-
3 3
6 6
-
2 2
-
-
-
-
-
-
7 13 20