(Rp.)
UPAH
1 Pekerja OH 150,000
2 Tukang OH 160,000
3 Kepala Tujang OH 168,000
4 Mandor OH 179,200
PERSIAPAN
5 Papan Nama LS 300,000
6 Pengukuran dan Bowplank LS 500,000
7 Laporan dan As Built Drawing LS 2,500,000
8 Keselamatan dan Kesehatan Kerja (K3) LS 500,000
BAHAN
8 Pasir Urug m3 233,300
9 Abu Batu m3 338,000
10 Pasir Pasang m3 280,000
11 Pasir Beton m3 284,600
12 Paving blok t = 6 cm Holywood m2 80,000
13 Paving blok t = 8 cm Holywood m2 100,000
14 Kansteen uk. 40 x 20 x 10 BH 26,500
15 Cover U-Ditch 600x600 122,600
15 U-Ditch 600x600 BH 890,000
Box Culvert 600 x 600 Light
16 Duty Beton Elemindo BH 1,393,200
Perkasa
ALAT
15 Sewa Stemper (Alat Pemadat Paving Block) Unit/Hari 300,000
18 Molen (Concrete Mixer 0.35 Unit/Hari 260,100
m3)
PROGRAM :
KEGIATAN :
SUB KEGIATAN :
HARGA TERKINI PEKERJAAN :
HARGA TERKINI LOKASI :
HARGA TERKINI SUMBER DANA :
HARGA TERKINI
LS
LS
LS
LS
SSH
SSH
SSH
SSH
AHSP
Admin Holywood
AHSP
SSH
SSH
SSH
SSH
SSH
SSH
SSH
SSH
SSH
SSH
SSH