Kabupaten : Bandung Barat lenis Prasarana : Peningkata

Kecamatan : Cikalongwetan
Take of Sheet Nama Kegiatan : Lapen
Desa : Cipada Ukuran : 900m x 2.5

Ukuran Jalan
Rehab Lapen ( P -P )
0 3
Panjang (P) = m
Lebar badan jln m
Lebar jalan (l) = m
p x l (L) = - m2 (i)

Lapen Baru ( P 3 - P 18 )
Panjang (P) = 500 m
Lebar badan jln 3.5 m
Lebar jalan (l) = 2.5 m
p x l (L) = 1,250.0 m2 (ii)
Persiapan Lahan
Total Panjang (P) = 500 m (i) + (ii) L$adan Jalan = P x l
Total Luas (L) = 1,250 (i(
m2 (i) + (ii) = 500 x 3.5 = 1,750 m2
Pembersihan = 0.1
HOK/m2 Pekerja = 0.10 x 1,750 @ 175.0 HOK

Detail Lapis Penetrasi (Lapen) Kebutuhan Bahan

Reha$ Vol. Bt Pecah 3/5= L x kebutuhan


= L x 0.033
= 33.00 m ( *olume antar patok (
3

1,250 x 0.051 @ 63.8 m3


Vol. Bt Pecah 2/3=
@ 63.75 m3 63.75 - 33.
= 30.75
m3

Baru Vol. Bt Pecah 1/2 = 1,250 x 0.016 @ 20.0 m3

@ 3
Vol. A$u Batu = 1,250 x 0.009 11.3 m

Vol. Aspal = L x kebutuhan


Aspal u/ lapen = 1,250 x 2.5
= 3,125 kg @20.2 drum @

Bt.Pecah 3/5 = 0.033 m3/m2 Aspal u/ tack coat = - x 0.3 (i)


Bt.Pecah 2/3 = 0.018 m3/m2 = - kg @ - drum @
Bt.Pecah 2/3+3/5 0.051 m3/m2
Bt.Pecah 1/2 = 0.016 m3/m2 Aspal u/ prime coat = 1,250 x 0.5 (ii)
Abu Batu = 0.009 m3/m2 = 625 kg @ #.0 drum @
2.5 kg/m
2
Aspal Lapen = 3
Prime Coat = 0.5 kg/m2 kg/m2 Total Vol. Aspal = 3'750 kg @ 2(.2 drum @
Tack Coat = 0.3 kg/m3
Minyak Bakar = 0.013 ltr/m2 Vol. Bt Belah 15/20 = L x 0.2 x 1.3
Kayu Bakar = 0.5 m /drum
3
= 3.90 m3 ( *olume antar patok (
faktor loss batu = 1.3
Vol. Minyak Bakar
= L x kebutuhan
= 1,250 x 0.013 @ 1).)3 liter

Vol. Kayu Bakar


= 24.2 x 0.5 @ 12.097 m3

Tanggal Survey : Dibuat Oleh :

Kabupaten : Bandung Barat lenis Prasarana : Peningkata


Kecamatan : Cikalongwetan
Take of Sheet Nama Kegiatan : Lapen
Desa : Cipada Ukuran : 900m x 2.5

Kebutuhan *lat
Kapasitas Mesin Gilas 8-10t : Mesin Gilas L m2
=
P'aspalan 4-5 lintasan = 450 m2/hari 450 m2/hari

1 hari = 5 jam = 1,250 @ 2.+ hari


450

Kebutuhan Tenaga Kerja (konstruksi)


Kemampuan tenaga kerja :
Pecah Batu : 1.33 HOK/m3 Pekerja pecah $t.10/15 = 1.33 x 0.2 Vol. Batu Blh
= 1.33 x 0.2 x 3.90
@ 1.0 HOK

Pasang Batu : 0.25 HOK/m2 Pekerja t.10/15


0.25 x L
pasng $
=
0.25 x 1,250 x 1%
=
@ 2.1 HOK

Pekerja = L x kemampuan t.k.


paspalan

Pekerja : 0.09 HOK/m2 = 1,250 x 0.090


@ 112.5 +OK

S Pekerja konstruksi = 1.0 + 2.1 + 112.5


@ 115.) +OK

Tukang : 0.004 HOK/m2


Tukang = 1,250 x 0.004
@ 5.0 +OK
Tanggal Survey : Dibuat Oleh :
Jalan

00

55kg

55kg

55kg

55kg